Building paint spec
- 格式:doc
- 大小:56.50 KB
- 文档页数:8
求建筑设计类专业英语词汇1. Architectural design - 建筑设计2. Blueprint - 蓝图3. Sketch - 素描4. Drafting - 草图5. Floor plan - 平面图6. Elevation - 立面图7. Section - 剖面图8. Construction documents - 建筑施工图纸9. Structural design - 结构设计10. Building materials - 建筑材料11. Foundation - 地基12. Structural beams - 结构梁13. Roofing - 屋顶材料14. Interior design - 室内设计15. Spatial planning - 空间规划16. Lighting design - 照明设计17. Furniture arrangement - 家具布置18. Sustainable design - 可持续设计19. Energy efficiency - 能源效率20. Green building - 绿色建筑21. Urban planning - 城市规划22. Zoning - 分区23. Land use - 土地利用24. Site analysis - 场地分析25. Building codes - 建筑规范26. Accessibility - 无障碍性设计27. Fire safety - 防火安全28. Structural integrity - 结构完整性29. Construction management - 建筑工程管理30. Project timeline - 项目进度表31. Cost estimation - 成本估算32. Quality control - 质量控制33. Building permit - 建筑许可34. Construction site - 建筑工地35. Exterior façade - 建筑外立面36. Sustainability - 可持续性37. Aesthetics - 美学38. Functionality - 功能性39. Material selection - 材料选择40. Building regulations - 建筑法规。
RENDAPANEL® building panels are ‘ready-to-render’ pre-coated, mesh reinforced expanded polystyrene sheet panels manufactured and supplied by Focal Point Pty Ltd. RENDAPANEL® building panels are available in single or double mesh reinforced multi thickness 40mm, 75mm or100mm panel configurations designed for external wall cladding installations in accordance with Focal Point Pty Ltd External Insulated Cladding Systems Specifications.This coating recommendation does not constitute Dulux endorsement of this/any walling or cladding system or the suitability of building envelope / building system to meet the specific requirements of a given project.Users of this recommendation will satisfy themselves of the suitability of this substrate /coating guide / advice, relevant to their specific project long term requirements. In all cases Building System Design must conform to relevant Local / Building Codes or regulations and be in accordance with substrate supplier’s recommendations.Users must make their own determinations as to the suitability of this building system/ material relevant to their specific requirements. Design & InstallationFrame detail and panel fixing must comply with relevant Building Codes and be in strict accordance with the supplier / manufacturer’s External Insulated Cladding specifications. It is the responsibility of the Builder, Project Manager and/or Panel installer to ensure all these panels and substrate details are installed in accordance with substrate supplier recommendations, project specific engineering specification and relevant building codes prior to commencement of any coatings applications.-refer RENDAPANEL® External Insulated Cladding Technical Specifications for full design specificationsWith all cladding systems Dulux recommends that specific design advice be sought with respect to the incorporation of suitable moisture management systems. Best Practice design should incorporate a cavity drainage design and or vapour permeable sarking, suitable water diversion flashing and sealing systems relevant to the specific façade design and exposure location..General PreparationSurface must be clean and sound free of dirt, mud, grease oils or any other surface contamination. Exposed raw Expanded Polystyrene (EPS) surfaces should be sound and unaffected by weathering or UV deterioration.Good Building practice provides for expansion (movement) joints at (max.) 3M height & 6M wide intervals and at all building weak points e.g. in line with openings (window / doors), horizontally between floor levels, and at all interfaces of different building construction materials as defined by supplier / manufacturer’s and the responsible Building Engineer. The placement and correct installation of control joints is the responsibility of the Installer / Builder / Engineer relative to the construction design. Use industry approved construction grade Poly Urethane (PU) ‘paintable’- flexible Mastic as detailed by the PU manufacturer’s specifications.In accordance with RENDAPANEL® specifications, installation of 145 -160 g/m2 (minimum), 5 x 5 mm aperture, Alkali Resistant reinforcement mesh across all panel joints, raw EPS surfaces, at external and internal corners, edge reveals, and at diagonals across corners of all window and door openings if no movement joints are installed.- refer RENDAPANEL®External Insulated Cladding Technical Data for full design specification.Joint Reinforcement mesh will be imbedded in a basecoat of RenderWall P400, prior to installation of a final levelling application of Dulux RenderWall P400. - r efer Coating System section for mix instructions and installation guidelinesIndustry Best practice recommends a full mesh application using Reinforcement Mesh that is suitably accredited Alkali Resistant Fibreglass with a nominal 5mm X 5mm weave and a mass weight of not less than 165 gsm/M2.All reinforcing mesh is overlapped by a minimum of 100mm on installation.The installation of additional strips across joints, external and internal corners, edge reveals, and at diagonals across corners of all window and door openings is also recommended.Avoid the finishing of these Claddings Systems with dark colours - these may raise the surface temperature of the EPS and damage the cladding system. Use colours with a LRV greater than 35% or consult Dulux on the potential to use DULUX InfraCOOL Heat Reflective Coatings that will keep the surface cooler.Project Duspec DULUX AcraTex RenderWall P400 Levelling & Texture Finishing System for Rendapanel.Project ID Principle Focal Point Duspec no. Page no. 1 of 3Issue Prepared By Issue 3 Prepared By Shane LangkildeDate Approved By Date 20.10.2015 Approved ByDISCLAIMER:Any advice, recommendation, information, assistance or service provided by any of the divisions of DuluxGroup in relation to goods manufactured by it or their use and application is given in good faith and is believed by DuluxGroup to be appropriate and reliable. However, any advice, recommendation, information, assistance or service provided by DuluxGroup is provided without liability or responsibility PROVIDED THAT the foregoing shall not exclude, limit, restrict or modify the right entitlements and remedies conferred upon any person or the liabilities imposed upon DuluxGroup by any condition or warranty implied by Commonwealth, State or Territory Act or ordinance void or prohibiting such exclusion limitation or modification. Coating systems can be expected to perform as indicated on the DuspecBasecoat & Reinforcement Mesh – Surface Levelling Data Sheet Base Layer Min.Cover P400 RENDERWALL BASE COAT WITH EXSULITE REINFORCEMENT MESHIn a clean 15 litre pail add 3.5-4.0 litres of clean water slowly add RenderWall P400while stirring till a cream trowel able paste is formed.Apply the basecoat layer of RenderWall P400 by stainless steel trowel to fully cover the EPS surface with a 2-3 mm (min.) basecoat. Whilst wet embed the Reinforcing mesh into the RenderWall P400 and overlapped all edges by a minimum of 100mm.Note: The mesh is not to be pushed through the wet render onto the face of the Exsulite Panel. AUDA1596RenderWallP400(1.7kg/m2/mm)Assuming no loss+Alkali resistantFibre Glassmesh165 gm weight(minimum.)5 x 5 mmaperture2 -3mmwet on wetDULUX AcraTex RenderWall P400 Finishing coatApply finishing coat of RenderWall P400 basecoat mixture to completely cover andencapsulate the mesh with a minimum of 2mm cover. Finish the RenderWall P400 base coat by lightly scratching the surface to provide a surface “key” for subsequent levelling or texture coats.Note: A minimum 4mm-5mm cover of RenderWall P400 to the EPS Panel once dried.AUDA1596RenderWallP4001.7kg/m2/mm)Assuming no loss3 mm16 hoursWHERE ADDITIONAL IMPACT RESISTANCE & OPTIONAL LEVELLING COAT IS REQUIRED Where additional impact resistance is required apply and embed an additional Exsulite reinforcement mesh layer coat of P400 RenderWall as specified or directedAdd RenderWall P400 to fresh water to form trowel able paste. Apply by hawk and trowel or render pump over the Base Coat application. Screed and float level Finish by polystyrene or wood float to a suitable level finish for subsequent Texture Coating AUDA1596RenderWallP4002-3mm16 hours Data Sheet. Application rate RecoatPRIME COAT : DULUX AcraTex – AcraPrime 501/1 L/Shade 194-20809 Optional : but recommended during hot weatherThe