附件:安徽省现行计价依据费用调整一览表一、2005《安徽省建设工程清单计价费用定额》工程造价计算程序表序号费用项目计算方法一分部分项工程量清单项目费∑[分部分项工程量×综合单价(不含进项税)]其中1.定额人工费2.定额机械费(不含进项税)二措施项目清单费(一)+(二)(一)施工技术措施项目清单费∑[施工技术措施项目清单×综合单价(不含进项税)]其中3.定额人工费4.定额机械费(不含进项税)(二)施工组织措施项目清单费(不含进项税)∑(1+2+3+4)×费率三其他项目清单费(不含进项税)按清单计价要求计算四规费(1+3)×规定的相应费率五价差(一)+(二)(一)材料价差(不含进项税)∑(材料用量×材料单价价差)(二)机械价差(不含进项税)∑(机械台班用量×机械台班单价价差)六税前工程造价一+二+三+四+五七税金六×11%八工程总造价六+七1.建筑工程取费费率(1)建筑工程施工组织措施费费率定额编号项目名称计算基数费率(%) A1 施工组织措施费A1-1 环境保护费人工费+机械费0.39~0.99 A1-2 文明施工费A1-2.l其中非市区工程人工费+机械费 3.15~3.94A1-2.2 市区工程人工费+机械费 3.94~5.91 A1-3 安全施工费人工费+机械费 3.00~5.00 A1-4 临时设施费人工费+机械费 4.59~8.79 A1-5 夜间施工费人工费+机械费0.00~0.20 A1-6 缩短工期措施费A1-6.1其中缩短工期10%以内人工费+机械费0.00~2.50A1-6.2 缩短工期20%以内人工费+机械费 2.50~3.50 A1-6.3 缩短工期30%以内人工费+机械费 3.50~4.50 A1-7 二次搬运费人工费+机械费0.91~1.32 A1-8 巳完工程及设备保护费人工费+机械费0.00~0.10 A1-9 冬雨季施工增加费人工费+机械费 1.30~3.00A1-10 工程定位复测、工程点交、场地清理费人工费+机械费 2.00~4.50A1-11 生产工具用具使用费人工费+机械费 1.80~3.50 A1-12 扬尘防治增加费人工费+机械费 1.96(2)建筑工程企业管理费费率定额编号项目名称计算基数费率(%)一类二类三类A2 企业管理费A2-l 民用建筑工程人工费+机械费32.11~37.09 26.13~31.11 20.14~25.13 A2-2 工业建筑工程人工费+机械费27.12~32.11 21.14~26.13 15.16~20.14 A2-3 钢结构工程人工费+机械费21.14~26.13 15.16~20.14 9.18~14.16 A2-4 构筑物及其他人工费+机械费32.11~37.09 26.13~31.11 20.14~25.13 A2-5 专业土石方工程人工费+机械费 1.20~1.20 10.17~15.16 6.19~9.18 A2-6 专业打桩工程人工费+机械费19.15~24.13 13.16~18.15 7.18~12.17 A2-7 其他专业工程人工费+机械费- 15.16~20.14 - (3)建筑工程利润率定额编号项目名称计算基数费率(%)一类二类三类A3 利润A3-l 民用建筑工程人工费+机械费23.71~27.83 18.55~22.68 13.40~17.52 A3-2 工业建筑工程人工费+机械费20.61~23.71 16.49~19.58 12.37~15.46 A3-3 钢结构工程人工费+机械费14.43~16.49 11.34~13.40 8.25~10.31 A3-4 构筑物及其他人工费+机械费18.55~21.65 14.43~17.52 10.31~13.40 A3-5 专业土石方工程人工费+机械费- 11.34~14.43 6.18~10.31 A3-6 专业打桩工程人工费+机械费13.40~16.49 9.28~12.37 5.15~8.25A3-7 其他专业工程人工费+机械费- 8.25~13.40 -(4)建筑工程规费费率定额项目名称计算基数费率(%) 编号A4 规费A4-1 社会保障费A4-1.1 养老保险费分部分项项目清单人工费+施工技术措施项目清单人工费20~35 A4-1.2 失业保险费分部分项项目清单人工费+施工技术措施项目清单人工费2~4A4-1.3 医疗保险费分部分项项目清单人工费+施工技术措施项目清单人工费8~15 A4-2 住房公积金分部分项项目清单人工费+施工技术措施项目清单人工费10~20 A4-3 工伤保险费分部分项项目清单人工费+施工技术措施项目清单人工费0.5~1.0 A4-4 工程排污费按工程所在地环保部门规定计取2.装饰装修工程取费费率(1)装饰装修工程施工组织措施费费率定额编号项目名称计算基数费率(%)B1 施工组织措施费B1-1 环境保护费人工费+机械费0.29~0.97 B1-2 文明施工费B1-2.1其中非市区工程人工费+机械费 3.01~4.17B1-2.2 市区工程人工费+机械费 4.17~5.24 B1-3 安全施工费人工费+机械费 2.46~4.93 B1-4 临时设施费人工费+机械费 3.77~8.28 B-5 夜间施工费人工费+机械费0.00~0.20 B1-6 缩短工期措施费B1-6.1其中缩短工期10%以内人工费+机械费0.00~1.80B1-6.2 缩短工期10%以内人工费+机械费 1.80~2.70 B1-6.3 缩短工期30%以内人工费+机械费 2.70~3.60 B1-7 二次搬运费人工费+机械费 1.90~2.50 B1-8 巳完工程及设备保护费人工费+机械费0.30~1.00 B1-9 冬雨季施工增加费人工费+机械费 1.30~2.20B1-10 工程定位复测、工程点交、场地清理费人工费+机械费 1.60~2.80B1-11 生产工具用具使用费人工费+机械费 1.90~3.60B1-12 扬尘防治增加费人工费+机械费0.96 (2)装饰装修工程企业管理费费率定额编号项目名称计算基数费率(%)一类二类三类B2 企业管理费B2-1 一般装饰工程人工费+机械费35.56~40.47 29.67~34.58 23.78~28.69B2-2 住宅及其他建筑装饰工程人工费+机械费30.66~35.56 24.76~29.67 18.87~23.78B2-3 专业幕墙工程人工费+机械费32.62~37.53 26.73~31.64 20.84~25.75 (3)装饰装修工程利润率定额编号项目名称计算基数费率(%)一类二类三类B3 利润B3-1 一般装饰工程人工费+机械费27.41~32.48 21.32~26.39 15.23~20.30B3-2 住宅及其他建筑装饰工程人工费+机械费22.33~27.41 16.24~21.32 10.15~15.23B3-3 专业幕墙工程人工费+机械费24.36~29.44 18.27~23.35 12.18~17.26(4)装饰装修工程规费费率定额编号项目名称计算基数费率(%)B4 规费B4-1 社会保障费B4-1.1 养老保险费分部分项项目清单人工费+施工技术措施项目清单人工费20~35B4-1.2 失业保险费分部分项项目清单人工费+施工技术措施项目清单人工费2~4B4-1.3 医疗保险费分部分项项目清单人工费+施工技术措施项目清单人工费8~15B4-2 住房公积金分部分项项目清单人工费+施工技术措施项目清单人工费10~20B4-3 工伤保险费分部分项项目清单人工费+施工技术措施项目清单人工费0.5~1.0 B4-4 工程排污费按工程所在地环保部门规定计取3.