BP7.5-12 规格书,Datasheet 资料

  • 格式:pdf
  • 大小:200.07 KB
  • 文档页数:1

Nominal VoltageNominal Capacity7.5Ah @ 20 hour rate F.V.(1.75V/cell)

Terminals25m

2.25 A

oooo Charge0

C

~40C(32F~104F)oooo Discharge-20C~50C(-4F~122F)oooo Storage.-20C~40C(-4F~104F)ABS(UL94-HB, UL94-V0 is optional)Internal Resistance

Length 151±1.5 Width 65±1.5 Container Height 94±1.5 Total Height OUTER DIMENSIONSTERMINAL TYPE12 V

Max. Charge Current

Container MaterialDIMENSION(mm/inch)2650g(5.84lbs.)VRLA Rechargeable Battery

(BP7.5-12FR)BP7.5-12 TechnologyMeasuresInnovationValues

ISO 9001

ISO14001

UL

CE

100±2.0

B.B. Battery Co., Ltd.Powered by REV. Feb. 2011A/1APPLICATION FEATURES

SPECIFICATIONS

IEC 61056-1JIS C 8702-1GB/T 19639.1Approx. Weight

Max. Discharge Current112.5 A (5 sec.)(Fully Charged )

Operating Temperature Range

(5.94±0.06)

(2.56±0.06)

(3.70±0.06)

(3.94±0.08)

All data shall be changed without prior notice, BB reserves the right to explain and update the information contained hereinto. UPSLaboratory Equipment

Toy-CarsPower PacksFishing Lights

100 2(3.94 0.08)

94 1.5(3.70 0.06)151 1.5(5.94 0.06)65 1.5(2.56 0.06)

(V/cell)F.V.DischargeTime5 Min10 Min15 Min30 Min1 Hr3 Hr5 Hr10 Hr20 HrUnit: WooConstant power discharge characteristics at 25 C/77 F

271314333348360200216224229234160167173176180 95.2 98.8101.1102.5103.521.922.322.522.722.815.0715.3015.3815.4415.488.428.558.598.628.624.43 4.50 4.52 4.54 4.54

(V/cell)F.V.DischargeTime5 Min10 Min15 Min30 Min1 Hr3 Hr5 Hr10 Hr20 HrUnit: AooConstant current discharge characteristics at 25 C/77 F

24.428.830.632.033.017.619.019.720.220.613.914.515.015.315.78.078.378.568.688.774.594.724.814.874.921.821.861.871.891.901.2561.2751.2821.2861.2900.7020.7120.7160.7180.7180.369 0.375 0.377 0.378 0.378 1.80V 1.75V 1.70V 1.65V 1.60V

1.80V 1.75V 1.70V 1.65V 1.60V T2 (Faston Tab 250) T1 is optional

Terminal T1Terminal T2

4.75(0.19)3.2(0.13)3.4(0.13)

6.35(0.25)

6.35(0.25)

0.8(0.03)7.95(0.31)

0.8(0.03)

54.656.257.257.958.5Maintenance free(no water topping-up required).No free acid(Non-spillable battery).Low self-discharge rate, lower than 3% capacity loss per month.Can be used in any orientation(excluding used inverted).Absorbent Glass Mat technology for efficient gas recombination.

芯天下--http://oneic.com/