混凝土地基
3634
搅拌缸出口中心线
6920
CR 控制室
SR 储存室
6058
500
500
2860
Chemical anchor (for bucket elevator) M16x250
L7: 50 kN
150 1510
6058
150
L8: 50 kN
1000
L5: 150 kN
L6: 150 kN
9009
Y
9311
4000
Attention ! 注意! Due to unknown local conditions at the customers job site and also due to unknown local laws and restrictions for plants, Jiangsu LINTEC can only provide a basic foundation drawing which shows the position, dimensions and outer contours of the delivered components. This drawing is an example and show a possible foundation under best local ground conditions without paying attention on local laws and restrictions or special local conditions like possible earthquakes, storms or soft ground zones. It is customer duty to develop a foundation drawing incl. static calculation. Everything below the concrete surface (0.00mm level) is customer duty. 由于对工地实际土壤情况及当地政府针对搅拌站的法律法规缺乏了解, 江苏林泰阁只能提供一张基本的地基图,标明主站的安装位置,尺寸及外部尺寸。 以此地基图为例,地况为最佳,未考虑当地法律法规,及当地特殊环境, 例如可能发生地震,暴雨或软土层。所以,客户应负责地基的图纸设计, 包括静态计算,即水泥面(0.00mm)以下的所有事宜。 1.) The required compressive strength of the concrete foundation is 200KN/m2 for standard CSD plants without inbuilt hot storage silo. 标准的CSD搅拌站不配成品仓的情况下,要求地基抗压强度200KN/m2。 2.) The concrete foundation thickness is adviced as 300mm in C20 quality and the concrete must reinforced with wire mesh frame work. 钢筋混凝土地基厚度建议为300mm,使用标号为C20的水泥。 3.) Only for the 4 main central support legs of the dryer drum are embedded plates necessary. 只有滚筒中间4个支撑下面要加预埋件。
Drawing number
1
Rev.
Change
Date
Name
Replacement for:
A3
2
Y
Core foundation for the dryer drum
7806 150 3010 150
干燥滚筒地基
Attention ! 注意! Due to unknown local conditions at the customers job site and also due to unknown local laws and restrictions for plants, Jiangsu LINTEC can only provide a basic foundation drawing which shows the position, dimensions and outer contours of the delivered components. This drawing is an example and show a possible foundation under best local ground conditions without paying attention on local laws and restrictions or special local conditions like possible earthquakes, storms or soft ground zones. It is customer duty to develop a foundation drawing incl. static calculation. Everything below the concrete surface (0.00mm level) is customer duty. 由于对工地实际土壤情况及当地政府针对搅拌站的法律法规缺乏了解, 江苏林泰阁只能提供一张基本的地基图,标明主站的安装位置,尺寸及外部尺寸。 以此地基图为例,地况为最佳,未考虑当地法律法规,及当地特殊环境, 例如可能发生地震,暴雨或软土层。所以,客户应负责地基的图纸设计, 包括静态计算,即水泥面(0.00mm)以下的所有事宜。 1.) The required compressive strength of the concrete foundation is 200KN/m2 for standard CSD plants without inbuilt hot storage silo. 标准的CSD搅拌站不配成品仓的情况下,要求地基抗压强度200KN/m2。 2.) The concrete foundation thickness is adviced as 300mm in C20 quality and the concrete must reinforced with wire mesh frame work. 钢筋混凝土地基厚度建议为300mm,使用标号为C20的水泥。 3.) Only for the 4 main central support legs of the dryer drum are embedded plates necessary. 只有滚筒中间4个支撑下面要加预埋件。
Dryer drum center axis
X
2500 1100
PR 泵房
化学螺栓M16x250(粉提)
37
890
76
2280
5920
E
E
5920
1219
Mixer outlet opening
970
774
1219
2028
3010
X
Fixed with chemical anchors M20x250
11956
3304 7695 4665 20804
10760
35000
5 bitumen tanks
5个沥青罐
2200
3561
2565
2250
9311
7650
控制室CR
11550
滚筒DD
3634
泵房PR
6058
储藏室SR
12192
4193
X
搅拌缸 出口
6058
Mixer outlet
11550
827
Embedded steelplate Q235B
预埋钢板Q235B
600 M20
钢筋混凝土
1000
4920 6920
1000
SECTION C-C SCALE 1 : 50
30
80 500 300 20
With wire mesh framework reinforced concrete
搅拌缸泄料口
Outer contour of the main tower containers Outer contour of the base frame of the bucket elevator
主站外部尺寸
粉提地基外部尺寸
干燥滚筒中心线
3719
2500
200 kN
C
7408
700
651 0.8
C L1: 75 kN
3860 7381 425 150 3010 3100 1000 150
43
60 20
0
38
60
L2: 75 kN
10 00
69
1000
L3: 150 kN
L4: 150 kN
30
0
MIxer outlet gate center axis
D
4170
600
D
10.78m3 reinforced concrete
Surface Scale: DIN EN ISO 8501-1 DIN ISO 12944 Project DIN EN ISO 1461
1:500
Total Weight: 512,312.2 kg
CSM 4000 Ethiopia
This drawing is our property. It may not be copied or shown to outside without our permission
Drwn. Chkd. Chkd. Issue