建筑施工质量管理论文中英文资料外文翻译文献
- 格式:doc
- 大小:50.50 KB
- 文档页数:11
(文档含英文原文和中文翻译)中英文资料外文翻译文献外文翻译Abstract:To study the application of continuum structural topology optimization methods to real engineering structures,an optimization method for an optimal topology design of multistory steel frame bracing systems is presented.On a sensitivity analysis,an element removal criterion for continuum structures with stress and multi-displacement constraints under multiple lateral loading conditions is proposed.A concept of mean thickness of a design domain is provided to ensure the reasonableness of optimal results.In the proposed optimization method,the optimal design of an unbraced steel frame without displacement constraints is performed firstly,and then the optimal topology of a bracing system for the multistory steel frame considering displacement constraints is obtained by using evolutionary structural optimization and the given removal criterion,and finally the optima layout of the bracing system is interpreted as bracing members.An example of 3-bay 12-story plane steel frame shows that it is effective for the given optimizationmethod in the optimal design of bracing systems for multistory steel frames.Key words:steel frame;bracing system;continuum;topology optimization;evolutionary structural optimization1.Reinforced ConcretePlain concrete is formed from a hardened mixture of cement ,water ,fine aggregate, coarse aggregate (crushed stone or gravel),air, and often other admixtures. The plastic mix is placed and consolidated in the formwork, then cured to facilitate the acceleration of the chemical hydration reaction lf the cement/water mix, resulting in hardened concrete. The finished product has high compressive strength, and low resistance to tension, such that its tensile strength is approximately one tenth lf its compressive strength. Consequently, tensile and shear reinforcement in the tensile regions of sections has to be provided to compensate for the weak tension regions in the reinforced concrete element.It is this deviation in the composition of a reinforces concrete section from the homogeneity of standard wood or steel sections that requires a modified approach to the basic principles of structural design. The two components of the heterogeneous reinforced concrete section are to be so arranged and proportioned that optimal use is made of the materials involved. This is possible because concrete can easily be given any desired shape by placing and compacting the wet mixture of the constituent ingredients are properly proportioned, the finished product becomes strong, durable, and, in combination with the reinforcing bars, adaptable for use as main members of any structural system.The techniques necessary for placing concrete depend on the type of member to be cast: that is, whether it is a column, a bean, a wall, a slab, a foundation. a mass columns, or an extension of previously placed and hardened concrete. For beams, columns, and walls, the forms should be well oiled after cleaning them, and the reinforcement should be cleared of rust and other harmful materials. In foundations, the earth should be compacted and thoroughly moistened to about 6 in. in depth to avoid absorption of the moisture present in the wet concrete. Concrete should always be placed in horizontal layers which are compacted by means of high frequency power-driven vibrators of either the immersion or external type, as the case requires, unless it is placed by pumping. It must be kept in mind, however, that over vibration can be harmful since it could cause segregation of the aggregate and bleeding of the concrete.Hydration of the cement takes place in the presence of moisture at temperatures above 50°F. It is necessary to maintain such a condition in order that the chemicalhydration reaction can take place. If drying is too rapid, surface cracking takes place. This would result in reduction of concrete strength due to cracking as well as the failure to attain full chemical hydration.It is clear that a large number of parameters have to be dealt with in proportioning a reinforced concrete element, such as geometrical width, depth, area of reinforcement, steel strain, concrete strain, steel stress, and so on. Consequently, trial and adjustment is necessary in the choice of concrete sections, with assumptions based on conditions at site, availability of the constituent materials, particular demands of the owners, architectural and headroom requirements, the applicable codes, and environmental reinforced concrete is often a site-constructed composite, in contrast to the standard mill-fabricated beam and column sections in steel structures.A trial section has to be chosen for each critical location in a structural system. The trial section has to be analyzed to determine if its nominal resisting strength is adequate to carry the applied factored load. Since more than one trial is often necessary to arrive at the required section, the first design input step generates into a series of trial-and-adjustment analyses.The trial-and –adjustment procedures for the choice of a concrete section lead to the convergence of analysis and design. Hence every design is an analysis once a trial section is chosen. The availability of handbooks, charts, and personal computers and programs supports this approach as a more efficient, compact, and speedy instructional method compared with the traditional approach of treating the analysis of reinforced concrete separately from pure design.2. EarthworkBecause earthmoving methods and costs change more quickly than those in any other branch of civil engineering, this is a field where there are real opportunities for the enthusiast. In 1935 most of the methods now in use for carrying and excavating earth with rubber-tyred equipment did not exist. Most earth was moved by narrow rail track, now relatively rare, and the main methods of excavation, with face shovel, backacter, or dragline or grab, though they are still widely used are only a few of the many current methods. To keep his knowledge of earthmoving equipment up to date an engineer must therefore spend tine studying modern machines. Generally the only reliable up-to-date information on excavators, loaders and transport is obtainable from the makers.Earthworks or earthmoving means cutting into ground where its surface is too high ( cuts ), and dumping the earth in other places where the surface is too low ( fills). Toreduce earthwork costs, the volume of the fills should be equal to the volume of the cuts and wherever possible the cuts should be placednear to fills of equal volume so as to reduce transport and double handlingof the fill. This work of earthwork design falls on the engineer who lays out the road since it is the layout of the earthwork more than anything else which decides its cheapness. From the available maps ahd levels, the engineering must try to reach as many decisions as possible in the drawing office by drawing cross sections of the earthwork. On the site when further information becomes available he can make changes in jis sections and layout,but the drawing lffice work will not have been lost. It will have helped him to reach the best solution in the shortest time.The cheapest way of moving earth is to take it directly out of the cut and drop it as fill with the same machine. This is not always possible, but when it canbe done it is ideal, being both quick and cheap. Draglines, bulldozers and face shovels an do this. The largest radius is obtained with the dragline,and the largest tonnage of earth is moved by the bulldozer, though only over short distances.The disadvantages of the dragline are that it must dig below itself, it cannot dig with force into compacted material, it cannot dig on steep slopws, and its dumping and digging are not accurate.Face shovels are between bulldozers and draglines, having a larger radius of action than bulldozers but less than draglines. They are anle to dig into a vertical cliff face in a way which would be dangerous tor a bulldozer operator and impossible for a dragline. Each piece of equipment should be level of their tracks and for deep digs in compact material a backacter is most useful, but its dumping radius is considerably less than that of the same escavator fitted with a face shovel.Rubber-tyred bowl scrapers are indispensable for fairly level digging where the distance of transport is too much tor a dragline or face shovel. They can dig the material deeply ( but only below themselves ) to a fairly flat surface, carry it hundreds of meters if need be, then drop it and level it roughly during the dumping. For hard digging it is often found economical to keep a pusher tractor ( wheeled or tracked ) on the digging site, to push each scraper as it returns to dig. As soon as the scraper is full,the pusher tractor returns to the beginning of the dig to heop to help the nest scraper.Bowl scrapers are often extremely powerful machines;many makers build scrapers of 8 cubic meters struck capacity, which carry 10 m ³heaped. The largest self-propelledscrapers are of 19 m ³ struck capacity ( 25 m ³ heaped )and they are driven by a tractor engine of 430 horse-powers.Dumpers are probably the commonest rubber-tyred transport since they can also conveniently be used for carrying concrete or other building materials. Dumpers have the earth container over the front axle on large rubber-tyred wheels, and the container tips forwards on most types, though in articulated dumpers the direction of tip can be widely varied. The smallest dumpers have a capacity of about 0.5 m ³, and the largest standard types are of about 4.5 m ³. Special types include the self-loading dumper of up to 4 m ³ and the articulated type of about 0.5 m ³. The distinction between dumpers and dump trucks must be remembered .dumpers tip forwards and the driver sits behind the load. Dump trucks are heavy, strengthened tipping lorries, the driver travels in front lf the load and the load is dumped behind him, so they are sometimes called rear-dump trucks.3. Safety of StructuresThe principal scope of specifications is to provide general principles and computational methods in order to verify safety of structures. The “ safety factor ”, which according to modern trends is independent of the nature and combination of the materials used, can usually be defined as the ratio between the conditions. This ratio is also proportional to the inverse of the probability ( risk ) of failure of the structure.Failure has to be considered not only as overall collapse of the structure but also as unserviceability or, according to a more precise. Common definition. As the reaching of a “ limit state ” which causes the construction not to accomplish the task it was designed for. There are two categories of limit state :(1)Ultimate limit sate, which corresponds to the highest value of the load-bearing capacity. Examples include local buckling or global instability of the structure; failure of some sections and subsequent transformation of the structure into a mechanism; failure by fatigue; elastic or plastic deformation or creep that cause a substantial change of the geometry of the structure; and sensitivity of the structure to alternating loads, to fire and to explosions.(2)Service limit states, which are functions of the use and durability of the structure. Examples include excessive deformations and displacements without instability; early or excessive cracks; large vibrations; and corrosion.Computational methods used to verify structures with respect to the different safety conditions can be separated into:(1)Deterministic methods, in which the main parameters are considered as nonrandom parameters.(2)Probabilistic methods, in which the main parameters are considered as random parameters.Alternatively, with respect to the different use of factors of safety, computational methods can be separated into:(1)Allowable stress method, in which the stresses computed under maximum loads are compared with the strength of the material reduced by given safety factors.(2)Limit states method, in which the structure may be proportioned on the basis of its maximum strength. This strength, as determined by rational analysis, shall not be less than that required to support a factored load equal to the sum of the factored live load and dead load ( ultimate state ).The stresses corresponding to working ( service ) conditions with unfactored live and dead loads are compared with prescribed values ( service limit state ) . From the four possible combinations of the first two and second two methods, we can obtain some useful computational methods. Generally, two combinations prevail:(1)deterministic methods, which make use of allowable stresses.(2)Probabilistic methods, which make use of limit states.The main advantage of probabilistic approaches is that, at least in theory, it is possible to scientifically take into account all random factors of safety, which are then combined to define the safety factor. probabilistic approaches depend upon :(1) Random distribution of strength of materials with respect to the conditions of fabrication and erection ( scatter of the values of mechanical properties through out the structure );(2) Uncertainty of the geometry of the cross-section sand of the structure ( faults and imperfections due to fabrication and erection of the structure );(3) Uncertainty of the predicted live loads and dead loads acting on the structure;(4)Uncertainty related to the approximation of the computational method used ( deviation of the actual stresses from computed stresses ).Furthermore, probabilistic theories mean that the allowable risk can be based on several factors, such as :(1) Importance of the construction and gravity of the damage by its failure;(2)Number of human lives which can be threatened by this failure;(3)Possibility and/or likelihood of repairing the structure;(4) Predicted life of the structure.All these factors are related to economic and social considerations such as:(1) Initial cost of the construction;(2) Amortization funds for the duration of the construction;(3) Cost of physical and material damage due to the failure of the construction;(4) Adverse impact on society;(5) Moral and psychological views.The definition of all these parameters, for a given safety factor, allows construction at the optimum cost. However, the difficulty of carrying out a complete probabilistic analysis has to be taken into account. For such an analysis the laws of the distribution of the live load and its induced stresses, of the scatter of mechanical properties of materials, and of the geometry of the cross-sections and the structure have to be known. Furthermore, it is difficult to interpret the interaction between the law of distribution of strength and that of stresses because both depend upon the nature of the material, on the cross-sections and upon the load acting on the structure. These practical difficulties can be overcome in two ways. The first is to apply different safety factors to the material and to the loads, without necessarily adopting the probabilistic criterion. The second is an approximate probabilistic method which introduces some simplifying assumptions ( semi-probabilistic methods ) .2. 中文翻译摘要:为了研究连续型拓扑优化理论在实际工程中的应用,该文给出了一种多层钢框架支撑体系连续型拓扑优化设计方法。