安装工程取费费率(1)安装工程施工组织措施费费率定额编号项目名称计算基数费率(%)C1 施工组织措施费C1-1 环境保护费人工费+机械费0.19~0.87C1-2 文明施工费人工费+机械费 1.46~4.08C1-3 安全施工费人工费+机械费 1.58~3.55C1-4 临时设施费人工费+机械费 3.95~6.59C1-5 夜间施工费人工费+机械费0.00~0.20C1-6 缩短工期措施费C1-6.1其中缩短工期10%以内人工费+机械费0.00~2.50C1-6.2 缩短工期20%以内人工费+机械费 2.50~4.00 C1-6.3 缩短工期300%以内人工费+机械费 4.00~6.00 C1-7 二次搬运费人工费+机械费0.60~1.30 C1-8 已完工程及设备保护费人工费+机械费0.00~0.30 C1-9 冬雨季施工增加费人工费+机械费 1.10~2.00C1-10 工程定位复测、工程点交、场地清理费人工费+机械费0.40~1.00C1-11 生产工具用具使用费人工费+机械费0.90~2.10 (2)安装工程企业管理费费率定额编号项目名称计算基数费率(%)一类二类三类C2 企业管理费C2-1 机械设备、热力设备、静置设备与工艺金属结构人工费+机械费 30.67~35.58 24.77~29.6818.88~23.79C2-2 工业管道及水、暖、通风、消防管道人工费+机械费 35.58~40.49 29.68~34.6023.79~28.70C2-3 电气、智能化、自动化控制及消防电气人工费+机械费 37.54~42.45 31.65~36.5625.76~30.67C2-4 炉窑砌筑工程人工费+机械费 30.67~40.49 19.86~29.68 - (3)安装工程利润率定额编号项目名称计算基数费率(%)一类二类三类C3 利润C3-1 机械设备、热力设备、静止设备与工艺金属结构人工费+机械费 16.25~21.32 10.15~15.234.06~9.14C3-2 工业管道及水、暖、通风、消防管道人工费+机械费 21.32~26.40 15.23~20.31 9.14~14.22C3-3 电气、智能化、自动化控制及消防电气人工费+机械费 25.39~30.46 19.29~24.3713.20~18.28C3-4 炉窑砌筑工程人工费+机械费 15.23~20.31 9.14~14.22 - (4)安装工程规费费率定额编号项目名称计算基数费率(%) C4 规费C4-1 社会保障费C4-1.1 养老保险费分部分项项目清单人工费+施工技术措施项目清单人工费20~35 C4-1.2 失业保险费分部分项项目清单人工费+施工技术措施项目清单人工费2~4 C4-1.3 医疗保险费分部分项项目清单人工费+施工技术措施项目清单人工费8~15 C4-2 住房公积金分部分项项目清单人工费+施工技术措施项目清单人工费10~20C4-3 工伤保险费分部分项项目清单人工费+施工技术措施项目清单人工费0.5~1.0 C4-4 工程排污费按工程所在地环保部门规定计取4.市政工程取费费率(1)市政工程施工组织措施费费率定额编号项目名称计算基数费率(%)D1 施工组织措施费D1-1 环境保护费人工费+机械费0.31~1.03D1-2 文明施工费人工费+机械费 1.34~4.63D1-3 安全施工费人工费+机械费 1.36~3.34D1-4 临时设施费人工费+机械费 3.99~5.59D1-5 夜间施工费人工费+机械费0.00~0.42D1-6 缩短工期措施费D1-6.1其中缩短工期10%以内人工费+机械费0.00~2.00D1-6.2 缩短工期20%以内人工费+机械费 2.00~3.10 D1-6.3 缩短工期300%以内人工费+机械费 3.10~4.00 D1-7 二次搬运费人工费+机械费0.53~1.27 D1-8 已完工程及设备保护费人工费+机械费0.00~0.10 D1-9 冬雨季施工增加费人工费+机械费 1.50~3.00D1-10 工程定位复测、工程点交、场地清理费人工费+机械费0.60~1.50D1-11 生产工具用具使用费人工费+机械费0.80~1.90 D1-12 扬尘防治增加费人工费+机械费 1.96 (2)市政工程企业管理费费率定额编号项目名称计算基数费率(%)一类二类三类D2 企业管理费D2-1 土石方工程人工费+机械费- 11.61~16.81 5.36~10.57 D2-2 道路工程人工费+机械费24.10~29.30 17.85~23.05 11.61~16.81 D2-3 桥涵工程人工费+机械费29.30~34.50 23.05~28.26 16.81~22.01 D2-4 隧道工程人工费+机械费17.85~23.05 11.61~16.81 5.36~10.57D2-5 给排水、燃气、供热工程人工费+机械费19.93~25.14 13.69~18.89 7.44~12.65D2-6 河道防洪及护岸工程人工费+机械费- 16.81~22.01 10.57~15.77 D2-7 路灯或交通设施工程人工费+机械费- 16.81~22.01 10.57~15.77(3)市政工程利润率定额编号项目名称计算基数费率(%)一类二类三类D3 利润D3-1 土石方工程人工费+机械费- 9.68~15.06 3.23~8.61 D3-2 道路工程人工费+机械费19.37~24.74 12.91~18.29 6.46~11.83 D3-3 桥涵工程人工费+机械费19.37~24.74 12.91~18.29 6.46~11.83 D3-4 隧道工程人工费+机械费15.06~20.44 8.61~13.99 2.15~7.53D3-5 给排水、燃气、供热工程人工费+机械费16.14~21.52 9.68~15.06 3.23~8.61D3-6 河道防洪及护岸工程人工费+机械费- 8.61~13.99 2.15~7.53 D3-7 路灯或交通设施工程人工费+机械费- 7.53~12.91 1.08~6.46 (4)市政工程规费费率定额编号项目名称计算基数费率(%) D4 规费D4-1 社会保障费D4-1.1 养老保险费分部分项项目清单人工费+施工技术措施项目清单人工费20~35 D4-1.2 失业保险费分部分项项目清单人工费+施工技术措施项目清单人工费2~4 D4-1.3 医疗保险费分部分项项目清单人工费+施工技术措施项目清单人工费8~15 D4-2 住房公积金分部分项项目清单人工费+施工技术措施项目清单人工费10~20 D4-3 工伤保险费分部分项项目清单人工费+施工技术措施项目清单人工费0.5~1.0 D4-4 工程排污费按工程所在地环保部门规定计取5.