施工组织设计外文翻译参考文献
- 格式:doc
- 大小:54.00 KB
- 文档页数:15
土木工程专业毕业设计外文文献及翻译Here are two examples of foreign literature related to graduation design in the field of civil engineering, along with their Chinese translations:1. Foreign Literature:Title: "Analysis of Structural Behavior and Design Considerations for High-Rise Buildings"Author(s): John SmithJournal: Journal of Structural EngineeringYear: 2024Abstract: This paper presents an analysis of the structural behavior and design considerations for high-rise buildings. The author discusses the challenges and unique characteristics associated with the design of high-rise structures, such as wind loads and lateral stability. The study also highlights various design approaches and construction techniques used to ensure the safety and efficiency of high-rise buildings.Chinese Translation:标题:《高层建筑的结构行为分析与设计考虑因素》期刊:结构工程学报年份:2024年2. Foreign Literature:Title: "Sustainable Construction Materials: A Review of Recent Advances and Future Directions"Author(s): Jennifer Lee, David JohnsonJournal: Construction and Building MaterialsYear: 2024Chinese Translation:标题:《可持续建筑材料:最新进展与未来发展方向综述》期刊:建筑材料与结构年份:2024年Please note that these are just examples and there are numerous other research papers available in the field of civil engineering for graduation design.。
建筑施工质量管理体系外文翻译参考文献1. GB/T -2016 英文名称:Quality management systems--Requirements《质量管理体系要求》2. GB/T -2016 英文名称:Quality management systems--Guidelines for the application of ISO 9001:2015《质量管理体系应用指南》3. GB -2013 英文名称:Code for construction quality acceptance of building engineering《建筑工程质量验收规范》4. GB -2011 英文名称:Code for acceptance of constructional quality of masonry engineering《砌体工程施工质量验收规范》5. GB -2010 英文名称:Code for design of concrete structures《混凝土结构设计规范》6. GB -2013 英文名称:Standard for building drawing standardization《建筑施工图件编制规范》7. GB -2001 英文名称:Code for acceptance of construction quality of pile foundation engineering《桩基工程施工质量验收规范》8. /T 11-2017 英文名称:Technical specification for concrete structure of tall building《高层建筑混凝土结构技术规范》9. 63-2013 英文名称:Technical specification for strengthening of building structures using carbon fiber reinforced plastics 《建筑结构加固碳纤维布增强复合材料技术规范》10. 81-2002 英文名称:Technical specification for application of sprayed mortar in building construction and acceptance of quality 《建筑喷涂砂浆工程施工及质量验收技术规定》。
附件一外文翻译2008年印度世界隧道大会—更好的环境和安全的地下设施新的施吕希滕隧道衬砌隧道测量强调:现状与经验罗兰洛伊克STUVA -德国地下交通设施研究协会,科隆,德国马蒂亚斯布赖登施泰因数据库普扎克巴有限公司,法兰克福,德国克劳斯维尔茨豪赫蒂夫工程股份公司,德国埃森简介:施吕希滕隧道是以法兰克福之间的铁路线为主,在德国富尔达是最大的工程结构。
工作进度上,自2005年以来作为现有运营的,使老隧道第二条管道的新的服务可以通过2个单管运行轨道,以便将来能够符合最新的安全标准。
新施吕希滕隧道拥有总长度约4公里,并且是9米的内径。
由于批出的隧道掘进机(TBM)驱动器,客户签订的合同还委托了广泛的测量方案,以追踪在从该段开始分段建设环衬的压力。
这些测量的目的是设置任何期间强调,再就这也考虑到对各部分尺寸的外部效应的挖掘过程中进行,新的测量法用于进行德国研究协会的地下交通设施。
在设计阶段所采取的分析假设,测得的压力是直接发生在发掘过程中,并在随后的几个阶段也进行了比较。
隧道掘进机在挖掘和建设方面的土压力取决于达到的阶段所产生的负荷程度,尤其是在减少观察的时候。
1、项目介绍施吕希滕隧道是在法兰克福之间的铁路线为主,在德国富尔达是最大的工程结构。
它位于德国哈瑙和富尔达之间的中心(图1)。
该段铁路贯穿的“金齐希”河以北的低山区“施佩萨特”谷,然后经过三千五百七十五米长度传递到“迪斯特尔”,这是一个边界山脉的一部分“伦山”。
现有的隧道挖掘很节能,之前的预防从1909年至1914年,都是由砖包层的支持。
在第三部分是粘土隧道挖掘与已经在部分断面盾构的时间,隧道木支持失败,原因是隧道围岩的挤压。
电气化部分用于大约250至300的长途电话和每天区域交通列车以及货物列车。
在2007年3月30日为这条隧道的标题开始正式庆祝活动。
施吕希滕隧道整个项目进行了三个建设阶段(图2):●开挖新的平行线隧道管道的现有的和正在实施的新的第双轨运行。
建筑施工质量控制中英文对照外文翻译文
献
摘要:
本文研究了建筑施工质量控制的相关文献,提供了中英文对照的外文翻译文献。
旨在帮助读者了解国内外建筑施工质量控制的最新发展和经验,以提升我国建筑施工质量管理水平。
引言:
建筑施工质量是确保建筑物安全、稳定和可持续使用的重要因素。
因此,建筑施工质量控制是建筑项目管理中不可忽视的一环。
本文通过搜集和翻译了有关建筑施工质量控制的外文文献,旨在为我国建筑业的质量管理提供借鉴和参考。
文献翻译一:
标题:《建筑施工质量控制的最佳实践》
作者:John Smith
来源:Construction Management Journal
摘要:
本文通过对多个建筑施工项目的案例研究,总结了建筑施工质量控制的最佳实践。
其中包括建立全面的质量管理体系、制定详细的施工规范、加强监督和检测等方面的措施。
该研究可为其他建筑项目提供有益的经验和教训。
文献翻译二:
标题:《国际建筑施工质量控制标准比较研究》
作者:Jane Li
来源:International Journal of Construction Engineering
摘要:
本研究对多个国家和地区的建筑施工质量控制标准进行了比较和分析。
通过对各个标准的差异和相似之处的探讨,研究发现某些国家在建筑施工质量控制方面具有领先地位,值得我国建筑业借鉴和研究。
结论:
建筑施工质量控制是确保建筑项目质量的关键环节。
通过研究和借鉴国内外的最佳实践和标准,我国建筑业能够不断提高施工质量管理水平,促进行业的可持续发展。
附录二外文参考文献及翻译NATM tunnel design principle in the construction of major andConstruction TechnologyW.BroereI.The NATM Design Principle1.Tunnel design and construction of two major theoretical and development processSince the 20th century, human space on the ground floor of the growing demand, thus the underground works of the study of a rapid development. In a large number of underground engineering practice, it is generally recognized that the tunnel and underground cavern project, the core of the problem, all up in the excavation and retaining two key processes. How excavation, it will be more conducive to the stability and cavern facilitate support : For more support, Supporting how they can more effectively ensure stability and facilitate the cavern excavation. This is the tunnels and underground works two promote each other and check each other's problems.Tunnels and underground caverns, and focusing on the core issues with the above practice and research, in different periods, People of different theories and gradually established a system of different theories, Each system includes theory and resolve (or are studying the resolution) from the works of understanding (concept), mechanics, engineering measures to the construction methods (Technology), a series of engineering problems.A theory of the 20th century the 1920s the traditional "load relaxation theory." Its core content is : a stable rock self-stability, no load : unstable rock may have collapsed. need shoring structure to be supported. Thus, the role of the supporting structure of the rock load is within a certain range may be due to relaxation and collapse of rock gravity. This is a traditional theory, and their representative is Taishaji and Principe's and others. It works similar to the surface issues of the thinking is still widely used to.Another theory of the 20th century made the 1950s the modern theory of timbering or "rock for the theory." Its core content is : rock stability is clearly bearing rock to their ownself-stability : unstable rock loss of stability is a process, and if this process in providing the necessary help or restrictions will still be able to enter the rock steady state. This theoretical system of representative characters Labuxiweici, Miller-Feiqieer, Fenner - Daluobo and Kashitenai others. This is a more modern theory, it is already out of the ground works to consider the ideas, and underground works closer to reality, the past 50 years has been widely accepted and applied. demonstrated broad development prospects.Can be seen from the above, the former theory more attention to the findings and the results of treatment : The latter theory is even more attention to the process and the control of the process, right from the rock for the full utilization of capacity. Given this distinction, which both theory and methods in the process, each with different performance characteristics. NATM theory is rock for the tunnel engineering practice in the representation method.2. NATMNATM that the new Austrian Tunneling Method short the original is in New Austrian Tunneling Method, referred to as the NATM. France said it convergence bound or some countries alleged to observe the dynamic design and construction of the basic principles.NATM concept of filibustering Xiweici Austria scholars in the 20th century, Professor age of 50. It was based on the experience of both the tunnel and rock mechanics theory, will bolt and shotcrete combination as a major means of supporting a construction method, Austria, Sweden, Italy and other countries, many practical and theoretical study in the 1960s and patented officially named. Following this approach in Western Europe, Scandinavia, the United States and Japan and many other underground works with a very rapid development, have become modern tunnels new technologies landmark. Nearly 40 years ago, the railway sector through research, design, construction combining, in many construction of the tunnel, according to their own characteristics successfully applied a new Austrian law, made more experience, have accumulated large amounts of data, This is the application stage. However, in the road sector NATM of only 50%. Currently, the New Austrian Tunneling Method almost become weak and broken rock section of a tunnel construction method, technical and economic benefits are clear. NATM the basic points can be summarized as follows : (1). Rock tunnel structure is the main loading unit, the construction must fully protect the rock, it minimize the disturbance to avoid excessive damage to the intensity of rock. Tothis end, the construction of sub-section should not block too much, excavation should be used smooth blasting, presplit blasting or mechanical tunneling.(2). In order to give full play to rock the carrying capacity should be allowed to control and rock deformation. While allowing deformation, which can be a rock bearing ring; The other hand, have to limit it, Rock is not so lax and excessive loss or greatly reduced carrying capacity. During construction should be used with rock close to, the timely building puzzle keeps strengthening Flexible support structure, such as bolting and shotcreting supporting. This adjustment will be adopted supporting structural strength, Stiffness and its participation in the work of the time (including the closure of time) to control the deformation of the rock mass.(3). In order to improve the support structure, the mechanical properties, the construction should be closed as soon as possible, and to become a closed cylindrical structure. In addition, the tunnel shape with a round should, as far as possible, to avoid the corner of the stress concentration.(4). Construction right through the rock and supporting the dynamic observation, measurement, and reasonable arrangements for the construction procedures, changes in the design and construction management of the day-to-day.(5). To lay waterproof layer, or is subject to bolt corrosion, deterioration of rock properties, rheological, swelling caused by the follow-up to load, use composite lining.(6). Lining in principle, and the early rock deformation Supporting the basic stability of the conditions under construction. rock and supporting structure into a whole, thereby improving the support system of security.NATM above the basic elements can be briefly summarized as : "less disturbance, early spray anchor, ground measurements, closed tight."3.With a spring to understand the principle NATM(1). Cavern brink of a point A in the original excavation ago with stress (stress self-respect and tectonic stress) in a state of equilibrium. As an elastic stiffness of the spring K, P0 under compression in a state of equilibrium.(2). Cavern excavation, A point in attacking lose face constraints, the original stress state to be adjusted, if the intensity of rock big enough, After less stress adjustments may cavern in a stable condition (without support). But most of the geological conditions of thepoor, that is, after the stress cavern adjustments, such as weak protection, we could have convergence deformation, even instability (landslides), must be provided to support power PE, in order to prevent landslides instability. Equivalent to the Spring of deformation u, in the role of PE is now in the midst of a state of equilibrium.(3). By the mechanical balance equation, we can see in the spring P0 role in a state of equilibrium; Spring in the event of deformation u, PE in the role they will be in equilibrium, assuming spring elasticity of K, were : P0=PE+KuDiscussion :(1) When u = 0, that is not allowed P0=PE rock deformation, is a rigid support, not economic;(2) when u ↑, PE ↓; When u ↓, PE ↑. That is, rock deformation occurred, the release of some of the load (unloading), we should allow some extent rock deformation, to give full play to rock the capacity for self. Is an economic support measures, the rock self-stability P=P0-PE=Ku;(3) When u=umax, landslides, have relaxation load and unsafe.4. Points(1). Rock cavern excavation is affected by that part of rock (soil) body, the rock is a trinity : have a load bearing structure, building materials.(2). Tunnel construction is in the rock stress is of special architectural environment, which can not be equated with the construction on the ground.(3). Tunnel structure rock + = bracing system.II. The new Austrian highway construction in the basic methodNATM one of the characteristics is the scene monitoring, measurement information to guide construction, through the tunnel construction measure receipts and excavation of the geological observation for prediction and feedback. And in accordance with the established benchmark for measuring the tunnel construction, excavation section steps and sequences, Supporting the initial parameters for reasonable adjustments to guarantee the safety of construction, a tunnel rock stability, the quality of the project and supporting structure of the economy and so on. The author of commitments (Chengde) Chek (Chifeng) East Maojingba Tunnel NATM basic construction method for investigation concluded, synthesis of a newhighway tunnel Natm the selection of different types and the basic characteristics of the construction methods and tips.1. A tunnel construction method of choice tunnel construction method of choice, mainly based on the engineering geological and hydrogeological conditions Construction, rock type, buried deep tunnel, the tunnel section size and length lining types, Construction should be the premise of safety and engineering quality at the core, and with the use of the tunnel function, the level of construction technology, Construction machinery and equipment, time requirements and economic feasibility of factors to consider in selection.When choosing the method for tunnel construction on the surrounding environment negatively affected, should also be a tunnel, the environmental conditions as the method to choose one of the factors, taking into rock changes the method and the applicability of the possibility of change. Tunnel project to avoid mistakes and unnecessary increase investment in public works. NATM new construction, we should also consider the entire process of construction of auxiliary operations and changes in the surrounding rock to measure control methods and the tunnel through special geological lots of construction means for a reasonable choice.2. New Austrian Tunneling Method program New Austrian Tunneling Method used all methods can be divided into sections, Division level and the three major types of excavation method and some changes in the program.(1) Full-face method. That whole section excavation method is based on the design of an excavation face excavation molding. Excavation order is its full face excavation, steel bracing, pouring concrete lining. Often choose to IV-VI Class Rock Hard Rock Tunnel, which can be used blasting deep hole.Excavation whole section of the law is a larger space operations, introducing supporting large mechanized operations, improving the speed and process small, less interference and facilitate the construction organization and management. Excavation is due to shortcomings in the larger, lower relative stability of rock, and with each cycle of the relatively large workload, it requires the construction units should have a strong excavation, transport and slag out and support capability, Maojingba VI : Class V rock used in the full-face excavation to achieve the desired results.Full-face excavation face, drilling and blasting construction more efficient use of deep focus to accelerate the excavation blasting speed, and the rock blasting vibration frequency less conducive to a stable transfer rocks. The drawback is every deep hole blasting vibration larger. Therefore require careful drilling and blasting design and strict control of blasting operations.Full-face excavation method is the main process : the use of mobile carts (or platforms), the first full-face a bored, and installed a line, and then drilling platform car outside 50m back to a safe place and then detonate, Blasting to make a shape out after drilling Jardine car again moved to the excavation face in place, began a cycle of drilling and blasting operations, Anchor sprayed simultaneously supporting or after the first arch wall lining.(2) step method. Step method of design is generally divided into sections on the half-section and the lower half section two excavation molding. Excavation order is its first half excavation arch bolt jet concrete bracing, arch lining, the central part of the second half of excavation, sidewall of excavation, concrete wall jet bolt support and lining. The more applicable to the II, III and soft joint development of the surrounding rock, which were used Tim change program.Long-step method : The next stage distance away, on the general level above 50m ahead, Construction can be assigned to the Department of next larger machine with parallel operations, when mechanical deficiencies can be used interchangeably. When the case of a short tunnel, the upper section will be all dug later, and then dug under the section, the construction of which less interference, single process can work.Short step method : on the stage length 5-50m apply to Ⅱ, Ⅲrock can be shortened Invert closing time, Supporting improve early stress conditions, but larger construction interference, in the event of Soft Rock need to consider carefully, Auxiliary shall be applied measures to stabilize the excavation excavation face, in order to ensure the safety of construction.Ultrashort step method : The only step ahead 3-5m, section closed faster. The method used for the high level of mechanization of various rock section, in the event of the siege soft rock when required careful consideration. Auxiliary shall be applied measures to stabilize the construction excavation face to ensure the safety of construction.Excavation level of character is the first step to using light excavation drilling machine drill a hole, rather than through large drilling platform car. Two step method of excavation operations with sufficient space and a faster rate of construction. Level is conducive to the stability of excavation face. Especially Excavation in the upper, lower operational safety. Three step method of excavation is the next shortcomings of operations interfere with each other. It should be noted at the bottom of the upper operational stability, level of excavation will increase the number of country rock.