建筑设计中英文对照外文翻译文献On the other hand, there is a significant amount ofliterature in the field of architecture design that is writtenin foreign languages. While it may not be as readily accessible for non-native speakers, there are many benefits to exploring literature in other languages. For example, architects who are fluent in multiple languages can have a broader understanding of different cultural approaches to architecture. By reading literature in foreign languages, architects can gain insights into design concepts and practices that may not be covered in English-language sources. This can lead to a more diverse and innovative approach to design.However, one challenge with accessing literature in foreign languages is the accuracy of translations. Architecture is a technical field with specific terminology, and it is important to ensure that translations accurately convey the intended meaning. In some cases, the translation of technical terms and concepts may not accurately convey their full meaning, which can lead to misunderstandings or confusion. Architects who rely on translated literature should be cautious and ensure they verify the accuracy of the translations with experts in the field.Despite these challenges, it is essential for architects to explore literature in multiple languages to stay informed and to gain a global perspective on architecture design. By consideringboth English and foreign language translated literature, architects can access a wider range of resources and insights. Additionally, architects should consider collaborating with colleagues who are fluent in different languages to ensure accurate translation and interpretation of foreign language sources.In conclusion, architecture design is a field that benefits from accessing literature in multiple languages. English provides a wealth of resources and is the global language of academia. However, architects who can access and read literature in foreign languages can gain new perspectives and insights into different cultural approaches to design. While caution should be taken to verify the accuracy of translations, architects should explore literature in multiple languages to broaden their understanding and enhance their creative problem-solving skills.。
建筑施工质量管理体系外文翻译参考文献1. GB/T -2016 英文名称:Quality management systems--Requirements《质量管理体系要求》2. GB/T -2016 英文名称:Quality management systems--Guidelines for the application of ISO 9001:2015《质量管理体系应用指南》3. GB -2013 英文名称:Code for construction quality acceptance of building engineering《建筑工程质量验收规范》4. GB -2011 英文名称:Code for acceptance of constructional quality of masonry engineering《砌体工程施工质量验收规范》5. GB -2010 英文名称:Code for design of concrete structures《混凝土结构设计规范》6. GB -2013 英文名称:Standard for building drawing standardization《建筑施工图件编制规范》7. GB -2001 英文名称:Code for acceptance of construction quality of pile foundation engineering《桩基工程施工质量验收规范》8. /T 11-2017 英文名称:Technical specification for concrete structure of tall building《高层建筑混凝土结构技术规范》9. 63-2013 英文名称:Technical specification for strengthening of building structures using carbon fiber reinforced plastics 《建筑结构加固碳纤维布增强复合材料技术规范》10. 81-2002 英文名称:Technical specification for application of sprayed mortar in building construction and acceptance of quality 《建筑喷涂砂浆工程施工及质量验收技术规定》。
外文资料:Prestressed Concrete BuildingsPrestressed concrete has been widely and successfully applied to building construction of all types.Both precast pretensioned members and cast-tensioned structures are extensively employed,sometimes in competition with one another, most effectively in combination wit each other.Prestressed concrete offers great advantages for incorporation in a totalaspects of these, that is, structure plus other building. It is perhaps the “integrative”functions,which have made possible the present growth in use of prestressed concrete buildings.These advantages include the following:Structural strength; Structure rigidity;Durability;Mold ability,into desired forms and shapes;Fire resistance;Architectural treatment of surfaces;Sound insulation;Heat insulation; Economy; Availability, through use of local materials and labor to a high degree.Most of the above are also properties of conventionally reinforced concrete. Presrressing,however,makes the structural system more effective by enabling elimination of the technical of difficulty,e.g.,cracks that spoil the architectural treatment.Prestressing greatly enhance the structure efficiency and economy permitting longer spans and thinner elements.Above all,it gives to the architect-engineer a freedom for variation and an ability to control behavior under service conditions.Although prestressed concrete construction involves essentially the same consideration and practices as for all structures, a number of special points require emphasis or elaboration.The construction engineer is involved in design only to a limited extent. First,he muse be able to furnish advice to the architect and engineer on what can he done. Because of his specialized knowledge of techniques relating to prestressed concrete construction, he supplies a very needed service to the architect-engineer.Second, the construction engineer may be made contractually responsible for the working drawings;that is,the layout of tendons,anchorage details,etc.It is particularly important that he gives careful attention to the mild steel and concrete details to ensure these are compatible with his presressing details.Third, the construction engineer is concerned with temporary stresses, stresses at release, stresses in picking, handling and erection, and temporary condition prior to final completion of the structure, such as the need of propping for a composite pour.Fourth,although the responsibility for design rests with the design engineer, nevertheless the construction engineer is also vitally concerned that the structure be successful form the point of view of structural integrity and service behavior. Therefore he will want to look at the bearing and connection details, camber, creep, shrinkage,thermal movements,durability provisions,etc.,and advise the design engineer of any deficiencies he encounters.Information on new techniques and especially application of prestressing to buildings are extensively available in the current technical literature of national and international societies.The International Federation of Prestressing(I.F.P)has attempted to facilitate the dissemination of this information by establishing a Literature Exchange Service,in which the prestressing journals of some thirty countries are regularly exchanged.In addition,an Abstract is published intermittently by I.F.P The Prestressed Concrete Institute(USA)regularly publishes a number of journals and pamphlets on techniques and applications, and proceduresare set up for their dissemination to architects and engineers as well as directly to the construction engineer. It is important that he keep abreast of these national and worldwide developments, so as to be able to recommend the latest and best that is available in the art,and to encourage the engineer to make the fullest and most effective use of prestressed concrete in their buildings.With regard to working drawings, the construction engineer must endeavor to translate the design requirements into the most practicable and economical details of accomplishment,in such a way that the completed element or structure fully complies with the design requirement;for example, the design may indicate only the center of gravity of prestressing and the effective prestress force. The working drawing will have to translate this into tendons having finite physical properties and dimensions.If the center of gravity of pre-stressing is a parabolic path then,for pre-tensioning,and approximation by chords is required,with hold-down points suitably located.The computation of pre-stress losses,form transfer stress to effective stress, must reflect the actual manufacturing and construction process used,as well as thorough knowledge of the properties of the particular aggregates and concrete mix to be employed.With post-tensioning, anchorages and their bearing plates must be laid out in their physical dimension. It is useful in the preparation of complex anchorage detail layouts to use full-scale drawings, so as to better appreciate the congestion of mild steel and anchorages at the end of the member. Tendons and reinforcing bars should be shown in full size rather than as dotted lines. This will permit consideration to be given as to how the concrete can be placed and consolidated.The end zone of both pre-tensioned and post-tensioned concrete memberssubject to high transverse or bursting stresses. These stresses are also influenced by minor concrete details,such as chamfers.Provision of a grid of small bars (sometimes heavy wire mesh is used), as close to the end of a girder as possible, will help to confine and distribute the concentrated forces. Closely spaced stirrups and/or tightly spaced spiral are usually needed at the end of heavily stressed members.Recent tests have confirmed that closeness of spacing is much more effective than increase in the size of bars. Numerous small bars, closely spaced, are thus the best solution.Additional mild-steel stirrups may also be required at hold-down points to resist the shear. This is also true wherever post-tensioned tendons make sharp bends. Practical consideration of concretion dictates the spacing of tendons and ducts. The general rules are that the clear spacing small be one-and-one-half times the maximum size of coarse aggregate. In the overall section, provision must be made for the vibrator stinger.Thus pre-stressing tendons must either be spaced apart in the horizontal plane, or, in special cases, bundled.In the vertical plane close contact between tendons is quite common.With post-tensioned ducts,however,in intimate vertical contact,careful consideration has to be given to prevent one tendon form squeezing into the adjacent duct during stressing.This depends on the size of duct and the material used for the duct.A full-scale layout of this critical cross section should be ually,the best solution is to increase the thickness ( and transverse strength ) of the duct, so that it will span between the supporting shoulders of concrete.As a last rest\ort it may be necessary to stress and grout one duct before stressing the adjacent one.This is time-consuming and runs the risks of grout blockage due to leaks from one duct to the other. Therefore the author recommendsthe use of heavier duct material,or else the respacing of the ducts.The latter,of course, may increase the prestressing force required.中文翻译:预应力混凝土建筑预应力混凝土已经广泛并成功地用于各种类型的建筑。
中英文对照外文翻译文献(文档含英文原文和中文翻译)Structural Systems to resist lateral loadsmonly Used structural SystemsWith loads measured in tens of thousands kips, there is little room in the design of high-rise buildings for excessively complex thoughts. Indeed, the better high-rise buildings carry the universal traits of simplicity of thought and clarity of expression.It does not follow that there is no room for grand thoughts. Indeed, it is with such grand thoughts that the new family of high-rise buildings has evolved. Perhaps more important, the new concepts of but a few years ago have become commonplace in today’ s technology.Omitting some concepts that are related strictly to the materials of construction, the most commonly used structural systems used in high-rise buildings can be categorized as follows:1.Moment-resisting frames.2.Braced frames, including eccentrically braced frames.3.Shear walls, including steel plate shear walls.4.Tube-in-tube structures.5.Tube-in-tube structures.6.Core-interactive structures.7.Cellular or bundled-tube systems.Particularly with the recent trend toward more complex forms, but in response also to the need for increased stiffness to resist the forces from wind and earthquake, most high-rise buildings have structural systems built up of combinations of frames, braced bents, shear walls, and related systems. Further, for the taller buildings, the majorities are composed of interactive elements in three-dimensional arrays.The method of combining these elements is the very essence of the design process for high-rise buildings. These combinations need evolve in response to environmental, functional, and cost considerations so as to provide efficient structures that provoke the architectural development to new heights. This is not to say that imaginative structural design can create great architecture. To the contrary, many examples of fine architecture have been created with only moderate support from the structural engineer, while only fine structure, not great architecture, can be developed without the genius and the leadership of a talented architect. In any event, the best of both is needed to formulate a truly extraordinary design of a high-rise building.While comprehensive discussions of these seven systems are generally available in the literature, further discussion is warranted here .The essence of the design process is distributed throughout the discussion.2.Moment-Resisting FramesPerhaps the most commonly used system in low-to medium-rise buildings, the moment-resisting frame, is characterized by linear horizontal and vertical members connected essentially rigidly at their joints. Such frames are used as a stand-alone system or in combination with other systems so as to provide the needed resistance to horizontal loads. In the taller of high-rise buildings, the system is likely to be found inappropriate for a stand-alone system, this