园林绿化及仿古建筑工程取费费率(1)园林绿化及仿古建筑工程施工组织措施费费率定额编号项目名称计算基数费率(%) E1 施工组织措施费E1-1 环境保护费人工费+机械费0.29~0.78 E1-2 文明施工费人工费+机械费0.98~3.13 E1-3 安全施工费人工费+机械费 1.19~2.78 E1-4 临时设施费人工费+机械费 3.32~4.84 E1-5 夜间施工费人工费+机械费0.00~0.30 E1-6 缩短工期措施费E1-6.1其中缩短工期10%以内人工费+机械费0.00~2.10E1-6.2 缩短工期20%以内人工费+机械费 2.10~3.10 E1-6.3 缩短工期30%以内人工费+机械费 3.10~4.10 E1-7 二次搬运费人工费+机械费0.10~0.30 E1-8 已完工程及设备保护费人工费+机械费0.00~0.20 E1-9 冬雨季施工增加费人工费+机械费 1.30~2.40E1-10 工程定位复测、工程点交、场地清理费人工费+机械费0.60~2.50E1-11 生产工具用具使用费人工费+机械费0.80~1.90 E1-12 扬尘防治增加费人工费+机械费0.96 (2)园林绿化及仿古建筑工程企业管理费费率定额编号项目名称计算基数费率(%)一类二类三类E2 企业管理费E2-1 园林绿化及仿古建筑工程人工费+机械费27.92~32.87 21.98~26.93 16.04~20.99 (3)园林绿化及仿古建筑工程利润率定额编号项目名称计算基数费率(%)一类二类三类E3 利润E3-1 园林绿化及仿古建筑工程人工费+机械费22.51~27.62 16.37~21.48 10.23~15.35(4)园林绿化及仿古建筑工程规费费率定额编号项目名称计算基数费率(%) E4 规费E4-1 社会保障费E4-1.1 养老保险费分部分项项目清单人工费+施工技术措施项目清单人工费20~35 E4-1.2 失业保险费分部分项项目清单人工费+施工技术措施项目清单人工费2~4E4-1.3 医疗保险费分部分项项目清单人工费+施工技术措施项目清单人工费8~15 E4-2 住房公积金分部分项项目清单人工费+施工技术措施项目清单人工费10~20 E4-3 工伤保险费分部分项项目清单人工费+施工技术措施项目清单人工费0.5~1.0 E4-4 工程排污费按工程所在地环保部门规定计取二、2008年《安徽省建筑节能定额综合单价表》工程造价计算程序表序号费用项目计算方法一分部分项工程费∑(分部分项工程量×综合单价)其中1.定额人工费2.定额材料费(不含进项税)3.定额机械费(不含进项税)4.综合费(不含进项税)(1+3)×费率二规费1×相应费率三价差(一)+(二)(一)材料价差(不含进项税)∑(材料用量×材料单价价差)(二)机械价差(不含进项税)∑(机械台班用量×机械台班单价价差)四税前工程造价一+二+三五税金四×11%六工程总造价四+五1.建设工程综合费构成及费率综合费率构成项目名称计算基数(费率)%施工组织措施费1.环境保护费定额人工费+定额机械费0.5922.文明施工费3.9443.安全施工费4.0044.临时设施费 6.5015.夜间施工费0.1026.二次搬运费 1.1187.已完工程及设备保护费0.18.冬雨季施工增加费 1.59.工程定位复测、工程点交、场地清理费 3.010.生产工具用具使用费 2.211.扬尘防治增加费 1.46企业管理费24.131 利润15.465 综合费率64.1172.规费规费构成项目名称计算基数费率(%)社会保1.养老保险费定额人工费22 2.失业保险费 3障费3.医疗保险费10 住房公积金12 工伤保险费 1三、2009“安徽省建筑、装饰装修工程及安装工程(常用册)”计价定额综合单价工程造价计算程序表序号费用项目计算方法一分部分项工程量清单项目费∑[分部分项工程量×综合单价(不含进项税)]其中1.定额人工费2.定额机械费(不含进项税)二措施项目清单费(一)+(二)(一)施工技术措施项目清单费∑[(施工技术措施项目清单×综合单价(不含进项税)]其中3.定额人工费4.定额机械费(不含进项税)(二)安全文明施工费(不含进项税)∑(1+2+3+4)×费率三其他项目清单费(不含进项税)按清单计价要求计算四规费(1+3)×规定的相应费率五价差(一)+(二)(一)材料价差(不含进项税)∑(材料用量×材料单价价差)(二)机械价差(不含进项税)∑(机械台班用量×机械台班单价价差)六税前工程造价一+二+三+四+五七税金六×11%八工程总造价六+七1.建筑工程综合费构成及费率建筑工程综合费构成及费率项目名称计算基数费率(%)施工组织措施费1.夜间施工费定额人工费 +定额机械费0.069 2.二次搬运费0.873 3.已完工程及设备保护费0.017 4.冬雨季施工增加费 1.655 5.工程定位复测、工程点交、场地清理费 2.504 6.生产工具用具使用费 2.037 7.扬尘防治增加费 1.96企业管理费20.572 利润14.888 综合费44.5752.装饰装修工程综合费构成及费率装饰装修工程综合费构成及费率项目名称计算基数费率(%)施工组织措施费1.夜间施工费定额人工费+定额机械费0.042 2.二次搬运费 1.686 3.已完工程及设备保护费0.467 4.冬雨季施工增加费 1.205 5.工程定位复测、工程点交、场地清理费 1.68 6.生产工具用具使用费 2.1057.扬尘防治增加费0.96 企业管理费22.431 利润15.651综合费46.2273.安装工程(常用册)综合费构成及费率安装工程(常用册)综合费构成及费率项目名称计算基数费率(%)施工组织措施费1.夜间施工费定额人工费+定额机械费0.042 2.二次搬运费0.809 3.已完工程及设备保护费0.127 4.冬雨季施工增加费 1.171 5.工程定位复测、工程点交、场地清理费0.526 6.生产工具用具使用费 1.146企业管理费25.092 利润14.565 综合费43.4784.