板模板(盘扣式)计算书计算依据:1、《建筑施工承插型盘扣式钢管支架安全技术规程》JGJ231-20102、《建筑施工模板安全技术规范》JGJ162-20083、《混凝土结构设计规范》GB 50010-20104、《建筑结构荷载规范》GB 50009-20125、《钢结构设计规范》GB 50017-2003一、工程属性二、荷载设计三、模板体系设计设计简图如下:模板设计平面图纵向剖面图横向剖面图四、面板验算按三等跨连续梁,取1m单位宽度计算。
W=bh2/6=1000×12×12/6=24000mm3,I=bh3/12=1000×12×12×12/12=144000m m4承载能力极限状态q1=[1.2×(G1k+(G2k+G3k)×h)+1.4×Q1k]×b=[1.2×(0.1+(24+1.1)×0.15)+1.4×3]×1=8.838kN/mq1静=[γG(G1k +(G2k+G3k)h)b] = [1.2×(0.1+(24+1.1)×0.15)×1]=4.638kN/mq1活=(γQ×Q1k)×b=(1.4×3)×1=4.2kN/m正常使用极限状态q=(γG(G1k +(G2k+G3k)×h)+γQ×Q1k)×b=(1×(0.1+(24+1.1)×0.15)+1×3)×1=6.865kN/m计算简图如下:1、强度验算M max=0.1q1静L2+0.117q1活L2=0.1×4.638×0.32+0.117×4.2×0.32=0.086kN·m σ=M max/W=0.086×106/24000=3.582N/mm2≤[f]=16.83N/mm2满足要求!2、挠度验算νmax=0.677ql4/(100EI)=0.677×6.865×3004/(100×9350×144000)=0.28mm νmax=0.28mm≤min{300/150,10}=2mm满足要求!五、小梁验算q1=[1.2×(G1k+(G2k+G3k)×h)+1.4×Q1k]×b=[1.2×(0.3+(24+1.1)×0.15)+1.4×3]×0.3=2.723kN/m 因此,q1静=1.2×(G1k+(G2k+G3k)×h)×b=1.2×(0.3+(24+1.1)×0.15)×0.3=1.463kN/mq1活=1.4×Q1k×b=1.4×3×0.3=1.26kN/m计算简图如下:1、强度验算M1=0.125q1静L2+0.125q1活L2=0.125×1.463×1.22+0.125×1.26×1.22=0.49kN·m M2=q1L12/2=2.723×0.12/2=0.014kN·mM max=max[M1,M2]=max[0.49,0.014]=0.49kN·mσ=M max/W=0.49×106/42670=11.488N/mm2≤[f]=12.87N/mm2满足要求!2、抗剪验算V1=0.625q1静L+0.625q1活L=0.625×1.463×1.2+0.625×1.26×1.2=2.043kNV2=q1L1=2.723×0.1=0.272kNV max=max[V1,V2]=max[2.043,0.272]=2.043kNτmax=3V max/(2bh0)=3×2.043×1000/(2×40×80)=0.957N/mm2≤[τ]=1.39N/mm2 满足要求!3、挠度验算q=(γG(G1k+(G2k+G3k)×h)+γQ×Q1k)×b=(1×(0.3+(24+1.1)×0.15)+1×3)×0.3=2.119kN/m挠度,跨中νmax=0.521qL4/(100EI)=0.521×2.119×12004/(100×8415×170.67×104)=1. 594mm≤[ν]=min(L/150,10)=min(1200/150,10)=8mm;悬臂端νmax=ql14/(8EI)=2.119×1004/(8×8415×170.67×104)=0.002mm≤[ν]=min(2×l/150,10)=min(2×100/150,10)=1.333mm1满足要求!六、主梁验算1、小梁最大支座反力计算q1=[1.2×(G1k+(G2k+G3k)×h)+1.4×Q1k]×b=[1.2×(0.5+(24+1.1)×0.15)+1.4×3]×0.3=2.795kN/m q1静=1.2×(G1k +(G2k+G3k)×h)×b=1.2×(0.5+(24+1.1)×0.15)×0.3=1.535kN/m q1活=1.4×Q1k×b =1.4×3×0.3=1.26kN/mq2=(γG(G1k+(G2k+G3k)×h)+γQ×Q1k)×b=(1×(0.5+(24+1.1)×0.15)+1×3)×0.3=2.179kN/m 承载能力极限状态按二等跨连续梁,R max=1.25q1L=1.25×2.795×1.2=4.193kN按悬臂梁,R1=2.795×0.1=0.28kNR=max[R max,R1]=4.193kN;正常使用极限状态按二等跨连续梁,R'max=1.25q2L=1.25×2.179×1.2=3.269kN按悬臂梁,R'1=q2l1=2.179×0.1=0.218kNR=max[R'max,R'1]=3.269kN;计算简图如下:主梁计算简图一2、抗弯验算主梁弯矩图一(kN·m)σ=M max/W=1.95×106/10330=188.746N/mm2≤[f]=205N/mm2满足要求!3、抗剪验算主梁剪力图一(kN)τmax=V max/(8I zδ)[bh02-(b-δ)h2]=9.487×1000×[40×602-(40-8)×522]/(8×309900×8)=27. 49N/mm2≤[τ]=125N/mm2满足要求!4、挠度验算主梁变形图一(mm)跨中νmax=1.911mm≤[ν]=min{1200/150,10}=8mm悬挑段νmax=0.668mm≤[ν]=min(2×150/150,10)=2mm满足要求!5、支座反力计算承载能力极限状态图一支座反力依次为R1=11.478kN,R2=17.873kN,R3=17.873kN,R4=11.478kN 七、可调托座验算按上节计算可知,可调托座受力N=17.873kN≤[N]=30kN满足要求!八、立柱验算1、长细比验算l01=hˊ+2ka=1000+2×0.7×450=1630mml0=ηh=1.2×1800=2160mmλ=max[l01,l0]/i=2160/15.9=135.849≤[λ]=150满足要求!2、立柱稳定性验算根据《建筑施工承插型盘扣式钢管支架安全技术规程》JGJ231-2010公式5.3.1-2:小梁验算q1=[1.2×(0.5+(24+1.1)×0.15)+1.4×0.9×3]×0.3 = 2.669kN/m同上四~六步计算过程,可得:R1=10.961kN,R2=17.067kN,R3=17.067kN,R4=10.961kN顶部立柱段:λ1=l01/i=1630.000/15.9=102.516查表得,φ=0.573不考虑风荷载:N1=Max[R1,R2,R3,R4]=Max[10.961,17.067,17.067,10.961]=17.098kN f= N1/(ΦA)=17098/(0.573×424)=70.376N/mm2≤[f]=205N/mm2满足要求!考虑风荷载:M w=γQφcωk×l a×h2/10=1.4×0.9×0.076×1.2×1.82/10=0.037kN·mN1w=Max[R1,R2,R3,R4]+M w/l b=Max[10.961,17.067,17.067,10.961]+0.037/1.2=17.098kN f= N1w/(φA)+M w/W=17098/(0.573×424)+0.037×106/4730=78.198N/mm2≤[f]=205N/mm2 满足要求!非顶部立柱段:λ=l0/i=2160.000/15.9=135.849查表得,φ1=0.371不考虑风荷载:N=Max[R1,R2,R3,R4]+γG×q×H=Max[10.961,17.067,17.067,10.961]+1.2×0.15×4.5=17. 877kNf=N/(φ1A)=17.877×103/(0.371×424)=113.646N/mm2≤[σ]=205N/mm2满足要求!考虑风荷载:M w=γQφcωk×l a×h2/10=1.4×0.9×0.076×1.2×1.82/10=0.037kN·mN w=Max[R1,R2,R3,R4]+γG×q×H+M w/l b=Max[10.961,17.067,17.067,10.961]+1.2×0.15×4 .5+0.037/1.2=17.908kNf=N w/(φ1A)+M w/W=17.908×103/(0.371×424)+0.037×106/4490=121.665N/mm2≤[σ] =205N/mm2满足要求!