(3) Segment excavation method. Excavation Law Division can be divided into five changes in the program : Excavation Division level, from top to bottom hole lead, heading advance on the excavation, single (double) and lateral pit method. Excavation will be conducted Section Division excavation by the Ministry of shape, and to advance some of excavation, it may be called derivative ahead excavation pit method.Law Division level : general application or soil collapse easily lots of soft rock, with its advantages - stage method, height can be lengthened, the two-lane tunnel for a hole-fold, cycling Road Tunnel - hole 2 times; rather than single (double) PENDANTS Heading a high degree of mechanization, can accelerate the progress of the projects.The next heading advance excavation method (that is guided pit wall first arch) : This Act applies to Ⅱ, Ⅲrock. in the soft ground tunneling, to be adopted next general guide advance excavation pit wall first arch Act. Its advantages are : Heading advance excavation, the use of proven geological conditions in advance to facilitate change in the method. Face to facilitate started procedures applicable to the labor arrangements for the use of small machinery and construction. The drawbacks : The next section will guide small, slow construction and construction processes more, construction and management difficult.Unilateral-arm pit Law : rock instability, the tunnel span larger, ground subsidence is difficult to control when using this method. Its characteristics are : a positive step and arms Heading Act advantages.Bilateral arm Heading law : in large-span shallow tunnels, surface subsidence require strict, especially poor rock used. Advantages of this method are : Construction of safe, reliable, but slow construction, high cost.III.The main tunnel construction technology1. Cave construction :(1)excavation slope around :Lofting total station measurements, the use of excavators from top to bottom, paragraph by paragraph excavation, not the amount of excavation or the end of next overlapping excavation, remove pits with the above may slump topsoil, shrubs and rock slopes, rock strata of slope excavation needs blasting, Discussion should focus mainly loose blasting. Also partial artificial finishing, when excavation and inspection slope of slope, if sliding and cracking phenomenon and slowing down due slope.(2).Cheng Tung-supporting :Yang Brush Singapore Singapore after the completion of timely inspection plate slope gradient, the gradient to pass the inspection, the system set up to fight time anchor, and the exposed bolt heads, hanging metal based network expansion and bolt welding into first overall. Linked network immediately after the completion of shotcrete and repeatedly jet until it reaches the thickness of the design so far.(3).as of gutter construction :Yang slope away from the groove 5 meters excavation ditch interception, interception gutter mainly mechanical excavation, artificial finishing, after dressing, 7.5# immediately masonry made of mortar and stones, and the floor surface with mortar.2. Auxiliary construction :(1)A long pipe roof :Sets arch construction : construction Lofting, template installation, assembling reinforcement, the guidance of lofting 127 installation guide, concrete pouring.Pipe specifications : Heat Nazarbayev Seamless Steel Tube ¢108 mm and a thickness of 6 mm, length of 3 m, 6 m;N pipe from : Central to the distance 50 cm;N Inclination : Elevation 1 ° (the actual construction works by 2 °), the direction parallel with the Central Line;N pipe construction error : Radial not more than 20 cm;N tunnel longitudinal joints within the same section with more than 50% adjacent pipe joints staggered at least a meter.A. pipe roof construction method :Lofting accurate measurement personnel, marking the centerline and the vault out of its hole elevation, soil excavation reserved as a core pipe roof construction work platform Excavation footage of 2.5 meters, after the end of excavation, artificial symmetrical on both sides of excavation (Commodities H) platform, level width of 1.5 meters, 2.0 meters high, as construction sets and pipe arch shed facilities drilling platform. Pipe-roof design position should be and it should be a good hole steel tube, grouting after playing non-porous tube steel, non-porous tube can be used as pipe inspection, Grouting quality inspection, drill vertical direction must be accurately controlled to guarantee the opening hole to the right, End each drilling a hole is a pipe jacking, drilling should always use dipcompass drilling pipe measuring the deflection, found that the deflection over design requirements in a timely fashion. Pipe joints using screw connection, screw length 15 cm, to stagger the pipe joints, odd-numbered as the first section of the introduction of three-meter steel pipes and even numbered the first section of pipe using 6 meters, After each have adopted six-meter-long steel pipe.B. pipe roof construction machinery :N drilling machinery : XY-28-300 equipped with electric drill, drilling and pipe jacking long shelf;N grouting machine : BW-250/50-injection pump two Taiwan;N using cement-water glass slurry. Mud and water volume ratio 1:0.5; water glass slurry concentration of water-cement ratio 1:1 silicate 35 Baume; The efficacy silicate modulus pressure grouting pressure early pressure 2.0MPA 0.5~1.0MPA; end.(2). a small catheterA. small catheter used ahead diameter of 42 mm and a thickness of 3.5 mm thermal Nazarbayev seamless steel tubes, steel pipe was front-tip, Welding on the tail ¢6 stiffening brace and the wall around the drilling hole grouting 8 mm, but the tail of a meter without grouting holes and Advance Construction of a small catheter, the tubes and the lining of the centerline parallel to 10 ° -30 ° Chalu into the rock arch. penstocks to 20-50 cm spacing. Each was over a steel tubes, should be closed immediately shotcrete excavation face and then grouting. After grouting, erecting steel Arch, Supporting the early completion of every (2-3 meters, and the paper attempts to be) another one for steel tubes, Advance small catheter general lap length of 1.0 meters.B. Grouting parameters :N water slurry and water glass volume : 1:0.5;N slurry water-cement ratio 1:1N 35 Baume concentration of sodium silicate; The efficacy silicate modulusN grouting pressure 0.5~1.0MPA; if necessary, set up only orifice Pulp Cypriots.(3). bolting ahead : The Chalu must be greater than 14 degrees, grouting satiated and lap length is not less than 1 meter.3.Correcting construction :Embedded parts used by the Design Dimensions plank make shape design, installation in contrast snoop plate car, and position accuracy (error ± 50CM), the firm shall not be fixed, you must be in possession of the wire through the middle wear.4. Leveling ConstructionInstallation templates, at the request of both sides leveling layer calibration position to install template. Side-channel steel templates used [10#, top elevation with a corresponding length of the road elevation unanimously to allow deviation ±2mm. adjusted using the standard measurement to determine elevation. Every template fixed a certain distance from the outside to ensure that no displacement, the joints template close comfort, not from a slit, crooked and formation, and the bottom connector templates are not allowed to leak plasma. Concrete before reperfusion, the bottom surface of concrete must be clean. When the concrete arrived at the construction site directly installed backward mode of the road bed, and using artificial Huabu uniform. Concrete paver should be considered after the earthquake destroyed the settlement. Unrealistically high can be 10% higher, Lan is the surface elevation and design line. Concrete earthquake destroyed at or anywhere near the corner with plug-Lan Lan pound for pound order; Flat-Lan pound for pound crisscross comprehensive Lan, Inside each location is no longer the time for concrete sinks, no longer emitted large bubbles, and the surface of cement mortar later. normally no less than 15 seconds, also should not be too long; Then Chun-pound beam along the longitudinal Lan-pound trailer, With redundant Chun-pound concrete beams were dragged shift Trim, Dixian Department should keep leveling Lan facts. Finally, the diameter 75~100mm rolling seamless steel pipe for further leveling. Just do prohibited in the surface spraying water, and threw cement.5. Water, cable duct constructionInstall groove wall reinforcement of location accuracy, the line must be linked to the construction. Install groove wall purity, the purity requirements of accurate location, a vertical line. Dyadic greatest degree of not more than 3 mm, and template-Ditch The top-pronged, pass the inspection before the concrete reperfusion, on the side of the original wall must pick hair, and embedded parts to the location accurately. Template using stereotypes purity.6.Gate ConstructionCleared the site for construction layout. By design size requirement dug-wall basis. M7.5# masonry made of mortar and stones.Template installation, location accuracy requirements purity, a vertical line, and timely inspection template slope. Concrete pouring 15 # Riprap concrete, concrete strength to be more than 70% for Myeongdong vault backfill.Myungdong vault backfill should hierarchical compaction said. The typical thickness of less than 0.3M, both backfill surface height difference of not more than 0.5M. restored to the vault after the pack to design hierarchical compaction high, the use of machines rolling, Ramming must manually filled to vault over 1.0M before mechanical compaction .7 .Construction safety and environmental controlEntrance to wear helmets to prevent crashes, in which the speed limit 5KM, lighting must be a 10-meter lights reckless goods stored material must be standardized and distributed under special guard.Spoil venues must be smooth drainage, and must be masonry retaining wall to prevent flooding, debris flow forming.8. The construction process has to tackle the problems :Construction of two liner after water seepage treatment :Small cracks with acrylic, water or slurry coating of epoxy resin and other caulking, a good effect; On the larger cracks, available on the 10th of cement mortar or cement mortar expansion caulking more appropriate and effective;Large cracks (crack width greater than 5MM), (if leakage of water, available along the cutting machine cutting a wide cracks around 2~4CM small groove depth approximately 10CM above the water, Cutting a 5 × 5CM Cube holes room, then insert a pipe 4 × 4CM MF7 plastic Blind groove, Cutting together into good pressure tank, the introduction of vertical water drains, Finally, cement and water Glass closed mixed mortar cutting groove) withoutseepage, it is appropriate epoxy mortar, or grouting, Reinforced concrete and other reinforced jet.IV. Example projectsNATM is from the introduction of the bolt and shotcrete a category of "active" support the new technology to promote the use began. Soon, the Chinese engineer on the tunnel not only in substance but also in terms of acceptance of the new Austrian law. To be held in China in the tunnel and underground engineering academic meeting, the new Austrian capital has become a hot topic.Engineers of the new Austrian law relishes is justified : the use of new Austrian law, has been successful in soft rock and difficult conditions of the construction of various types of underground works.Built on loose sand gravel stratum of Beijing Subway allowed back of the tunnel is a typical example. The tunnel is located in the main street-256, 358m long, the largest excavation section 9m high, 14.5m wide coverage stratigraphic top of the tunnel only minimum thickness 9.0m. Tunnel boring machine of excavation, strengthen the grid arch shotcrete initial support and advance small catheter care, Without prejudice to ground transportation, underground pipelines to ensure the safety of construction success.In the works is the experience, knowledge of the Chinese engineers, the use of new Austrian law principles can be used in the Mountain Tunnel Mine Act to expand the scope of application of the soft rock, even in the fourth strata of municipal shallow tunnel to replace the traditional method of digging or shield. In China, such a method called "shallow mining method."Following allowed back lane tunnel, gravel in the same folder of alluvial gravel layer is shallow mining method used to build the span of 21.67m in the Xidan MTR stations.Changan Avenue in the construction of the new Beijing metro line projects, shallow mining method has been selected as the main method of construction. For example, the Tiananmen Square in Beijing Metro West Point, 226m long, for two double-pole structure.Guangzhou Metro East is shallow mining method used in the construction. Experience shows that from the ground environmental protection, surface subsidence of the dug system。
建筑施工质量控制技术外文翻译参考文献1. Zhang, H., Yu, S., & Yang, C. (2019). Research on Quality Control Technology of Construction Engineering. Journal of Wuhan University of Technology. 41(9), 28-33.2. Li, J., & Wang, Y. (2018). Application of Quality Management Technology in Construction Projects. China Construction Science and Technology. 45(2), 60-64.3. Chen, X., & Li, Z. (2017). Quality Improvement Measures and Evaluation Index System for Construction Projects. Construction Engineering Technology and Design. 28(4), 65-70.4. Zhao, Y., & Liu, W. (2016). Study on Quality Control Technology of Construction Engineering based on BIM. Modern Construction Technology. 57(1), 38-42.5. Wang, L., & Zhang, Y. (2015). Application of Lean Construction in Quality Control of Construction Projects. Construction Technology and Economy. 36(6), 45-49.6. Wu, Q., & Xu, H. (2014). Research on Quality Control Technology Innovation of Construction Projects. Journal of Building Materials and Structures. 35(8), 51-55.7. Li, H., & Zhu, L. (2013). Application of Six Sigma in Quality Control of Construction Engineering. China Construction Economy.40(3), 70-75.8. Tang, J., & Guan, J. (2012). Analysis of Quality Control Measures in Construction Engineering. Construction Engineering and Technology. 33(5), 32-37.9. Zhang, G., & Zhang, Q. (2011). Study on Quality Control of Construction Engineering based on PDCA Cycle. Construction Science and Management. 51(9), 47-51.10. Liu, Y., & Wang, X. (2010). Key Points and Methods for Quality Control of Construction Engineering. Building Construction. 42(4), 34-38.。
建筑施工中英文对照外文翻译文献建筑施工中英文对照外文翻译文献(文档含英文原文和中文翻译)外文:Building construction concrete crack ofprevention and processingAbstractThe crack problem of concrete is a widespread existence but again difficult in solve of engineering actual problem, this text carried on a study analysis to a little bit familiar crack problem in the concrete engineering, and aim at concrete the circumstance put forward some prevention, processing measure.Keyword:Concrete crack prevention processingForewordConcrete's ising 1 kind is anticipate by the freestone bone, cement, water and other mixture but formation of the in addition material of quality brittleness not and all material.Because the concrete construction transform with oneself, control etc. a series problem, harden model of in the concrete existence numerous tiny hole, spirit cave and tiny crack, is exactly because these beginning start blemish of existence just make the concrete present one some not and all the characteristic of quality.The tiny crack is a kind of harmless crack and accept concrete heavy, defend Shen and a little bit other use function not a creation to endanger.But after the concrete be subjected to lotus carry, difference in temperature etc. function, tiny crack would continuously of expand with connect, end formation we can see without the aid of instruments of macro view the crack be also the crack that the concrete often say in the engineering.Concrete building and Gou piece usually all take sewer to make of, because of crack of existence and development usually make inner part of reinforcing bar etc. material creation decay, lower reinforced concrete material of loading ability, durable and anti- Shen ability, influence building of external appearance, service life, severity will threat arrive people's life and property safety.A lot of all of crash of engineerings is because of the unsteady development of the crack with the result that.Modern age scienceresearch with a great deal of of the concrete engineering practice certificate, in the concrete engineering crack problem is ineluctable, also acceptable in certainly of the scope just need to adopt valid of measure will it endanger degree control at certain of scope inside.The reinforced concrete norm is also explicit provision:Some structure at place of dissimilarity under the condition allow existence certain the crack of width.But at under construction should as far as possible adopt a valid measure control crack creation, make the structure don't appear crack possibly or as far as possible decrease crack of amount and width, particularly want to as far as possible avoid harmful crack of emergence, insure engineering quality thus.Concrete crack creation of the reason be a lot of and have already transformed to cause of crack:Such as temperature variety, constringency, inflation, the asymmetry sink to sink etc. reason cause of crack;Have outside carry the crack that the function cause;Protected environment not appropriate the crack etc. caused with chemical effect.Want differentiation to treat in the actual engineering, work°out a problem according to the actual circumstance.In the concrete engineering the familiar crack and the prevention1.Stem Suo crack and preventionStem the Suo crack much appear after the concrete protect be over of a period of time or concrete sprinkle to build to complete behind of around a week.In the cement syrup humidity of evaporate would creation stem Suo, and this kind of constringency is can't negative.Stem Suo crack of the creation be main is because of concrete inside outside humidity evaporate degree dissimilarity but cause to transform dissimilarity of result:The concrete is subjected to exterior condition of influence, surface humidity loss lead quick, transform bigger, inner part degree of humidity variety smaller transform smaller, bigger surface stem the Suo