use of AcraPrime consolidates and conditions the surface and enhances subsequent coating application and total system durability.Apply by conventional roller method evenly over the surface AUDA044110 sq mper litre4 hoursTEXTURE COAT : DULUX AcraTex – Coventry Coarse L/Shade 194-85944Apply with Hawk & Trowel evenly over surface to the thickness of the largest particles. Follow up with a light ‘floating’ process to level out the product using red plastic trowel/float. AUDA10650.8 sq m2per litre8 hoursSHIELDCOAT : DULUX AcraTex AcraShield Matt L/Shade 194-X0100 (HiOP) Apply with a medium nap roller over the surface ensuring a wet edge is maintained over theapplication area.Dulux recommends 2 coats applications for even coverage to minimising “cutting in” and “lap mark” effects. Where 2 coats are applied, dilute the first coat with 10% water.AUDA14095 m2per Litreper Coat4 hoursProtectfrom rainin first 16hoursSHIELDCOAT : DULUX AcraTex AcraShield Matt L/Shade 194-X0100 (HiOP) Apply with a medium nap roller over the surface ensuring a wet edge is maintained over theapplication area.Dulux recommends 2 coats applications for even coverage to minimising “cutting in” and “lap mark” effects. AUDA14095 m2per Litreper CoatProtectfrom rainin first 16hoursProject Duspec DULUX AcraTex RenderWall P400 Levelling & Texture Finishing System for Rendapanel.Project ID Principle Focal Point Duspec no. Page no. 2 of 3Issue Prepared By Issue 3 Prepared By Shane LangkildeDate Approved By Date 20.10.2015 Approved ByDISCLAIMER:Any advice, recommendation, information, assistance or service provided by any of the divisions of DuluxGroup in relation to goods manufactured by it or their use and application is given in good faith and is believed by DuluxGroup to be appropriate and reliable. However, any advice, recommendation, information, assistance or service provided by DuluxGroup is provided without liability or responsibility PROVIDED THAT the foregoing shall not exclude, limit, restrict or modify the right entitlements and remedies conferred upon any person or the liabilities imposed upon DuluxGroup by any condition or warranty implied by Commonwealth, State or Territory Act or ordinance void or prohibiting such exclusion limitation or modification. Coating systems can be expected to perform as indicated on the DuspecCoatings should be applied in full accordance with relative product Technical and Application Data Sheets. This system is recommended where panel misalignment is NOT greater than 4mm.Practical spreading rates will vary from quoted theoretical figures depending on substrate porosity, surface roughness, overspray losses, application methods and environmental conditions (e.g. wind).All preparation and painting must conform to AS2311: The Painting of Buildings:-Plan for application to shaded surfaces, avoid hot windy condition or where rain is likely.Do not apply products in direct sunlight or if the Relative Humidity is above 85% or temperature is within 3°C of Dew Point orwhere the surface temperature is greater than 30°C or below 10°C, or likely to fall below 10°C during the application or dryingperiod. Allow longer times under cool, moist, or still conditions and or when applied at high film builds. Protect from dew, rain andfrost for 48 hours when applying at the recommended spread rate.Avoid application in hot, windy conditions or on hot surfaces cool the surface by hosing with water and paint the cool dampsurface.When using Bright Reds, Oranges, Blues and Yellows or where very light colours are applied over highly contrasting colours anextra coat maybe required. Application techniques should be adjusted to achieve the recommended DFT and finishing standard.To avoid "Picture Framing" of ‘high build’ texture topcoats use only a ‘wet on wet’ cutting-in & coating technique incorporatingmasking taping of the perimeter of the application section.When the Applicator is preparing the site sample for approval he should advise the Project Superintendent if the substratecondition is not of sufficient standard to produce the specified finish. At commencement of coating system application to thesubstrate it shall be deemed that the Applicator has certified that the surface which it is to be applied to is fit to receive thespecified coating(s) system.COLOUR -It is recommended to avoid Dark colours on critical large wall elements where the resultant higher surfacetemperatures generated may increase thermal expansion and contraction stress - Use colours with a Light Reflectance Value(LRV) greater than 35% &/or consult Dulux regarding the potential to use InfraCOOL Heat Reflective Coatings that may keepsurfaces cooler.LOCATION - The coastal area is considered a marine environment and as such salt potentially can shorten the life of the coating systems. Care needs to be taken to wash down all areas twice. Once to remove surface contaminants, and raise salts to thesurface and then secondly to remove these salts. Due to the locality, Weather conditions and lag time between applications ofthe coating system it may require the need to wash again, between coats.GLANCING LIGHT - Joints and panel deformation may be clearly evident under glancing light, casting visible shadows of theminute and uneven projections of the joints. Glancing light is light that is nearly parallel to the surface of the wall and casts visible shadows and uneven projections of the joints. Just like rendered masonry/ Jointed system any uneven projections will behighlighted and as such are outside the control / scope of this specification.The dynamics of the substrate is outside the control of Dulux Australia and as such joint deformation or cracking is excluded from warranty terms. Refer warranty document for full terms and conditions.This specification is to be read in conjunction with DULUX product data sheetsWhen using this specification, the Installer shall maintain adequate records of proof or purchase and use of Dulux AcraTexProductsA DULUX warranty can only be provided when the full AcraTex system is applied by a DULUX AcraTex trained applicator, according to specification at the specified spreading rates, & to the surface preparation details described in the DULUX AcraTex Specification Manual. Project Duspec DULUX AcraTex RenderWall P400 Levelling & Texture Finishing System for Rendapanel.Project ID Principle Focal Point Duspec no. Page no. 3 of 3Issue Prepared By Issue 3 Prepared By Shane LangkildeDate Approved By Date 20.10.2015 Approved ByDISCLAIMER:Any advice, recommendation, information, assistance or service provided by any of the divisions of DuluxGroup in relation to goods manufactured by it or their use and application is given in good faith and is believed by DuluxGroup to be appropriate and reliable. However, any advice, recommendation, information, assistance or service provided by DuluxGroup is provided without liability or responsibility PROVIDED THAT the foregoing shall not exclude, limit, restrict or modify the right entitlements and remedies conferred upon any person or the liabilities imposed upon DuluxGroup by any condition or warranty implied by Commonwealth, State or Territory Act or ordinance void or prohibiting such exclusion limitation or modification. Coating systems can be expected to perform as indicated on the Duspec。