安全文明施工费及费率安全文明施工费及费率专业工程计算基数费率(%)建筑工程定额人工费+定额机械费12.170装饰装修工程11.286 安装(常用册)工程8.5225.规费及费率规费构成及费率项目名称计算基数费率(%)社会保险费 1.养老保险费定额人工费222.失业保险费 33.医疗保险费10 住房公积金12 工伤保险费0.8四、2012《安徽省抗震加固工程计价定额》1.工程造计计算程序表序号费用项目计算方法一分部分项工程费∑(分部分项工程量×定额基价)其中1、定额人工费2、定额材料费(不含进项税)3、定额机械费(不含进项税)二综合费(不含进项税)1×相应费率三价差(一)+(二)(一)材料价差(不含进项税)∑(材料用量×材料单价价差)(二)机械价差(不含进项税)∑(机械台班用量×机械台班单价价差)四税前工程造价一+二+三六工程总造价四+五项目名称计算基础费率(%)施工组织措施费1.夜间施工费定额人工费0.0512.二次搬运费0.6473.已完工程及设备保护费0.0134.冬雨季施工增加费 1.2465.工程定位复测、工程点交、场地清理费 1.8856.生产工具用具使用费 1.533安全文明施工费9.363规费1.养老保险费20.0002.失业保险费 2.0003.医疗保险费8.0004.生育保险费0.8005.工伤保险费 1.0006.住房公积金 5.0007.扬尘防治增加费 2.433 企业管理费14.657 利润8.684 综合费78.7722.综合费构成及费率表五、2010《安徽省城市轨道交通工程计价定额综合单价》1.工程量清单计价(1)工程造价计算程序表(2)工程综合费构成及费率项 目 名 称计算基数 费率(%)上册下册土石方施工组织措施费1.夜间施工费 定额人工费 + 定额0.18 0.09 0.14 2.二次搬运费0.730.810.60序号 费用项目计算方法一分部分项工程量清单项目费 ∑[分部分项工程量×综合单价(不含进项税)]其 中1.定额人工费2.定额机械费(不含进项税)二 措施项目清单费(一)+(二)(一)施工技术措施项目清单费 ∑[(施工技术措施项目清单×综合单价(不含进项税)]其 中3.定额人工费4.定额机械费(不含进项税)(二)安全文明施工费(不含进项税) ∑(1+2+3+4)×费率 三 其他项目清单费(不含进项税) 按清单计价要求计算 四 规费 (1+3)×规定的相应费率五 价差(一)+(二)(一)材料价差(不含进项税) ∑(材料用量×材料单价价差) (二)机械价差(不含进项税) ∑(机械台班用量×机械台班单价价差)六 税前工程造价 一+二+三+四+五七 税金 六×11% 八工程总造价六+七3.已完工程及设备保护费机械费0.04 0.13 0.044.冬雨季施工增加费 1.91 1.32 1.585.工程定位复测、工程点交、场地清理费0.89 0.60 0.746.生产工具用具使用费 1.15 1.28 0.957.扬尘防治增加费 2.00 - 2.00 企业管理费23.63 30.91 4.96 利润18.25 20.15 4.35 综合费48.78 55.29 15.36(3)安全文明施工费项目名称计算基数费率(%)上册上册土石方环境保护费定额人工费+ 定额机械费0.99 0.90 0.39文明施工费 4.44 4.18 1.77 安全措施费 3.16 3.58 1.26 临时设施费 5.52 6.97 2.21 (4)规费项目名称计算基数费率(%)社会保险费1.养老保险费定额人工费22.002.失业保险费3.003.医疗保险费10.00住房公积金12.00 工伤保险费0.802.定额计价(适用于城市轨道交通工程编制概算、预算)(1)工程造价计算程序表○1上册、土石方工程序号费用项目计算方法一工程直接费∑(分部分项工程量×定额基价)其中1.定额人工费2.定额材料费(不含进项税)3.定额机械费(不含进项税)二综合费(不含进项税)(1+2+3)×相应费率三价差(一)+(二)+(三)(一)人工价差∑(人工工日量×人工单价价差)(二)材料价差(不含进项税)∑(材料用量×材料单价价差)(三)机械价差(不含进项税)∑(机械台班用量×机械台班单价价差)四税前工程造价一+二+三五税金四×11%六工程总造价四+五○2下册序号费用项目计算方法一工程直接费∑(分部分项工程量×定额基价)其中1.定额人工费2.定额材料费(不含进项税)3.定额机械费(不含进项税)二综合费(不含进项税)1×相应费率三价差(一)+(二)+(三)(一)人工价差∑(人工工日量×人工单价价差)(二)材料价差(不含进项税)∑(材料用量×材料单价价差)(三)机械价差(不含进项税)∑(机械台班用量×机械台班单价价差)四税前工程造价一+二+三五税金四×11%六工程总造价四+五(2)定额费率费用名称计算基础费率(%)综合费上册定额人工费+定额材料费+定额机械费+±材料价差26.31下册定额人工费128.33土石方工程定额人工费+定额材料费+定额机械费+±材料价差17.85 税金税前工程造价11.00六、2011年《安徽省建设工程概算定额》建设工程费用(建筑安装工程费)有关费率标准费用名称计算基础费率(%)综合费建筑工程人工费+施工机械费83.465 安装工程80.680税金税前工程造价11.00。
安徽省建设工程清单计价定额计价软件恒智天成安徽省建设工程清单计价/定额计价2合1软件软件简介:是根据工程量清单相关计价规范、各省市相关配套定额、其他相关文件汇编为编制基础,配合我们多年做该类产品经验,参考了市场上相关同类产品的优点,加上我们对实际预算工作的特点的总结编制而成。
这是完整的工程预算编制软件,是工程建设中招投标,工程造价管理的有效工具,具有各种换算功能。
主要用途:适用于各种预算文件的编制,包括建筑、安装、市政等等。
协助预算人员完成工程量清单的标书、标底、投标、预算概算的标书、标底、投标、结算审计等工作。
