107-广州地铁6号线对广州市轨道网络拓扑特性的影响分析
- 格式:pdf
- 大小:660.13 KB
- 文档页数:9
关于广州地铁客流规模影响因素的分析摘要:本文从线网布局与城区人员密集程度的关系、影响客流的外部和内部因素以及研究讨论等方面入手,详细的阐明了影响广州地铁客流规模的因素以及解决问题的手段,为广州地铁扩大客流规模提供了有效的办法。
关键词:影响客流的外部和内部因素影响客流规模的存在问题提升客流规模的研究讨论中图分类号:u293.1+3文献标识码:a文章编号:abstract: this article from the line network layout and the relationship between the city personnel intensive degree, the influence of the external and internal factors of passenger flow and the research of the discussion, the detailed clarify the influence factors of the passenger flow of guangzhou metro, the scale and the solution to the problem of measure, to expand the scale of guangzhou metro passenger flow provides efficient way.key words: the influence of the external and internal factors of passenger flow affect the size of the passenger flow problems of the size of the passenger flow discussed ascension改革开放以来,我国经济迅速发展,人民生活水平日益提高,同时城市交通日趋紧张,人口高密度、建筑高密度和交通高密度已成为其突出的特征。
城轨车辆常见网络故障分析与排查摘要:地铁车辆MVB(MultifunctionVehicleBus多功能车辆总线)作为列车网络总线,它既是重点也是难点,在提升列车技术性能的同时也带来许多故障点。
列车网络是车辆控制系统的一个重要组成部分,必须单独进行网络试验来保证车辆的网络系统功能正常。
关键词:城轨车辆;网络故障;分析与排查引言随着自动化技术的不断发展,大量不同功能的设备的应用,对作为车辆控制核心的列车通讯网络系统也不断提出新的要求。
同时,网络通讯系统布线简单,占用空间少,标准统一,数据承载量大,可维护性强等优点,也在不断取代传统硬线控制系统。
文章从硬件结构、传输速率、传输距离、抗干扰能力、冗余性等各方面对城轨车辆上使用的列车网络系统做比较分析,总结得出常用网络的优缺点和适用环境。
1列车网络通讯系统为满足安全、快捷、舒适的要求,城轨车辆上安装了大量设备,包括牵引系统、制动系统、旅客服务系统、烟火报警系统、信号控制系统等。
列车通讯网络将全列车辆的各个设备连接到一起,以统一处理设备状态检测、运行信息提示、设备故障及维护信息等任务。
随着电子技术和计算机技术的发展,各种总线协议、接口硬件不断更新,车辆网络的组成也向着多样化发展。
1.1 RS485总线RS485总线常用两线制传输方式,可提供高达10Mbit/s的数据传输速率,最大通讯距离约1200m,但数据信号传输所允许的最大电缆长度与信号传输的波特率成反比,两者无法兼得。
因采用平衡发送和差分接收的方式,抗共模干扰能力。
支持多点通讯,但只支持终端匹配的总线型结构,不支持环形或星型网络,一般支持32个节点。
1.2 CAN总线CAN总线为多主方式的串行通讯总线,采用双绞线来传输信号。
CAN总线可提供高达1Mbit/s的数据传输速率,当信号传输距离达到10Km时,仍可提供高达50Kbit/s的数据传输速率。
具有高抗电磁干扰性,而且能够检测出产生的任何错误。
CAN总线同样为终端匹配的总线型结构,理论上可以挂接无数个节点,但在实际应用中,节点数目受网络硬件的电气特性限制。
河南科技Henan Science and Technology电气与信息工程总第877期第6期2024年3月收稿日期:2023-09-12作者简介:李谋思(1991—),男,硕士,工程师,研究方向:岩土工程监测及测量。
轨道交通GNSS 控制网的建立及数据分析处理李谋思1 刘志锋2(1.武汉市勘察设计有限公司,湖北 武汉 430022;2.广州地铁设计研究院股份有限公司,广东 广州 510010)摘 要:【目的】研究城市轨道交通平面首级GNSS 控制网的布设方法及数据分析处理,总结项目经验。