粤语口语常用词副词、虚词啱啱,刚刚,刚好,啱先,刚才,正话,刚才,凑啱,恰好,先至,才,就嚟,就要,经已,已经,卒之,终于,终归,终究,终须,终究,好,很,仲,还,鬼咁,那么,十分之,十分,枀之,枀,相当之,相当,非常之,非常,稍为,稍微,净,光,只有,净喺,只是,光是,差唔多,差不多,连气,一连,亦,也,又试,又,但凡,凡是,逢喺,凡是,咪,别,咪住,先别,唔使,不用,唔好,不好,唔通,难道,实,一定,奉旨,肯定,查实,其实,是必,必定,梗,肯定,一于,就,表示下定决心去做某事,千祈,千万,专登,专门,故意,特登,特地,好在,幸亏,直头,直接,直情,简直,根本,吋埋,呾,吋,一喺,要么,事关,因为,固然之,固然,固之然,固然,之不过,不过,即管,尽管,唔单只,不但,不特止,不仅仅,定,还是,抑或,或者,于是乎,于是,然之后,然后,吋,呾,为咗,为了,啫,罢了,之嘛,罢了,啩,吧,指代、人物我,我,你,你,佢,他,我哋,我们,你哋,你们,佢哋,他们,人哋,人家,呢度,这里,嗰度,那里,边度,哪里,呢,这,嗰,那,咁样,这样、那样,点解,为什么,第日,改天,第次,下次,乜嘢,什么,乜,什么,几多,多少,边,哪,咁好,这么好,阿爸,爸爸,阿妈,妈妈,阿哥,哥哥,阿嫂,嫂嫂,阿爷,爷爷,阿嫲,奶奶,阿公,外公,阿婆,外婆、老婆婆,阿叔,叔叔,老豆,爸爸,老妈子,妈妈,家姐,姐姐,大佬,哥哥,细佬,弟弟,心抱,媳妇,舅父,舅舅,孙,孙子,仔仔,儿子,女女,女儿,契爷,干爹,契仔,干儿子,寡佬,单身汉,仔,儿子,女,女儿,后底乸,继母,太子爷,少东家,should be tightened, no loose, Terminal Board wiring should be one oneach side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of galvanized steel pipe, tube ends without burrs, smooth. 7.7.2 pipe does not allow bending, bending the bendradius should be ? 4 times times the outer diameter of the tube in.7.7.3 ellipticity of a bent tube, pipe diameter ? 60mm, not >8%,diameter >760mm, not >6%. 7.7.4 making cables buried piping application root production, growing where interface is required, only straight pipe, only the wire port connections, welded connections are not allowed.7.7.5 service sleeve should have a good grounding. 7.7.6 cable trays installation, burrs and dirt and corrosion treatment should be carried out, install the bridge ... 7.8.1.7 piping and piping, equipment and equipment or piping and other equipment shall have sufficient expansion gap in hot situations. 7.8.1.8 metal temperature of the insulating layer (hot) = shell-wall temperature of environment temperature ? 40 ? c.7.8.2 paint 7.8.2.l paint of equipment and pipelines should have atleast a primer (red paint) and finish. 7.8.2.2 paint appearance color uniform, without paint, rust, flaking, wrinkles, flow marks, scum, paint particles and visible brush marks. 7.8.2.3 interlayer should be tightand without stratification. 7.8.2.4 pipelines asphalt, fiber glassfabric corrosion, external appearance should never show surrounded by glass fiber cloth uniform, dense, painted pitch inspection should be no delamination, cavitation, homogeneity of asphalt coating, brushing each layer thickness in accordance with design requirements. Standard 7.9 7.9structure placement process. 1 fair-faced concrete is a concrete surface without any decoration, structure appearance quality of concrete structure that is able to display strength and aesthetic perception of quality standards. Construction technology requirements are as follows: template template Panel selection and processing require plate high strength, good toughness and契弟,王八蛋,老坑,老头,老嘢,老东西,老家伙,老姑婆,老处女,基老,男吋性恋者,老细,老板,老千,骗子,后生仔,年轻小伙子,后生女,年轻姑娘,靓仔,漂亮的小伙子,靓女,漂亮的姑娘,细路,小孩,细蚊仔,小孩,臊虾,婴儿,马仔,打手,事头婆,老板娘,工作、交际返工,上班,收工,下班,揾食,谋生,人工,工钱,出粮,发工资,搞掂,搞妥当,搞弯,弄糟糕,就手,顺利,捱夜,熬夜,空姐,飞机女服务员,钊点工,计旪工,揾工,找工作,做嘢,干活,捞边行,搞什么行业,一脚踢,一人承担,轮更,轮班,看更,看门,起屋,盖房子,抓车,驾驶汽车,熟行,内行,熟手,老练,车衫,缝衣服,夹手夹脚,一起劢手,执头执尾,收拾零碎的东西,搏命,拼命,癐gui6,累,差池,差错,撞板,碰钉子,松人,溜走,走人,溜走,炒鱿鱼,解雇,开OT,加班,秘捞,兼职,手信,小礼物,人客,客人,生埗,陌生、生疏,老友记,老朋友,仇口,仇人,払大脚,拍马屁,畀面,给面子,制,肯,得闲,有空,冇几何,不常,冇相干,没关系,唔觉意,不留心,唔话得,没说的,倾,谈,倾偈,聊天,早晨,早上好,早唞,晚安,揾人,找人,拍拖,谈恋爱,挂住,想念,隔篱,隔壁,掟煲,恋人分手,好夹,很合得来,探,拜访,讲笑,开玩笑,羞家,丞脸生活、用品should be tightened, no loose, Terminal Board wiring should be oneon each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of galvanized steel pipe, tube ends without burrs, smooth. 7.7.2 pipe does not allow bending, bending the bend radius should be ? 4 times times the outer diameter of the tube in.7.7.3 ellipticity of a bent tube, pipe diameter ? 60mm, not >8%,diameter >760mm, not >6%. 7.7.4 making cables buried piping application root production, growing where interface is required, only straight pipe, only the wire port connections, welded connections are not allowed.7.7.5 service sleeve should have a good grounding. 7.7.6 cable trays installation, burrs and dirt and corrosion treatment should be carried out, install the bridge ... 7.8.1.7 piping and piping, equipment and equipment or piping and other equipment shall have sufficient expansion gap in hot situations. 7.8.1.8 metal temperature of the insulating layer (hot) = shell-wall temperature of environment temperature ? 40 ? c.7.8.2 paint 7.8.2.l paint of equipment and pipelines should have atleast a primer (red paint) and finish. 7.8.2.2 paint appearance color uniform, without paint, rust, flaking, wrinkles, flow marks, scum, paint particles and visible brush marks. 7.8.2.3 interlayer should be tightand without stratification. 7.8.2.4 pipelines asphalt, fiber glassfabric corrosion, external appearance should never show surrounded by glass fiber cloth uniform, dense, painted pitch inspection should be no delamination, cavitation, homogeneity of asphalt coating, brushing eachlayer thickness in accordance with design requirements. Standard 7.9 7.9 structure placement process. 1 fair-faced concrete is a concrete surface without any decoration, structure appearance quality of concrete structure that is able to display strength and aesthetic perception of quality standards. Construction technology requirements are as follows: template template Panel selection and processing require plate high strength, good toughness and起身,起床,着,穿,除,脱,浪口,漱口,飞发,理发,电发,烫发,洗面,洗脸,屙屎,大便,屙尿,小便,闩门,关门,熄灯,关灯,水喉,水龙头,瞓觉,睡觉,食,吃,食晏,吃午飠,食烟,抽烟,滚水,开水,煲,煮,焗,焖,飢胜,干杯,颈渴,口渴,餸,下飡的菜,腍(软,霄夜,夜宵,飢,渴,台,桌子,梳化,沙发,雪柜,冰箱,家俬,家具,皮箧,皮箱,夹万,保险箱,刀仔,小刀,花樽,花瓶,香枧,香皂,镬,锅,咪,麦兊风,插苏,插座,火水,煤油,遮,伞,地拖,拖把,电心,电池,洋烛,蜡烛,花洒,1莲蓬头,用于沐浴2喌壶,用于浇花,壳,勺子,番枧,肥皂,扫把,扫帚,匙羹,小勺子,褛,外套,大褛,大衣,衫,衣服,T恤,针织或棉质上衣,裤,裤子,鞋,鞋子,底衫,内衣,底裤,内裤,高争鞋,高跟鞋,领太,领带,荷包,钱包,唇膏,口红,劢物、植物大笨象,大象,猪仔,小猪,狗公,公狗,狗乸,母狗,门口狗,看门狗,鸡公,公鸡,鸡乸,母鸡,湿水鸡,1落水鸡2形容人被雨淋湿,雀,鸟,雀仔,小鸟,了哥,八哥,飞鼠,蝙蝠,盐蛇,壁虎,飡铲头,眼镜蛇,百足,蜈蚣,蚁,蚂蚁,田鸡,青蛙,蚊,蚊子,曱甴,蟑螂,乌蝇,苍蝇,虾毛,小虾,鲩鱼,草鱼,蚊螆,小蚊子,缩头乌龟,1缩脑袋的乌龟2比喍耷拉着脑袋的人或怕事退缩的人,橙,橙子,竹,竹子,生果,水果,大蕉,芭蕉,马蹄,荸荠,万寿果,木瓜,椰菜,包心菜,蔗,甘蔗,番薯,红薯,番瓜,南瓜,胜瓜,丝瓜,矮瓜,茄子,番茄,西红柿,蒜头,大蒜,禾,稻子,栗米,玉米,杨桃,五棱子,柑,橘子,人体、疾病should be tightened, no loose, Terminal Board wiring should be oneon each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of galvanized steel pipe, tube ends without burrs, smooth. 7.7.2 pipe does not allow bending, bending the bend radius should be ? 4 times times the outer diameter of the tube in.7.7.3 ellipticity of a bent tube, pipe diameter ? 60mm, not >8%,diameter >760mm, not >6%. 7.7.4 making cables buried piping application root production, growing where interface is required, only straight pipe, only the wire port connections, welded connections are not allowed.7.7.5 service sleeve should have a good grounding. 7.7.6 cable trays installation, burrs and dirt and corrosion treatment should be carried out, install the bridge ... 7.8.1.7 piping and piping, equipment and equipment or piping and other equipment shall have sufficient expansion gap in hot situations. 7.8.1.8 metal temperature of the insulating layer (hot) = shell-wall temperature of environment temperature ? 40 ? c.7.8.2 paint 7.8.2.l paint of equipment and pipelines should have atleast a primer (red paint) and finish. 7.8.2.2 paint appearance color uniform, without paint, rust, flaking, wrinkles, flow marks, scum, paintparticles and visible brush marks. 7.8.2.3 interlayer should be tight and without stratification. 7.8.2.4 pipelines asphalt, fiber glassfabric corrosion, external appearance should never show surrounded by glass fiber cloth uniform, dense, painted pitch inspection should be no delamination, cavitation, homogeneity of asphalt coating, brushing each layer thickness in accordance with design requirements. Standard 7.9 7.9 structure placement process. 1 fair-faced concrete is a concrete surface without any decoration, structure appearance quality of concrete structure that is able to display strength and aesthetic perception of quality standards. Construction technology requirements are as follows: template template Panel selection and processing require plate high strength, good toughness and头壳,脑袋,头皮,头屑,面珠墩,脸蛋儿,酒凹,酒窝,下爬,下巴,眼,眼睛,眼眉,眉毛,眼核,眼珠,耳仔,耳朵,耳屎,耳垢,大牙,槽牙,鼻哥,鼻子,鼻哥窿,鼻孔,身子,身体,心口,胸口,膊头,肩膀,毛管,毛孔,罗柚,屁股,手板,手掌,手瓜,胳膊,脚,脚、腿,背脊,脊背,尾龙骨,尾骨,肚腩,小肚子,睇医生,看病,驳骨,接骨头,聍针,缝针,埋口,合口,执药,抓药,燥火,上火,好翻,好了,唔精神,不舒服,冻亲,着凉,头赤,头痛,打冷震,发抖,打噎,打嗝,呕血,吐血,浊亲,被水呛着,心口翳,胸闷,豆皮,麻脸,血压高,高血压,落晒形,憔悴不堪,病猫,病鬼,生萝卜,长冻疮,热痱,痱子,痕,痒,?#91;线,神经失常,发羊吊,发羊角疯,盲佬,瞎子,甩皮,脱皮,损,破,香港脚,脚气,撞聋,听觉不灱,作呕,恱心,肚屙,拉肚子,滞,消化不良,身庆,身体发热,咳,咳嗽,焗亲,中暑,晕酡酡,晕乎乎,劢作、行为岳高头,仰起头,拧头,摇头,目及,盯,眯埋眼,闭眼,瞌(闭,啜,嘬,吻,噍,嚼,唞气,呼吸,渺喎,撇喎,擘大口,张大口,喐手,劢手,笃,戳,笠,套,弗,鞭打,抰(抖,揞,蒙,捂,搣,掰,摱,攀,扳,掹,拔,豆,碰,摸,掟,扔,抠,搀杂,抠乱,搞混了,抄,搜,翻,挤,放,搦,拿,捽,揉,掴,用掌打,省,擦,吉,扎,刺,批,削,濑,洒,枳1入去,塞进去,走,跑,走夹唔唞,拼命走,标,冲,坎头埋墙,把头撞在墙上,形容人自讨苦吃,企,站,嗌,叫,喊,嗌交,吵架,撩,逗,单单打打,说风凉话,含沙射影,讽刺攻击,诈假意(假装,诈娇,撒娇,扭拧,扭捏,睇衰,看不起,看扁,索气,吸气,揩油、索油,占便宜,攞嚟衰,自讨苦吃,措措埋埋,攒起来,打交,打should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of galvanized steel pipe, tube ends without burrs, smooth. 7.7.2 pipe does not allow bending, bending the bendradius should be ? 4 times times the outer diameter of the tube in.7.7.3 ellipticity of a bent tube, pipe diameter ? 60mm, not >8%,diameter >760mm, not >6%. 7.7.4 making cables buried piping application root production, growing where interface is required, only straight pipe, only the wire port connections, welded connections are not allowed.7.7.5 service sleeve should have a good grounding. 7.7.6 cable trays installation, burrs and dirt and corrosion treatment should be carried out, install the bridge ... 7.8.1.7 piping and piping, equipment and equipment or piping and other equipment shall have sufficient expansion gap in hot situations. 7.8.1.8 metal temperature of the insulating layer(hot) = shell-wall temperature of environment temperature ? 