九、高宽比验算根据《建筑施工承插型盘扣式钢管支架安全技术规范》JGJ231-2010 第6.1.4: 对长条状的独立高支模架,架体总高度与架体的宽度之比不宜大于3 H/B=4.5/27=0.167≤3满足要求!十、抗倾覆验算混凝土浇筑前,倾覆力矩主要由风荷载产生,抗倾覆力矩主要由模板及支架自重产生M T=ψc×γQ(ωk L1Hh2+Q3k L1h1)=1×1.4×(0.076×45×4.5×3.9+0.55×45×3.9)=219.164kN ·mM R=γG(G1k+0.15H/(l a l b))L1B12/2=0.9×(0.5+0.15×4.5/(1.2×1.2))×45×272/2=14300.93k N·mM T=219.164kN·m≤M R=14300.93kN·m满足要求!混凝土浇筑时,倾覆力矩主要由泵送、倾倒混凝土等因素产生的水平荷载产生,抗倾覆力矩主要由钢筋、混凝土、模板及支架自重产生M T=ψc×γQ(Q2k L1H+Q3k L1h1)=1×1.4×(0.25×45×4.5+0.55×45×3.9)=206.01kN·mM R=γG[(G2k+G3k)×h0+(G1k+0.15H/(l a l b))]L1B12/2=0.9×[(24+1.1)×0.15+(0.5+0.15×4.5 /(1.2×1.2))]×45×272/2=69880.801kN·mM T=206.01kN·m≤M R=69880.801kN·m满足要求!梁模板(盘扣式,梁板立柱共用)计算书计算依据:1、《建筑施工承插型盘扣式钢管支架安全技术规程》JGJ231-20102、《混凝土结构设计规范》GB 50010-20103、《建筑结构荷载规范》GB 50009-20124、《钢结构设计规范》GB 50017-2003一、工程属性二、荷载设计三、模板体系设计设计简图如下:平面图立面图四、面板验算取单位宽度b=1000mm,按四等跨连续梁计算:W=bh2/6=1000×15×15/6=37500mm3,I=bh3/12=1000×15×15×15/12=281250m m4q1=[1.2(G1k+(G2k+G3k)×h)+1.4×Q1k]×b=[1.2×(0.1+(24+1.5)×1.35)+1.4×3]×1=45.6 3kN/mq1静=1.2×[G1k+(G2k+G3k)×h]×b=1.2×[0.1+(24+1.5)×1.35]×1=41.43kN/mq1活=1.4×Q1k×b=1.4×3×1=4.2kN/mq2=[1×G1k+1×(G2k+G3k)×h+1×Q1k]×b=[1×0.1+1×(24+1.5)×1.35+1×3]×1=37.525k N/m计算简图如下:1、强度验算M max=0.107q1静L2+0.121q1活L2=0.107×41.43×0.152+0.121×4.2×0.152=0.111kN·m σ=M max/W=0.111×106/37500=2.965N/mm2≤[f]=15N/mm2满足要求!2、挠度验算νmax=0.632q2L4/(100EI)=0.632×37.525×1504/(100×10000×281250)=0.043mm≤[ν]=min[L/150,10]=min[150/150,10]=1mm满足要求!3、支座反力计算设计值(承载能力极限状态)R1=R5=0.393q1静L+0.446q1活L=0.393×41.43×0.15+0.446×4.2×0.15=2.723kN R2=R4=1.143q1静L+1.223q1活L=1.143×41.43×0.15+1.223×4.2×0.15=7.874kN R3=0.928q1静L+1.142q1活L=0.928×41.43×0.15+1.142×4.2×0.15=6.487kN标准值(正常使用极限状态)R1'=R5'=0.393q2L=0.393×37.525×0.15=2.212kNR2'=R4'=1.143q2L=1.143×37.525×0.15=6.434kNR3'=0.928q2L=0.928×37.525×0.15=5.223kN五、小梁验算承载能力极限状态:梁底面板传递给左边小梁线荷载:q1左=R1/b=2.723/1=2.723kN/m梁底面板传递给中间小梁最大线荷载:q1中=Max[R2,R3,R4]/b =Max[7.874,6.487,7.874]/1= 7.874kN/m梁底面板传递给右边小梁线荷载:q1右=R5/b=2.723/1=2.723kN/m小梁自重:q2=1.2×(0.3-0.1)×0.6/4 =0.036kN/m梁左侧模板传递给左边小梁荷载q3左=1.2×0.5×(1.35-0.15)=0.72kN/m梁右侧模板传递给右边小梁荷载q3右=1.2×0.5×(1.35-0.15)=0.72kN/m梁左侧楼板传递给左边小梁荷载q4左=[1.2×(0.5+(24+1.1)×0.15)+1.4×3]×(0.5-0.6/ 2)/2×1=0.932kN/m梁右侧楼板传递给右边小梁荷载q4右=[1.2×(0.5+(24+1.1)×0.15)+1.4×3]×((1-0.5)-0.6/2)/2×1=0.932kN/m左侧小梁荷载q左=q1左+q2+q3左+q4左 =2.723+0.036+0.72+0.932=4.411kN/m 中间小梁荷载q中= q1中+ q2=7.874+0.036=7.91kN/m右侧小梁荷载q右=q1右+q2+q3右+q4右 =2.723+0.036+0.72+0.932=4.411kN/m 小梁最大荷载q=Max[q左,q中,q右]=Max[4.411,7.91,4.411]=7.91kN/m正常使用极限状态:梁底面板传递给左边小梁线荷载:q1左'=R1'/b=2.212/1=2.212kN/m梁底面板传递给中间小梁最大线荷载:q1中'=Max[R2',R3',R4']/b =Max[6.434,5.223,6.434]/1= 6.434kN/m梁底面板传递给右边小梁线荷载:q1右'=R5'/b=2.212/1=2.212kN/m小梁自重:q2'=1×(0.3-0.1)×0.6/4 =0.03kN/m梁左侧模板传递给左边小梁荷载q3左'=1×0.5×(1.35-0.15)=0.6kN/m梁右侧模板传递给右边小梁荷载q3右'=1×0.5×(1.35-0.15)=0.6kN/m梁左侧楼板传递给左边小梁荷载q4左'=[1×(0.5+(24+1.1)×0.15)+1×3]×(0.5-0.6/2)/2×1=0.727kN/m梁右侧楼板传递给右边小梁荷载q4右'=[1×(0.5+(24+1.1)×0.15)+1×3]×((1-0.5)-0.6/ 2)/2×1=0.727kN/m左侧小梁荷载q左'=q1左'+q2'+q3左'+q4左' =2.212+0.03+0.6+0.727=3.569kN/m 中间小梁荷载q中'= q1中'+ q2'=6.434+0.03=6.464kN/m右侧小梁荷载q右'=q1右'+q2'+q3右'+q4右' =2.212+0.03+0.6+0.727=3.569kN/m 小梁最大荷载q'=Max[q左',q中',q右']=Max[3.569,6.464,3.569]=6.464kN/m为简化计算,按二等跨连续梁和悬臂梁分别计算,如下图:1、抗弯验算M max=max[0.125ql12,0.5ql22]=max[0.125×7.91×0.92,0.5×7.91×0.22]=0.801kN·mσ=M max/W=0.801×106/64000=12.514N/mm2≤[f]=15.44N/mm2满足要求!2、抗剪验算V max=max[0.625ql1,ql2]=max[0.625×7.91×0.9,7.91×0.2]=4.449kNτmax=3V max/(2bh0)=3×4.449×1000/(2×60×80)=1.39N/mm2≤[τ]=1.78N/mm2满足要求!3、挠度验算ν1=0.521q'l14/(100EI)=0.521×6.464×9004/(100×9350×256×104)=0.923mm≤[ν]=min[l1/150,10]=min[900/150,10]=6mmν2=q'l24/(8EI)=6.464×2004/(8×9350×256×104)=0.054mm≤[ν]=min[2l2/150,10]= min[400/150,10]=2.667mm满足要求!4、支座反力计算承载能力极限状态R max=[1.25qL1,0.375qL1+qL2]=max[1.25×7.91×0.9,0.375×7.91×0.9+7.91×0.2]=8.899 