节拍生产标准1960-B 节拍生产标准1927-16供应商质量过程控制计划审核汇总表Date:Supplier Name:供应商名称Mfg.DUNS:Plant Location &Country:公司地址/国家Auditor:(SQE,SQI)Auditor Phone:评审员评审员电话Auditor:E-Mail:评审员邮箱通用分部Part Number (s):Part Name:零件编号Drawing Date:图面日期设计变更单号PPAP/In terim/Be nestare Status:Progra m 生产件批准车型年份项目Creativit y Team:开发项目,样商品Reason For 评审依据保安件Type of Audit:WWP Supplier QualityGM 1960-B Process Control Plan Audit Summary SheetGM 1927-16Supplier Phone:供应商电话GM Division:EWO #: / ODM #Eng. Change Level:Model Year:Commodity:Safety Related Part ?Product Validation/Qualification Complete:FutureLaunchCurrentPartialOtherInitial Follow Up Run at Rate (GP9 Attachement B)Yes NoYes No N/AN/A评审类型产品有效期质量完成情况Driver of Audit:评审范围Focus of Audit:评审要点Approve d 批准批准,同时需要文档没批准复评日期YesNoN/A1.2.3.4.5.6.7.8.9.10.11.12.13.14.15.Approved, but need Documentation Not Approved Follow-Up Audit Date:TECHNICAL INFORMATION AVAILABILITYCommentsAre actual drawings availabe at production facility with the latest最后一次设变的生产设备的实际图纸是否为有效版本?Does the supplier have the final customer approved drawing?供应商是否有最终顾客批准的图纸?Is the print complete (Tolerances, GD&T, Correct Datums, KPCs,图纸内容是否完整?Are all technical regulations/CTS/SSTS available?所有的技术标准是否有效?If supplier is design responsible, has DFMEA been used todevelop the PFMEA?如果供方有设计责任,是否参照DFMEA作PFMEA?QUALITY SYSTEM DOCUMENTATION Is a Process Flow Diagram available?过程流程图是否有效?Does the Process Flow Diagram include receiving?过程流程是否包括让步接收?Does the Process Flow Diagram include rework?过程流程是否包括返工返修?Does the Process Flow Diagram include scrap?过程流程是否包括报废?Does the Process Flow Diagram include gauging/inspection?过程流程是否包括计量器具?Does the Process Flow Diagram include shipping?过程流程是否包括交付?Does the Process Flow Diagram include labeling and Part ID atreceiving, WHIP, finished good and shipping areas?过程流程是否包括产品标识和接受零件代码,whip,成品,发货区域?Is there a PFMEA available?是否有有效的PFMEA?Is the PFMEA acceptable (RPNs, numbers match Process flowand include KPCs/PQCs/KCCs)?PFMEA 是否可接收?Is there any evidence that it is kept up to date?是否有改进的证据?APQP Confirmation Mgmt. Request Plant Request Run @ RateTop FocusCSL-1CSL-2Major Disruption DD&WComponent Check Plan Critical Fastner (D02)D/PFMEAShutdown/Start Up Audit CPIP/WarrantyOtherPart / Assembly Line /Cell Operation / MachineComplete Mfg. SystemQuality System -Ongoing Documentation16.17.18.19.20.21.22.23.24.25.26.27.28.29.30.31.32.33.34.35.36.Is there a Process Control Plan (PCP) available?是否有有效的过程控制计划?Is the Process Control Plan (PCP) acceptable (numbers match PFMEA and Process Flow, including KPCs/PQCs/KCCs, GP-12 if applicable and latest EWO/ODM included)?过程控制计划是否可接收(与PFMEA匹配的参数和流程,包括过程特性/产品特性,如早期生产限制合适,是否包括最新的EWO/ODM)?Are all "Current Controls" listed on the PFMEA detailed on the所有PFMEA 中标注的当前的控制方法是否具体体现在控Are process controls in place in the PCP to address the high PFMEA Risk Priority Numbers?PFMEA中涉及的高风险控制要求是否体现在控制计划中?Is there a procedure/process for Continuous Improvement for是否建立了优先减少风险的持续改进过程?Are KPCs/PQCs/KCCs called out on the PCP?