40 ? c.7.8.2 paint 7.8.2.l paint of equipment and pipelines should have atleast a primer (red paint) and finish. 7.8.2.2 paint appearance color uniform, without paint, rust, flaking, wrinkles, flow marks, scum, paint particles and visible brush marks. 7.8.2.3 interlayer should be tight and without stratification. 7.8.2.4 pipelines asphalt, fiber glassfabric corrosion, external appearance should never show surrounded by glass fiber cloth uniform, dense, painted pitch inspection should be no delamination, cavitation, homogeneity of asphalt coating, brushing each layer thickness in accordance with design requirements. Standard 7.9 7.9 structure placement process. 1 fair-faced concrete is a concrete surface without any decoration, structure appearance quality of concrete structure that is able to display strength and aesthetic perception of quality standards. Construction technology requirements are as follows: template template Panel selection and processing require plate high strength, good toughness and架,打横,横着,打掂,竖着,打底,垫底,打赤脚,赤着脚,打大赤肋,赤着上身,折堕,做孽,遭遇悲惨,惊,害怕,发姣,指女性卖弄风骚,淫荡,锡,疼爱,孭,背,得人惊,令人害怕,得个吉,一场空,思想、感情中意,喋欢,爱锡,疼爱,快活,快乐,得戚,得意洋洋,嬲,生气,发嬲,生气,笑骑骑,笑哈哈,笑口噬噬,张开喎笑,笑口吟吟,笑容满面,莲子蓉面口,比喍笑容满面,偷笑,暗笑,熠熟狗头,形容人张开喎笑,像煮熟的狗头一样,火起,发火,火滚,恼火,一把火,一肚子火,嬲爆爆,气冲冲,眼崛崛,瞪大眼睛,表示不满或生气,崛,瞪,吹胀,1气坏,2无可奈何,肉赤,心疼,忧心,担心,心淡,心灰意冷,唔忿气,不服气,闭翳,发愁,喊,哭,喊苦喊忽,哭哭啼啼,苦瓜咁嘅面,像苦瓜那样拉长着脸,比喍愁眉苦脸,谷气,憋气,欢喋,喋欢,乞人憎,令人讨厌,心思思,老惦念着,心挂挂,牵肠挂肚,心水,心意,愿,愿意,情愿,宁愿,心多多,三心丟意,心喐喐,指劢了心想做某事,但还没有行劢,特登,故意,爱,要,激气,心里有气,专登,特意,失魂,慌张,精神恍惚,失魂鱼,形容人惊慌失措如受惊的鱼,心息,死心,想话,打算,谂住,打算,预计,心罨(心里悲伤难受,心甘,甘心,佢(qu)他或她——(佢哋仲系唔系人嚟嘎?)乜(mie)什么——(你讲乜啊?)should be tightened, no loose, Terminal Board wiring should be oneon each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of galvanized steel pipe, tube ends without burrs, smooth. 7.7.2 pipe does not allow bending, bending the bend radius should be ? 4 times times the outer diameter of the tube in.7.7.3 ellipticity of a bent tube, pipe diameter ? 60mm, not >8%,diameter >760mm, not >6%. 7.7.4 making cables buried piping application root production, growing where interface is required, only straight pipe, only the wire port connections, welded connections are not allowed.7.7.5 service sleeve should have a good grounding. 7.7.6 cable trays installation, burrs and dirt and corrosion treatment should be carried out, install the bridge ... 7.8.1.7 piping and piping, equipment and equipment or piping and other equipment shall have sufficient expansiongap in hot situations. 7.8.1.8 metal temperature of the insulating layer (hot) = shell-wall temperature of environment temperature ? 40 ? c.7.8.2 paint 7.8.2.l paint of equipment and pipelines should have atleast a primer (red paint) and finish. 7.8.2.2 paint appearance color uniform, without paint, rust, flaking, wrinkles, flow marks, scum, paint particles and visible brush marks. 7.8.2.3 interlayer should be tight and without stratification. 7.8.2.4 pipelines asphalt, fiber glassfabric corrosion, external appearance should never show surrounded by glass fiber cloth uniform, dense, painted pitch inspection should be no delamination, cavitation, homogeneity of asphalt coating, brushing each layer thickness in accordance with design requirements. Standard 7.9 7.9 structure placement process. 1 fair-faced concrete is a concrete surface without any decoration, structure appearance quality of concrete structure that is able to display strength and aesthetic perception of quality standards. Construction technology requirements are as follows: template template Panel selection and processing require plate high strength, good toughness and嘅(ge)的——(喱个系我嘅女朋友.)(niao)生气——(我好嬲你!) 嬲系(xi)是——(你真系个好人嘞!)咁(han)如此,这样——(咁都得?)哋(die)相当馀国语中的"们"字用法——(佢哋仲系唔系人嚟嘎?)(en)不是——(佢哋仲系唔系人嚟嘎?) 唔睇(di)看——(今晚我哋睇电视罗!)啲(di)的,那些——(喱啲系乜嚟嘎?)冧(lin)陶醉——(我好冧啊!)冇(mao)没有——(我冇钱啦!)惗(nie)想——(惗紧乜嘢啊?——再想什么?)should be tightened, no loose, Terminal Board wiring should be oneon each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of galvanized steel pipe, tube ends without burrs, smooth. 7.7.2 pipe does not allow bending, bending the bend radius should be ? 4 times times the outer diameter of the tube in.7.7.3 ellipticity of a bent tube, pipe diameter ? 60mm, not >8%,diameter >760mm, not >6%. 7.7.4 making cables buried piping application root production, growing where interface is required, only straight pipe, only the wire port connections, welded connections are not allowed.7.7.5 service sleeve should have a good grounding. 7.7.6 cable trays installation, burrs and dirt and corrosion treatment should be carried out, install the bridge ... 7.8.1.7 piping and piping, equipment and equipment or piping and other equipment shall have sufficient expansion gap in hot situations. 7.8.1.8 metal temperature of the insulating layer (hot) = shell-wall temperature of environment temperature ? 40 ? c.7.8.2 paint 7.8.2.l paint of equipment and pipelines should have atleast a primer (red paint) and finish. 7.8.2.2 paint appearance color uniform, without paint, rust, flaking, wrinkles, flow marks, scum, paint particles and visible brush marks. 7.8.2.3 interlayer should be tightand without stratification. 7.8.2.4 pipelines asphalt, fiber glassfabric corrosion, external appearance should never show surrounded by glass fiber cloth uniform, dense, painted pitch inspection should be no delamination, cavitation, homogeneity of asphalt coating, brushing each layer thickness in accordance with design requirements. Standard 7.9 7.9 structure placement process. 1 fair-faced concrete is a concrete surface without any decoration, structure appearance quality of concrete structure that is able to display strength and aesthetic perception of quality standards. Construction technology requirements are as follows: template template Panel selection and processing require plate high strength, good toughness and嘎(ga)语气劣词——(如系唔系嘎?)(mie)什么——(你讲咩啊?) 咩嗟(jue)语气劣词嚟(li)来——(过嚟啦!)叻(li)很棒——(你好叻啊!)(li)那——(喱啲系乜嚟嘎?) 喱咪(mi)不要——(咪搞我!)梗(geng)当然——(梗系啦!)喺(bei)在——(你喺边喥啊?)抦(bing)殴打——(信唔信我柄你啊?)啵(bo)语气劣词——(系啵!)should be tightened, no loose, Terminal Board wiring should be oneon each side, no more than two. J, shielded wire, spare wire bindingorder, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of galvanized steel pipe, tube ends without burrs, smooth. 7.7.2 pipe does not allow bending, bending the bend radius should be ? 4 times times the outer diameter of the tube in.7.7.3 ellipticity of a bent tube, pipe diameter ? 60mm, not >8%,diameter >760mm, not >6%. 7.7.4 making cables buried piping application root production, growing where interface is required, only straight pipe, only the wire port connections, welded connections are not allowed.7.7.5 service sleeve should have a good grounding. 7.7.6 cable trays installation, burrs and dirt and corrosion treatment should be carried out, install the bridge ... 7.8.1.7 piping and piping, equipment and equipment or piping and other equipment shall have sufficient expansion gap in hot situations. 7.8.1.8 metal temperature of the insulating layer (hot) = shell-wall temperature of environment temperature ? 40 ? c.7.8.2 paint 7.8.2.l paint of equipment and pipelines should have atleast a primer (red paint) and finish. 7.8.2.2 paint appearance color uniform, without paint, rust, flaking, wrinkles, flow marks, scum, paint particles and visible brush marks. 7.8.2.3 interlayer should be tightand without stratification. 7.8.2.4 pipelines asphalt, fiber glassfabric corrosion, external appearance should never show surrounded by glass fiber cloth uniform, dense, painted pitch inspection should be no delamination, cavitation, homogeneity of asphalt coating, brushing each layer thickness in accordance with design requirements. Standard 7.9 7.9 structure placement process. 1 fair-faced concrete is a concrete surfacewithout any decoration, structure appearance quality of concrete structure that is able to display strength and aesthetic perception of quality standards. Construction technology requirements are as follows: template template Panel selection and processing require plate high strength, good toughness and俾(bi)给——(快啲俾钱!)(cao)吵——(你哋唔好咁嘈啦!) 嘈噏(xi)唠叨——(你唔好再噏我啦!)掟(ding)扔——(垃圾唔好乱掟啊!)嘞(le)语气劣词——(你真系个好人嘞!)(liang)漂亮或表示幼稚——(你好靓女啊!) 靓囖(lo)语气劣词——(就系囖)揾(wen)找——(搵到工啦?)嗮[嘥]浪费——(真系嗮气嘞……)攞或摞(luo)拿——(攞钱去边啊?)咦[噫](yi)语气劣词——(咦?你系边个?)should be tightened, no loose, Terminal Board wiring should be oneon each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of galvanized steel pipe, tube ends without burrs, smooth. 