because of the difficulty in mobilizing sufficient stiffness under lateral forces.Analysis can be accomplished by STRESS, STRUDL, or a host of other appropriatecomputer programs; analysis by the so-called portal method of the cantilever method has no place in today’s technology.Because of the intrinsic flexibility of the column/girder intersection, and because preliminary designs should aim to highlight weaknesses of systems, it is not unusual to use center-to-center dimensions for the frame in the preliminary analysis. Of course, in the latter phases of design, a realistic appraisal in-joint deformation is essential.3.Braced FramesThe braced frame, intrinsically stiffer than the moment –resisting frame, finds also greater application to higher-rise buildings. The system is characterized by linear horizontal, vertical, and diagonal members, connected simply or rigidly at their joints. It is used commonly in conjunction with other systems for taller buildings and as a stand-alone system in low-to medium-rise buildings.While the use of structural steel in braced frames is common, concrete frames are more likely to be of the larger-scale variety.Of special interest in areas of high seismicity is the use of the eccentric braced frame.Again, analysis can be by STRESS, STRUDL, or any one of a series of two –or three dimensional analysis computer programs. And again, center-to-center dimensions are used commonly in the preliminary analysis.4.Shear wallsThe shear wall is yet another step forward along a progression of ever-stiffer structural systems. The system is characterized by relatively thin, generally (but not always) concrete elements that provide both structural strength and separation between building functions.In high-rise buildings, shear wall systems tend to have a relatively high aspect ratio, that is, their height tends to be large compared to their width. Lacking tension in the foundation system, any structural element is limited in its ability to resist overturning moment by the width of the system and by the gravity load supported by the element. Limited to a narrow overturning, One obvious use of the system, which does have the needed width, is in the exterior walls of building, where the requirement for windows is kept small.Structural steel shear walls, generally stiffened against buckling by a concrete overlay, have found application where shear loads are high. The system, intrinsically more economicalthan steel bracing, is particularly effective in carrying shear loads down through the taller floors in the areas immediately above grade. The sys tem has the further advantage of having high ductility a feature of particular importance in areas of high seismicity.The analysis of shear wall systems is made complex because of the inevitable presence of large openings through these walls. Preliminary analysis can be by truss-analogy, by the finite element method, or by making use of a proprietary computer program designed to consider the interaction, or coupling, of shear walls.5.Framed or Braced TubesThe concept of the framed or braced or braced tube erupted into the technology with the IBM Building in Pittsburgh, but was followed immediately with the twin 110-story towers of the World Trade Center, New York and a number of other buildings .The system is characterized by three –dimensional frames, braced frames, or shear walls, forming a closed surface more or less cylindrical in nature, but of nearly any plan configuration. Because those columns that resist lateral forces are placed as far as possible from the cancroids of the system, the overall moment of inertia is increased and stiffness is very high.The analysis of tubular structures is done using three-dimensional concepts, or by two- dimensional analogy, where possible, whichever method is used, it must be capable of accounting for the effects of shear lag.The presence of shear lag, detected first in aircraft structures, is a serious limitation in the stiffness of framed tubes. The concept has limited recent applications of framed tubes to the shear of 60 stories. Designers have developed various techniques for reducing the effects of shear lag, most noticeably the use of belt trusses. This system finds application in buildings perhaps 40stories and higher. However, except for possible aesthetic considerations, belt trusses interfere with nearly every building function associated with the outside wall; the trusses are placed often at mechanical floors, mush to the disapproval of the designers of the mechanical systems. Nevertheless, as a cost-effective structural system, the belt truss works well and will likely find continued approval from designers. Numerous studies have sought to optimize the location of these trusses, with the optimum location very dependent on the number of trusses provided. Experience would indicate, however, that the location of these trusses is provided by the optimization of mechanical systems and by aesthetic considerations,as the economics of the structural system is not highly sensitive to belt truss location.6.Tube-in-Tube StructuresThe tubular framing system mobilizes every column in the exterior wall in resisting over-turning and shearing forces. The term‘tube-in-tube’is largely self-explanatory in that a second ring of columns, the ring surrounding the central service core of the building, is used as an inner framed or braced tube. The purpose of the second tube is to increase resistance to over turning and to increase lateral stiffness. The tubes need not be of the same character; that is, one tube could be framed, while the other could be braced.In considering this system, is important to understand clearly the difference between the shear and the flexural components of deflection, the terms being taken from beam analogy. In a framed tube, the shear component of deflection is associated with the bending deformation of columns and girders (i.e, the webs of the framed tube) while the flexural component is associated with the axial shortening and lengthening of columns (i.e, the flanges of the framed tube). In a braced tube, the shear component of deflection is associated with the axial deformation of diagonals while the flexural component of deflection is associated with the axial shortening and lengthening of columns.Following beam analogy, if plane surfaces remain plane (i.e, the floor slabs),then axial stresses in the columns of the outer tube, being farther form the neutral axis, will be substantially larger than the axial stresses in the inner tube. However, in the tube-in-tube design, when optimized, the axial stresses in the inner ring of columns may be as high, or even higher, than the axial stresses in the outer ring. This seeming anomaly is associated with differences in the shearing component of stiffness between the two systems. This is easiest to under-stand where the inner tube is conceived as a braced (i.e, shear-stiff) tube while the outer tube is conceived as a framed (i.e, shear-flexible) tube.7.Core Interactive StructuresCore interactive structures are a special case of a tube-in-tube wherein the two tubes are coupled together with some form of three-dimensional space frame. Indeed, the system is used often wherein the shear stiffness of the outer tube is zero. The United States Steel Building, Pittsburgh, illustrates the system very well. Here, the inner tube is a braced frame, the outer tube has no shear stiffness, and the two systems are coupled if they were considered as systemspassing in a straight line from the “hat” structure. Note that the exterior columns would be improperly modeled if they were considered as systems passing in a straight line from the “hat” to the foundations; these columns are perhaps 15% stiffer as they follow the elastic curve of the braced core. Note also that the axial forces associated with the lateral forces in the inner columns change from tension to compression over the height of the tube, with the inflection point at about 5/8 of the height of the tube. The outer columns, of course, carry the same axial force under lateral load for the full height of the columns because the columns because the shear stiffness of the system is close to zero.The space structures of outrigger girders or trusses, that connect the inner tube to the outer tube, are located often at several levels in the building. The AT&T headquarters is an example of an astonishing array of interactive elements:1.The structural system is 94 ft (28.6m) wide, 196ft(59.7m) long, and 601ft (183.3m)high.2.Two inner tubes are provided, each 31ft(9.4m) by 40 ft (12.2m), centered 90 ft (27.4m)apart in the long direction of the building.3.The inner tubes are braced in the short direction, but with zero shear stiffness in the longdirection.4. A single outer tube is supplied, which encircles the building perimeter.5.The outer tube is a moment-resisting frame, but with zero shear stiffness for thecenter50ft (15.2m) of each of the long sides.6. A space-truss hat structure is provided at the top of the building.7. A similar space truss is located near the bottom of the building8.The entire assembly is laterally supported at the base on twin steel-plate tubes, becausethe shear stiffness of the outer tube goes to zero at the base of the building.8.Cellular structuresA classic example of a cellular structure is the Sears Tower, Chicago, a bundled tube structure of nine separate tubes. While the Sears Tower contains nine nearly identical tubes, the basic structural system has special application for buildings of irregular shape, as the several tubes need not be similar in plan shape, It is not uncommon that some of the individual tubes one of the strengths and one of the weaknesses of the system.This special weakness of this system, particularly in framed tubes, has to do with the concept of differential column shortening. The shortening of a column under load is given by the expression△=ΣfL/EFor buildings of 12 ft (3.66m) floor-to-floor distances and an average compressive stress of 15 ksi (138MPa), the shortening of a column under load is 15 (12)(12)/29,000 or 0.074in (1.9mm) per story. At 50 stories, the column will have shortened to 3.7 in. (94mm) less than its unstressed length. Where one cell of a bundled tube system is, say, 50stories high and an adjacent cell is, say, 100stories high, those columns near the boundary between .the two systems need to have this differential deflection reconciled.Major structural work has been found to be needed at such locations. In at least one building, the Rialto Project, Melbourne, the structural engineer found it necessary to vertically pre-stress the lower height columns so as to reconcile the differential deflections of columns in close proximity with the post-tensioning of the shorter column simulating the weight to be added on to adjacent, higher columns.抗侧向荷载的结构体系1.常用的结构体系若已测出荷载量达数千万磅重,那么在高层建筑设计中就没有多少可以进行极其复杂的构思余地了。
建筑施工质量控制技术外文翻译参考文献1. Zhang, H., Yu, S., & Yang, C. (2019). Research on Quality Control Technology of Construction Engineering. Journal of Wuhan University of Technology. 41(9), 28-33.2. Li, J., & Wang, Y. (2018). Application of Quality Management Technology in Construction Projects. China Construction Science and Technology. 45(2), 60-64.3. Chen, X., & Li, Z. (2017). Quality Improvement Measures and Evaluation Index System for Construction Projects. Construction Engineering Technology and Design. 28(4), 65-70.4. Zhao, Y., & Liu, W. (2016). Study on Quality Control Technology of Construction Engineering based on BIM. Modern Construction Technology. 57(1), 38-42.5. Wang, L., & Zhang, Y. (2015). Application of Lean Construction in Quality Control of Construction Projects. Construction Technology and Economy. 36(6), 45-49.6. Wu, Q., & Xu, H. (2014). Research on Quality Control Technology Innovation of Construction Projects. Journal of Building Materials and Structures. 35(8), 51-55.7. Li, H., & Zhu, L. (2013). Application of Six Sigma in Quality Control of Construction Engineering. China Construction Economy.40(3), 70-75.8. Tang, J., & Guan, J. (2012). Analysis of Quality Control Measures in Construction Engineering. Construction Engineering and Technology. 33(5), 32-37.9. Zhang, G., & Zhang, Q. (2011). Study on Quality Control of Construction Engineering based on PDCA Cycle. Construction Science and Management. 51(9), 47-51.10. Liu, Y., & Wang, X. (2010). Key Points and Methods for Quality Control of Construction Engineering. Building Construction. 42(4), 34-38.。
