RCCN Conduit Fittings NBL Brass Cable
- 格式:pdf
- 大小:559.59 KB
- 文档页数:3
Commercial Pump Systems TanksAmtrol pre-charged, potable water pressure tanks are engineered to reduce surge and ensure minimum pump run time in municipal well systems and pump applications.Available in diaphragm, full acceptance and partial acceptance bladder designs, all Well-X-Trol tanks are made in the USA at our ISO 9001:2015 certified facilities. AllASME tanks meet Section VIII, Division I standards.BDiaphragm Models•Industry’s thickest butyl diaphragm for extralong life.•Patent pending Antimicrobial liner neutralizesbacteria on contact.•Tested to JIS Z 2801 for reduction of Legionella,staphylococcus and E. coli.•Follows ASHRAE 188 Anti-Legionella guidelines.•Patented Turbulator™prevents sediment buildup.Fresh Water Turbulator™•Patented diffuser agitates incomingwater to keep it tasting fresh and clean.•Prevents sediment build-up to extendtank life.Antimicrobial Liner Protection•Safe, Silver-Ion technology targets activemicroorganisms; neutralizes bacteria on contact.•Compound is molded into the water reservoirlining; lasts the life of the tank; patent pending.Full Acceptance Bladder Models •Larger sizes for high flow systems.•Replaceable, full acceptance design.•Heavy duty butyl bladder; industry’s thickest.•Bladder meets NSF/ANSI 61 standards.•NAF 2016 compliant.Maximum Operating Temperature: 240°F. Factory Pre-charge: 25 PSIG.Maximum Operating Temperature: 240°F. Factory Pre-charge: 25 PSIGPartial Acceptance Bladder Models•Replaceable, partial acceptable bladder design.•Heavy duty butyl bladder; industry’s thickest.•Available in compact sizes for limited space.Multiple WELL-X-TROL tanks can be used in larger systems.Maximum Operating Temperature: 240°F. Factory Pre-charge: 25 PSIG© 2019 Worthington Industries Inc. MC10008 (06/19) One or more features of this product are covered by U.S. patents, visit /patents for more information.1400 Division Road, West Warwick, RI USA 02893T: 800.426.8765 。
1,Regulating Pool 调节池2, Pumping Station 提升泵房3, Anaerobic Tank 厌氧池4, Facultative Tank 兼氧池(翻译把兼氧好氧池分开了) 5, Aerobic Tank 好氧池6, Biochemical Sedimentation Tank 生化沉淀池7, Reaction Tank 反应池物化沉淀池8, Physical and Chemical Sedimentation Tank9, Fan Room 风机房10, Sludge Pool 污泥池11, The Sludge Concentration Pool 污泥浓缩池12, Sludge Dewatering Room 污泥脱水间Cids 酸Process Flow Chart 工艺流程图Wastewater 废水Emission On Standard 达标排放Overflow Into The Regulating Pool 溢液进调节池Sludge transport污泥外运Biogas 沼气Agent 药剂Bar Screen格栅Returned Slude污泥回流Boiler Room 锅炉房Switching Room 配电室Add The Pharmacy 配药间Office Lab 办公化验室Legend 图例Filter Press 板框压滤机Temperature(温度)pH(pH值)BOD5 at 20°C(五日生化需氧量)Total nitrogen (as N)(总氮)COD (mg O2 /l)(化学需氧量)Total phosphorus (as P)(总磷)Suspended solids (悬浮物SS)Total ammonia (as N) (总氨氮)Oils, fats & grease (动植物油类)Phenols (酚类)Mercury (as Hg)(汞)Nickel (as Ni)(镍)Cobalt (as Co)(钴)Lead (as Pb)(铅)Antimony (as Sb)(锑)Tin (as Sn)(锡)Chromium (as Cr VI)(六价铬)Chromium (as total Cr) (总铬)Arsenic (as As)(砷)Cadmium (as Cd)(镉)Zinc (as Zn)(锌)Copper (as Cu)(铜)"Mineral oils (Interceptors)(物理处理出水矿物油)""Benzene, toluene & xylene (combined)(苯、甲苯、二甲苯总量)"Mineral oils (Biological Treatment)(生物处理出水矿物油)""Organochlorine pesticides (as Cl) (有机氯农药)""Mothproofing agents (as Cl) (防蛀剂)""Organophosphorus pesticides (as P) (有机磷农药)"Adsorbable organic halogen compounds (AOX)(可吸附有机卤化物Sulphide(asS)(硫化物)Color (dilution ratio)(色度稀释倍数)Particulate matter(粉尘)(挥发性有机碳,Volatile organic carbons (as C) (excluding formaldehyde)不包含甲醛)Formaldehyde(甲醛)Isocyanates (as NCO)(异氰酸酯)Cyanide(氰化物)。
ForewordNational Building Information Modeling Standard™©2007 National Institute of Building Sciences. All rights reserved .ForewordThe construction industry is in the middle of a growing crisis worldwide. With 40% of the world’s raw materials being consumed by buildings, the industry is a key player in global economics and politics. And, since facilities consume 40% of the world’s energy and 65.2% of total U.S.electrical consumption, the construction industry is a key player in energy conservation, too! With facilities contributing 40% of the carbon emissions to the atmosphere and 20% of material waste to landfills, the industry is a key player in the environmental equation. Clearly, the construction industry has a responsibility to use the earth’s resources as efficiently as possible.Construction spending in the United States is estimated to be $1.288 trillion for 2008. The Construction Industry Institute estimates there is up to 57% non-value added effort or waste in our current business models. This means the industry may waste over $600 billion each year.There is an urgent need for construction industry stakeholders to maximize the portion of services that add value in end-products and to reduce waste.Another looming national crisis is the inability to provide enough qualified engineers. Someestimate the United States will be short a million engineers by the year 2020. In 2007, the United States was no longer the world’s largest consumer, a condition that will force United States industry to be more competitive in attracting talented professionals. The United States construction industry must take immediate action to become more competitive.The current approach to industry transformation is largely focused in efforts to optimize design and construction phase activities. While there is much to do in those phases, a lifecycle view is required. When sustainability is not adequately incorporated, the waste associated with current design, engineering, and construction practices grows throughout the rest of the facility’s lifecycle. Products with a short life add to performance failures, waste, recycling costs, energyconsumption, and environmental damage. Through cascading effects, these problems negatively affect the economy and national security due to dependence on foreign petroleum, a negative balance of trade, and environmental degradation. To halt current decline and reverse existing effects, the industry has a responsibility to take immediate action.While only a very small portion of facility lifecycle costs occur during design and construction, those are the phases where our decisions have the greatest impact. Most of the costs associated with a facility throughout its lifecycle accrue during a facility’s operations and sustainment. Carnegie-Mellon University research has indicated that an improvement of just 3.8% in productivity in the functions that occur in a building would totally pay for the facility’s design, construction, operations and sustainment, through increased efficiency. Therefore, as industry focuses on creating, maintaining, and operating facilities more efficiently, simultaneous action is required to ensure that people and processes supported by facilities are optimized.BIM stands for new concepts and practices that are so greatly improved by innovative information technologies and business structures that they will dramatically reduce the multiple forms of waste and inefficiency in the building industry. Whether used to refer to a product – Building Information Model (a structured dataset describing a building), an activity – Building Information Modeling (the act of creating a Building Information Model), or a system – Building Information Management (business structures of work and communication that increase quality andefficiency), BIM is a critical element in reducing industry waste, adding value to industry products, decreasing environmental damage, and increasing the functional performance of occupants.ForewordNational Building Information Modeling Standard™©2007 National Institute of Building Sciences. All rights reserved .The National Building Information Model Standard™ (NBIMS) is a key element to building industry transformation. NBIMS establishes standard definitions for building information exchanges to support critical business contexts using standard semantics and ontologies. Implemented in software, the Standard will form the basis for the accurate and efficientcommunication and commerce that are needed by the building industry and essential to industry transformations. Among other benefits, the Standard will help all participants in facilities-related processes achieve more reliable outcomes from commercial agreements.Thus, there is a critical need to increase the efficiency of the construction process. Today’s inefficiency is a primary cause of non-value added effort, such as re-typing (often with a new set of errors) information at each phase or among participants during the lifecycle of a facility or failing to provide full and accurate information from designer to constructor. With the implementation of this Standard, information interoperability and reliability will improve significantly. Standard development has already begun and implementable results will beavailable soon. BIM development, education, implementation, adoption, and understanding are intended to form a continuous process ingrained evermore into the industry. Success, in the form of a new paradigm for the building construction industry, will require that individuals andorganizations step up to contribute to and participate in creating and implementing a commonBIM standard. Each of us has a responsibility to take action now.David A. Harris, FAIAPresidentNational Institute of Building SciencesTable of ContentsNational Building Information Modeling Standard™©2007 National Institute of Building Sciences. All rights reserved .ForewordTable of ContentsSection 1 – Introduction to the National Building InformationModeling Standard™ Version 1 - Part 1: Overview,Principles, and MethodologiesChapter 1.1 Executive SummaryChapter 1.2 How to Read Version 1 -Part 1 of the NBIMStandard Navigation guide for readers with varied interests, responsibilities, and experience with BIM.Section 2 – Prologue to the National BIM StandardChapter 2.1 BIM Overall Scope An expansive vision for building informationmodeling and related concepts.Chapter 2.2 Introduction to the National BIM Standard Committee The Committee’s vision and mission,organization model, relationships to otherstandards development organizations,philosophical position, and the Standardproduct.Chapter 2.3 Future Versions Identifies developments for upcoming versionsof the Standard including sequence ofdevelopments, priorities, and planned releasedates.Section 3 – Information Exchange ConceptsChapter 3.1 Introduction to ExchangeConcepts What is an information exchange? Theory and examples from familiar processes.Chapter 3.2 Data Models and the Role of Interoperability.High level description of how BIM informationwill be stored in operational and projectsettings. Compares and contrasts integrationand interoperability and the NBIM Standardrequirement for interoperability.Chapter 3.3 Storing and SharingInformation Description of conceptual need for a shared, coordinated repository for lifecycle information.Presents an approach to providing the sharedinformation for a BIM which can be used byinformation exchangesTable of ContentsNational Building Information Modeling Standard™©2007 National Institute of Building Sciences. All rights reserved .Chapter 3.4 Information Assurance Discusses means to control information inputand withdrawal from a shared BIM repository.Section 4 – Information Exchange ContentChapter 4.1 BIM MinimumDefines quantity and quality of information required for a defined BIM. Chapter 4.2 Capability Maturity Model Building on the BIM Minimum chapter, furtherdefines a BIM and informs planning to improvethe capability to produce a mature BIM.Section 5 – NBIM Standard Development ProcessChapter 5.1 Overview of ExchangeStandard Developmentand Use ProcessDiagrams and describes major components in NBIM Standard development process. Chapter 5.2 Workgroup Formationand RequirementsDefinition Introduces the concept of forums and domain interest groups forming around needed exchange definitions. Discusses theInformation Delivery Manual (IDM) process andtools for requirements definition activities.Chapter 5.3 User-Facing Exchange Models Covers the IDM requirements for IFC-independent data model views.Chapter 5.4 Vendor-Facing Model View Definition, Implementation and Certification Testing Explains Model View Definition (MVD)requirements for schema-specific modeldefinition and the NBIMS Committee’s role infacilitating implementation and certificationtesting.Chapter 5.5 Deployment Discusses Project Agreements and use ofGeneric BIM Guides associated with BIMauthoring (creating a BIM) using certifiedapplications, validating the BIM construction,validating data in the BIM model, and using theBIM model in certified products to accomplishproject tasks through interoperable exchanges.Chapter 5.6 Consensus-Based Approval MethodsDescribes various methods of creating,reviewing, and approving the NBIM StandardExchange Requirements, Model ViewDefinitions, Standard Methods, Tools, andReferences used by and produced by theNBIMS Committee.Table of ContentsNational Building Information Modeling Standard™©2007 National Institute of Building Sciences. All rights reserved .AcknowledgementsReferencesGlossaryAppendicesIntroduction to AppendicesAppendix A Industry Foundation Classes(IFC or ifc) IFC define the virtual representations of objects used in the capital facilitiesindustry, their attributes, and theirrelationships and inheritances.Appendix B CSI OmniClass ™OmniClass is a multi-table facetedclassification system designed for useby the capital facilities industry to aidsorting and retrieval of informationand establishing classifications forand relationships between objects ina building information model.Appendix C International Framework for Dictionaries (IFDLibrary ™)A schema requires a consistent set ofnames of things to be able to work.Each of these names must have acontrolled definition that describeswhat it means and the units in which itmay be expressed.Section 1 – Introduction