拓新办公楼设计摘要本工程为xxxx限公司的拟建办公楼,建筑设计为四层,建筑面积一共为4402.48平方米,楼房标高为19.8米。
一层主要设计为大厅,接待室和设备用房,二至五层为标准办公用房。
建筑采用比较规则的柱网设计,为办公空间的灵活组合划分提供条件,亦对工程造价提供了较为经济的的方案。
本工程结构设计采用多层钢筋混凝土框架结构,基本步骤为:结构计算简图的确定;荷载计算;内力分析;内力组合;梁、柱截面配筋、板的设计、基础的设计以及结构施工图的绘制等。
其中,内力计算只考虑恒荷载和活荷载;柱、板的设计采用弹性理论;梁的设计采用塑性理论;基础选用柱下独立基础。
在进行截面设计时,遵循了强剪弱弯,强柱弱梁,强节点弱构件的设计原则,且满足构造要求,除对本框架进行手算外,还利用了PKPM 对本结构进行了电算。
本设计从建筑到结构是一个较为完整的设计过程,通过毕业设计复习和巩固了以前所学知识,把主要课程联系成一个完整的体系,并运用于设计中;本次毕业设计培养了我进行独立设计的基本能力,为毕业后的工作打下了坚实的基础。
关键词:框架结构;混凝土;建筑设计;结构设计Design of Office Building for TuoXinABSTRACTThe engineering is planned for a proposed office building for Tuoxin. which is divided into five stories. The building covers a total construction area of 4402.48 square meters and stands a ground elevation of 19.8 meters. The first storey includes the hall, reception room and spare room, while from the second storey to fifth storey are standard office. The building uses regular pillars net design, resulting in flexible combination and division for office space and a more economical scheme for the project .The design of engineering structures using multi-storey reinforced concrete frame structure, the basic steps are: the determination of the structure of the calculation diagram; load calculation; internal force analysis; combination of internal forces; beams, reinforced concrete column cross section, board design, basic design and structural mapping, such as construction. Among them, the internal force calculation concerns the constant load and live load only. The column and board design use a flexible plate theory; beam design uses plastic theory; The basis uses column-under single foundation. Seismic design in cross section, follows the design principles of strong bent weak shear, weak beam strong column and strong node weak component, and meet the construction requirements meanwhile. Moreover, the structure computerization is shown by using PKPM.From construction to the design of structure is a rather complete design process. Through design review and consolidation of the previous knowledge, the main courses are linked into a complete system and used in this design; The Graduation Project has trained me in the basic ability of independent design ,which lays down a solid foundation for the work after graduate.Keywords: Frame Structure; Concrete; Architectural Design; Structure Design目录1 建筑设计说明 (6)1.1设计依据 (6)1.2设计构思 (6)1.3工程概况 (6)1.4设计资料 (7)1.4.1工程地质条件 (7)1.4.2气象资料 (7)1.4.3抗震设防烈度 (7)1.4.4材料 (7)1.4.5建筑装修标准 (7)2 结构设计 (9)2.1结构平面布置 (9)2.1.1结构方案的确定 (9)2.1.2基础类型的确定 (9)2.2结构构件截面尺寸确定 (9)2.3框架计算简图 (11)2.4荷载计算 (13)2.4.1 屋面均布恒载 (13)2.4.2 楼面均布恒载 (13)2.4.3 活荷载 (14)2.4.4 楼面均布活载 (14)2.4.5 梁柱自重 (14)2.4.6 墙体自重 (16)2.5水平地震力作用下框架侧移计算 (18)2.5.1 横梁线刚度 (18)2.5.2横向框架柱的侧移刚度D值 (19)2.5.3 横向框架自振周期 (20)2.5.4横向地震作用计算 (21)2.5.5 横向框架抗震变形验算 (22)2.6水平地震作用下横向框架的内力分析 (23)2.7风荷载 (26)2.7.1基本信息 (26)2.7.2 横向框架在风荷载作用下的位移计算 (28)2.7.3 风荷载作用下横向框架的内力分析 (28)2.8竖向荷载作用下横向框架的内力分析 (31)2.8.1 荷载计算 (32)2.8.2 横向框架在恒荷载作用下的内力计算 (37)2.8.3 横向框架在活荷载作用下的内力计算 (45)3 内力组合 (52)3.1横向框架梁内力组合 (52)3.2框架梁弯矩调幅 (52)3.3框架梁内力组合 (63)3.4框架柱内力组合 (68)4 梁柱截面设计及配筋计算 (73)4.1设计信息 (73)4.2正截面承载力计算 (73)4.3梁斜截面承载力计算 (77)4.4柱的配筋计算 (80)4.5框架柱正截面承载力计算 (81)4.6柱斜截面受剪计算 (86)5 其他构件设计 (87)5.1板的配筋计算 (87)5. 1.1板区划分 (87)5.1.2 板配筋计算 (88)5.2楼梯设计 (91)5.2.1楼梯设计资料 (91)5.2.2楼梯梯段斜板设计 (92)5. 2.3平台板设计 (94)5.2.4平台梁设计 (95)5.3基础设计 (96)5.3.1设计说明 (97)5.3.2荷载计算 (97)5.3.3地基承载力设计值的确定 (97)5. 3.4边柱独立基础设计 (97)5. 3.5中柱联合基础设计 (101)6 PKPM电算结果 (105)参考文献 (117)致谢 .......................................................................................................... 错误!未定义书签。
办公楼设计规范五层及五层以上办公建筑应设电梯。
4.1.4 电梯数量应满足使用要求,按办公建筑面积每5000m2至少设置1台。
超高层办公建筑的乘客电梯应分层分区停靠。
1 门洞口宽度不应小于,高度不应小于;4.1.9 办公建筑的走道应符合下列要求:1 宽度应满足防火疏散要求,最小净宽应符合表4.1.9的规定:表4.1.9 走道最小净宽注:高层内筒结构的回廊式走道净宽最小值同单面布房走道。
2 高差不足两级踏步时,不应设置台阶,应设坡道,其坡度不宜大于1:8。
根据办公建筑分类,办公室的净高应满足:一类办公建筑不应低于;二类办公建筑不应低于;三类办公建筑不应低于。
办公建筑的走道净高不应低于,贮藏间净高不应低于。
5.0.2 办公建筑的开放式、半开放式办公室,其室内任何一点至最近的安全出口的直线距离不应超过30m。
详细说明“办公用房建筑总使用面积系数,多层建筑不应低于60%,高层建筑不应低于57%”。
公寓式办公楼、酒店式办公楼除参照本规范执行外,还需执行住宅设计规范和旅馆建筑设计规范的相关条文。
办公楼设计规范:8 普通办公室每人使用面积不应小于4m2,单间办公室净面积不应小于1Om22 设计绘图室,每人使用面积不应小于6m2;研究工作室每人使用面积不应小于5m2 一般根据使用要求进行布置后计算人数。
建筑防火低规:学校、商店、办公楼、候车(船)室、民航候机厅、展览厅、歌舞娱乐放映游艺场所等民用建筑中的疏散走道、安全出口、疏散楼梯以及房间疏散门的各自总宽度,应按下列规定经计算确定:1 每层疏散走道、安全出口、疏散楼梯以及房间疏散门的每100 人净宽度不应小于表的规定;当每层人数不等时,疏散楼梯的总宽度可分层计算,地上建筑中下层楼梯的总宽度应按其上层人数最多一层的人数计算;地下建筑中上层楼梯的总宽度应按其下层人数最多一层的人数计算;2 当人员密集的厅、室以及歌舞娱乐放映游艺场所设置在地下或半地下时,其疏散走道、安全出口、疏散楼梯以及房间疏散门的各自总宽度,应按其通过人数每100 人不小于1m 计算确定;3 首层外门的总宽度应按该层或该层以上人数最多的一层人数计算确定,不供楼上人员疏散的外门,可按本层人数计算确定;建筑防火高规:高层建筑内走道的净宽,应按通过人数每100人不小于1.00m计算;高层建筑首层疏散外门的总宽度,应按人数最多的一层每100人不小于1.00m计算。