kN同理可得:梁底支撑小梁所受最大支座反力依次为R1=4.962kN,R2=8.899kN,R3=7.338kN,R4= 8.899kN,R5=4.962kN正常使用极限状态R max'=[1.25q'L1,0.375q'L1+q'L2]=max[1.25×6.464×0.9,0.375×6.464×0.9+6.464×0.2]= 7.272kN同理可得:梁底支撑小梁所受最大支座反力依次为R1'=4.015kN,R2'=7.272kN,R3'=5.91kN,R4' =7.272kN,R5'=4.015kN六、主梁验算主梁自重忽略不计,主梁2根合并,其受力不均匀系数=0.6,则单根主梁所受集中力为Ks×Rn,Rn为各小梁所受最大支座反力1、抗弯验算主梁弯矩图(kN·m)σ=M max/W=0.727×106/4490=161.825N/mm2≤[f]=205N/mm2满足要求!2、抗剪验算主梁剪力图(kN)V max=6.381kNτmax=2V max/A=2×6.381×1000/424=30.1N/mm2≤[τ]=125N/mm2 满足要求!3、挠度验算主梁变形图(mm)νmax=0.26mm≤[ν]=min[L/150,10]=min[500/150,10]=3.333mm满足要求!4、支座反力计算承载能力极限状态支座反力依次为R1=1.935kN,R2=17.165kN,R3=1.935kN立柱所受主梁支座反力依次为P1=1.935/0.6=3.225kN,P2=17.165/0.6=28.609kN,P3=1.935/0.6=3.225kN七、可调托座验算1、扣件抗滑移验算两侧立柱最大受力N=max[R1,R3]=max[1.935,1.935]=1.935kN≤0.85×8=6.8kN 单扣件在扭矩达到40~65N·m且无质量缺陷的情况下,单扣件能满足要求!2、可调托座验算可调托座最大受力N=max[P2]=28.609kN≤[N]=30kN满足要求!八、立柱验算1、长细比验算h max=max(ηh,h'+2ka)=max(1.2×1500,1000+2×0.7×500)=1800mmλ=h max/i=1800/15.9=113.208≤[λ]=150长细比满足要求!查表得,φ=0.3862、风荷载计算M w=φc×1.4×ωk×l a×h2/10=0.9×1.4×0.031×0.9×1.52/10=0.008kN·m根据《建筑施工承插型盘扣式钢管支架安全技术规程》JGJ231-2010公式5.3.1-2:1)面板验算q1=[1.2×(0.1+(24+1.5)×1.35)+1.4×0.9×3]×1=45.21kN/m2)小梁验算q1=max{2.695+1.2×[(0.3-0.1)×0.6/4+0.5×(1.35-0.15)]+[1.2×(0.5+(24+1.1)×0.15)+1. 4×0.9×3]×max[0.5-0.6/2,(1-0.5)-0.6/2]/2×1,7.797+1.2×(0.3-0.1)×0.6/4}=7.833kN /m同上四~六计算过程,可得:P1=3.18kN,P2=28.286kN,P3=3.18kN立柱最大受力N w=max[P1+N边1,P2,P3+N边2]+1.2×0.15×(3.9-1.35)+M w/l b=max[ 3.18+[1.2×(0.5+(24+1.1)×0.15)+1.4×0.9×3]×(0.9+0.5-0.6/2)/2×0.9,28.286,3.18+[ 1.2×(0.5+(24+1.1)×0.15)+1.4×0.9×3]×(0.9+1-0.5-0.6/2)/2×0.9]+0.459+0.008/1=28. 753kNf=N/(φA)+M w/W=28753.141/(0.386×424)+0.008×106/4490=177.466N/mm2≤[f]=300N/mm2满足要求!九、高宽比验算根据《建筑施工承插型盘扣式钢管支架安全技术规范》JGJ231-2010 第6.1.4: 对长条状的独立高支模架,架体总高度与架体的宽度之比不宜大于3 H/B=3.9/30=0.13≤3满足要求,不需要进行抗倾覆验算!十、立柱支承面承载力验算F1=N=28.753kN1、受冲切承载力计算根据《混凝土结构设计规范》GB50010-2010第6.5.1条规定,见下表可得:βh=1,f t=0.829N/mm2,η=1,h0=h-20=130mm,u m =2[(a+h0)+(b+h0)]=1320mmF=(0.7βh f t+0.25σpc,m)ηu m h0=(0.7×1×0.829+0.25×0)×1×1320×130/1000=99.579kN≥F1=28.753kN满足要求!2、局部受压承载力计算根据《混凝土结构设计规范》GB50010-2010第6.6.1条规定,见下表可得:f c=8.294N/mm2,βc=1,βl=(A b/A l)1/2=[(a+2b)×(b+2b)/(ab)]1/2=[(600)×(600)/(200×200)]1/2=3,A ln=ab=40000 mm2F=1.35βcβl f c A ln=1.35×1×3×8.294×40000/1000=1343.628kN≥F1=28.753kN满足要求!墙模板(木模板)计算书计算依据:1、《建筑施工模板安全技术规范》JGJ162-20082、《混凝土结构设计规范》GB50010-20103、《建筑结构荷载规范》GB 50009-20124、《钢结构设计规范》GB 50017-2003一、工程属性二、荷载组合新浇混凝土对模板的侧压力标准值G4k=min[0.22γc t0β1β2v1/2,γc H]=min[0.22×24×4×1×1×21/2,24×4.5]=min[29.87,108]=29.87kN/m2承载能力极限状态设计值S承=0.9max[1.2G4k+1.4Q3k,1.35G4k+1.4×0.7Q3k]=0.9 max[1.2×29.87+1.4×2,1.35×29.87+1.4×0.7×2]=0.9max[38.644,42.285]=0.9×42 .285=38.056kN/m2正常使用极限状态设计值S正=G4k=29.87 kN/m2三、面板布置模板设计立面图四、面板验算墙截面宽度可取任意宽度,为便于验算主梁,取b=0.5m,W=bh2/6=500×122/ 6=12000mm3,I=bh3/12=500×123/12=72000mm41、强度验算q=bS承=0.5×38.056=19.028kN/m面板弯矩图(kN·m)M max=0.095kN·mσ=M max/W=0.095×106/12000=7.928N/mm2≤[f]=15N/mm2 满足要求!2、挠度验算q=bS正=0.5×29.87=14.935kN/m面板变形图(mm)ν=0.43mm≤[ν]=l/400=200/400=0.5mm满足要求!五、小梁验算1、强度验算q=bS承=0.275×38.056=10.465kN/m小梁弯矩图(kN·m)小梁剪力图(kN)M max=0.327kN·mσ=M max/W=0.327×106/42670=7.664N/mm2≤[f]=16.2N/mm2 满足要求!2、挠度验算q=bS正=0.275×29.87=8.214kN/m小梁变形图(mm)ν=0.462mm≤[ν]=l/400=500/400=1.25mm满足要求!3、支座反力计算R1=4.507kN,R2=...R37=4.007kN,R38=5.509kN六、主梁验算1、强度验算主梁弯矩图(kN·m)M max=0.611kN·mσ=M max/W=0.611×106/4490=136.083N/mm2≤[f]=205N/mm2 满足要求!2、挠度验算主梁变形图(mm)ν=0.369mm≤[ν]=l/400=500/400=1.25mm满足要求!七、对拉螺栓验算对拉螺栓横向验算间距m=max[500,500/2+200]=500mm 对拉螺栓竖向验算间距n=max[500,500/2+250]=500mm N=0.95mnS承=0.95×0.5×0.5×38.056=9.038kN≤N t b=17.8kN 满足要求!