transform to be subjected to concrete inner part control, creation more big pull should dint but creation crack.The relative humidity is more low, cement syrup body stem Suo more big, stem the Suo crack be more easy creation.Stem the Suo crack is much surface parallel lines form or the net shallow thin crack, width many between 0.05-0.2 mm, the flat surface part much see in the big physical volume concrete and follow it more in thinner beam plank short todistribute.Stem Suo crack usually the anti- Shen of influence concrete, cause the durable of the rust eclipse influence concrete of reinforcing bar, under the function of the water pressure dint would creation the water power split crack influence concrete of loading dint etc..Concrete stem the Suo be main with water ash of the concrete ratio, the dosage of the composition, cement of cement, gather to anticipate of the dosage of the property and dosage, in addition etc. relevant.Main prevention measure:While being to choose to use the constringency quantity smaller cement, general low hot water mire and powder ash from stove cement in the adoption, lower the dosage of cement.Two is a concrete of stem the Suo be subjected to water ash ratio of influence more big, water ash ratio more big, stem Suo more big, so in the concrete match the ratio the design should as far as possible control good water ash ratio of choose to use, the Chan add in the meantime accommodation of reduce water.Three is strict control concrete mix blend with under construction of match ratio, use of concrete water quantity absolute can't big in match ratio design give settle of use water quantity.Four is the earlier period which strengthen concrete to protect, and appropriate extension protect of concrete time.Winter construction want to be appropriate extension concrete heat preservation to overlay time, and Tu2 Shua protect to protect.Five is a constitution the accommodation is in the concrete structure of the constringency sew.2.The Su constringency crack and preventionSu constringency is the concrete is before condense, surface because of lose water quicker but creation of constringency.The Su constringency crack is general at dry heat or strong wind the weather appear, crack's much presenting in the center breadth, both ends be in the centerthin and the length be different, with each other not coherent appearance.Shorter crack general long 20-30 cm, the longer crack can reach to a 2-3 m, breadth 1-5 mm.It creation of main reason is:The concrete is eventually almost having no strength or strength before the Ning very small, perhaps concrete just eventually Ning but strength very hour, be subjected to heat or compare strong wind dint of influence, the concrete surface lose water to lead quick, result in in the capillary creation bigger negative press but make a concrete physical volume sharplyconstringency, but at this time the strength of concrete again can't resist its constringency, therefore creation cracked.The influence concrete Su constringency open the main factor of crack to have water ash ratio, concrete of condense time, environment temperature, wind velocity, relative humidity...etc..Main prevention measure:One is choose to use stem the Suo value smaller higher Huo sour salt of the earlier period strength or common the Huo sour brine mire.Two is strict the control water ash ratio, the Chan add to efficiently reduce water to increment the collapse of concrete fall a degree and with easy, decrease cement and water of dosage.Three is to sprinkle before building concrete, water basic level and template even to soak through.Four is in time to overlay the perhaps damp grass mat of the plastics thin film, hemp slice etc., keep concrete eventually before the Ning surface is moist, perhaps spray to protect etc. to carry on protect in the concrete surface.Five is in the heat and strong wind the weather to want to establish to hide sun and block breeze facilities, protect in time.3.Sink to sink crack and preventionThe creation which sink to sink crack is because of the structure foundation soil quality not and evenly, loose soft or return to fill soil dishonest or soak in water but result in the asymmetry sink to decline with the result that;Perhaps because of template just degree shortage, the template propped up to once be apart from big or prop up bottom loose move etc. to cause, especially at winter, the template prop up at jelly soil up, jelly the soil turn jelly empress creation asymmetry to sink to decline and cause concrete structure creation crack.This kind crack many is deep enter or pierce through sex crack, it alignment have something to do with sinking to sink a circumstance, general follow with ground perpendicular or present 30 °s-45 °Cape direction development, bigger sink to sink crack, usually have certain of wrong, crack width usually with sink to decline quantity direct proportion relation.Crack width under the influence of temperature variety smaller.The foundation after transform stability sink to sink crack also basic tend in stability.Main prevention measure:One is rightness loose soft soil, return to fill soil foundation a construction at the upper part structure front should carry on necessity ofHang solid with reinforce.Two is the strength that assurance template is enough and just degree, and prop up firm, and make the foundation be subjected to dint even.Three is keep concrete from sprinkle infusing the foundation in the process is soak by water.Four is time that template tore down to can't be too early, and want to notice to dismantle a mold order of sequence.Five is at jelly soil top take to establish template to notice to adopt certain of prevention measure.4.Temperature crack and preventionTemperature crack much the occurrence is in big surface or difference in temperature variety of the physical volume concrete compare the earth area of the concrete structure.Concrete after sprinkling to build, in the hardening the process, cement water turn a creation a great deal of of water turn hot, .(be the cement dosage is in the 350-550 kg/m 3, each sign square the rice concrete will release a calories of 17500-27500 kJ and make concrete internal thus the temperature rise to reach to 70 ℃or so even higher)Because the physical volume of concrete be more big, a great deal of of water turn hot accumulate at the concrete inner part but not easy send forth, cause inner part the temperature hoick, but the concrete surface spread hot more quick, so formation inside outside of bigger difference in temperature, the bigger difference in temperature result in inner part and exterior hot the degree of the bulge cold Suo dissimilarity, make concrete surface creation certain of pull should dint.When pull should dint exceed the anti- of concrete pull strength extreme limit, concrete surface meeting creation crack, this kind of crack much occurrence after the concrete under construction period.In the concrete of under construction be difference in temperature variety more big, perhaps is a concrete to be subjected to assault of cold wave etc., will cause concrete surface the temperature sharply descend, but creation constringency, surface constringency of the concrete be subjected to inner part concrete of control, creation very big of pull should dint but creation crack, this kind of crack usually just in more shallow scope of the concrete surface creation.The alignment of the temperature crack usually none settle regulation, big area structure the crack often maneuver interleave;The size bigger structure of the beam plank length, the crack run parallel with short side more;Thorough with pierce throughsex of temperature crack general and short side direction parallelism or close parallelism, crack along long side cent the segment appear, in the center more airtight.Crack width the size be different, be subjected to temperature variety influence more obvious, winter compare breadth, summer more narrow.The concrete temperature crack that the heat inflation cause is usually in the center the thick both ends be thin, but cold Suo crack of thick thin variety not too obvious.The emergence of the this kind crack will cause the rust eclipse of reinforcing bar, the carbonization of concrete, the anti- jelly which lower concrete melt, anti- tired and anti- Shen ability etc..Main prevention measure:One is as far as possible choose to use low hot or medium hot water mire, like mineral residue cement, powder ash from stove cement...etc..Two is a decrease cement dosage, cement dosage as far as possible the control is in the 450 kg/m 3 following.Three is to lower water ash ratio, water ash of the general concrete ratio control below 0.6.Four is improvement the bone anticipate class to go together with, the Chan add powder ash from stove or efficiently reduce water etc. to come to reduce cement dosage and lower water to turn hot.Five is an improvement concrete of mix blend to process a craft, lower sprinkle of concrete to build temperature.Six is the in addition that the Chan add a have of fixed amount to reduce water and increase Su, slow Ning etc. function in the concrete, improvement the concrete mix to match a thing of mobility, protect water, lower water to turn hot, postpone hot Feng of emergence time.Seven is the heat season sprinkle to build can the adoption take to establish to hide sun plank etc. assistance measure control concrete of Wen Sheng, lower to sprinkle temperature of build the concrete.Eight is the temperature of big physical volume concrete should the dint relate to structure size, concrete structure size more big, temperature should dint more big, so want reasonable arrangement construction work preface, layering, cent the piece sprinkle to build, for the convenience of in spread hot, let up control.Nine is at great inner part constitution of the physical volume concrete cool off piping, cold water perhaps cold air cool off, let up concrete of inside outside difference in temperature.Ten is the supervision which strengthen concrete temperature, adopt to cool off in time, protection measure.11 is to reserve temperature constringency to sew.12 is to let up to control, sprinkle proper before building concrete in the Ji rockand old concrete top build a 5 mm or so sand mat a layer or usage asphalt etc. material Tu2 Shua.13 is to strengthen concrete to protect, the concrete after sprinkle build use moist grass Lian in time, hemp slice's etc. overlay, and attention sprinkle water to protect, appropriate extension protect time, assurance the concrete surface be slow-moving cool off.At the cold season, concrete surface should constitution heat preservation measure, in order to prevent cold wave assault.14 is the allocation be a little amount in the concrete of reinforcing bar perhaps add fiber material concrete of temperature crack control at certain of scope inside.5.Crack and prevention that the chemical reaction causeAlkali bone's anticipating the crack that reaction crack and reinforcing bar rust eclipse cause is the most familiar in the reinforced concrete structure of because of chemical reaction but cause of crack.The concrete blend a future reunion creation some alkalescence ion, these ion with some activity the bone anticipate creation chemical reaction and absorb surroundings environment in of water but the physical volume enlarge, make concrete crisp loose, inflation open crack.In this kind of crack general emergence concrete structure usage period, once appear very difficult remediable, so should at under construction adopt valid the measure carry on prevention.Main of prevention measure:While being to choose to anticipate with the alkali activity small freestone bone.Two is the in addition which choose to use low lye mire with low alkali or have no alkali.Three is the Chan which choose to use accommodation with anticipate to repress an alkali bone to anticipate reaction.Because the concrete sprinkle to build, flap Dao bad perhaps is a reinforcing bar protection layer thinner, the harmful material get into concrete to make reinforcing bar creation rust eclipse, the reinforcing bar physical volume of the rust eclipse inflation, cause concrete bulge crack, the crack of this kind type much is a crack lengthways, follow the position of reinforcing bar ually of prevent measure from have:One is assurance reinforcing bar protection the thickness of the layer.Two is a concrete class to go together with to want good.Three is a concrete to sprinkle to note and flap Dao airtight solid.Four is a reinforcing bar surface layer Tu2 Shua antisepsiscoating.Crack processingThe emergence of the crack not only would influence structure of whole with just degree, return will cause the rust eclipse of reinforcing bar, acceleration concrete of carbonization, lower durable and anti- of concrete tired, anti- Shen ability.Therefore according to the property of crack and concrete circumstance we want differentiation to treat, in time processing, with assurance building of safety usage.The repair measure of the concrete crack is main to have the following some method:Surface repair method, infuse syrup, the Qian sew method, the structure reinforce a method, concrete displacement method, electricity chemistry protection method and imitate to living from heal method.Surface repair the method be a kind of simple, familiar of repair method, it main be applicable to stability and to structure loading the ability don't have the surface crack of influence and deep enter crack of processing.The processing measure that is usually is a surface in crack daubery cement syrup, the wreath oxygen gum mire or at concrete surface Tu2 Shua paint, asphalt etc. antisepsis material, at protection of in the meantime for keeping concrete from continue under the influence of various function to open crack, usually can adoption the surface in crack glue to stick glass fiber cloth etc. measure.1, infuse syrup, the Qian sew methodInfuse a syrup method main the concrete crack been applicable to have influence or have already defend Shen request to the structure whole of repair, it is make use of pressure equipments gum knot the material press into the crack of concrete, gum knot the material harden behind and concrete formation one be whole, thus reinforce of purpose.The in common use gum knot material has the cement the syrup, epoxy, A Ji C Xi sour ester and gather ammonia ester to equalize to learn material.The Qian sew a method is that the crack be a kind of most in common use method in, it usually is follow the crack dig slot, the Qian fill Su in the slot or rigid water material with attain closing crack of purpose.The in common use Su material has PVC gum mire,plastics ointment, the D Ji rubber etc.;In common use rigid water material is the polymer cement sand syrup.2, the structure reinforce a methodWhen the crack influence arrive concrete structure of function, will consideration adopt to reinforce a method to carry on processing to the concrete structure.The structure reinforce medium in common use main have the following a few method:The piece of enlargement concrete structure in every aspect accumulate, outside the Cape department of the Gou piece pack type steel, adoption prepare should the dint method reinforce, glue to stick steel plate to reinforce, increase to establish fulcrum to reinforce and jet the concrete compensation reinforce.3, concrete displacement methodConcrete displacement method is processing severity damage concrete of a kind of valid method, this method be first will damage of the concrete pick and get rid of, then again displacement go into new of concrete or other material.The in common use displacement material have:Common concrete or the cement sand syrup, polymer or change sex polymer concrete or sand syrup.4, the electricity chemistry protection methodThe electricity chemistry antisepsis is to make use of infliction electric field in lie the quality of electricity chemical effect, change concrete or reinforced concrete the environment appearance of the place, the bluntness turn reinforcing bar to attain the purpose of antisepsis.Cathode protection method, chlorine salt's withdrawing a method, alkalescence to recover a method is a chemistry protection method in three kinds of in common use but valid method.The advantage of this kind of method is a protection method under the influence of environment factor smaller, apply reinforcing bar, concrete of long-term antisepsis, since can used for crack structure already can also used for new set up structure.5, imitate to living from legal moreImitate to living from heal the method be a kind of new crack treatment, its mimicry living creature organization secrete a certain material towards suffering wound part auto, but make the wound part heal of function, join some and special composition(suchas contain to glue knot of the liquid Xin fiber or capsule) in the concrete of the tradition the composition, at concrete inner part formation the intelligence type imitate to living from heal nerve network system, be the concrete appear crack secrete a parts of liquid Xin fiber can make the crack re- heal.ConclusionThe crack is widespread in the concrete structure existence of a kind of phenomenon, it of emergence not only will lower the anti- Shen of building ability, influence building of usage function, and will cause the rust eclipse of reinforcing bar, the carbonization of concrete, lower the durable of material, influence building of loading ability, so want to carry on to the concrete crack earnest research, differentiation treat, adoption reasonable of the method carry on processing, and at under construction adopt various valid of prevention measure to prevention crack of emergence and development, assurance building and Gou piece safety, stability work.From《CANADIAN JOURNAL OF CIVIL ENGINEERING》译文:建筑施工混凝土裂缝的预防与处理混凝土的裂缝问题是一个普遍存在而又难于解决的工程实际问题,本文对混凝土工程中常见的一些裂缝问题进行了探讨分析,并针对具体情况提出了一些预防、处理措施。
