As one of the important subjects of project management originated the First World War, and now it has been becoming more and more systematic and professional. In China the systematic project risk management framework was developed by the end of last century, but the practical application of project risk management still needs further improvement. With above background, this thesis focused on the medium or large real estate project, research project character, project management, typical Chinese construction project process, risk management, and project risk management. The first chapter briefed the current international and domestic study status of the subject, thesis purpose, and thesis scope, which are risk and its countermeasures research for the implementation phase of medium or large real estate project. The second chapter briefed the concept and character of real estate project, risk of project, and project risk management, which is the theoretical foundation of further risk management study for the implementation phase of medium or large real estate project. Chapter3,4 and 5 are the project risk management practice on the implementation phase of medium or large real estate project. Chapter 3 is for project engineering risk management, which introduced the concept, purpode, and principle of project engineering at the beginning, and then analyzed the engineering objective, including schedule, cost, and quality, at last it identified and analyzed the project engineering risks and provided design change procedure and design company selection procedure as the risk response. Chapter 4 detailed the concept, principle, objective and key roles of project procurement, identified and assessed the project procurement risk, and also provided contractor selection procedure, vendor selection procedure, examples of procurement plans to response and monitor project risk. Chapter 5 firstly introduced the construction concept, character, process and project construction objectives, including quality objective, schedule objective, and safety objective, and then identified and assessed construction quality risk, schedule risk, cost risk and safety risk, The postscript of this thesis briefed the dynamic project risk management concept, restriction and limitation of this thesis, and opportunities for further research. Totally there are 14 appendixes attached after the thesis. These appendixes could be used as guidance and reference of risk management for real estate project. They are provided to be very useful in term of risk management for real estate project implementation phases.

Project risk management as a procedure of optimism and decision, in which information will come out gradually in the multistage construction. The key to the risk management is how to select the risk response plan. Directed by the system theory and combined the theory of option pricing and project risk management, this paper adopts criterion method to analyze the management and activity in the stage of engineering project implement on the base of comparison to relative documents. This paper emphatically argues the choice of response plans under the condition of risks according to the established analysis frame. These forecasts are hypotheses abstract form the similar project performed before, whether they are actual or not will hugely affect the success of project The implement stage means project period from the location to product whose target is transform the plan to real and mark the aims. The implement stage occupies the most period of project, has huge work, consume the most resource. What is worth to mind is that the implement stage is

process not only to form the real proprirty but also product information, for example, the knowledge of field status and the capability of contractor can only be obtained form implement. So in order to mark the target, the manager must test the hypotheses and use the new information assess the status of influence element, choose the best response plan according to the condition. This paper has value in instructing the project investor/manager in how to establish a risk management configuration and making decision under risk condition in the implement stage of construction project.

This thesis begins with the knowledge system of project management, analyses the whole course of risk management and sets forth the method and program of project risk identification, risk appraisement and risk monitoring in project minutely. Finally, It shows a risk case of building project focal point for the investment decision of early stage with qualitative and quantitative analysis. Chapter 1 Discuss the important concept, method and knowledge system of project risk management, such as the definition of project, the knowledge system of project management PMBOKX the intension of risk, the content of risk management and so on ,carry out the risk analysis of building project emphatically. Chapter 2 Mainly introduce the tool and technology of project risk identification, such as checking table, the rules of systems analysis(WBS), the method of SWOT technology. Thinking of the demerit for every tool, hence author emphasize that we should appraise the gained information resource synthetically. Chapter 3 Explain how to go on the estimation and assessment of project risk, put forward the tool and technology of project risk analysis (as AHP, probability and sensitivity analysis ). When analyzing project risk quantitatively, first we should have definite warranty, do not surmise risk without foundation; Secondly, distinguish confirmed project from unconfirmed project in quantitative analysis. When using two important tools of quantitative risk analysis—probability and sensitivity analysis, one side is to estimate the probability of risk variable exactly; the other side is to judge and analyze the guidelines of probability analysis truly, as square margin, expected figure, disperse modulus. Through quantifying risk, it can strengthen our sense of risk management. Chapter 4 Elaborate the basic method of monitoring project risk. In order to carry into execution monitoring project risk, it is essential to establish perfect replying risk plan. The main steps is: lessening risk, take precautions against risk (as project method, instructing method, program method), conveying risk selling, inviting public bidding, the contract of absolving obligation, insurance and guarantee), avoidance, leave behind and measure in support. Chapter 5 A risk management example. First, analyze the various possible existent risk factors of this project systematically. Secondly, study its sensitivity factor thorough quantifying assessment risk for the project, as well as establishing and putting in practice a plan in order to control the negative influence in minimum level. The building has total 130500 square in architectural area, superior geographical location and tremendously potential value, its overall investment is 4.26 hundreds million. This chapter first studies the market from place environment all around traffic and market requirement, then analyzes systematically financing risk and organic risk of joint venture. On the basis of foregoing analysis, it establishes some parameter of risk quantifying analysis, calculates its selling revenue running expense and cash flow form, uses sensitivity analysis to gain best sensitivity factor. As the uncertain essence of risk, it is extremely important to analyze probability factor of the project. So we confirm the probability form of every variable, then calculate