1.工程简况本工程为陕西省石油化工局办公楼(兼单身职工宿舍),位于西安市雁塔路。
该建筑物为五层局部六层的楼房,最高处22.45 米,平面为“L”型,附楼带半地下室,总建筑面积6121m2。
承重结构除门厅部分为现浇钢筋混凝土框架外,其余均为砖混结构,实体砖墙承重预制钢筋混凝土空心板,大梁及楼梯均为现浇钢筋混凝土结构。
为满足抗震要求,每个楼层设置圈梁一道,在外墙设置圈梁一道,在外墙内每隔十米左右设置有钢筋混凝土抗震构造柱。
室内地面均采用水磨石地面。
室内抹灰为石灰砂浆打底,纸筋灰罩面并喷白。
室外装修均采用干粘石。
屋面采用炉渣保温层,二道防水;3mm 厚SBS 改性沥青防水卷材一道,2mm 厚聚氨酯防水涂抹一道,散水为无筋混凝土一次抹光。
设备安装及水、暖、电工程配合土建施工。
2.地址及环境条件根据勘测报告土壤为1 级大孔性黄土,天然地基承载力为15T/m2,地下水位在地表下6-7m,地表耕土层厚为0.5m。
建筑场地南侧及北侧均有已建成建筑物,西侧为菜地,以砖墙为界。
东侧为雁塔路,距道沿3m 内的人行道不得占用,沿街树木不得损坏。
人行道一侧上面尚有高压输电线及电话线通过。
3.气象条件施工期间在夏、秋二季。
主导风向:偏东。
雨季为9、10 两个月。
工程施工期间不遇冬季。
4.施工工期要求本工程基础工程(前期±0.00 以下,附楼地下室-2.350以下)已完工。
要求4 月1 日开工,10 月30 日竣工。
限定总工期为7 个月。
5.施工技术经济条件施工任务由西安市某建筑公司承担,该公司针对本工程组建项目经理部,由其下属的施工队副则具体的施工任务.该队有瓦工20 人,木工16 人,钢筋工12 人,混凝土工6 人,以及其他辅助工种工人(如油漆工、玻璃工、柏油工、机工、电工及普工等)共计140 人,根据施工需要有部分民工协助工作(如混凝土可配20-30 名民工)。
装修阶段可以从其他施工队调入抹灰工,但抹灰工不超过40 人。
某单位多层砖混结构办公楼工程施工组织设计一、施工概况1、工程特征1工程概貌本工程为某公司的办公楼,位于××市郊××公路边,除门厅部分为现浇钢筋混凝土半框架外,皆采用砖混结构;总建筑面积为6262m2;要求4月1日开工,在本年12月底竣工,总工期9个月,日历工期225天,实际工期天;2建筑设计本工程为L型,南北方向长,东西方向总长为,该建筑物大部分为五层,高,局部六层,高,附楼F—L轴带地下室,在11轴线处有一道温度缝,在F轴线处有一道沉降缝;室内地面除门厅、走廊、试验室、卫生间、后楼梯、踏步为水磨石面层外,其他皆采用水泥砂浆地面;室内装修主要采用白灰砂浆,外喷106涂料,室外装饰以马赛克为主,窗间墙为干粘石,腰线、窗套为贴面砖;散水为混凝土一次抹光;3结构设计基础埋深,在C15素混凝土垫层上砌条形砖基础,基础中设钢筋混凝土地圈梁,实心砖墙承重,每层设现浇混凝土圈梁;内外墙交接处和外墙转角处设构造柱;除卫生间、洗室采用现浇板外,其余楼盖和层面均采用预制钢筋混凝土多孔板,大梁、楼梯及挑檐沟均为现浇混凝土构件;2、自然条件1地形地质施工现场已经平整;天然地基承载力为150kN/m2,地下水位在地表下4—5m,无侵蚀;2主要气象施工期间主导风向偏东,雨季为6、7月份,冬季为12月至第二年1、2月份;二、施工方案的选择1、施工程序与施工流向1施工程序与各部分工程的施工顺序本工程的分部工程划分及施工程序为:基础→主体→屋面→内装饰→外墙装饰及室外基础工程的施工顺序:挖土方→垫层→砌基础→混凝土基础→回填土主体工程的施工顺序:脚手架→扎构造柱钢筋→砌砖墙→柱、梁、板、楼梯支模→浇柱混凝土→扎梁、板、楼梯钢筋→浇梁、板、楼梯混凝土→吊装楼板含楼板灌缝→拆模屋面工程的施工顺序:找平层→隔气层→保温层→找平层→防水层→保护层内装饰工程的施工顺序:天棚、内墙抹灰→安装门窗→玻璃油漆→墙面喷白→楼地面外墙装饰及室外工程的施工顺序:外墙面装饰→台阶散水2施工段的划分与施工流向基础工程:分为3段,1—11轴线为第一段,11—22轴线为第二段,F—L轴线为第三段,由南向北流水施工;主体工程:与基础施工相应,1—5层每层分为3个施工段,地下室只有F—L轴线部分有,记为1个施工段,第6层只有11—22轴线部分有,记为一个施工段,共17个施工段,自南向北,由下而上组织流水施工,保证砌砖墙工序连续施工;屋面工程:不分段,整体一次施工;内装饰工程:自下而上,一层一段,共7段;其中地下室无需安装门窗和玻璃油漆工序,此2道工序施工段为6段;外墙装饰及室外工程:不分段,自上而下整体一次施工;2、施工方法及机具选择1基础工程①挖基槽采用两台挖掘机,两台装载机,8辆自卸汽车配合外运;待基坑开挖出一定范围后进行人工刷坡,依据现场土质和周围环境情况计划坡比,放坡系数为1:,人工刷坡与机械开挖同时进行;要求配合机械挖土的施工人员清楚挖土区域及机械前后行走范围及回转半径,严禁在机械前后行走范围及回转半径内行走及施工配合作业;②地下水处理地面排水遵循先整治后开挖的施工顺序,施工前先做好地面排水,地面排水随地形坡势沿开挖基坑外边缘设30公分高阻水带,再修200×300水渠排水,以防地表水流入坑内;坑内排水沿基坑横向中线向基坑东西方向挖四个积水坑,用水泵抽水;第四章土方回填回填工艺4.1.1土方回填应分层进行,每层厚度不超过250mm,并逐层夯实;回填的填料种类、密实度要求、虚铺厚度和压实遍数等应符合设计要求;施工前,应做好水平标志,以控制回填的高度或厚度;严格控制材料容重、含水率等指标;4.1.2 回填时加强对天气的监测,了解当天的天气预报,做到雨天停止室外回填施工,并采取相应措施对受潮回填土层进行处理;回填土质回填前需找好土源,对淤泥、腐殖土、耕植土和有机含量大于8%的土,不得作为回填土,回填前检验回填土的含水率是否最优检验方法为:用手将灰紧捏成团,两指轻捏即碎;若含水率偏高,可采用翻松、晾晒或均匀掺入干土等措施;若含水率偏低,采用预先洒水润湿等措施;抄好标高,严格控制回填土厚度、标高和平整度;回填夯实4.2.1 人力打夯前将填土初步整平,打夯按一定方向进行,一夯压半夯,夯夯相接,行行相连,两遍纵横交叉,分层夯打;4.2.2 夯实基槽及地平时,夯实路线由四边开始,然后再夯向中间;夯实机具采用HC-70立式打夯机,夯击次数为140~150次/min,夯实起落高度为145mm,生产率为h;4.2.4 填土厚度为250mm,打夯之间对填土进行初步平整,打夯机依次夯打,均匀分布,不留间隙;4.2.4 打夯应一夯压半夯,夯夯相连,行行相连,纵横交叉;③砖基础砂浆配合比应采用重量比,并由试验室确定,水泥计量精度为±2%,砂,掺合料为±5%;宜用机械搅拌,投料顺序为砂→水泥→掺合料→水,搅拌时间不少于;砂浆应随拌随用,一般水泥砂浆和水泥混合砂浆须在拌成后3h和4h内使用完,不允许使用过夜砂浆;组砌方法应正确,一般采用满丁满条;里外咬槎,上下层错缝,采用“三一”砌砖法即一铲灰,一块砖,一挤揉,严禁用水冲砂浆灌缝的方法;基础大放脚的撂底尺寸及收退方法必须符合设计图纸规定,如一层一退,里外均应砌丁砖;如二层一退,第一层为条砖,第二层砌丁砖;大放脚的转角处,应按规定放七分头,其数量为一砖半厚墙放三块,二砖墙放四块,以此类推;砖基础砌筑前,基础垫层表面应清扫干净,洒水湿润;先盘墙角,每次盘角高度不应超过五层砖,随盘随靠平、吊直;砌基础墙应挂线,24墙反手挂线,37以上墙应双面挂线;基础标高不一致或有局部加深部位,应从最低处往上砌筑,应经常拉线检查,以保持砌体通顺、平直,防止砌成“螺丝”墙;基础大放脚砌至基础上部时,要拉线检查轴线及边线,保证基础墙身位置正确;同时还要对照皮数杆的砖层及标高,如有偏差时,应在水平灰缝中逐渐调整,使墙的层数与皮数杆一致;各种预留洞、埋件、拉结筋按设计要求留置,避免后剔凿,影响砌体质量;变形缝的墙角应按直角要求砌筑,先砌的墙要把舌头灰刮尽;后砌的墙可采用缩口灰,掉入缝内的杂物随时清理;安装管沟和洞口过梁其型号、标高必须正确,底灰饱满;如坐灰超过20mm厚,用细石混凝土铺垫,两端搭墙长度应一致;2钢筋混凝土工程①模板工程A、柱模板安装柱模板采用定型组合木模;按照轴线,按柱设计的位置,安装组合模板,就位后先用铁丝与主筋连接临时固定,按照墙体马牙槎的预留位置,在两侧粘贴一层海绵条,使模板与墙体接缝严密,以保证混凝土浇筑时不漏浆;柱模板安装完后,要检查并纠正位移和垂直度,再由下而上安装柱箍;B、圈梁、梁模板安装圈梁、梁模板采用木模;安装梁模板前先安装钢管支柱,应采用双排支柱,间距为600—1000mm,支柱间设置斜撑和水平拉杆,以保证稳定性;按设计标高调整支柱标高,铺梁底木模板,并拉线找直找平;对于梁长超过4m的应按梁跨的1‰—3‰进行起拱;绑扎圈梁、梁钢筋时,校正位置和保护层,经检查合格后,清除垃圾杂物即可安装两侧模板;侧模安装完成后、拉通线校正侧模,并用Ф48钢管加固;C、顶板模安装顶板模板采用木质胶合板,支撑体系采用木支柱,支柱要垂直,并适当拉接,以确保支柱稳定,支柱间距应控制在800—1200mm范围内;支柱及连接杆搭设完毕后,再铺设木方,木方间距为20—25cm,加固牢靠,拉通线找平,模板要从一个方向铺设,尽量用大块模板,减少拼缝,不足处用小块补齐,拼缝要严密,与节点间连接的四周梁侧模要顶紧,楼面模板铺设完毕后,应用水准仪测量模板标高进行校正,同时检查支柱是否牢靠,同时在柱筋上标注混凝土板厚度控制线,便于控制混凝土厚度,标高校正完后,在支柱之间加设水平拉杆及斜撑,一般离地面20—30cm处设一道,然后向上每左右一道,并将楼面清扫干净.