to the National BIM Standard V 1 - Part 1Chapter 1.1National Building Information Modeling Standard™©2007 National Institute of Building Sciences. All rights reserved .Chapter 1.1 Executive SummaryNational Building Information Modeling Standard™ Version 1 - Part 1:Overview, Principles, and MethodologiesIntroductionThe National Building Information Modeling Standard (NBIMS) Committee is a committee of the National Institute of Building Sciences (NIBS) Facility Information Council (FIC). The vision for NBIMS is “an improved planning, design, construction, operation, and maintenance process using a standardized machine-readable information model for each facility, new or old, which contains all appropriate information created or gathered about that facility in a format useable by all throughout its lifecycle.”1 The organization, philosophies, policies, plans, and working methods that comprise the NBIMS Initiative and the products of the Committee will be the National BIM Standard (NBIM Standard), which includes classifications, guides, recommended practices, and specifications.This publication is the first in a series intended to communicate all aspects of the NBIMS Committee and planned Standard, which will include principles, scope of investigation,organization, operations, development methodologies, and planned products. NBIMS V1-P1 is a guidance document that will be followed by publications containing standard specifications adopted through a consensus process .Wherever possible, international standards development processes and products, especially the NIBS consensus process, American Society for Testing and Materials (ASTM), AmericanNational Standards Institute (ANSI), and International Standards Organization (ISO) efforts will be recognized and incorporated so that NBIMS processes and products can be recognized as part of a unified international solution. Industry organizations working on open standards, such as the International Alliance for Interoperability (IAI), the Open Geospatial Consortium (OGC), and the Open Standards Consortium for Real Estate (OSCRE), have signed the NBIMS Charter inacknowledgement of the shared interests and commitment to creation and dissemination of open, integrated, and internationally recognized standards. Nomenclature specific to North American business practices will be used in the U.S. NBIMS Initiative. Consultations with organizations in other countries have indicated that the U.S.-developed NBIM Standard, once it is localized, will be useful internationally as well. Continued internationalization is considered essential to growth of the U.S. and international building construction industries.BIM Overall Scope and DescriptionBuilding Information Modeling (BIM) has become a valuable tool in some sectors of the capital facilities industry. However in current usage, BIM technologies tend to be applied within vertically integrated business functions rather than horizontally across an entire facility lifecycle. Although the term BIM is routinely used within the context of vertically integrated applications, the NBIMS Committee has chosen to continue using this familiar term while evolving the definition and usage to represent horizontally integrated building information that is gathered and applied throughout the entire facility lifecycle, preserved and interchanged efficiently using open and interoperable technology for business, functional and physical modeling, and process support and operations. 1 Charter for the National Building Information Modeling (BIM) Standard, December 15, 2005, pg.1. See /bim/pdfs/NBIMS_Charter.pdf .Section 1 – Introduction to the National BIM Standard V 1 - Part 1Chapter 1.1National Building Information Modeling Standard™©2007 National Institute of Building Sciences. All rights reserved .NBIM Standard Scope and DescriptionThe NBIMS Initiative recognizes that a BIM requires a disciplined and transparent data structure supporting all of the following.x A specific business case that includes an exchange of building information. x The users’ view of data necessary to support the business case. x The machine interpretable exchange mechanism (software) for the required information interchange and validation of results.This combination of content selected to support user needs and described to support open computer exchange form the basis of information exchanges in the NBIM Standard. All levels must be coordinated for interoperability, which is the focus of the NBIMS Initiative. Therefore, the primary drivers for defining requirements for the National BIM Standard are industry standard processes and associated information exchange requirements.In addition, even as the NBIM Standard is focused on open and interoperable informationexchanges, the NBIMS Initiative addresses all related business functioning aspects of the facility lifecycle. NBIMS is chartered as a partner and an enabler for all organizations engaged in the exchange of information throughout the facility lifecycle.Data Modeling for BuildingsKey to the success of a building information model is its ability to encapsulate, organize, and relate information for both user and machine-readable approaches. These relationships must be at the detail level, relating, for example, a door to its frame or even a nut to a bolt, whilemaintaining relationships from a detailed level to a world view. When working with as large a universe of materials as exists in the built environment, there are many traditional verticalintegration points (or stovepipes) that must be crossed and many different languages that must be understood and related. Architects, engineers, as well as the real estate appraiser or insurer must be able to speak the same language and refer to items in the same terms as the first responder in an emergency situation. Expand this to the world view where systems must be interoperable in multiple languages in order to support the multinational corporation. Over time ontologies will be the vehicles that allow cross communication to occur. In order to standardize these many options, organizations need to be represented and solicited for input. There are several, assumed to be basic, approaches in place that must come together in order to ensure that a viable and comprehensive end-product will be produced.The Role of InteroperabilitySoftware interoperability is seamless data exchange at the software level among diverseapplications, each of which may have its own internal data structure. Interoperability is achieved by mapping parts of each participating application’s internal data structure to a universal data model and vice versa. If the employed universal data model is open, any application canparticipate in the mapping process and thus become interoperable with any other application that also participated in the mapping. Interoperability eliminates the costly practice of integrating every application (and version) with every other application (and version).The NBIM Standard maintains that viable software interoperability in the capital facilities industry requires the acceptance of an open data model of facilities and an interface to that data model for each participating application. If the data model is industry-wide (i.e. represents the entire facility lifecycle), it provides the opportunity to each industry software application to become interoperable.Section 1 – Introduction to the National BIM Standard V 1 - Part 1Chapter 1.1National Building Information Modeling Standard™©2007 National Institute of Building Sciences. All rights reserved .Storing and Sharing InformationOne of the innovations, demonstrated by some full-service design and engineering firms and several International Alliance for Interoperability (IAI) demonstration projects, has been the use of a shared repository of building information data. A repository may be created by centralizing the BIM database or by defining the rules through which specific components of BIM models may be shared to create a decentralized shared model. As BIM technology and use matures, thecreation of repositories of project, organization, and/or owner BIM data will have an impact on the framework under which NBIMS operates. Owners are likely to create internally as-built and as-maintained building model repositories, which will be populated with new and updated information supplied via design/construction projects, significant renovations, and routine maintenance and operations systems.Information AssuranceThe authors caution that, while a central (physical or virtually aggregated) repository of information is good for designing, constructing, operating, and sustaining a facility, and therepository may create opportunities for improved efficiency, data aggregation may be a significant source of risk.Managing the risks of data aggregation requires advanced planning about how best to control the discovery, search, publication, and procurement of shared information about buildings and facilities. In general, this is addressed in the data processing industry through digital rights management. Digital rights management ensures that the quality of the information is protected from creation through sharing and use, that only properly authorized users are granted access, and only to that subset of information to which they should have access. There is a need toensure that the requirements for information are defined and understood before BIMs are built, so that facility information receives the same protection that is commonplace in world-wide personnel and banking systems.Minimum BIM and the Capability Maturity ModelThe NBIM Standard Version 1 - Part 1 defines a minimum standard for traditional vertical construction, such as office buildings. It is assumed that developing information exchange standards will grow from this minimum requirement.The Standard also proposes a Capability Maturity Model (CMM) for use in measuring the degree to which a building information model implements a mature BIM Standard. The CMM scores a complete range of opportunity for BIMs, extending from a point below which one could say the data set being considered is not a BIM to a fully realized open and interoperable lifecycle BIM resource.The U.S. Army Corps of Engineers BIM Roadmap 2 is presented as a useful reference for building owners seeking guidance on identifying specific data to include in a BIM from a design or construction perspective.2 See https:///default.aspx?p=s&t=19&i=1 for the complete roadmap.Section 1 – Introduction to the National BIM Standard V 1 - Part 1Chapter 1.1National Building Information Modeling Standard™©2007 National Institute of Building Sciences. All rights reserved .NBIM Standard Process DefinitionProposals for the processes the NBIMS Committee will employ to produce the NBIM Standard and to facilitate productive use are discussed. A conceptual diagram to orient the user is provided. Components of this diagram correspond to section 5 chapters.Both the process used to create the NBIM Standard and the products are meant to be open and transparent. The NBIMS Committee will employ consensus-based processes to promote industry-wide understanding and acceptance. Additionally, the Committee will facilitate the process whereby software developers will implement standard exchange definitions and implementations tested for compliance. Finally, the NBIMS Committee will facilitate industry adoption and beneficial use through guides, educational activities, and facilitation of testing by end users of delivered BIMs.The Information Exchange Template, BIM Exchange Database, the Information Delivery Manual (IDM), and Model View Definition (MVD) activities together comprise core components of the NBIM Standard production and use process. The Information Exchange Template and BIM Exchange Database are envisioned as web-based tools to provide search, discovery, and selection of defined exchanges as well as a method of providing initial information necessary to propose and begin a new exchange definition discussion. The NBIMS workgroup formation phase teams will use the IDM, adapted from international practices, to facilitate identification and documentation of information exchange processes and requirements. IDM is the user-facing phase of NBIMS exchange standard development with results typically expressed in human-readable form. MVD is the software developer-facing phase of exchange standard development. MVD is conceptually the process which integrates Exchange Requirements (ERs) coming from many IDM processes to the most logical Model Views that will be supported by softwareapplications. Implementation-specific guidance will specify structure and format for data to be exchanged using a specific version of the Industry Foundation Classes (IFC or ifc) specification. The resulting generic and implementation-specific documentation will be published as MVDs, as defined by the Finnish Virtual Building Environment (VBE) project,3 the Building Lifecycle Interoperability Consortium (BLIS),4 and the International Alliance for Interoperability (IAI).5 The Committee will work with software vendors and the testing task team members to plan and facilitate implementation, testing, and use in pilot projects. After the pilot phase is complete, the Committee will update the MVD documents for use in the consensus process and ongoing commercial implementation. Finally, after consensus is reached, MVD specifications will be incorporated in the next NBIMS release.NBIMS AppendicesReference standards in the NBIM Standard provide the underlying computer-independent definitions of those entities, properties, relationships, and categorizations critical to express the rich language of the building industry. The reference standards selected by the NBIMSCommittee are international standards that have reached a critical mass in terms of capability to share the contents of