present value of each possible event according to different constitutes of risk variable; and sort all possible events according to their present values from small to big, calculate accumulative probability, square margin and disperse modulus, thus analyze the risk of project quantitatively, provide quantitative support for supervisor when they will make a decision. Comparing with international advanced level, our country has great gap on the link of how to apply theory of project risk management to practice of project management, especially short of system research in project risk management. On the basis International project contracting is rather a complex project in the cooperation of international economy and technology, and the implementing of the projects will be influenced by political, economy and social situations Firstly, this paper systemically analyzed the market situation of the international project contracting, and concretely analyzed the market structure in Asia, America, Africa and Europe. It concluded the trend of the development of the international contracting market; projects are becoming large-scale and complex and the contracting pattern is diversified, and the management of the international project contracting is standardized. Secondly, this paper analyzed the development status and characteristic of the international project contracting in our country. Although the internationalization tendency of our country’s international project contracting firm is preferable, there is large gap in the whole strength when compared with firms from the developed countries, and also there are limitations in the distributing of the projects in different regions and industries. Thirdly, this paper summarized the technique of international project contracting risk identification, estimate and appraise in our country. Put forward to finance and non-finance risk treating means, and apply the energy release theory to international project contracting risk management, and research the dominating risk in the bid phase and construction and build the energy release model of each phrase. In the cases of Kun River Hydroelectric Station Project in Vietnam and Aromatic Plant Shali Irrigation Project in Nepal, this paper put forward to the technique of the international project contracting risk identification, estimation, appraise and reply in dealing with the project risk. Finally, in the risk estimation and risk appraise, this paper paid attention to evaluate the losing caused by the risk exactly; in the risk reply ,give attention to two aspects of cost and return, look after the economic and logical risk reply measure, in order to make the project risk least, the operating of companies most efficiently and the return highest

外文翻译

项目风险管理作为项目管理的重要内容之一,起源于第一次世界大战之后。在20世纪50年代受到欧美各国的普遍重视和广泛应用。特别是20世纪80年代以后,随着高新技术的快速发展以及经济全球化,项目风险管理的研究也越来越系统化,专业化。在我国,直到20世界末才建立了比较系统的项目风险管理框架,但将项目风险管理应用与工程项目,应用于房地产开发,还有待进一步加强。另一方面,近年来大量外资项目进入中国,带来了先进完善的项目管理和风险管理的系统和方法,这些外资公司也需要正确地预测和管理在中国投资的工程项目的风险。本论文正是在以上背景下,以大中型房地产项目为对象,研究项目的特点,房地产项目的特点,项目管理的基本理论,我国基本建设程序,风险理论和项目风险管理理论,进而利用项目风险管理理论,通过风险识别,风险分析,风险应对,风险监控等步骤来研究大中型房地产项目实施阶段的项目风险和应对措施。本文前两章为课题研究的背景和理论基础,第一章介绍了本课题的国内外现状,课题的意义和课题的研究范围。本课题以大中型房地产项目为对象,重点研究项目实施阶段的项目设计,采购,施工的风险和应对措施。第二章对大中型房地产项目的风险和项目风险管理进行简单介绍,为大中型房地产项目实施阶段风险管理研究打下理论基础。在介绍风险理论时,应用了风险因素的交互理论来理解风险的本质,即风险是损害和暴露度两种因素的结合。在研究项目风险管理的流程是,将项目实施阶段风险管理划分为风险识别,风险分析,风险应对,风险监控四个步骤,并对每个步骤的依据,方法,和结果做了介绍。本文第三章,第四章和第五章是项目风险理论在大中型房地产项目实施阶段风险管理的应用。第三章是工程设计阶段的风险管理,首先研究了项目工程涉及的含义,作用和原则以及工程设计的进度,费用,质量三大目标。然后应用风险要素的交互理论和项目风险管理理论来研究大中型房地产项目设计阶段的风险因素,最后确定设计变更和设计单位的选择等工程设计阶段的主要风险因素,并制定相应的应对措施。第四章是大中型房地产项目采购阶段的风险管理,也是通过研究项目采购的含义,原则,作用,目标和关键角色来识别和分析项目采购阶段的主要风险因素,并制定承包商和供应商评选程序来缓解风险,也介绍项目采购计划的制定方法和内容,并给出了示例。第五章是大中型房地产项目施工阶段的风险管理,首先介绍了项目施工的含义,施工活动的特征,施工过程以及项目施工的质量,进度,成本,安全四大目标,然后用风险要素的交互理论和项目风险管理理论来识别和分析项目施工阶段的主要风险因素,制定相应的风险应对和监控措施,最后提供了材料审批,施工方案审核,施工设备检查,现场变更控制,技术问题澄清,施工安全管理和安全监察分析等控制程序,并介绍了项目规划的施工报建要求,作为示例,也提供了房地产项目设备调试阶段的项目风险跟踪表。本文结束语部分介绍了项目风险管理的动态要求以及本课题的局限性。本文的14个附录是项目实施阶段风险应对和监控的示例,要求和管理程序。这些程序已经在我所承担的项目中实际运用,并被证明有效地缓解项目实施阶段的风险。