注意水电空调孔道预留;D、模板拆除模板的拆除必须待混凝土达到要求的脱模强度;圈梁、柱模板应在混凝土强度能保证其表面及棱角不因拆模而损坏时,方可拆除;现浇板、梁等模板待混凝土达到设计强度时,方可拆除;一般拆模顺序:先支的后拆,后支的先拆;先拆非承重部位;后拆承重部位;有梁板顶盖先拆柱,再拆顶板底模、梁侧模板,最后拆梁底模板;拆下的模板要及时清理粘结物,修理并涂隔离剂,分类整齐堆放备用,拆下的连接件及配件应及时收集,集中统一管理;E、成品保护及施工注意事项模板安装和拆除应轻起轻放,避免碰撞柱、墙、梁等,以防止模板变形和损坏构件;安装模板应自下而上进行,每块模板要求位置正确,表面平整,连接件上紧,拼缝严密,支撑体系牢固;②钢筋工程A、柱钢筋绑扎绑扎时,按设计要求的箍筋间距和数量,先将箍筋按弯钩错开套在下层伸出的搭接筋上,再立起柱子筋,在搭接长度内将搭接钢筋绑好,绑扣向里,便于箍筋向上移动;在立好的柱主筋上用粉笔标出箍筋间距,然后将套好的箍筋向上移动,由上往下用铅丝绑扎;箍筋应与主筋垂直,箍筋转角与主筋交叉点均要绑扎,主筋与箍筋非转角部分的相交点成梅花绑扎,以防骨架歪斜;柱子钢筋保护层用水泥砂浆垫块绑在柱立筋外皮上,间距为1000mm,以确保主筋保护层正确;砌完墙后,应对柱钢筋进行修整,以确保钢筋位置及间距正确,然后即可支模浇筑;B、梁钢筋绑扎绑扎顺序:在主筋上划出箍筋间距,将梁主筋穿好箍筋并分开,首先固定主筋,然后将主筋和箍筋绑扎牢固;梁主筋与箍筋应垂直,箍筋的接头应交错设置,箍筋转角与纵向钢筋的交叉点均应扎牢;主次梁钢筋相遇时,次梁的纵向受力筋应放在主梁的纵向受力筋上;梁钢筋保护层用水泥砂浆垫块控制,绑在梁外层钢筋上;C、板钢筋绑扎绑扎前应先将模板上垃圾杂物清扫干净,用粉笔在模板上划好主筋、分布筋的间距,先排放受力筋,后放分布筋,预埋件、电缆管、预留孔等同时配合安装并固定,与圈梁、梁交叉处,板的钢筋应锚固在梁内;D、楼梯钢筋绑扎楼梯支模首先在墙上弹线放好大样,先支底板;在支好的楼梯底模上,弹上主筋和分布筋的位置线;先绑主筋后绑分布筋,每个交点均要绑扎;板筋应按要求锚固到楼梯梁内;根据板厚确定踏步高度;E、钢筋保护及施工注意事项加工成型的钢筋或骨架运至现场,应分别按结构部位、钢筋编号和规格等整齐堆放,保持钢筋表面清洁,防止被油渍、泥土污染或压弯变形;贮存期不宜过久,以免钢筋重遭锈蚀;安装电线管、暖卫线管或其它管线埋设物时,应避免任意切断和碰动钢筋;保护层砂浆垫块厚度应准确,垫块间距应适宜,以防因垫块厚薄和间距不一,而导致顶板出现裂缝,梁底、柱侧露筋;板钢筋绑扎以后,应禁止人在钢筋上行走;在混凝土浇筑前应检验合格后再浇筑混凝土,以免将板的负筋压到下面,而影响板的承载力;③混凝土工程A、施工工艺及要点混凝土搅拌前,搅拌机应先加水空转湿润后再行加料搅拌,开始搅拌第一罐混凝土时,应按配合比减一半石子,以后各罐均按规定下料;投料顺序是:先加石子、再倒水泥、后倒砂子、最后加水,外加剂应和水泥一并倒入;搅拌混凝土应使砂、石、水泥、外加剂完全拌合均匀,颜色一致为止,搅拌时间应不少于分钟;B、构造柱混凝土浇筑先浇灌5cm厚与混凝土配合比相同的减半石子混凝土;混凝土应分层浇灌,每层浇灌厚度不得超过50cm,先将振动棒插入柱底部,使其振动,再灌入混凝土,边下料边振动,直到顶部,并用木抹子将顶部压实压平;C、梁、板混凝土浇筑浇筑混凝土梁、板应同时进行,浇筑时应顺次梁方向;先主梁的混凝土分层浇筑,用“赶浆法”由梁一端向另一端做成阶梯形向前推进,当起始点的混凝土达到底板位置时,再与板混凝土一起浇筑,随着阶梯的不断延伸,梁、板混凝土连续同时前推直至完成;浇筑与振捣应紧密配合,每一层下料宜慢,梁底充分振实后再下二层料;用赶浆法保持水泥浆沿梁底包裹石子和推进,每层应先振实后再装下层料,梁底与梁侧部位要充分振实,并避免碰动钢筋;柱梁交叉处,一般钢筋较密集,浇筑混凝土时宜用Ф30振动捧从梁的上部钢筋较稀处插入梁端振捣,必要时,可辅以同强度等级的细石混凝土浇筑,并用人工配合振捣,并可从梁端下料向柱内进料然后振实;浇筑楼板及顶板时,虚铺厚度应略大于板厚,用平板式振动器垂直浇筑方向来回振捣D、楼梯混凝土浇筑浇筑时从楼梯段下部向上浇筑,先振实底板混凝土,至达到踏步位置时,再与踏步混凝土一起浇筑,不断连续向上推进,并随时用木抹子将踏步上平面压实抹平;浇筑混凝土时应经常观察模板、钢筋、预留孔洞、预埋铁件和插筋等有无移动、变形或堵塞情况,发现问题应立即停止浇筑,并在已浇筑混凝土凝结前修理好;混凝土浇筑完后,应在12小时以内适当覆盖浇水养护,正常气温每天浇水不少于两次,并不少于7天;三、施工机械选择地基基础施工阶段,即在拟建房屋西侧安装一台QT1-6塔吊;主体结构施工所需砖、混凝土、构件和周转材料的水平、垂直运输主要由此塔吊承担;同时在办公楼北端和后楼西端设置一座扣管式井架,以弥补塔吊所安装不到的位置和缓解塔吊吊次,并作为垂直运输砂浆的主要工具;主体结构施工完毕后,拆除塔吊,另在办公楼南端增设一座扣管式井架共同承担装修阶段的垂直运输;水平运输可用双轮手推车;QT1-6塔吊起重量为2~6t,起重半径8~20cm,最大起重高度40m,起重力矩400kN·m;井架每个4m×2m,卷扬机棚每个×,且距离井架不小于10m;经验算,垂直运输能力满足需要;四、质量安全措施及降低成本措施1、质量措施1施工前认真做好图纸会审和技术交底工作,正确贯彻按图施工原则;将图纸错漏、交接部分的矛盾、设计不合理及材料代用等解决在施工前;严格控制设计变更和材料代用,凡工程变更及材料代用一律有设计院发正式变更通告单及材料代用证明书;主要技术问题及主要分项工程施工前,应有现场工程负责人组织交底,并有记录;2加强对原材料、半成品、构件的质量检测和管理工作,不合格的材料、半成品和构件不准进场;做到材料配比准确,每班校验一次混凝土塌落度,混凝土、砂浆试块分房屋层次和时间按要求留足;加强石灰的淋制、熟化工作,提前2~3个月化好抹灰用石灰膏,以免墙面抹灰起泡、开裂;回填土必须分层虚铺25m一层3严格执行各项质量检查制度;在施工组自检、互检、交接检的基础上,分层分段进行验收评定,及时办理隐蔽工程验收手续和结构工程质量验收手续,各分部门分项工程均应严格执行“施工及验收规范”;4施工中要做好已完项目的保护工作;楼梯踏步及时做好保护套,凡过双轮手推车的门口,均应在门框上车轴高度钉150mm宽的铁皮;室内装饰逐间完成后要封门,禁止入内;5施工的收尾阶段,应逐层逐间检查,发现问题及时返修,彻底搞好一间或一层后,应立即清扫上锁;2、安全措施1交生产任务的同时一定要做好安全交底;各工种操作人员应严格按本工种安全操作规程进行施工;尤其新工人进入施工现场前,一定要进行现场安全教育;2搞好“三宝”和“四口”防护措施;进入现场的工作人员一律戴安全帽;建筑物外墙四周要挂设安全网,安全网张挂在脚手架上,随层升高;高空作业要系好安全带;出入口架设防护棚,楼梯口架设防护栏杆,楼梯井架设立网;3经常检查各种机电设备和防护设施的完好情况,严禁非司机操作机械设备;各种电动机械设备,必须有可靠有效的安全接地和防雷装置;非从事专业电气和机械的人员严禁使用或玩弄机电设备及装置;4现场要加强消防安全工作;现场不得随意生明火,明火作业必须有专人看管;3、降低成本措施1按照施工进度计划和施工平面图进料、堆料,减少二次搬运;砂石、砖等实行量方、点数收料,清底使用;水泥实行限额、凭票领用,按项结算,水泥袋按数回收;各工种都要做到工完场清,不另支付清理用工;2砌筑砂浆掺水泥重量2%木质黄酸钙及10%粉煤灰,节约白灰、水泥;混凝土掺减水剂,节约水泥;3广泛使用钢模板、钢夹具、钢管顶撑等工具摸板,节约木料,提高摸板周转率;4回收落地灰,过筛后重新搅拌使用;5搅拌站所用热水由公司院内锅炉房引入,节约占地面积和锅炉费用;4、雨季施工管理措施为加强建设工程冬季施工技术管理,确保工程质量,提高经济效益,根据该工程冬季施工项目,特制定技术管理措施:该工程地质条件较为复杂,为保证建筑物的正常使用,根据该工程的特点和工程要求,因地制宜,采取综合措施,做到技术先进、经济合理,特制定以下措施:1严格执行国家有关标准、建筑施工规范;2及时了解现场情况,以及地下墓、坑、管道等情况,采取针对措施和加快清理工作,确保基础工程按期施工;3在进行基础工程过程中,为了确保工程正常进行,采取有效措施防止雨水浸泡基础;现场布置的临建给水管道,埋地暗敷,所有给水管道、蓄水箱、排污水沟等远离建筑物;给水管道埋置前,先进行水压试验,当确定不漏水时方可使用;4主要施工机械设置防雨蓬,确保机器正常运转,雨天不影响正常施工;5混凝土浇筑时,设置宽幅面防水塑料雨布,雨天边浇筑、边覆盖;逢雨季时,穿插室内作业,工期不受影响;6为防止雨季施工期间,场地内必须排水畅通无阻,电气设备必须有防雨、防雷、避雷措施;机座要保持一定的高度,配电箱、电机、电焊机等要有防雨罩,各类施工机械设备,应在雨季之前普查一遍,做到安全可靠;5、冬季施工管理措施明确责任,做好冬季施工技术交底,确保每个工序按规定、规范、技术措施组织施工,要认真做好冬季施工记录,整理好施工技术档案;入冬前,要对现场的技术员、工长、施工员、材料员、试验员及主要工种的班组长、测温员、司炉工、电焊工、外加剂掺配和高空作业人员进行技术培训,掌握有关冬季施工方案、施工方法、质量标准,掌握必须的技术工作和操作要点;在冬季施工过程中,对于防冻剂掺量,原材料和加热、混凝土养护和测温、试块制作的养护及保温、加热设施的管理等各项冬季施工措施,都要设置专人负责,及时做好记录,并由工程主要技术负责人和质量检查人员抽查,随时掌握质量状况,发现问题及时纠正,切实保证工程质量;在冬季施工期间,必须指定专人掌握气温变化情况,及时传达气象信息,并随时做好气象记录,并有针对气温骤然降的技术措施和物资准备;五、施工进度计划1、计算表1基础工程1—11轴线段面积为 m2,11—22轴线段面积为 m2,F—L轴线段面积为 m2,因此各段工程量比值如下:1—11轴线段占%,11—22轴线段占%,F—L轴线段占%;基础工程的工程量计算如下表垫层与砖基础之间需留1天的技术间歇:2主体工程3屋面工程屋面工程的工程量计算如下表:4内装饰工程内装饰工程的工程量计算如下表:5外墙面装饰及室外工程外墙面装饰及室外工程的工程量计算如下表:2、一层主体工程双代号网络图其中A:扎构造柱钢筋、B:砌砖墙、C:柱、梁、板、楼梯支模、D:浇柱混凝土、E:扎梁、板、楼梯钢筋、F:浇梁、板、楼梯混凝土、G:吊装楼板含楼板灌缝、H:拆模;关键线路为:错误!→错误!→错误!→错误!→错误!→错误!→错误!→错误!→错误!→错误!→错误!→错误!