complex design and construction projects. NBIMS V1-P1 includes three candidate reference standards as Appendix documents: IAI Industry Foundation Classes (IFC or ifc), Construction Specifications Institute (CSI) OmniClass ™, and CSI IFDLibrary ™.3http://cic.vtt.fi/projects/vbe-net/4 5Section 1 – Introduction to the National BIM Standard V 1 - Part 1Chapter 1.1National Building Information Modeling Standard™©2007 National Institute of Building Sciences. All rights reserved .The IFC data model consists of definitions, rules, and protocols that uniquely define data sets which describe capital facilities throughout their lifecycles. These definitions allow industrysoftware developers to write IFC interfaces to their software that enable exchange and sharing of the same data in the same format with other software applications, regardless of the internal data structure of the individual software application. Software applications that have IFC interfaces are able to exchange and share data with other application that also have IFC interfaces.The OmniClass ™ Construction Classification System (OmniClass or OCCS) is a multi-tableclassification system designed for use by the capital facilities industry. OmniClass includes some of the most commonly used taxonomies in the capital facilities industry. It is applicable for organizing many different forms of information important to the NBIM Standard, both electronic and hard copy. OCCS can be used in the preparation of many types of project information and for communicating exchange information, cost information, specification information, and other information that is generated throughout the facility’s lifecycle.IFDLibrary ™ is a kind of dictionary of construction industry terms that must be used consistently in multiple languages to achieve consistent results. Design of NBIMS relies on terminology and classification agreement (through OmniClass ) to support model interoperation. Entries in the OmniClass tables can be explicitly defined in the IFDLibrary once and reused repeatedly,enabling reliable automated communications between applications – a primary goal of NBIMS. ReferencesNBIMS References in this document represent the work of many groups working in parallel to define BIM implementation for their areas of responsibility. Currently there are four types of references.x Business Process Roadmaps are documents that provide the business relationships of the various activities of the real property industry. These will be the basis for organizing the business processes and will likely be further detailed and coordinated over time. The roadmaps will help organize NBIMS and the procedures defined in the InformationDelivery Manuals (IDMs).x Candidate Standards are documents that are candidates to go through the NBIMS consensus process for acceptance as part of future NBIMS. It is envisioned that Part 2 or later releases of the Standard will incorporate these documents once approved.x Guidelines have been developed by several organizations and include items that should be considered for inclusion in NBIMS. Since NBIMS has not existed prior to this, there was no standard from which to work, resulting in a type of chicken-or-egg dilemma.When formal NBIMS exists there will need to be some harmonization, not only between the guidelines and NBIMS, but also in relating the various guidelines to each other.While guidelines are not actually a part of NBIMS, they are closely related and therefore included as references.xOther Key References are to parallel efforts being developed in concert with NBIMS. Not part of NBIMS, they may, in fact, be standards in their own right.。
Max Cargo Weight800 kg600 kgPayload (GVM - Tare Weight)1,072 kg1,089 kgPermissable Axle Weight (PAW) - front 1,610 kg1,610 kgPermissable Axle Weight (PAW) - rear1,780 kg1,780 kgTowing capacity 2.2 CRDiAutomaticBraked2,500 kgUnbraked750 kgMaximum towball weight100 kgMaximum roof load (2 / 3 rack system)100 kgFuel consumption* 2.2 CRDiAutomaticCombined (L/100km)7.0Urban (L/100km)8.9Extra Urban (L/100km) 5.9CO- combined (g/km)1832Fuel tank volume75 L*Source: Australian Design Rule 81/02 static laboratory combined average city and highway cycle test. Real world fuel consumption will vary depending on a combination of driving habits, the condition of the vehicle, and other factors such as road, traffic and weather conditions. ADR 81/02 test results are meant for comparison purposes only.Dimensions Van Crew VanExterior Van Crew VanLength5,253 mmWidth1,997 mmHeight2,000 mmWheelbase3,273 mmWheel track - front / rear1,732 mm / 1,716 mmMinimum ground clearance (based onkerb weight) 186 mmInterior Van Crew VanCargo length (Upper/Lower)2,607 mm1,435 mmCargo width1,640 mmCargo height1,436 mmCargo area - (VDA)4,935 L2,340 LEffective sliding door opening width 870 mmWheels & tyres 2.2 CRDiWheel type SteelWheel dimensions 6.5J x 17Tyre dimensions215/65 R17 108HSpare wheel type Full size steelBody Configuration Van Liftback Van Twin Swing Crew Van Liftback Crew Van Twin Swing2 seater●●--5 seater--●●Dual sliding doors●●●●Liftback rear door●-●-Twin Swing rear doors - with wide open-ing capability-●-●Driving convenience Van Liftback Van Twin Swing Crew Van Liftback Crew Van Twin Swing Electronic Parking Brake (EPB) (with autohold function)●●●●One touch turn signal - 3, 5, or 7 flashes●●●●Rear wiper - with auto wipe on reverse ●-●-Steering wheel mounted controls - audio,phone, cruise control & trip computer●●●●Drive mode - 4 settings (Comfort, Eco,Sport, Smart)●●●●Remote open / close front windows - viakeyless entry remote●●●●Tilt & telescopic steering column●●●●Active safety Van Liftback Van Twin Swing Crew Van Liftback Crew Van Twin Swing Electronic Stability Control (ESC)including;Van Liftback Van Twin Swing Crew Van Liftback Crew Van Twin Swing Anti-lock Braking System (ABS)●●●●Brake Assist System (BAS)●●●●Electronic Brakeforce Distribution (EBD)●●●●Hill-start Assist Control (HAC)●●●●Multi-Collision Braking (MCB)●●●●Traction Control System (TCS)●●●●Vehicle Stability Management (VSM) ●●●●Hyundai SmartSense ™ including;Van LiftbackVan Twin SwingCrew Van LiftbackCrew Van Twin SwingBlind-Spot Collision-Avoidance Assist- Rear (BCA-R)●●●●Driver Attention Warning (DAW)●●●●Forward Collision-Avoidance Assist (FCA) - camera and radar type, including:●●●●- Car/Pedestrian/Cyclist detection - City/Urban/Interurban operational speeds- Junction Turning (FCA-JT) function-alityHaptic warning function●●●●Intelligent Speed Limit Assist (ISLA) ●●●●Lane Following Assist (LFA)●●●●Lane Keeping Assist - Line/Road-Edge (LKA-L/R)●●●●Leading Vehicle Departure Alert (LVDA)●●●●Rear Cross-Traffic Collision - Avoidance Assist (RCCA)●●●●Rear Occupant Alert (ROA) - door logic type--●●Rear View Monitor (RVM)●●●●Safe Exit Warning (SEW)●●●●Smart Cruise Control (SCC) with Stop & Go●●●●Surround View Monitor (SVM)●-●-Other featuresParking Distance Warning-Front (PDW-F) - 4 sensors, with guidance display ●●●●Parking Distance Warning-Reverse (PDW-R) - 4 sensors, with guidance display●●●●Rear view camera with dynamic guide lines●●●●Emergency Stop Signal (ESS)●●●●Tyre Pressure Monitoring System (TPMS) - individual tyre pressure readout ●●●●Passive safety Van Liftback Airbags 7xVan LiftbackVan Twin SwingCrew Van LiftbackCrew Van Twin SwingFront airbags - driver & front passenger ●●●●Side (thorax) airbags - driver & front passenger●●●●Front centre airbag ●●●●Side curtain airbags ●●●●DoorsVan LiftbackVan Twin SwingCrew Van LiftbackCrew Van Twin SwingImpact sensing auto door unlock ●●●●Roll-over sensor●●●●Rear door child safety locks --●●SeatbeltsVan LiftbackVan Twin SwingCrew Van LiftbackCrew Van Twin SwingPretensioners, load limiters & height ad-justable upper mounts on front seat belts ●●●●Seat belt reminder - front seats ●●●●Seat belt monitor - rear seats--●●3 point retractable seatbelts on all seats positions ●●●●SeatingVan LiftbackVan Twin SwingCrew Van LiftbackCrew Van Twin SwingHeight adjustable head restraints - front ●●●●Height adjustable head restraints - rear --●●Security Van Liftback Van Twin Swing Crew Van Liftback Crew Van Twin Swing Security systemVan LiftbackVan Twin SwingCrew Van LiftbackCrew Van Twin SwingActive lock/unlock operation (user configurable)●●●●Anti-theft alarm ●●●●Central locking ●●●●Engine immobiliser●●●●Van Twin Swing Crew Van Liftback Crew Van Twin SwingKeyless entry remote - 2x●●●●Multimedia system Van Liftback Van Twin Swing Crew Van Liftback Crew Van Twin Swing Functions Van Liftback Van Twin Swing Crew Van Liftback Crew Van Twin Swing Bluetooth phone connectivity●●●●Touch screen - 8” display●●●●Wireless Apple CarPlay1 & Android Auto2compatibility●●●●Speakers Van Liftback Van Twin Swing Crew Van Liftback Crew Van Twin Swing Audio system - 2 speakers●●●●Audio/media sources Van Liftback Van Twin Swing Crew Van Liftback Crew Van Twin Swing AM / FM radio●●●●Bluetooth audio streaming●●●●Quiet Mode - Speaker volume limitationfor a quieter cabin●●●●Radio Data System (RDS)●●●●USB multimedia input - 1x●●●●Occupant comfort & convenience Van Liftback Van Twin Swing Crew Van Liftback Crew Van Twin Swing Front seats Van Liftback Van Twin Swing Crew Van Liftback Crew Van Twin Swing Driver’s seat - height adjustable●●●●Front centre console - wireless chargingpad (Qi standard)3●●●●Front centre console - power outlets - 1x12V outlet ●●●●Front centre console - power outlets - 1xUSB charge port●●●●Front centre console - 1x MultimediaUSB port●●●●Grip handles - 2x (passenger)●●●●Second row seats Van Liftback Van Twin Swing Crew Van Liftback Crew Van Twin Swing Fixed bench seat--●●USB charge ports - 2x - rear of centreconsole--●●Coat hooks - 2x--●●Windows/shades Van Liftback Van Twin Swing Crew Van Liftback Crew Van Twin Swing One touch window up & down function●●●●with anti-pinching safety feature - frontwindowsPop-out latch type windows - 2nd row --●●Power windows - front●●●●Sunvisor (extendable) - driver and frontpassenger●●●●Vision & sight Van Liftback Van Twin Swing Crew Van Liftback Crew Van Twin Swing Interior mirror Van Liftback Van Twin Swing Crew Van Liftback Crew Van Twin Swing Day / night rear view mirror●●●●Exterior mirrors Van Liftback Crew Van Liftback Crew Van Twin Swing Heated●●●●Power adjustable ●●●●Power folding with auto fold function●●●●Instrument cluster/driving displaysInstrument cluster - 4.2” TFT LCD withtrip computer & digital speedometer●●●●Ventilation & heating Van Liftback Van Twin Swing Crew Van Liftback Crew Van Twin Swing Air conditioningCabin air filter ●●●●Manual air conditioning●●●●Other featuresHeated rear windshield●●●●Exterior styling Van Liftback Van Twin Swing Crew Van Liftback Crew Van Twin Swing FrontFront garnish strip - black ●●●●Front grille - body coloured ●●●●Body coloured mirrors●●●●Mud guards●●●●Rear Van Liftback Van Twin Swing Crew Van Liftback Crew Van Twin Swing Mud guards●●●●Exterior lighting - front Van Liftback Van Twin Swing Crew Van Liftback Crew Van Twin Swing Headlight functions - automatic dusksensing●●●●Interior lighting - first row Van Liftback Van Twin Swing Crew Van Liftback Crew Van Twin Swing Front room lights●●●●Safety reflectors - front doors●●●●Interior lighting - second row Van Liftback Van Twin Swing Crew Van Liftback Crew Van Twin Swing Centre room light--●●Sliding door couresty lamps--●●Interior lighting - others Van Liftback Van Twin Swing Crew Van Liftback Crew Van Twin Swing Cargo area room lamp●●●●Interior light fade-out delay●●●●Storage solutions Van Liftback Van Twin Swing Crew Van Liftback Crew Van Twin Swing Front seats Van Liftback Van Twin Swing Crew Van Liftback Crew Van Twin Swing Cup holders - centre storage box - 2x--●●Cup holders - dashboard - 1x●●●●Cup holders - front console - 1x●●●●Dash top storage tray●●●●Door map pockets and bottle bulges●●●●Front roof trays -2x●●●●Glovebox compartment●●●●Ticket holders - sunvisors (driver andfront passenger)●●●●Rear seats Van Liftback Van Twin Swing Crew Van Liftback Crew Van Twin Swing 2nd row cup holders - rear centre con-sole - 2x--●●Rear bench multi-box--●●Sliding door map pockets and bottlebulges--●●Others Van Liftback Van Twin Swing Crew Van Liftback Crew Van Twin Swing Cargo Partition - behind 2nd row --●●4 tie down hooks in cargo area--●●8 tie down hooks in cargo area●●--Floor covering in cargo area●●●●Notes:1. Apple CarPlay requires iPhone 5 or subsequent model (lightning cable) in order to operate.2. Android Auto requires a device with Android 5.0 operating system or subsequent version in order to operate.3. Wireless charging requires a Qi-enabled smartphone or adapter in order to operate.Key:● = Feature included as standard on trim- = Feature is not available on trim。