管理就是一个在信息不断进入的多阶段活动中进行优化决策的过程,其关键在于对风险应对方案的选择。本文采用规范研究的方法,以系统理论为指导,将期权定价理论与项目风险管理理论相结合,分析工程项目实施阶段的管理过程,在与相关文献对比的基础上分析工程项目实施阶段活动。在建立分析框架的基础上重点分析风险条件下的应对方案的选择这一决策问题。由于应对方案的实施会改变项目结果的分布,简单地采用项目原折现率对期望值折现来对应对方案进行评价已不再适用。通过对应对方案的性质的分析并结合实物期权的理论,本文认为风险应对方案应该看作是一种衍生于项目的实物期权,应该使用期权定价方法对其投入进行衡量。在对实物期权法的计算过程进行分析的基础上,指出由于未考虑活动引起的成本变化而无法实现其所计算的项目价值增加。在分析期权定价原来的基础上,提出以

单位风险价格作为应对方案的评价指标,并证明在某些特定的市场条件下,应用实物期权的分析方法确实可以发现一个最优的应对方案。本文对指导工程项目的投资者/管理者如何在项目实施阶段建立一个风险管理体系并正确做出风险决策有一定的参考价值。

本文从项目管理的知识体系入手,分析了项目风险管理的全过程,对项目风险识别,风险评价,风险监控的程序和方法进行了较详尽的阐述。最后,通过一个建设项目案例重点对投资项目前期决策的风险作了定量和定性的分析。第一章论述了项目风险管理的重要概念,方法和知识体系,如项目的界定,项目管理的知识体系(PMBOK),风险的内涵及风险管理的内容等等,并着重进行了工程建设项目的风险分析。第二章主要介绍了项目风险识别的工具和技术。如核对表,系统分析法(WBS),SWOT技术等方法。考虑到每种方法都有其局限性,因此作者强调应对获取的信息资源进行综合评审。第三章说明了如何进行项目风险的估计和评估,提出了项目风险分析的工具和技术(如AHP,概率和敏感性分析法)。在进行项目定量风险分析时,首先要有明确的依据,不能凭空臆测:其次应区分清确定性项目和不确定性项目定量分析的方法。在应用定量风险分析的两种重要工具——概率和敏感性分析法时,一是要准确估计出风险变量的概率;二是对概率分析指标,如方差,期望值,离散系数等进行准确的评判和分析。通过风险的量化,可以强化我们风险管理的意识。第四章阐述了项目风险监控的基本方法。为了更好地实施项目风险监控,制定完善的风险应对计划是必要的,其措施主要有:减轻风险,预防风险(如工程法,教育法,程序法),转移风险(出售,发包,开脱责任合同,保险与担保),回避,自留,后各措施。第五章为风险管理实例。首先系统地分析了该项目可能存在的各种风险因素,然后就其敏感性因素进行了较为深入的定量研究,达到量化评估风险对项目的潜在影响,已经制定并实施计划以便将消极影响控制在最低程度的目的。该项目总建筑面积13.05万米,总投资4.26亿元人民币,地理位置优越,升值潜力巨大。本章首先从地段,周边环境,交通和市场需求等诸多方面对该项目进行了市场调研,然后对该项目在融资风险和合资的组织风险进行了系统的分析。在上述分析的基础上,确立了项目风险定量分析的有关参数,计算了项目的销售收入,经营成本及现金流量表,进行了项目敏感性分析,得出最敏感性因素。由于风险不确定性的本质,对项目敏感性因素进行概率分析是极其重要的。因此首先确定了变量的概率分布;然后根据风险变量的不同组合计算出各个可能事件的净现值;并对各个可能事件按净现值的由小到大排序,计算出净现值大于零的累积概率、方差及离散系数,从而定量地分析了项目的风险,为管理者决策时提供了量化支持。与国际先进水平相比,我国目前在项目风险管理理论如何应用到项目管理实践这个环节上还有很大差距,尤其缺乏对项目风险管理的系统研究。本文在较系统地研究了项目分析管理的基础上在风险的定量分析上提出了自己的一点见解,以期达到解决实际问题的目的。