柱模板(设置对拉螺栓)计算书计算依据:1、《建筑施工模板安全技术规范》JGJ162-20082、《混凝土结构设计规范》GB50010-20103、《建筑结构荷载规范》GB 50009-20124、《钢结构设计规范》GB 50017-2003一、工程属性二、荷载组合新浇混凝土对模板的侧压力标准值G4k=min[0.22γc t0β1β2v1/2,γc H]=min[0.22×24×4×1×1×21/2,24×4.5]=min[29.87,108]=29.87kN/m2承载能力极限状态设计值S承=0.9max[1.2G4k+1.4Q3k,1.35G4k+1.4×0.7Q3k]=0.9 max[1.2×29.87+1.4×2,1.35×29.87+1.4×0.7×2]=0.9max[38.644,42.285]=0.9×42 .285=38.056kN/m2正常使用极限状态设计值S正=G4k=29.87 kN/m2三、面板验算模板设计平面图1、强度验算最不利受力状态如下图,按四等跨连续梁验算静载线荷载q1=0.9×1.35bG4k=0.9×1.35×0.7×29.87=25.404kN/m活载线荷载q2=0.9×1.4×0.7bQ3k=0.9×1.4×0.7×0.7×2=1.235kN/mM max=-0.107q1l2-0.121q2l2=-0.107×25.404×0.152-0.121×1.235×0.152=-0.065kN·m σ=M max/W=0.065×106/(1/6×700×122)=3.841N/mm2≤[f]=14.742N/mm2满足要求!2、挠度验算作用线荷载q=bS正=0.7×29.87=20.909kN/mν=0.632ql4/(100EI)=0.632×20.909×1504/(100×8925×(1/12×700×123))=0.074mm≤[ν]=l/400=150/400=0.375mm满足要求!四、小梁验算1、强度验算小梁上作用线荷载q=bS承=0.15×38.056=5.708 kN/m小梁弯矩图(kN·m)M max=0.285kN·mσ=M max/W=0.285×106/42.67×103=6.672N/mm2≤[f]=13.5N/mm2满足要求!2、抗剪验算小梁剪力图(kN·m)V max=2.346kNτmax=3V max/(2bh0)=3×2.346×1000/(2×40×80)=1.1N/mm2≤[τ]=1.35N/mm2 满足要求!3、挠度验算小梁上作用线荷载q=bS正=0.15×29.87=4.481 kN/m小梁变形图(mm) ν=0.409mm≤[ν]=1.5mm满足要求!4、支座反力计算承载能力极限状态R max=4.438正常使用极限状态R max=3.484五、柱箍验算模板设计立面图1、柱箍强度验算连续梁中间集中力取小P值;两边集中力为小梁荷载取半后,取P/2值。
目录第一章前言.......................................... 错误!未定义书签。
第二章方案论述....................................... 错误!未定义书签。
2.1建筑设计说明......................................... 错误!未定义书签。
2.1.1设计依据....................................................................................... 错误!未定义书签。
2.1.2设计内容....................................................................................... 错误!未定义书签。
2.1.3建筑方案简图............................................................................... 错误!未定义书签。
2.2建筑设计论述......................................... 错误!未定义书签。
2.2.1各部分工程构造........................................................................... 错误!未定义书签。
2.3结构设计说明......................................... 错误!未定义书签。
2.3.1建筑部分....................................................................................... 错误!未定义书签。
2.3.2结构设计依据............................................................................... 错误!未定义书签。
筑龙网 w w w .z h u l o n g .c o m 泵站设计计算书一、流量确定考虑到输水管漏渗和净化站本身用水,取自用水系数α=1.5,则近期设计流量: Q=1.05×100000÷3600÷24=1.215 m ³/s远期设计流量 :Q=1.05×1.5×100000÷3600÷24=1.823 m ³/s二、设计扬程(1)水泵扬程: H=HST+Σh式中HST 为水泵静扬程.Σh 包括压水管水头损失、吸水管路水头损失和泵站内部水头损失采用灵菱型式取水头部。
在最不利情况下的水头损失,即一条虹吸自流管检修时要求另一条自流管通过75%最大设计流量,取水头部到吸水间的全部水头损失为1米,则吸水间最高水面标高为4.36-1=39.36米,最低水位标高为32.26-1=31.26米。
正常情况时,Q=1.215/2=0.608 m ³/s,一般不会淤泥,所以设计最小静扬程: HST=42.50-39.36=3.14 m 设计最大静扬程: HST=42.50-31.26=11.24 m(2)输水管中的水头损失∑h 设采用两条φ900铸铁管,由徽城给水工程总平面图可知,泵站到净水输水管干线全长1000m ,当一条输水管检修时,另一条输水管应通过75%设计流量,即:Q=0.75×1.823=1.367 m ³/s ,查水力计算表得管内流速v=2.16 m/s, 1000i=5.7m ,所以∑h=1.1×5.7×1000/1000=6.27m (式中1.1系包括局部水头损失而加大的系数)。
(3)泵站内管路中的水头损失hp其值粗估为2 m(4)安全工作水头 hp其值粗估为2 m综上可知,则水泵的扬程为:设计高水位时:Hmax=11.24+1+6.27+2+2=21.51 m设计低水位时:Hmin=3.14+1+6.27+2+2=13.41 m三、机组选型及方案比较:筑龙网 w w w .z h u l o n g .c o m 水泵选型有以下二种方案:方案一 方案二水泵型号 20sh-19 20sh-19A 流量范围 450─650L/s 36─560L/s扬程范围 15─27m 14─23m轴功率 148─137KW 108KW允许吸上真空高度 4m 4m泵重量 1950Kg 2000Kg 电动机重量 1530Kg 1380Kg功率 190KW 135KW配带电动机型号 JR-126─6 JS-126─6方案一: 一台20sh-19型水泵(Q=450~650 l/s,H=15~27m, N=148~137KW),近期4台,3台工作,一台备用,远期增加一台,4台工作,一台备用。
工程量计算书一、土石方工程1.平整场地清单量S=49.2*(16.2-1.8-1.8+0.2)+(3.7+0.2)*0.8*2+(3.8*2+0.2)*0.8*2+(3.1+2.6+3.1+0.2)*1*3+(2.6+0.2)*0.8*3=682.2m²计价量S′=682.2+(49.2+2*2)*2+(16.2-1.8-1+0.2+2)*2*2+3.7*2*2+3.1*2*6+2.6*2*3+(1.2*2+1.6*2+2)*3=963.8m²2.挖一般土方:挖土深度6.6-0.7=5.9mV=[(49+1.4*2)*(16.2-1-1.8+0.5*2)+(3.1*2+2.6+1.7+1)*(0.5+1.25)*2+(3.1*2+2.6+1.1*2)*(0.5+1.25)]*5.9+(3.3*3.6*3+5.95*2.6+2.6*4.4*2)*0.2=5526.453m³计价量:考虑工作面,地下室做防水,基础外边外扩1m,放坡系数:机械开挖,坑内作业,选择0.33V′=(A+2C+KH)*(B+2C+KH)*H+1/3*K²H³=(49+1.4*2+2*0.7+0.33*5.53)*(15.2+0.5+0.45+2*0.7+0.33*5.53)*5.53+1/3*0.33²*5.53³=5901.68m³3.挖基坑土方V=(2.2+0.7*2)*(2.6+0.7*2)*3*(8.18-5.53-0.7)=84.24m³4.