钢结构专业英语词汇Aacceptable quality 合格质量acceptance lot 验收批量aciera 钢材admixture 外加剂against slip coefficient between friction surface of high-strength bolted connection 高强度螺栓摩擦面抗滑移系数aggregate 骨料air content 含气量air-dried timber 气干材allowable ratio of height to sectional thickness of masonry wall or column砌体墙、柱容许高厚比allowable slenderness ratio of steel member 钢构件容许长细比allowable slenderness ratio of timber compression member 受压木构件容许长细比allowable stress range of fatigue 疲劳容许应力幅allowable ultimate tensile strain of reinforcement 钢筋拉应变限值allowable value of crack width 裂缝宽度容许值allowable value of deflection of structural member 构件挠度容许值allowable value of deflection of timber bending member 受弯木构件挠度容许值allowable value of deformation of steel member 钢构件变形容许值allowable value of deformation of structural member 构件变形容许值allowable value of drift angle of earthquake resistant structure抗震结构层间位移角限值amplified coefficient of eccentricity 偏心距增大系数anchorage 锚具anchorage length of steel bar 钢筋锚固长度approval analysis during construction stage 施工阶段验算arch 拱arch with tie rod 拉捍拱arch-shaped roof truss 拱形屋架area of shear plane 剪面面积area of transformed section 换算截面面积aseismic design 建筑抗震设计assembled monolithic concrete structure 装配整体式混凝土结构automatic welding 自动焊接auxiliary steel bar 架立钢筋Bbackfilling plate 垫板balanced depth of compression zone 界限受压区高度balanced eccentricity 界限偏心距bar splice 钢筋接头bark pocket 夹皮batten plate 缀板beam 次梁bearing plane of notch 齿承压面bearing plate 支承板bearing stiffener 支承加劲肋bent-up steel bar 弯起钢筋block 砌块block masonry 砌块砌体block masonry structure 砌块砌体结构blow hole 气孔board 板材bolt 螺栓bolted connection (钢结构螺栓连接bolted joint (木结构螺栓连接bolted steel structure 螺栓连接钢结构bonded prestressed concrete structure 有粘结预应力混凝土结构bow 顺弯brake member 制动构件breadth of wall between windows 窗间墙宽度brick masonry 砖砌体brick masonry column 砖砌体柱brick masonry structure 砖砌体结构brick masonry wall 砖砌体墙broad-leaved wood 阔叶树材building structural materials 建筑结构材料building structural unit 建筑结构单元building structure 建筑结构built-up steel column 格构式钢柱bundled tube structure 成束筒结构burn-through 烧穿butt connection 对接butt joint 对接butt weld 对接焊缝Ccalculating area of compression member 受压构件计算面积calculating overturning point 计算倾覆点calculation of load-carrying capacity of member 构件承载能力计算camber of structural member 结构构件起拱cantilever beam 挑梁cap of reinforced concrete column 钢筋混凝土柱帽carbonation of concrete 混凝土碳化cast-in-situ concrete slab column structure 现浇板柱结构cast-in-situ concrete structure 现浇混凝土结构cavitation 孔洞cavity wall 空斗墙cement 水泥cement content 水泥含量cement mortar 水泥砂浆characteriseic value of live load on floor or roof 楼面、屋面活荷载标准值characteristi cvalue o fwindload 风荷载标准值characteristic value of concrete compressive strength 混凝土轴心抗压强度标准值characteristic value of concrete tensile strength 混凝土轴心抗拉标准值characteristic value of cubic concrete compressive strength混凝土立方体抗压强度标准值characteristic value of earthquake action 地震作用标准值characteristic value of horizontal crane load 吊车水平荷载标准值characteristic value of masonry strength 砌体强度标准值characteristic value of permanent action 永久作用标准值characteristic value of snowload 雪荷载标准值characteristic value of strength of steel 钢材强度标准值characteristic value of strength of steel bar 钢筋强度标准值characteristic value of uniformly distributed live load 均布活标载标准值characteristic value of variable action 可变作用标准值characteristic value of vertical crane load 吊车竖向荷载标准值charaeteristic value of material strength 材料强度标准值checking section of log structural member,原木构件计算截面chimney 烟囱circular double-layer suspended cable 圆形双层悬索circular single-layer suspended cable 圆形单层悬索circumferential weld 环形焊缝classfication for earthquake-resistance of buildings 建筑结构抗震设防类别clear height 净高clincher 扒钉coefficient of equivalent bending moment of eccentrically loaded steel memher (beam-column 钢压弯构件等效弯矩系数cold bend inspection of steelbar 冷弯试验cold drawn bar 冷拉钢筋cold drawn wire 冷拉钢丝cold-formed thin-walled sectionsteel 冷弯薄壁型钢cold-formed thin-walled steel structure 冷弯薄壁型钢结构cold-rolled deformed bar 冷轧带肋钢筋column bracing 柱间支撑combination value of live load on floor or roof 楼面、屋面活荷载组合值compaction 密实度compliance control 合格控制composite brick masonry member 组合砖砌体构件composite floor system 组合楼盖composite floor with profiled steel sheet 压型钢板楼板composite mortar 混合砂浆composite roof truss 组合屋架compostle member 组合构件compound stirrup 复合箍筋compression member with large eccentricity 大偏心受压构件compression member with small eccentricity 小偏心受压构件compressive strength at an angle with slope of grain 斜纹承压强度compressive strength perpendicular to grain 横纹承压强度concentration of plastic deformation 塑性变形集中conceptual earthquake-resistant design 建筑抗震概念设计concrete 混凝土concrete column 混凝土柱concrete consistence 混凝土稠度concrete floded-plate structure 混凝土折板结构concrete foundation 混凝土基础concrete mix ratio 混凝土配合比concrete wall 混凝土墙concrete-filled steel tubular member 钢管混凝土构件conifer 针叶树材coniferous wood 针叶树材connecting plate 连接板connection 连接connections of steel structure 钢结构连接connections of timber structure 木结构连接consistency of mortar 砂浆稠度constant cross-section column 等截面柱construction and examination concentrated load 施工和检修集中荷载continuous weld 连续焊缝core area of section 截面核芯面积core tube supported structure 核心筒悬挂结构corrosion of steel bar 钢筋锈蚀coupled wall 连肢墙coupler 连接器coupling wall-beam 连梁coupling wall-column... 墙肢coursing degree of mortar 砂浆分层度cover plate 盖板covered electrode 焊条crack 裂缝crack resistance 抗裂度crack width 裂缝宽度crane girder 吊车梁crane load 吊车荷载creep of concrete 混凝土徐变crook 横弯cross beam 井字梁cup 翘弯curved support 弧形支座cylindrical brick arch 砖筒拱Ddecay 腐朽decay prevention of timber structure 木结构防腐defect in timber 木材缺陷deformation analysis 变形验算degree of gravity vertical for structure or structural member 结构构件垂直度degree of gravity vertical forwall surface 墙面垂直度degree of plainness for structural memer 构件平整度degree of plainness for wall surface 墙面平整度depth of compression zone 受压区高度depth of neutral axis 中和轴高度depth of notch 齿深design of building structures 建筑结构设计design value of earthquake-resistant strength of materials 材料抗震强度设计值design value of load-carrying capacity of members 构件承载能力设计值designations 0f steel 钢材牌号designvalue of material strength 材料强度设计值destructive test 破损试验detailing reintorcement 构造配筋detailing requirements 构造要求diamonding 菱形变形diaphragm 横隔板dimensional errors 尺寸偏差distribution factor of snow pressure 屋面积雪分布系数dogspike 扒钉double component concrete column 双肢柱dowelled joint 销连接down-stayed composite beam 下撑式组合粱ductile frame 延性框架dynamic design 动态设计Eearthquake-resistant design 抗震设计earthquake-resistant detailing requirements 抗震构造要求effective area of fillet weld 角焊缝有效面积effective depth of section 截面有效高度effective diameter of bolt or high-strength bolt 螺栓(或高强度螺栓有效直径effective height 计算高度effective length 计算长度effective length of fillet weld 角焊缝有效计算长度effective length of nail 钉有效长度effective span 计算跨度effective supporting length at end of beam 梁端有效支承长度effective thickness of fillet weld 角焊缝有效厚度elastic analysis scheme 弹性方案elastic foundation beam 弹性地基梁elastic foundation plate 弹性地基板elastically supported continuous girder 弹性支座连续梁elasticity modulus of materials 材料弹性模量elongation rate 伸长率embeded parts 预埋件enhanced coefficient of local bearing strength of materials 局部抗压强度提高系数entrapped air 含气量equilibrium moisture content 平衡含水率equivalent slenderness ratio 换算长细比equivalent uniformly distributed live load 等效均布活荷载etlectlve cross-section area of high-strength bolt 高强度螺栓的有效截面积ettectlve cross-section area of bolt 螺栓有效截面面积euler's critical load 欧拉临界力euler's critical stress 欧拉临界应力excessive penetration 塌陷Ffiber concrete 纤维混凝仁filler plate 填板门fillet weld 角焊缝final setting time 终凝时间finger joint 指接fired common brick 烧结普通砖fish eye 白点fish-belly beam 角腹式梁fissure 裂缝flexible connection 柔性连接flexural rigidity of section 截面弯曲刚度flexural stiffness of member 构件抗弯刚度floor plate 楼板floor system 楼盖four sides(edgessupported plate 四边支承板frame structure 框架结构frame tube structure 单框筒结构frame tube structure 框架-简体结构frame with sidesway 有侧移框架frame without sidesway 无侧移框架frange plate 翼缘板friction coefficient of masonry 砌体摩擦系数full degree of mortar at bed joint 砂浆饱满度function of acceptance 验收函数Ggang nail plate joint 钉板连接glue used for structural timberg 木结构用胶glued joint 胶合接头glued laminated timber 层板胶合木glued laminated timber structure 层板胶合结构grider 主梁grip 夹具grith weld 环形焊缝groove 坡口gusset plate 节点板Hhanger 吊环hanging steel bar 吊筋heartwood 心材heat tempering bar 热处理钢筋height variation factor of wind pressure 风压高度变化系数heliral weld 螺旋形僻缝high-strength bolt 高强度螺栓high-strength bolt with large hexagon bea 大六角头高强度螺栓high-strength bolted bearing type join 承压型高强度螺栓连接,high-strength bolted connection 高强度螺栓连接high-strength bolted friction-type joint 摩擦型高强度螺栓连接high-strength holted steel slsteel structure 高强螺栓连接钢结构hinge support 铰轴支座hinged connection 铰接hlngeless arch 无铰拱hollow brick 空心砖hollow ratio of masonry unit 块体空心率honeycomb 蜂窝hook 弯钩hoop 箍筋hot-rolled deformed bar 热轧带肋钢筋hot-rolled plain bar 热轧光圆钢筋hot-rolled section steel 热轧型钢hunched beam 加腋梁Iimpact toughness 冲击韧性impermeability 抗渗性inclined section 斜截面inclined stirrup 斜向箍筋incomplete penetration 未焊透incomplete tusion 未溶合incompletely filled groove 未焊满indented wire 刻痕钢丝influence coefficient for load-bearing capacity of compressionmember 受压构件承载能力影响系数influence coefficient for spacial action 空间性能影响系数initial control 初步控制insect prevention of timber structure 木结构防虫(oinspection for properties of glue used in structural member 结构用胶性能检验inspection for properties of masnory units 块体性能检验inspection for properties of mortar 砂浆性能检验inspection for properties of steelbar 钢筋性能检验integral prefabricated prestressed concrete slab-column structure整体预应力板柱结构intermediate stiffener 中间加劲肋intermittent weld 断续焊缝Jjoint of reinforcement 钢筋接头Kkey joint 键连接kinetic design 动态设计knot 节子(木节)Llaced of battened compression member 格构式钢柱lacing and batten elements 缀材(缀件)lacing bar 缀条lamellar tearing 层状撕裂lap connectlon 叠接(搭接)lapped length of steel bar 钢筋搭接长度large pannel concrete structure 混凝土大板结构large-form cocrete structure 大模板结构lateral bending 侧向弯曲lateral displacement stiffness of storey 楼层侧移刚度lateral displacement stiffness of structure 结构侧移刚度lateral force resistant wallstructure 抗侧力墙体结构leg size of fillet weld 角焊缝焊脚尺寸length of shear plane 剪面长度lift-slab structure 升板结构light weight aggregate concrete 轻骨料混凝土limit of acceptance 验收界限limitimg value for local dimension of masonry structure砌体结构局部尺寸限值limiting value for sectional dimension 截面尺寸限值limiting value for supporting length 支承长度限值limiting value for total height of masonry structure 砌体结构总高度限值linear expansion coeffcient 线膨胀系数lintel 过梁load bearing wall 承重墙load-carrying capacity per bolt 单个普通螺栓承载能力load-carrying capacity per high-strength holt 单个高强螺桂承载能力load-carrying capacity per rivet 单个铆钉承载能力log 原木log timberstructure 原木结构long term rigidity of member 构件长期刚度longitude horizontal bracing 纵向水平支撑longitudinal steel bar 纵向钢筋longitudinal stiffener 纵向加劲肋longitudinal weld 纵向焊缝losses of prestress 预应力损失lump material 块体Mmain axis 强轴main beam 主梁major axis 强轴manual welding 手工焊接manufacture control 生产控制map cracking 龟裂masonry 砌体masonry lintel 砖过梁masonry member 无筋砌体构件masonry units 块体masonry-concrete structure 砖混结构masonry-timber structure 砖木结构mechanical properties of materials 材料力学性能melt-thru 烧穿method of sampling 抽样方法minimum strength class of masonry 砌体材料最低强度等级minor axls 弱轴mix ratio of mortar 砂浆配合比mixing water 拌合水modified coefficient for allowable ratio of height to sectionalthickness of masonry wall 砌体墙容许高厚比修正系数modulus of elasticity of concrete 混凝土弹性模量modulus of elasticity parellel to grain 顺纹弹性模量moisture content 含水率moment modified factor 弯矩调幅系数monitor frame 天窗架mortar 砂浆multi-defence system of earthquake-resistant building 多道设防抗震建筑multi-tube supported suspended structure 多筒悬挂结构Nnailed joint 钉连接net height 净高net span 净跨度net water/cementratio 净水灰比non-destructive inspection of weld 焊缝无损检验non-destructive test 非破损检验non-load-bearingwall 非承重墙non-uniform cross-section beam 变截面粱non-uniformly distributed strain coefficient of longitudinal tensile reinforcement 纵向受拉钢筋应变不均匀系数normal concrete 普通混凝土normal section 正截面notch and tooth joint 齿连接number of sampling 抽样数量Oobligue section 斜截面oblique-angle fillet weld 斜角角焊缝one-way reinforced(or prestressedconcrete slab 单向板open web roof truss 空腹屋架ordinary concrete 普通混凝土ordinary steel bar 普通钢筋orthogonal fillet weld 直角角焊缝outstanding width of flange 翼缘板外伸宽度outstanding width of stiffener 加劲肋外伸宽度over-all stability reduction coefficient of steel beam 钢梁整体稳定系数overlap 焊瘤overturning or slip resistance analysis 抗倾覆、滑移验算Ppadding plate 垫板partial penetrated butt weld 不焊透对接焊缝partition 非承重墙penetrated butt weld 透焊对接焊缝percentage of reinforcement 配筋率perforated brick 多孔砖pilastered wall 带壁柱墙pit 凹坑pith 髓心(oplain concrete structure 素混凝土结构plane hypothesis 平截面假定plane structure 平面结构plane trussed lattice grids 平面桁架系网架plank 板材plastic adaption coefficient of cross-section 截面塑性发展系数plastic design of steel structure 钢结构塑性设计plastic hinge 塑性铰plastlcity coefficient of reinforced concrete member in tensile zone受拉区混凝土塑性影响系数plate-like space frame 干板型网架plate-like space truss 平板型网架plug weld 塞焊缝plywood 胶合板plywood structure 胶合板结构pockmark 麻面polygonal top-chord roof truss 多边形屋架post-tensioned prestressed concrete structure 后张法预应力混凝土结构precast reinforced concrete member 预制混凝土构件prefabricated concrete structure 装配式混凝土结构presetting time 初凝时间prestressed concrete structure 预应力混凝土结构prestressed steel structure 预应力钢结构prestressed tendon 预应力筋pre-tensioned prestressed concrete structure 先张法预应力混凝土结构primary control 初步控制production control 生产控制properties of fresh concrete 可塑混凝土性能properties of hardened concrete 硬化混凝土性能property of building structural materials 建筑结构材料性能purlin 檩条Qqlue timber structurer 胶合木结构quality grade of structural timber 木材质量等级quality grade of weld 焊缝质量级别quality inspection of bolted connection 螺栓连接质量检验quality inspection of masonry 砌体质量检验quality inspection of riveted connection 铆钉连接质量检验quasi-permanent value of live load on floor or roof 楼面、屋面活荷载准永久值Rradial check 辐裂ratio of axial compressive force to axial compressive ultimate capacity of section 轴压比ratio of height to sectional thickness of wall or column 砌体墙柱高、厚比ratio of reinforcement 配筋率ratio of shear span to effective depth of section 剪跨比redistribution of internal force 内力重分布reducing coefficient of compressive strength in sloping grain for bolted connection 螺栓连接斜纹承压强度降低系数reducing coefficient of liveload 活荷载折减系数reducing coefficient of shearing strength for notch and tooth connection齿连接抗剪强度降低系数regular earthquake-resistant building 规则抗震建筑reinforced concrete deep beam 混凝土深梁reinforced concrete slender beam 混凝土浅梁reinforced concrete structure 钢筋混凝土结构reinforced masonry structure 配筋砌体结构reinforcement ratio 配筋率reinforcement ratio per unit volume 体积配筋率relaxation of prestressed tendon 预应筋松弛representative value of gravity load 重力荷载代表值resistance to abrasion 耐磨性resistance to freezing and thawing 抗冻融性resistance to water penetration 抗渗性reveal of reinforcement 露筋right-angle filletweld 直角角焊缝rigid analysis scheme 刚性方案rigid connection 刚接rigid transverse wall 刚性横墙rigid zone 刚域rigid-elastic analysis scheme 刚弹性方案rigidity of section 截面刚度rigidly supported continous girder 刚性支座连续梁ring beam 圈梁rivet 铆钉riveted connecction 铆钉连接riveted steel beam 铆接钢梁riveted steel girder 铆接钢梁riveted steel structure 铆接钢结构rolle rsupport 滚轴支座rolled steel beam 轧制型钢梁roof board 屋面板roof bracing system 屋架支撑系统roof girder 屋面梁roof plate 屋面板roof slab 屋面板roof system 屋盖roof truss 屋架rot 腐朽round wire 光圆钢丝Ssafety classes of building structures 建筑结构安全等级safetybolt 保险螺栓sapwood 边材sawn