国际工程承包是一项极其复杂的国际经济技术合作项目,工程项目实施受政治、经济、社会等多重因素的影响。本文首先系统分析了国际工程承包市场的状况,具体分析了亚洲、美洲、非洲以及肉粥市场的市场格局,总结了国际承包市场发展趋势:工程规模大型化、复杂化;承发包方式多样化;国际工程承包管理规范化。其次,本文分析了我国国际工程承包的发展状况和特点。指出虽然我国国际工程承包公司的国际化发展势头较好,但整体实力与发达国家的公司还有相当大的差距,在承包工程的地区以及行业分布上也比较局限,我国国家工程承包商自身的特点决定了我国国际工程承包面临相当大的风险。之后,本文系统总结了我国国际工程承包风险的识别、刚iji、评价方法,提出财务手段和非财务手段的国际工程承保风险应对策略,并对能量释放理论应用于国际工程风险管理,研究了投标阶段和施工阶段的主要风险,建立了国际承包工程投标阶段和施工阶段的能量释放模型。本文还结合越南昆山水电站工程和尼泊尔孙莎里灌溉工程实例,提出了我国国际工程承包商在处理国际工程承包风险的过程中,运用多种识别、估计、评价、应对的风险管理方法。最后本文从力争

全面考虑各种风险;准确估计风险造成的损失;兼顾成本,收益两方面因素,寻求经济合理等方面提出了降低国际工程承包风险,提高企业经营效率的风险应对措施。

项目管理外文翻译----ERP项目实施成功因素和风险管理

ERP项目实施成功因素和风险管理 参考国外的一些文献资料,一个成功的ERP项目,往往要花费数年时间,数千万美元得以完成。再回头看国内,随着ERP怀疑论的抬头,价格战的兴起,ERP作为一种软件供应商的产品,却有走下神坛趋势。就连ERP界的首领SAP 也推出了Business One产品,价格低于十万。不过,即便ERP软件能做到免费,或如IBM推崇的按需收费的境界,从整个企业实施的角度,考虑到人员、培训、维护、业务重组、二次开发、三次、n次开发,其费用应该也在数百万乃至千万人民币的规模。这对于国内企业而言,已是不小的数目了。 但是,还是有不少企业怀着美丽的梦想,踏上ERP实施的艰辛之旅。其中又有不少项目以失败告终。而对于那些最后的幸存者,是否就可以还戟入仓,饮酒高歌呢? 事实上,企业在成功实施ERP项目后,将面对较实施前更大的风险。在未来的五到十年中,是否有一个扎实的ERP风险管理机制将决定了企业是否能在最初的ERP投资中真正获益。 1998年Thomas H.Davenport在哈佛商务评论发表了名为《将企业放入企业系统》的文章(Putting the entERPrise into the entERPrise system)。该文系统地提出了企业系统,或称ERP系统给企业运作带来积极及消极的引响。同时也直接提出了未来企业必须面对的一个风险:将整个企业放入企业系统中的风险。 按照美国项目管理协会对风险的定义,“风险”是指对项目有利或不利的不确定因素。 项目是“为完成某一独特的产品或服务所做的一次性努力”,项目的“独特性”决定了项目不可能是以与以前完全相同的方式、由与以前完全相同的人来完成的,同时,项目所要创造的产品或服务,以及项目可能涉及的范围、时间及成本都不可能在项目开始时完全确定,因此,在项目进行过程中也相应会出现大量的不确定性,即项目风险。本文以下所提到的“风险”是指对项目“不利”的不确定因素。 对项目不利的风险存在于任何项目中,并往往会给项目的推进和项目的成功带来负面影响。风险一旦发生,它的影响是多方面的,如导致项目产品/服务的功能无法满足客户的需要、项目费用超出预算、项目计划拖延或被迫取消等,其最终体现为客户满意度的降低。因此,识别风险、评估风险并采取措施应对风险即风险管理对项目管理具有十分重要的意义。 风险管理的具体内容 项目风险管理主要分为以下几个步骤:风险识别、定性/定量风险分析、风险应对计划编制及风险监控。 1.风险识别 风险识别,是指识别并记录可能对项目造成不利影响的因素。由于项目处于不断发展变化的过程中,因此风险识别也贯穿于整个项目实施的全过程,而不仅仅是项目的开始阶段。风险识别不是一次性的工作,而需要更多系统的、横向的思维。几乎所有关于项目的计划与信息都可能作为风险识别的依据,如项目进度及成本计划、工作分解结构、项目组织结构、项目范围、类似项目的历史信息等。 需要注意的是,并非所有的风险都可以通过风险识别来进行管理。风险识别只能发现已知风险(如:已知项目组织中某一成员能力不能完全满足要求)或已知未知风险(known-unknown,即“事件名称已知”,如“客户方人员参与力度不足”);而某些风险,由于项目的独特性,不可能在其发生前预知