→错误!;六、施工平面图布置1搅拌站的布置施工高峰时,一天最大需混凝土67m3,砂浆;一台 m3的混凝土搅拌机台班产量为30~45m3,需2台;一台的砂浆搅拌机台班产量为10~17m3,需2台;每台搅拌机10~20m2作业棚,可取每台15m2,即需60m2的作业棚;2钢筋棚及堆场每个钢筋工需作业棚3m2,堆场为作业棚面积的3倍,高峰时钢筋工人数按14人计算;因此钢筋棚及堆场需168m2;3木工棚堆场每个木工需作业棚2m2,堆场为其建筑面积的3倍,高峰时木工人数18人计算,另加一台圆锯和一台刨床所需建筑面积60 m2;因此木工棚堆场需204m2;4其他工人作业及工具棚瓦工20人、混凝土工40人和抹灰工70人按每个 m2建筑面积计算;因此其他工人作业及工具棚需65m2;5红砖堆场本工程所需标准红砖总量为1478千块,按储备量为总量的三分之一计算,按每平米场地储存千块计算;因此红砖堆场需985m2;另在生石灰堆场旁边设置2个淋灰池;每个4m×5m;6砂堆场本工程所需砂为2113m3,储备量去总数的25%,每平方米储存砂;因此砂堆场需440m2;7砾石堆场总量为1527m3,储备量为总量的25%,每平方米储存 m3;因此砾石堆场需318m2;8水泥库总量为777t,储备量为20%,按每平方米存水泥计算;因此水泥库需111m2;9白水泥库总量为,储备量按100%,按每平方米存1t白水泥计算;因此白水泥库需;10木门窗堆棚木门窗总面积为2147m2,按储备量100%,每平方米场地堆放20 m2门窗计算;因此木门窗堆棚需107m2;11脚手杆脚手板堆场其堆场取100m2,脚手杆长6m及2m,板规格为50×300×4000mm,场地布置应考虑使其能放下;12预制楼板堆场预制楼板总量为2778块、分五次进场,每次平均为556块,每块预制楼板面积为4× m2,按叠放五层计算;因此预制楼板堆场需222m2;13沥青堆场及沥青锅面积取30m2;14其他仓库在现场需设置存放五金、电器、油漆、玻璃、卷材等其它材料的材料库,约60m2;另在现场需搭建一座工具库,面积为30m2;15办公室按10名管理干部考虑,则办公室面积为:3m2/人×10=30m2;设置在已建房屋内;16休息室取最高峰的平均职工人数计算,共需2752工日,除以30天,平均人数为91人,按每人0.15m2的指标计算,则休息室面积为:0.15m2/人×91人≈14m2;设置在已建房屋内;17茶炉及简单灶房总面积取30m2;18食堂取最高峰的平均职工人数计算,共需2752工日,除以30天,平均人数为91人,按每人0.9m2的指标计算,则食堂面积为:0.9m2/人×91人≈82m2;19厕所面积取10m2;设置在已建房屋内;。
某公司办公楼建筑结构设计【开题报告+文献综述+毕业论文】本科毕业论文开题报告土木工程某公司办公楼建筑结构设计一、本课题国内外研究动态,选题的依据和意义(一)国内研究动态1 建筑设计方面:( 1 ) 总平面布�Z 应合理布局、功能分区明确、节约用地、交通组织顺畅,并应满足当地行政主管部门的有关规定和指标。
( 2 ) 根据使用要求、用地条件、结构选型等情况按建筑模数选择开间和进深,合理确定建筑平面,提高使用面积系数,并宜留有发展余地。
( 3 ) 进行局部设计,如地下室墙身、楼地面、顶棚、屋面、楼面、坡面及楼梯位�Z ,消防要求等进行设计。
各部分都要按照规范要求进行设计。
2 在结构设计方面:( 1 ) 框架结构在竖向荷载作用和水平向荷载作用下内力计算分别采用弯矩分配法和 D 值法。
( 2 ) 框架在各种荷载作用下的内力确定后,必须找出各构件的控制截面及其最不利内力组合。
荷载组合有可变荷载效应控制的组合和永久荷载效应控制的组合。
( 3 ) 主梁按弹性理论计算,次梁和板考虑塑性内力重分布方法计算 3 进行“ 三水准、两阶段” 设计方法进行抗震设计:( 1 ) “ 强柱弱梁” 的设计由于框架柱受轴向压力作用,其延性通常比梁的延性小,一旦框架柱先于框架梁出现塑性铰,就会产生较大的层间位移,甚至形成同层各柱上下端同时出现塑性铰的“ 柱铰结构” ,从而危及结构承受垂直荷载的能力,因此当发生地震作用时应先使梁先破坏。
( 2 ) “ 强剪弱弯” 的设计强剪弱弯是保证构件延性,防止脆性破坏的重要原则,它要求人为加大各承重构件相对于其抗弯能力的抗剪承载力,使这些部位在结构经历罕遇地震的过程中以足够的保证率不出现脆性剪切失效。
对于混凝土框架结构梁应注意抗剪验算和构造,使其满足相关规范要求。
( 3 ) 做好“ 强节点弱构件” 的设计,当建筑许可时,尽可能将柱的截面尺寸做得大些,使柱的线刚度与梁的线刚度的比值尽可能大于 1 ,并控制柱的轴压比满足规范要求,以增加延性。
多层混凝土框架结构设计任务书一、工程概况建设地点:南方某学院工程名称:行政办公楼该行政办公楼为5层板式建筑,钢筋混凝土框架结构体系,建筑面积约为4400平方米。
建筑物平面为一字形,总宽度20米,总长度50米。
建筑方案确定:房屋横向的中部设为走廊,宽(定位轴线间距)为3.6米,走廊两侧房间的进深(定位轴线间距)均为7.5米,开间(定位轴线间距)均为3.6米;各层层高为3.3米,室内外高差0.45米。
梁柱现浇,屋面板、楼面板选用预应力混凝土空心标准板。
二、设计资料气候条件:年均降雨量1640mm,最高气温+39,最低气温0,基本风压值0.4,基本雪压值0.35。
地质条件:自然地表以下0.42m内为填土,填土下一层为1m厚砂质粘土,再下一层为砾石层。
砂质粘土承载力特征值为230,砾石层承载力特征值为300。
地下水位在地表下4.7m处,地下水对混凝土无侵蚀性。
建筑场地为B类粗糙地面。
抗震设防烈度:6度。
建筑材料:墙体材料可选用空心砌块或粘土空心砖,混凝土强度等级为C30,纵筋为HRB335,箍筋为HPB300。
屋面面层做法:采用合成高分子涂膜防水屋面,三级防水,上人,无保温层,具体为,40厚370370地砖,缝宽5~8,1:1水泥砂浆填缝,20厚1:2:9水泥石灰砂浆,1层350号石油沥青油毡,2厚聚氨酯防水涂料,刷基层处理剂一遍,20厚1:2.5水泥砂浆找平层,屋面面层总厚度最小值为83mm,自重1.92,屋面找坡3%。
楼面面层做法:采用水磨石楼面,具体为,12厚1:2水泥石子磨光,一素水泥浆结合层,18厚1:3水泥砂浆找平层,再来一素水泥浆结合层,楼面面层总厚度30mm,自重0.65。
三、设计内容及要求确定梁柱截面尺寸及一榀横向框架的计算简图,荷载分析计算,横向框架侧移验算,框架分别在竖向及水平荷载作用下的内力计算、内力组合及截面设计,柱下独立基础设计。
撰写设计计算说明书,绘制该横向框架的模板配筋施工图(梁柱纵剖面参考比例1:40~50;梁柱横剖面参考比例1:20~25)。
h学号_ **********毕业论文(设计)课题华源开发公司多层商业办公楼框架结构设计学生姓名陈鹏系别土木建筑系专业班级土木工程专业07级本科一班指导教师刘鹏飞2011年4月华源开发公司多层商业办公楼框架结构设计摘要本设计为华源公司开发的多层商业办公楼结构设计,采用框架结构,建筑层数为五层。
本地区抗震设防烈度为7度,场地类别为二类场地,基本风压为2kN,基本雪压为.0m/402kN。
楼﹑屋盖均采用现浇钢筋混凝土结构。
.0m/35本设计贯彻“实用、安全、经济、美观”的设计原则。
按照建筑设计规范,认真考虑了影响设计的各项因素。
本设计选取了结构方案中的中间横向框架进行设计。
先进行了层间荷载代表值的计算,接着利用顶点位移法求出自震周期,进而按底部剪力法计算水平地震荷载作用下大小,同时计算出结构在风荷载作用下的荷载大小,进而求出在水平荷载作用下的结构内力(弯矩、剪力、轴力)。
接着计算竖向荷载(恒载及活荷载)作用下的结构内力。
找出最不利的一组或几组内力组合。
选取最安全的结果计算配筋并绘图。
此外还进行了结构方案中的室内楼梯的设计,完成了平台板,梯段板,平台梁等构件的内力和配筋计算及施工图绘制。
对楼板也进行了配筋计算,采用是的是双向板。
基础采用了柱下独立基础,对基础行了受力和配筋计算。
整个设计过程中,严格遵循相关的专业规范,参考相关资料和有关最新的国家标准图集,对设计的各个环节进行综合全面科学的考虑。
总之,实用、安全、经济、美观是本设计的原则。
设计计算整个过程中综合考虑了抗震要求、技术经济指标和施工工业化的要求。
关键词:框架结构;抗震设计;荷载计算;内力计算;计算配筋AbstractThis design for huayuan worldbest company developed the multi-layered commercial office building structural design, uses frame structure, construction layer for five layers. This region seismic fortification intensity of 7 degrees, site categories for type venues, basic wind pressure is for 2/40.0m kN , basic snow 2/35.0m kN . Floor, roof adopts cast-in-situ reinforced concrete structure.This design implementation "the practical, safe, economic, beautiful" design principle. According to the architectural design standard, carefully consider the various factors affecting design.This design chose the transverse frame structure scheme design among. The first between layers of load calculation, then represent value for using vertex displacement method, and then from the earthquake cycle by bottom shear method to calculate the size of horizontal seismic load, and calculate the structure in the wind load, and then find out load size under horizontal loads of structural internal force (moment, shear force and axial force). Then calculating vertical load (constant