PCB专业英语培训内部教材(2)
- 格式:ppt
- 大小:1.66 MB
- 文档页数:35
PCB英语培训资料一. 流程英语及相关词汇❖PCB(Printed Circuit Board) 印制线路板❖Marketing Department市场部❖PE – Product Engineering Department 产品工程部❖MI - Manufacturing Instruction生产制作指示/生产流程单❖CAD/CAM - Computer Aided Design计算机辅助设计/制造❖TQ—Engineering Technical Query 工程问题1. Inner board cutting: 内层开料-1❖Sheet Size大料尺寸❖Panel Size拼板尺寸❖Material Type材料类型❖Supplier供应商❖Base material基材❖Thickness厚度❖Board Thickness板厚❖Laminate Thickness材料厚度❖inner core 芯板/内层板料❖Comparative Tracking Index 比较漏电痕迹指数CTI❖Glass Transition Temperature玻璃态转化温度Tg1. Inner board cutting: 内层开料-2❖Dielectric Thickness介电层厚度❖Dielectric constant介电常数Er❖Base Copper底铜/基铜❖Delamination分层❖Flammability可燃性❖Baking烘板❖Single/double单层/双面❖Double sided board双面板❖Multilayer board 多层板❖Bare board裸板(board without copper)2. Inner Image Transfer:内层图像转移/内光成像3. Inner Etching 内层蚀板4. Inner AOI—Automatic Optical Inspection自动光学检查5. Pressing 层压❖Lamination 压板❖Lay-up structure压板结构❖PP - Prepreg半固化片❖Copper clad/ Copper foil铜箔Cu foil❖Resin树脂❖After Pressed Thickness压板后之厚度6. Drilling 钻孔-1❖Hole孔❖Hole Type孔类型❖Hole Tolerance 孔径公差❖Hole chart 孔表/分孔图❖Plated Though Hole 金属化孔PTH❖Non-Plated Though Hole 非金属化孔NPTH❖Drill tape钻带❖Blind via hole盲孔❖Buried hole埋孔❖Hole Diameter孔径6. Drilling 钻孔-2❖Hole location孔位❖Hole Position Tolerance孔位误差❖Hole Position Deviation孔位置偏差❖2nd Drilling 重钻❖Mounting hole安装孔❖Pin hole销定孔❖Target Hole目标孔❖Slot 槽,坑❖No. of holes孔数❖Laser via hole激光穿孔❖Roughness粗糙度7. Plate Through Hole (PTH)沉铜/孔化❖Hole wall copper thick 孔壁铜厚❖Defect缺陷❖Cracking裂缝8. Outer Dry Film 外层干菲林/外光成像-1❖Dry Film干菲林/干膜D/F❖External layer外层❖Internal layer内层❖Component Side 零件面C/S❖Solder Side焊接面S/S❖Top side/ layer 顶层❖Bottom side/layer底层❖Primary side首面❖Secondary side第二面❖(提示: 层的写法尽量按客户的习惯书写)8. Outer Dry Film 外光成像-2❖Power plane电源层❖Ground 接地层❖Layer层❖Dry-film tenting D/F封孔❖Surface mounting Device表面粘贴装置SMD❖Line Width线宽—LW❖Line Space线隙—LS: Line-Line/Line-Pad/Pad-Pad❖Conductor导体❖Circuit线路❖Pattern线路❖Artwork菲林❖Master drawing菲林图形❖Artwork Modification菲林修改❖Outer Dry Film外光成像-3❖Annular ring锡圈❖Min.Annular Ring最小环宽/焊盘宽❖Hole breakout 破环/崩孔❖Pad焊盘❖Round pad圆盘❖Teardrop泪珠❖Clearance/space间距/间隙❖Minimum 最小---Min.❖Maximum 最大---Max.❖Min.Spacing between Line to Line线与线间的最小距离❖Test coupon图样❖Registration Deviation 对位偏差9. Pattern Plating 线路电镀/图形电镀❖Plating电镀❖Chemical corrosion化学腐蚀❖Copper plating电镀铜❖Copper thickness on hole wall 孔内铜厚❖Max.Board Thickness After Plating电镀后总板厚度之上限10. Outer Etching 外蚀板❖Undercut侧蚀11. Solder Resist 湿绿油/阻焊-1❖S/M(Solder Mask) 阻焊❖Solder resist film阻焊菲林❖SM print SM印油菲林❖SM imaging SM曝光菲林❖Solder Mask opening 阻焊开窗/曝光窗❖Solder Mask material/Type 绿油材料/类型❖Color颜色❖Shiny有光泽的,发光的(光亮油,)❖Matte哑光油的❖Matte Green 哑光绿油❖Liquid Photo-Imaginable (LPI)液态光固化剂11. Solder Mask 湿绿油/阻焊-2❖W/F(Wet Film) 湿膜/湿绿油❖Ball Grid Array (BGA) 球栅阵列❖S/M Bridge 绿油桥❖Cover 盖(油入孔)❖Tenting封孔/盖油❖Via Plugging 封孔❖Plug Hole塞孔❖Filled with solder resist 塞孔❖Solder mask on bare copper (SMOBC) 裸铜覆盖阻焊膜❖Encroach 侵占, 蚕食❖Encroach into holes 入孔12. Carbon Ink 印碳油❖Carbon ink碳油❖Carbon Resistance 碳油电阻13. Component Mark 印字符❖Silk Screen丝印❖Component Marking 元件字符C/M❖Legend字符❖Corner mark板角记号❖Logo标记❖Date Code周期代号❖Cust. P/N: customer part number客户型号❖Revision/Version:版本号14. Gold Finger Plating 金手指❖Bevelling斜边❖Gold Finger(G/F) 金手指❖Chamfer倒角❖Key slot槽孔❖Au/Ni 