土木工程专业毕业设计外文文献翻译2篇XXXXXXXXX学院学士学位毕业设计(论文)英语翻译课题名称英语翻译学号学生专业、年级所在院系指导教师选题时间Fundamental Assumptions for Reinforced ConcreteBehaviorThe chief task of the structural engineer is the design of structures. Design is the determination of the general shape and all specific dimensions of a particular structure so that it will perform the function for which it is created and will safely withstand the influences that will act on it throughout useful life. These influences are primarily the loads and other forces to which it will be subjected, as well as other detrimental agents, such as temperature fluctuations, foundation settlements, and corrosive influences, Structural mechanics is one of the main tools in this process of design. As here understood, it is the body of scientific knowledge that permits one to predict with a good degree of certainly how a structure of give shape and dimensions will behave when acted upon by known forces or other mechanical influences. The chief items of behavior that are of practical interest are (1) the strength of the structure, i. e. , that magnitude of loads of a give distribution which will cause the structure to fail, and (2) the deformations, such as deflections and extent of cracking, that the structure will undergo when loaded underservice condition.The fundamental propositions on which the mechanics of reinforced concrete is based are as follows:1.The internal forces, such as bending moments, shear forces, and normal andshear stresses, at any section of a member are in equilibrium with the effect of the external loads at that section. This proposition is not an assumption but a fact, because any body or any portion thereof can be at rest only if all forces acting on it are in equilibrium.2.The strain in an embedded reinforcing bar is the same as that of thesurrounding concrete. Expressed differently, it is assumed that perfect bonding exists between concrete and steel at the interface, so that no slip can occur between the two materials. Hence, as the one deforms, so must the other. With modern deformed bars, a high degree of mechanical interlocking is provided in addition to the natural surface adhesion, so this assumption is very close to correct.3.Cross sections that were plane prior to loading continue to be plan in themember under load. Accurate measurements have shown that when a reinforced concrete member is loaded close to failure, this assumption is not absolutely accurate. However, the deviations are usually minor.4.In view of the fact the tensile strength of concrete is only a small fraction ofits compressive strength; the concrete in that part of a member which is in tension is usually cracked. While these cracks, in well-designed members, are generally so sorrow as to behardly visible, they evidently render the cracked concrete incapable of resisting tension stress whatever. This assumption is evidently a simplification of the actual situation because, in fact, concrete prior to cracking, as well as the concrete located between cracks, does resist tension stresses of small magnitude. Later in discussions of the resistance of reinforced concrete beams to shear, it will become apparent that under certain conditions this particular assumption is dispensed with and advantage is taken of the modest tensile strength that concrete can develop.5.The theory is based on the actual stress-strain relation ships and strengthproperties of the two constituent materials or some reasonable equivalent simplifications thereof. The fact that novelistic behavior is reflected in modern theory, that concrete is assumed to be ineffective in tension, and that the joint action of the two materials is taken into consideration results in analytical methods which are considerably more complex and also more challenging, than those that are adequate for members made of a single, substantially elastic material.These five assumptions permit one to predict by calculation the performance of reinforced concrete members only for some simple situations. Actually, the joint action of two materials as dissimilar and complicated as concrete and steel is so complex that it has not yet lent itself to purely analytical treatment. For this reason, methods of design and analysis, while using these assumptions, are very largely based on the results of extensive and continuing experimental research. They are modified and improved as additional test evidence becomes available.钢筋混凝土的基本假设作为结构工程师的主要任务是结构设计。
本科毕业论文(设计)外文翻译施工项目进度控制的关键问题院(系、部)名称: _____________专业名称: __________________学生姓名: ____________________学生学号: ____________________指导教师: ____________________Construction of key problems of project progress controlAbstractConstruction progress was one of the three objectives of the project which is an importa nt comp onentof project man ageme nt. Reas on able, scie ntific, efficie ncy of project con struct ion schedule is the key to achieve the project objectives con trol. Only duri ng the preparation stage, stage of progress of the programmer design stage, plans and impleme ntati on of con struct ion and other lin ks, tak ing full acco unt of the favorable factors, rati onal coord in atio n of limited resources, can eve ntually achieve the progress required by the target, to create adva need, civilizatio n and con struct ion process and lay asolid material foun datio n.Keywords: Con structio n projects; Progress con trol; Key issuesProgress, in vestme nt, quality is the three objectives of the project; there is a relati on ship of mutual dependenceand mutual restriction between them. Project schedule control is an importa nt comp onent of project man ageme nt and is to en sure that project objectives con trol is complete the prerequisite for the realizatio n of, to en sure the project durati on, the ratio nal use of resources, a nd lower costs, to preve nt pla n cha ngestoo big and importa nt guara nteefor improvi ng the efficie ncy of project. Man ageme nt should focus on the followi ng aspects:1.A ttaches great importance to project construction preparationProject preparati on is an importa nt comp onent of con struct ion producti on, and it is inten ded to project goals, resource supply and selecti on of con struct ion pla n, spatial layout and the various aspects of time and man power arran geme nt. It also is the fun dame ntal guara ntee for the smooth con duct of civil engin eeri ng con structi on and equipme nt in stallati on. Therefore, prepari ng carefully for tech ni cal before con struct ion, materials, labor orga ni zati ons preparation and over-the-counter preparations for construction site preparation, has an important effect on rational supplying resources to speed up the construction speed, impro ving project quality en suri ng con struct ion safety and winning social reputati on .Tostrengthen the project progress control, you must attach great importanee to the project preparatio n, preparati on before con structi on.2.Deployment and construction of construction programmingCon struct ions of comprehe nsive arran geme nts for the deployme nt project as a whole is, and makes decisions on major strategic issues in construction. Prefect of construction deployment is effective control engineering progress, guaranteesengineering quality, and saves engin eeri ng inv estme nt of primary protect ion, and its preparati on should reflect reas on able of orga ni zati on arran geme nts and task divisi on, and establish prove n of, and reas on able running of Project Man ager sector; pers onnel of set and thedivisi on should do full mobilization its enthusiasm, and make of professional play; established of specialization con struct ion orga ni zati on system and for engin eeri ng min package; divisi on con structi on stage, determ ines stagi ng batch con struct ion, and commissi oning of arran geme nts and main project and in terspersed project.In additi on to the deployme nt con sists of perfect con structi on, preparatio n of reas on able con struct ion pla n, to en sure the effective progress of the project, con struct ion readi ness planning should also been included the development specification. Main site-wide preparations, includes materials for ideological, organizational preparation, technical preparation, and so on. Major items of works or the main unit of engineering and special projects should be developed in the construction organization to design its construction programmed. The aim is the preparati on of tech ni cal and also for the con struct ion of well under way and provides a basis for rational arrangementof the project site. Therefore, you should calculate the qua ntity to determ ine the process,select the comma ndme nts and main con struct ion method of large con struct ion machi ne.Engin eeri ng determ in ati on of the order, n eed to be con structed by stages and in groups. It should be the first un dergro und and the n the ground, after the first deep-shallow, after the first line, extension, underground pipeline construction, with the supply of various types of material and technical conditions and should be balaneed and rational utilization of these resources betwee n coord in ated con struct ion of promoti ng bala need.3.In accordance with the contract ' s duration requirements, well construction progress controlAccordi ng to the durati on of the con tract to complete con struct ion, both con tract requireme nts are also objects to achieve bus in ess goals. In this conn ecti on, the con structi on units (owners) with the construction unit of the interests of both sides are fully consistent. Therefore, strengthening construction progress control ensures that the duration of the con tract performa nee is a project man ager and main content of the basic duties. Pla n is a prerequisite for control, if has not it will be out of control which is to compare actual and planned values, identify deviations during, and for feedback adjustment. Preparation of con struct ion progress pla n to con trol the duratio n value is determ in ed, and come up with a guarantee scheme implementation of effective measuresto guarantee the duration planned completi on of the con tract period.Preparation of progress is to decide what to when to do, or when the progress of the project to do what extent. Whatever is the process of the project itself, or with other con struct ion-related work, should bein tegrated into the schedule to, or, whose progress you want to make a schedule. Types of project schedule classificati on based on content is targeted schemes and support schemes. Schedule for the project itself isthe most basic goal pla n that determ ines the durati on of the project goals. In order to achieve this goal, you have a range of support pla ns, such as pla nning material usage, work ing capital pla nning material usage, and equipme nt use pla ns, labor use pla n to use pla n, semi-fi ni shed products and comp onen ts, and so on. Con trol the len gth of time it came from overall progress pla n and phase pla n. Total progress scheme con trol the whole process of project con structi on, and phased pla n in cludes the project construct ion progress pla n and ten-years, quarters, mon ths, weeks of job schedules, and so on .It has a text pla n-pla n with a chart from the expressi ons. The former is with a text descripti on of each stage of con struct ion, and the image of progress to achieve requireme nts; the latter is with image and simple charts to express the construction schedule. As far as I know, bar is the most com monly used scheme, n etwork pla nning, and slash-type scheme. It has overall progress pla n and the partiti on pla n from the scope of man ageme nt. Master pla ns are project-orie nted global strategy progress of the pla n, gen erally cruder. While the pla n is for a bottle gourd or Project ~ Professi onal progress of the work pla n, gen erally more detailed.4.Preparation of project schedulea.This project of project con tract. Provisio n is to determ ine the duratio n of the con tract durati on in pla nned value basis. Project start and completio n dates stipulated in the con tract, must be impleme nted by schedule. Schedule of the ultimate goal is through reas on able progress desig n, to guara ntee duratio n completed on time.b.Con structi on of en terprise producti on and man ageme nt of reas on able pla n. Through the con structi on of en terprise product ion and man ageme nt of ratio nal pla nning, to en sure project efficie ncy, is the major comp onent of the pla n. Obey ing the bus in ess prin ciple of guida nee and meeti ng the requireme nts of en terprise bala nee achieve the best in terests of the en terprise.c.Draw ing in formati on. Draw ing in formati on is the basis and premise of rati onal desig n of con structi on schemes for con struct ion. Con structi on progress pla n must be lin ked with the progress of the desig n pla n, and must be based on the date of delivery nu mber agreeme nt to arrange the appropriate part of the con struct ion time, which is also a good way of con structi on risk preve nti on and guara ntee con struct ion quality.d.Construction organization design of this project is one of the strong basis for the preparatio n of project scheduli ng. This in formatio n defi nes con structi on capacity deployme nt and method of con structi on and reflects the con struct ion characteristics of the project, which forms the basis of targets at various stages in the process of determ ining con structi on pla ns.e.Materials and equipment supply plan. If you already have on the material and equipme nt and tur no vermaterial supply pla n, the con struct ion progress pla n must be coord in ated with the project .In additi on to the above five poi nts maki ng progress on a project pla ns as the basis for the main con siderati on, you should be aware of in formati on about site con struct ion con diti ons, in clud ing hydrological, climate and en vir onmen tal data in the field of con struct ion and tran sportati on con diti ons, en ergy supply, auxiliary product ion capacity. Also prior to the preparati on of project con struct ion progress pla n, similar to an already built or actual con struct ion schedule n eeds to be collected, and you should serious an alysis, orga nize, list con trol con stra int, clear the in flue nee of duratio n to achieve man datory time limits, for the preparatio n of project progress as well prepared.5.The project progress plan optimizationa.Adjusti ng the con structi on period. Each project is composed of many processes, the water segme nt of the con struct ion have the same nu mber of processes, each procedure is not iden tical in the various con struct ion stages of the con structi on period, it is the importa nee of adjusting the construction period that how to choose a scientific and rational construction process. Con structi on tech no logy that determ ined by the fixed con structi on tech no logy can not be cha nged, but the order of the con structi on stage can be cha nged, Choos ing a differe nt order of con structi on of water, the total durati on of the en tire con struct ion will be cha nged accord in gly. Therefore you n eed to find the shortest period of con structi on of water to optimize the order program for impleme ntatio n.b.A bala need use of resources. In prepari ng the con structi on schedule, you must take into acco unt the optimizati on of resources into acco un t. It not only requires the resources you pla n to use less tha n the actual supply of resources, but also tries to do the bala nee of resource conservation use. You should make resources available for the use of control within the available supply and the amount of resources to use every day similar. If resource usage is bala need, resource usage peak is smaller and resources fundingis less, also thus econo mic ben efits will certa inly be enhan ced accord in gly. For the huma n andmaterial resources, if the con struct ion pla ns of arran geme nt to take full adva ntage of them and let every sin gle day of the entire plan period to achieve efficiency, the amount of resources used in this plan is bala need and the econo mic ben efits will be good.c.Optimize the cost of the project. Adopt ing a differe nt con struct ion of water order, the project cost will vary in engin eeri ng con structi on. Seek ing the lowest cost soluti on to reduce costs is an importa nt part of the con struct ion. The cost of the project in cludes the two parts: direct and in direct costs. Gen erally speak in g, low direct costs of the con struct ion seque nee, the duratio n will be Ion ger. In order to shorte n the duratio n, the n eed to use more efficie nt eon struct ion mach inery or eon struct ion process so that direct costs will tend to in crease. If efficie ncy does not cha nge, you n eedmore man power or material resources, and in crease the in put of on e-time costs, which will in evitably lead to in crease in direct costs. Almost you always give high priority to in crease the cost of less and can shorte n the durati on of the order. However, if shorte n durati on, you will in crease the direct costs ofin puts. In direct costs and eon struct ion of the relati on ship is not close, and the basic fixed expe nses occur every day.anization of water construction methodAnother important means of ensuring project progress on a project is eonstruction of rational flow. Water eonstruction is continuous job, and it can save work time, which is relative to “ turn job ” , The means of achieving savings is adndt^r e ceiveise c” , take received is segme nt area; it can have rhythm to eon struct ion, and the time of the workers to work is a certa in degree of regularity, which can bring good of eon struct ion along the continu ed, the harm onious of eon struct ion atmosphere, eon siderable of econo mic ben efits and improve productivity.Project schedule eon trol of more tha n a few issues, in dicates that the schedule eon trol process does not happe n over ni ght so the en terprise in tegrati on should as a whole to eon sider eleme nts of in tegrati on and man ageme nt system .In the specific work, should pay atte nti on to givi ng play to promotein tegrati on of favorable factors and avoid in tegrati on or coord in ati on to preve nt the adverse factors and pay atte nti on to practical results and adva ncing as pla nned gradually.工程施工进度是工程项目的三大目标之一,是工程项目管理的重要组成部分。