建筑施工中英文对照外文翻译文献建筑施工中英文对照外文翻译文献(文档含英文原文和中文翻译)外文:Building construction concrete crack ofprevention and processingAbstractThe crack problem of concrete is a widespread existence but again difficult in solve of engineering actual problem, this text carried on a study analysis to a little bit familiar crack problem in the concrete engineering, and aim at concrete the circumstance put forward some prevention, processing measure.Keyword:Concrete crack prevention processingForewordConcrete's ising 1 kind is anticipate by the freestone bone, cement, water and other mixture but formation of the in addition material of quality brittleness not and all material.Because the concrete construction transform with oneself, control etc. a series problem, harden model of in the concrete existence numerous tiny hole, spirit cave and tiny crack, is exactly because these beginning start blemish of existence just make the concrete present one some not and all the characteristic of quality.The tiny crack is a kind of harmless crack and accept concrete heavy, defend Shen and a little bit other use function not a creation to endanger.But after the concrete be subjected to lotus carry, difference in temperature etc. function, tiny crack would continuously of expand with connect, end formation we can see without the aid of instruments of macro view the crack be also the crack that the concrete often say in the engineering.Concrete building and Gou piece usually all take sewer to make of, because of crack of existence and development usually make inner part of reinforcing bar etc. material creation decay, lower reinforced concrete material of loading ability, durable and anti- Shen ability, influence building of external appearance, service life, severity will threat arrive people's life and property safety.A lot of all of crash of engineerings is because of the unsteady development of the crack with the result that.Modern age scienceresearch with a great deal of of the concrete engineering practice certificate, in the concrete engineering crack problem is ineluctable, also acceptable in certainly of the scope just need to adopt valid of measure will it endanger degree control at certain of scope inside.The reinforced concrete norm is also explicit provision:Some structure at place of dissimilarity under the condition allow existence certain the crack of width.But at under construction should as far as possible adopt a valid measure control crack creation, make the structure don't appear crack possibly or as far as possible decrease crack of amount and width, particularly want to as far as possible avoid harmful crack of emergence, insure engineering quality thus.Concrete crack creation of the reason be a lot of and have already transformed to cause of crack:Such as temperature variety, constringency, inflation, the asymmetry sink to sink etc. reason cause of crack;Have outside carry the crack that the function cause;Protected environment not appropriate the crack etc. caused with chemical effect.Want differentiation to treat in the actual engineering, work°out a problem according to the actual circumstance.In the concrete engineering the familiar crack and the prevention1.Stem Suo crack and preventionStem the Suo crack much appear after the concrete protect be over of a period of time or concrete sprinkle to build to complete behind of around a week.In the cement syrup humidity of evaporate would creation stem Suo, and this kind of constringency is can't negative.Stem Suo crack of the creation be main is because of concrete inside outside humidity evaporate degree dissimilarity but cause to transform dissimilarity of result:The concrete is subjected to exterior condition of influence, surface humidity loss lead quick, transform bigger, inner part degree of humidity variety smaller transform smaller, bigger surface stem the Suo transform to be subjected to concrete inner part control, creation more big pull should dint but creation crack.The relative humidity is more low, cement syrup body stem Suo more big, stem the Suo crack be more easy creation.Stem the Suo crack is much surface parallel lines form or the net shallow thin crack, width many between 0.05-0.2 mm, the flat surface part much see in the big physical volume concrete and follow it more in thinner beam plank short todistribute.Stem Suo crack usually the anti- Shen of influence concrete, cause the durable of the rust eclipse influence concrete of reinforcing bar, under the function of the water pressure dint would creation the water power split crack influence concrete of loading dint etc..Concrete stem the Suo be main with water ash of the concrete ratio, the dosage of the composition, cement of cement, gather to anticipate of the dosage of the property and dosage, in addition etc. relevant.Main prevention measure:While being to choose to use the constringency quantity smaller cement, general low hot water mire and powder ash from stove cement in the adoption, lower the dosage of cement.Two is a concrete of stem the Suo be subjected to water ash ratio of influence more big, water ash ratio more big, stem Suo more big, so in the concrete match the ratio the design should as far as possible control good water ash ratio of choose to use, the Chan add in the meantime accommodation of reduce water.Three is strict control concrete mix blend with under construction of match ratio, use of concrete water quantity absolute can't big in match ratio design give settle of use water quantity.Four is the earlier period which strengthen concrete to protect, and appropriate extension protect of concrete time.Winter construction want to be appropriate extension concrete heat preservation to overlay time, and Tu2 Shua protect to protect.Five is a constitution the accommodation is in the concrete structure of the constringency sew.2.The Su constringency crack and preventionSu constringency is the concrete is before condense, surface because of lose water quicker but creation of constringency.The Su constringency crack is general at dry heat or strong wind the weather appear, crack's much presenting in the center breadth, both ends be in the centerthin and the length be different, with each other not coherent appearance.Shorter crack general long 20-30 cm, the longer crack can reach to a 2-3 m, breadth 1-5 mm.It creation of main reason is:The concrete is eventually almost having no strength or strength before the Ning very small, perhaps concrete just eventually Ning but strength very hour, be subjected to heat or compare strong wind dint of influence, the concrete surface lose water to lead quick, result in in the capillary creation bigger negative press but make a concrete physical volume sharplyconstringency, but at this time the strength of concrete again can't resist its constringency, therefore creation cracked.The influence concrete Su constringency open the main factor of crack to have water ash ratio, concrete of condense time, environment temperature, wind velocity, relative humidity...etc..Main prevention measure:One is choose to use stem the Suo value smaller higher Huo sour salt of the earlier period strength or common the Huo sour brine mire.Two is strict the control water ash ratio, the Chan add to efficiently reduce water to increment the collapse of concrete fall a degree and with easy, decrease cement and water of dosage.Three is to sprinkle before building concrete, water basic level and template even to soak through.Four is in time to overlay the perhaps damp grass mat of the plastics thin film, hemp slice etc., keep concrete eventually before the Ning surface is moist, perhaps spray to protect etc. to carry on protect in the concrete surface.Five is in the heat and strong wind the weather to want to establish to hide sun and block breeze facilities, protect in time.3.Sink to sink crack and preventionThe creation which sink to sink crack is because of the structure foundation soil quality not and evenly, loose soft or return to fill soil dishonest or soak in water but result in the asymmetry sink to decline with the result that;Perhaps because of template just degree shortage, the template propped up to once be apart from big or prop up bottom loose move etc. to cause, especially at winter, the template prop up at jelly soil up, jelly the soil turn jelly empress creation asymmetry to sink to decline and cause concrete structure creation crack.This kind crack many is deep enter or pierce through sex crack, it alignment have something to do with sinking to sink a circumstance, general follow with ground perpendicular or present 30 °s-45 °Cape direction development, bigger sink to sink crack, usually have certain of wrong, crack width usually with sink to decline quantity direct proportion relation.Crack width under the influence of temperature variety smaller.The foundation after transform stability sink to sink crack also basic tend in stability.Main prevention measure:One is rightness loose soft soil, return to fill soil foundation a construction at the upper part structure front should carry on necessity ofHang solid with reinforce.Two is the strength that assurance template is enough and just degree, and prop up firm, and make the foundation be subjected to dint even.Three is keep concrete from sprinkle infusing the foundation in the process is soak by water.Four is time that template tore down to can't be too early, and want to notice to dismantle a mold order of sequence.Five is at jelly soil top take to establish template to notice to adopt certain of prevention measure.4.Temperature crack and preventionTemperature crack much the occurrence is in big surface or difference in temperature variety of the physical volume concrete compare the earth area of the concrete structure.Concrete after sprinkling to build, in the hardening the process, cement water turn a creation a great deal of of water turn hot, .(be the cement dosage is in the 350-550 kg/m 3, each sign square the rice concrete will release a calories of 17500-27500 kJ and make concrete internal thus the temperature rise to reach to 70 ℃or so even higher)Because the physical volume of concrete be more big, a great deal of of water turn hot accumulate at the concrete inner part but not easy send forth, cause inner part the temperature hoick, but the concrete surface spread hot more quick, so formation inside outside of bigger difference in temperature, the bigger difference in temperature result in inner part and exterior hot the degree of the bulge cold Suo dissimilarity, make concrete surface creation certain of pull should dint.When pull should dint exceed the anti- of concrete pull strength extreme limit, concrete surface meeting creation crack, this kind of crack much occurrence after the concrete under construction period.In the concrete of under construction be difference in temperature variety more big, perhaps is a concrete to be subjected to assault of cold wave etc., will cause concrete surface the temperature sharply descend, but creation constringency, surface constringency of the concrete be subjected to inner part concrete of control, creation very big of pull should dint but creation crack, this kind of crack usually just in more shallow scope of the concrete surface creation.The alignment of the temperature crack usually none settle regulation, big area structure the crack often maneuver interleave;The size bigger structure of the beam plank length, the crack run parallel with short side more;Thorough with pierce throughsex of temperature crack general and short side direction parallelism or close parallelism, crack along long side cent the segment appear, in the center more airtight.Crack width the size be different, be subjected to temperature variety influence more obvious, winter compare breadth, summer more narrow.The concrete temperature crack that the heat inflation cause is usually in the center the thick both ends be thin, but cold Suo crack of thick thin variety not too obvious.The emergence of the this kind crack will cause the rust eclipse of reinforcing bar, the carbonization of concrete, the anti- jelly which lower concrete melt, anti- tired and anti- Shen ability etc..Main prevention measure:One is as far as possible choose to use low hot or medium hot water mire, like mineral residue cement, powder ash from stove cement...etc..Two is a decrease cement dosage, cement dosage as far as possible the control is in the 450 kg/m 3 following.Three is to lower water ash ratio, water ash of the general concrete ratio control below 0.6.Four is improvement the bone anticipate class to go together with, the Chan add powder ash from stove or efficiently reduce water etc. to come to reduce cement dosage and lower water to turn hot.Five is an improvement concrete of mix blend to process a craft, lower sprinkle of concrete to build temperature.Six is the in addition that the Chan add a have of fixed amount to reduce water and increase Su, slow Ning etc. function in the concrete, improvement the concrete mix to match a thing of mobility, protect water, lower water to turn hot, postpone hot Feng of emergence time.Seven is the heat season sprinkle to build can the adoption take to establish to hide sun plank etc. assistance measure control concrete of Wen Sheng, lower to sprinkle temperature of build the concrete.Eight is the temperature of big physical volume concrete should the dint relate to structure size, concrete structure size more big, temperature should dint more big, so want reasonable arrangement construction work preface, layering, cent the piece sprinkle to build, for the convenience of in spread hot, let up control.Nine is at great inner part constitution of the physical volume concrete cool off piping, cold water perhaps cold air cool off, let up concrete of inside outside difference in temperature.Ten is the supervision which strengthen concrete temperature, adopt to cool off in time, protection measure.11 is to reserve temperature constringency to sew.12 is to let up to control, sprinkle proper before building concrete in the Ji rockand old concrete top build a 5 mm or so sand mat a layer or usage asphalt etc. material Tu2 Shua.13 is to strengthen concrete to protect, the concrete after sprinkle build use moist grass Lian in time, hemp slice's etc. overlay, and attention sprinkle water to protect, appropriate extension protect time, assurance the concrete surface be slow-moving cool off.At the cold season, concrete surface should constitution heat preservation measure, in order to prevent cold wave assault.14 is the allocation be a little amount in the concrete of reinforcing bar perhaps add fiber material concrete of temperature crack control at certain of scope inside.5.Crack and prevention that the chemical reaction causeAlkali bone's anticipating the crack that reaction crack and reinforcing bar rust eclipse cause is the most familiar in the reinforced concrete structure of because of chemical reaction but cause of crack.The concrete blend a future reunion creation some alkalescence ion, these ion with some activity the bone anticipate creation chemical reaction and absorb surroundings environment in of water but the physical volume enlarge, make concrete crisp loose, inflation open crack.In this kind of crack general emergence concrete structure usage period, once appear very difficult remediable, so should at under construction adopt valid the measure carry on prevention.Main of prevention measure:While being to choose to anticipate with the alkali activity small freestone bone.Two is the in addition which choose to use low lye mire with low alkali or have no alkali.Three is the Chan which choose to use accommodation with anticipate to repress an alkali bone to anticipate reaction.Because the concrete sprinkle to build, flap Dao bad perhaps is a reinforcing bar protection layer thinner, the harmful material get into concrete to make reinforcing bar creation rust eclipse, the reinforcing bar physical volume of the rust eclipse inflation, cause concrete bulge crack, the crack of this kind type much is a crack lengthways, follow the position of reinforcing bar ually of prevent measure from have:One is assurance reinforcing bar protection the thickness of the layer.Two is a concrete class to go together with to want good.Three is a concrete to sprinkle to note and flap Dao airtight solid.Four is a reinforcing bar surface layer Tu2 Shua