lumber+A610 方木sawn timber structure 方木结构saw-tooth joint failure 齿缝破坏scarf joint 斜搭接seamless steel pipe 无缝钢管seamless steel tube 无缝钢管second moment of area of tranformed section 换算截面惯性矩second order effect due to displacement 挠曲二阶效应secondary axis 弱轴secondary beam 次粱section modulus of transformed section 换算截面模量section steel 型钢semi-automatic welding 半自动焊接separated steel column 分离式钢柱setting time 凝结时间shake 环裂shaped steel 型钢shapefactorofwindload 风荷载体型系数shear plane 剪面shearing rigidity of section 截面剪变刚度shearing stiffness of member 构件抗剪刚度short stiffener 短加劲肋short term rigidity of member 构件短期刚度shrinkage 干缩shrinkage of concrete 混凝干收缩silos 贮仓skylight truss 天窗架slab 楼板slab-column structure 板柱结构slag inclusion 夹渣sloping grain 斜纹slump 坍落度snow reference pressure 基本雪压solid-web steel column 实腹式钢柱space structure 空间结构space suspended cable 悬索spacing of bars 钢筋间距spacing of rigid transverse wall 刚性横墙间距spacing of stirrup legs 箍筋肢距spacing of stirrups 箍筋间距specified concrete 特种混凝上spiral stirrup 螺旋箍筋spiral weld 螺旋形焊缝split ringjoint 裂环连接square pyramid space grids 四角锥体网架stability calculation 稳定计算stability reduction coefficient of axially loaded compression 轴心受压构件稳定系数stair 楼梯static analysis scheme of building 房屋静力汁算方案static design 房屋静力汁算方案statically determinate structure 静定结构statically indeterminate structure 超静定结构sted 钢材steel bar 钢筋steel column component 钢柱分肢steel columnbase 钢柱脚steel fiber reinforced concrete structure 钢纤维混凝土结构steel hanger 吊筋steel mesh reinforced brick masonry member 方格网配筋砖砌体构件steel pipe 钢管steel plate 钢板steel plateelement 钢板件steel strip 钢带steel support 钢支座steel tie 拉结钢筋steel tie bar for masonry 砌体拉结钢筋steel tube 钢管steel tubular structure 钢管结构steel wire 钢丝stepped column 阶形柱stiffener 加劲肋stiffness of structural member 构件刚度stiffness of transverse wall 横墙刚度stirrup 箍筋stone 石材stone masonry 石砌体stone masonry structure 石砌体结构storev height 层高straight-line joint failure 通缝破坏straightness of structural member 构件乎直度strand 钢绞线strength classes of masonry units 块体强度等级strength classes of mortar 砂浆强度等级strength classes of structural steel 钢材强度等级strength classes of structural timber 木材强度等级strength classes(grades of concrete 混凝土强度等级strength classes(grades of prestressed tendon 预应力筋强度等级strength classes(grades of steel bar 普通钢筋强度等级strength of structural timber parallel to grain 木材顺纹强度strongaxis 强轴structural system composed of bar 杆系结构structural system composed of plate 板系结构structural wall 结构墙superposed reinforced concrete flexural member 叠合式混凝土受弯构件suspended crossed cable net 双向正交索网结构suspended structure 悬挂结构swirl grain 涡纹Ttensile(compressive rigidity of section 截面拉伸(压缩刚度tensile(compressive stiffness of member 构件抗拉(抗压刚度tensile(ultimate strength of steel 钢材(钢筋抗拉(极限强度test for properties of concrete structural members 构件性能检验thickness of concrete cover 混凝土保护层厚度thickness of mortarat bed joint 水平灰缝厚度thin shell 薄壳three hinged arch 三铰拱tie bar 拉结钢筋tie beam 系梁tie tod 系杆tied framework 绑扎骨架timber 木材timber roof truss 木屋架tor-shear type high-strength bolt 扭剪型高强度螺栓torsional rigidity of section 截面扭转刚度torsional stiffness of member 构件抗扭刚度total breadth of structure 结构总宽度total height of structure 结构总高度total length of structure 结构总长度transmission length of prestress 预应力传递长度transverse horizontal bracing 横向水平支撑transverse stiffener 横向加劲肋transverse weld 横向焊缝transversely distributed steelbar 横向分布钢筋trapezoid roof truss 梯形屋架triangular pyramid space grids 三角锥体网架triangular roof truss 三角形屋架trussed arch 椽架trussed rafter 桁架拱tube in tube structure 筒中筒结构tube structure 简体结构twist 扭弯two hinged arch 双铰拱two sides(edges supported plate 两边支承板two-way reinforced (or prestressed concrete slab 混凝土双向板Uultimate compressive strain of concrete 混凝土极限压应变unbonded prestressed concrete structure 无粘结预应力混凝土结构undercut 咬边uniform cross-section beam 等截面粱unseasoned timber 湿材upper flexible and lower rigid complex multistorey building 上柔下刚多层房屋upper rigid lower flexible complex multistorey building 上刚下柔多层房屋Vvalue of decompression prestress 预应力筋消压预应力值value of effective prestress 预应筋有效预应力值verification of serviceability limit states 正常使用极限状态验证verification of ultimate limit states 承载能极限状态验证vertical bracing 竖向支撑vierendal roof truss 空腹屋架visual examination of structural member 构件外观检查visual examination of structural steel member 钢构件外观检查visual examination of weld 焊缝外观检查Wwall beam 墙梁wall frame 壁式框架(门wall-slab structure 墙板结构warping 翘曲warping rigidity of section 截面翘曲刚度water retentivity of mortar 砂浆保水性water tower 水塔water/cement ratio 水灰比weak axis 弱轴weak region of earthquake-resistant building 抗震建筑薄弱部位web plate 腹板weld 焊缝weld crack 焊接裂纹weld defects 焊接缺陷weld roof 焊根weld toe 焊趾weldability of steel bar 钢筋可焊性welded framework 焊接骨架welded steel beam 焊接钢梁welded steel girder 焊接钢梁welded steel pipe 焊接钢管welded steel strueture 焊接钢结构welding connection 焊缝连接welding flux 焊剂welding rod 焊条welding wire 焊丝wind fluttering factor 风振系数wind reference pressure 基本风压wind-resistant column 抗风柱wood roof decking 屋面木基层Yyield strength (yield point of steel 钢材(钢筋屈服强度(屈服点)焊接常用中、英文术语定义及解释1 母材金属base mental, parent mental 被焊金属材料的统称。
abrupt changing rhyme scheme突变韵律absolute type vibration transducer绝对式测振传感器abutment桥台abutment anchor bar桥台锚固栓钉abutment capping台帽abutment shaft台身accidental action偶然作用acid proof cement耐酸水泥acid rain酸雨acoustoelasticity声弹性法actions on bridge桥梁上的作用additional pile method加桩法additional strut beam method加撑梁法adjusting shaft校正井aerial remote sensing航空遥感aerodynamic model气流模型aerogeophysical prospecting航空物探aerophotography航空摄影aerophotography航片aesthetical ability审美能力aesthetical affection审美感受aesthetical appreciation审美评价aesthetical order审美序列aesthetical standard审美标准aesthetical taste审美趣味aesthetical treatment of bridge details桥梁细部美学处理aesthetical viewpoint审美观点age龄期aggregate interlock骨料咬合作用aggregate interlock集料aging of cold drawn bar冷拉时效air compressor空气压缩机air entraining agent加气剂air jet out let on outside wall of caisson井壁气龛air jetting method to reduce skin friction壁后压气法air spinning method空中纺缆法air vent排气孔air-entraining silicification method加气硅化法air-entrapping cement加气水泥air-lift dredger空气吸泥机airlock气闸Akashi Kaikyo Bridge明石海峡大桥Alcantara Bridge阿尔坎塔拉桥alkali liquid stabilization method碱液加固法allowable bearing capacity of foundation soil地基容许承载力allowable eccentricity of foundation base of bridge桥基底容许偏心alluvial deposit冲积层alluvium movement泥沙运动ALRT Bridge埃尔特桥alternate rhyme scheme交叉韵律alternatives比较方案aluminium-thermal spraying coating热喷铝涂层aluminum alloy steel bridge铝合金钢桥Alzette Bridge阿尔泽特桥ambient random vibration test环境随机激励振动试验Amizada Bridge埃米塞得桥analogy association类比联想analogy method比拟法anchor barge定位船anchor beam平衡梁anchor bearing plate锚垫板anchor bearing ring锚垫圈anchor by bond粘结锚anchor pile锚碇桩anchor plate锚碇板anchor span锚跨anchor span组合跨anchorage锚碇anchorage锚具anchorage for CCL prestressing system CCL体系锚具anchorage length锚固长度anchorage of rail线路锁定anchorage pier锚墩anchorage with ring plug环销锚anchorage with tapered plug锥销锚anchorage with wedges片销锚anchorage zone design锚下端块设计anchored bulkhead abutment锚锭板桥台anchored in rock piles嵌岩桩anchored pier锚固墩anchoring box锚箱angle steel角钢angular displacement of pier top墩顶转角angular transducer倾角仪Anlan Bridge安澜桥Annacis Island Bridge安纳西斯岛桥annual maximum instantaneous discharge年瞬时最大流量Anping Bridge安平桥antecedent rainfall前期降雨anti-creeper防爬器anticreeping angle防爬角钢antifreezing agent 防冻剂antirust welded steel bearing防锈焊接钢支座appraisal of rock section岩石薄片鉴定appreciation of beauty审美approach slab used at bridge end 桥头渡板approach span引桥appropriate reinforcement design适筋设计aqueduct bridge水渠桥arc hinge弧形铰arc plate bearing弧形钢板支座arch axis拱轴线arch bridge拱桥arch bridge with arch ring laid by cantilever method悬砌拱桥arch bridge with suspended road, through arch bridge下承式拱桥arch bridge with thrusts at supports有推力拱桥arch bridge with truss rib桁架肋拱桥arch bridge without thrusts at supports无推力拱桥arch centering拱架arch covering拱板arch crown拱顶arch culvert拱形涵洞arch disc bridge拱片桥arch hinge拱铰arch protection护拱arch rib拱肋arch ring拱圈arch seat拱座arch stone拱石arch tile拱波arch truss拱形桁架arched abutment拱形桥台areal rainfall面雨量Arrabida Bridge阿拉比德桥arrangement of culvert elevation涵洞的立面布置arrangement of piles in rank form桩的行列式排列artificial ground人工地基artificial loading method假载法artificial upper limit of frozen soil冻土人为上限assemblable truss拆装梁assembling bolt拼装螺栓assembling of member 杆件组装assembling pin冲钉assembling steel truss from members钢梁杆件拼装assembling steel truss on falsework脚手架上拼装钢梁association联想Astoria Bridge阿斯托里亚桥attribute of beauty美的属性Aue Bridge奥埃桥automatic welding自动焊auxiliary bridge for construction施工便桥auxiliary functions of bridge桥梁附加功能auxiliary pier辅助墩auxiliary pier method辅助墩法average discharge rate平均流量average discharge velocity平均流速axial bearing capacity of drilled caisson embedded in bedrock嵌岩管柱轴向承载力axial bearing capacity of piles桩轴向承载力axial compression strength of concrete混凝土轴心抗压强度Ba Bridge灞桥back of arch拱背back stayed abutment背撑式桥台Bailey bridge贝雷桥Baimianshi Bridge over Wushui River白面石武水大桥Baishatuo Changjiang (Yangtze) River Bridge at Chongqing重庆白沙砣长江大桥Baitashan Iron Bridge over Yellow River白塔山黄河铁桥balance weight abutment衡重式桥台balanced cantileuer construction均衡悬臂施工法balanced cantilever erecting crane for bridge spans双悬臂式架桥机balanced design平衡设计balanced failure界限破坏ballasted deck碎石铺装桥面ballasted deck bridge道碴桥面桥bamboo cable bridge笮桥bamboo cable bridge竹索桥bamboo reinforced concrete open caisson竹筋混凝土沉井band suspension displacement meter张线式位移计bank bar边滩Baodai Bridge宝带桥Baoding Bridge at Dukou渡口宝鼎桥barge驳船barrel arch bridge板拱桥Barrios de luna Bridge巴里奥斯·卢纳桥bascule bridge立转桥base-line survey基线测量basic rib基肋basic variable基本变量basic variable load基本可变荷载basic wind pressure基本风压basic wind speed基本风速basin流域Bauschinger effect of steel钢筋包辛格效应bay bridge海湾桥Bayonne Bridge贝永桥Bazi Bridge八字桥BBRV anchorage BBRV镦头锚BBRV wire posttensioning system BBRV体系beam bridge梁式桥beam bridge with wavy cross-section波形截面梁桥beam bridge without ballast无碴梁桥beam lowering落梁beam on elastic foundation analogy弹性地基梁比拟法beam-frame system rigid frame bridge梁-框体系刚架桥bearing支座bearing in butt joint正接抵承bearing member承重构件bearing of the hole-side钉孔承压bearing stiffener, end stiffener端加劲肋bearing stratum 持力层bearing stress of timber木材承压应力bearing structure承重结构bearing template, bed block支承垫石beauty of bridge body主体美beauty of bridge configuration桥梁造型美beauty of bridge decoration装饰美beauty of content内涵美beauty of form形式美bed for structure test结构试验台座bed load推移质bed material 河床质bed rock基岩bed shear河底切力bed-load transport推移质输沙率bedrock mark基岩标behavior test of prestressing anchorage预应力锚具性能试验Beida Friendship Bridge at Dalian大连市北大友谊桥Beipei Chaoyang Bridge at Chongqing重庆市北碚朝阳桥belt conveyor带式输送机benchland stage平滩水位benchmark (B.M.)水准点benchmark leveling基平bend test of bars钢筋冷弯试验bending plasticity of timber木材的弯曲塑性bending-up of flexural reinforcement钢筋的弯起Bendorf Bridge 本道夫桥bent cap. Capping盖梁bent structure排架结构bent-up bar弯起钢筋biaxial stress behavior of concrete混凝土双轴应力性能bidding, enter a bid投标bi-prestressing system concrete bridge双预应力体系混凝土桥bituminous deck pavement沥青铺装桥面bituminous surface treatment沥青表面处置blade bit刮刀钻头bleeding of concrete泌水blind ditch盲沟blind drain behind abutment, blind ditch behind abutment桥台后排水盲沟blind peariform anchorage暗藏梨状锚block砌块block for seismic protection防震挡块boat bridge舟桥bolt and nail connection栓钉结合bolt and weld connection栓焊连接bolt connection普通螺栓连接bolt tension calibrator螺栓轴力计bolted and welded steel truss bridge栓焊钢桁架桥bond failure mechanism粘结破坏机理bond stress粘结应力bond test for reinforcing bars钢筋握裹力试验Bonhomme Bridge博诺姆桥bored cast-in-situ pile钻孔灌注桩bored cast-in-situ pile with casing带套管钻孔灌注桩bored-inserting method钻孔插入法boring and grouting method钻孔灌浆法boring machine for cast-in-place piles灌注桩钻机Bosporus Bridge博斯普鲁斯桥Bosporus-Ⅱ Bridge博斯普鲁斯二桥boundary layer wind tunnel 大气边界层风洞boundary line of bridge construction, clearance of bridge constru桥梁建筑限界bowstring arch bridge, tied-arch bridge系杆拱桥box abutment箱形桥台box culvert箱形涵洞box frame bridge箱形桥box girder箱梁box girder bridge箱形梁桥box girder bridge with inclinedweb plate斜腹板箱梁桥box girder bridge with steel deck slab钢桥面板箱梁桥box girder with multiple cells多室箱梁box-ribbed arch bridge箱形拱桥brace拉条bracket牛腿bracket against a pier墩旁托架braided river游荡型河流braking bracing, braking frame制动撑架braking force and tractive force制动力和牵引力braking pier, abutment pier制动墩Brazo Largo Bridge布拉佐·拉戈桥break joint错缝brick culvert砖涵bridge桥梁bridge aerodynamic shape桥梁气动外形bridge aerodynamics桥梁空气动力学bridge aesthetics桥梁美学bridge and culvert桥涵bridge axis profile桥轴断面图bridge buffeting桥梁抖振bridge covering桥屋bridge crane桥式起重机bridge crossing structure over river桥渡bridge deck桥面bridge decoration桥上装饰bridge design procedure (program)桥梁设计程序bridge erecting crane架桥机bridge flutter桥梁颤振bridge foundation桥梁基础bridge layout in plan桥梁平面布置bridge lighting桥上照明bridge loadings, load on bridge桥梁荷载bridge maintenance gang养桥工区bridge member桥梁构件bridge planning design桥梁规划设计bridge project桥梁建设项目bridge project construction depth of bridge桥梁建筑高度bridge railing桥栏bridge rehabilitation桥梁修复bridge site桥位bridge site engineering survey桥位工程测量bridge site hydrographic plan桥渡水文平面图bridge site profile桥址纵断面图bridge site reconnaissance and topographic survey桥址勘测bridge site topographic map桥址地形图bridge sleeper桥忱bridge sleeper grooving桥枕刻槽bridge staircase桥梯bridge structure design method桥梁结构设计方法bridge tower桥塔bridge vortex-excited resonance桥梁涡激共振bridge with open floor明桥面桥Briesle Mass Bridge布里斯勒·玛斯桥Brinell hardness布林奈尔硬度brittle fracture of steel钢的脆断brittle-coating method脆性涂层法broken joint断缝Brooklyn Bridge布鲁克林桥Brotonne Bridge布鲁东纳桥Bubiyan Bridge布比延桥bucket elevator斗式提升机buckling coefficient of plate翘曲系数buckling load of column, buckling load压屈荷载buckling of plate钢板翘曲budget of working-drawings of a project施工图预算budget quota of bridge construction桥梁工程预算定额buildings at ends of bridge proper桥头建筑built-up formwork组合模板built-up section member组合杆件bulk cement truck散装水泥车bunched rails轨束梁bundle of I-beams工字梁束bundled girder束合大梁buoyancy of water水浮力buoyant box浮箱buried abutment埋置式桥台buried framed abutment框架埋置式桥台buried pile-column abutment桩柱埋置式桥强buried rib abutment肋形埋置式桥台buried river地下暗河burlap cofferdam麻袋围堰burring 除剌butt joint对接接头butt weld对接焊缝butt welder for reinforcing steel钢筋对焊机butt welding对接焊buttonhead anchorage镦头锚bybrid overflow pavement混合式过水路面c critical gradient临界坡度cable clamp索夹cable compaction紧缆cable crane缆索起重机cable net