编制依据:建设部颁布的《建筑工程工程清单计价规范GB-50500-2008、2003》安徽省建筑工程消耗量定额(2005)安徽省安装工程消耗量定额(2005)安徽省装饰装修工程消耗量定额(2005)安徽省市政工程消耗量定额(2005)安徽省园林绿化及仿古建筑工程消耗量定额(2005)安徽省合肥地区装饰工程综合估价表(1999)安徽省建筑工程综合估价表(2000)全统安装工程安徽单位估价表(2000)安徽省市政工程预算定额(2000)安徽省建筑工程预算定额(98)安徽省装饰工程综合估价表(99)安徽省合肥地区建筑工程综合估价表(2000)安徽省仿古建筑及园林工程定额(2000)安徽省建筑装饰装修工程(2009)安徽省安装工程(2009)全统房修工程预算定额安徽省综合价格(1999)合肥市政工程消耗量定额(2009)合肥园林绿化及仿古建筑工程消耗量定额(2009)the real implementation of the "quasi, ruthless. Tough," requirement, carry forward the spirit of a nail, and the corrective measures The implementation of the nerve endings, do not let the rectification is not in place, not to retreat, the people are not satisfied. Pin four is to adhere to the reform and innovation. To reform the way of thinking and innovative courage to turn style, against four winds, the courage toface the contradictions, good at solving the chronic ills, dare to break the outdated customs and bad habits Hensha unhealthy tendencies, trees, fresh healthy. The five is to adhere to tackling the problem. That isthe wind Su Ji and the education supervision combined, in order to establish a new system to promote the normalization of style building, long-term, to enhance the party spirit of honest and pragmatic people thought conscious action. The six is to insist on the completion of the third grasp the overall situation. Activity and end This year the goalof safety production work plan for next year, work together, to promote the activities and the work of production safety with both hands, two promotion, two not mistake. Two, rectification of the overall objectivesand specific objectives: (a) the overall path around the "four focus", carried out the outstanding problems of the special rectification, the full implementation of the central and provincial Party committee clear the rectification task, effectively curb the "four winds", realize the overall improvement of Party and government. The point is: focus on the people, the people, convenience, and resolutely curb the bureaucratic style of work; looking to stimulate grassroots vitality, resolutely curb the Wenshan sea; focus on the cadres honest, clean government, politics, and resolutely curb exceed the standard Quasi occupied office space, Gongjusiyong, public funds, extravagance of the wind; focus on establish a correct view of achievements, the concept of power, and resolutely curb acts against the interests of the masses. Accelerate the system reform and construction, improve the people honest and pragmatic normalization system, constantly consolidate and expand educational practice achievements, make people satisfied. The recent reform goal: Political Quality Bureau and all Party members and cadres, further improve the quality of the business; the "four winds", "two" problem has been effectively solved. The middle goal of the reform: "opposition party and government austerity waste1(清单计价、定额计价合2为1:巧妙的把清单计价和定额计价融合在一起,操作模式统一,定额计价提供传统的“工料单价法”和最新的“综合单价法”两种计算模式。
安徽省建筑工程计价定额综合单价(2009) 建筑总说明一、为促进建筑业又好又快发展,进一步规范建筑市场工程量清单计价行为,方便快速报价和简化计价过程,根据2005年“安徽省建设工程工程量清单计价依据”和有关规定,编制了“安徽省建筑、装饰装修工程及安装工程(常用册)计价定额综合单价”(以下简称综合单价)。
二、本综合单价适用于安徽省境内的工程量清单计价的建筑工程、装饰装修工程及安装工程(常用册)。
其中安装工程(常用册)主要包括电气设备安装工程,消防工程,给排水、采暖、燃气工程,通风空调工程,建筑智能化系统设备安装工程,刷油、防腐蚀、绝热工程。