工程项目风险及其管理研究文献综述

工程项目风险及其管理研究 文献综述 风险管理已在工程项目管理方面得到了一定范围的运用。工程项目风险管理是风险管理和项目管理相结合的一门学科。一般工程项目风险起源入手,探讨降低工程项目风险、为工程项目提供安全保障、促使工程项目顺利进行的方法,其目的是寻找对工程项目风险进行有效管理的途径。而工程项目风险管理对工程的顺利进行具有很大的意义,对此国内外众多学者都进行了相关的研究。国外的研究有:1984年,美国项目管理学会PMI制定的PMBOK将项目风险管理作为一个重要组成部分,并与2000年对其进行了修正,足以可见PMI对项目风险的重视。另外 C.B.Chapman教授在《Risk Analysis for Large Projects:Models,Methods and Cases》一书中提出了“风险工程”的概念,改框架的构建弥补了单一过程的风险分析技术的不足。除此之外,国外的众多学者也从工程项目风险管理的各方面进行了详细的研究。而在此基础上,我国的学者对工程项目风险管理也进行了大量的研究,其研究现状如下:王蔚初(2010)中《现代工程项目风险分析和管理》中主要对工程项目风险的全面风险管理进行了综述,着手于项目风险的预测与识别,项目风险的评估与分析,项目风险的应对策略以及项目风险的监控和防范,阐述了有关项目风险管理的各个方面。 张根合,李渊(2010)在《工程项目风险管理初探》中指出,工程项目的启动需要经过立项、可行性研究、设计、项目计划等步骤,所有这些工作都需要面对一些变化。因此,如何识别、分析、应对工程项目风险成为需要工程项目参与各方妥善解决的问题。 张晓晨(2010)在《项目风险管理研究浅析》中指出,风险管理一直是项目管理中的重点和难点问题。所以他结合自己多年来从事项目管理的经验,对项目风险概念、研究现状、及项目风险管理系统模型进行了深入的研究,对项目管理过程中的风险问题做了进一步的阐述,希望能对广大项目管理人员起到抛砖引玉的作用。

《项目风险管理计划》模板

技术文件

【模板使用说明】 1)本报告适用于对组织外报告项目风险。本报告经项目负责人审批(需要时应经副 区总审批)后,可以提供给顾客、客户或合约方。 2)模板内容供参考,可以根据实际情况删除或增加二级和三级标题要求的内容,但不 能删除一级标题。 3)对于模板中涉及数据的分析和统计,建议使用表格和图形表示,使数据更清晰直观。 4)在编辑完整个文档后,点击鼠标右键,选择“更新域——更新整个目录”即可。 5)请在完成整个文档的编写后,将模板中给出的说明删除。 文档版本变更记录(文档作者或修改者更新文档版本时填写):

目录 1概述............................................................................................................................................ 2定义和缩略语............................................................................................................................ 3项目风险管理组织.................................................................................................................... 4项目定义风险管理表................................................................................................................ 4.1项目风险类别定义 ........................................................................................................... 4.2项目风险概率和影响定义 ............................................................................................... 4.3项目风险状态定义 ........................................................................................................... 4.4项目风险管理表 ............................................................................................................... 5项目风险管理策略.................................................................................................................... 6项目风险管理进度安排............................................................................................................ 7其它............................................................................................................................................