在控制计划中是否标注了关键控制特性和关键产品特Are sample sizes and check frequency for each operation是否合理的规定了每个过程的样品尺寸和检验频次?Do your supplier's provide evidance of approved material for all components needed for the assembled part?供应商是否获得协力厂商提供的零组件材质证明和试验报告等证据?Are controls in place to ensure only approved incoming material released for production?是否依据协力厂商提供的检验证明实施进料检验?When parts require traceability, do controls link component traceability to the final part?当零部件有可追溯性要求时,是否作了标识并能追溯到产品形成的过程?Is the workplace properly configured and matches Process Flow 是否配置了合理的工作场所并与过程流程图相符合?Are all tools and gauges properly identified?所有配置的工具和量检具其准确度和精度是否满足要Are all gauges calibrated?所有量检具是否定期校验?Are all tools and gauges certified?所有配置的工具和量检具能否提供表明校验状态的合格证明?Is gauge Repeatability and Reproducabilty less than 10%?所有量检具的重复性和再现性是否小于10%?Do all gauges have proper operator instructions?所有量检具是否有合适的操作规程或作业指导书?Are proper operator instructions available for each operation?操作规程或作业指导书是否对每个操作过程都有效?Are Standardized Work instructions detailed to run the job properly, including handling of non-conforming parts?作业指导书是否详细标注了正常操作所需的内容(包括手工制品)Is there Standardized Work?是否将作业指导书配挂在现场?Is the Standradized Work being followed?是否按作业指导书操作?Do the operators understand the instructions?37.38.39.40.41.42.43.44.45.46.47.48.49.50.51.52.53.54.55.56.57.58.59.60.61.操作员是否了解作业指导书内容?Have operators been properly trained?操作者是否经过适当的培训Are boundary samples (BS) available to operators?操作者是否有合适的限度样件?Are boundary samples (BS) in use?限度样件是否在现场使用?Are Master Parts or samples available to confirm inspection?是否依据标准样件进行确认检验?Are Master Parts available for error proofing devices?标准样件对防呆装置是否有效?Is there a Preventive Maintenance (PM) plan on tools and is it是否建立了工具的预防性维护计划并付诸实施?Is there a Preventive Maintenance (PM) plan on equipment and 是否建立了设备的预防性维护计划并付诸实施?Are listed tests and inspections per control plan, actually每个控制计划是否规定了检验和实验项目并按规定执行?Where the Process Control Plan calls for SPC are the data控制计划规定的SPC能否提供合适数据记录?Are the Upper Control Limits (ULC) current?控制图的上控制限是否为现行的?Are the Lower Control Limits (LCL) current?控制图的下控制限是否为现行的?Does the data make sense and are reasonable control limits数据是否合理,数据限(线)是否依据数据计算?Are out of control points noted with the corrective action taken?对超出控制限的点是否采取适当的对策?Are product audits showing acceptable results for Final Product?产品最终审核的结果是否满足接受准则?Does the manufacturing process demonstrate the required capability or performance?制造过程是否显示了所要求的能力和性能?Does packaging and material handling protect parts from包装和包装材料是否起到有效的防护作用?Are instructions for handling Work In Process (WIP) and final product followed throughout the process to shipping area; including repair/rework areas?在制品和最终产品是否按规定存放在指定的区域,包括返工返修Are all parts and components labeled properly?所有零部件是否正确标识?QUALITY SYSTEM IMPLEMENTATION BY MANAGEMENT Is there a process for documenting and tracking Downtime?是否建立了偶发事故应急处理过程文件(计划和记Is there a process for documenting and tracking Scrap?