金/镍15. Hot Air Leveling 喷锡❖HAL(Hot Air Leveling) 热风整平❖HASL Hot Air Solder Leveling❖Impedance阻抗IMP❖Surface Treatment表面处理16. Immersion Silver 沉银17. OSP抗氧化处理18. Immersion Tin 沉锡19. Immersion Gold/Imm Au 沉金20. Solder/Tin/Lead Stripping 退锡❖ENIG----Electroless Nickel/Immersion Gold 沉金(工艺) ❖Ag银21. V-Cutting V-坑❖V-Cut V - 坑❖Remain Thickness 保留厚度❖Scoring==V-CUT刻槽❖Scratch划痕❖V-groove V- 坑22. Routing (铣/锣板)/ Punching 啤板❖Profiling外围成型❖Engineering drawing工程图纸❖Fiducial mark基准点❖Dimension尺寸❖Length 长度❖Width 宽度❖Breakaway tab/area板边位❖Datum hole基准参考孔❖Punching die /Punch 啤模❖Offset偏移量❖Outline外形❖Shape 外形23. Electrical Testing 电测试❖E-test fixture E-T 夹具❖Electrical Test Fixture电测试夹具❖V oltage电压❖Open/short开路/短路❖Probe point测试点24. Outer Final QC 最后检查❖Warpage翘曲度❖Bow and twist 板弯曲25. Peelable Mask 印蓝胶❖Peelable Mask/Blue Mask蓝胶❖Peelable可剥性26. Packing&Shipment 包装出货❖Vacunm Pack真空包装❖No.of Pcs Per Bag每包数量❖Packing包装27. Other其它相关-1❖Gerber Data 客户资料打包文件❖Checklist检查表❖production film 生产菲林❖Paste film粘贴/贴键菲林/钢网❖Solder coating上锡❖Reliability可靠性❖Assembly安装性❖Correspondance符合性❖Pin gauge 针规❖Backplane背板❖Customer客户27. Other其它相关-2❖Customer P/N客户产品编号❖Delivery交货❖Description说明❖Golden board金板❖Missing 缺少❖Mother board 主机板❖Ionic cleanliness离子清洁度/离子污染度❖Location位置❖Max. X-out坏板上限/最大允许报废板数❖No.of Array/Panel每个拼板套板数❖Negative反面的❖Positive正的27. Other其它相关-3❖Production生产板❖Sample样板❖Remark备注❖Special requirement特殊要求❖Specification详细说明,制作规范❖Wiring线路❖Square方形的❖View From…观察方向由…❖Lead free process 无铅处理❖Dummy Pad 为圆形或方形的PAD(加在板边位/标位或空白处起平衡电镀作用)❖Dummy copper实心的铜皮❖Thermal Pad 散热盘❖Fibre纤维面二. 问题之基本模式❖Title: Engineering technical question of 021D2002R2 (JOVE P/N: 20LN21119)==On Hold/Go on with suggestion❖Hello Ye jian,❖Nice to contact with you! I'm Jack, an Engineer from Engineering department in Jove.❖For the captioned project, we found some questions need you to confirm with customer.❖Question 1: As there are PTH (plated-hole) between the edge of unit, after doing V-cut, the holes will be scratched, and after customer divide them into two parts along the v-cut line, the copper showing in A part on the hole wall and that on the board may be picked off, which will lead to solder failure. Please refer to fig01❖Suggestion: a)To avoid this potential fault, we will modify the cad data: to add two PTH holes as position B to insure the connection between top and bottom sides. And to add two NPTH holes as position C (use 2nd drill) at the end-point of V-cut line which closed to that big PTH hole to cut the copper off so as to avoid copper being picked off. Please kindly confirm this modification can be acceptable.❖b) Or we will do sample board to let our customer to approve. Please have one, a) or b)? ❖Question 2: Same case as question 1 except that the PTH holes is only on one edge of unit. Please refer to fig02❖Suggestion: a) We will do them NPTH holes and will shave the copper around holes to get about 8 mil clearance.❖ b) We only add two NPTH holes (use 2nd drill) at the end-point of V-cut line whichclosed to that big PTH hole to avoid that potential fault. Please kindly confirm these modification can be acceptable.❖❖Have a nice day!❖B.Regards❖Ding, you de**********************❖Engineering technical question of 021D2002R2 (JOVE P/N: 20LN21119)==On Hold/Go on with suggestion❖Dear John(名字)❖Hello Mr Smith(姓)❖Hi Miss Green❖Nice day John❖Good Morning Jack❖Nice to contact with you! / I’m glad to cooperate with you!❖I'm Jack, an Engineer from Engineering department in Jove.❖1) After checking the captioned new project/updated gerber data, we have some questions as below. Would you please help to settle them. 在检查完此新板后,我们有如下问题。