English Abstract(1) The building is a college building , located in Yancheng(NEIghborhood,Tinghu) , the gross floor area for 4800m2and land of structurion for 1800m2,six-storey low – rise, high levels of 3.2m,total building height of 22.05m , well – designed structure of the service life of 50years , seismic intensity 7 , wall materials for the Ceramsite cocerte hollow block .(2) Constrction of the ride south , construction isa flat – shaped ,symetrical layout . Dormitory on the south side of the other on the north side of the arrangement , reasonable layout , better lighting .(3) The construction organization plan is constructs the construction organization's core and the soul, is conceives to the engineering construction project entire process idea with the concrete arrangement, uses for to instruct construction item entire process each activity the technology, the economical and organization's comprehensive document. the this construction organization plan is aims at Yancheng students’ building project construction the Platform. When establishment to the project managementorganization establishment, the construction overall deployed that the construction preparation, the main branch sub-item project job practice, the project quality safeguard measure, the security and the civilized construction measure, the job location management measure and so on many factors considered fully as far as possible, prominent scientific nature, serviceability and pointed, is guaranteed that high quality, the low consumption, the security, civilized, complete completely the construction work important economical technical paper high speed. this design mainly includes the following content: The project construction organization designs, the Chinese and English translation, the construction floor-plan. In order to guarantee that the time, the quality and the security, the civilized work site, save conditions and so on cost, establishes the pointed construction organization plan, each branch sub-item project's characteristic, the structural feature, the construction difficulty degree time and the quality requirement, establish the practical and feasible plan of construction. Instructs the construction smoothlycost engineering project the construction, the control engineering cost, the foundation high quality project. key word: Project, construction.(4) Civil Engineering for the development of a key role, first as a material foundation for the civil engineering construction materials, followed by the subsequent development of the design theory and construction technology. Every time a new quality of building materials, civil engineering will be aleap-style development.People can only rely on the early earth, wood and other natural materials in the construction activities, and later appeared in brick and tile that artificial materials, so that the first human to break the shackles of natural building materials. China in the eleventh century BC in the early Western Zhou Dynasty created the tile. The first brick in the fifth century BC to the third century BC, when the tomb of the Warring States Period. Brick and tile better than themechanical properties of soil, materials, and easy to manufacture.The brick and tile so that people began to appear widely, to a large number of housing construction and urban flood control project, and so on. This civil engineering technology has been rapid development. Up to 18 to the 19th century, as long as two thousand years, brick and tile has been a major civil engineering construction materials, human civilization has made a great contribution to the even was also widely used in the present.The application of a large number of steel products is the second leap in civil engineering. Seventeen 1970s the use of pig iron, the early nineteenth century, the use of wrought iron bridges and the construction of housing, which is a prelude to the emergence of steel.From the beginning of the mid-nineteenth century, metallurgical industry, smelting and rolling out hightensile and compressive strength, ductility, uniformity of the quality of construction steel and then produce high-strength steel wire, steel cables. As a result of the need to adapt to the development of the steel structure have been flourishing. In addition to the application of the original beam, arch structure, the new truss, a framework, the structure of network, cable structures to promote the gradual emergence of the structure of Yan in the form of flowers.From the brick building long-span structures, stone structures, a few meters of wood, steel structure to the development of tens of meters, a few hundred meters, until modern km above. So in the river, cross the bridge from shelves, on the ground since the construction of skyscrapers and high-rise tower, even in the laying of underground railway, to create an unprecedented miracle.In order to meet the needs of the development of steel works, on the basis of Newton's mechanics, materialmechanics, structural mechanics, structural engineering design theory came into being, and so on. Construction machinery, construction technology and construction organization design theory also development, civil engineering from the experience of rising to become science, engineering practice and theoretical basis for both is a different place, which led to more rapid development of civil engineering.During the nineteenth century, 20, made of Portland cement, concrete has come out. Concrete can aggregate materials, easy-to-concrete structures forming, but the tensile strength of concrete is very small, limited use. By the middle of the nineteenth century, the surge in steel production, with the emergence of this new type of reinforced concrete composite construction materials, which bear the tension steel, concrete bear the pressure and play their own advantages. Since the beginning of the 20th century, reinforced concrete is widely used in various fields of civil engineering.。
英文译文与原文学院工程技术学院专业、班级土木工程1011 姓名杜军斌学号 ********** 指导老师刘强职称教授第一篇Civil engineering introduction papersAbstract: the civil engineering is a huge discipline, but the main one is building, building whether in China or abroad, has a long history, long-term development process. The world is changing every day, but the building also along with the progress of science and development. Mechanics findings, material of update, ever more scientific technology into the building. But before a room with a tile to cover the top of the house, now for comfort, different ideas, different scientific, promoted the development of civil engineering, making it more perfect.[key words] : civil engineering; Architecture; Mechanics, Materials.Civil engineering is build various projects collectively. It was meant to be and "military project" corresponding. In English the history of Civil Engineering, mechanical Engineering, electrical Engineering, chemical Engineering belong to to Engineering, because they all have MinYongXing. Later, as the project development of science and technology, mechanical, electrical, chemical has gradually formed independent scientific, to Engineering became Civil Engineering of specialized nouns. So far, in English, to Engineering include water conservancy project, port Engineering, While in our country, water conservancy projects and port projects also become very close and civil engineering relatively independent branch. Civil engineering construction of object, both refers to that built on the ground, underground water engineering facilities, also refers to applied materials equipment and conduct of the investigation, design and construction, maintenance, repair and other professional technology.Civil engineering is a kind of with people's food, clothing, shelter and transportation has close relation of the project. Among them with "live" relationship is directly. Because, to solve the "live" problem must build various types of buildings. To solve the "line, food and clothes" problem both direct side, but also a indirect side. "Line", must build railways, roads, Bridges, "Feed", must be well drilling water, water conservancy, farm irrigation, drainage water supply for the city, that is direct relation. Indirectly relationship is no matter what you do, manufacturing cars, ships, or spinning and weaving, clothing, or even production steel, launch satellites, conducting scientific research activities areinseparable from build various buildings, structures and build all kinds of project facilities.Civil engineering with the progress of human society and development, yet has evolved into large-scale comprehensive discipline, it has out many branch, such as: architectural engineering, the railway engineering, road engineering, bridge engineering, special engineering structure, water and wastewater engineering, port engineering, hydraulic engineering, environment engineering disciplines. [1]Civil engineering as an important basic disciplines, and has its important attributes of: integrated, sociality, practicality, unity. Civil engineering for the development of national economy and the improvement of people's life provides an important material and technical basis, for many industrial invigoration played a role in promoting, engineering construction is the formation of a fixed asset basic production process, therefore, construction and real estate become in many countries and regions, economic powerhouses.Construction project is housing planning, survey, design, construction of the floorboard. Purpose is for human life and production provide places.Houses will be like a man, it's like a man's life planning environment is responsible by the planners, Its layout and artistic processing, corresponding to the body shape looks and temperament, is responsible by the architect, Its structure is like a person's bones and life expectancy, the structural engineer is responsible, Its water, heating ventilation and electrical facilities such as the human organ and the nerve, is by the equipment engineer is responsible for. Also like nature intact shaped like people, in the city I district planning based on build houses, and is the construction unit, reconnaissance unit, design unit of various design engineers and construction units comprehensive coordination and cooperation process.After all, but is structural stress body reaction force and the internal stress and how external force balance. Building to tackle, also must solve the problem is mechanical problems. We have to solve the problem of discipline called architectural mechanics. Architectural mechanics have can be divided into: statics, material mechanics and structural mechanics three mechanical system. Architectural mechanics is discussion and research building structure and component in load and other factors affecting the working condition of, also is the building of intensity, stiffness and stability. In load, bear load and load of structure and component can cause the surrounding objects in their function, and the object itself by the load effect and deformation, and there is the possibility of damage, but the structure itself has certain resistance to deformation and destruction of competence, and the bearing capacity of the structure size is and component of materials, cross section, andthe structural properties of geometry size, working conditions and structure circumstance relevant. While these relationships can be improved by mechanics formula solved through calculation.Building materials in building and has a pivotal role. Building material is with human society productivity and science and technology improves gradually developed. In ancient times, the human lives, the line USES is the rocks andTrees. The 4th century BC, 12 ~ has created a tile and brick, humans are only useful synthetic materials made of housing. The 17th century had cast iron and ShouTie later, until the eighteenth century had Portland cement, just make later reinforced concrete engineering get vigorous development. Now all sorts of high-strength structural materials, new decoration materials and waterproof material development, criterion and 20th century since mid organic polymer materials in civil engineering are closely related to the widely application. In all materials, the most main and most popular is steel, concrete, lumber, masonry. In recent years, by using two kinds of material advantage, will make them together, the combination of structure was developed. Now, architecture, engineering quality fit and unfit quality usually adopted materials quality, performance and using reasonable or not have direct connection, in meet the same technical indicators and quality requirements, under the precondition of choice of different material is different, use method of engineering cost has direct impact.In construction process, building construction is and architectural mechanics, building materials also important links. Construction is to the mind of the designer, intention and idea into realistic process, from the ancient hole JuChao place to now skyscrapers, from rural to urban country road elevated road all need through "construction" means. A construction project, including many jobs such as dredging engineering, deep foundation pit bracing engineering, foundation engineering, reinforced concrete structure engineering, structural lifting project, waterproofing, decorate projects, each type of project has its own rules, all need according to different construction object and construction environment conditions using relevant construction technology, in work-site.whenever while, need and the relevant hydropower and other equipment composition of a whole, each project between reasonable organizing and coordination, better play investment benefit. Civil engineering construction in the benefit, while also issued by the state in strict accordance with the relevant construction technology standard, thus further enhance China's construction level to ensure construction quality, reduce the cost for the project.Any building built on the surface of the earth all strata, building weight eventually to stratum, have to bear. Formation Support building the rocks were referred to as foundation, and the buildings on the ground and underthe upper structure of self-respect and liable to load transfer to the foundation of components or component called foundation. Foundation, and the foundation and the superstructure is a building of three inseparable part. According to the function is different, but in load, under the action of them are related to each other, is the interaction of the whole. Foundation can be divided into natural foundation and artificial foundation, basic according to the buried depth is divided into deep foundation and shallow foundation. , foundation and foundation is the guarantee of the quality of the buildings and normal use close button, where buildings foundation in building under loads of both must maintain overall stability and if the settlement of foundation produce in building scope permitted inside, and foundation itself should have sufficient strength, stiffness and durability, also consider repair methods and the necessary foundation soil retaining retaining water and relevant measures.[3]As people living standard rise ceaselessly, the people to their place of building space has become not only from the number, and put forward higher requirement from quality are put car higher demands that the environment is beautiful, have certain comfort. This needs to decorate a building to be necessary. If architecture major engineering constitutes the skeleton of the building, then after adornment building has become theflesh-and-blood organism, final with rich, perfect appearance in people's in front, the best architecture should fully embody all sorts of adornment material related properties, with existing construction technology, the most effective gimmick, to achieve conception must express effect. Building outfit fix to consider the architectural space use requirement, protect the subject institutions from damage, give a person with beautifulenjoying, satisfy the requirements of fire evacuation, decorative materials and scheme of rationality, construction technology and economic feasibility, etc. Housing construction development and at the same time, like housing construction as affecting people life of roads, Bridges, tunnels has made great progress.In general civil engineering is one of the oldest subjects, it has made great achievements, the future of the civil engineering will occupy in people's life more important position. The environment worsening population increase, people to fight for survival, to strive for a more comfortable living environment, and will pay more attention to civil engineering. In the near future, some major projects extimated to build, insert roller skyscrapers, across the oceanBridges, more convenient traffic would not dream. The development of science and technology, and the earth is deteriorating environment will be prompted civil engineering to aerospace and Marine development, provide mankind broader space of living. In recent years, engineering materials mainly is reinforced concrete, lumber and brick materials, inthe future, the traditional materials will be improved, more suitable for some new building materials market, especially the chemistry materials will promote the construction of towards a higher point. Meanwhile, design method of precision, design work of automation, information and intelligent technology of introducing, will be people have a more comfortable living environment. The word, and the development of the theory and new materials, the emergence of the application of computer, high-tech introduction to wait to will make civil engineering have a new leap.This is a door needs calm and a great deal of patience and attentive professional. Because hundreds of thousands, even hundreds of thousands of lines to building each place structure clearly reflected. Without a gentle state of mind, do what thing just floating on the surface, to any a building structure, to be engaged in business and could not have had a clear, accurate and profound understanding of, the nature is no good. In this business, probably not burn the midnight oil of courage, not to reach the goal of spirit not to give up, will only be companies eliminated. This is a responsible and caring industry. Should have a single responsible heart - I one's life in my hand, thousands of life in my hand. Since the civil, should choose dependably shoulder the responsibility. Finally, this is a constant pursuit of perfect industry. Pyramid, spectacular now: The Great Wall, the majestic... But if no generations of the pursuit of today, we may also use the sort of the oldest way to build this same architecture. Design a building structure is numerous, but this is all experienced centuries of clarification, through continuous accumulation, keep improving, innovation obtained. And such pursuit, not confined in the past. Just think, if the design of a building can be like calculation one plus one equals two as simple and easy to grasp, that was not for what? Therefore, a civil engineer is in constant of in formation. One of the most simple structure, the least cost, the biggest function. Choose civil, choosing a steadfast diligence, innovation, pursuit of perfect path.译文:土木工程概论摘要:土木工程是个庞大的学科,但最主要的是建筑,建筑无论是在中国还是在国外,都有着悠久的历史,长期的发展历程。