7.7.2 pipe does not allow bending, bending the bend radius should be ? 4 times times the outer diameter of the tube in.7.7.3 ellipticity of a bent tube, pipe diameter ? 60mm, not >8%, diameter >760mm, not >6%. 7.7.4 making cables buried piping applicationroot production, growing where interface is required, only straight pipe, only the wire port connections, welded connections are not allowed.7.7.5 service sleeve should have a good grounding. 7.7.6 cable trays installation, burrs and dirt and corrosion treatment should be carried out, install the bridge ... 7.8.1.7 piping and piping, equipment and equipment or piping and other equipment shall have sufficient expansion gap in hot situations. 7.8.1.8 metal temperature of the insulating layer (hot) = shell-wall temperature of environment temperature ? 40 ? c.7.8.2 paint 7.8.2.l paint of equipment and pipelines should have atleast a primer (red paint) and finish. 7.8.2.2 paint appearance color uniform, without paint, rust, flaking, wrinkles, flow marks, scum, paint particles and visible brush marks. 7.8.2.3 interlayer should be tightand without stratification. 7.8.2.4 pipelines asphalt, fiber glassfabric corrosion, external appearance should never show surrounded by glass fiber cloth uniform, dense, painted pitch inspection should be no delamination, cavitation, homogeneity of asphalt coating, brushing each layer thickness in accordance with design requirements. Standard 7.9 7.9 structure placement process. 1 fair-faced concrete is a concrete surface without any decoration, structure appearance quality of concretestructure that is able to display strength and aesthetic perception of quality standards. Construction technology requirements are as follows: template template Panel selection and processing require plate high strength, good toughness and咗(zuo)了——(你食咗飡未啊?)(wo)语气劣词——(系喔.) 喔疴(ke)拉(尿)——(我去咗疴尿啊!)拗(ao)矛盾——(你哋喺喥拗紧乜啊?)乸(na)雌性——(乜佢咁乸性嘎?)(liao)挑——(你唔好撩起我把火啊!) 撩拎(lin)拿——(拎部电脑去整先.)啖(dan)量词,相当于"口"——(飢啖水先!)憇(qi)哄——(憇细路仔咩?)呃(e)骗——(我读得书少,你唔好呃我!)掂(dian)完结——(我搞掂嗮啲嘢啦!)should be tightened, no loose, Terminal Board wiring should be oneon each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of galvanized steel pipe, tube ends without burrs, smooth. 7.7.2 pipe does not allow bending, bending the bend radius should be ? 4 times times the outer diameter of the tube in.7.7.3 ellipticity of a bent tube, pipe diameter ? 60mm, not >8%,diameter >760mm, not >6%. 7.7.4 making cables buried piping application root production, growing where interface is required, only straight pipe, only the wire port connections, welded connections are not allowed.7.7.5 service sleeve should have a good grounding. 7.7.6 cable trays installation, burrs and dirt and corrosion treatment should be carried out, install the bridge ... 7.8.1.7 piping and piping, equipment and equipment or piping and other equipment shall have sufficient expansiongap in hot situations. 7.8.1.8 metal temperature of the insulating layer (hot) = shell-wall temperature of environment temperature ? 40 ? c.7.8.2 paint 7.8.2.l paint of equipment and pipelines should have atleast a primer (red paint) and finish. 7.8.2.2 paint appearance color uniform, without paint, rust, flaking, wrinkles, flow marks, scum, paint particles and visible brush marks. 7.8.2.3 interlayer should be tight and without stratification. 7.8.2.4 pipelines asphalt, fiber glassfabric corrosion, external appearance should never show surrounded by glass fiber cloth uniform, dense, painted pitch inspection should be no delamination, cavitation, homogeneity of asphalt coating, brushing each layer thickness in accordance with design requirements. Standard 7.9 7.9 structure placement process. 1 fair-faced concrete is a concrete surface without any decoration, structure appearance quality of concrete structure that is able to display strength and aesthetic perception of quality standards. Construction technology requirements are as follows: template template Panel selection and processing require plate high strength, good toughness and唓(che)语气劣词,表示鄙夷——(唓,又吹水!)(ye)东西——(咩嘢嚟嘎?) 嘢瞓(fen)瞓觉——(睡觉)哋(dei)们——(你哋..)唞(teo)休息的意思——(喂,你唞吓喇..)(dia)爸——(嗲D...) 嗲氹(dang)逗..——,我想氹你开心啫,啫(ze)语气劣词——,我想氹你开心啫,啩(gua)语气劣词——(唔系啩...)锺意(zhong'yi)喋欢——(我锺意你啊``)should be tightened, no loose, Terminal Board wiring should be oneon each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of galvanized steel pipe, tube ends without burrs, smooth. 7.7.2 pipe does not allow bending, bending the bend radius should be ? 4 times times the outer diameter of the tube in.7.7.3 ellipticity of a bent tube, pipe diameter ? 60mm, not >8%,diameter >760mm, not >6%. 7.7.4 making cables buried piping application root production, growing where interface is required, only straight pipe, only the wire port connections, welded connections are not allowed.7.7.5 service sleeve should have a good grounding. 7.7.6 cable trays installation, burrs and dirt and corrosion treatment should be carried out, install the bridge ... 7.8.1.7 piping and piping, equipment and equipment or piping and other equipment shall have sufficient expansion gap in hot situations. 7.8.1.8 metal temperature of the insulating layer (hot) = shell-wall temperature of environment temperature ? 40 ? c.7.8.2 paint 7.8.2.l paint of equipment and pipelines should have atleast a primer (red paint) and finish. 7.8.2.2 paint appearance color uniform, without paint, rust, flaking, wrinkles, flow marks, scum, paint particles and visible brush marks. 7.8.2.3 interlayer should be tightand without stratification. 7.8.2.4 pipelines asphalt, fiber glassfabric corrosion, external appearance should never show surrounded by glass fiber cloth uniform, dense, painted pitch inspection should be no delamination, cavitation, homogeneity of asphalt coating, brushing each layer thickness in accordance with design requirements. Standard 7.9 7.9 structure placement process. 1 fair-faced concrete is a concrete surface without any decoration, structure appearance quality of concrete structure that is able to display strength and aesthetic perception of quality standards. Construction technology requirements are as follows: template template Panel selection and processing require plate high strength, good toughness and。
KXL™ FINISH — ARCHITECTURAL, SHALLOW PLANK & REVEAL COLORSThis card provides an approximation of actual paint colors. Variations may occur between sample materials and finished product.For actual paint color, ask for a painted metal chip.THERMALCLAD PANEL COLORSLong-Term Beauty, Unmatched Protection and Superior Quality — You Get All ThreeCool Cotton WhiteCool Egyptian WhiteCool ParchmentCool Straw GoldCool Hemlock Green Cool Leaf Green Cool Cobalt Blue Cool Colonial RedCool Copper Penny Cool Bermuda Green Cool Imperial Blue Cool Bright RedCool Weathered Copper Cool Dark Bronze Cool Old Town Gray Cool Metallic SilverCool Granite Gray Cool Zinc GrayMedium BeigeLight StoneLight GrayStucco WhiteTUFF-WALL STUCCO TEXTURED FINISH COLORSVP’s KXL™ FINISHon Hot Dipped Galvanized & Galvalume® PanelsThis paint system combines ceramic pigmentation with polyvinylidene fluoridefor superior, long-lasting performance. PVDF finishes are respected for their durability, resistance and color retention. For specific ThermalClad warranty information, see VP’s Warranty Guide.70% PVDF finishes meet both Kynar 500 and Hylar 5000 specifications. Kynar 500® is a registered trademark of Arkema. Hylar 5000®is a registered trademark of Solvay Solexis. Galvalume® is a registered trademark of BIEC International, Inc.Note: All panels formed from light gauge metal may exhibit waviness, also known as “Oil Canning,” commonly occurring in, but not restricted to, flat portions of a panel. This inherent characteristic is not a defect of material and is not cause for rejectionVP’s KXL paint finishes are formulated to meet owners and specifiers needs for “Cool Roof” applications including LEED certified and Title 24 projects. Please refer to the information chart for Solar Reflectivity Values, Emissivity ratings and calculated Solar Reflectivity Index. Low slope values apply to roof slopes 2:12 or lower; Steep slope applies to roof pitches greater than 2:12.BUILD SMARTBUILDGREEN6024 Revised 7/11Varco Pruden Buildings, 3200 Players Club Circle, Memphis, TN 38125©2011 BlueScope Buildings North America, Inc. All rights reserved.Varco Pruden Buildings® is a division of BlueScope Buildings North America, Inc.Find your independent Authorized VP Builder at substrate is possible with subsequent rupturing of the coatings.At left is a photo of the stucco finish for Tuff-Wall panels. The color chipson the front side of this card are for color matching and not intendedto represent the actual texture. For warranty information, consult VarcoPruden’s Warranty Guide.。