三、本综合单价是编制与审核建设工程投资估算、设计概算、施工图预算的指导性依据,是编制与审核招标控制价、界定成本价、调解处理工程造价纠纷和鉴定工程造价的依据,也是企业投标报价和工程结算的参考依据。
四、本综合单价编制的原则。
遵循“市场形成价格、企业自主报价、政府宏观调控”的工程造价管理原则。
综合单价表现形式实行“量”“价”合一,方便使用;项目设置对传统定额项目进行适当综合、调整、合并,力求简明;计量规则和费用计算程序力求简化;价格水平适中,能够充分反映市场。
五、本综合单价主要编制依据。
1.2005年《安徽省建设工程量清单计价规范》(建筑、装饰装修、安装工程)(DBJ/T-206-2005)。
2.2005年《安徽省建筑工程消耗量定额》、《安徽省装饰装修工程消耗量定额》、《安徽省安装工程消耗量定额》。
3.2005年《安徽省建设工程清单计价费用定额》、《安徽省建设工程清单计价施工机械台班费用定额》。
4.有关标准图集及典型工程案例。
六、本综合单价消耗量的确定。
(一)人工工日消耗量:人工工日一律以“综合工日”表示,不分工种、技术等级。
其内容包括基本用工、超运距用工、辅助用工、人工幅度差。
(二)材料消耗量:包括主要材料、辅助材料、零星材料等。
凡能计量的材料、成品、半成品均按品种、规格逐一列出数量,并入相应损耗。
总说明一、《安徽省建筑工程计价定额》以下简称“本建筑定额”,是依据国家现行有关工程建设标准、规范及相关定额,并结合近几年我省出现的新工艺、新技术、新材料的应用情况,及建筑工程设计与施工特点编制的。
二、本建筑定额包括:砌筑工程;混凝土及钢筋混凝土工程;屋面及防水工程;绿色建筑工程;厂库房大门、特种门工程;钢木结构运输、安装工程;脚手架、建筑物垂直运输及超高降效;构筑物工程;防腐工程等内容。
三、本建筑定额适用于我省境内民用与工业建筑的新建、扩建、改建工程。
涉及室外地(路)面、室外给排水等工程的项目,按《安徽省市政工程计价定额》的相应项目执行。
四、本建筑定额的作用:1.是编审设计概算、最高投标限价、施工图预算的依据;2.是调解处理工程造价纠纷的依据;3.是工程成本评审,工程造价鉴定的依据;4.是施工企业编制企业定额、投标报价、拨付工程价款、竣工结算的参考依据。
五、本建筑定额是按照正常的施工条件,大多数施工企业采用的施工方法、机械化装备程度、合理的施工工期、施工工艺、劳动组织编制的,反映当前社会平均消耗量水平。
六、本建筑定额中人工工日以“综合工日”表示,不分工种、技术等级。
内容包括:基本用工、辅助用工、超运距用工及人工幅度差。
七、本建筑定额中的材料:1.本建筑定额中的材料包括主要材料、辅助材料、周转材料和其他材料。
2.本建筑定额中的材料消耗量包括净用量和损耗量。
损耗量包括:从工地仓库、现场集中堆放地点或现场加工地点至操作或安装地点的现场运输损耗、施工操作损耗、施工现场堆放损耗。
凡能计量的材料、成品、半成品均逐一列出消耗量,难以计量的材料以“其他材料费”形式表示。
3.混凝土、砂浆及各种胶泥等均按半成品消耗量体积以“m3”表示,设计强度(配合比)等与定额不同时,可以调整。
本建筑定额中现拌混凝土、预拌混凝土、预制混凝土的养护,均按自然养护考虑,如有特殊要求,可在措施费中考虑。
4.混凝土、砂浆配合比,执行《安徽省建设工程计价共用定额》的规定。
总说明为规范建设工程工程量清单计价行为,统一建设工程工程量清单的编制和计价方法,根据国家标准《建设工程工程量清单计价规范》和国家有关法律法规,结合安徽省实际情况,制定《安徽省建设工程工程量清单计价规范》(DBJ34/T —206—2005)(以下简称省清单计价规范)。
一、省清单计价规范的组成省清单计价规范主要由以下各分册组成:(1)《安徽省建设工程工程量清单计价规范(建筑工程)》;(2)《安徽省建设工程工程量清单计价规范(装饰装修工程)》;(3)《安徽省建设工程工程量清单计价规范(安装工程)》;(4)《安徽省建设工程工程量清单计价规范(市政工程)》;(5)《安徽省建设工程工程量清单计价规范(园林绿化及仿古建筑工程)》。
二、省清单计价规范的内容省清单计价规范作为省级计价标准,是“安徽省建设工程工程量清单计价依据”的重要组成部分,内容主要包括:(1)安徽省建设工程工程量清单计价依据说明。
(2)安徽省建设工程工程量清单计价规则。
(3)工程量清单计价:包括工程量清单编制,工程量清单报价与控制价(标底价)编制,工程结算。
(4)安徽省建筑工程建筑面积计算规定。
(5)安徽省建筑工程工程量清单项目计价指引。
三、省清单计价规范按照国家标准《建设工程工程量清单计价规范》要求编制,适用于全省建设工程工程量清单计价活动。
建设工程工程量清单计价活动,除应遵循省清单计价规范外,还应符合国家标准《建设工程工程量清单计价规范》和国家有关法律、法规及标准、规范的规定。
四、省清单计价规范由安徽省工程建设标准定额总站(安徽省建设工程造价总站)负责管理与解释。
1 安徽省建设工程工程量清单计价依据说明1.0.1为合理确定和控制工程造价,维护和规范建设市场秩序,全面贯彻国家标准《建设工程工程量清单计价规范》、推行工程量清单计价,根据国家法律、法规、规章和标准,并按照“政府宏观调控、企业自主报价、市场形成价格”的改革需要,结合本省实际情况,省工程建设标准定额总站组织编制了“安徽省建设工程工程量清单计价依据”(以下简称清单计价依据)。
《安徽省建设工程工程量清单计价规范》(建筑工程)一、土石方工程1、平整场地:按设计图示尺寸以建筑物首层建筑面积计算。
2、挖土方根据:土壤类别、挖土平均厚度、弃土运距(按设计图示面积尺寸以体积计算。
3、挖基础土方:按设计图示尺寸以基础垫层底面积乘以挖土深度计算,分土壤类别、基础类型、垫层底宽和底面积、挖土深度、弃土运距4、冻土冻土开挖:按设计图示尺寸开挖面积乘以厚度以体积计算。
分冻土厚度、弃土运距5、挖淤泥、流砂:按设计图示位置、界限以体积计算。
分:挖掘深度、弃淤泥和流砂距离。
6、管沟土方:按设计图示以管道中心线长度计算。
分土壤类别、管外径、挖沟平均深度、弃土石运距、回填要求。
7、预裂爆破:按设计图示以钻孔总长度计算。
分岩石类别、单孔深度、单孔装药量、炸药品种和规格、管道品种和规格。
8、石方开挖:按设计图示尺寸以体积计算。
分岩石类别、开凿深度、弃碴运距、光面爆破要求、基底摊座要求、爆破石块直径要求9、管沟石方:按设计图示以管道中心线长度计算。
分岩石类别、管外径、开业深度、弃碴运距、基底摊要求、爆破石块直径要求。
10、土(石)方填:按图示尺寸以体积计算(1、场地回填:回填面积乘以平均回填厚度2、室内回填:主墙间净面积乘以回填厚度3、基础回填:挖方体积减去设计室外地坪以下埋设的基础体积,包括基础垫层及其他构筑物)。