项目风险管理分析中英文对照外文翻译文献

中英文对照外文翻译文献 (文档含英文原文和中文翻译) 原文: Project Risk Analysis Chapter 1 Introduction 1.1 About this compendium This course compendium is to be used in the course “Risikostyring is projector”. The focus will be on the following topics: ? R isk identification ? Risk structuring ? Risk modeling in the light of a time schedule and a cost model

? Risk follows up We will also discuss elements related to decision analysis where risk is involved, and use of life cycle cost and life cycle profit models. The course compendium comprises a large number of exercises, and it is recommended to do most of the exercises in order to get a good understanding of the topics and methods described. A separate MS Excel program, pRisk.xls has been developed in order to assist numerical calculations and to conduct Monte Carlo simulation. 1.2 Definitions Aleatory uncertainty Variation of quantities in a population. We sometimes use the word variability rather than aleatory uncertainty. Epistemic uncertainty Lack of knowledge about the “world”, and observable quantities in particular. Dependency The relation between the sequences of the activities in a project. Observable quantity A quantity expressing a state of the “world”, i.e. a quantity of the p hysical reality or nature, that is unknown at the time of the analysis but will, if the system being analyzed is actually implemented, take some value in the future, and possibly become known. Parameter We use the term parameter in two ways in this report. The main use of a parameter is that it is a quantity that is a part of the risk analysis models, and for which we assign numerical values. The more academic definition of a parameter used in a probability

2018年华南理工大学项目风险管理平时作业

作业题: 一、名词解释: 1.风险因素: 答:风险因素是风险事件发生的潜在原因。在具备一定的条件时,风险因素才有可能发生风险事件,这一定的条件称为转化条件(主要原因)。即使具备转化条件,还必须具备另外的条件时,风险事件才会真的发生,这种条件称为触发条件(直接原因)。 2.风险损失 答:风险损失在风险管理中系指非故意的、非计划的和非预期的经济价值的减少,通常以货币来衡量。它包括直接损失和间接损失。直接损失指财产损毁和人员伤亡的价值。间接损失指直接损失以外的额外物质损失、收入损失和责任损失。 3.纯粹风险 答:纯粹风险指仅造成损失而无收益可能的风险。例如自然灾害、火灾、安全事故等突发性风险。这类风险一般具有一定的规律性和前兆,可以通过统计分析发现并采取预防策略。纯粹风险的后果有损失和无损失两种可能。 4.风险辨识之风险核查表 答:风险核对表是基于以前类比项目信息及其他相关信息编制的风险识别核对图表。核对表一般按照风险来源排列。利用核对表进行风险识别的主要优点是快而简单,缺点是受到项目可比性的限制。 5.风险辨识之德尔菲法 答:德尔菲法是由美国著名咨询机构兰德公司于20世纪50年代初发明的。它本质上是一种匿名反馈函询法。其做法是,在针对所要预测的问题征得各专家的意见后,进行整理、归纳、统计,再匿名反馈给各专家,再次征求意见,再集中,再反馈,直到得到较集中稳定的意见。德尔菲法不仅用于风险因素的罗列,还可用于估计风险发生的可能性及其影响。 6.风险辨识之流程图法 答:流程图法是将一个工程项目的实施过程,或工程项目某一部分的管理过程,或某一部分结构的施工过程,按步骤或阶段顺序以若干模块形式组成一个流程图,每个模块中都标出各种潜在的风险或利弊因素,从而给决策者一个清晰具体的印象。 7.风险估计之正态分布 答:正态分布(Normal distribution)又名高斯分布(Gaussian distribution),是一个在数学、物理及工程等领域都非常重要的概率分布,在统计学的许多方面有着重大的影响力。若随机变量X服从一个数学期望为μ、方差为σ^2的高斯分布,记为N(μ,σ^2)。其概率密度函数为正态分布的期望值μ决定了其位置,其标准差σ决定了分布的幅度。因其曲线呈钟形,因此人们又经常称之为钟形曲线。我们通常所说的标准正态分布是μ = 0,σ = 1的正态分布。

工程项目风险管理随堂练习

第一章工程工程风险管理理论·第一节风险与风险管理 本次练习有15题,你已做15题,已提交15题,其中答对15题. 当前页有10题,你已做10题,已提交10题,其中答对10题. 1. 下列不属于风险本质地因素是(). A. 风险事件 B.风险损失 C. 风险因素 D. 转化条件 答题: A. B. C. D. (已提交) 参考答案:D 问题解读: 2. 将风险分为财产风险、人身风险和责任风险是按风险()进行地分类. A.分析依据 B.产生原因 C.受损对象 D.造成后果 答题: A. B. C. D. (已提交) 参考答案:C 问题解读: 3. 由于建设工程风险地(),只有对特定建设工程地风险进行定量评价,才能使目标规划地结果更合理、更可靠. A. 个别性 B. 主观性 C. 复杂性 D.不确定性 答题: A. B. C. D. (已提交) 参考答案:A 问题解读: 4. 以下关于工程工程风险管理定义说法不正确地是(). A. 工程工程风险管理地关键是选择和实施风险应对策略 B. 工程工程风险管理是一个周期性动态过程 C. 工程工程风险管理地关键阶段是施工阶段地风险控制 D. 工程工程管理地主体是工程各参与方 答题: A.