土方回填V(垫层)=[(49+1.4*2+0.1*2)*(13.4+0.5*2+0.1*2)+(1+1.25-0.5)*(1.2+3.1*2+ 2.6+0.5+1+0.1*2)*2+(1.25+1+0.5)*(10+1.1*+0.1*2)]*0.1=84.89m³V(防水找平层)=848.9*0.07=59.423m³V(褥垫层)=850.75*0.2=170.15m³V(满堂基础)=[(49+1.4*2)*(13.4+1)+11.5*1.75*2+12.2*1.75]*0.7+(3.3*3.6*3+5.95*2.6+2.6*4.4*2)*0.9+43.2*1.95=736.095m³V(地下室)=[49.2*13.6+(3.1*2+2.6+0.2)*1.2*3]*(5.53-0.7)=3388.35m³V(回填)=5526.45+84.24-84.89-59.423-170.15-736.095-3388.35=1171.78m³5.余方弃置V=5526.45+84.24-1171.78=4438.91m³二、砌筑工程:标准层第四层1.砌体墙 200厚外墙1轴:V=[5.6(长度)*2.9(墙高)*0.2(墙厚)-0.72(扣窗)-0.532(扣梁)]*2(根数)=3.992m³V=(3.8*2.9*0.2-0.3-0.366)*2=2.076m³J轴:V=(1.9*2.9*0.2-0.54-0.19)*3=1.116m³V=(2.4*2.9*0.2-0.285-0.24)*3=2.601m³V=(1.9*2.9*0.2-0.54-0.19)*3=1.116m³H轴:V=(3*2.9*0.2-0.54-0.3)*2=1.8m³V=(2.1*2.9*0.2-0.45-0.21)*4=2.232m³V=(3.4*2.9*0.2-0.27-0.258)*4=5.776m³V=(1.4*2.9*0.2-0.126)*2=1.372m³F轴:V=(2*2.9*0.2-0.21-0.16)*4=3.16m³A轴:V=(8.8*2.9*0.2-2.312-0.688)*3=6.312m³V=(0.9*2.9*0.2-0.238-0.072)*6=1.272m³B轴:V=(2.2*2.9*0.2-0.68-0.22)*2=0.752m³V=(6.1*2.9*0.2-1.36-0.61)*2=3.136m³2.砌体墙 200厚内墙G轴:V=[6.6(长度)*2.9(墙高)*0.2(墙厚)-0.756(扣门)-0.462(扣梁)]*2=5.22m ³V=(5.7*2.9*0.2-0.756-0.387)*4=8.652m³F轴:V=(2*2.9*0.2-0.484-0.16)*3=1.548m³V=0.9*2.9*0.2*4=2.088m³E轴:V=(3.2*2.9*0.2-0.212)*4=6.576m³C轴:V=(7.4*2.9*0.2-2.76-0.868)*3=9.444m³3轴:V=(6.6*2.9*0.2-0.588(扣洞)-0.504-0.632)*6=12.624m³V=(4.2*2.9*0.2-0.378(扣门)-0.406(扣梁))*6=9.912m³4轴:V=(3.05*2.9*0.2-0.216(扣门)-0.291(扣梁))*6=7.572m³V=(1.4*2.9*0.2-0.42(扣门))*6=2.352m³V=0.7*2.9*0.2*6=2.436m³5轴:V=(6.8*2.9*0.2-0.51(扣梁))*3=10.302m³V=(1*2.9*0.2-0.08)*3=1.5m³10轴:V=(5.8*2.9*0.2-0,566)*2=5.596m³3.砌体墙 100厚内墙F轴:V=(3.5*2.9*0.1-0.1225(扣梁))*2=0.785m³2轴:V=(2.1*2.9*0.1-0.168(扣门)-0.06(扣梁))*6=2.286m³4轴:V=1.2*2.9*0.1*6=2,088m³V=(1.75*2.9*0.1-0.147(扣门)-0.0525(扣梁))6=1.848m³D轴:V=(2.45*2.9*0.0.0813(扣梁))*6=3.7752m³三、混凝土及钢筋混凝土工程:标准层第四层1.矩形梁:L8:V=0.2*0.35*3.9=0.273m 模板:S=0.2*3.9+0.35*3.9*2=3.51㎡L4:V=0.2*0.35*3.9=0.273m³模板:S=0.2*3.9+0.35*3.9*2=3.51㎡L10:V=0.2*0.35*15.5=1.085m³模板:S=0.2*15.5+0.35*15.5*2=11.63㎡L1:V=0.2*0.3*2.2*2=0.264m³模板:S=(0.2*2.2+0.3*2.2*2)*2=3.52㎡XL2:V=0.2*0.4*0.9*6=0.432m³模板:S=(0.2*0.9+0.4*0.9*2)*6=5.4㎡L3:V=0.2*0.4*8.8*3=2.112m³模板:S=(0.2*8.8+0.4*8.8*2)*3=26.4㎡L2:V=0.2*0.5*7.2*3=2.16m³模板:S=(0.2*7.2+0.5*7.2*2)*3=25.92㎡L5:V=0.2*0.35*7.8=0.546m³模板:S=0.2*7.8+0.35*7.8*2=7.02㎡XL4:V=0.2*0.45*1.6*2=0.288m³模板:S=(0.2*1.6+0.45*1.6*2)*2=3.52㎡L9:V=0.2*0.35*3.9=0.273m 模板:S=0.2*3.9+0.35*3.9*2=3.51㎡L12:V=0.2*0.35*15.5=1.085m³模板:S=0.2*15.5+0.35*15.5*2=11.63㎡L7:V=0.2*0.35*3.9=0.273m 模板:S=0.2*3.9+0.35*3.9*2=3.51㎡L6:V=0.2*0.35*7.8=0.546m³模板:S=0.2*7.8+0.35*7.8*2=7.02㎡L13:V=0.2*0.3*1.9*4=0.456m³模板:S=(0.2*1.9+0.3*1.9*2)*4=6.08㎡L11:V=0.2*0.35*14.6=1.022m³模板:S=0.2*14.6+0.35*14.6*2=13.14㎡KL1:V=0.2*0.3*2.2*4=0.528m³模板:S=(0.2*2.2+0.3*2.2*2)*4=7.04㎡KL2:V=0.2*0.3*1.8*2=0.216m³模板:S=(0.2*1.8+0.3*1.8*2)*2=2.88㎡LLK26:V=0.2*0.5*3=0.3m³模板:S=0.2*3+0.5*3*2=3.6㎡LLK2:V=0.2*0.5*5.6*2=1.12m³模板:S=(0.2*5.6+0.5*5.6*2)*2=13.44㎡LLK3:V=0.2*0.5*11*2=2.2m³模板:S=(0.2*11+0.5*11*2)*2=26.4㎡LLK1:V=0.2*0.5*3.8=0.38m³模板:S=0.2*3.8+0.5*3.8*2=4.56㎡LLK12:V=0.2*0.5*2.5=0.25m³模板:S=0.2*2.5+0.5*2.5*2=3㎡LLK19:V=0.2*0.4*3.1=0.248m³模板:S=0.2*3.1+0.4*3.1*2=3.1㎡LLK4:V=0.2*0.5*4.5*2=0.9m³模板:S=(0.2*4.5+0.5*4.5*2)*2=10.8㎡LLK24:V=0.2*0.4*2*3=0.48m³模板:S=(0.2*2+0.4*2*2)*3=6㎡LLK5:V=0.2*0.5*4.5*4=1.8m³模板:S=(0.2*4.5+0.5*4.5*2)*4=21.6㎡LLK7:V=0.2*0.5*4.4*4=1.76m³模板:S=(0.2*4.4+0.5*4.4*2)*4=21.12㎡LLK20:V=0.2*0.5*2.1*4=0.84m³模板:S=(0.2*2.1+0.5*2.1*2)*4=10.08㎡LL1:V=0.2*0.5*1.9*4=0.76m³模板:S=(0.2*1.9+0.5*1.9*2)*4=9.12㎡LLK31:V=0.2*0.5*2.4*3=0.72m³模板:S=(0.2*2.4+0.5*2.4*2)*3=8.64㎡LLK25:V=0.2*0.4*4.2*2=0.84m³模板:S=(0.2*4.2+0.4*4.2*2)*2=8.4㎡LLK8:V=0.2*0.4*3.5*4=1.12m³模板:S=(0.2*3.5+0.4*3.5*2)*4=14㎡LL2:V=0.2*0.5*1*3=0.3m³模板:S=(0.2+0.5*2)*3=3.6㎡LLK16:V=0.2*0.6*7.4=0.888m³模板:S=0.2*7.4+0.6*7.4*2=10.36㎡LLK21:V=0.2*0.35*6.5*2=0.91m³模板:S=(0.2*6.5+0.35*6.5*2)*2=11.7㎡LLK6:V=0.2*0.5*5.7*4=2.28m³模板:S=(0.2*5.7+0.5*5.7