antisepsiscoating.Crack processingThe emergence of the crack not only would influence structure of whole with just degree, return will cause the rust eclipse of reinforcing bar, acceleration concrete of carbonization, lower durable and anti- of concrete tired, anti- Shen ability.Therefore according to the property of crack and concrete circumstance we want differentiation to treat, in time processing, with assurance building of safety usage.The repair measure of the concrete crack is main to have the following some method:Surface repair method, infuse syrup, the Qian sew method, the structure reinforce a method, concrete displacement method, electricity chemistry protection method and imitate to living from heal method.Surface repair the method be a kind of simple, familiar of repair method, it main be applicable to stability and to structure loading the ability don't have the surface crack of influence and deep enter crack of processing.The processing measure that is usually is a surface in crack daubery cement syrup, the wreath oxygen gum mire or at concrete surface Tu2 Shua paint, asphalt etc. antisepsis material, at protection of in the meantime for keeping concrete from continue under the influence of various function to open crack, usually can adoption the surface in crack glue to stick glass fiber cloth etc. measure.1, infuse syrup, the Qian sew methodInfuse a syrup method main the concrete crack been applicable to have influence or have already defend Shen request to the structure whole of repair, it is make use of pressure equipments gum knot the material press into the crack of concrete, gum knot the material harden behind and concrete formation one be whole, thus reinforce of purpose.The in common use gum knot material has the cement the syrup, epoxy, A Ji C Xi sour ester and gather ammonia ester to equalize to learn material.The Qian sew a method is that the crack be a kind of most in common use method in, it usually is follow the crack dig slot, the Qian fill Su in the slot or rigid water material with attain closing crack of purpose.The in common use Su material has PVC gum mire,plastics ointment, the D Ji rubber etc.;In common use rigid water material is the polymer cement sand syrup.2, the structure reinforce a methodWhen the crack influence arrive concrete structure of function, will consideration adopt to reinforce a method to carry on processing to the concrete structure.The structure reinforce medium in common use main have the following a few method:The piece of enlargement concrete structure in every aspect accumulate, outside the Cape department of the Gou piece pack type steel, adoption prepare should the dint method reinforce, glue to stick steel plate to reinforce, increase to establish fulcrum to reinforce and jet the concrete compensation reinforce.3, concrete displacement methodConcrete displacement method is processing severity damage concrete of a kind of valid method, this method be first will damage of the concrete pick and get rid of, then again displacement go into new of concrete or other material.The in common use displacement material have:Common concrete or the cement sand syrup, polymer or change sex polymer concrete or sand syrup.4, the electricity chemistry protection methodThe electricity chemistry antisepsis is to make use of infliction electric field in lie the quality of electricity chemical effect, change concrete or reinforced concrete the environment appearance of the place, the bluntness turn reinforcing bar to attain the purpose of antisepsis.Cathode protection method, chlorine salt's withdrawing a method, alkalescence to recover a method is a chemistry protection method in three kinds of in common use but valid method.The advantage of this kind of method is a protection method under the influence of environment factor smaller, apply reinforcing bar, concrete of long-term antisepsis, since can used for crack structure already can also used for new set up structure.5, imitate to living from legal moreImitate to living from heal the method be a kind of new crack treatment, its mimicry living creature organization secrete a certain material towards suffering wound part auto, but make the wound part heal of function, join some and special composition(suchas contain to glue knot of the liquid Xin fiber or capsule) in the concrete of the tradition the composition, at concrete inner part formation the intelligence type imitate to living from heal nerve network system, be the concrete appear crack secrete a parts of liquid Xin fiber can make the crack re- heal.ConclusionThe crack is widespread in the concrete structure existence of a kind of phenomenon, it of emergence not only will lower the anti- Shen of building ability, influence building of usage function, and will cause the rust eclipse of reinforcing bar, the carbonization of concrete, lower the durable of material, influence building of loading ability, so want to carry on to the concrete crack earnest research, differentiation treat, adoption reasonable of the method carry on processing, and at under construction adopt various valid of prevention measure to prevention crack of emergence and development, assurance building and Gou piece safety, stability work.From《CANADIAN JOURNAL OF CIVIL ENGINEERING》译文:建筑施工混凝土裂缝的预防与处理混凝土的裂缝问题是一个普遍存在而又难于解决的工程实际问题,本文对混凝土工程中常见的一些裂缝问题进行了探讨分析,并针对具体情况提出了一些预防、处理措施。
土木工程质量管理中英文资料外文翻译文献On civil engineering construction project quality management1 IntroductionCivil engineering building project success lies in the quality of quality, separate, other everything is out of the question. Therefore, to take civil engineering construction quality management in the construction project implementation plan and implementation process.In practice, no more than the use of engineering quality of care. But to ensure the construction quality, using the party there is a need for the organization experienced professional quality management team, design of the wholeconstruction process, including engineering design, construction units, building material, construction process and supervision and other aspects of the management, but also guide the construction unit of the construction personnel to timely and effectively encourages training. This article from the above several aspects to discuss.2.construction of the effective surveillance on the use of unit, design unit as a design once, is the work of supervisors, why should I organize the quality surveillance team? Because our country construction there are still many unsatisfactory objective or objective aspects, the unit is necessary to hire have the sense of responsibility, have management experience, familiar with the policies and regulations, have good communication ability quality management, set up quality management team, the construction design and construction process for effective management monitoring. The management team, can according to the engineering build pause status stop adjustment, implementation of compulsory system. On ordinary civil construction, quality management is relatively easy, with the possible exception of new information on the use of new technology, the whole quality management more rule-based. On special request of civil building engineering, quality management will be arranged to stop.First of all, on the quality of project design management. This stage, mainly for the design units in strict accordance with the unit can the fundamental request stop design, to check whether reasonable design plan, design intent can and thesurrounding geographical environment as well as local humane environment of harmony, in the technology and the budget is feasible, can be advanced technology, reliable structure can safely, whether the unit in charge of construction appropriate technology request etc..These aspects of the management and inspection, in relation to the whole building after project completion, in the use of function, quality, human physical performance and other aspects whether can reach certain degree of satisfaction of the big issue.At this stage, management personnel more to listen to designers to design the idea", a lot of advisory application unit in macroscopical and microcosmic staff views on initiative, make design to perfection.In addition, to check the design drawings can correctly reflect the design plan, calculated correctly, drawing dimensioning can have mistakenly, selection of materials and construction request whether reasonable, the overall design of various departments such as can harmonious design. Because our country is in the design and supervision work still is lacked very much, in the aspects of management and examination must be careful, in order to prevent subsequent quality disputes.Secondly, to the construction supervision supervision.Construction supervision is the key to guarantee the construction quality. Quality management departments should promptly to supervision departments to key local construction quality monitoring report, implement supervision duty. At the same time, but also in a timely manner, sampling test, certain constructiontechnology can fit design request. On construction supervision departments, to check its supervision can improve the supervision work procedure, to check whether supervision report specification, not in conformity with the requests of construction operation can be corrected in a timely manner.Again, on the construction equipment and construction personnel basic quality supervision and inspection construction can stop, with safe and reliable, can satisfy the design request and to complete construction; construction team consisting of whether reasonable, the construction of the technical staff to whether accord with basic request, especially on special request link, can have the equivalent level technical personnel in charge of participating in the construction process. Pay attention to the quality of construction unit, it progresses to the legal view. On raw materials procurement and construction of test procedures are detailed records.In addition, to stop the construction effect of sampling, discover a problem, timely and inspect manage personnel contact, stop the rectification, to prevent the engineering dispute, avoid engineering quality formation of waste.3construction of the various communication quality management work is not a design and construction method for cubic, but the entire project important constituent, it is designed with all relevant units of the divergent interests of. Present quality problems, the parties involved have the duty, have loss. At this point, the quality management must communicate with relevant parties, won the understanding and support. In addition, in the process of construction, also oftenencounter the construction side of the design request of doubt problem. The generation of these problems, sometimes due to the use of units of detailed request, some are the result of the design concept and design thoughts of the reasons, some due to the construction process the request of different caused. These problems cannot be ignored, should be promptly to communicate, understand the request, the timely adjustment. Not conscious construction, so that the practical results and design request is betrayed, and the use of units of the basic request of betrayal, unnecessary disputes and losses.4construction personnel training and encourage civil engineering building operators is worker of a gleam of. From the present situation, the construction team of individual technical quality is also very important. Some construction unit, construction personnel activity, the construction of personnel practice degree no true assessment, making the construction quality to sell at a discount greatly.Then, is it right? A start to construction personnel examination, request to high level? At least from the now situation, which is not ideal. First, each building project on the detailed construction technology has different request. In the organization of the construction process, request a certain proportion of with some degree of worker technician, another local can have initial operation skills of construction workers. During the construction process, to guide the construction of a reasonable distribution of work, make the workers work in practice to further mature some basic types of operational procedures and technical requirements, andon this basis, the organization staff to stop training, make the understanding of the new technology, become established during the construction of the backbone. Then let them in the work of a scheme to other construction personnel to impart technical.In this respect, the construction unit according to the detailed status of layout. There has been a reasonable training mechanism, the construction personnel to understand the practical operation level, and improve their technical level of power. In the long run, the overall quality of the progress of the construction unit is also very important.On the other hand, effective encouragement and improve construction worker job enthusiasm and learning enthusiasm of the necessary measures. Frontline workers mostly from rural, energy consumption, the low pay, the mood is stable. Therefore, to establish effective encouraging mechanism. To ensure that the wage Qing month, labor safeguard measures, management of human nature, care workers and Ankang. In addition, to organize the workers involved in the construction management and technology research, fully adjustable open invention enthusiasm of workers. Technology progress leads to an increase in income, so as to promote the stable construction team, the construction quality is very important. It is hard to imagine that a majority of people full of grievances of the construction team can achieve the task.5ConclusionIt is often said, should be " a matter of expediency in construction, quality first", however, the quality problem is emerge in an endless stream. If in the construction process of some links, quality difference, these difference basically from accumulated will change the whole engineering quality. Therefore, do not let every link of the quality monitoring, on the problem of construction promptly corrected, is to use units, design units, as for as to construction unit as, namely to society as. With such a sense of duty, our engineering degree will gradually progress, can form the good work habits. Constitute the benign development of building construction environment. On the other hand, quality management can't think of what to do what, to systematic, procedural, design the whole management process, all the data, project compilation record, best to establish a computer database, stored in the computer. Management of examination conclusions, text, image, and correcting the situation chart problem timely records. This is the construction quality management informatization is the inevitable trend of development. This is my civil engineering construction quality management shortcomings, to be further developed.译文:关于土木工程施工工程的质量管理1.引言土木工程建立工程的成败在于质量,分开质量,其他一切都无从谈起。