bridge索网桥cable protection斜缆防护cable saddle索鞍cable stayed bridge斜拉桥cable stayed bridge of multi-cable system密索体系斜拉桥cable stayed bridge with a single central cable plane单索面斜拉桥cable stayed bridge with continuous girder连续梁式斜拉桥cable stayed bridge with continuous rigid frame连续刚构式斜拉桥cable stayed bridge with double inclined cable planes双斜索面斜拉桥cable stayed bridge with double vertical cable planes双铅垂索面斜拉桥cable stayed bridge with rigid stays刚性索斜拉桥cable stayed bridge with single-cantilever girders单悬臂梁式斜拉桥cable stayed bridge with T-shaped rigid frames T形刚构式斜拉桥cable supported bridge缆索承重桥cable system being stable of the first order一阶稳定缆索体系cable system being stable of the second order二阶稳定缆索体系cable tower索塔cable with stranded wires钢绞线索cable wrapping缰丝cable-stayed bridge with composite girder钢结合梁斜拉桥caisson disease沉箱病caisson pile沉井型桩calcium silicate cement. Portland cement硅酸盐水泥calculated rise计算矢高calculating width of pile桩的计算宽度calculation of distortion by influence line用影响线计算畸变calling for tenders招标calm impression of force力的镇静camber上拱度camber预拱度canal bridge运河桥cantilever arch悬壁拱cantilever beam bridge悬臂梁桥cantilever concreting悬臂浇筑法cantilever construction method悬臂施工法cantilever erection悬臂拼装法cantilever method for assembling steel truss钢梁悬臂拼装法cantilever span悬臂跨cantilever truss bridge悬臂桁架梁桥cantilever truss construction method悬臂桁架法cantilever trussed arch bridge悬臂桁架拱桥cantilevered pier悬臂式桥墩cantilevered slab悬壁板cantilevered slab of deck trough confiing ballast道碴槽悬臂板cap of open caisson沉井顶盖capacitance type displacement transducer电容式位移传感器carbon equivalent [Ceq]碳当量carbon steel wire碳素钢丝cardborad drain method纸板排水法carriageway行车道carriageway beam行车道梁casing boring machine套管钻机casing method箍套法casing pipe护筒cast iron bridge铸铁桥cast steel bearing铸钢支座cast-in-place pile with variable cross-section变截面灌注桩cast-in-place reinforced concrete beam bridge就地浇筑钢筋混凝土梁桥cast-in-situ pile就地灌注桩catastrophic flood特大洪水catastrophic flood特大洪水处理catchment gutter聚水槽catenarian arch axis悬链线拱轴catenary arch bridge悬链线拱桥cathodic protection (cp) of steel bar钢筋阴极防腐法catwalk猫道cause and effect association因果联想cellular cofferdam of steel sheet pile构体式钢板桩围堰cement grouting method水泥灌浆法cement mortar mixer水泥砂浆搅拌机cement mortar pump水泥砂浆输送泵cement stabilized soil method水泥加固土法center of rainstorm暴雨中心center-hole jack穿心式千斤顶central span中孔centrifugal compacting process for reinforced concrete pipe-pile混凝土管桩离心法成型centrifugal force离心力centrifugal pump离心泵chain block链条滑车Changjiang (Yangtze) River Bridge at Nanjing南京长江大桥Changjiang (Yangtze) River Bridge at Wuhan武汉长江大桥Changjiang (Yangtze) River Bridge at Zhicheng枝城长江大桥Changjinag (Yangtze) River Bridge at Jiujiang九江长江大桥channel bottom slope河底经降channel bridge河渠桥channel section槽钢Chao Phraya River Bridge湄南河桥character association性质联想characteristic crack width特征裂缝宽度characteristic load特征荷载characteristic value of an action作用特征值charge amplifier电荷放大器chassification of prestressed concrete预应力混凝土的分类check消力槛check dam. Mud avalanche retaining dyke谷坊check load验算荷载chemical analysis of water水样分析chemical churning process单管旋喷注浆法chemical consolidation化学防护chemical method of derusting化学除锈chemical stabilization method化学加固法Chezy coefficient谢基系数Chezy formula谢基公式chipped stone arch bridge料石拱桥Choisy-le-Roi Bridge舒瓦西-勒-鲁瓦桥chute滑道chute急流槽circular arch bridge圆弧拱桥circular load cell环箍式测力计circulation current环流clasp nail马钉class A partially prestressed concrete bridge A类部分预应力混凝土桥class B partially prestressed concrete bridge B类部分预应力混凝土桥cleaning borehole of cast-in-situ bored pile钻孔灌注桩清孔clear lane width行车道净宽clear span of bridge桥梁净跨clearance above bridge deck桥面净空clearance above highway bridge deck公路桥面净空限界clearance testing car限界检查车clearance widening on curve曲线上净空加宽client, proprietor建设单位climber爬升器climbing form爬模closed drainage system封闭式排水系统closed end pipe pile闭口端管桩Coalbrookdale Bridge煤溪谷桥coefficient of arch axis拱轴系数coefficient of buckling for reinforced concrete column钢筋混凝土柱的纵向弯曲系数coefficient of dynamic response动力响应系数coefficient of live-load increment活载发展系数coefficient of rivets or bolts铆钉或螺栓系数coefficient of runoff径流系数coefficient of secondary stress in section截面次应力系数coefficient of thermal expansion of concrete混凝土热膨胀系数coefficient of variation of arch thickness拱厚变换系数coefficient of working live load运行活载系数cofferdam围堰cofferdam on the top of open caisson井顶围堰coherent coefficient of pier (T)墩的相干系数Tcohesive soil foundation粘性土地基coincide ratio of rivet hole钉孔通过率cold bending冷弯cold drawing machine for reinforcing steel钢筋冷拉机cold extruding machine for reinforcing steel and wire钢筋冷拔机cold flow of timber木材的冷流cold upsetting machine for rein-forcing steel and wire钢筋冷镦机cold-drawn low-carbon steel wire冷拔低碳钢丝cold-drawn rebar冷拉钢筋cold-drawn steel wire冷拔钢丝cold-rolled threadend anchorage轧丝锚cold-twisted rebar冷扭钢筋cold-worked bar冷作钢筋collapse崩塌colonnade foundation embedded in bedrock嵌岩管柱基础colour色彩column bent pier排柱式桥墩columnar pier柱式桥墩combination beam bridge with flat curved slab微弯板组合梁桥combination of load荷载组合combined beam bridge组合式梁桥combined braced system组合式撑架体系combined bridge, highway and railway bridge公路铁路两用桥combined end-bearing and friction pile中间型桩combined erecting equipment for bridge spans联合架桥机combined estimate index综合概算指标combined suspension and cable stayed bridge悬拉桥combined-system arch bridge组合体系拱桥combining value of actions作用组合值commercial function of bridge商业性桥梁Commodore J. Barry Bridge考莫多尔桥common compensated strain gauge公共补偿片compatibility相容性compatibility calculation相容性计算compatibility torsion协调扭转competitive tender of design scheme设计方案竞标complete correlation, function correlation完全相关completely probabilistic method全概率法complex type section of stream bed河床复式断面composite abutment组合式桥台composite beam bridge结合梁桥composite beam bridge组合式板桥composite box girder bridge组合箱梁桥composite expansion joint组合式伸缩缝composite girder复合大梁composite pile混合桩comprehensive unit price综合单价compressed-air floating caissons气筒浮式沉井compression failure of an over-reinforced member超筋破坏compression field theory压力场理论compression of soil土的压缩性compressive plasticity of timber木材压缩塑性compressive strength inclined to grain斜纹抗压强度compressive strength of concrete混凝土抗压强度compressive strength of reinforced concrete column钢筋混凝土柱的抗压强度compressive strength parallel to grain顺纹抗压强度compressive strength perpendicular to grain横纹抗压强度computation of temperature difference温差计算concealed pin暗销concealed work隐蔽工程concordant tendon吻合索concrete arch bridge混凝土拱桥concrete bridge混凝土桥concrete foundation of pier and abutment混凝土墩台基础concrete grades混凝土强度等级concrete hinged bearing混凝土铰支座concrete mixer混凝土搅拌机concrete mobile unit汽车式混凝土搅拌设备concrete open caisson混凝土沉井concrete placing boom混凝土布料杆concrete placing bucket混凝土吊斗concrete plant混凝土工厂concrete protective covering for rive bed混凝土护底concrete pump混凝土泵concrete slump cone混凝土坍落度简concrete truck mixer混凝土搅拌输送车concrete vibrator混凝土振捣器conductor for assembling组装胎型cone exploration锥探cone penetration test触探cone-anchorage jack锥式千斤顶confined concrete约束混凝土confined water承压水conic pitching of abutment桥台护锥conical pitching, conical revetment锥体护坡connecting line bridge across the strait跨海联络桥connection for built-up sections缀连性连接connection of steel bridge钢桥连接constant cross-section pier等截面桥墩construction budget, construction estimate施工预算construction cost, construction expenses工程费construction details施工详图construction error施工误差construction joint of concrete混凝土施工缝construction of bridge piers and abutments桥梁墩台施工construction specification施工规范constructional bar构造钢筋constructional loading施工荷载constuction with travelling formwork移动模架法contact stress beneath foundation基础接触应力contact type displacement measurement接触式位移测量continental river内陆河流continuity equation of constant flow (stationary flow)恒定流连续方程continuity stresses外约束应力continuous arch analysis连拱计算continuous arch bridge连续拱桥continuous beam bridge连续梁桥continuous conveyor连续输送机continuous deck method连续桥面法continuous pad built-up section member连续垫板组合杆件continuous rail无缝线路continuous rhyme scheme连续韵律continuous rigid frame bridge连续刚构桥continuous slab bridge连续板桥continuous-hinged rigid frame bridge连续铰接刚构桥contract of construction施工承包contraction coefficient收缩系数contractor, construction unit施工单位Contrasting method对比法conversion stress, equivalent stress换算应力coping, pier capping墩帽corner connection角接头corner joint隅节点corner stiffener隅加劲corner stiffening plate肱板correction for temperature effect温度修正correlation analysis相关分析correlation coefficient相关系数correlation of zero零相关corridor bridge廊桥corrosion-resistant steel bridge耐蚀钢桥corrugated metal pipe culvert波纹铁管涵cost of construction management施工管理费counter weight平衡重counterfort abutment扶壁式桥台coupler for tendons预应力筋连接器crack chart of structure结构裂缝图crack control裂缝控制cracking moment开裂弯矩crawler crane履带起重机creep camber徐变拱creep coefficient of concrete混凝土徐变系数creep limit of timber木材蠕变极限creep of concrete混凝土徐变creep of timber木材的蠕变creep of track轨道爬行criterion of similarty相似判据critical buckling load for reinforced concrete column钢筋混凝土柱的临界压力critical depth of flow临界水深critical flow临界流critical load of steel column钢压杆临界荷载critical relative compression depth界限相对受压区高度critical section临界断面critical speed临界速度critical velocity极限速度critical velocity of flow临界流速cross beam, floor beam横梁cross bracing 交叉撑架Cross Form Bridge鱼沼飞梁cross-section of stream河流横断面cross-sectional profile横断面图cross-wind galloping横风驰振crushing strength at elastic limit of timber木材弹性极限压碎强度crystallographic symmetry结晶对称cubic compressive strength of concrete混凝土立方体抗压强度culvert涵洞culvert abutment涵台culvert body涵洞洞身culvert foundation涵洞基础culvert grade涵底坡度culvert inlet and outlet涵洞洞口culvert inlet with flared wing wall八字翼墙洞口culvert location涵位culvert outlet erosion protection洞口冲刷防护culvert with steep grade陡坡涵洞culvert with top-fill暗涵culvert without top-fill明涵curb缘石curing by ponding围水养护curing of concrete混凝土养护current meter流速仪curve sign曲线标志curved bridge弯桥cut-off flow dike 截水坝cut-off wall截水墙cutting切割cutting edge of open caisson沉井刃脚cycle of incremental launching顶推循环dam bridge, gate bridge水闸桥Dames-Point Bridge达姆岬桥data logging system数据采集和处理系统datum level of elevation高程基准面Dazi Bridge over Lasa River, Xizang西藏拉萨河达孜桥dead load恒载debris flow泥石流deck bridge上承式桥deck construction桥面构造deck drainage桥面排水deck elevation桥面标高deck pavement桥面铺装deck slab桥面板deck slab行车道板deck truss girder bridge上承式桁架梁桥deck type arch bridge上承式拱桥decompression moment消压弯矩deduct losses扣损deep diving equipment深潜水设备deep foundation深基础deep mixing method深层搅拌法deep-reach深槽defective rivets不良铆钉defensive function of bridge防御性桥梁deflection theory挠度理论deflector导流板deformation joint 变形缝deformed bar变形钢筋degradation and sedimentation at meander reach of river河弯冲淤degree of prestressign, degree of prestress预应力度delivery with idler car游车发运depression detention填洼depth of matural flow天然水深derailment force掉道荷载derrick crane桅杆起重机derusting machine for reinforcing steel钢筋除锈机derusting of steel girder钢梁除锈derusting with steel wire brush钢刷除锈design approximate estimate设计概算design criteria设计准则design department, design section设计单位design discharge rate设计流量design discharge velocity设计流速design flood设计洪水design flood frequency设计洪水频率design life, designed service life设计寿命design load设计荷载design load spectrum设计荷载谱design of bridge cross-section桥梁横断面设计design of bridge opening孔径设计design of bridge profile桥梁纵断面设计design of loading products up-on a wagon成品装车设计design rainstorm设计暴雨design reference period设计基准期design stages, design phases设计阶段design stress spectrum 设计应力谱design stress-strain curve设计应力-应变曲线design water level设计水位design wind speed设计风速destructive test of structures结构破坏性试验detachable bridge for highway装配式公路钢桥detachable pneumatic caisson可撤式沉箱detachable truss for railway铁路拆装式桁梁deterministic design method定值设计法detour bridge便桥deviated flow斜流deviation coefficient C v变差系数 C vdiagonal斜杆diagonal crack, diagonal tension crack斜裂缝diagonal strut斜撑dial gauge百分表dial gauge千分表dial gauge with strain gauge transducer机电百分表diaphragm横隔板diaphragm wall equipment地下墙钻机diaphragm-wall bridge foundation地下连续墙桥基diesel hammer柴油锤differential transformer type displacement transducer差动变压器式位移传感器differential-acting steam hammer差动汽锤differentio-integral amplifier微积分放大器dimension量纲dimensional analysis量纲分析direct charges, direct cost直接费direct solar radiation太阳直接辐射direct-circulation drill正循环钻机discharge流量discharge at benchland stage平滩流量discharge for unit width单宽流量discharge velocity流速displacement at the top of pier or abutment墩(台)顶位移displacement of pier and abutment墩台变位displacement of pier head under the effect of sunshine日照作用下的墩顶位移displacement restriction equipment位移限制装置distorted model变态模型distortion畸变distribution of stream velocity in profile断面流速分布distribution of temperature difference温差分布distribution reinforcement分布钢筋dive drilling method潜水钻孔法diverging lane分车道diving appliances and equipment潜水设备Dizful Bridge提斯孚尔桥dominant discharge, formative discharge造床流量double cantilever beam bridge双悬臂梁桥double -columns pier双柱式桥墩double deck双层桥面double deck box-girder bridge双层箱梁桥double modulus theory双模量理论double pylon cable stayed bridge双塔式斜拉桥double shear双剪double-acting steam hammer双动汽锤double-hinged rigid frame bridge双铰刚架桥double-wall cofferdam of steel sheet pile双层钢板桩围堰double-wall cofferdam of timber sheet pile双层木板桩围堰double-webbed box girder bridge双腹板箱梁桥doubly reinforced section双筋截面doule-action jack双作用千斤顶dowel action销栓作用down hand welding俯焊drainage and waterproof system排水防水系统drainage channel排水槽drainage opening泄水孔drainage opening泄水口drainage pipe泄水管drainage pipe-line排水管道drainage pipe-line泄水管道drainage slope on pier-top墩顶排水坡dredging well沉井取土井dredging with hydraulic equipment in pneumatic caisson沉箱水力机械挖泥drill bit钻头drilled caisson管柱drilling钻探drilling after hand marking号孔钻孔drilling after welding后孔法drilling auger螺旋钻机drilling bucket回转斗钻机drilling mud钻孔泥浆dripping nose滴水driveway slab车道板drop dam跌水坝drop hammer落锤dry bridge旱桥dry joint干接缝duct孔道ductility of steel钢材的韧性Düisbrig-Neuenkamp Bridge杜伊斯堡-诺因坎普桥duplicate rhyme scheme重复韵律durability耐久性duration of flow concentration汇流历时dush jet mixing method粉体喷射搅拌法Dusseldorf-flehe Bridge杜塞多尔夫-弗勒埃桥Dusseldorf-Neuss Bridge杜塞尔多夫·诺依斯桥dynamic动态对称dynamic action动态作用dynamic balance动态平衡dynamic beauty动态美dynamic consolidation强夯法dynamic factor动力系数dynamic ice pressure动态冰压力dynamic modulus of elasticity of timber木材的动弹性模量dynamic photoelasticity动态光弹性法dynamic pile test桩动力试验dynamic resistance strain