C. D. (已提交) 参考答案:C 问题解读: 5. 以下()是按风险产生地不同原因来划分地. A.政治风险 B.财产风险 C.技术风险 D.特殊风险 E.行业风险 答题: A. B. C. D. E. F. >> (已提交) 参考答案:ACD 问题解读: 6. 风险是活动或是事件发生并产生不良后果地可能性.() 答题: 对. 错. (已提交) 参考答案:√ 问题解读: 7. 风险是特定环境中和特定期间内自然存在地导致经济损失地变化.() 答题:. 对. (已提交)错参考答案:√问题解读:)(.8. 风险是在特定地客观条件下,在特定地时期内,某种损失发生地可能性 答题:. 对错(已提交). √参考答案:问题解读:9. 风险是可测定地不确定性.() 答题:. 对(已提交)错. √参考答案:问题解读: 10. 风险因素与风险事件是简单地一对一关系.() 答题: 对. 错. (已提交) 参考答案:× 11. 风险产生地原因是由于不确定性事件造成地,而不确定性事件又是由于信息不完备造成地. 答题:

项目风险管理文献综述

项目风险管理文献综述 项目的实现过程是一个存在着很多不确定性的过程,因为这一过程是一个复杂的、一次性的、创新性的并且涉及许多关系与变数的过程。 项目风险管理是为了最好地达到项目的目标,识别、分配、应对项目生命周期内风险的科学与艺术,是一种综合性的管理活动,其理论和实践涉及到自然科学、社会科学、工程技术、系统科学、管理科学等多种学科。项目风险管理的目标可以被认为是使潜在机会或回报最大化、使潜在风险最小化。 针对当前我国工程建设中,对风险认识和估计不足,在建设过程中又没有有效的风险防范措施等情况。本文着重从风险的认识、特点、产生原因进行分析,介绍了它的基本概念及其常用的几种风险识别、风险评价和风险应对和监控的方法,提出控制风险的对策措施。 项目风险管理 项目风险是指由于项目所处的环境和条件本身的不确定性,和项目业主、客户、项目组织或项目的某个当事人主观上不能准确预见或控制因数影响,使项目的最终结果与当事人的期望产生悖离,并存在给当事人带来损失的可能性。 工程项目风险的产生 1.政策风险 政策风险是项目实施过程中,由于国家、行业的主管部门对所实施的项目相关的政策、法律法规、规划或标准的更新、更改给项目所带来的风险。对这类风险的管理和控制,首先要保证所实施的项目符合国家的产业政策,还应密切注意与项目相关的法律法规及标准可能发生的变化。如调整国民经济计划、产业政策,强行下令已开工的项目下马,或对一些企业实行关停并转等,许多工程业主不得不因此而改变其投资计划,因此,不可避免要遭受重大损失。再者由于政府角色与地位的特殊性,一旦政府换届就有可能导致工程项目发生变更,由此造成工程项目独特的“政治风险”。 2.市场风险 由于产品和原材料的市场价格及供需变化,产品的市场竞争能力等因素给项目造成的风险。该风险是竞争性项目最常遇到的风险,对项目的收益影响至关重要。避免或减少该风险必须采取综合性措施。一是前期做好市场调研,把握项目的产品市场和原材料市场的变化趋势;在选择时,注重项目产品的生命周期,避开进入衰退期的项目,选择具有市场生命力和发展前景的项目,避免市场风险。二是结合企业发展战略,做好产品市场定位,运用营销策略来降低或化解不利因素的影响,从而减少、降低市场风险。 3.管理风险 指项目管理过程中,由于管理层决策失误、战略调整等管理方面的因素造成的风险,是一种人为的风险,具有主观性、可控性,与项目的组织、管理实施有直接联系。 4.财务风险 项目在实施过程中由于资金融通、资金周转、利率汇率变化使项目可能发生超投资或资金短