中英文对照外文翻译文献(文档含英文原文和中文翻译)原文:Housing Problems and Options for the Elderly 1. IntroductionHousing is a critical element in the lives of older persons. The affordability of housing affects the ability of the elderly to afford other necessities of life such as food and medical care. Housing that is located near hospitals and doctors, shopping, transportation, and recreational facilities can facilitate access to services that can enhance the quality of life. Housing can also be a place of memories of the past and a connection to friends and neighbors. Housing with supportive features and access to services can also make it possible for persons to age in place. In this session, we will be examining housing problems andoptions for the elderly. Along the way, we will be testing your housing IQ with a series of questions and exercises.2. Housing Situation of Older PersonsHow typical is the housing situation of the olders?We will begin by examining five areas :(1)Prevalence of home ownership (2)Length of stay in current residence (3)Living arrangements (4)Attachments of older persons to where they live (5)Moving behavior.With whom older persons live can influence housing affordability, space needs, and the ability to age in place. About 54% of older persons live with their spouses, 31% live alone, almost 13% live with related persons other than their spouse and about 2% live with unrelated persons. With increasing age, older persons (primarily women) are more likely to live alone or with a relative other than a spouse. Frail older women living alone are the persons most likely to reside in homes with ‘extra’ rooms and to need both physically supportive housing features and services to "age in place". This segment of the population is also the group most likely to move to more supportive housing settings such as assisted living.Many older persons have strong psychological attachments to their homes related to length of residence. The home often represents the place where they raised their children and a lifetime of memories. It is also a connection to an array of familiar persons such as neighbors and shopkeepers as well as near by places including houses of worship, libraries and community services. For manyolder persons, the home is an extension of their own personalities which is found in the furnishings . In addition, the home can represent a sense of economic security for the future, especially for homeowners who have paid off their mortgages. For owners, the home is usually their most valuable financial asset. The home also symbolizes a sense of independence in that the resident is able to live on his or her own. For these types of reasons, it is understandable that in response to a question about housing preferences, AARP surveys of older persons continue to find that approximately 80% of older persons report that what they want is to "stay in their own homes and never move." This phenomena has been termed the preference to "age in place."Although most older persons move near their current communities, some seek retirement communities in places with warmer weather in the southwest, far west and the south.3. The Federal Government's Housing Programs for the ElderlyThe federal government has had two basic housing strategies to address housing problems of the elderly. One strategy, termed the "supply side" approach, seeks to build new housing complexes such as public housing and Section 202 housing for older persons. Public housing is administered by quasi-governmental local public housing authorities. Section 202 Housing for the elderly and disabled is sponsored by non-profit organizations including religious and non-sectarian organizations. Approximately 1.5 million olderpersons or 3% of the elderly population live in federally assisted housing, with about 387,000 living in Section 202 housing. Over time, the government has shifted away from such new construction programs because of the cost of such housing, the problems that a number of non-elderly housing programs have experienced, and a philosophy that the government should no longer be directly involved with the building of housing. Section 202 housing, a very popular and successful program, is one of the few supply-side programs funded by the federal government, although the budget allocation during the last ten years has allowed for the construction of only about 6,000 units per year compared to a high of almost 20,000 units in the late 1970s. Instead of funding new construction, federal housing initiatives over the last decade have emphasized ‘demand side’ subsidies that provide low-income renters with a certificate or a voucher that they can use in a variety of multiunit settings, including apartments in the private sector that meet rental and condition guidelines. These vouchers and certificates are aimed at reducing excessive housing costs. Some certificates are termed ‘project based’ subsidies and are tied to federally subsidized housing such as Section 202. Because housing programs are not an entitlement, however, supply-side and demand side programs together are only able to meet the needs of about 1/3 of elderly renters who qualify on the basis of income.While advocates for housing have been trying to hold on to the existing programs in the face of huge budget cuts at HUD, much of the attention has been shifting towards meeting the shelter and service needs of the frail elderly. This emphasis reflects the increasing number of older persons in their eightiesand nineties who need a physically supportive environment linked with services. This group of older persons includes a high percentage of older residents of public and Section 202 housing. Initially built for independent older persons who were initially in the late sixties and early seventies, this type of housing now includes older persons in their eighties and nineties, many of whom have aged in place. Consequently, the government is faced with creating strategies to bring services into these buildings and retrofit them to better suit the needs of frail older persons. A major initiative of the early 1990s, which may be stalled by current budget problems at HUD, has been for the federal government to pay for service coordinators to assess the needs of residents of government assisted housing complexes and link them with services. As of 1998, there were approximately 1,000 service coordinators attached to government assisted housing complexes across the country.4. The Housing Continuum: A Range of Options for ElderlyA long-standing assumption in the field of housing has been that as persons become more frail, they will have to move along a housing continuum from one setting to another. As the figure on housing options suggests, along this continuum are found a range of housing options including single family homes, apartments, congregate living, assisted living, and board and care homes (Kendig & Pynoos, 1996). The end point of the housing continuum has been thenursing home. These options vary considerably in terms of their availability, affordability, and ability to meet the needs of very frail older persons.The concept of a continuum of supportive care is based on the assumption that housing options can be differentiated by the amount and types of services offered; the supportiveness of the physical setting in terms of accessibility, features, and design; and the competency level of the persons to whom the housing is targeted. The figure on housing options indicates how such options generally meet the needs of older persons who are categorized,as independent, semi-dependent and dependent. Semi-dependent older persons can be thought of as needing some assistance from other persons with instrumental activities of daily living (IADLs) such as cooking, cleaning, and shopping. In addition to needing assistance with some IADLs, dependent older persons may require assistance with more basic activities such as toileting, eating and bathing. Although semi-dependent and dependent older persons can be found throughout the housing continuum, independent older persons are very unlikely to reside in housing types such as assisted living specifically designed and equipped to meet the needs of frail older persons unless their spouses require these needs.Although the continuum of housing identifies a range of housing types, there is increasing recognition that frail older persons do not necessarily have to move from one setting to another if they need assistance. Semi-dependent or dependent older persons can live in a variety of settings, including their own homes and apartments, if the physical environment is made more supportive, caregivers are available to provide assistance and affordable services areaccessible.5. ConclusionsHousing plays a critical role in the lives of older persons. Most older homeowners who function independently express a high level of satisfaction with their dwelling units. However, high housing costs, especially for renters, remain a financial burden for many older persons and problems associated with housing condition persist especially for low- income renters and persons living in rural areas. Federal housing programs such as public housing, Section 202 housing, and Section 8 housing certificates have only been able to address the basic housing problems of only about one-third of eligible older persons because of limited budgets. Moreover, a shortage of viable residential options exists for frail older persons. Up until the last decade, housing for the elderly was conceived of primarily as shelter. It has become increasingly recognized that frail older persons who needed services and physically supportive features often had to move from their homes or apartments to settings such as board and care or nursing homes to receive assistance. Over time, however, the concept of a variety of housing types that can be linked has replaced the original idea of the continuum of housing. It is possible for frail older persons to live in a variety of existing residential settings, including their own homes and apartments with the addition of services and home modifications. Consequently, the last decade has seen a number of efforts to modify homes, add service coordinators to multi-unit housing and create options such as accessory and ECHO units. Although thesestrategies have been enhanced by a somewhat greater availability of home care services, Medicaid policy still provides incentives to house frail older persons in nursing homes. The most visible development in the field of housing for frail older persons has been the growth of private sector assisted living which is now viewed by many state governments as a residential alternative to nursing homes. The AL movement itself has raised a number of regulatory and financing issues that cross-cut housing and long term care such as what constitutes a residential environment, insuring that residents can age in place, accommodating resident preferences, protecting the rights of individuals and insuring quality of care. Nevertheless, the emergence of AL along with a wider range of other housing options holds out the promise that older persons will have a larger range of choices among living arrangements.译文:老年人的住宅问题与选择一、简介住宅在老年人生活的极为重要。
工程管理论文中英文资料对照外文翻译The Internet is Applicated in Real EstateThe Real Estate Industry and the World Wide Web: Changing Technology, Changing Location.The Internet, in its Web based graphics version, has captured the imagination of both consumers and businesses. Its convenience, speed, low cost and versatility are being exploited on a daily basis in ever-changing ways. Together with its capacity to transform existing businesses, promote new businesses and facilitate exchange of information and data, its other striking attribute has been the speed with which this new technology has spread throughout the global economy.Keywords:The internet;Real Estate;ApplicatedThe number of computer hosts grew by more than ten-fold between 1995 and early 1999. The number of Web sites increased almost 100-fold, to over two million, between 1995 and 1998.By the year 2000, there will be approximately 400-500 million Internet users in the world, and the total number of Web sites will exceed five million.This new technology has the potential for affecting the real estate industry directly and indirectly. Directly, it may become a tool that allows a real estate business to expand its information and sales network. Indirectly, it may change the location equation where and how firms do business which in turn will affect the role of firms involved in real estate development, investment and transactions.Measuring the Spread of the WebThere are few reliable published statistics on Internet or Web use, and statistics reported by different analysts are often inconsistent. Our discussion of the Web and real estate is based on limited information from surveys and on examination of Web sites rather than on more comprehensive data. We have built our overview of the role of the World Wide Web and real estate by examining a variety of sources(including trade publications, existing Web sites, and our own survey of selected real estate firms)From E-mail to E-commerceBefore the advent of the World Wide Web, the Internet existed mostly for the purposes of e-mail, data transfers, newsgroups and bulletin boards, and its reach was limited primarily to the academic and the defense community. The technology itself was not particularly user-friendly, the network speed was not very high, the medium was limited to text and data, and accessing information was cumbersome and time-consuming. The browser technology greatly simplified usage, enabled multimedia information, and created interactive possibilities. The technology brought together TV entertainment, library information, news bulletins, communication