*2)*4=27.36㎡LLK13:V=0.2*0.5*6.4=0.64m³模板:S=0.2*6.4+0.5*6.4*2=7.68㎡LLK9:V=0.2*0.5*5.9*2=1.18m³模板:S=(0.2*5.9+0.5*5.9*2)*2=14.16㎡LLK22:V=0.2*0.4*6.5*2=1.04m³模板:S=(0.2*6.5+0.4*6.5*2)*2=13㎡LL3:V=0.2*0.5*1.9*2=0.38m³模板:S=(0.2*1.9+0.5*1.9*2)*2=4.56㎡LLK29:V=0.2*0.5*3=0.3m³模板:S=0.2*3+0.5*3*2=3.6㎡LLK23:V=0.2*0.4*3.1=0.248m³模板:S=0.2*3.1+0.4*3.1*2=3.1㎡LLK11:V=0.2*0.5*3.8=0.38m³模板:S=0.2*3.8+0.5*3.8*2=4.56㎡LLK15:V=0.2*0.5*2.5=0.25m³模板:S=0.2*2.5+0.5*2.5*2=3㎡LLK14:V=0.2*0.5*6.4=0.64m³模板:S=0.2*6.4+0.5*6.4*2=7.68㎡LLK17:V=0.2*0.6*7.4=0.888m³模板:S=0.2*7.4+0.6*7.4*2=10.36㎡2.直形墙Q-1 V1=1.7(长度)*2.9(墙高)*0.2(墙厚)*16(个数)=15.776m³模板:V=1.7*(2.9-0.1)*2*16=152.32㎡V2=0.6*2.9*0.2*16=5.568m³模板:S=0.6*(2.9-0.12)*2*16=53.376㎡ V3=3.8*2.9*0.2*2=4.408m³模板:S=3.8*(2.9-0.1)*2*2=42.56㎡ V4=0.5*2.9*0.2*2=0.58m³模板:S=0.5*(2.9-0.1)*2*2=5.6㎡V5=0.3*2.9*0.2*6=1.044m³模板:S=0.3*(2.9-0.12)*2*6=10.01㎡ V6=2.2*2.9*0.2*8=10.208m³模板:S=2.2*(2.9-0.12)*2*8=97.856㎡ V7=0.8*2.9*0.2*4=1.856m³模板:S=0.8*(2.9-0.1)*2*4=17.92㎡ V8=1*2.9*0.2*2=1.16m³模板:S=1*(2.9-0.1)*2*2=11.2㎡Q-2 V1=1.7*2.9*0.2*16=15.776m³模板:S=1.7*(2.9-0.1)2*16=152.32㎡ V2=0.6*2.9*0.2*16=5.568m³模板:S=0.6*(2.9-0.1)*2*16=53.76㎡4.板现浇板 100厚V1=3.5*2.8*0.1*2=1.96m³模板:S=(3.5-0.2)*(2.8-0.2)*2=17.16㎡V2=2.3*2*0.1*2=0.92m³模板:S=(2.3-0.2)*(2-0.2)*2=7.56㎡V3=3.5*2*0.1*2=1.4m³模板:S=(3.5-0.2)*(2-0.2)*2=11.88㎡V4=2.3*1.6*0.1*2=0.736m³模板:S=(2.3-0.2)*(1.6-0.2)*2=5.88㎡V5=3.5*4*0.1*2=2.8m³模板:S=(3.5-0.2)*(4-0.2)*2=25.08㎡V6=1*2*0.1*6=1.2m³模板:S=(1-0.2)*(2-0.2)*2=2.88㎡V7=1*1.6*0.1*6=0.96m³模板:S=(1-0.2)*(1.6-0.2)*6=6.72㎡V8=2.9*3.8*0.1*6=6.612m³模板:S=(2.9-0.2)*(3.8-0.2)*6=58.32㎡V9=4.2*1.6*0.1*6=4.032m³模板:S=(4.2-0.2)*(1.6-0.2)*6=33.6㎡V10=2.4*2*0.1*3=1.44m³模板:S=(2.4-0.2)*(2-0.2)*3=11.88㎡V11=2.6*2.8*0.1*4=2.912m³模板:S=(2.6-0.2)*(2.8-0.2)*4=24.96㎡V12=1.4*2*0.1*4=1.12m³模板:S=(1.4-0.2)*(2-0.2)*4=8.64㎡V13=3.6*2*0.1*4=2.88m³模板:S=(3.6-0.2)*(2-0.2)*4=24.48㎡V14=2.4*1.6*0.1*4=1.536m³模板:S=(2.4-0.2)*(1.6-0.2)*4=12.32㎡V15=3.6*4*0.1*4=5.76m³模板:S=(3.6-0.2)*(4-0.2)*4=51.68㎡现浇板 120厚V1=(2.9*2.2+3.1*2)*0.12*6=9.058m³模板:S=[(2.9-0.2)*(2.2-0.2)+(3.1-0.2)*(2-0.2)]*6=63.72㎡V2=4.2*5*0.12*6=15.12m³模板:S=(4.2-0.2)*(5-0.2)*6=115.2㎡钢筋工程量:剪力墙:1.Q-1 ①水平筋 L=1800-2*15+10d*2=1930mm=1.93mN=[(2900-50)/200+1]*2=16*2=32根(向上取整+1)质量=0.00617*8*8*1.93*32=24.39kg②纵筋L=2900+1.2Lae=2900+1.2*35*10=3320mm=3.32mN=[(900-200*2+15*2+6*2)/200+1]*2=8根(向上取整+1)质量=0.00617*10*10*3.32*8=16.39kg③拉筋L=200-2*15+2*(5d+1,9d)=253mm质量=0.00617*6*6*0.253*18=1.02kgGBZ-1 ①纵筋L=2900+Lle=2900+49*12=3488mm=3.488mL=2900-(Lle+0.3Lle)+0.3Lle+Lle+Lle=3.488mm质量=0.00617*12*12*3.49*7*2=43.4kg②箍筋L=(700+200)*2-8*20+11.9d*2=1830.4mm=1.83mN=2900/200+1=16根质量=0.00617*8*8*1.83*16=11.56kgL=(500+200)*2-8*20+11.9d*2=1382.8mm=1.38m质量=0.00617*6*6*1.38*16=4.9kgL=200-2*20+[1.9d+max(10d,75)]*2=333mm=0.333m质量=0.00617*6*6*0.333*32=2.42kgGBZ-3 ①纵筋L=2900+Lle=2900+49*12=3488mm=3.488mL=2900-(Lle+0.3Lle)+0.3Lle+Lle+Lle=3.488mm质量=0.00617*12*12*3.49*6=18.6kg②箍筋L=(400+200)*2-8*20+11.9d*2=1182.8mm=1.183mN=2900/200+1=16根质量=0.00617*8*8*1.183*16=4.2kgL=200-2*20+[1.9d+max(10d,75)]*2=333mm=0.333m 质量=0.00617*6*6*0.333*16=1.21kgD=6 理论质量小计 (1.02+4.9+2.42+4.2+1.21)*10=137.5kgD=8 理论质量小计 (11.56+24.39)*10=359.5kgD=10 理论质量小计 16.39*10=163.9kgD=12 理论质量小计 (43.4+18.6)*10=620kg。
湖畔郦百合苑9-13、14、15、18、19#楼及车库工程 模板工程施工方案模板计算书1.计算依据1.参考资料《建筑结构施工规范》 GB 50009—2001《钢结构设计规范》 GB 50017—2003《木结构设计规范》 GB 50005—2003《混凝土结构设计规范》 GB 50010—2002《钢结构工程施工质量验收规范》 GB 50205-20012.侧压力计算混凝土作用于模板的侧压力,根据测定,随混凝土的浇筑高度而增加,当浇筑高度达到某一临界时,侧压力就不再增加,此时的侧压力即为新浇筑混凝土的最大侧压力。
侧压力达到最大值的浇筑高度称为混凝土的有效压头。
通过理论和实践,可按下列二式计算,并取其最小值:2/121022.0V t F c ββγ=H F c γ=式中 F------新浇筑混凝土对模板的最大侧压力(KN/m 2)γc ------混凝土的重力密度(kN/m 3),此处取26kN/m 3t 0------新浇混凝土的初凝时间(h ),可按实测确定。
当缺乏实验资料时,可采用t0=200/(T+15)计算;假设混凝土入模温度为250C ,即T=250C ,t 0=5V------混凝土的浇灌速度(m/h );取2.5m/hH------混凝土侧压力计算位置处至新浇混凝土顶面的总高度(m );取9mβ1------外加剂影响修正系数,不掺外加剂时取1;掺具有缓凝作用的外加剂时取1.2。