load and live load) under the action of structural internal force. Find out the most unfavorable one group or several groups of internal force combination. Select the security reinforcement and the results calculated animation In addition to the structure scheme design of indoor stair, completing the flat bedplate, ladder section board, platform beam of internal force and the component such as reinforcement calculation and construction drawing. Also on floor reinforcement calculation, using yes is two-way board. Foundation adopted under column independent basis, the base line stress and reinforcement calculation.The whole design process, strictly abide by relevant professional regulation, reference related materials and related the latest national standard atlas of design of each link, comprehensive comprehensive scientific consideration. Anyhow, practical, safe, economic, beautiful is the design principles. Design calculation the whole process took into consideration the seismic requirements, technical and economic indexes and construction industrialized requirements.Keywords: Frame structure; Seismic design; The load calculation; Internal force calculation; Calculation of reinforcement目录第一章建筑设计说明.................................................................................................................................... - 1 -1.1平面设计 (1)1.1.1 使用部分平面设计 .............................................................................................................................. - 2 -1.1.2 交通联系部分设计 .............................................................................................................................. - 2 -1.1.3 平面组合设计 ...................................................................................................................................... - 2 -1.2剖面设计 (2)1.3立面设计 (3)1.4楼板层和地面 (3)1.5基础和地基 (4)1.6交通联系部分的设计 (4)1.6.1 楼梯设计 .............................................................................................................................................. - 4 -1.6.2 门厅的设计 .......................................................................................................................................... - 5 -1.6.3 室外台阶 .............................................................................................................................................. - 5 -1.6.4 门和窗的设计 ...................................................................................................................................... - 5 -1.7其它设计 (6)1.7.1 散水设计 .............................................................................................................................................. - 6 -1.7.2 勒脚的设计 .......................................................................................................................................... - 6 -1.7.3 女儿墙设计 .......................................................................................................................................... - 6 -第二章结构设计说明.................................................................................................................................... - 7 -2.1材料要求 (7)2.2填充墙要求 (7)2.3截面尺寸要求 (7)2.4结构布置要求 (7)2.5计算过程 (8)2.5.1 计算简图 .............................................................................................................................................. - 8 -2.5.2 在竖向荷载作用下的近似计算 .......................................................................................................... - 9 -2.5.3 地震作用计算 ...................................................................................................................................... - 9 -2.5.4 框架的内力组合 .................................................................................................................................. - 9 -2.5.5 正截面和斜截面的设计 .................................................................................................................... - 10 -第三章结构计算书 ..................................................................................................................................... - 11 -3.1工程概况 . (11)3.2设计原始资料 (11)3.2.1 建筑要求 ............................................................................................................................................ - 11 -3.2.3 建筑技术条件 .................................................................................................................................... - 11 -3.3材料选用 . (12)3.4结构选型 (12)3.5结构布置及计算简图 (12)3.5.1 选择承重方案 .................................................................................................................................... - 12 -3.5.2 梁、柱截面尺寸估算 ........................................................................................................................ - 12 -3.5.3 框架结构计算简图 ............................................................................................................................ - 13 -3.6重力荷载计算 .. (14)3.6.1 屋面及楼面的永久荷载标准值 ........................................................................................................ - 14 -3.6.2 屋面及楼面可变荷载标准值 ............................................................................................................ - 15 -3.6.3 梁、柱、墙、窗、门重力荷载计算................................................................................................. - 15 -3.7重力荷载代表值 . (15)3.7.1 第5层的③轴线框架重力荷载代表值: ....................................................................................... - 15 -3.7.2 第3~4层的③轴线框架重力荷载代表值: ................................................................................. - 16 -3.7.3 第2层的③轴线框架重力荷载代表值: ....................................................................................... - 16 -3.7.4 第1层的③轴线框架重力荷载代表值: ....................................................................................... - 16 -3.8横向框架侧移刚度计算 . (17)3.8.1 计算梁、柱的线刚度 ........................................................................................................................ - 17 -3.8.2 计算柱的侧移刚度 ............................................................................................................................ - 17 -第四章横向水平荷载作用下框架结构的内力和侧移计算......................................................................... - 19 -4.1横向水平地震作用下的框架结构的内力和侧移计算.. (19)4.1.1 横向自振周期的计算 ........................................................................................................................ - 19 -4.1.2 水平地震作用及楼层地震剪力计算................................................................................................. - 19 -4.1.3 水平地震作用下的位移验算 ............................................................................................................ - 21 -4.1.4 水平地震作用下框架内力计算 ........................................................................................................ - 22 -4.2横向风荷载作用下框架结构的内力和侧移计算. (25)4.2.1 风荷载标准值 .................................................................................................................................... - 25 -4.2.2 风荷载作用下的水平位移验算 ........................................................................................................ - 27 -4.2.3 风荷载作用下框架结构内力计算 .................................................................................................... - 28 -第五章竖向荷载作用下横向框架结构的内力计算 .................................................................................... - 32 -5.1计算单元 . (32)5.2.1 恒载计算 ............................................................................................................................................ - 33 -5.2.2 活荷载计算 ........................................................................................................................................ - 36 -5.3内力计算 . (39)5.3.1 恒载作用下的内力计算 .................................................................................................................... - 39 -5.3.2 活载、雪载作用下的内力计算 ........................................................................................................ - 44 -第六章横向框架内力组合 .......................................................................................................................... - 51 -6.1结构抗震等级 .. (51)6.2框架梁内力组合 (51)6.2.1 作用效应组合 .................................................................................................................................... - 51 -6.2.2 承载力抗震调整系数 ........................................................................................................................ - 51 -6.2.3 梁内力组合表 .................................................................................................................................... - 51 -6.2.4 计算跨间最大弯矩 ............................................................................................................................ - 54 -6.3框架柱内力组合 . (56)6.3.1 柱内力组合 ........................................................................................................................................ - 