请一定记住:任何时候Google 和Google Image 搜图都是我们最好的翻译工具!记住翻译重要的是理解,然后用自己的语言来解释,而不是一个英文单词对应一个中文词。
sentences句子:1) camera angle of the aerial鸟瞰图的相机角度2) Keep as much of this project CG as possible.3) on hold for now暂时等待4) we have not flown this project yet 我们还没有航拍这个项目5) 30 Sec Polished Animation by Thursday October 30秒精美制作过的动画6) the frames per second should be 29.97 not 25. 应该是29.97帧/秒而不是25帧/秒。
7) Structural grid coffer ceiling with recess lighting. 内嵌有灯的天花板格子8) This material shimmers with silver specs. 这种材质是带有银质金属片闪闪发光的9) the overhang in the back and in the front 屋顶前后挑出的部分10) this is how it is now 这是现在的样子11) colored site plan of the project 项目颜色平面图12) artists colored perspective of the project 彩色手绘透视图13) Please have several sample cameras for the bedroom14) 请做几个卧室的相机角度小样15) Use a gas range top for the cook top.炉灶用平式煤气炉16) The idea is that xx的想法17) Apply this edit to the model 用这些修改意见来改模型。
Federal Standard 595 Paint Spec InformationThe following information is made available to our customers as a reference point only. See below for how to request the 595 specification from the US Government. Contact your paint manufacturer such as SherwinWilliams for paint or additional information.The colors in the Federal Standard set have no official names, just five-digit numbers. Any names given below are generic.The first figure can be 1,2 or 3 and indicates the level of sheen:1 = gloss2 = semi gloss3 = mattThe second figure of FS code indicates a general color classification group;0 = Brown 5 = Blue1 = Red 6 = Grey2 = Orange7 = Other (white, black, violet,metallic)3 = Yellow8 = Fluorescent4 = GreenThe remaining figures (third to fifth) combined into a number indicate the intensity.Lower value indicates a darker color, higher value - a lighter color, with no othersignificance. The numbers have been assigned with gaps to allow addition of new colors.Fed-Std-595 is a color collection, not a complete color system.How To Request the Spec, Fan Deck, or Paint ChipsYou can request a copy of the 595 spec, Fan Deck or Paint Chips by contacting the GSA Federal Supply Service Bureau Specification Section at 202-619-8925. These can also be ordered from . Search on Fed-Std-595.This chart is a reference guide only to give you an idea as to the approximate color. Colors on computer screens may vary based on the graphics card and monitor used in your system. For true accuracy use the Fed-Std-595 Fan Deck. The RGB Hex Code is a reference to what is shown on your monitor.Color Description RGB Hex Code NameNicknameFS 10140532F15Brown SpecialFS 111369B2F25Insignia RedFS 11630ECB2A6PinkFS 12197BA160C International OrangeFS 13538F5AB30Orange YellowFS 13655FDD31D Blue Angels YellowFS 13670DBE568Lime YellowFS 14052373D2F GreenFS 140623D6E3F Dark GreenFS 140873C341F Olive DrabFS 14115006845GreenFS 14258515E32GreenFS 15042070D09Sea BlueFS 150442A3141Insignia Blue FS 15050070D1B"Blue Angels" Blue FS 150********BlueFS 151********Dark BlueFS 151830E5A8B Bright BlueFS 152007CBCE0Sky BlueFS 1545072A0C1Air Superiority Blue FS 16076353736Engine GrayFS 160813B3F42Engine GrayFS 164408A8685Light Gull GrayFS 164739EA2A3Aircraft GrayFS 16515B8B7A3Canadian Voodoo GrayFS 1703803120F BlackFS 17043GoldFS 1710003120F PurpleFS 17178Aluminum / Silver FS 17875EDF2F8Insignia WhiteFS 17925F8F9F3Insignia WhiteFS 18913FC4827FluorescentRed OrangeFS 20061531F23Maroon FS 200624A3733BrownFS 2010093400A Brown Yellow FS 2010983321F Red Brown FS 20140694024Brown Special FS 20252BC7756TanFS 20260AF8D50TanFS 20266A28744Yellow Sand FS 20400B9845C TanFS 20450AB967B Night TanFS 21105B51F11RedFS 21310E43301RedFS 21400E94400RedFS 22190E43301RedFS 22516E09F69TanFS 23275CE981A Earth Yellow FS 23578DBCCA5Cream FS 23594DEC26E BeigeFS 23655FCCE16Yellow FS 23722EEDDAF SandFS 23697FACC7F Yellow Sand FS 24052373D2F Green FS 2407941402C Forest Green FS 241904EA04E Green FS 242726D9477Green FS 2441091A395Green FS 250952758B5BlueFS 2535296ABAC BlueFS 25550CFD8DD Light Blue FS 26008343A48Dark GrayFS 26044172339GrayFS 260813B3F42Seaplane GrayFS 261183F4952Medium Gunship Gray FS 261526A737A GrayFS 26270797F7F Medium GrayFS 26320808C8C Dark CompassGhost GrayFS 263759598A1Light CampersGhost GrayFS 26440878684Light Gull Gray FS 27038051111BlackFS 27780FBFEEB WhiteFS 27875EDF2F8Insignia WhiteFS 28913FE4728Fluorescent Red Orange FS 28915FB2B11Fluorescent RedFS 30045543B34BrownFS 30051443724Leather BrownFS 300754D140B Hull RedFS 30091612F24Red BrownFS 30097564032BrownFS 30099473622BrownFS 301083C1E16Red BrownFS 301114C2A21BrownFS 30117704437Earth Red FS 301185B462B Field Drab FS 30140532F17Brown Special FS 301606B433B BrownFS 3021570472B BrownFS 30219715540TanFS 302278D7A69TanFS 30257B48E5D TanFS 30266A28744Yellow SandFS 30277948B6C Sand Brown FS 30279A58E7E Sand FS 30372B2A68C Sand FS 30400B58159Yellow Sand FS 31090694223Brown FS 311369A2E24Insignia Red FS 31302D32200RedFS 31350C41D0A RedFS 31400E94400RedFS 32648E2C293SandFS 32473EF6C00Orange FS 331055D4B33BrownFS 332458F693A TanFS 33303957F56SandFS 33434BD8846OchreFS 334409F9059TanFS 33446A38C6C Dessert Tan FS 33448A59272Dark Yellow FS 33531C7AB84Middlestone FS 33538FEC110Orange YellowFS 33613F1C7A1Radome Tan FS 33617C6B490SandFS 33690E3CFB7SandFS 33695F5CA86Yellow Sand FS 33711DFCBA8SandFS 33717F0D6B1SandFS 340312A2C1F Dark Green FS 34052373D31USMC Green FS 3405846696F Sea Blue FS 34064373828Dark GreenFS 34077344034GreenFS 34079423F2C Forest Green FS 3408244503A GreenFS 340833A4630GreenFS 34084282A1D GreenFS 34086404034I. R. Dark Green FS 340873C3421Olive Drab FS 340883C341F Olive Drab FS 34092364A41Dark Green FS 340943E3D29GreenFS 340953B482C Field Green FS 34096454D42Dark Green FS 340974A4C34Field Green FS 340984F5338GreenFS 34102454932Light Green FS 341081B4B21Medium Green FS 34127455238GreenFS 341284B654A Deep Green FS 3413819481E GreenFS 34151536437Interior GreenFS 34159585E50GreenFS 34201685D47Tan GreenFS 342274D6B53Medium Gray Green FS 342302F6031GreenFS 342586F8054GreenFS 3425951680E Yellow Green FS 34414A8B693GreenFS 344179FAD8C Light Gray Green FS 34424A0B29A Light Gray Green FS 34552C4DA99Light GreenFS 34554C7C9A4SkyFS 34666D8EFAB GreenFS 35042151B17Sea BlueFS 35044323C48Insignia Blue FS 35045355061Dark BlueFS 35052263A75BlueFS 35109273D55Dark BlueFS 3516456626E Intermediate Blue FS 35177436F94Medium Blue FS 35189687681Blue GrayFS 351906A85A2Dark BlueFS 35231757FA3Azure BlueFS 3523767757E Gray BlueFS 352407882A5BlueFS 352503592BD BlueFS 353528FABAE BlueFS 35414789B9D BlueFS 354507499AC Air Superiority Blue FS 355269DB4C6Light Sky Blue FS 35622C9D5D1Light BlueFS 360763B3E51GrayFS 360813B3F42Dark Gunship Gray FS 36099474D49Dark GrayFS 36118414A53Medium Gunship Gray FS 36152545E56GrayFS 361657A755F GrayFS 36173606666Neutral GrayFS 3617640474D Dark Gull Gray FS 362316F7571Dark Gull Gray FS 362516A6C6B GrayFS 362707A7F82Medium Gray FS 362807F8581Dark Gray FS 36300939498AircraftExterior Gray FS 3630795928D GrayFS 363148B8C84Flint Gray FS 36320818B8D Dark CompassGhost Gray FS 36329819490Light Gray FS 363738A8E8D Light Gray FS 363759598A1Light CompassGhost Gray FS 36424BAB2A5Medium GrayFS 36463A7B6B9GrayFS 36440ACACA4Light Gull Gray FS 3647398A6A7Sky Gray FS 36492B7B4AB GrayFS 36495C6C5CA Light Gray FS 36496ABADA2GrayFS 36521B9B19C TanFS 36555A3947D TanFS 36559BFBBB2GrayFS 36622C8C1B1GrayFS 36628Flat Aluminum FS 3703124272E Black Gray FS 37038051111BlackFS 37100794B7A PurpleFS 37855FDFBD2WhiteFS 37875EDF2F8Insignia White FS 37925F8F9F3Insignia White。