β2------混凝土塌落度影响系数,当塌落度小于30mm 时,取0.85;50—90mm 时,取1;110—150mm 时,取1.15。
大模板侧压力计算2/121022.0V t F c ββγ=20.22265 1.0 1.0 2.545.2/K N m =⨯⨯⨯⨯⨯=H F c γ==26x9=234KN/m取二者中的较小值,F =45.2kN/ m 2有效压头高度:/45/26 1.74c h F m γ===倾倒混凝土产生的水平载荷标准值4.0 kN/ m 2245.2 1.24 1.460/q K N m =⨯+⨯=柱模板侧压力计算2/121022.0V t F c ββγ= 20.22265 1.0 1.15 2.552/K N m =⨯⨯⨯⨯⨯=H F c γ==26x9=234KN/m取二者中的较小值,F =52kN/ m 2有效压头高度:/52/262c h F m γ===倾倒混凝土产生的水平载荷标准值6.0 kN/ m 2252 1.26 1.471/q K N m =⨯+⨯=综上,大模板混凝土侧压力标准值为45KN/m 2,设计值为60KN/m 2;柱模板混凝土侧压力标准值为52KN/m 2,设计值为80KN/m 2。
石板幕墙设计计算一.基本概况:工程名称: 蛇口SCT大厦幕墙高度:50(m)基本风压:700(Pa)地区类别:A(类)层 间 高:3800(mm)支点间距:3100(mm)分格长度:1000(mm)分格宽度:1200(mm)二.确定荷载:1.风荷载:根据中华人民共和国标准《建筑结构荷载规范》GBJ 9-87,以及中华人民共和国行业标准《玻璃幕墙工程技术规范》(以下称《规范》),建筑物 表面上风荷载标准值,应按下式计算:W k =βzμzμsWo(《规范》5.2.2)式中:W k作用在幕墙上的风荷载标准值(N/m2)βz瞬时风压的阵风系数μz风压高度变化系数μs风荷载体型系数Wo基本风压(N/m2)根据本大楼的具体情况,风荷载计算的有关数据取值如下:βz =2.25μz =1.379(Z/10)^0.24=2.03μs =1.5采用重现期为50年的基本风压值,取系数1.1即:W k =1.1βzμzμsWo=1.1×2.25×2.03×1.5×700=5275.5(Pa)2.地震荷载:根据《规范》规定,垂直于幕墙平面地震作用可按下式计算:q E =βE αmaxG/A (《规范》5.2.5) 式中:q E作用于幕墙平面内的水平地震作用G幕墙构件的重量取:800A幕墙构件的面积αmax 水平地震影响系数最大值,取:βE 动力放大系数,取3.0故:q E =3×0.08×800×A/A=192三.型材断面的设计:1.立柱断面的设计:本大厦的层间高为3800(mm),根据结构的实际情况,立柱采用双支点结构安装,各 支点的距离分别为3100(mm)和 700(mm)(见图一)。
由于每一立柱为 3个支点,即立柱 为一超静定梁,为了简化计算,取两支点间距离较大的一段,并把它简化为简支梁进 行计算。
( 图 一 )根据《规范》5.5.5要求,立柱的最大允许挠度为:L/180且应小于20mm。
一、平整场地:建筑物场地厚度在±30cm以内的挖、填、运、找平。
1、平整场地计算规则(1)清单规则:按设计图示尺寸以建筑物首层面积计算。
(2)定额规则:按设计图示尺寸以建筑物外墙外边线每边各加2米以平方米面积计算。
2、平整场地计算公式S=(A+4)×(B+4)=S底+2L外+16式中:S———平整场地工程量;A———建筑物长度方向外墙外边线长度;B———建筑物宽度方向外墙外边线长度;S底———建筑物底层建筑面积;L外———建筑物外墙外边线周长。
该公式适用于任何由矩形组成的建筑物或构筑物的场地平整工程量计算。
二、基础土方开挖计算开挖土方计算规则(1)、清单规则:挖基础土方按设计图示尺寸以基础垫层底面积乘挖土深度计算。
(2)、定额规则:人工或机械挖土方的体积应按槽底面积乘以挖土深度计算。
槽底面积应以槽底的长乘以槽底的宽,槽底长和宽是指基础底宽外加工作面,当需要放坡时,应将放坡的土方量合并于总土方量中。
2、开挖土方计算公式:(1)、清单计算挖土方的体积:土方体积=挖土方的底面积×挖土深度。
(2)、定额规则:基槽开挖:V=(A+2C+K×H)H×L。
式中:V———基槽土方量;A———槽底宽度;C———工作面宽度;H———基槽深度;L———基槽长度。
.其中外墙基槽长度以外墙中心线计算,内墙基槽长度以内墙净长计算,交接重合出不予扣除。
基坑开挖:V=1/6H[A×B+a×b+(A+a)×(B+b)+a×b]。
式中:V———基坑体积;A—基坑上口长度;B———基坑上口宽度;a———基坑底面长度;b———基坑底面宽度。
三、回填土工程量计算规则及公式1、基槽、基坑回填土体积=基槽(坑)挖土体积-设计室外地坪以下建(构)筑物被埋置部分的体积。
式中室外地坪以下建(构)筑物被埋置部分的体积一般包括垫层、墙基础、柱基础、以及地下建筑物、构筑物等所占体积2、室内回填土体积=主墙间净面积×回填土厚度-各种沟道所占体积主墙间净面积=S底-(L中×墙厚+L内×墙厚)式中:底———底层建筑面积;L中———外墙中心线长度;L内———内墙净长线长度。
1非溢流坝段设计计算1.1设计校核洪水位的确定由堰流公式相应洪水位= 堰顶高程+ H0H0=1.05H dB=Q/qn=B/b式中:Q--流量m3/sB--溢流堰孔口宽mH0--堰顶以上作用水头G--重力加速度9.8m3/sm—流量系数n—孔口数H d—堰面曲线定型设计水头B—溢流孔的净宽b—孔口净宽q—单宽流量--侧收循系数,根据闸墩厚度及墩头形状而定,=1, =0.95,m=0.502,q=60㎡/s,b=5m,堰顶高程=1057.00m计算成果见表:表5.2 堰顶高程1.2坝顶高程的确定坝顶高程分别按设计和校核两种情况,用以下公式进行计算:波浪要素按官厅公式计算。
公式如下:1/31/121022000.0076gh gD v v v -⎛⎫= ⎪⎝⎭...............................① 1/3.751/2.15022000.331gL gD v v v -⎛⎫= ⎪⎝⎭...............................②212z h Hh cthLLππ=...............................③ 库水位以上的超高h ∆:1c z h h h h ∆=++式中1h --波浪高度,mz h --波浪中心线超出静水位的高度,mc h --安全超高,m(查规范得,设计情况取0.3m,校核情况取0.2m)o v --计算风速。
水库为正常蓄水位和设计洪水位时,宜用相应洪水期多年平均最大风速的1.5~2.0倍,取19m/s ,校核洪水位时,宜用相应洪水期多年平均最大风速,15 m/sD-风区长度;取800m L--波长;M H--坝前水深 1.2.1.1 设计情况下gD/v 02=9.8×800/192=21.72,在20—250之间,故h 的累积频率为5%的波高,带入①中,9.8×h 5%/192=0.0076×19-1/12×(9.81×800/192)1/3 得h 5%=0.55m查《混凝土重力坝设计规范》表B.6.3得 h 5%/hm=1.95 hm=0.55/1.95=0.282m h 1%/hm=2.42 h 1%=0.282×2.42=0.682m将各值带入②得9.81L/192=0.331×19-1/2.15×(9.81×800/192)1/3.75L=6.32m 公式③得H=1064.29-1021.00=43.29mhz=3.14×0.6822/6.32×coth(可知库水位超高 1c z h h h h ∆=++=1.213m 可知坝顶高程=1063.17+1.231=1064.38m1.2.1.2校核情况计算方法同上,可知库水位超高 1c z h h h h ∆=++=0.934m 可知坝顶高程=1067.22+0.934=1068.15m以上两种情况取较大值,所以坝顶高程为1068.15m 则坝高=1068.15-1021.00=47.15m1.3确定下游水深由资料可知,坝址处河道宽取37m,假定下游水位h=5m,m=1.43,i-0.00682,b=37,n=0.050 由水力学公式可得A=(b+mh)h=(37+1.43×5)×5=220.75㎡m h b x ++=12=37+2×5×43.11+=52.59mR=A/X=220.75/52.59=4.20 C=R 1/6/n=1/0.05×4.201/6=25.40m 1/2/sQ=AC Ri =220.75×25.40×0.06822.4⨯=948.97m 3/s依次假定h=4m,得Q=644.28 m 3/s假定h=3m,得Q=393.81 m 3/s假定h=2m,得Q=197.72 m 3/s假定h=1m,得Q=61.76 m 3/s 做图得下图依据图可得:在设计情况下,Q=324 m3/s,对应的h=2.8m在校核情况下,Q=690 m3/s,对应的h=4.4m在消能防冲情况下,Q=268 m3/s,对应的h=2.5m在厂房校核情况下,Q=587 m3/s,对应的h=3.9m在电站引用流量情况下,Q=80 m3/s,对应的h=1.2m1.4坝截面的假定为了适应运用和施工的需要,坝顶必须有一定的宽度。