【方法】结合城市轨道交通平面首级GNSS 控制测量的规范要求及工程实际情况,以某市轨道交通四号线GNSS 控制网的建立及数据处理过程为例,采用框架网、线路网的分级布设,介绍了地铁GNSS 控制网的主要精度要求、测点布设原则、外业采集过程、数据处理流程、质量检验等方法。
【结果】控制网布设时应与相邻线路控制网重合点进行联测;点位选取除须符合规范要求外,还应与线路走向及施工相配合,与相邻线路控制点联测,保证点位精度;数据处理过程中需特别注意同步环及异步环精度,针对长基线、车站附近控制点等重要位置应采用测量机器人进行边长观测及修正。
【结论】城市轨道交通平面首级GNSS 控制网的布设是一个费时费力的过程,数据分析处理对技术人员经验要求较高,该控制网测设,能够很好地满足生产要求,对类似工程具有一定的借鉴意义。
关键词:GNSS 控制网布设;框架网;线路网;数据处理;轨道交通中图分类号:TG333 文献标志码:A 文章编号:1003-5168(2024)06-0011-05DOI :10.19968/ki.hnkj.1003-5168.2024.06.002Establishment and Data Analysis of GNSS Control Network of Rail TransitLI Mousi 1 LIU Zhifeng 2(1.Wuhan Geotechnical Engineering and Surveying Co., LTD, Wuhan 430022, China; 2.Guangzhou Metro De⁃sign & Research Institute Co. Ltd, Guangzhou 510000, China)Abstract: [Purposes ] This paper aims to study the layout method and data analysis and processing of thefirst level GNSS control network for urban rail transit, thus summarizing project experience. [Methods ] Combined with the specification requirements of the first-level GNSS control measurement of urban railtransit plane and the actual situation of the project, and taking the establishment and data processing of the GNSS control network for Line 4 of a certain city's rail transit as an example, the hierarchical layoutof the frame network and the line network is adopted. The main accuracy requirements of the subway GNSScontrol network, the principle of measuring point layout, the field collection process, data processing flow,quality inspection and other methods are introduced. [Findings ] When laying out the control network, it is advisable to conduct joint measurement with the overlapping points of the adjacent line control network. The selection of point positions should not only comply with the requirements of the specifications, but also be coordinated with the line direction and construction, and should be connected with the adjacent line control points to ensure the accuracy of point positions; During