分:土质要求、密度要求、粒径要求、夯填(碾压)、松填、运输距离其他相关问题应按现列规定处理1、土壤及岩石的分类应按下表确定;土普氏土壤及岩石名称天然湿度下极限压碎石分类平均容量强度(KG/CM2)3)分(KG/M类2、土石方体积应按挖掘前的天然密实体积计算,如需按天然密实体积折算时,应按下表计算土石方体积折算系数表天然密实体积虚方体积夯实后体积松填体积1.00 1.30 0.87 1.080.77 1.00 0.67 0.831.15 1.49 1.00 1.240.93 1.20 0.81 1.003、挖土方平均厚度应按自然地面测量标高至设计地坪标高间的平均厚度确定。
安徽省建设工程工程量清单计价规范1. 2.1.1为统一建设工程工程量清单计价原则、计价程序和要求,根据“安徽省建设工程工程量清单计价依据”,结合我省实际,制定本规则。
2.1.2本规则适用于本省行政区域内的建筑工程、装饰装修工程、安装工程、市政工程、园林绿化工程及仿古建筑工程等的工程量清单计价活动。
2.1.3凡在本省行政区域范围内,全部使用国有资金或国有资金投资为主的建设工程,必须执行本规则。
其他投资的建设工程是否采用工程量清单计价,由业主自行确定。
如采用工程量清单计价招标的,应执行本规则。
国有资金:是指国家财政性的预算内或预算外资金,国家机关、国有企事业单位和社会团体的自由资金及贷款资金,国家通过对内发行政府债券或向国外政府及国际金融机构举借主权外债所筹集的资金。
“国有资金投资为主”的工程是指国有资金占总投资额50%以上(不含50%),或不足50%、但国有资产投资者实质上拥有控股权的工程。
2.1.4工程量清单计价活动应遵循客观、公正、公平、诚信的原则,遵照国家有关法律、法规和政策,维护发包人与承包人的合法权益。
2.1.5《安徽省建设工程工程量清单计价规范》对所有工程量清单计价活动具有约束力,必须严格执行。
“安徽省建设工程消耗量定额”和“安徽省建设工程消耗量定额综合单价”等是编制与核审工程设计概算、施工图预算的指导性依据,是编制与审核招标工程控制价或标底价、工程结算的重要依据,是调解处理工程造价纠纷和鉴定工程造价的依据,是投标报价的参考性依据。
工程量清单计价活动各方主体必须遵守清单计价依据中的强制性规定。
工程量清单计价成果文件,应按照《安徽省建设工程工程量清单计价规范》规定的格式填写。
2.1.6省建设行政主管部门负责全省建设工程工程量清单计价活动的监督管理,具体工作委托省建设工程造价管理机构负责。
各市建设行政主管部门负责本行政区域内工程量清单计价活动的监督管理。
2.2清单计价工程费用的构成与计算2.2.1工程量清单计价的工程费用,由分部分项工程量清单计价合计费用,措施项目清单计价合计费用,其他项目清单计价合计费用、规费和税金构成。
安徽省建设工程清单计价取费费率第一节建筑工程取费费率一、建筑工程施工技术措施费建筑工程施工技术措施费按建筑工程计价规范和建筑工程消耗量定额规定执行。
注 : 专业工程施工组织措施费费率乘以系数 0.6。
三、建筑工程企业管理费费率四、建筑工程利润率六、建筑工程税金费率注 : 税费包括营业税、城市建设维护税及教育费附加。
第二节装饰装修工程取费费率一、装饰装修工程施工技术措施费装饰装修工程施工技术措施费按装饰装修工程计价规范和装饰装修工程消耗量定额规定执行。
二、装饰装修工程施工组织措施费费率注:专业工程施工组织措施费费率乘以系数 0.6。
三、装饰装修工程企业管理费费率注:1. 专业幕墙工程适用于单独承包的工程项目。
2. 幕墙的试验费未包括 , 设计有要求时另行计算。
四、装饰装修工程利润率注:1. 专业幕墙工程适用于单独承包的工程项目。
2. 幕墙的试验费未包括 , 设计有要求时另行计算。
五、装饰装修工程规费费率六、装饰装修工程税金费率注:税费包括营业税、城市建设维护税及教育费附加。
第三节安装工程取费费率一、安装工程施工技术措施费安装工程施工技术措施费按安装工程计价规范和安装工程消耗量定额规定执行。
二、安装工程施工组织措施费费率三、安装工程企业管理费费率四、安装工程利润率五、安装工程规费费率六、安装工程税金费率注:税费包括营业税、城市建设维护税及教育费附加。
第四节市政工程取费费率一、市政工程施工技术措施费市政工程施工技术措施费按市政工程计价规范和市政工程消耗量定额规定执行。
二、市政工程施工组织措施费费率三、市政工程企业管理费费率四、市政工程利润率五、市政工程规费费率六、市政工程税金费率注:税费包括营业税、城市建设维护税及教育费附加。
第五节园林绿化及仿古建筑工程取费费率一、园林绿化及仿古建筑工程施工技术措施费园林绿化及仿古建筑工程技术措施费按园林绿化及仿古建筑工程计价规范和消耗量定额规定执行。
二、园林绿化及仿古建筑工程组织措施费费率三、园林绿化及仿古建筑工程企业管理费费率四、园林绿化及仿古建筑工程利润率五、园林绿化及仿古建筑工程规费费率六、园林绿化及仿古建筑工程税金费率建筑工程取费工程类别划分标准装饰装修工程取费工程类别划分标准一、装饰装修工程取费工程类别划分二、工程类别划分标准说明1.装饰工程类别是根据建筑装饰标准划分的。
安徽省清单计价规范(总63页)--本页仅作为文档封面,使用时请直接删除即可----内页可以根据需求调整合适字体及大小--总说明为规范建设工程工程量清单计价行为,统一建设工程工程量清单的编制和计价方法,根据国家标准《建设工程工程量清单计价规范》和国家有关法律法规,结合安徽省实际情况,制定《安徽省建设工程工程量清单计价规范》(DBJ34/T—206—2005)(以下简称省清单计价规范)。
一、省清单计价规范的组成省清单计价规范主要由以下各分册组成:(1)《安徽省建设工程工程量清单计价规范(建筑工程)》;(2)《安徽省建设工程工程量清单计价规范(装饰装修工程)》;(3)《安徽省建设工程工程量清单计价规范(安装工程)》;(4)《安徽省建设工程工程量清单计价规范(市政工程)》;(5)《安徽省建设工程工程量清单计价规范(园林绿化及仿古建筑工程)》。
二、省清单计价规范的内容省清单计价规范作为省级计价标准,是“安徽省建设工程工程量清单计价依据”的重要组成部分,内容主要包括:(1)安徽省建设工程工程量清单计价依据说明。
(2)安徽省建设工程工程量清单计价规则。
(3)工程量清单计价:包括工程量清单编制,工程量清单报价与控制价(标底价)编制,工程结算。
(4)安徽省建筑工程建筑面积计算规定。
(5)安徽省建筑工程工程量清单项目计价指引。
三、省清单计价规范按照国家标准《建设工程工程量清单计价规范》要求编制,适用于全省建设工程工程量清单计价活动。
建设工程工程量清单计价活动,除应遵循省清单计价规范外,还应符合国家标准《建设工程工程量清单计价规范》和国家有关法律、法规及标准、规范的规定。
