LIFTING OPERATION CL

  • 格式:xls
  • 大小:85.50 KB
  • 文档页数:1

1: Yes2: No3: N/A
(Emp#)Assessment Completed By Date(DD/MM/YY)Contractor's Area SupervisorDate (DD/MM/YY)
ES&H Compliance Check List - LIFTING OPERATION
IC-28

REPORT No. ___________

/ // /
(Checklist valid from _______________________________ )

Location Area :Precast yard
Type of work :

Are the ground conditions suitable i.e. firm, level surface?
equipment?
Are all outriggers extended fully and placed on outrigger pads?
Is an exclusion zone set up to protect the swing radius of the equipment?
Is the area free of obstructions i.e. area around equipment and any routes required to travel to?
Where excavators are used as lifting devices, is the safe working load (SWL) displayed and a lifting point installed on the
Is a banksman/slinger appointed for all lifting operations and are they aware of the weight of the load lifted?

6
7
8
9
10

2
3
4
5
Has a lift plan been developed? Is it approved and avilable on site?

Does the lifting device have in date certification i.e. crane certification and are all safety devices i.e. crane alarms in working
order?
Has the crane operator completed daily inspection of crane?

EAST CORRIDOR PROJECT P011
No.Item Addressed
Is it Compliant?
Does crane operator have suitable competence certification?
1