是否建立了废品控制过程的文件?Is there a process for documenting and tracking Premium是否建立了超额费用的文件?Is there a process for documenting and tracking Plant Problem 是否建立了设备停机故障的文件?Does leadership ensure that Out of Control Conditions are领导层能否确保超出控制范围的项目得到管理?Are Action Plans (AP) followed?是否实施了反应计划?Is responsibility for implementation assigned and do peopleunderstand their responsibility?是否明确了所有人员的职责权限,他们是否理解?62.63.64.65.66.67.Auditors Comme nts:Supplier Represe ntative Signatur e GMReprese ntative Signatur eAre problems quickly communicated to people who can help?是否建立了有效的内部沟通系统?Does the support system respond to the operator?操作者是否熟悉操作系统?If more than one shift, does information part passes across是否所有的结果都有记录?Are suitable actions taken in case of deviations?当结果偏离基准或规定时,是否采取合适的措当多班轮换时,能否将当班的产品信息传递给Are all checks to be done under the PCP requirements所有在 PCP要求下的检查记录是否得到执行?Are results properly documented?。
采购一天时间管理计划表1. 引言在采购过程中,时间的有效管理尤为重要。
合理规划和管理一天的时间,可以有效提高采购人员的工作效率和工作质量。
本文将介绍一个采购一天时间管理计划表,帮助采购人员有效管理自己的时间,提高工作效率。
2. 时间分配2.1 早上•8:00 - 8:30:早晨计划•8:30 - 9:00:查看和回复电子邮件•9:00 - 10:00:预备会议•10:00 - 11:00:开会2.2 上午•11:00 - 11:30:处理紧急事务•11:30 - 12:00:购买办公用品2.3 中午•12:00 - 13:00:午休2.4 下午•13:00 - 14:00:查看供应商报价•14:00 - 15:00:与供应商洽谈合同•15:00 - 16:00:处理采购订单2.5 下午茶歇•16:00 - 16:30:与同事交流讨论2.6 傍晚•16:30 - 17:00:处理采购合同•17:00 - 17:30:填写采购报告•17:30 - 18:00:整理资料归档3. 时间管理技巧3.1 规划和优先级在早晨计划时间内,对当天的工作进行规划,明确每项任务的优先级。
将重要、紧急的任务放在前面处理,提高工作效率。
3.2 集中时间管理将相似的任务进行集中处理,避免在不同的任务之间频繁切换,以提高工作效率。
例如,将查看供应商报价和与供应商洽谈合同的任务排在一起。
3.3 设置时间限制对于每个任务,可以设置一个合理的时间限制,对自己进行约束。
在规定的时间内完成任务,避免过度投入在某一个任务中,提高工作效率。
3.4 合理利用碎片时间碎片时间是指短暂的空闲时间,比如早上的等待时间、午饭后的休息时间等。
在这些碎片时间中,可以处理一些简单、快速的任务,提高工作效率。
4. 时间管理工具4.1 日历使用日历工具,将每天的工作安排和任务提醒记录下来。
可以使用电子日历或者打印出来的纸质日历,提醒自己每天的工作安排。
4.2 待办事项清单创建一个待办事项清单,将每天的任务列出来,并将已完成的任务勾选或标记。
供应商审核计划编制:
审核:
批准:
年月
供应商审核计划
1、通过此次审核,证实供应商在质量管理体系的运行是否符合我公司的要求;
2、针对此次审核中暴露出来的供应商在体系、过程和产品存在的缺陷和问题,要求其制定有效的纠正预防措施并予以执行,提高供应商的质量管理体系运行有效性和效率,为产品质量的稳定和提升提供有力的质量管理体系保证。
江苏双菊汽车配件有限公司供方现场审核标准及其评分法则。
(见附件1)
审核组长:
审核组成员:
审核时间: 年月日
首次会议,审核开始
末次会议,审核结束
六、审核记录和报告
审核组成员在审核过程中应做好记录,审核完毕作出审核结论并形成报告.
七、附加说明
1,本计划由江苏双菊汽车配件有限公司质量部负责编制.
2,本计划如有变动,将通过适当方式通知受审核方和审核组成员.
附件1,
供应商现场审核评价评分表
评审人员签字:
签名:。
供应商改善计划表一、基本信息供应商名称:__________________________供应商地址:__________________________供应商联系人:__________________________供应商联系电话:__________________________二、供应商现状评估1.质量水平:□高□中□低2.交货准时率:□高□中□低3.服务态度:□好□中□差4.技术能力:□强□中□弱5.价格水平:□高□中□低6.创新能力:□强□中□弱7.持续改进能力:□强□中□弱三、供应商改善目标1.提高质量水平2.提高交货准时率3.改善服务态度4.加强技术能力5.降低价格水平(如有需要)6.提高创新能力7.加强持续改进能力四、供应商改善计划1.质量改善计划:a. 加强供应商质量控制,引入更严格的质量检测标准。
b. 提高供应商员工质量意识,定期开展质量培训。
c. 加强与供应商的沟通,及时反馈质量信息,促进质量改进。
2.交货改善计划:a. 加强与供应商的沟通,提前预测需求,合理安排生产计划。
b. 引入更严格的交货考核标准,对交货不及时的情况进行惩罚。
c. 加强供应链管理,优化物流环节,提高运输效率。
3.服务改善计划:a. 提高服务响应速度,及时解决客户问题。
b. 加强服务人员培训,提高服务意识和能力。
c. 建立客户服务满意度调查制度,持续改进服务质量。
4.技术改善计划:a. 支持供应商进行技术升级和创新,引入新技术和设备。
b. 加强技术交流和合作,共同研发新产品。
c. 提高技术人才的引进和培养,提升整体技术实力。
5.价格改善计划(如有需要):a. 优化采购流程,降低采购成本。
b. 加强与供应商的谈判,争取更优惠的价格。
c. 引入竞争机制,促使供应商降低价格。
五、供应商改善措施1.培训和提升:为供应商提供必要的培训和资源,以帮助他们提升质量、交货、服务和技术能力。
这可能包括质量管理、供应链管理、客户服务技巧等方面的培训。