四、省清单计价规范由安徽省工程建设标准定额总站(安徽省建设工程造价总站)负责管理与解释。
1 安徽省建设工程工程量清单计价依据说明为合理确定和控制工程造价,维护和规范建设市场秩序,全面贯彻国家标准《建设工程工程量清单计价规范》、推行工程量清单计价,根据国家法律、法规、规章和标准,并按照“政府宏观调控、企业自主报价、市场形成价格”的改革需要,结合本省实际情况,省工程建设标准定额总站组织编制了“安徽省建设工程工程量清单计价依据”(以下简称清单计价依据)。
安徽省建筑工程计价定额综合单价总说明一、为促进建筑业又好又快发展,进一步规范建筑市场工程量清单计价行为,方便快速报价和简化计价过程,根据2005年“安徽省建设工程工程量清单计价依据”和有关规定,编制了“安徽省建筑、装饰装修工程及安装工程(常用册)计价定额综合单价”(以下简称综合单价)。
二、本综合单价适用于安徽省境内的工程量清单计价的建筑工程、装饰装修工程及安装工程(常用册)。
其中安装工程(常用册)主要包括电气设备安装工程,消防工程,给排水、采暖、燃气工程,通风空调工程,建筑智能化系统设备安装工程,刷油、防腐蚀、绝热工程。
三、本综合单价是编制与审核建设工程投资估算、设计概算、施工图预算的指导性依据,是编制与审核招标控制价、界定成本价、调解处理工程造价纠纷和鉴定工程造价的依据,也是企业投标报价和工程结算的参考依据。
四、本综合单价编制的原则。
遵循“市场形成价格、企业自主报价、政府宏观调控”的工程造价管理原则。
综合单价表现形式实行“量”“价”合一,方便使用;项目设置对传统定额项目进行适当综合、调整、合并,力求简明;计量规则和费用计算程序力求简化;价格水平适中,能够充分反映市场。
五、本综合单价主要编制依据。
1.2005年《安徽省建设工程量清单计价规范》(建筑、装饰装修、安装工程)(DBJ/T-20 6-2005)。
2.2005年《安徽省建筑工程消耗量定额》、《安徽省装饰装修工程消耗量定额》、《安徽省安装工程消耗量定额》。
3.2005年《安徽省建设工程清单计价费用定额》、《安徽省建设工程清单计价施工机械台班费用定额》。
4.有关标准图集及典型工程案例。
六、本综合单价消耗量的确定。
(一)人工工日消耗量:人工工日一律以“综合工日”表示,不分工种、技术等级。
其内容包括基本用工、超运距用工、辅助用工、人工幅度差。
(二)材料消耗量:包括主要材料、辅助材料、零星材料等。
凡能计量的材料、成品、半成品均按品种、规格逐一列出数量,并入相应损耗。
安徽省建设工程工程量清单计价规则2.1总则2.1.1为统一建设工程工程量清单计价原则、计价程序和要求,根据“安徽省建设工程工程量清单计价依据”,结合我省实际,制定本规则。
2.1.2本规则适用于本省行政区域内的建筑工程、装饰装修工程、安装工程、市政工程、园林绿化工程及仿古建筑工程等的工程量清单计价活动。
2.1.3凡在本省行政区域范围内,全部使用国有资金或国有资金投资为主的建设工程,必须执行本规则。
其他投资的建设工程是否采用工程量清单计价,由业主自行确定。
如采用工程量清单计价招标的,应执行本规则。
国有资金:是指国家财政性的预算内或预算外资金,国家机关、国有企事业单位和社会团体的自由资金及贷款资金,国家通过对内发行政府债券或向国外政府及国际金融机构举借主权外债所筹集的资金。
“国有资金投资为主”的工程是指国有资金占总投资额50%以上(不含50%),或不足50%、但国有资产投资者实质上拥有控股权的工程。
2.1.4工程量清单计价活动应遵循客观、公正、公平、诚信的原则,遵照国家有关法律、法规和政策,维护发包人与承包人的合法权益。
2.1.5 《安徽省建设工程工程量清单计价规范》对所有工程量清单计价活动具有约束力,必须严格执行。
“安徽省建设工程消耗量定额”和“安徽省建设工程消耗量定额综合单价”等是编制与核审工程设计概算、施工图预算的指导性依据,是编制与审核招标工程控制价或标底价、工程结算的重要依据,是调解处理工程造价纠纷和鉴定工程造价的依据,是投标报价的参考性依据。
工程量清单计价活动各方主体必须遵守清单计价依据中的强制性规定。
工程量清单计价成果文件,应按照《安徽省建设工程工程量清单计价规范》规定的格式填写。
2.1.6省建设行政主管部门负责全省建设工程工程量清单计价活动的监督管理,具体工作委托省建设工程造价管理机构负责。
各市建设行政主管部门负责本行政区域内工程量清单计价活动的监督管理。
2.2清单计价工程费用的构成与计算2.2.1工程量清单计价的工程费用,由分部分项工程量清单计价合计费用,措施项目清单计价合计费用,其他项目清单计价合计费用、规费和税金构成。
安徽省建设工程工程量清单计价规范————(DBJ34/T—206—2005)总说明为规范建设工程工程量清单计价行为,统一建设工程工程量清单的编制和计价方法,根据国家标准《建设工程工程量清单计价规范》和国家有关法律法规,结合安徽省实际情况,制定《安徽省建设工程工程量清单计价规范》(DBJ34/T—206—2005)(以下简称省清单计价规范)。
一、省清单计价规范的组成省清单计价规范主要由以下各分册组成:(1)《安徽省建设工程工程量清单计价规范(建筑工程)》;(2)《安徽省建设工程工程量清单计价规范(装饰装修工程)》;(3)《安徽省建设工程工程量清单计价规范(安装工程)》;(4)《安徽省建设工程工程量清单计价规范(市政工程)》;(5)《安徽省建设工程工程量清单计价规范(园林绿化及仿古建筑工程)》。
二、省清单计价规范的内容省清单计价规范作为省级计价标准,是“安徽省建设工程工程量清单计价依据”的重要组成部分,内容主要包括:(1)安徽省建设工程工程量清单计价依据说明。
(2)安徽省建设工程工程量清单计价规则。
(3)工程量清单计价:包括工程量清单编制,工程量清单报价与控制价(标底价)编制,工程结算。
(4)安徽省建筑工程建筑面积计算规定。
(5)安徽省建筑工程工程量清单项目计价指引。
三、省清单计价规范按照国家标准《建设工程工程量清单计价规范》要求编制,适用于全省建设工程工程量清单计价活动。
建设工程工程量清单计价活动,除应遵循省清单计价规范外,还应符合国家标准《建设工程工程量清单计价规范》和国家有关法律、法规及标准、规范的规定。
四、省清单计价规范由安徽省工程建设标准定额总站(安徽省建设工程造价总站)负责管理与解释。
1 安徽省建设工程工程量清单计价依据说明1.0.1 为合理确定和控制工程造价,维护和规范建设市场秩序,全面贯彻国家标准《建设工程工程量清单计价规范》、推行工程量清单计价,根据国家法律、法规、规章和标准,并按照“政府宏观调控、企业自主报价、市场形成价格”的改革需要,结合本省实际情况,省工程建设标准定额总站组织编制了“安徽省建设工程工程量清单计价依据”(以下简称清单计价依据)。