一般地,坝顶宽度取最大坝高的8%~10%。
,且不小于3m,考虑到交通要求,坝顶宽取7m防浪墙高1.2m,所以坝面高程为1066.95m,所以不含防浪墙的坝高为45.95m坝体上游面采用铅直面,下游坝坡设为1:0.7因为基本三角形的顶点与正常蓄水位齐平,故重力坝剖面的下游坡向上延伸应与正常蓄水位相交,则可以算出下游坡面的起坡点的高程为1055.7m可以计算出来坝底宽度为31.29m,大坝截面尺寸如左图:2进水口的设计2.1孔径D的拟定孔径D的拟定可依据下式:D=(4Q/πv p)1/2式中:Q—每个发电孔引取的流量,m3/svp—孔内的允许流速,m/s,对于发电孔vp=5.0~6.0m/s本工程设置两台发电机组,2个进水口,则每个引水口的流量为37.5 m3/s带入上式得D=3.090~2.821m,取D=3.0m2.2进水口高程的确定本工程采用有压进水口,,有压进水口应保证在上游最低运行水位以下有足够的淹没深度有压进水口最小淹没深度可按戈登公式估算,即S=cvd1/2式中: S——进水口淹没深度v——闸门断面的水流流速d——闸孔高度c——经验系数,取0.73进水口高度d=1.6667D=1.6667×3=5m v=Q/A=75/5×5×2=15m/s 将各值带入得S=2.45m进水口底板高程=死水位-S-d=1033.5-2.45-5=1026.05m2.3进水口体型设计进水口体形应满足水流平顺、水头损失小的要求,进水口形状应尽可能符合流线变化规律。
工程中常采用椭圆曲线活着圆弧形的三向收缩矩形进水口椭圆方程为:22221y xab+=式中 a —椭圆长半轴,顶面曲线a 为孔高h ,侧面曲线a 为孔宽B ; b —椭圆短半轴,顶面曲线b=(1/3~1/4)a, 侧面曲线a=b=a/5 则进口段顶面曲线:x 2/52+y 2/1.52=1 X 2/52+y 2/1=12.4闸门与门槽有压泄水孔一般在进水口设置拦污栅和平面检修门,在出口处设置无门槽的弧形闸门 闸门槽宽取3m,深取2m2.5渐变段有压泄水孔控申断面为圆形,进水口闸门为矩形,在进口闸门之后需设置渐宽段,以保持水流平顺, 根据规范取渐宽段长度为7m 渐变规律一般都是收缩型,采用圆角过渡2.6通气孔和平压管 2.7水力计算进水孔的过流能力可按下式进行计算:gH A Q c 2μ= (8-1)式中:H ——为工作闸门处的水头,m ; c A ——为闸孔的过水段面面积,m 2 ;μ——为流量系数,应随进口段的局部水头损失而定,当短管长度不超过10倍孔高时,有闸门时80.0=μ85.0~;无闸门槽时90.0=μ95.0~。
A c =5×5=25㎡,取μ=0.85,闸门处的水头H=1057-(1026.09+2.5)=28.41m 将上述各值带入公式得Q=501.20m 3/s ﹥75 m 3/s 所以,该有压进水口的过流能力满足要求3 非溢流坝段的荷载分析 3.1计算截面的选择选择坝基面作为计算截面作用在坝基面的荷载有:自重,静水压力,扬压力,泥沙压力,浪压力。
取1m 坝长进行计算3.2坝体自重的计算自重W 在正常蓄水位、设计洪水位、校核洪水位完全一样计算步骤如下; 坝体自重()W KN 的计算公式:c W Vr =式中:331c V m m r --坝体体积,,由于取坝长,可以用断面面积替代,通常把它分成如图所示的若干个简单的几何图形分别计算;坝体混凝土的重度,取24KN/m 。
第一部分坝体:面积:S 1=bH=7×44.7=312.9㎡荷载标准值:G k =r c S 1=24×312.9=7509.6KN荷载设计值:G= r g G k =7509.6KN 第二部分坝体:S 2=1/2(B-b )h=421.43㎡ 其它值计算如上,得G k =10114.32 KNG=10114.32 KN3.3上下游水平静水压力静水压力是作用在上下游坝面的主要荷载,计算时常分解为水平压力H P 和垂直压力V P 两种。
H P 的计算公式为:212H w P r H =式中:H ——计算点的作用水头,m ;w r ——水的重度,常取39.81/KN m ; 静水压力作用分项系数γQ1=1,静水压力P 与作用水头H 有关,所以在正常蓄水位、设计洪水位、校核洪水位时静水压力P 各不相同,应分别计算;3.3.1设计工况上游水深H u =1064.29-1021=43.29m ;下游水深H d =2.8m上游水平静水压力:2112kw u P H γ==1/2×9.81×43.292=9192.09KN 111Q k P P γ==1.0×9192.09=9192.09KN下游水平静水压力:2212k w d P H γ=-=-38.46KN212Q k P P γ==-38.46KN3.3.2校核工况上游水深H u =1067.22-1021=44.22m ;下游水深H d =4.4m 上游水平静水压力:2112k w uP H γ==1/2×9.81×46.222=10478.49KN111Q k P P γ==1.0×10478.49=10478.49KN下游水平静水压力:2212k w d P H γ=-=-94.96KN212Q k P P γ==-94.96KN 3.3.3正常蓄水位工况上游水深H u =1057.0-1021=36.0m ;下游水深H d =1.2m 上游水平静水压力:2112k w uP H γ==1/2×9.81×36.02=6356.88KN 111Q k P P γ==1.0×6356.88=6356.88KN下游水平静水压力:2212k w d P H γ=-=-7.06KN212Q k P P γ==-7.06KN 3.4上下游坝面竖直静水压力 3.4.1设计工况下游水深H d =2.8m面积:S 3=mH d 2/2=0.7×2.82/2=2.74m 荷载标准值:33k w G S γ==9.81×2.47=26.88KN 荷载设计值:33G k G G γ==1.0×26.88=26.88KN3.4.2校核工况下游水深H d =4.4m面积:S 3=mH d 2/2=6.78m荷载标准值:33k w G S γ==66.51KN 荷载设计值:33G k G G γ==66.51KN3.4.3正常蓄水位工况下游水深H d =1.2m面积:S 3=mH d 2/2=0.42m荷载标准值:33k w G S γ==4.12KN 荷载设计值:33G k G G γ==4.12KN3.5浪压力当H u ﹥L/2时,可假定浪顶及水深等于L/2处的浪压力为0,静水位处的浪压力最大,并呈三角形分布.则浪压力P l =1/4r w (L/2+h l +h z )L-1/2r w (L/2)2式中: H u —坝前水深波浪要素L,h l ,h z 按官厅公式计算3.5.1设计工况由前面计算可知,在此工况下,Hu=43.29m,L=6.32m,r l =1.2,h l =0.682m,h z =0.231m,r w =9.81KN/m 3将这些值带入,得 P lk =12.95KN设计值:P l = P lk r l =15.54KN3.5.2校核工况在此工况下,Hu=46.22m,L=5.55m, r l =1.2, h l =0.558m,h z =0.176m,r w =9.81KN/m 3将这些值带入,得 P lk =9.99KN设计值:P l = P lk r l =11.99KN3.5.3正常蓄水位工况在此工况下,Hu=36.00m,L=6.32m, r l =1.2, h l =0.682m,h z =0.231m,r w =9.81KN/m 3将这些值带入,得 P lk =12.95KN设计值:P l = P lk r l =15.54KN3.6淤沙压力由于坝体上游面采用铅直面,所以只有水平泥沙压力,水平泥沙压力()skH P KN 为:220.5tan (45/2)skH sb s s P r h ϕ︒=-式中:3;m sb s s r h ϕ---︒淤沙的浮重度,KN/m 坝前淤沙厚度,;淤沙的内摩擦角,()。