Whirlpool W/C 生产线员工英文培训教材( Unit 2 )一. 公司所用基本单词1.厂区公司: company 工厂factory 宿舍:dormitory 车间: workshop 办公室:office 饭堂: canteen 小商店: Mini-store 医务室: clinic 演讲室: auditorium 篮球场basketball ground 北大门: North Gate 保安:security 建筑物: building 清洁工: cleaner 一楼: the first floor 公交车: bus 房间: room 电视: television 热水器: water heater 桌子:desk 椅子: chair 衣柜: wardrobe 被子: quilt2. 公司各部门制造部: manufacturing 工程部: engineering 质量保证部:QA(Quality Assurance) 计划部:planning 采购部:purchasing 测试部: testing 人事部: HR(human resource) 设施工程部: Facility 财务部:Finance 电脑部:IT(Information Technology)3. 公司各职务名称营运经理: Operation Manager 事业部总监:Business Unit Director(BUD) 事业部经理:Business Unit Manager(BUM) 工作坊经理: Workcell Manager 功能部经理: Functional Manager经理: manager主任: officer 生产线经理: Line Manager 生产线主管: Line Supervisor 工程师: engineer 技术员:technician 高级助理: senior line leader 助理: line leader 替位: floater 物料员:material handler 工人: worker 计划员: planner 采购员: buyer4. 常用的缩写IQC: Incoming Quality Control来料质量控制IPQA: In Process Quality Audit 过程中质量稽核OBA :Out of Box Audit 开箱检查AVL :Approved Vendor List 批准的供应商清单BOM: Bill Of Material 物料清单CAR: Corrective Action Report纠正措施报告CRD :Component Reference Designator元件参考指定DPM: Defects Per Million每百万的坏点DL :Direct Labor直接生产工人IL :Indirect Labor间接生产工人ECN: engineer change notice工程更改通知ESD :electro-static discharge静电放电FPY: first pass yield 第一次通过率FVT: functional verification test功能确认测试ICT: in-circuit test在线测试PCB: printed circuit board印刷线路板PLV: part to line verification system生产线上元件确认系统RMA: returned material authorization授权返回物料SMT: surface mount technology 表面贴装技术MI: manual insertion 手动插件AI: automatic insertion自动插件5.生产线所用的各种文件1> visual aids 直观教具Material & tooling &equipment list 物料/工具/设备清单P/N: part number: 物料编号Description:描述quantity: 数量history tracking of VA changes VA改变历史跟踪2>DA: deviation authorization 授权的背离Initiated by:起草人customer:客户effective date:执行日期expiry date:过期日期Affected product/assembly: 影响的产品/组装affected process:影响的工序Reason for change: 改变的原因description of change 改变的描述Originator:创作者signature:签名approval: 批准3> First Article Build 首件报告Line no 生产线名initiator:填写人model name: 型号名start time: 开始时间Complete time:完成时间process:工序accept:接受reject:拒收comment:意见Approved to run 批准运行not approved to run 不准运行4> Output tracking report 产量跟踪报表time in hour:时间(小时) target qty: 目标数量machine packout qty:机器生产数downtime: 停机时间problem:问题root cause/action 根本原因/采措施PIC :person in charge: 负责人5> model change over time tracking 转机时间跟踪表Normal run 正常生产trial run: 试运行NPI: new product instruction:新产品引进Loading material: 装料start time: 开始时间end time:结束时间spend time:花费时间Machines/Process Change over:机器/过程转换remark:备注Start time: Time of final board SMT(testing) for last model. 开始时间指的是上一产品最后一块板完成SMT的时间End of time: time of first board SMT(testing) for running model. 结束时间指的是正在运行的产品第一块板完成SMT的时间Model change over time:(max of processes’ change over time) 转拉时间指的是在转拉过程中最长工序所花费的时间二.口语训练Nice to Meet You很高兴认识你听下列对话,练习自读跟读。