gauge动态电阻应变仪dynamic response动力响应dynamic response动力效应dynamic signal analyzer动态信号分析仪dynamic test of pile桩基动力试验dynamic test of structures 结构动载(力)试验Dywidag anchorage迪维达克锚具Dywidag threadbar posttensioning system迪维达克体系Eads Bridge伊兹桥early strength component早强剂earth pressure静止土压力earth pressure due to live load活载产生的土压力earthquake地震earthquake focus震源earthquake intensity地震烈度earthquake load, seismic action地震荷载earthquake magnitude地震震级earthquake simulation地震模拟振动台earthquake wave地震波East-Huntington Bridge东享廷顿桥eccentric compression method偏心受压法eccentrically loaded columns偏心受压柱eccentricity magnification factor for reinforced concrete column钢筋混凝土柱的偏心距增大系数economical span length经济跨径economy of bridge widening桥梁加宽经济性economy-technique index经济技术指标eddy-current type displacement transducer电涡流式位移传感器edge milling铣边edge planing刨边edge processing边缘加工effect due to change of temperature温度变化影响effect due to differential settlement of foundation基础不均匀沉降影响effect of concrete creep on thermal response混凝土徐变对热效应的影响effect of cracking on thermal response裂缝对热效应的影响effect of tension stiffening拉区强化效应effective coefficient of cost费用有效系数effective flange width有效翼缘宽度effective length at the end of nail钉端钳制长度effective prestress有效预应力effective slenderness ratio换算长细比effective span length有效跨径effects of actions作用效应elastic after-effect of timber木材弹性后效elastic buckling弹性屈曲elastic buckling of plate弹性翘曲elastic compliance of timber木材弹性柔量elastic constant of pier墩的弹性常数elasto-plastic bucking弹塑性屈曲elasto-plastic bucking of plate弹塑性翘曲electric hoist电动滑车electric impact method电力冲击法electric oil pump电动油泵electric winch电动卷扬机electrical measurement of non-electric quantities非电量电测技术electrical prospecting电法勘探electro silicification method电动硅化法electrodynamical vibration exciter电动式激振器electrodynamical vibration table电动式振动台electro-hydraulic servo fatigue test machine电液伺服式疲劳试验机electro-hydraulic vibration exciter电液式激振器electro-hydraulic vibration table电动液压式振动台electro-osmotic consolidation method电渗固结法elevated line bridge高架线路桥elevated monorail bridge高架单轨铁路桥elevating jack提升千斤顶elevation of base of foundation基底标高elevation of culvert涵底标高elevation of rail base轨底标高elevation of springing拱趾标高eluvium残积层embedded steel预埋钢筋emergency bridge紧急抢险桥empirical frequency经验频率empirical frequency curve经验频率曲线empty and real虚实end bearing colonnade foundation端承式管柱基础end bearing pile, point bearing pile支承桩end diagonal端斜杆end resistance of pile桩端阻力end zone splitting锚下端块劈裂endurance limit持久极限endurance strength of timber 木材持久强度energy input线能量energy rate of section断面比能engineering barge工程船舶engineering geology工程地质enlarged culvert inlet流线型洞口entrance of bridge桥梁入口epicenter震中epicentral distance震中距epoxy resin joint环氧树脂水泥胶接缝equal strength beam等强度梁equiamplitude fatigue tester等幅疲劳试验机equilibrium bifurcation平衡分叉equilibrium torsion平衡扭转equiponderant coefficient for live-load increment活载发展均衡系数equivalent length for bridge maintenance桥梁换算长度equivalent loading of highway公路等代荷载equivalent uniformly distributed live load换算均布活载。
Home / Products / Brass Gland / RCCN Conduit Fittings NB GRCCN Conduit Fittings NBGMetal Flexible Conduit FittingsThread:G,Metric, PGMaterial:A.C.F are made from zincic metal.B.Eare made of rubber NBR).D is madeof sheet iron .Certificates:CEColor:ArgentineProtect class:IP6Work T.:-40°C to 100°C,120°C in a short time.Products characteristics: 1.thickness added zincic metal,good looking2.conmmon impregnant resistant,such as water,salty,alcohol,oil, grease and so on.3.we can adjust the sizes according to your request.Marks:The finished goods are including locknut and washer.Metal Flexible Conduit Fittings NBGItem No.ThreadG/M/PG Suitable RCCN metal flexible conduit MCRThreadO.D.D1ThreadLengthL1JointLengthL2+L3Packingpcszincic metal Brass nickel plated Correspondingitem noMetric øBritish Tube thread NBG-GNBG-01G G1/4"MCR-0163/16"13.2816100 NBG-02G TNBG-02G G1/4"MCR-0285/16"13.2816100 NBG-03G TNBG-03G G3/8"MCR-03101/4"16.5817100 NBG-04G TNBG-04G G3/8"MCR-04133/8"16.5818100 NBG-05G TNBG-05G G1/2"MCR-05161/2"21.31123100 NBG-06G TNBG-06G G3/4"MCR-06203/4"26.6142250 NBG-08G TNBG-08G G1"MCR-08251"33.4152850 NBG-10G TNBG-10G G1 1/4"MCR-103211/4"42.1153025 NBG-12G TNBG-12G G1 1/2"MCR-123811/2"47.8163225 SpecificationNBG-16G TNBG-16G G2"MCR-1651259.6183410 NBG-20G G2 1/2"MCR-2064 2 1/2"75.1223810 NBG-24G G3"MCR-24803"87.822465 NBG-32G G4"MCR-321004"11324505Metric thread NBG-MNBG-01M M14*1.5MCR-0163/16"M14*1.5816100 NBG-02M M14*1.5MCR-0285/16"M14*1.5816100 NBG-03M TNBG-03M M16*1.5MCR-03101/4M16*1.5817100 NBG-04M TNBG-04M M16*1.5MCR-04133/8"M16*1.5818100 NBG-05M TNBG-05M M20*1.5MCR-05161/2"M20*1.51123100 NBG-06M TNBG-06M M25*1.5MCR-06203/4"M25*1.5142250 NBG-08M TNBG-08M M32*1.5MCR-08251"M32*1.5152850 NBG-10M TNBG-10M M40*1.5MCR-103211/4"M40*1.5153025 NBG-12M TNBG-12M M50*1.5MCR-1238 1 1/2M50*1.5163225 NBG-16M TNBG-16M M63*1.5MCR-16512"M63*1.5183410 NBG-20M M76*2MCR-2064 2 1/2"M76*2223810 NBG-24M M88*2MCR-24803"M88*222465 NBG-32M M114*2MCR-321004"M114*224505Metric thread NBG-PGNBG-03P TNBG-03P PG9MCR-03101/4"15.2816100 NBG-04P TNBG-04P PG11MCR-04133/8"18.6917100 NBG-05P TNBG-05P PG13.5MCR-05161/2"20.41123100 NBG-06P TNBG-06P PG21MCR-06203/4"28.3142350 NBG-08P TNBG-08P PG29MCR-08251"37.0152850 NBG-10P TNBG-10P PG29MCR-1032 1 1/4"37.0153025 NBG-12P TNBG-12P PG36MCR-123811/2"47.0163225 NBG-16P TNBG-16P PG48MCR-16512"59.3183410Product ShowDow nloadMorezProduct Brass Gland >RCCN Metal joint TUV-CE cer…IP68 Metal Joints English RCCN Zinc alloy connector en…RCCN Metal hose connector …RCCN Metal connector new C…RCCN Metal hose connector …Catalogue-PDFRelated ProudctRCCN Conduit Fittings …Metal Flexible Conduit FittingsRCCN Flexible Conduit …Metal Flexible Conduit FittingsPDFPDFPDFPDFPDFPDF。
Date: ____________________Job Name: _____________________________ Location: ______________________________ Engineer: ______________________________ Contractor: ____________________________GSDC-0622Scope:This submittal covers Spears® PVC & CPVC Double Containment System fittings intended for use in pressure and drainage applications. Product Specification:Thermoplastic Double Containment System shall be a floating carrier design constructed from conventional pipe and fittings meeting applicable ASTM requirements for all standard configurations of primary carrier and secondary containment. System shall include all pipe, fittings, centralizers, valves and valve boxes to be supplied by Spears®Manufacturing Company. Standard configurations (tees, elbows, crosses, etc.) of primary carrier fitting shall be equipped with extender couplings for installation in secondary containment pipe and fittings. Primary carrier system shall be supported by polypropylene slide-on centralizer brackets positioned with clean room adhesive. Centralizers shall provide annular space suitable for drainage or installation of user-supplied leak detection cable. Specialty fittings shall be according to manufacturer’s specifications and suitable for use with specified primary carrier and secondary containment system. Specialty fittings include the following:a)Termination Fitting for start and stop of secondary containment.b)Closure Fitting for joining two (2) secondary containment lines that meet.c)Expansion Joint/Coupling for thermal expansion/contractioncompensation or joining of pipelines.d)Sensor Saddles for connection of user-supplied leak detectionapparatus.e)Any other custom fitting configuration designed for the system. Double Containment System shall be air-vented in the secondary containment to prohibit pressurization in excess of 10 psi.Valve Box enclosure for ball and ball check valves shall be Tee-Style with specified valve installed and [option: external stem extension].as applicable.Installation:Double Containment System shall be installed in accordance with Spears® Double Containment Design & Installation Guide (DC-3), established industry practices and all applicable code requirements. Installation shall be made by qualified personnel trained in making solvent cement joints per ASTM practice D2855, and flanged joint assembly according to manufacturer’s instructions. Primary carrier and secondary containment pipe and fitting connections shall be made by conventional solvent cement welding. Flanged assembly connections may be used where required for disassembly or as a design necessity. Solvent cement shall be in accordance with ASTM D2564(PVC) F493(CPVC) F2618 (LabWaste®). All Primer shall conform to ASTM F656. Solvent cement and primer shall be Spears®. Installation training is recommended with a qualified individual from Spears® Manufacturing Company. Referenced Standards:ASTM D1785 - CPVC Schedule 40, 80, 120 PipeASTM D2466 - CPVC Schedule 80 FittingsASTM D2467 - CPVC Schedule 80 FittingsASTM D2564 - Solvent Cements for CPVC Pipe & FittingsASTM D2855 - Practice for Making Solvent Cemented JointsASTM F439 – CPVC Schedule 80 FittingsASTM F441 – CPVC Schedule 40, 80 PipeASTM F2618 - CPVC Corrosive Drainage Piping SystemASTM/E84 – Flame & Smoke TestingASTM F493 – Solvent Cements for CPVC Pipe & FittingsASTM F656 – Primers for CPVC Pipe & FittingsApprovals:NSF®– NSF International WaterICC-PMG 1278 – Listing for Plenum UseUL – GREENGUARD GOLD Certified UL 2818。
Barbed FittingsThe World StandardDubl-Barb FittingsCompact One-piece Economical ReusableUse with Polyethylene Tubing⏹⏹⏹⏹⏹Hose Barb FittingsAll Brass Construction Straight and Metric Threads Beaded & Standard Hose BarbsUse with Hose Clamp Reusable⏹⏹⏹⏹⏹Catalog 3501E Barbed FittingsGAdvantagesCompact one-piece, push-on barbed fitting for a quick, economical way to connect polyethylene tubing. In addition to the styles shown, custom DUBL-BARB fittings to meet your exact requirements are available. Machined from CA 360 or CA 345 brass.ApplicationsBecause of the many available variations in qualities of polyethylene tubing, DUBL-BARB ® fittings are recommended for use with Parker Parflex ® polyethylene tubing (or an equal grade). Parker Parflex® tubing is highly resistant to environmental stress cracking which is necessary for long life when coupled with expansion fittings.Working Pressure and Temperature RangesIn tube sizes 1/4 to 3/8 working pressures up to 150 psi are practical at temperatures ranging from -65° to +90°F on tube size 1/2 working pressures up to 100 psi at temperatures ranging from -65° to +75°F .Assembly Instructions Simply push tube over the two barbs — be sure tubing is cut squarely.OrderBy part number and name.NomenclaturePart numbers are constructed from symbols that identify the style and size of the fitting. The first series of numbers and letters identifies the style and type fitting. The second series of numbers describes the size.SizesT ube sizes are determined by the numbers of sixteenths of an inch in the tube O.D.Special FittingsFitting configurations and/or sizes other than those shown in the catalog can be furnished. It is suggested that a print or sketch be submitted with the inquiry.PricingOnly items priced in current supplementary price list PL3501 are carried in stock. Price and delivery for non-stock items furnished on request for specified quantity.example: 231 –8 –6Run Tee (Tube to male pipe)1/2" (8/16) Tube O.D.3/8" (6/16) Pipe ThreadPlug 20PART TuBe TuBeC NO. O.D.I.D.DIA.LM20-4 1/4 .170 .290 .56 .4120-6 3/8 .250 .390 .68 .4420-8 1/2 .377 .577 .81 .56Plug Adapter 20PART TuBe TuBe TuBe TuBe C NO.O.D. 1 I.D. 1 O.D. 2 I.D. 2DIA.L20-4-5/32 5/32 .096 1/4 .170 .290 .65union 22PART TuBe TuBe FLOW NO.O.D.I.D.LMDIA. D22-5/32 5/32x5/32 .096x.096 .59 .28 .06222-4 1/4x1/4 .170x.170 .84 .41 .12022-6 3/8x3/8 .250x.250 .94 .44 .18722-8 1/2x1/2 .375x.375 1.19 .56 .312union Reducer 22PART TuBe TuBe FLOW NO.O.D.I.D.LMNDIA. D22-4-5/32 1/4x5/32 .170x.096 .72 .41 .28 .06222-4-6 1/4x3/8 .170x.250 .88 .44 .41 .12022-4-8 1/4x1/2 .170x.375 1.06 .56 .41 .12022-6-8 3/8x1/2 .250x.375 1.06 .56 .44 .187Bulkhead union 22BHPART TuBe TuBe ST.C P FLOW BLkHD NO.O.D. I.D.THD.HexMAx.LMDIA. D HOLe DIA.22BH-4-4 1/4 .170 5/16-24 7/16 .219 1.38 .78 .120 5/1622BH-6-6 3/8 .250 3/8-24 7/16 .375 1.63 1.00 .187 3/8union 22CAT ube to Compress-AlignPART TuBe TuBe CA CFLOW NO.O.D. I.D. TuBeHexLMDIA. D22CA-4-4 1/4 .170 1/4 7/16 1.15 .41 .120GBulkhead union 22CABHT ube to Compress-AlignPART TuBe TuBe CA ST.C P FLOW BuLkHeAD NO.O.D. I.D. TuBeTHD.HexMAx.LMDIA. DHOLe DIA.22CABH-4-4 1/4 .170 1/4 5/16-24 7/16 .219 1.53 .78 .120 5/1622CABH-6-6 3/8 .250 3/8 3/8-24 9/16 .375 1.87 1.00 .187 3/8Female Connector 26PART TuBe TuBe PIPe CFLOW NO.O.D. I.D. THReADHexLDIA. D26-5/32-2 5/32 .096 1/8 1/2 .79 .06226-4-2 1/4 .170 1/8 1/2 .91 .12026-6-2 3/8 .250 1/8 1/2 .93 .18726-6-4 3/8 .250 1/4 11/16 1.06 .187Male Connector 27PART TuBe TuBe STRAIgHT CFLOW NO.O.D. I.D. THReADHexLDIA. D27-1* 1/8 .062 10-32 1/4 .61 .05227-2* 1/4 .125 10-32 1/4 .74 .093*For vinyl tubing only.Barb-to-Pipe Adapter 28PART TuBe TuBe TuBe TuBe PIPe C FLOW NO.O.D. 1 I.D. 1 O.D. 2 I.D. 2THD.HexLDIA. D28-4-5/32-2 5/32 .096 1/4 .170 1/8 7/16 1.07 .062Male Connector 28PART TuBe TuBe PIPeC FLOW NO.O.D. I.D.THReADHexLDIA. D28-5/32-2 5/32 .096 1/8 7/16 .84 .06228-4-1 1/4 .170 1/16 3/8 .93 .12028-4-2 1/4 .170 1/8 7/16 .97 .12028-4-4 1/4 .170 1/4 9/16 1.09 .12028-4-10x32* 1/4 .170 10-32 1/4 .71 .09328-6-2 3/8 .250 1/8 7/16 1.00 .18728-6-4 3/8 .250 1/4 9/16 1.13 .18728-8-4 1/2 .375 1/4 9/16 1.25 .31228-8-6 1/2 .375 3/8 11/16 1.28 .31228-8-8 1/2 .375 1/2 7/8 1.44 .312*Straight threadNO. O.D. I.D. THReAD L N DIA. D220-4-2 1/4 .170 1/8 1.50 1.00 .120union Tee 224PART TuBe TuBe FLOWNO. O.D. I.D. L M DIA. D224-5/32 5/32 .096 1.00 .50 .062224-4 1/4 .170 1.25 .63 .120224-6 3/8 .250 1.38 .69 .187224-8 1/2 .375 1.63 .81 .312union Tee 224 Combination SizesPART TuBe TuBe FLOW FLOWNO. O.D. I.D. L M N DIA. D DIA. D1224-4-4-5/32 1/4x5/32 .170x.096 1.25 .63 .50 .120 .062224-6-6-5/32 3/8x5/32 .250x.096 1.38 .69 .50 .187 .062224-6-6-4 3/8x1/4 .250x.170 1.38 .69 .62 .187 .120224-8-8-4 1/2x1/4 .375x.170 1.62 .81 .65 .312 .120224-8-8-6 1/2x3/8 .375x.250 1.62 .81 .69 .312 .187union elbow 225PART TuBe TuBe