the data processing process, special attention should be paid to the accuracy of synchronous and asynchronous loops. For important partssuch as long baselines and control points near stations, measurement robots can be used for edge lengthobservation and correction. [Conclusions] The layout of the first level GNSS control network for urban rail transit is a time-consuming and laborious process, and data analysis and processing require high ex⁃perience from technical personnel. The control network measurement can well meet production require⁃ments and has certain guiding significance for similar projects.Keywords:GNSS control network deployment; frame network; line network; data process; rail transit0 引言近年来,国内各大城市的在建地铁线路快速增加,线路之间穿越、交叉越来越频繁,超长站间距也越来越普遍。
DOI:10.19392/ki.1671-7341.201827155广州地铁六号线保护区段相关知识研究周劲豪广州地铁集团有限公司㊀广东广州㊀510220摘㊀要:结合广州地铁六号线信号保护区段仍存在盲点,以及六号线二期开通的新信号设备情况,现对六号线信号系统的保护区段相关知识进行专题研究㊂关键词:影响;显示;解锁;征用一㊁保护区段设置目的保护区段可以防止列车越过红灯造成影响,为了使列车能在一条进路的末端接近一架不可越过的信号机,这时联锁将设置保护区段,使列车在紧制情况下越过末端信号机,也能在保护区段内停车,因此每一条锁闭的进路末端外方都存在保护区段㊂二㊁保护区段列车运行的影响对非CBTC 列车,保护区段不满足将直接影响列车进路始端信号机的开放;对CBTC 列车,保护区段不满足将导致列车停车点前移(ATO 不能正常进对标)㊂三㊁保护区段在人机界面上的显示正常情况下,保护区段的建立多数不会以图形化在HMI /MMI /大屏上显示,但是在信号系统中会仍默认存在(如封锁保护区段,始端信号机无法开放)㊂如保护区段需要征用道岔的情况时,就会建立保护进路,保护进路建立后,将显示为浅绿色光带,进路上的道岔将被逻辑锁定㊂(一)道岔离终端信号满足紧制距离,保护区段不显示如下图:S1201-S1302进路建立,S1302信号机外方建立保护区段(在T1302-1内),保护区段足够长,末端信号机到岔区距离满足紧制距离,保护区段不会征用P1302道岔,因此S1302外方不会建立保护进路,也不会显示浅绿色光带㊂(二)道岔离终端信号不满足紧制距离,保护区段显示如:S2103-X2202进路建立,S2223信号机外方建立保护区段,由于保护区段末端已越过P2219道岔,因此保护区段需要征用P2219道岔,建立保护进路,显示浅绿色光带㊂(三)特殊例子:道岔离终端信号满足紧制距离,保护区段仍显示若列车紧制越过出站号机可能导致挤岔,该保护区段会延长并直接征用道岔到安全位置㊂四㊁保护区段道岔的征用保护进路分为:优选保护进路及关键保护进路㊂(1)优选保护进路是指如果道岔可动就将保护进路上的道岔锁闭在较佳的位置,否则,将道岔锁闭在既有位置,六号线优选保护道岔大部分都是优先正位,只有S0112优先反位㊂a.优先正位:如下图:S0110-X0116进路建立后,保护进路上P0105道岔不论在定位还是反位,S0110信号机都可以正常开放㊂b.优先反位:列车如从入厂线出厂,浔峰岗采用折返线1道折返,列车出厂后转换轨1道至浔峰岗折返线2道进路自动排列后,P0104保护区段优先征用反位,与浔峰岗折返进路冲突,浔峰岗折返进路无法排列㊂(2)关键保护进路是指保护进路上的道岔必须能转到在规定的位置㊂否则会导致始端信号机无法开放或CBTC 列车停车点前移㊂六号线仅有五段关键保护进路,分别是:a.浔峰岗联锁区:末端信号机为X0118的进路,P0110道岔必须在定位或可转动到定位;b.浔峰岗联锁区:末端信号机为S0105的进路,P0103道岔必须在定位或可转动到定位;c.