and data in one desktop machine.Although initially the greatest patrons of the Internet were the academic community, the commercial sector quickly caught on to the potential of the Web. The private sector saw in the Web an opportunity to widen its marketing reach, lower costs of information dissemination, improve customer relations, and ultimately to conduct sales. Existing private sector Web sites can be roughly categorized into three types, as summarized. The most basic level is for simple information dissemination. The firm registers a Web site and develops a page giving basic company information. The second stage is an expansion of information, marketing goods and services or providing other customer information. The third stage is the addition of transactions tothe activities possible on the Web site.Most business sites at present are in Stage 2. The use of the World Wide Web for detailed information dissemination, and marketing has had several advantages. For the firm, marketing, information dissemination and customer services on the Web can be monitored and analyzed with some details unavailable from conventional methods of marketing using other media. Internet tools can now provide a firm with data on who accessed the site, which pages were visited most, heavily, from where and for how long. This information contributes to improved measures of the results of promotional efforts. The promotional costs associated with the Internet have also been very low. For example, in direct mail marketing, to send a one-page color brochure to 5,000 random addresses will cost upwards of $2,500. The cost of setting up a Web site could be one-tenth of this amount or less (although tracking and analysis can quickly add to the cost)?Many different sectors, including real estate, have found the Internet to be both efficient and cost-effective as a marketing device.The next logical step - a full-fledged office/store on the Web with transaction capability and commerce on the Internet is now being attempted in varying degrees depending on the firm's area of business. Retail sites selling products between $10 and $100, the kind that are traditionally part of a direct mail sales catalog, seem to be the ones having the greatest success(although 4% of sites sell products over $10,000 and another 13% sell products ranging from $100 to$9,999)?A number of retail sites have also harnessed a secondary revenue stream from advertising. Advertising revenues on the Web have crossed the billion-dollar mark and total Internet generated revenue will approach$100 billion this year.Consumers' Use of the WebSurveys of consumers using the Web suggest that a Web site does notsubstitute for the more traditional forms of business, but can greatly facilitate the run-up to the final transaction. The most common use of the Web is for information searching, closely followed by work-related uses, education, and entertainment. A significant majority of those that use the Web for shopping do so to carry out detailed research on product information(90%)and to do price comparisons(85%). This more often leads to purchases through normal channels(67%). Most of the online purchases tend to be of items that are standardized-four of the five top items bought on the Web, according to survey, are software, books, hardware and music (the fifth is travel). More than half of consumers who make purchases on the Web spend less than $500 in a six-month period.The demographics of Web users vary widely in age and income. Surveys by Georgia Tech, Active Media and Web indicate that the average age of Web users is 35 years, with average household income $67,000. Most are college educated (65%). A high proportion of the respondents (42%) has accessed real estate sites.Limits to the Web - Some "Catches" to the New Technology New technology is frequently a mixed blessing, and the World Wide Web is no exception. Apart from the teething troubles that any new technology faces and the time, as well as resources needed to learn, adapt and master it, the Web poses some unique issues and problems of its own. Consumers today are facing information overload of taxing proportions. It is not always easy, or even possible, to locate the relevant information on the Web, despite sophisticated search engines. Once the site is located, fancy graphics, complex linkages, labyrinthine routings, and a lot of irrelevant information may overwhelm the consumer - in short, poor and confusing site design can reduce the site's effectiveness.From the point of view of the business, there are two commonly heardcomplaints. First, the business may find that its site does not figure prominently on search results, limiting the number of customers reached. Second, for many firms, Web initiated leads are as yet few and far between. Real Estate Web SitesReal Estate firms and related businesses were among the early private sector pioneers of Internet use and have had a fast growing presence on the Web. presence on the Web. One example of the real estate sector's presence on the Internet in its pre-World Wide Web incarnation was the real estate classified bulletin board of Prodigy, the online service, which had listings for homes and other real estate. A few real estate related Web sites started in 1994 (generally regarded as the inaugural year of the Web). The New York City Real Estate Guide Web site, created in the summer of 1994, was one of the first to offer free access to the latest New York real estate information. By the summer of 1995, the site was receiving more than 100,000 inquiries a month.The real estate industry registered its entry on the Web in a dramatic way in 1995. By the end of that year there were close to 4,000 real estate Web sites. The content matter of the sites, as well as the mix of real estate related firms on the Web have changed over time. Initially, quite a few of the sites were residential real estate brokerages and listing guides, but fairly rapidly the list expanded to include commercial and retail listings, mortgage brokers,appraisers, architects, real estate attorneys, developers, construction firms, and suppliers. As investment vehicles for real estate expanded, REITs, publicly held firms, and investment advisors also added Web sites.The early real estate broker Web sites quickly took advantage of the unique features of the Web. Prospective customers could find out what properties were for sale or rent, look up detailed descriptions of each listing, view photographs and floor plans, and contact the broker by e-mail. Viewerscould also look up statistical and data reports on conditions in various geographical areas and on emerging macroeconomic trends.Ever since then, the real estate industry has been among the most enthusiastic users of the Web, by some measures accounting for 4% to 6% of commercial Web sites. A survey conducted by Real Estate Broker's Insider in early 1998 confirmed that nearly 95% of the respondents/brokers had a Web site, and more than 90% of the housing stock on sale at a given time is now listed on the Web. Indeed, because of the dispersed, localized nature of the role of information in real estate, the prospective gains from information dissemination, comparability, and Web links were particularly significant in real estate.For much of the real estate sector, the Internet generates not so much the actual transactions themselves, but creates initial leads that are later followed by transactions, purchases and sales. Web sites frequently lead to contacts that are then nurtured through telephone and person-to-person meetings. For residential real estate, Web activity includes residential searches, housing details, and pricing information (both on houses and mortgages), with follow-up contact with brokers. Real estate-related transactions are seen in the hospitality industry (making reservations for hotels and vacation homes and in online mortgage applications). Mortgage and home loan finance companies report both inquiries from mortgage shoppers who obtained initial information from their Web sites, as well as closing of loans through the Web, lead to great savings in time and overhead costs.It is not just the real estate professionals who are enthusiastic about their Internet presence, judging it to be as effective as print and radio advertising. Mortgage shoppers, homebuyers and vacation rental seekers as well applaud, in particular, the convenience it brings to the entire process of searching, researching, comparing, communicating and transacting business.Beyond these sectors, many other types of real-estate related firms are using the Web to broaden their market areas, increase the depth of their marketing, and to provide a range of services to existing customers. Commercial brokers provide not only information on available sites but also on market conditions for different locations and sometimes more in-depth economic analysis of a region. REITs and other investment firms provide detailed information on their products as well as background market or economic information. Public companies provide up-to-date stock quotes and quarterly and annual reports on the Web.Web Penetration and Use: The Experience of Leading Real Estate Firms We conducted a limited survey of a sample of leading real-estate related firms in the US and California. Responses from approximately 60 of these firms showed that over four-fifths had Web Sites by March 1999. 2 Of those with Web sites, one-third had inaugurated their sites by the end of 1996. Among the earliest with a Web presence were brokers, investment firms, lenders, business and financial services firms, law firms, residential developers, and a trade organization. Another third of the group were newcomers, with sites inaugurated in 1998 or early 1999. Commercial developers were prominent among this group, with residential developers, consultants and advisors, lenders, REITs and investment firms also among this group. Those without sites were more likely to be privately held firms with a relatively narrow base of activity (for example, a commercial developer centered in the San Francisco Bay Area)?Most with Web sites used their site to provide information about the company and to market services. In addition, about one-third marketed property from their site, providing detailed information on the characteristics of buildings available, surrounding communities, and other related data. Other Web site uses include employee recruiting, providing information formembers or investors, and disseminating related information on topics such as regulations or real estate markets.What does the Web specifically do for Real Estate?According to Activemedia, an internet research company, some of the sectors experiencing the greatest growth in terms of their presence on the Web in 1998 were computer hardware and software, real estate, publishing and information, finance and Internet services. A significant initial motivation for this rush for the Web is provided by, what can be termed, the "tiptoe" effect. The first ones on the Web had an additional advantage over those who did not; information on their services, products, home listings now be accessed conveniently by those with computers. The low setup cost, however, and the potential disadvantage of not having a Web presence has propelled others in the profession to set up their own sites.Real estate shares in some of the basic advantages of the Web mentioned earlier, such as ease of marketing, communication and feedback from clients, lowered costs of operations and convenience of customer service and support. In addition, the Web provides positive features specific to the real estate industry.Key elements include the following.1.Increased geographic reach.The Web has dramatically increased the geographic reach of both buyers and sellers. Although the "local" aspect of real estate will perhaps never be whittled away completely, there is no doubt that inquiries about properties can now emanate from far away to a much greater degree than before. This, in turn, potentially increases the size and "depth" of the market and makes it more efficient.2.Capability of visualization.In some sense, increased geographic reach has become possible due tothe other emergent feature of the Web, the capability of visualization. In its most state-of-the-art form, Web sites now allow prospective buyers to take virtual tours of homes, resorts, hotels and convention centers.3.Reduced transaction costs.The Web may reduce transactions costs. This has been particularly apparent in the case of mortgages. According to Fannie Mae, 1.5% of all mortgages were handled online this past year. The Web-attributable features that make this kind of a transaction possible are instantaneous comparability, interactive capability, online calculation, online applications, and continuous updating of the sites.4.Improved information dissemination.The Web offers broad opportunities for increasing the scope and depth of information provided by many different types of firms. A well constructed home page gives an overview of a firm's range of services or activities. Links allow the customer or client to learn much more detail about the selected items of most interest, while ignoring less relevant pieces of information. A number of sites take advantage of the ability to link to resources beyond the company's Web pages, linking customers and clients to related Web resources.Unlike retail sectors, such as books and computer hardware, the Web as yet has not become a threat to the "middle man" role of many real estate firms. Instead, it is more likely to be used as a means of expanding services offered or locations served. However, in the long term, the Web and related Internet technology have the potential to change the structure of business activity, which in turn will affect the demand for real estate in type if not in quantity. For example, some retailers already have closed stores while expanding sales on the Web. Also, the Internet has been seen as one factor allowing the decentralization of office space. These trends to date have notled to a decline, but rather to a redistribution in the demand for office, retail and warehouse space.These are summarized .Speculation on Potential Impact of Internet on Real Estate Industry.1.Shortening of Transaction Cycle2.Precise Market Targeting3.Transformed Competition4.Cost savings:a)Marketing,b)Sales,c)Operation5.Possibility of Disintermediation;Lowering of Commissionsbination of Comparison Shopping and Direct Sales7.Access to MBS Secondary MarketHow to Find the Real Estate Sector on the WebThere are a few key sites that can be used to access the broad range of real-estate related Web sites. These include:-Site sponsored by the National Association of Realtors, linking users to realtor, home sales and market information.-Site sponsored by the National Association of Home Builders, providing a wide range of market information.-Directory to commercial real estate sites, including brokers,developers, investors and analysts. and , two sites that provide users with information about mortgage rates, mortgage brokers and with the opportunity to submit an application online. (National Association of Real Estate Investment Trusts) and (Real Estate Investment Advisory Council), two associations related to real estate investment trusts.-The California Association of Realtors site.the site for the Urban Land Institute, with information onthe organization, programs, conferences, and publications related to real estate and land use. has three online magazines including National Real Estate Investor, Shopping Center World, and Midwest Real Estate News. An additional real estate online magazine, can available at .Ashok Deo BardhanRESEARCH FELLOWCynthia A. KrollREGIONAL ECONOMIST互联网在房地产业的应用摘要:互联网,仅仅它的网页图形版本,就已经吸引了众多消费者和商家的目光。