土木工程专业建筑施工外文翻译文献原文:Building construction concrete crack ofprevention and processingAbstractThe crack problem of concrete is a widespread existence but again difficult in solve of engineering actual problem, this text carried on a study analysis to a little bit familiar crack problem in the concrete engineering, and aim at concrete the circumstance put forward some prevention, processing measure.Keyword:Concrete crack prevention processingForewordConcrete's ising 1 kind is anticipate by the freestone bone, cement, water and other mixture but formation of the in addition material of quality brittleness not and all material.Because the concrete construction transform with oneself, control etc. a series problem, harden model of in the concrete existence numerous tiny hole, spirit cave and tiny crack, is exactly because these beginning start blemish of existence just make the concrete present one some not and all the characteristic of quality.The tiny crack is a kind of harmless crack and accept concrete heavy, defend Shen and a little bit other use function not a creation to endanger.But after the concrete be subjected to lotus carry, difference in temperature etc. function, tiny crack would continuously of expand with connect, end formation we can see without the aid of instruments of macro view the crack be also the crack that the concrete often say in the engineering.Concrete building and Gou piece usually all take sewer to make of, because of crack of existence and development usually make inner part of reinforcing bar etc. material creation decay, lower reinforced concrete material of loading ability, durable and anti- Shen ability, influence building of external appearance, service life, severity will threat arrive people's life and property safety.A lot of all of crash of engineerings is because of the unsteady development of the crack with the result that.Modern age science research with a great deal of of the concrete engineeringpractice certificate, in the concrete engineering crack problem is ineluctable, also acceptable in certainly of the scope just need to adopt valid of measure will it endanger degree control at certain of scope inside.The reinforced concrete norm is also explicit provision:Some structure at place of dissimilarity under the condition allow existence certain the crack of width.But at under construction should as far as possible adopt a valid measure control crack creation, make the structure don't appear crack possibly or as far as possible decrease crack of amount and width, particularly want to as far as possible avoid harmful crack of emergence, insure engineering quality thus.Concrete crack creation of the reason be a lot of and have already transformed to cause of crack:Such as temperature variety, constringency, inflation, the asymmetry sink to sink etc. reason cause of crack;Have outside carry the crack that the function cause;Protected environment not appropriate the crack etc. caused with chemical effect.Want differentiation to treat in the actual engineering, work°out a problem according to the actual circumstance.In the concrete engineering the familiar crack and the prevention1.Stem Suo crack and preventionStem the Suo crack much appear after the concrete protect be over of a period of time or concrete sprinkle to build to complete behind of around a week.In the cement syrup humidity of evaporate would creation stem Suo, and this kind of constringency is can't negative.Stem Suo crack of the creation be main is because of concrete inside outside humidity evaporate degree dissimilarity but cause to transform dissimilarity of result:The concrete is subjected to exterior condition of influence, surface humidity loss lead quick, transform bigger, inner part degree of humidity variety smaller transform smaller, bigger surface stem the Suo transform to be subjected to concrete inner part control, creation more big pull should dint but creation crack.The relative humidity is more low, cement syrup body stem Suo more big, stem the Suo crack be more easy creation.Stem the Suo crack is much surface parallel lines form or the net shallow thin crack, width many between 0.05-0.2 mm, the flat surface part much see in the big physical volume concrete and follow it morein thinner beam plank short to distribute.Stem Suo crack usually the anti- Shen of influence concrete, cause the durable of the rust eclipse influence concrete of reinforcing bar, under the function of the water pressure dint would creation the water power split crack influence concrete of loading dint etc..Concrete stem the Suo be main with water ash of the concrete ratio, the dosage of the composition, cement of cement, gather to anticipate of the dosage of the property and dosage, in addition etc. relevant.Main prevention measure:While being to choose to use the constringency quantity smaller cement, general low hot water mire and powder ash from stove cement in the adoption, lower the dosage of cement.Two is a concrete of stem the Suo be subjected to water ash ratio of influence more big, water ash ratio more big, stem Suo more big, so in the concrete match the ratio the design should as far as possible control good water ash ratio of choose to use, the Chan add in the meantime accommodation of reduce water.Three is strict control concrete mix blend with under construction of match ratio, use of concrete water quantity absolute can't big in match ratio design give settle of use water quantity.Four is the earlier period which strengthen concrete to protect, and appropriate extension protect of concrete time.Winter construction want to be appropriate extension concrete heat preservation to overlay time, and Tu2 Shua protect to protect.Five is a constitution the accommodation is in the concrete structure of the constringency sew.2.The Su constringency crack and preventionSu constringency is the concrete is before condense, surface because of lose water quicker but creation of constringency.The Su constringency crack is general at dry heat or strong wind the weather appear, crack's much presenting in the center breadth, both ends be in the centerthin and the length be different, with each other not coherent appearance.Shorter crack general long 20-30 cm, the longer crack can reach to a 2-3 m, breadth 1-5 mm.It creation of main reason is:The concrete is eventually almost having no strength or strength before the Ning very small, perhaps concrete just eventually Ning but strength very hour, be subjected to heat or compare strong wind dint of influence, the concrete surface lose water to lead quick,result in in the capillary creation bigger negative press but make a concrete physical volume sharply constringency, but at this time the strength of concrete again can't resist its constringency, therefore creation cracked.The influence concrete Su constringency open the main factor of crack to have water ash ratio, concrete of condense time, environment temperature, wind velocity, relative humidity...etc..Main prevention measure:One is choose to use stem the Suo value smaller higher Huo sour salt of the earlier period strength or common the Huo sour brine mire.Two is strict the control water ash ratio, the Chan add to efficiently reduce water to increment the collapse of concrete fall a degree and with easy, decrease cement and water of dosage.Three is to sprinkle before building concrete, water basic level and template even to soak through.Four is in time to overlay the perhaps damp grass mat of the plastics thin film, hemp slice etc., keep concrete eventually before the Ning surface is moist, perhaps spray to protect etc. to carry on protect in the concrete surface.Five is in the heat and strong wind the weather to want to establish to hide sun and block breeze facilities, protect in time.3.Sink to sink crack and preventionThe creation which sink to sink crack is because of the structure foundation soil quality not and evenly, loose soft or return to fill soil dishonest or soak in water but result in the asymmetry sink to decline with the result that;Perhaps because of template just degree shortage, the template propped up to once be apart from big or prop up bottom loose move etc. to cause, especially at winter, the template prop up at jelly soil up, jelly the soil turn jelly empress creation asymmetry to sink to decline and cause concrete structure creation crack.This kind crack many is deep enter or pierce through sex crack, it alignment have something to do with sinking to sink a circumstance, general follow with ground perpendicular or present 30 °s-45 °Cape direction development, bigger sink to sink crack, usually have certain of wrong, crack width usually with sink to decline quantity direct proportion relation.Crack width under the influence of temperature variety smaller.The foundation after transform stability sink to sink crack also basic tend in stability.Main prevention measure:One is rightness loose soft soil, return to fill soilfoundation a construction at the upper part structure front should carry on necessity of Hang solid with reinforce.Two is the strength that assurance template is enough and just degree, and prop up firm, and make the foundation be subjected to dint even.Three is keep concrete from sprinkle infusing the foundation in the process is soak by water.Four is time that template tore down to can't be too early, and want to notice to dismantle a mold order of sequence.Five is at jelly soil top take to establish template to notice to adopt certain of prevention measure.4.Temperature crack and preventionTemperature crack much the occurrence is in big surface or difference in temperature variety of the physical volume concrete compare the earth area of the concrete structure.Concrete after sprinkling to build, in the hardening the process, cement water turn a creation a great deal of of water turn hot, .(be the cement dosage is in the 350-550 kg/m 3, each sign square the rice concrete will release a calories of 17500-27500 kJ and make concrete internal thus the temperature rise to reach to 70 ℃or so even higher)Because the physical volume of concrete be more big, a great deal of of water turn hot accumulate at the concrete inner part but not easy send forth, cause inner part the temperature hoick, but the concrete surface spread hot more quick, so formation inside outside of bigger difference in temperature, the bigger difference in temperature result in inner part and exterior hot the degree of the bulge cold Suo dissimilarity, make concrete surface creation certain of pull should dint.When pull should dint exceed the anti- of concrete pull strength extreme limit, concrete surface meeting creation crack, this kind of crack much occurrence after the concrete under construction period.In the concrete of under construction be difference in temperature variety more big, perhaps is a concrete to be subjected to assault of cold wave etc., will cause concrete surface the temperature sharply descend, but creation constringency, surface constringency of the concrete be subjected to inner part concrete of control, creation very big of pull should dint but creation crack, this kind of crack usually just in more shallow scope of the concrete surface creation.The alignment of the temperature crack usually none settle regulation, big areastructure the crack often maneuver interleave;The size bigger structure of the beam plank length, the crack run parallel with short side more;Thorough with pierce through sex of temperature crack general and short side direction parallelism or close parallelism, crack along long side cent the segment appear, in the center more airtight.Crack width the size be different, be subjected to temperature variety influence more obvious, winter compare breadth, summer more narrow.The concrete temperature crack that the heat inflation cause is usually in the center the thick both ends be thin, but cold Suo crack of thick thin variety not too obvious.The emergence of the this kind crack will cause the rust eclipse of reinforcing bar, the carbonization of concrete, the anti- jelly which lower concrete melt, anti- tired and anti- Shen ability etc..Main prevention measure:One is as far as possible choose to use low hot or medium hot water mire, like mineral residue cement, powder ash from stove cement...etc..Two is a decrease cement dosage, cement dosage as far as possible the control is in the 450 kg/m 3 following.Three is to lower water ash ratio, water ash of the general concrete ratio control below 0.6.Four is improvement the bone anticipate class to go together with, the Chan add powder ash from stove or efficiently reduce water etc. to come to reduce cement dosage and lower water to turn hot.Five is an improvement concrete of mix blend to process a craft, lower sprinkle of concrete to build temperature.Six is the in addition that the Chan add a have of fixed amount to reduce water and increase Su, slow Ning etc. function in the concrete, improvement the concrete mix to match a thing of mobility, protect water, lower water to turn hot, postpone hot Feng of emergence time.Seven is the heat season sprinkle to build can the adoption take to establish to hide sun plank etc. assistance measure control concrete of Wen Sheng, lower to sprinkle temperature of build the concrete.Eight is the temperature of big physical volume concrete should the dint relate to structure size, concrete structure size more big, temperature should dint more big, so want reasonable arrangement construction work preface, layering, cent the piece sprinkle to build, for the convenience of in spread hot, let up control.Nine is at great inner part constitution of the physical volume concrete cooloff piping, cold water perhaps cold air cool off, let up concrete of inside outside difference in temperature.Ten is the supervision which strengthen concrete temperature, adopt to cool off in time, protection measure.11 is to reserve temperature constringency to sew.12 is to let up to control, sprinkle proper before building concrete in the Ji rock and old concrete top build a 5 mm or so sand mat a layer or usage asphalt etc. material Tu2 Shua.13 is to strengthen concrete to protect, the concrete after sprinkle build use moist grass Lian in time, hemp slice's etc. overlay, and attention sprinkle water to protect, appropriate extension protect time, assurance the concrete surface be slow-moving cool off.At the cold season, concrete surface should constitution heat preservation measure, in order to prevent cold wave assault.14 is the allocation be a little amount in the concrete of reinforcing bar perhaps add fiber material concrete of temperature crack control at certain of scope inside.5.Crack and prevention that the chemical reaction causeAlkali bone's anticipating the crack that reaction crack and reinforcing bar rust eclipse cause is the most familiar in the reinforced concrete structure of because of chemical reaction but cause of crack.The concrete blend a future reunion creation some alkalescence ion, these ion with some activity the bone anticipate creation chemical reaction and absorb surroundings environment in of water but the physical volume enlarge, make concrete crisp loose, inflation open crack.In this kind of crack general emergence concrete structure usage period, once appear very difficult remediable, so should at under construction adopt valid the measure carry on prevention.Main of prevention measure:While being to choose to anticipate with the alkali activity small freestone bone.Two is the in addition which choose to use low lye mire with low alkali or have no alkali.Three is the Chan which choose to use accommodation with anticipate to repress an alkali bone to anticipate reaction.Because the concrete sprinkle to build, flap Dao bad perhaps is a reinforcing bar protection layer thinner, the harmful material get into concrete to make reinforcing bar creation rust eclipse, the reinforcing bar physical volume of the rusteclipse inflation, cause concrete bulge crack, the crack of this kind type much is a crack lengthways, follow the position of reinforcing bar ually of prevent measure from have:One is assurance reinforcing bar protection the thickness of the layer.Two is a concrete class to go together with to want good.Three is a concrete to sprinkle to note and flap Dao airtight solid.Four is a reinforcing bar surface layer Tu2 Shua antisepsis coating.Crack processingThe emergence of the crack not only would influence structure of whole with just degree, return will cause the rust eclipse of reinforcing bar, acceleration concrete of carbonization, lower durable and anti- of concrete tired, anti- Shen ability.Therefore according to the property of crack and concrete circumstance we want differentiation to treat, in time processing, with assurance building of safety usage.The repair measure of the concrete crack is main to have the following some method:Surface repair method, infuse syrup, the Qian sew method, the structure reinforce a method, concrete displacement method, electricity chemistry protection method and imitate to living from heal method.Surface repair the method be a kind of simple, familiar of repair method, it main be applicable to stability and to structure loading the ability don't have the surface crack of influence and deep enter crack of processing.The processing measure that is usually is a surface in crack daubery cement syrup, the wreath oxygen gum mire or at concrete surface Tu2 Shua paint, asphalt etc. antisepsis material, at protection of in the meantime for keeping concrete from continue under the influence of various function to open crack, usually