FLOWNO. O.D. I.D. M DIA. D225-5/32 5/32 .096 .50 .062225-4-4 1/4 .170 .63 .120225-6-6 3/8 .250 .69 .187225-8-8 1/2 .375 .81 .312union elbow 225 Combination SizePART TuBe TuBe TuBe TuBe FLOW FLOW NO. O.D. 1 O.D. 2 I.D. 1 I.D. 2 M1 M2 DIA. D1 DIA. D2 225-4-5/32 1/4 5/32 .170 .096 .63 .50 .120 .062GNO.O.D. I.D. THReADLMNDIA. D228-4-2 1/4 .170 1/8 1.91 .66 .44 .120Male elbow 229PART TuBe TuBe PIPeFLOW NO.O.D. I.D.THReADMNDIA. D229-5/32-2 5/32 .0961/8 .56 .63 .062229-4-1 1/4 .170 1/16 .62 .60 .120229-4-2 1/4 .170 1/8 .69 .63 .120229-4-4 1/4 .170 1/4 .72 .72 .120229-6-2 3/8 .250 1/8 .69 .69 .187229-6-4 3/8 .250 1/4 .75 .75 .187229-8-4 1/2 .375 1/4 .94 .74 .312229-8-6 1/2 .375 3/8 .94 .81 .31290° elbow Barb Adapter 229PART TuBe TuBe TuBe TuBe PIPe FLOW NO.O.D. 1 I.D. 1 O.D. 2 I.D. 2 THReADMDIA. D229-4-5/32-2 5/32 .096 1/4 .170 1/8 .78 .062Female elbow 230PART TuBe TuBe PIPeFLOW NO.O.D. I.D.THReADLMNDIA. D230-4-2 1/4 .170 1/8 .91 .66 .44 .120230-6-4 3/8 .250 1/4 1.12 .78 .63 .187Male Run Tee 231PART TuBe TuBe PIPeFLOW NO.O.D. I.D.THReADLMNDIA. D231-4-2 1/4 .170 1/8 1.28 .66 .69 .120231-6-2 3/8 .250 1/8 1.38 .69 .69 .187231-6-4 3/8 .250 1/4 1.44 .75 .75.187Male Branch Tee 232PART TuBe TuBe PIPe FLOW NO. O.D. I.D. THReAD L M N DIA. D 232-4-1 1/4 .170 1/16 1.33 .66 .65 .120 232-4-2 1/4 .170 1/8 1.38 .69 .66 .120 232-6-2 3/8 .250 1/8 1.38 .69 .69 .187 232-6-4 3/8 .250 1/4 1.50 .75 .75 .187Tee 233PART TuBe TuBe COMB. FLOW NO. O.D. I.D. TuBe L M N DIA. D 233-4-4-4 1/4 .170 1/4 .73 .53 .74 .120 233-6-6-4 1/4 .170 3/8 .87 .59 .80 .120Female Branch Tee 237PART TuBe TuBe PIPe FLOW NO. O.D. I.D. THReAD L M N DIA. D 237-5/32-2 5/32 .096 1/8 1.06 .53 .44 .062 237-4-2 1/4 .170 1/8 1.34 .67 .49 .120Solder Connector 238PART TuBe TuBe FLOW NO. O.D. 1 I.D. 1 L M DIA. D 238-4-4 1/4 .170 .91 .25 .120GAdvantagesAll Parker hose barb fitting pipe threads are made to Dryseal standards. Connectors, unions, nuts and extended elbows and tees are machined from CA 360 and CA 345 brass.Temperature and Working Pressure RangesFrom -40° to +160°F . at 150 PSI maximum.Note: These fittings are intended for use with 97HC hose clamp, similar type clamp or a crimped ferrule.Assembly Instructions1. Cut hose cleanly and squarely to length.2. Slide clamp on hose.3. Lubricate hose. Push hose on fitting until hose bottoms against stop ring or hex.4. Position hose clamp as shown below and secure with a screwdriver or wrench. Maintain “A” dimension noted below for proper clamp positioning.HOSe HOSe SIzeCLAMPA3/16" 97 HC-3 1/4"1/4" 97 HC-3 1/4"5/16" 97 HC-6 1/4"3/8" 97 HC-6 1/8"1/2" 97 HC-8 1/8"5/8" 97 HC-12 1/8"3/4" 97 HC-12 1/8"OrderBy part number and name.NomenclaturePart numbers are constructed from symbols that identify the style and size of the fitting. The first series of numbers and letters identifies the style and type fitting. The second series of numbers describes the size.SizesPipe sizes are determined by the number of sixteenths of an inch in the pipe size.Special FittingsFitting configurations and/or sizes other than those shown in the catalog can be furnished. It is suggested that a print or sketch be submitted with the inquiry.PricingOnly items priced in current supplementary price list PL3501 are carried in stock. Price and delivery for non-stock items furnished on request for specified quantity.example: 125 HBL –6 –4Hose Barb to Male Pipe Hose Barb3/8" (6/16) Hose I.D.1/4" (4/16) NPTF/PTFCatalog 3501EHose Barb FittingsBeaded Hose Barb to Male Pipe 68HBPART I.D. HOSe PIPe CFLOW NO.SIze THReADHexLMDIA.D68HB-6-6 3/8 3/8 11/16 1.53 .78 .28168HB-8-4 1/2 1/4 5/8 1.56 .78 .37568HB-8-6 1/2 3/8 11/16 1.53 .78 .40668HB-8-8 1/2 1/2 7/8 1.73 .78 .40668HB-10-6 5/8 3/8 3/4 1.62 .88 .50168HB-10-8 5/8 1/2 7/8 1.92 .88 .50168HB-12-8 3/4 1/2 7/8 1.98 .88 .56468HB-12-12 3/4 3/4 1 1/16 2.04 .97 .62568HB-16-12 1 3/4 1 1/8 2.12 1.00 .75068HB-16-16 1 1 1.38 2.31 1.00 .812Beaded Hose Barb to SAe Straight Thread 685HBPART I.D. HOSe STRAIgHT C FLOW NO.SIzeTHReAD HexLMDIA.D685HB-4-4 1/4 7/16-20 9/16 1.40 .78 .18685HB-6-4 3/8 7/16-20 9/16 1.39 .78 .18685HB-8-8 1/2 3/4-16 7/8 1.48 .78 .40685HB-10-8 5/8 3/4-16 7/8 1.56 .78 .40685HB-12-8 3/4 3/4-16 7/8 1.75 .97 .40685HB-12-12 3/4 1 1/16-12 1 1/4 1.82 .97 .62685HB-16-8 1 3/4-16 1 1/8 1.79 .97 .40685HB-16-12 1 1 1/16-12 1 1/4 1.99 .97 .62Note: Viton o-ring is standardHose Barb to Metric Adaptor 68HB-x-MIxPART TuBe MeTRIC NuMBeRSIzeTHReADHexLMD68HB-6-MI12 3/8 M12 x 1.5 11/16 1.50 .78 .24 68HB-6-MI14 3/8 M14 1.5 3/4 1.51 .78 .30 68HB-8-MI12 1/2 M12 x 1.5 11/16 1.50 .78 .24Note: Viton o-ring is standardStainless Steel Worm Drive Clamp 97HCPART D C H NO.MAx. MIN.HexMAx.W97HC-3 .62 .25 .25 1.00 .3197HC-6 .87 .38 .31 1.40 .5097HC-8 1.00 .44 .31 1.53 .5097HC-12 1.25 .50 .31 1.80 .50Hose Mender 122HBLPART I.D. HOSe C FLOW NO.SIzeDIA.LMO.D.DIA. D122HB-3* 3/16 5/16 1.44 .69 .227 .125122HBL-4 1/4 3/8 2.00 .97 .290 .187122HBL-5 5/16 7/16 2.00 .97 .353 .250122HBL-6 3/8 1/2 2.00 .97 .415 .281122HBL-8 1/2 5/8 2.00 .97 .530 .375122HBL-12 3/4 7/8 2.00 .97 .790 .562* 3 Barb design.GHose Barb to Male Pipe 125HBPART I.D. HOSe PIPe CFLOW NO.SIze THReADHexLMO.D.DIA. D125HB-2-2 1/8 1/8 7/16 1.07 .50 .185 .093125HB-3-2 3/16 1/8 7/16 1.25 .69 .227 .125125HB-3-4 3/16 1/4 9/16 1.44 .69 .227 .125Hose Barb to Male Pipe 125HBLPART I.D. HOSe PIPe CFLOW NO.SIze THReADHexLMO.D.DIA. D125HBL-4-2 1/4 1/8 7/16 1.54 .97 .290 .187125HBL-4-4 1/4 1/4 9/16 1.72 .97 .290 .187125HBL-4-6 1/4 3/8 11/16 1.77 .97 .290 .187125HBL-5-2 5/16 1/8 7/16 1.54 .97 .353 .250125HBL-5-4 5/16 1/4 9/16 1.72 .97 .353 .250125HBL-5-6 5/16 3/8 11/16 1.77 .97 .353 .250125HBL-6-2 3/8 1/8 7/16 1.54 .97 .415 .281125HBL-6-4 3/8 1/4 9/16 1.72 .97 .415 .281125HBL-6-6 3/8 3/8 11/16 1.77 .97 .415 .281125HBL-6-8 3/8 1/2 7/8 1.97 .97 .415 .281125HBL-8-4 1/2 1/4 9/16 1.72 .97 .530 .375125HBL-8-6 1/2 3/8 11/16 1.77 .97 .530 .375125HBL-8-8 1/2 1/2 7/8 1.97 .97 .530 .375125HBL-8-12 1/2 3/4 1-1/16 1.98 .97 .530 .375125HBL-10-6 5/8 3/8 11/16 1.77 .97 .645 .468125HBL-10-8 5/8 1/2 7/8 1.97 .97 .645 .468125HBL-10-12 5/8 3/4 1-1/16 1.98 .97 .645 .468125HBL-12-8 3/4 1/2 7/8 1.97 .97 .790 .562125HBL-12-12 3/4 3/4 1-1/16 1.98 .97 .790 .562125HBL-16-12 1 3/4 1-1/16 2.18 1.17 1.02 .750125HBL-16-16 1 1 1-3/8 2.36 1.17 1.02 .875Male Swivel Hose Barb 125HBLSVPART I.D. HOSe PIPe CFLOW NO.SIze THReADHexLMO.D.DIA. D125HBLSV-4-4 1/4 1/4 11/16 2.14 .97 .290 .187125HBLSV-6-4 3/8 1/4 11/16 2.14 .97 .415 .250125HBLSV-6-6 3/8 3/8 11/16 2.14 .97 .415 .250125HBLSV-8-8 1/2 1/2 7/8 2.48 .97 .530 .375Hose Barb to Female Pipe 126HBLPART I.D. HOSe PIPe CFLOW NO.SIze THReADHexLMO.D.DIA. D126HBL-4-2 1/4 1/8 1/2 1.47 .97 .290 .187126HBL-4-4 1/4 1/4 11/16 1.58 .97 .290 .187126HBL-5-4 5/16 1/4 11/16 1.58 .97 .353 .250126HBL-6-2 3/8 1/8 1/2 1.47 .97 .415 .281126HBL-6-4 3/8 1/4 11/16 1.58 .97 .415 .281126HBL-6-6 3/8 3/8 13/16 1.63 .97 .415 .281126HBL-8-6 1/2 3/8 13/16 1.59 .97 .530 .375126HBL-8-8 1/2 1/2 1 1.73 .97 .530 .375126HBL-12-12 3/4 3/4 1-1/4 1.92 .97 .790 .562Ball-end Joint Adapter to Male Pipe 127HBFor use with 128HBLSVMALe MALePART N.P.S.M. N.P.T. C FLOWNO. THReAD THReAD Hex L DIA. D127HB-4-2 1/4 1/8 9/16 .91 .219127HB-4-4 1/4 1/4 9/16 1.10 .281127HB-6-4 3/8 1/4 11/16 1.10 .312127HB-6-6 3/8 3/8 11/16 1.15 .406127HB-8-6 1/2 3/8 7/8 1.25 .406127HB-8-8 1/2 1/2 7/8 1.50 .531Hose Barb to Swivel Female Ball-end 128HBLSVI.D. FeMALePART HOSe N.P.S.M. C FLOW NO. SIze THReAD Hex L M O.D. DIA. D 128HBLSV-4-4 1/4 1/4 5/8 1.50 .97 .290 .187 128HBLSV-5-4 5/16 1/4 5/8 1.50 .97 .353 .250 128HBLSV-6-4 3/8 1/4 5/8 1.63 .97 .415 .250 128HBLSV-6-6 3/8 3/8 3/4 1.50 .97 .415 .281 128HBLSV-8-8 1/2 1/2 29/32 1.52 .97 .530 .375Hose Barb 90° elbow to Male Pipe 129HBPART I.D. HOSe PIPe FLOW NO. SIze THReAD L M N O.D. DIA. D 129HB-3-2 3/16 1/8 .97 .69 .66 .227 .173 129HB-4-2 1/4 1/8 1.04 .76 .66 .290 .187 129HB-4-4 1/4 1/4 1.06 .76 .86 .290 .187 129HB-4-6 1/4 3/8 1.30 .76 .84 .290 .187 129HB-5-2 5/16 1/8 1.06 .76 .66 .353 .234 129HB-5-4 5/16 1/4 1.12 .76 .84 .353 .234 129HB-5-6 5/16 3/8 1.19 .76 .84 .353 .234 129HB-6-2 3/8 1/8 1.32 .97 .94 .415 .281 129HB-6-4 3/8 1/4 1.32 .97 .94 .415 .281 129HB-6-6 3/8 3/8 1.50 .97 1.06 .415 .281 129HB-6-8 3/8 1/2 1.52 .97 1.25 .415 .281 129HB-8-4 1/2 1/4 1.53 .97 1.06 .530 .375 129HB-8-6 1/2 3/8 1.53 .97 1.06 .530 .375 129HB-8-8 1/2 1/2 1.53 .97 1.25 .530 .375 129HB-12-12 3/4 3/4 1.33 .79 1.27 .790 .562Hose Barb elbow to SAe Straight Thread 1295HBPART I.D. HOSe STRAIgHT B FLOW NO. SIze THReAD Hex L M O.D. DIA. D 1295HB-6-6 3/8 9/16-18 11/16 1.10 1.11 .410 .270 Note: Viton o-ring is standardHose Barb 45° elbow to Male Pipe 139HBPART I.D. HOSe PIPe FLOW NO. SIze THReAD L M N O.D. DIA. D 139HB-4-2 1/4 1/8 .91 .76 .68 .290 .187 139HB-4-4 1/4 1/4 1.00 .76 .68 .290 .187 139HB-6-4 3/8 1/4 1.00 .76 .68 .415 .281GHose Barb to Swivel 45° Female Flare 146HBLFSVPART I.D. HOSe STRAIgHT CFLOW NO.SIze THReADHexLMO.D.DIA. D146HBLFSV-4-4 1/4 7/16-20 9/16 1.55 .97 .290 .187146HBLFSV-4-6 1/4 5/8-18 3/4 1.72 .97 .290 .187146HBLFSV-6-6 3/8 5/8-18 3/4 1.72 .97 .415 .281Beaded Hose Barb elbow to SAe Straight Thread 1695HBPART HOSe STRAIgHT NuMBeRSIzeTHReADHexLMND1695HB-6-4 3/8 7/16-20 9/16 1.09 .78 1.10 .181695HB-8-6 1/2 9/16-18 9/16 1.10 .78 1.11 .301695HB-8-8 1/2 3/4-16 7/8 1.28 .78 1.47 .401695HB-10-8 5/8 3/4-16 7/8 1.47 .88 1.47 .401695HB-10-10 5/8 7/8-14 1 1.41 .88 1.60 .501695HB-12-8 3/4 3/4-16 7/8 1.47 .97 1.47 .401695HB-12-10 3/4 7/8-14 1 1.60 .97 1.62 .501695HB-12-12 3/4 1 1/16-12 1 1.60 .97 1.64 .621695HB-16-12 1 1 1/16-12 1 1/4 1.60 .97 1.75 .60Note: Viton o-ring is standardBeaded elbow to Metric Adaptor 169HB-x-MIxPART HOSe MeTRIC NuMBeRSIzeTHReADHexLMND169HB-10-MI27 5/8 M27 x 2.0 7/8 1.41 .78 1.63 .50169HB-16-MI27 1 M27 x 2.0 1 1.67 .97 1.68 .71169HB-16-MI33 1 M33 x 2.0 1 5/16 1.75 .97 1.90 .84Note: Viton o-ring is standardHose Barb Tee to SAe Straight Thread 1725HBPART I.D. HOSe STRAIgHT BFLOW NO.SIze THReADHexLMO.D.DIA. D1725HB-6-6 3/8 9/16-18 11/16 2.20 1.10 .420 .280Note: Viton o-ring is standardHose Barb Tee to Male Pipe 171HBPART I.D. HOSe PIPeFLOW NO.SIze THReADLL1MNO.D. DIA. D171HB-4-4 1/4 1/4 1.10 .85 .76 1.10 .290.187Beaded Hose Barb 45° elbow Tube to Male Pipe 179HBPART I.D. HOSe NPTF CFLOW NO.SIze THReAD HexLMNO.D. DIA. D179HB-6-4 3/8 1/4-18 .75 1.09 .78 .93 .45 .28179HB-6-6 3/8 3/8-18 .75 1.09 .78 .93 .45 .28179HB-10-8 5/8 1/2-14 .81 1.19 .78 1.13 .70 .50179HB-12-8 3/4 1/2-14 .81 1.19 .78 1.13 .83 .56Beaded Hose Barb 45° elbow Tube to Straight Thread 1795HBPART I.D. HOSe STRAIgHT CFLOW NO.SIze THReAD HexLMNDIA. D1795HB-8-8 1/2 3/4-16 7/8 1.12 .78 1.16 .4001795HB-10-8 5/8 3/4-16 7/8 1.22 .88 1.16 .3981795HB-12-8 3/4 3/4-16 7/8 1.22 .88 1.16 .3981795HB-12-12 3/4 1 1/16-12 1 1/4 1.35 .97 1.65 .6201795HB-16-12 1 1 1/16-12 1 1/4 1.38 .97 1.47 .6201795HB-16-14 1 1 3/16-12 1 3/8 1.25 .97 1.80 .720Note: Viton o-ring is standardBeaded Hose Barb 45 elbow to Metric Thread 179HB-x-MIxPART HOSe MeTRIC NuMBeRSIzeTHReADHexLMND179HB-12-MI18 3/4 M18 x 1.5 13/16 1.15 .78 1.16 .44179HB-16-MI27 1 M27 x 2.0 1 1/16 1.51 .97 1.71 .71Note: Viton o-ring is standardBeaded Hose Barb 90° elbow Tube to Male Pipe 269HBPART I.D. HOSe PIPeFLOW NO.SIze THReADLMNDIA. D269HB-6-6 3/8 3/8 1.19 .78 .88 .281 269HB-8-4 1/2 1/4 1.16 .78 .99 .310269HB-8-6 1/2 3/8 1.16 .78 1.08 .406 269HB-8-8 1/2 1/2 1.28 .78 1.25 .406 269HB-10-4 5/8 1/4 1.13 .78 .99 .312269HB-10-6 5/8 3/8 1.16 .78 .99 .406269HB-10-8 5/8 1/2 1.28 .78 1.25 .501 269HB-12-8 3/4 1/2 1.28 .78 1.25 .625269HB-12-12 3/4 3/4 1.33 .78 1.27 .625Beaded Hose Barb 45° elbow Tube to Male Pipe 279HBPART I.D. HOSe NPTF CFLOW NO.SIze THReAD HexLMNO.D. DIA. D279HB-16-12 1 3/4-14 1.12 1.38 .97 1.13 1.06.720。
Home / Products / Brass Gland / RCCN Conduit Fittings NB L
RCCN Conduit Fittings NBL
Metal Flexible Conduit Fittings
Thread:G,Metric, PG
Material:A.C.F.I are made from Brass metal.B.E are made of rubber
NBR).D is made of sheet iron
Certificates:CE,ROHS
Color:Argentine(yellow)
Protect:IP67,if request IP68, need to use with RCCN SCM connectors
Operate T.:-40°C to 100°C,120°C in a short time.
Products characteristics: 1.thickness added zincic metal,good looking
2.conmmon impregnant resistant,such as water,salty,
alcohol,oil, grease and so on.
3.we can adjust the sizes according to your request.
4.special sizes can be produced
Remarks:The finished goods are including locknut and washer.
Metal Flexible Conduit Fittings NBL
Item No.Thread
G/M/PG
Cable Range
Suitable RCCN metal flexible conduit MCR
Thread
O.D.
D1
Thread
Length
L1
Corresponding
item no
Metric øBritish
Metric thread NBL-M
NBL-03M M16*1.56-10MCR-03101/4M16*1.58 NBL-04M M16*1.56-10MCR-04133/8"M16*1.511 NBL-05M M20*1.58-12MCR-05161/2"M20*1.511 NBL-06M M25*1.510-14MCR-06203/4"M25*1.514 NBL-08M M32*1.515-22MCR-08251"M32*1.515 NBL-10M M40*1.518-25MCR-103211/4"M40*1.515 NBL-12M M50*1.526-32MCR-1238 1 1/2M50*1.516 NBL-16M M63*1.537-44MCR-16512"M63*1.518 Specification
NBL-20M M76*242-52MCR-2064 2 1/2"M76*222 NBL-24M M88*255-62MCR-24803"M88*222 NBL-32M M114*278-84MCR-321004"M114*224
Metric thread NBL-P
NBL-03P PG94-8MCR-03101/4"15.28 NBL-04P PG116-10MCR-04133/8"18.69 NBL-05P PG13.58-12MCR-05161/2"20.411 NBL-06P PG2113-18MCR-06203/4"28.314 NBL-08P PG2918-25MCR-08251"37.015 NBL-10P PG2918-25MCR-1032 1 1/4"37.015 NBL-12P PG3626-32MCR-123811/2"47.016 NBL-16P PG4837-44MCR-16512"59.318
Tube thread NBL-G
NBL-03G G3/8"4-8MCR-03101/4"16.58 NBL-04G G3/8"6-10MCR-04133/8"16.58 NBL-05G G1/2"8-12MCR-05161/2"21.311 NBL-06G G3/4"13-18MCR-06203/4"26.614 NBL-08G G1"15-22MCR-08251"33.415 NBL-10G G1 1/4"22-28MCR-103211/4"42.115 NBL-12G G1 1/2"26-32MCR-123811/2"47.816 NBL-16G G2"37-44MCR-1651259.618
Product Show
More
z
Product Brass Gland >
Dow nload
RCCN Metal joint TUV-CE cer…IP68 Metal Joints English RCCN Metal hose connector …RCCN Brass environmental c…RCCN Metal connector new C…
RCCN Metal hose waterproof…Catalogue-PDF
Related Proudct
RCCN Conduit Fittings …
Metal Flexible Conduit Fittings
RCCN Flexible Conduit …
Metal Flexible Conduit Fittings
PDF
PDF
PDF
PDF
PDF
PDF。