坦尾联锁区:末端信号机为X0508的进路,P0506道岔必须在定位或可转动到定位;d.植物园联锁区:末端信号机为X2310的进路,P2302道岔仅定位㊂原因是若排列X2305-S2313的进路,列车紧制越过X2310号机可能导致挤岔,所以保护区段会征用P2302道岔到安全位置(定位)㊂五㊁保护区段的解锁六号线进路保护区段的解锁区段均为终端信号机的前一个计轴区段,详见附表1㊂在保护区段建立后,列车占用解锁区段,保护进路就开始进行正常解锁㊂在占用解锁区段前也会出现解锁倒计时,但倒计时会不断重复,保护进路不会解锁㊂只有列车开始占用解锁区段,倒计时结束后,保护区段才会解锁㊂在非CBTC 模式下,保护进路的解锁时间为256秒,CBTC 模式下,保护进路的解锁时间分为三个阶段:1)列车触发信号机防护解锁保护进路(时间从256秒开始倒数);2)列车进站时变更为ATC 解锁(时间从60秒开始倒数)㊂此处可解释为什么列车在长湴上行紧制,司机处理时间过长保护区段会提前解锁;3)列车停稳后变更为CBI 解锁(即联锁解锁,时间约从75秒开始倒数)㊂参考文献:[1]信号设备故障应急处理指南(六号线).[2]卡斯柯信号系统联锁表.271机械化工科技风2018年9月. All Rights Reserved.。
都市快轨交通第20卷第1期2007年2月学术探讨广州地铁6号线的隧道通风设计胡自林1 余晓琳2(1.广州市地下铁道设计研究院 广州 510010;2.华南理工大学交通学院 广州 510640)摘 要 广州地铁6号线穿越老城区,因此隧道通风设计的控制因素较多。
通过简化和输入合理的边界条件和参数,运用SES程序对该线路进行计算,针对隧道内温度和风量进行分析。
指出在现有配置隧道通风系统的情况下,深埋隧道内近、远期的全线温度满足要求;单端设置活塞风井的“活塞效应”作用较大,隧道区间换气量达到《地铁设计规范》规定,且增设消声器对活塞风道的作用影响不大,设计优化、合理。
关键词 广州地铁6号线 隧道 通风 活塞效应 区间1 工程概况1.1 线路特点广州地铁6号线起于白云区金沙洲浔峰岗山脚,跨过环城高速后,沿金沙大道行进,接着跨过白沙河,到达大坦沙北端后以大坡度入地,向东南穿越荔湾区,经越秀区、东山区后,转至东北方向至天河区,止于天河区高塘石,线路全长29.7k m,共设25座车站,其中9座车站分别与其他轨道交通线换乘。
其中,地下段长22.6km,包含19个车站,大部分属于深埋车站(见图1)。
平均车站间隔1k m多,站间距相对较短,基本上6号线的2个区间隧道相当于5号线的1个车站区间隧道,区间结构为马蹄形,断面面积为21.3m2。
因此,隧道通风的设计也应该与其他线路有一定程度的区别和创新。
1.2 车辆情况6号线采用直线电机系统。
列车为4辆编组,双向运行,高峰小时设计能力为30对/h,列车定员916人/图1 6号线工程线路示意图 收稿日期:2005-12-28 修回日期:2006-10-11 作者简介:胡自林,男,助理工程师,huz ilin@dts j 都市快轨交通 第20卷第1期2007年2月列,高峰小时列车最小运行间隔2m i n ,单向最大设计输送能力27480人次/h 。
车辆的长度L =70.4m ,宽度W =2.9m ,高度H =3.6m ,地板面至轨面高度H f ≤930mm 。
广州地铁6号线萝岗车辆段早高峰时段发车效率分析及其提
升对策
马骁
【期刊名称】《城市轨道交通研究》
【年(卷),期】2022(25)4
【摘要】基于广州地铁6号线萝岗车辆段的实际情况,分析了列车出段路径,并仔细测算了列车出段运行时间。
测算发现,早高峰时段的列车出场运行平均时间为483 s,大于时刻表的计划运行间隔,进而导致萝岗车辆段列车出场延误。
提出通过调整列车出场路径来减少列车出场时间。
深入分析了限制车辆段发车能力的瓶颈位置,并针对性提出优化规章、提高出库速度,提高司机驾驶水平,优化检修库库门确认流程,以及提升司机的弓靴转换操作效率等一系列对策。
建议将分段出场及正线摆放过夜车作为储备应急方案,并阐述了方案风险和预防措施。
【总页数】5页(P147-151)
【作者】马骁
【作者单位】广州地铁集团有限公司
【正文语种】中文
【中图分类】U292.4
【相关文献】
1.广州地铁六号线(萝岗站)土建工程——花岗岩残积土及全风化层物理力学性质统计分析
2.广州地铁三号线洛溪车辆段出入段线设计方案及能力分析
3.广州市轨
道交通六号线萝岗车辆段高边坡加固与防护技术4.基于如何提高地铁车辆段往返正线接发车效率的可行性分析5.对地铁车辆段物业开发的思考与探讨——以广州市6号线萝岗车辆段为例
因版权原因,仅展示原文概要,查看原文内容请购买。