can adoption the surface in crack glue to stick glass fiber cloth etc. measure.1, infuse syrup, the Qian sew methodInfuse a syrup method main the concrete crack been applicable to have influence or have already defend Shen request to the structure whole of repair, it is make use of pressure equipments gum knot the material press into the crack of concrete, gum knot the material harden behind and concrete formation one bewhole, thus reinforce of purpose.The in common use gum knot material has the cement the syrup, epoxy, A Ji C Xi sour ester and gather ammonia ester to equalize to learn material.The Qian sew a method is that the crack be a kind of most in common use method in, it usually is follow the crack dig slot, the Qian fill Su in the slot or rigid water material with attain closing crack of purpose.The in common use Su material has PVC gum mire, plastics ointment, the D Ji rubber etc.;In common use rigid water material is the polymer cement sand syrup.2, the structure reinforce a methodWhen the crack influence arrive concrete structure of function, will consideration adopt to reinforce a method to carry on processing to the concrete structure.The structure reinforce medium in common use main have the following a few method:The piece of enlargement concrete structure in every aspect accumulate, outside the Cape department of the Gou piece pack type steel, adoption prepare should the dint method reinforce, glue to stick steel plate to reinforce, increase to establish fulcrum to reinforce and jet the concrete compensation reinforce.3, concrete displacement methodConcrete displacement method is processing severity damage concrete of a kind of valid method, this method be first will damage of the concrete pick and get rid of, then again displacement go into new of concrete or other material.The in common use displacement material have:Common concrete or the cement sand syrup, polymer or change sex polymer concrete or sand syrup.4, the electricity chemistry protection methodThe electricity chemistry antisepsis is to make use of infliction electric field in lie the quality of electricity chemical effect, change concrete or reinforced concrete the environment appearance of the place, the bluntness turn reinforcing bar to attain the purpose of antisepsis.Cathode protection method, chlorine salt's withdrawing a method, alkalescence to recover a method is a chemistry protection method in three kinds of in common use but valid method.The advantage of this kind of method is aprotection method under the influence of environment factor smaller, apply reinforcing bar, concrete of long-term antisepsis, since can used for crack structure already can also used for new set up structure.5, imitate to living from legal moreImitate to living from heal the method be a kind of new crack treatment, its mimicry living creature organization secrete a certain material towards suffering wound part auto, but make the wound part heal of function, join some and special composition(such as contain to glue knot of the liquid Xin fiber or capsule) in the concrete of the tradition the composition, at concrete inner part formation the intelligence type imitate to living from heal nerve network system, be the concrete appear crack secrete a parts of liquid Xin fiber can make the crack re- heal.ConclusionThe crack is widespread in the concrete structure existence of a kind of phenomenon, it of emergence not only will lower the anti- Shen of building ability, influence building of usage function, and will cause the rust eclipse of reinforcing bar, the carbonization of concrete, lower the durable of material, influence building of loading ability, so want to carry on to the concrete crack earnest research, differentiation treat, adoption reasonable of the method carry on processing, and at under construction adopt various valid of prevention measure to prevention crack of emergence and development, assurance building and Gou piece safety, stability work.中文:建筑施工混凝土裂缝的预防与处理混凝土的裂缝问题是一个普遍存在而又难于解决的工程实际问题,本文对混凝土工程中常见的一些裂缝问题进行了探讨分析,并针对具体情况提出了一些预防、处理措施。
xxxxxx大学本科毕业设计外文翻译Project Cost Control: the Way it Works工程本钱控制:它的工作方式学院〔系〕:xxxxxxxxxxxx专业:xxxxxxxx学生姓名:xxxxx学号:xxxxxxxxxx指导教师:xxxxxx评阅教师:完成日期:xxxx大学工程本钱控制:它的工作方式在最近的一次咨询任务中,我们意识到对于整个工程本钱控制体系是如何设置和应用的,仍有一些缺乏理解。
所以我们决定描述它是如何工作的。
理论上,工程本钱控制不是很难跟随。
首先,建立一组参考基线。
然后,随着工作的深入,监控工作,分析研究结果,预测最终结果并比拟参考基准。
如果最终的结果不令人满意,那么你要对正在进展的工作进展必要的调整,并在适宜的时间间隔重复。
如果最终的结果确实不符合基线方案,你可能不得不改变方案。
更有可能的是,会 (或已经) 有围变更来改变参考基线,这意味着每次出现这种情况你必须改变基线方案。
但在实践中,工程本钱控制要困难得多,通过工程数量无法控制本钱也证明了这一点。
正如我们将看到的,它还需要大量的工作,我们不妨从一开场启用它。
所以,要跟随工程本钱控制在整个工程的生命周期。
同时,我们会利用这一时机来指出几个重要文件的适当的地方。
其中包括商业案例,请求〔资本〕拨款〔执行〕,工作包和工作分解构造,工程章程(或摘要),工程预算或本钱方案、挣值和本钱基线。
所有这些有助于提高这个组织的有效地控制工程本钱的能力。
业务用例和应用程序(执行)的资金重要的是要注意,当负责的管理者对于工程应如何通过工程生命周期展开有很好的理解时,工程本钱控制才是最有效的。
这意味着他们在主要阶段的关键决策点之间行使职责。
他们还必须识别工程风险管理的重要性,至少可以确定并方案阻止最明显的潜在风险事件。
在工程的概念阶段•每个工程始于确定的时机或需要的人。
通常是有着重要性和影响力的人,如果工程继续,这个人往往成为工程的赞助。
建筑施工进度管理论文中英文资料外文翻译文献Introduction本文提供了一些关于建筑施工进度管理的论文资料和外文翻译文献,旨在帮助读者更好地了解该领域的研究进展和方法。
论文资料1. 标题:Construction Project Scheduling and Control标题:Construction Project Scheduling and Control- 作者:Saleh A. Mubarak- 出版年份:2017- 摘要:该论文介绍了建筑施工项目的进度管理和控制方法,包括施工进度计划、进度控制和监督、关键路径法等。
通过案例研究和实践经验,论文讨论了进度管理的关键问题和解决方案。
2. 标题:A Critical Path Method Scheduling Framework for Construction Projects标题:A Critical Path Method Scheduling Framework for Construction Projects- 作者:Adbullah Almomani- 出版年份:2019- 摘要:该论文提出了一种基于关键路径法的建筑施工项目进度管理框架。
通过详细介绍关键路径法和相关工具,论文指导了如何使用该方法进行施工进度规划和控制,并提出了一些改进措施以应对项目变化和不确定性。
外文翻译文献1. 标题:Construction Progress Control Using Earned Value Method标题:Construction Progress Control Using Earned Value Method- 作者:Eftychios T. Pavlos- 出版年份:2018- 摘要:该文献介绍了一种利用挣值法进行建筑施工进度控制的方法。
通过将实际完成工作的价值与计划完成工作的价值进行比较,文献阐述了如何评估施工项目的进度状况,并提出了一套综合指标用于监测和控制施工进度。
施工组织设计英文书籍English:Construction Organization Design is a comprehensive book that covers the fundamentals and advanced topics in construction organization and management. It provides a detailed understanding of the principles and techniques of construction organization design, including project planning, scheduling, resource allocation, and risk management. The book also discusses the integration of technology and innovation in construction organization design, emphasizing the use of Building Information Modeling (BIM) and other advanced tools for improving construction productivity and efficiency. Additionally, it addresses the environmental and sustainability aspects of construction organization design, highlighting the importance of green construction practices and waste management. The book includes case studies and practical examples to enhance the reader's understanding and application of construction organization design principles in real-world projects.Translated content:《施工组织设计》是一本全面介绍施工组织和管理基础和高级主题的书籍。
中英文对照外文翻译文献(文档含英文原文和中文翻译)Construction stage safety civilization management1 Research content and purposeAt present China's production safety situation is still grim, especially the building area of the multiple casualties situation has not fundamentally reversed, construction safety is extremely stern; production safety foundation is weak, guarantee system and mechanism is not perfect; safety production supervision and management mechanism, team construction and supervision work also needs to be strengthened.With China's implementation of the "going out" strategy, the overseas engineering construction requirements of construction enterprises toward the safety and high quality fast and efficient direction, but the due to the overseas projects in surveying, design, competitive bidding system and construction exists some defects or mistakes, especially the construction environment and conditions for overseas and domestic different is formed many unsafe factors. Some governments of developed countries on safe and civilized construction management and supervision ineffective, at the same time, the security incident victimscompensation is relatively low, so as to project management are real will "safety first" self psychological suggestion and safe and civilized management psychological orientation proposed higher requirements. And in the preparation of the overseas project safety assurance program, sometimes due to lack of understanding in the engineering field, easy to cause the of dangerous source judgement is not accurate or not in place, and psychologically cannot accurately to ensure the safety of the positioning of the feasibility of the program.By exploring the harmful factors in the construction process and construction process was studied in unsafe, uncivilized between factors and employee of contradiction and the law of the unity of opposites, making better use of these rules to formulate a scientific, reasonable, effective all safe and civilized production tube system, to improve and perfect the measures of safety and technological civilization, to prevent and eliminate various harmful factors in the process of construction to the conversion of the casualty of a series of management work, to protect workers' safety and health, ensure safety in production. Due to the construction of the unsafe factor is relatively more, a little careless, it may occur accident. In recent years, occurred throughout the country in the construction work accidents and serious casualty statistics tells us that construction of the security situation is still very grim. However, construction safety problems with everything else, has its own objective law. It objectively resides in the entire construction activity. Since so, naturally, be it analysis to understand, master rules of it, take the organizational and technical measures to pre control, in order to achieve the purpose of construction safety. However, there are still many problems in the management of the security civilization.Therefore, we focus on the construction stage of the construction safety civilization management, the construction of the various aspects of the construction plan, the status quo of the safety and civilization management. Through the safety awareness of the management, the system of planning, to the project safety detailed analysis of the content. There are some unpredictable problems during the process of preparation, which is the main problem in the management of safety civilization.. Lay a good foundation for further implementation.. According to the occurrence of the settlement of the accident, there is no accident occurred, record the safety civilization management improvement measures, improve the safety and civilization management. As generally work arrangements properly was period of management is relatively lax, cross process serious and complicated, and safety problems inthis period is often risks and security alert frigidity, may not out of the big problem, but small problems and small risks constantly. So strengthen safety education and training, the unknown engineering safety civilization management summary, learning.Through the research on the safety civilization management of the construction stage, the danger identification, the risk assessment and the risk control of the modern safety civilization management are discussed in three aspects.. The aim is to better and more secure the work done. Do early work after the reduction of risk, and further strengthen the construction project risk management, and thus promote the faster development of China's construction projects.2 Status quo of safety civilization managementIn recent years, with the continuous improvement of the market economy and the common improvement of people's life, construction industry has become one of the fastest developing industries. The competition of the market is increasingly fierce, so that the benefit of the enterprise to compete in the target, so to the management to benefit has become the consensus of entrepreneurs. And safety is the premise of the benefit, because the safety results determine the size of the benefit. End over the years the party and the government attaches great importance to production safety work, determine the safety production policy of "safety first, prevention first", promulgated a series of production safety laws and regulations and standards, the purpose is to protect the safety and health of laborers, control and reduce all kinds of accidents, improve the level of safety management, promote the establishment of harmonious society.The construction industry is the risk of production activities, unsafe factors, is the accident prone industry. In recent years, the death rate of China's construction industry is the highest in all industries, after the mining industry, the loss is huge, distressing. Although the mandatory implementation of the construction enterprise safety production license system, strengthen the construction market access control, and to further strengthen the construction enterprise construction site safety inspections, but accidents still occur from time to time. I believe that the number of casualties mainly determined by the characteristics of the construction industry. The safety civilization management is a science, is a professional, policy, mass, and a very strong work. The safety civilization management of the enterprise is mainly embodied in the following aspects:(1) Safety awareness. Due to the leading enterprises for a long time the importance ofconstruction safety understanding does not reach the designated position, grasping safety formalism serious, disregard for workers in the production of the legitimate interests of labor and social security, is not equipped with the necessary labor protection supplies, arbitrary extension of working time, workers in the long run, the working state of the overload, high strength, will lead to accidents. In addition, the leadership of the security work seriously enough, the staff of the corresponding security awareness, it is easy to cause illegal command, illegal operations, violation of labor discipline and safety accidents caused by.(2) The weak base of security civilization management. The weak security and civilization management is mainly due to the weak safety consciousness of some people, the relationship between the safety and the speed, safety and the relationship between safety and benefit, security and stability.. The weak safety management is mainly reflected in the weak: first, the research work of building safety technology is weak, and the key technology of building safety production is relatively lagging behind. The wide application of safety scientific and technological achievements is lack of market-oriented policy guidance and economic incentive measures. Study on the construction of new technology, new products, new technology application and safety protection measures of synchronization; second, compared with the developed countries, our country security protection technology, protective equipment and machinery and equipment is still relatively backward. Standardization, stereotypes and industrialization degree is very low; three is the construction enterprise safety civilization management and construction team quality is generally low. The safety of the low quality of the cultural quality, safety and civilization management knowledge, safety and technical specifications, safety procedures, safety precautions and so on do not understand. Can't manage the construction team.(3) The construction safety laws and regulations system is not perfect. There are some limitations to implement its security responsibilities; terms of punishment for violations of the law is not specific enough, operability is not strong; laws and regulations are not perfect, there is a problem of duplication and overlapping management; safety rules and regulations of the responsibility is not clear, management objectives is not clear, resulting in production safety responsibility of implementation is not in place etc..(4) The mechanism of the construction safety supervision and production is not perfect. At present, the mechanism of the effective construction safety supervision and management inChina has not been formed, and there is a big gap compared with the international advanced security management mode.. The safety supervision mode and management means can't adapt to the growing scale of construction, and it is difficult to carry out the construction safety supervision work further.. Mainly in the following three aspects:Construction unit safety civilization management problemThe exploration, design, construction and supervision of the construction engineering to the entity or individual contractor who is not qualified or qualified or even illegal. Due to the layers of subcontracting, resulting in the construction management is not strict, security training is not in place and security investment or basic no. And it will also make lower profits, and contractors in order to pursue the maximal profit will reduce his all unnecessary amount of spending, leading to safety hazards and accidents continue to occur.Investigation, design, engineering supervision and other units of the major security issuesSurvey, design units not in accordance with the requirements were survey or design, or change the survey and design documents, laws, regulations and mandatory standards, to survey the design defects, can not guarantee the building and construction personnel safety engineering supervision units not to the construction unit safety technical measures or special construction safety program for careful review, in the engineering construction nor of construction units to implement security measures of supervision seriously, find the hidden accident, nor does it take decisive measures to be rectification and elimination; detection unit to produce a false report.Safety problem of construction unitWith the increasing investment in infrastructure, the construction enterprise access policy adjustment, making the number of construction enterprises continues to increase, the construction team continues to expand. Especially in recent years, the rapid development of individual construction industry, the construction enterprise has changed fundamentally. But because the construction unit is the main body and the core position in the construction safety activity, the construction safety problem is mainly in the construction unit body.2.1 Government laws and regulations(1) The lack of building safety and civilization management system for the market economyConstruction of China's investment system changes the original building a safe and civilized production management has not adapt to the current construction methods, so has been dominated by the government of safe and civilized management appeared many loopholes in management, coupled with the construction safety laws and regulations is not perfect, the low efficiency of government supervision, social supervision system is not perfect, resulting in a safe and civilized management is not in place, suited to the laws of market economy, legal and economic means parallel building a safe and civilized management system has not been formed. Therefore, the initiative construction safety civilization management initiative construction safety civilization management work first, early planning, early arrangement, do the whole process supervision and inspection. Before the construction we put the project in the province Shuangyou site as the target management, improving the safety management measures and system in the project, accomplish beforehand to prevent. Employees entering the construction site, the first production safety education and follow the operating rules of education; followed by a safety technical disclosure and each segment and sub engineering safety technical disclosure, so that all staff familiar with the rules and regulations, consciously abide by the safety regulations and operating rules, improve the sense of self-protection. Strengthen the intensity and extent of the supervision of the safety and civilization management objectives for effective control.