中英文资料外文翻译文献Building construction quality managementAbstract:adhere to the quality first, improve the management level, improve the quality of construction is the key, only to meet the required quality standards and user requirements under the premise of quality, time limit for a project, cost, to meet the requirements, to provide more high-quality, safe, economical and applicable building products. Based on this, the building construction quality management of.Key words: housing construction building construction quality management1 strengthen training, selection of construction personnel is laying the quality control personnel foundationEngineering quality were all participants in the project construction technology management, operating personnel coordination work results, so construction workers is to form the main factor of project quality. To control the engineering quality first is the training and selection of construction personnel, improving their comprehensive quality. We should improve their quality awareness, according to comprehensive quality regardless of idea construction personnel must establish five concepts: the concept of quality first, pre-control priority idea, talk with data concept and social benefit and enterprise benefit and comprehensive benefit idea. The second is the construction of the technical quality of personnel, management, construction personnel should have higher quality planning and management capacity, production personnel should have superb technical ability, be strict in one's demands of the style of work, strict implementation of quality standards and procedures of the legal concept, service personnel should do good technology and service life, can be with excellent service indirectly to ensure engineering quality.2 give full play to QC quality control functionAccording to "the anti-seizure combination, prevention first " principle is carried outactively " tell, help, anti, card" scientific examination method, and the construction personnel together, common to the owners of construction process, responsible, quality control personnel, users, the construction personnel to establish new relations of cooperation, quality inspection staff and the construction site operations personnel is consistent, it is to provide users with high quality, satisfaction of building products. But the construction production is busy, to snatch the project schedule is loosen quality management tendency occurs. This led to check the quality of the project is checked with contradictions between. To give full play to the initiative of the staff to check the quality of the project, it is necessary to establish the authority of the quality inspection personnel, it is very necessary and important.3 following a case analysis gradually quality management, engineering survey:The territory of Hechi a building for the underground layer, on the ground twenty-two, twenty-five buildings, covers an area of 2550.4 square meters, building a total height of 79.950 meters, construction area of 4008 square meters underground, on the ground 36855 square meters, balcony area is 1570.1 square meters; the main design reasonable service life is 50 years; building fire grade two, seismic fortification intensity is 7 degrees, frame aseismic grade two; the ground floor to the ground floor three layer 2-A axis 2-6 axis and2-17 axis short limb shear wall seismic rating for a class, the rest of shear wall seismic grade two. The project uses the base form of prestressed high-strength concrete pipe pile, structure type for the cast-in-place reinforced concrete frame shear wall structure.4 construction managementOn the construction quality management, mainly involves three aspects, one is about the design, survey and document review management. On design, reconnaissance unit quality behavior and results of the activities of the supervision, the emphasis is placed on the design, survey and document review supervisory control. If the violation of the relevant laws, regulations and mandatory standards for the design and survey documents, can be through direct economic penalties and legal sanctions, enabling direct responsibility assumed by the error caused by negligence or intentional quality responsibility. Two of the activities of the bidding management, focuses on the construction bidding supervision, market supervision and quality supervision the effective integration, through the quality supervision to promote the market competition and standardization of the benign operation,effectively through market operation, to ensure the validity of quality supervision. Three is the text of the contract supervision, is the focus of construction contract supervision, quality management standardization and legalization to fulfil the terms of the contract, the legal effect of contract binding the construction quality and results. By analyzing the three aspects of examination and supervision, to achieve the government's construction qualityof the implementation process control and supervision. Before the construction, in the final analysis is the emphasis of quality management for owners of quality behavior management, because the owner of all these activities of the organizers, decision makers, which is the standard construction owner quality behavior and results of the activities of the important measures.5 construction management5.1 Lraw materials quality controlMaterial quality engineering construction quality is the key, use of raw materials does not meet the requirements of engineering, engineering quality can not meet the requirements. Therefore, in the construction quality control of stop before construction on material quality control, to ensure the quality of materials, in order to improve construction quality. For the control of materials, first of all to the common material supply necessary audit, select qualified suppliers for the supply of materials. Secondly, to approach the necessary inspection of raw materials, including: quality inspection report of the inspection, the inspection of appearance, physical and chemical inspection inspection. Through a series of tests to ensure the quality of the raw materials entering.5.2 procedures and time limit controlTo implement the handover inspection system, on the procedures of unqualified shall enter into next working procedure construction. At the same time construction quality affected by seasons, the reasonable arrangement of construction schedule is to ensure the engineering quality are important measures, and blindly rush period will inevitably lead to serious consequences. Quality control step is to establish quality control, selected key and key technology to undertake the key is checked, the two is to strengthen the operation of the management, project quality is good or bad, depends to some extent on the construction of personnel operation level.5.3 increase on-site inspectionsQuality management in the construction site should strive to grasp first-hand information, and strive to achieve the timely control, for the occurrence of the problem must accomplish early discovery, early correction of bad old practices die hard, avoid, avoid large loss. For example, in the masonry tie bar examination, if taken after the completion of a masonry opening examination, is not easy to check, and to identify the problems are also difficult to remedy, but in the on-site inspection in a timely manner to solve, can avoid bigger loss, but also easy to get the cooperation.The entity quality inspection methods should adopt scientific monitoring instruments and equipment, to provide accurate, reliable and convincing data, strengthen the government engineering quality supervision and inspection of scientific and authoritative. Through the supervision, to ensure the implementation of mandatory standards, ensure the construction of law, regulations and standard carry out, from macroscopical overall grasp the construction project quality and structure safety. In addition, in strengthening program management at the same time, we must strengthen the technical control. Technology control method using standard evaluation method is better. Evaluation of standard methods are mainly as follows: one is the on site quality assurance condition examination and evaluation, two is the completion of the project the detection results of the examination and evaluation, three is on site quality assurance data examination and evaluation, four of engineering entity size deviation of the measured, five is for the completion of engineering the macro visual inspection evaluation.5.4 after the completion of the managementAfter the completion of the quality management of construction projects is put into use check management. First of all to ensure that do not meet the quality standards of the project can not be put into use, avoid inferior project to the state and public users cause direct harm and influence. The second is the decoration, repair and maintenance of quality supervision in construction project whole life quality management category : one is to eliminate or reduce due to renovation, maintenance process caused by irregularities on the construction engineering foundation, body structure and environmental quality, damage, cause quality accident. Two is prevented due to repair, maintenance quality is not up to the requirements to the state and public users production and living environment caused by direct damage. At this stage of the supervision should be emphasized good two close: it is strictly for its completion and acceptance review, supervision, to ensure that theregistration of the reliability, authority and effectiveness. Two is to enhance the decoration, maintenance of quality management in the process, so that construction project whole life quality objectives are effective implementation, for users to create a safe, comfortable, healthy production, living environment, so that the construction quality and realizing the sustainable development. Advocating and implementing project quality insurance, the project quality management into economic management category, to solve engineering after the delivery of quality problem tenants to find the responsible party for any menace from the "rear".This phase is the project by construction to use or production of mark; is on engineering quality inspection the necessary link; is the guarantee contract task is finished in the round, improve project quality level of final checks. The unit after the completion of the project, must undertake the final inspection and test. Unit engineering technical person in charge should be prepared for the demands of information collected materials, equipment, component quality certificate of materials, a variety of material test data, record of concealed work, construction records records. By the technical director of project organization project technology, quality, production and other relevant professional and technical personnel to the scene inspection and evaluation. To identify the construction quality defects should be corrected, and should be corrected once again after the verification to demonstrate conformity. To ensure engineering quality accord with mandatory standard design documents and the requirements of the contract, the employer, the Ministry of supervision of the project completion report. Attended by the construction unit of the organization of the main parties involved in the completion of initial inspection, acceptance procedure.endingProject, quality, the quality of housing construction related to people's daily life and the safety of life and property. In recent years, the housing quality problems have already become the focus of public attention, annual 3.15 consumer rights day, China Consumers Association published by consumer complaints the largest of the ten major categories of commodities, the housing quality problems at the front. Therefore, construction management in many aspects, quality management is the key and core. Only do a good job in building engineering construction quality planning and housing construction quality control, to create more quality engineering.Reference.[1 ] Building Engineering ( Construction Management ) [ J]. Journal of Taizhou Polytechnic College.[2 ] Wang Yan. Paying attention to construction management" two pieces of skins" phenomenon [J ]. Management of construction enterprises.[3 ] Lin Yihong, Li Yuanying. To improve construction quality several ponders [J ]. Shanxi building, 2005, 31 ( 1): 127-128.[4 ] Bu Narui, Wang Liwen, Li Wanqin. Discussion on construction management [ J]. Journal of Hebei Institute of Architecture and Civil Engineering, 2002, ( 02).Hu Zhenghua[ 5]. The era of knowledge economy the construction management [J ]. Parathion design and powder engineering, 2005, ( 06).[ 6].Zheng Jingqiu.Infuluencing the contrcution qulity of Engineering five fsctors[J ]. Shanxi building.2005,31( 1):135-136.浅谈房屋建筑施工中的质量管理摘要:坚持质量第一、提高管理水平,是提高建筑工程质量关键之所在,只有在符合规定的质量标准和用户要求的前提下,满足质量、工期、成本等要求,才能为社会提供更多的优质、安全、经济适用的建筑产品。