56 -6.3.2 柱端弯矩值设计值的调整 ................................................................................................................ - 61 -第七章截面设计 ......................................................................................................................................... - 63 -7.1框架梁 .. (63)7.1.1 梁的正截面受弯承载力计算 ............................................................................................................ - 63 -7.1.2 梁斜截面受剪承载力计算 ................................................................................................................ - 65 -7.2框架柱 .. (67)7.2.1 柱截面尺寸验算 ................................................................................................................................ - 67 -7.2.2 框架柱的截面设计 ............................................................................................................................ - 68 -第八章板配筋计算 ..................................................................................................................................... - 73 -8.1板的配筋 . (73)8.1.1 设计资料 ............................................................................................................................................ - 73 -8.1.2 荷载计算 ............................................................................................................................................ - 74 -8.1.3 板的计算 ............................................................................................................................................ - 74 -第九章楼梯设计 ..........................................................................................................................................- 78 -9.1建筑设计 . (78)9.2结构设计 (78)9.3梯段板设计 (79)9.3.1 斜板设计(一、二层) .................................................................................................................... - 79 -9.3.2 平台板设计 ........................................................................................................................................ - 80 -9.3.3 平台梁设计 ........................................................................................................................................ - 81 -10.1材料选用 (83)10.2荷载选用 (83)10.2.1 由基础梁传到基顶的荷载 .............................................................................................................. - 83 -10.3基础截面计算 (84)10.4地基承载力及基础冲切验算 (84)10.4.1 A柱的验算....................................................................................................................................... - 84 -10.4.2 B柱的验算 ....................................................................................................................................... - 86 -10.5基础底板计算配筋 . (87)10.5.1 A柱的配筋计算 ............................................................................................................................... - 87 -10.5.2 B柱的配筋计算 ............................................................................................................................... - 88 -结论 ............................................................................................................................................................ - 90 -参考文献 ........................................................................................................................................................ - 91 -致谢 .............................................................................................................................................................- 92 -第一章建筑设计说明这次毕业设计的课题为华源开发公司多层商业办公楼框架结构设计,本着富有时代气息的原则,来设计一座具有现代化气息的商业办公楼。
多层办公楼的建筑设计综述学生姓名:金刚杰指导教师:俞静摘要:本文以本科毕业生的角度,综合整理了关于多层办公楼的建筑设计需要准备和注意的资料,并结合本次设计内容开展综述,主要分为时代背景、前期准备、建筑设计、总结等;在做设计前,准备的资料有很多,需要我们耐心并细心的了解学习,从中熟悉并掌握相应建筑规范,打好坚实基础,做到有准备、有计划、有条理的完成任务。
关键词:建筑设计;规范1 办公楼设计发展趋势办公是人类最主要的工作活动之一。
从历史发展来看,自人类社会形成固定居民点以来,就有了原始办公楼建筑的雏形。
从原始部落居民点中央的议事建筑到奴隶社会、封建社会的衙署、会馆、商号等涌动着办公楼建筑的影子。
近代真正意义上的办公楼建筑的诞生是在西方工业革命之后,新材料、新技术、新功能产生了大量新类型的建筑。
办公建筑也许是20世纪和21世纪头20年最重要的建筑类型,正如厂房是19世纪工业时代的象征一样,办公建筑是后工业时代的象征。
而现代城市中心区的办公楼仍将向高层和超高层发展,并出现办公单元的布局形式[1]。
现代办公楼建筑通过对传统办公楼模式的革命性创新,应用生态节能等高科技,不仅创造了更加舒服的室内物理环境,而且引入空中景观中庭和社会功能,创造了更加人性化、令人愉快的工作环境,空间也变得流动和富于趣味,强调精神化的需求,是社会学意义上的进化。
未来办公楼建筑的发展趋势是明显的:为满足大量办公人员生活需要,开放型中庭和低层对外服务裙房的布局正被广泛采用。
围绕着绿色生态和节能的主题,建筑形态会更加多样化,功能构成会更加丰富,更加强调人性化和令人身心愉悦的空间环境创造。
办公楼设计时应充分考虑适应性、灵活性、高效性和人性化的设计理念,以充分展示建筑功能与建筑形象的亲和力与开放性,做到人及建筑与环境的和谐共处、永续发展,创造亲切宜人的建筑形象和舒适自然的办公环境[2]。
随着社会的发展,生态主义、智能化、人性化、个性化、现代化、功能复合化办公建筑的设计理念将是今后现代办公楼的发展趋势。