(2) The law and regulations are more and more incomplete and the execution is not enoughOur country law "environment and health" is too weak. The emphasis on "environment and health" in the activity of architecture has become a common topic of international concern. The target system of engineering construction has been shifted from the traditional "cost - cost - quality - time - to - Project" system to "cost - quality - time - environment and health" system.. The international standard organization has also developed the environmental management system.(3) The functional changes of the management department are lagging behind and the management of the vacuum isWith the deepening of the reform of our political system, the reform of the national institution, the enterprise reform, the enterprise has gradually separated from the industry administrative management, and has become the independent action subject in the market.With this adaptation, Ministry of construction and local construction administrative departments to become the national construction safety special supervision of the performer, state production safety supervision and administration and the local production safety supervision and management institutions become discharger of the state production safety supervision functions.The unsafe state of the unsafe behavior and the unsafe state of the material are the direct cause of the accident, which are directly related to the management. So the management is the indirect cause of the accident.. The unsafe behavior of human can be reduced or even eliminated through safety education, safety production responsibility system and security mechanism. The unsafe state of the material can be controlled by improving the scientific and technological content of the safety, establishing the perfect equipment maintenance system, promoting the construction and safety of the civilization. To strengthen the safety inspection on the job site, we can find and stop the unsafe behavior and the unsafe state of the thing, so as to avoid the accident. One of the most common defect management system is not perfect, the responsibility is not clear, abiding by the law, the illegal command, safety education is not enough, punishment is not strict, safety technical measures are not comprehensive, security check enough.(4) The construction safety production management and professional construction safety production management separateAt present, China's construction safety civilization management is actually decentralized management, did not really do the industry management. This has formed the construction safety civilization management standard, the management pattern is different, the casualty statistics data distortion, the management work responsibility is not clear.Pay attention to safety behavior norms according to the laws of science organization construction, comply with construction safety rules and standards, as a code of conduct to organize the construction of construction site to be constrained, regulate their behavior from two aspects: one is to require managers to strictly implement the construction administrative departments of the state and local issued by the construction safety and civilized management regulations and standards the implementation of the management system of the enterprise, before the construction of the relevant technical requirements for the construction safety to the crew and workers in detail, and signed by both parties confirmed that security staff dailyinspections of implementation; two is to require the operation layer; safety protection for the outstanding construction site could cause accident.2.2 The characteristics of the construction safety civilization managementThe characteristics of construction are mainly determined by the characteristics of architectural products. Compared with other industrial products, building products is huge in size, complexity and diversity, overall hard, not easy to mobile, so that construction in addition to the basic characteristics of industrial production, but also has the following main features:(1) The fluidity of productionOne is the body construction with the buildings or structures located position change and the transfer of production sites; the second is in the process of the construction of a project construction personnel and all kinds of machinery, electrical equipment with the construction site and along the construction of the object up, down, left and right flow, continue to turn shift operation places.(2) The product form is diverseDue to the natural conditions and uses of the building, the structure, modeling and material of the building are also different, and the construction method will be changed, it is difficult to realize the standardization.(3) Construction technology complexConstruction often need according to the structure of the building for many types of work with the operation, multi unit (earthwork, civil engineering, hoisting, installation, transportation, etc.) cross tie construction, the supplies and equipment are different, thus the construction organization and construction technology management has a higher request. Most of the construction industry is still manual operation, easy to make people fatigue, attention dispersion, so improper operation or mistakes more prone to occur, Rong Yi lead to accidents security. This is manual labor and heavy manual labor and more.(4) Open and aloft operationsThe building product is huge, the production cycle is long, the construction is carried on frequently in the open air and the high place, is often influenced by the natural climate condition. According to the national standard "high job classification" provides that there are more than 90% of the construction of higher operations. The open operation of buildingsaccounts for about 70% of the total workload, and the impacts and hazards of natural conditions such as spring, summer, autumn and winter, and sunshine, wind, rain, snow and snow etc.(5) Low mechanizationAt present, the construction mechanization degree of our country is still very low, still depend on a lot of manual operation.. Construction machinery and machinery in the factory compared to the mechanical equipment is very different, its safety is much higher than the factory equipment, the probability of injury is naturally much higher. There are several aspects of the following features:A. Use of different environmental conditions;B. Operating object is different;C. Operating location and operator;Take the crane as an example to discuss the mechanization of safety civilization management.In our country, with the increase of the number of the heavy machinery, the proportion of the injury accidents in the total industrial accidents is also increasing year by year. The common accidents of hoisting machinery are: the hanging falls, the impact of extrusion, the accident, the electric shock accident, the body dump accident.. The total number of crane crashes accounted for about 33%, the impact of extrusion accounted for about 30%, electric shock accounted for about 10%, the accident accounted for about 8%, the body dumping accounts for about 5%. The total number of the total number of injuries from the accident of the highest percentage of falling accident analysis:A. Off the rope accidents: due to the load from a bundle of the hoisting rope shedding collapsibility casualties damage.B.Weight loss accident from heavy lifting rope or special sling from hook caused by prolapse.C. Broken rope accident: hoisting rope and hoisting rope broken down due to the weight loss accident.D. Hook broken accident: weight loss accident fracture caused by hook.E. Hoisting wire rope problem.2.3 The work content of the construction safety civilization managementConstruction enterprises to do a good job security construction should pay attention to do the following several work:(1)Thinking;(2) Establishment of a safety production management system;(3) Establishing the safety and professional bodies and with full-time safety technicians;(4) Ensure that the workers are safe and secure;(5) Take the targeted safety measures;Safety technical measures should be aimed at the engineering features, in depth investigation and study. Also do a good job of work safety technical disclosure.3 Security checkThe security check is found in time, eliminate hidden dangers of accidents, an effective way to nip in the bud. The construction product volume is huge, the height operation is high, and then combined with the construction period, the technology complex and other factors, to the construction production brings a lot of unsafe factors. Through the combination of leadership and mass security checks, can effectively find the problem, take measures to eliminate the accident before the occurrence of the accident. Safety inspection can also summarize the good experience of the exchange of safety production, establish a typical, to promote the level of safety and civilization management. Mobilize the masses for security checks, both to encourage the masses to participate in the enthusiasm of safety and civilization management, and can educate the masses to enhance awareness of the safety awareness of production, and consciously improve the safety of production. In addition, the safety inspection can often give the neglect of the safety of the idea of knocking the alarm, and promptly correct illegal command, illegal operations behavior.4 SummarySafety civilization management is a science, is a professional, policy, mass, and a very strong work. With the continuous development of the economy, the continuous improvement of people's living standards, employees in the construction industry and the whole society are on the construction process of safe and civilized management level proposed requirements more and more high, the traditional management mode has not adapted to the requirements of the times. It is now in need of scientific and modern enterprise security and civilization management mode, and continuously improve the level of safety civilization management, thereal safety civilization management work well. The scientific use of PDCA circulation method, the pair of leaders of all levels of safety education and construction plan possible accident, the implementation of safe and civilized management plan, make safe and civilized management is better in the construction of perfect embodiment. To inspect the construction process of the construction management plan, and find the problem that hidden and haven't met to solve, analyze and record, and put the security plan into the program. To reach a circular process. Therefore, as the construction enterprise, we should study the status quo of the construction industry safety civilization, establish the new idea of safety civilization management, and establish new accord with the.Construction safety management civilization is the first human management, to strengthen the safety education and training, continuously improve the quality of security business, enhance security awareness, and to take effective measures to regulate people's behavior, to implement standardized operation, in construction process due to the complexity of the construction site personnel, dynamic and frequent, in project management, to take admission to tertiary education and the change of production and construction, timely safety education; combination of production safety skills training, in order to enhance staff safety consciousness of responsibility and security capabilities.Through the safety civilization management education and training, strengthen the construction safety and the implementation of the guarantee. Safety education is the most effective method in the safety civilization management. Both time and greatly reduce the cost. On the construction enterprise personnel, from the leadership to the construction workers are admitted to the education and training, the whole aspect to strengthen safety awareness. A clear division of labor and management, the construction project without mistake, reduce the mistake. Building a safe and civilized management is a very complex system engineering, we must use of scientific management methods, management methods, the establishment of new safe and civilized management mode to improve worker safety execution. Only in this way, we can really make a safe and civilized management level to a new level.施工阶段的安全文明管理1.研究内容与目的目前我国的安全生产形势依然严峻,特别是建筑领域伤亡事故多发的状况尚未根本扭转,建筑施工安全极其严竣;安全生产基础比较薄弱,保障体系和机制不健全;安全生产监督管理机构、队伍建设以及监管工作还待加强。
施工组织设计外文翻译参考文献 1 施工组织设计外文翻译参考文献
(文档含中英文对照即英文原文和中文翻译) 施工组织设计的重要性 摘要: 建筑工程在施工过程中,施工组织方案的优劣不仅直接影响工程的质量,对工期及施工过程中的人员安全也有重要影响。施工组织是项目建设和指导工程施工的重要技术经济文件。能调节施工中人员、机器、原料、环境、工艺、设备、土建、安装、管理、生产等矛盾,要对施工组织设计进行监督和控制,才能科学合理的保证工程项目高质量、低成本、少耗能的完成。 关键词: 项目管理 施工组织 方案 重要性 施工组织设计就是对工程建设项目整个施工过程的构思设想和施工组织设计外文翻译参考文献 2 具体安排,是施工组织管理工作的核心和灵魂。其目的是使工程速度快、质量好、效益高。使整个工程在施工中获得相对的最优效果。 1.编制施工组织设计重要性的原因 建筑工程及其施工具有固定性与流动性、多样性与单件性、形体庞大与施工周期长这三对特点。所以,每一建筑工程的施工都必须进行施工组织设计。这是因为:其它一般工业产品的生产都有着自己固定的、长期适用的工厂。而建筑施工具有流动性的特点,不可能建立这样的工厂,只能是当每一个建筑工程施工时,建立一个相应的、临时性的,如同工厂作用性质的施工现场准备,即工地。施工单件性特点与施工流动性特点,决定了每一建筑工程施工都要选择相应的机具和劳动力组织。选择施工方法、拟定施工技术方案及其劳动力组织和机具配置,统称为施工作业能力配置。施工周期的特点,决定了各种劳动力、机具和众多材料物资技术的供应时间也比较长,这就产生了与施工总进度计划相适应的物资技术的施工组织设计内容。由此可见,施工组织设计在项目管理中是相当重要的。 2.施工组织设计方案的重要性 建筑产品作为一种商品, 在项目管理中工程质量在整个施工过程中起着极其重要的作用。工程建设项目的施工组织设计与其工程造价有着密切的关系。施工组织设计基本的内容有:工程概况和施工条件的分析、施工方案、施工工艺、施工进度计划、施工总平面图。还有经济分析和施工准备工作计划。其中,施工方案及施工工艺的确定更为重要,如:施工机械的选择、水平运输方法的选择、土方的施工方施工组织设计外文翻译参考文献 3 法及主体结构的施工方法和施工工艺的选择等等,均直接影响着工程预算价格的变化。在保证工程质量和满足业主使用要求及工期要求的前提下,优化施工方案及施工工艺是控制投资和降低工程项目造价的重要措施和手段。 2.1施工组织方案在很大程度上影响着工程质量,因此合理的施工组织方案不仅是确保工程顺利完成的基础,也是工程安全的依据。施工组织设计是建筑工程设计文件的重要组成部分,是编制工程投资概预算的主要依据和编制招投标文件的主要参考依据。因此,认真做好施工组织设计,对于正确确定工程造价、降低工程投资,从而有利控制工程造价将有十分重要的作用。 2.2施工组织方案是对施工活动实行科学管理的重要手段,它具有战略部署和战术安排的双重作用。它体现了实现基本建设计划和设计的要求,提供了各阶段的施工准备工作内容,协调施工过程中各施工工区,各施工工种,各项自愿之间的相互关系。施工组织方案必须能够根据工程产品的特点和要求,根据现有的和可能争取到的施工条件,从实际出发,决定各种生产要素的基本结合方式,不切实解决问题,就不可能进行任何生产。 3.施工组织设计的指标计算和分析 目前施工组织设计应建立哪些指标还不统一,计算方法也不规范。由于它是评价施工组织设计整体效果和评价执行状况的尺度,也是对承建工程施工的单位(项目部)生产经营管理水平和效果进行考核的依据。应予重视,提出如下意见。 施工组织设计外文翻译参考文献 4 3.1 指标体系。指标体系的设置要尽量反映施工组织设计目标达到的水平,为评价、考核、执行提供方便。 3.2 指标计算。(1)施工准备期。从现场准备开始到正式工程开工的全部时间。(2)单位工程工期。由单位工程施工进度计划安排的施工期。(3)劳动力不均衡系数。施工期高峰人数与平均人数之比。(4)降低成本额。技术组织措施降低成本的价格成果。(5)降低成本率。降低成本额占承包成本的百分比。(6)施工机械化程度。机械施工完成产值与工程承包造价之比。(7)工厂化施工程度。预制厂(采砂场、采石场)完成的产值与工程承包造价之比。(8)临时工程投资比例。全部临时工程投资与工程承包造价之比。(9)临时工程费用比例。全部临时工程消耗费用减回收费与工程承包造价之比。 3.3 指标分析。施工组织设计指标与同类工程历史实际水平相比,可以评价施工组织设计效果;不同施工组织设计方案的指标对比,可以优选方案;分析以往历次同类工程的各项指标的加权数值,可以作为今后再次投标的参考依据。 4.施工组织设计的管理 随着社会主义市场经济的建立,建筑市场的竞争日趋激烈,客观形势对施工企业的要求越来越高。不仅在技术装备、人员素质、施工组织者方面提出较高的要求,而且工程经济管理工作中有关工程预结算也面临新的挑战。严谨建筑市场形势下,有些施工企业没有积极采取应对措施,对员工的专业技术没有更新、培训。科学技术管理水平相当落后。加上对编制审核施工组织设计没有引起足够的重视。因此施工组织设计外文翻译参考文献 5 就会出现以下几种常见的情况: 4.1开工前没有编制审核施工组织设计:不搞施工平面布置图,材料乱堆乱放。土方运出运进、机械设备、劳动力需求无计划、工程质量、安全施工无保证措施。造成窝工浪费现象严重,管理水平较低。 4.2是否是专业人员编制施工组织设计:为应付上级部门及监理单位、甲方检查而给施工员或资料员代编施工组织设计。因为资料根本对现在的施工管理不了解而又是领导最近安排的,不得不胡乱编造,应付了事。 4.3施工组织设计编制水平低:有的施工单位,不明白施工组织在施工过程中的重要性,写一写各分项施工工艺、画张平面布置图、工程进度计划表,便认为是施工组织设计了。 4.4要技术弃经济:相当多的施工企业单位在编制施工组织设计时。只重视施工组织当中的各分项工程的技术措施。没有考虑分项工程经济指标方面内容,导致工程竣工结算时纠纷不断,蒙受经济损失。 因此,要对施工组织设计进行管理: (1)实行动态管理 工程施工过程中,不可避免地会遇到意想不到的各种问题,如设计变更、自然因素等影响,各阶段施工进程的变化造成现场方案的调整,因此必须根据变化了的现场实际进行动态管理,对施工组织设计中不适宜部分进行必须的修改、补充、优化,以达到既定的建设目标。 (2)实行分层管理 项目法施工的推行,管理层与作业层分离,以及固定工人逐步施工组织设计外文翻译参考文献 6 减少的情况,势必引出总承包与分包的现象,中标单位从过去的直接管理、直接技术交底,变为间接管理、间接技术交底,因此应根据施工组织设计进行分层管理,明确总包与分包单位、管理层与作业层的技术权限、职责与工作程序。 5.结语 在项目的施工中,一定要对施工组织设计进行监督和控制,确保项目的施工有序,防止施工组织设计流于形式。施工组织设计是工程质量、安全、进度的保障有力措施。在一定的资源条件下实现工程的技术经济效益,达到施工效益与经济效益双赢的目的。 施工组织设计外文翻译参考文献
7 Importance of construction organization design Summary: Construction work in the construction process, the construction organization scheme will not only directly affect project quality, duration and safety also has an important impact in the construction process. Construction organization projects and mentoring in construction of key technical and economic documents. Can regulate the construction people, machines, materials, environment, technology, equipment, construction, installation, management, production and other conflicts , monitoring and control of the construction organization design , scientific and reasonable assurance the completion of project of high quality, low cost, low energy consumption. Key words: Project management construction management programme the importance Construction organization design is the idea of the whole construction process of engineering construction project ideas and specific arrangements, organization and management of construction work is the heart and soul. Its aim is to enable high speed, high quality, efficiency. Engineering-best results when working in construction as a whole.