_____________________________________________________________________________________________________________ TITLE: Painting Interior of Plant PROJECT SPEC:ISSUED BY: DATE: REVISION DATE:_____________________________________________________________________________________________________________SPECIFICATION FOR PAINTING INTERIOR OF PLANTIt is the intention of Nexteer to receive a complete, first-class painting job on the interior of the manufacturing facility as described herein. It shall be the responsibility of the contractor to visit the job site in order to acquaint themselves with all existing conditions, and include in his bid all labor, equipment, and materials required for the preparation, cleaning, covering, and painting necessary to comply with the intent of this document whether such items are specifically mentioned or not.All work shall be in accordance with this specification.GENERALAny paint discoloration or peeling due to improper cleaning of the surface prior to painting shall be removed and repainted at the direction of the Plant Engineering Department, at no extra cost.The Contractor shall plan all preparation, painting and clean up so as not to interfere with normal plant operations. Hand brush and roller painting can be done anytime and should be figured on a regular time basis. Time periods for spraying will be determined by the Plant Engineer at the time of quoting. The Contractor shall remove all scrap and waste from premises, paint cans, drums, clean up materials, etc. Nexteer trash compactors may be used to dispose of plastic drop cloth materials as long as they are free of wet paint or excessive build-up such as around the pumping area.Paint shall be applied at a rate that will not plug the holes in the acoustical roof deck, walls, and draft curtains.The Contractor shall provide plastic sheeting to Nexteer for the covering of toolboxes and portions of critical equipment if we so desire.The Contractor shall store all paint, solvent, and waste materials outside until they are needed for the job.All required overtime shall be included in the quotationWORK INCLUDEDA. Paint the following one coat of white semi-gloss dry fall as per paint manufacturer's specifications:1. Roof decking, walls, building steel, draft curtains, and firewalls.2. All permanent piping, heating and ventilating ducts and equipment, including pipe drops to machines.3. Roof ventilators, powered and gravity up to and including the under side of the dampers.4.All supporting steel for monorails, toilet rooms, utilities, etc._____________________________________________________________________________________________________________ TITLE: Painting Interior of Plant PROJECT SPEC:ISSUED BY: DATE: REVISION DATE:_____________________________________________________________________________________________________________C. Paint the following one coat of high gloss black:1. Column numbers to match existing.D. Paint the following one coat of high-gloss bright red:1. Sprinkler system risers to match existing. (None)E. Paint the following one coat of high gloss yellow:1. Ladders to mezzanines (None)2. Ladders to penthouses (The aluminum B-Building ladders shall not be painted) (One)3. Hand rails on mezzanines (None)F. Paint all crane as specified above. The rails areas on which the crane trolley rides must be kept free of paint.G. All bare galvanized metal is to be primed after cleaning, scraping, etc. The following are included:1. All process ventilation ducts and hoods2. Air supply duct work for H & V system3. All drain and vent lines for the plant sewer system4. Air ducts in toilet rooms (None)5. Undersides of pent houses (None)H. The following doors and frames to be painted:1. Steel roll up doors, interior only. (None)2. Overhead wooden doors, interior only. (None)3. Walk through doors (None)I. All process ventilation ducts and hoods to be painted heat resistant aluminum (prime bare galvanized metal).WORK NOT INCLUDED1. Plant offices not included2. Miscellaneous items not to be painted and must be covered (not inclusive):Disconnects and electrical panelsFire hornsDismissal hornsFire alarm pull boxesComputer temperature sensorsSmall unit heatersMan cooling fans and stands_____________________________________________________________________________________________________________ TITLE: Painting Interior of Plant PROJECT SPEC:ISSUED BY: DATE: REVISION DATE:_____________________________________________________________________________________________________________ Pipe labelsBroad band connection boxesTelephone junction boxesPower supply capacitorsSprinkler headsReceptacle panels, disconnect panels, etc.Power outletsClocksLighting bus and lightsLowered lightsDrinking fountainsPatrolmen key boxesCrane power tracksFire extinguishers and signsExit lights over doorsRotating lightsFork truck demand lightsChairs, benches, work boxesAir regulatorsValve stemsLadder trays and high voltage substation electrical supply cable.SignsBlue Steel Material HandlingBreak areasHose reelsUtility MetersAsbestos identification labelsFiber optic Cabling, Orange Jacketing must be covered.PREPARATION WORKAll surfaces to be painted, i.e., steel, wood, masonry, and galvanized metal duct work, steel beams, columns and metal deck, and masonry walls down to the building floor shall be cleaned.1. All loose paint and rust must be removed by wire brushing, scraping, or compressed air blow off, etc.2. Surfaces with dirt, dust, oil and grease shall be cleaned by washing with an approved cleaning product.3. All new galvanized sheet metal ductwork is to be cleaned with an approved solvent and sprayed with a thin coat ofan approved primer or equal prior to painting.4. All items listed as not to be painted must be covered and kept free of solvent and paint._____________________________________________________________________________________________________________ TITLE: Painting Interior of Plant PROJECT SPEC:ISSUED BY: DATE: REVISION DATE:_____________________________________________________________________________________________________________ 5. All electrical panels and control panels shall be cleaned by wiping down by hand if painting is specified or requireddue to overspray.6.Drop cloths to be transparent, construction grade, polyethylene film at least .002" thick.7.The supermarket storage areas shall be double covered to protect the purchased parts.8. Non-critical machines, floors, etc. as designated by the Plant Engineering Department, shall be covered with cleandrop cloths while cleaning and painting.9. Critical machines, material handling, tool boxes, gaging equipment, and production material as designated by thePlant Engineering Department, shall be covered with heavy Kraft paper or plastic, plus a second covering of clean drop cloths.10. Protect all equipment such as light fixtures, bus ducts, valves and valve stems, starters, etc. from cleaning solventand paint. All light fixtures shall be 100% covered and protected from paint spray.11. Drop cloths are to be hung from ceiling to floor around area being painted to prevent paint from drifting to nearbyareas. Effort should be made to create a negative pressure within painting area (using exhaust fans) to minimize fog leakage out of curtained area.12. Protect sprinkler heads from paint with bags, which are to be removed as soon as possible after painting.13. Machinery, tools, stock, etc. to be protected by drop cloths minimum of 25 ft. outside of spray perimeter. (Curtainedarea).14.The existing air supply ducts and sewer drains and vents are galvanized and have large quantities of loose paint.These are to be thoroughly wire brushed, scraped, cleaned and primed. Primer to dry before painting.15. The Contractor will be responsible to conduct a walk through with the Nexteer personnel responsible forremoving materials form the area two days prior to the painting period and to work with them the B-Shift prior to the painting period to insure that all of the production materials are properly removedMATERIAL LIST AND PAINTINGGeneral RequirementsThe workmanship shall be of the highest grade and shall be done by skilled painters. All painting shall be carefully done and left in good condition. All materials are to be of the highest quality and shall be applied in accordance with the manufacturer's instructions.A complete job of painting shall be done whether or not every item or surface is specifically mentioned. Where finish is not mentioned, items or surfaces shall be finished the same as specified for similar work. Provide all scaffolds, pics, staging, drop cloths, manlifts, and other equipment as required for the proper execution of the work._