毕业设计任务书专业:土木工程专业方向:建筑工程方向题目:多层办公楼指导教师:建筑李华明(副高)结构陈敏杰(正高)夏俊华(正高)施工宋长路(副高)吉林建筑工程学院建筑装饰学院土木工程专业本科毕业设计任务书一、项目名称:多层办公楼二、项目地点:长春市三、项目简介:本项目为多层框架结构,为某单位行政办公楼,位于长春市某主要街道一侧,建筑等级2级,耐火等级不低于2级。
地段图由指导教师给定。
四、基本要求:1、办公楼设计必须满足“适用、安全、经济、美观”的基本要求。
2、平面布局要求分区明确,流线合理,互不干扰。
3、建筑造型简洁,空间完整,反映出时代特征。
4、建筑层数5-7层。
5、外文摘要完整、准确、通顺、清晰、简洁。
其中英文不少于2000个印刷符号.6、编制施工组织设计,其说明书要求内容全面、条理清晰;7、编制施工进度计划表,采用统一表格,用HB铅笔绘制;8、绘制施工平面图,可采用手绘或计算机绘图,比例1:200-1:500。
五、设计条件1、自然条件(1)地势平坦(2)主导风向:西南风(3)土壤冻结深度:-1.7m(4)地震设防烈度:7度(5)地质资料:场地土类别、地质勘察资料由指导教师给出2、设备条件上下水,电力由城市系统引入,主供热中心供热采暖3、房间组成及面积分配门厅60-100m²接待室30-45m²办公室(若干)每间15-45m²资料室30-45m²会议室(三个)100-120m²(一个),30-45m²(二个)电脑打字复印室30-45m²仓库30-45m²其它:厕所、走道、楼梯根据需要设置4、施工条件(1)施工工期由指导教师给定;(2)施工现场位置及周围环境见建筑总平面图;(3)施工现场地势高差较大(见地形图),需进行场地竖向整平;(4)本工程处于长春市市区,所有建筑材料、构配件和施工机械均可经市区道路直接运抵现场;(5)所有建筑材料、构配件均由施工单位购买,货源已经落实;(6)施工单位的劳动力、施工机械和运输工具均能满足本工程的需要;(7)施工现场应设置施工需要的搅拌站、加工棚、材料构件堆场及其他临时建筑物;(8)施工现场内不设工人宿舍,工人在工地附近生活区居住;(9)水源、电源已由建设单位引到施工现场附近,可直接引入现场。
六、设计内容(一)建筑部分1、要求完成(1)建筑方案及初步设计;(2)建筑平面、立面和剖面设计;(3)主要部位的建筑构造设计及材料作法;(4)绘制建筑施工图。
2、建筑设计成果(1)建筑设计说明书:①简述建设地点、使用功能、平面布局、建筑面积、层数、层高、建筑总高度、楼梯(交通疏散)布置。
②简述建筑设计方案的特点、立面处理、内外装饰及装饰材料的选用。
③细部节点做法,屋面防水材料的选用及做法。
文字应在1500—2000字之间。
(2)建筑施工图:其中选择一张铅笔手绘,其余用CAD绘制。
①建筑设计总说明、图纸目录、门窗表、装饰材料做法表、总平面图(1:500)②底层平面图(1:100)③标准层平面图(1:100)④剖面图(1 ~ 2 个)(1:100)⑤立面图(1 个)(1:100)⑥主楼梯详图(1:50)⑦主要节点构造详图(3 ~ 4 个)(1:20)(二)结构部分1、结构设计计算内容(1)根据已确定的建筑设计方案,按技术先进、经济合理、安全可靠、施工方便的原则选择主体结构承重体系,主体结构建议采用钢筋混凝土现浇框架结构;(2)完成标准层结构平面布置;(3)确定框架结构的计算简图,选取一个具有代表性的计算单元,确定计算模型,计算相应的参数;(4)荷载的汇集计算:包括竖向恒载、竖向活载、水平风荷载、水平地震作用计算;(5)框架内力组合:按最不利内力情况,进行内力组合;(6)梁柱的截面设计:对所确定的计算单元框架中的梁柱进行承载力计算;(7)柱下基础设计:基础形式由地质条件确定,可选用柱下钢筋混凝土独立基础或桩基础;(8)现浇板的配筋计算;(9)主楼梯配筋计算;2、结构设计成果(1)结构设计说明书:①结构方案的选择,柱网布置,结构构件尺寸的选择及材料的选用。
②计算简图的确定,结构作用(荷载)确定,结构内力分析方法。
③抗震设防烈度、抗震等级及对抗震设防的有关要求。
④地基条件、基础形式的选择及依据。
⑤设计中是否采用了新技术、新材料。
⑥对施工质量、施工技术、施工管理方面的要求。
(2)结构设计计算书一份:内容包括荷载汇集;地震作用计算;风荷载作用计算;荷载组合及内力分析;一品框架配筋计算;现浇板配筋计算;楼梯配筋计算;悬挑构件配筋计算;基础及基础梁配筋计算;薄弱层验算;其它必要的结构构件配筋计算。
(3)结构图纸:其中选择一张铅笔手绘,其余用CAD绘图。
①结构设计总说明;②基础平面布置及基础配筋图(1:100;1:30)③标准层板配筋图(1:100)④选定一榀框架梁柱配筋图(1:50;1:20)⑤选定一层梁平法配筋图(1:100)⑥选定一层柱平法配筋图(1:100;1:20)⑦主楼梯配筋图(1:50;1:30)(三)施工部分1、编写工程概况内容包括:工程概况、地点特征、施工条件、施工特点分析及本工程的主要实物量。
2、制定施工方案(1)测量放线:测量工作的总要求;工程轴线的控制;垂直度控制。
(2)土方工程:场地平整土方量计算与调配;确定土方开挖及运输方案。
(3)基础工程:独立基础的垫层、钢筋混凝土基础的施工方法和技术要点;桩基础施工设备的选择、打桩顺序、打桩方法;灌注桩的施工工艺及质量要求。
(4)主体工程:确定主体工程施工顺序;起重运输机械混凝土泵及泵车的选择;主要构件模板选型及设计,绘制模板施工图;脚手架选型及设计;钢筋混凝土框架结构施工方法。
(5)砌筑工程:砖墙、砌块墙、组合墙的组砌方法及质量要求;弹线及皮数杆的控制要求。
(6)屋面工程:确定屋面工程施工顺序、屋面各个构造层次施工方法、屋面施工材料运输方式等。
(7)装饰工程:确定装饰工程施工顺序及流水施工安排、主要装饰工程施工工艺。
(8)施工技术组织措施:保证质量措施;保证安全措施;冬雨期施工措施。
3、编制单位工程施工进度计划(1)编制施工进度计划的初始方案;(2)绘制劳动力动态曲线;(3)施工进度计划初始方案的检查和调整;(4)绘制施工进度计划表。
4、单位工程施工平面图设计(1)起重运输机械的布置:塔式起重机、井架、混凝土泵和泵车等的布置。
(2)搅拌站、加工棚、仓库及材料构件堆场的布置:计算搅拌站、加工棚、仓库、堆场的面积;合理确定搅拌站、加工棚、仓库及材料构件堆场的位置。
(3)运输道路的布置:选择路面结构及宽度;合理布置施工道路。
(4)临时设施的布置:计算确定各种临时设施的面积;合理确定其位置。
(5)临时供水供电线路的布置:选择供水干管的直径;供水线路的布置;供电线路的布置。
(6)绘制施工平面图。
七、参考资料(一)建筑部分1、《房屋建筑学》傅信祁广士奎主编第二版中国建筑工业出版社2、《房屋建筑学》张一弘金虹柴广益主编东北大学出版社3、《现行建筑设计规范大全》修订缩印本中国建筑工业出版社(1)房屋建筑制图统一标准GB/T50001-2001(2)总图制图标准(3)建筑制图标准(4)建筑设计防火规范 GBJ16-87、GB50045-95(5)民用建筑设计通则 JGJ37-87(6)中小学校建筑设计规范 GBJ99-86(7) 旅馆建筑设计规范JGJ62-904、《建筑设计资料集》(1)(2)(3)第二版中国建筑工业出版社5、参考图集(1)《室内设施》 DBJT06-46-92(2)《APP改性沥青防水卷材屋面建筑构造》DBJT201-91(3)《陶粒混凝土小型空心砌块填充墙体建筑构造》DBJT06-74097(4)《建筑工程做法》 DBJT06-35-90(5)《节能构造参考图集》 DBJT06-12-90(6)《塑钢门窗图集》 DBJT06-69-93(7)《室外设施》 DBJT06-16-85(8)《墙身》 DBJT06-13-90(9)《钙塑门窗图集》吉J94-771(二)结构部分1、《钢筋砼及砌体结构》教材中国建工出版社王振东主编2、《多高层建筑结构设计》教材3、《钢筋砼结构静力计算手册》中国建工出版社4、《钢筋砼结构构造手册》中国建筑工业出版社5、《简明建筑基础计算与设计手册》中国建筑工业出版社6、《楼梯设计手册》7、《力学与基础工程》教材8、有关结构设计规范:《钢筋砼结构设计规范》、《建筑结构荷载规范》、《建筑抗震设计规范》、《建筑地基基础设计规范》(三)施工部分1、《工程施工质量验收规范合订本》中国建筑工业出版社2、《建筑施工手册》中国建筑工业出版社3、《建筑施工》中国建筑工业出版社重庆建筑大学等编4、《土木工程施工》同济大学出版社应惠清等编著5、《建筑工程预算定额》吉林科技出版社八、毕业设计要求1、毕业设计计算书应包括统一格式的封面、中外文设计总说明、目录、正文、致谢、参考文献等,并应与毕业设计任务书、工程图纸等一同放入填写好的资料袋内上交。
2、标题应简短、明确,主标题不宜超过20字。
3、中外文设计总说明简要介绍设计任务、设计标准、主要技术资料、设计原则及设计方法、设计成果等,中文字数以800字左右为宜,并翻译成英文。
4、目录按三级标题编写(即:1……、1.1……、1.1.1……),要求标题层次清晰。
目录中的标题应与正文中的标题一致。
5、毕业设计正文包括建筑部分、结构部分、施工部分。
建筑部分主要内容包括概述、建筑体型选择与平面布置、立面设计、剖面设计、垂直交通设计、防火设计。
结构部分包括工程概况、截面尺寸估算、荷载汇集、水平荷载作用下框架内力及侧移计算、在竖向荷载作用下结构内力计算、内力组合及内力调整、梁柱截面设计板楼梯配筋设计基础设计。
施工部分包括工程概况及施工特点分析、施工方案、编制施工进度计划、施工平面图、施工技术组织措施。
6、致谢谢辞应以简短的文字对在毕业设计过程中曾直接给予帮助的人员(例如指导教师、答疑教师及其他人员)表示自己的谢意,这不仅是一种礼貌,也是对他人劳动的尊重,是治学者应有的思想作风。
7、参考文献参考文献是毕业设计不可缺少的组成部分,它反映毕业设计的取材来源、材料的广博程度和材料的可靠程度,也是作者对他人知识成果的承认和尊重。
一份完整的参考文献可向读者提供一份有价值的信息资料。
在毕业设计中必须列入主要的参考文献。
8、图纸规格一律用A1(594x841),要求图面清楚整洁,线条粗细分明,尺寸及标注齐全,符号及比例正确,构造合理,能表达设计意图,符合国家制图标准并与计算书一致。
9、毕业设计过程中应严格遵守纪律。
要求每周的规定时间必须到教室进行毕业设计并接受指导教师的指导和检查,学生有事请假按有关规定办理。