CMMI-3项目已定义过程071009-V1.0

  • 格式:xls
  • 大小:53.00 KB
  • 文档页数:6

项目名称

项目简述

选择生命周期模型

项目类型选择

裁剪规定

序号过程域文档名称

1IT2007-0015-项目进度表070929-V1.0

2IT2007-0015-项目数据管理计划和跟踪表070929-V1.0

3IT2007-0015-项目综合计划071007-v1.0

4IT2007-0015-工作日志070929-V1.0

5IT2007-0015-项目周报070929-V1.0

6IT2007-0015-里程碑评审报告070929-V1.0

7IT2007-0015-项目问题跟踪表070929-V1.0

8IT2007-0015-PERT估计记录表070929-V1.0

9IT2007-0015-法估计记录表070929-V1.0

10IT2007-0015-类比法估计记录表070929-V1.0

11IT2007-0015-工作量和成本的估计记录070929-V1.0

12IT2007-0015-项目关键依赖关系依赖记录070929-V1.0

13IT2007-0015-风险来源和分类一览表070929-V1.0

14IT2007-0015-风险管理一览表070929-V1.0

15IT2007-0015-需求跟踪矩阵-横向070929-V1.0

16IT2007-0015-需求跟踪矩阵-纵向070929-V1.0

17IT2007-0015-信息事业部需求库070929-V1.0

18IT2007-0015-软件需求规格说明书070929-V1.0

19IT2007-0015-用户需求规格说明书070929-V1.0

20IT2007-0015-概要设计说明书070929-V1.0

21IT2007-0015-数据库设计说明书070929-V1.0

22IT2007-0015-详细设计说明书070929-V1.0

23IT2007-0015-操作手册070929-V1.0

24IT2007-0015-维护手册070929-V1.0

25IT2007-0015-单元测试用例和记录070929-V1.0

26IT2007-0015-产品集成环境检查单070929-V1.0

27IT2007-0015-集成策略及接口管理表070929-V1.0

28IT2007-0015-培训手册070929-V1.0

29IT2007-0015-部培训方案070929-V1.0

30IT2007-0015-听课人员签到表070929-V1.0

31IT2007-0015-系统交付清单070929-V1.0

32IT2007-0015-项目试运行阶段问题反馈表070929-V1.0

33IT2007-0015-试运行总结报告070929-V1.0

34IT2007-0015-现场工作日志070929-V1.0

35IT2007-0015-结项总结报告070929-V1.0

36IT2007-0015-项目开发总结070929-V1.0

37IT2007-0015-目结项申请表070929-V1.0C类项目已定义过程

RM

RD

TS

PI ★:必选; ☆:项目没有此过程可以不选; ▲:选中

PP

PMC

IPM

RSKM □ 纯瀑布模型 □ 重叠瀑布模型 □ 并行瀑布模型 □ 快速原型模型 □ 其他

□ A 类(公司级项目) □ B 类(工厂级项目) □ C 类(外协项目)38IT2007-0015-验收报告070929-V1.0

39IT2007-0015-同行评审时间表070929-V1.0

40IT2007-0015-同行评审工作报告070929-V1.0

41IT2007-0015-《测试报告》同行评审检查单070929-V1.0

42IT2007-0015-《测试用例及记录跟踪表》同行评审检查单070929-V1.0

43IT2007-0015-《概要设计说明书》同行评审检查单070929-V1.0

44IT2007-0015-《软件需求规格说明书》评审检查单070929-V1.0

45IT2007-0015-《详细设计说明书》同行评审检查单070929-V1.0

46IT2007-0015-《用户需求规格说明书》同行评审检查单070929-V1.0

47IT2007-0015-Java代码走查检查单070929-V1.0

48IT2007-0015-原型(JSP)页面检查单070929-V1.0

49IT2007-0015-同行评审问题汇总070929-V1.0

50IT2007-0015-同行评审报告070929-V1.0

51IT2007-0015-系统测试计划070929-V1.0

52IT2007-0015-测试申请单070929-V1.0(客观性)

53IT2007-0015-测试用例及记录跟踪表070929-V1.0

54IT2007-0015-测试用例模版070929-V1.0

55IT2007-0015-系统测试报告070929-V1.0

56IT2007-0015-集成测试计划070929-V1.0

57IT2007-0015-集成测试报告070929-V1.0

58IT2007-0015-验收测试计划070929-V1.0

59IT2007-0015-验收测试报告070929-V1.0

60IT2007-0015-度量分析一表070929-V1.0

61IT2007-0015-度量数据采集表、指示图及验证表070929-V1.0

62IT2007-0015-组织公共度量集070929-V1.0

63IT2007-0015-项目资源模型070929-V1.0

64IT2007-0015-项目质量保证计划070929-V1.0

65IT2007-0015-PPQA问题管理一览表070929-V1.0

66IT2007-0015-不符合问题与跟踪报告070929-V1.0

67IT2007-0015-PPQA产品检查单070929-V1.0

68IT2007-0015-PPQA过程检查单070929-V1.0

69IT2007-0015-目配置项清单070929-V1.0

70IT2007-0015-配置管理计划070929-V1.0

71IT2007-0015-配置项标识规则070929-V1.0

72IT2007-0015-入库检查单070929-V1.0

73IT2007-0015-配置项状态报告表070929-V1.0

74IT2007-0015-配置项状态记录表070929-V1.0

75IT2007-0015-变更申请表070929-V1.0

76IT2007-0015-变更跟踪表070929-V1.0

77IT2007-0015-基线状态报告表070929-V1.0

78IT2007-0015-基线和产品发布申请单070929-V1.0

79IT2007-0015-基线及产品发布检查表070929-V1.0

80IT2007-0015-审计报告单模板070929-V1.0

81IT2007-0015-CM周报模板070929-V1.0

82IT2007-0015-CM阶段报告模版070929-V1.0

83IT2007-0015-供应商候选名单070929-V1.0

84IT2007-0015-合格供应商名录070929-V1.0PPQA

CMVER

VAL

MA85IT2007-0015-供应商档案070929-V1.0

86IT2007-0015-采购计划070929-V1.0

87IT2007-0015-供应商评分标准070929-V1.0

88IT2007-0015-招标申请表070929-V1.0

89DARIT2007-0015-候选方案评价表070929-V1.0

与其他项目共享的程度

PPQA对裁减结果的符合性检查结论: 裁减符合裁减规范要求,□ 裁减不符合裁减规范要求 □ 需要上报的事项分析和评价事项

保证组织过程的一致性

适合本项目顾客的类型

明显节约项目成本

PPQA签字 有利于进度的把握

技术难度对项目的压力缓解

与项目人员的经验相匹配

更容易达到质量要求SAM

对裁减结果的分析、评价项目经理 填写日期

裁剪规定裁剪结果裁剪原因

★★型 □ 其他★

★★

高中低

日期