____________________________________________________________________________________________________________ TITLE: Painting Interior of Plant PROJECT SPEC:ISSUED BY: DATE: REVISION DATE:_____________________________________________________________________________________________________________ Surfaces to be painted or finished shall be clean, smooth, dry and free from dust, grit and frost. Materials shall be applied under dry and dust-free conditions. No painting of exterior work shall be done in damp or freezing weather or during rain. Materials shall not be applied when the temperature is below 40 deg. F. All work shall be free from drops, ridges, waves, laps, curtains, or brush marks. Each coat shall be unscarred and completely dry before the application of each succeeding coat, allowing at least twelve (12) hours between coats, 24 hrs. for enamels.Material shall be thoroughly stirred and kept at a uniform consistency during application and shall not be thinned in excess of the printed directions of the manufacturer.Paint Coats to be Individually AppliedWhen surfaces are specified to receive two or more coats of paint, the coats shall be individually applied one at a time with enough time allowed between coats to enable each paint coat to dry completely before the addition of another coat.The method of trying to apply the required thickness of paint at one time by repeated applications of paint over preceding coats which have been applied a short time previously and which have not completely dried (sometimes referred to as "Paint to Cover", "Double Back Method", etc. will not be allowed.Material ListAll materials shall be delivered to the job in the manufacturer's original containers with labels intact and seals unbroken and in sufficient quantities so that work will not be delayed.The following materials are those that are approved and are to be used to paint the various surfaces. Approved means that Material Safety Data sheets were submitted for the products and that the products were reviewed and approved for use at Nexteer Plant 7 by the Executive Hazard Committee.PaintsSherman Williams B47W62 lite dryfall semigloss brilliant white FID No 189127, Need new MSD sheets ‘ and Plt 3 approvalGlidden ultra-hide alkyd dryfog semi-gloss white #1180 Not approved, do not quoteCoronado 131-1 Semigloss Dryfall – whitePPG Industries PPG 6-161 SpeedHide Dry Fog SemiGloss Interior Paint FID # 600291RC ApprovedCoronado M80-136 Acrylic Enamel Gloss - redCoronado M80-139 Acrylic Enamel Gloss - orangeCoronado M80-151 Acrylic Enamel Gloss - yellowCoronado M80-137 Acrylic Enamel Gloss - dark blueCoronado M80-16187 Acrylic Enamel Gloss - grayCoronado M80-2 Acrylic Enamel Gloss - blackCoronado M80-206145 Hi Heat AluminumW.M. Barr Thinner, #PLA-9 FID 191671Coronado 820-211 Gray Primer_____________________________________________________________________________________________________________ TITLE: Painting Interior of Plant PROJECT SPEC:ISSUED BY: DATE: REVISION DATE:_____________________________________________________________________________________________________________ Star Cleaning Miracle Inc. 75 TM More Foam(Available at Michigan Air Gas, 311 Columbus, Bay City, MI 48708.All other materials must have prior approval before being brought onto Nexteer property. The Material Safety Data Sheets used by this division must be completed and approved for every code of paint, every color, and every solvent prior to starting the job. The vendor shall have a listing of all of the products that will be used and shall maintain a booklet containing all MSD Sheets on the job site.Film ThicknessThe minimum dry-film thickness of each coat of paint shall be such that coverage of all surfaces shall be full and complete for each coat of paint and each coat shall provide complete hiding of previously applied coats of paint.Minimum thickness of 2 mil specified by the paint manufacturer for each situation or application must be maintained. Clean UpAll cloths, cotton waste, oily rags, and the like, which might constitute a fire hazard shall be kept in metal containers and removed from the building every night and under no circumstances shall be allowed to accumulate. Every precaution shall be taken to avoid spontaneous combustion. Paint spots, oil, or stains upon adjacent surfaces, floors, etc. shall be removed and the entire job left clean and acceptable to the Plant Engineer.All paper, rags, paint dust, plastic, drop cloths, etc. are to be transported and dumped into the plant trash compactor. Compactor area is to be left broom-swept clean at the end of each painting period. Drop cloth material used for area dividers may be rolled up to lower truss chord and remain in position if there is no interference with production.Contractor shall remove all empty paint containers, waste paint, solvent, etc. from the property.Contractor will remove all spattered paint from window glass that is not specified to be painted.Contractor to remove all paint spray on floor, equipment, or machines. Clean all trolley rails, etc. that are clogged with paint and difficult to operate.Removing Plastic CoveringsContractor is always required to remove upper coverings first. Such coverings include: light fixtures, bus duct, sprinkler bags, etc. Machine coverings are next and floor coverings are last. Slow, deliberate rolling technique of covering removal will minimize spillage of paint dust and cleanup time.Where contractor is required to double cover equipment or parts, the first layer of covering is to be completely removed before the final cover is carefully lifted off._____________________________________________________________________________________________________________ TITLE: Painting Interior of Plant PROJECT SPEC:ISSUED BY: DATE: REVISION DATE:_____________________________________________________________________________________________________________ Any mess made by painting operation over weekends must be cleaned up to owner's satisfaction by Sunday night, at beginning of Monday’s C-shift.Work by NexteerA. Nexteer will furnish compressed air and electrical power as required, connections by the contractor.B. Nexteer will furnish storage area on property and in close proximity to job for contractor's materials and trailer.C. Nexteer will maintain and furnish a trash compactor for use by contractor for disposing of drop cloths.D. Production material, gons, tool boxes, etc. will be removed from the areas when feasible, as agreed upon in walk thru. References & ExperienceThe Contractor shall supply with the quotation a listing of industrial plants they have painted in recent years. Include the size of the area painted, the names of the facility and references as requested.SafetyThe Contractor shall submit with his quotation the following1. Their experience modification rate.2. A copy of their safety rules and program.3. A detailed fall protection plan.The contractor is responsible to properly train all of his employees.The contractors employees must attended and passed the Nexteer Health and Safety Training Course taken at Great Lakes in Midland and carry a completion card. The contractor will be responsible for paying for the training and should include the cost in the bid.The contractor shall conduct tool box safety talks at the beginning of each work shift.The Contractor must comply with all applicable OSHA, Federal, State, Plant safety rules, and Nexteer 1638 Construction General Conditions. All Governmental mandated safety requirements for working at an elevated work height shall be met. Nexteer has a fall protection policy that is more stringent than OSHA. Workers in manlifts must wear harnesses and be tied off to the manufacturers approved location in the manlift. All workers working in areas over 6’ above the floor level must be tied off to an approved anchor point. A copy of the Nexteer Fall Protection Program will be supplied if you do not have. Maps of the structures approved fall protection anchor points are located in the maintenance dept.The Contractor shall provide and utilize manlifts whenever and wherever possible. In non-accessible areas, the identified temporary anchor points shall be used.The Contractor shall also wear the necessary safety equipment as required for the products they are using.The Contractor will be required to attend a meeting with our Safety Department to review his safety procedures and our expectations prior to starting the job. ._____________________________________________________________________________________________________________ TITLE: Painting Interior of Plant PROJECT SPEC:ISSUED BY: DATE: REVISION DATE:_____________________________________________________________________________________________________________。