16秋北航《项目风险管理》在线作业1

北航《项目风险管理》在线作业1 一、单选题(共10 道试题,共30 分。) 1. 项目风险评价的依据是()。 A. 项目范围说明书、风险管理计划 B. 风险管理计划、风险记录手册、组织管理知识 C. 风险管理计划、风险记录手册、项目范围说明书 D. 风险管理规划、风险识别和估计的成果、项目进展状况、项目类型 正确答案: 2. 下列不属于项目风险基本特征的是()。 A. 客观性 B. 多样行 C. 必然性 D. 规律性 正确答案: 3. 所谓(),是对一个风险事件所采取的行动,它是为减小风险发生的可能性,或者降低它的有害影响的严重性而采取的行动。 A. 风险应对 B. 风险响应 C. 风险控制 D. 风险决策 正确答案: 4. ()就是对项目风险提出处理意见和办法。 A. 风险监控 B. 风险应对 C. 风险分析 D. 风险决策 正确答案: 5. 敏感性分析程序是()。 A. 确定分析指标、计算影响程度、选择不确定因素、寻找敏感因素 B. 确定分析指标、选择不确定因素、计算影响程度、寻找敏感因素 C. 选择不确定因素、计算影响程度、确定分析指标、寻找敏感因素 D. 确定不确定因素、确定分析指标、计算影响程度、寻找敏感因素 正确答案: 6. 当()时候,需要制定附加风险应对措施。 A. WBS发生变化 B. 成本基准计划发生变化

C. 预料之外的风险事件或影响大于预期影响 D. 项目计划于更新 正确答案: 7. 风险管理的基本程序包括()。 A. 识别、评价、制订对策和控制 B. 识别、规划、控制和评估 C. 要素识别、缓解管理和对策 D. 评价、回避、接受和缓解 正确答案: 8. 通过风险分析过程决定所识别的一个风险事件无法避免,也不能减轻或保险,这是个关键的风险事件,一旦发生可能造成项目失败,项目经理最佳的选择是()。 A. 贬低风险的重要性,让项目团队找到一个克服任何失败的方法 B. 非常关注,加强管理该风险事件和所有的其它相关事件 C. 让项目评估小组继续分析该风险事件,直到降低预期负值 D. 忽略风险评估,因为不管赋予了什么值,都只是一个估计,绝对不会完全等同于预期的状态 正确答案: 9. 项目经理可能意识到不能满足某些合同条款和项目目标,要达到某些规范既费成本又花时间。这时项目出现风险可能性较高,同客户协商降低风险可能性这种手段()。 A. 可以消除所有项目和客户风险而不需要任何成本 B. 可以重新定义风险对客户发生的可能性 C. 可以使项目范围减小并改进交付给客户的产品 D. 可能减少支付罚金的成本并且满足修订过的规范达到客户的最低要求 正确答案: 10. 下列()工具最适合衡量计划进度风险。 A. CPM B. 决策树 C. WBS D. PERT 正确答案: 北航《项目风险管理》在线作业1 二、多选题(共10 道试题,共40 分。) 1. 在项目生命周期内持续使用()等措施来落实质量方针的执行。 A. 质量计划 B. 质量控制 C. 质量保证

项目风险管理论文综述

工程项目风险管理文献 一、引言 工程项目风险管理被认为是项目管理的三大支柱之一,在我国的许多项目中,由于没有风险意识而造成的损失是巨大的,同样,风险和盈利是同时存在的,通常风险大的工程项目才有较高的盈利,降低风险的目的就是减少不必要的成本开支,以实现目标利润,创造良好的经济效益。这样,风险管理就成为项目管理的重点之一,风险管理从很大程度上关系着一个工程投资项目的盈利收入,是一门需要我们大力研究的一门管理应用学科,对风险管理有着深刻的认识也显得尤为重要。 1、《我国工程项目风险管理研究综述》,王月明、卿本姚,四川建筑科学研究2007 (02) 风险管理的概念可以从经济学、保险学、风险管理学等不同的角度给出不同的定义。其中学术界较为普遍接受的有以下定义: (1)风险就是与出现损失有关的不确定性; (2)风险就是在给定的情况下和特定的时间内,可能发生的结果之间的差异。目前,工程风险管理专家对工程项目的风险定义为:工程项目风险是指所有影响工程项目目标实现的不确定因素的集合。当定量的评价建设工程风险时,会出现风险与概率、潜在的损失的函数关系可以表示为:(p,q) 其中R表示风险量;p表示风险发生的概率,q表示潜在的损失。在风险管理理论和方法中,多数情况是以离散情况来定量表示风险发生的概率和损及其失,因而,风险量R相应的表示为 p1 q1 p2 q2 p3 q3 ........... p n q n (1,2,3 表示风险事件的数量) 2、《工程项目管理》,陆惠民、苏振民、王延树风险是客观存在的,不以人的意志为转移, 因此,风险管理比不可少。 所谓风险管理(),就是人们对潜在的意外损失进行辨认、评估,并根据具体情况采取相应的措施进行处理,即在主观上尽可能做到有备无患,或在客观上无法避免时亦能寻求切实可行的补救措施,从而减少意外损失或化解风险为我所用。 工程项目风险管理师指参与工程项目建设的各方,包括发包方、承包方和勘察、设计、监理咨询单位等在工程项目的筹划、勘察设计、工程施工以及竣工后投入使用各阶段采取的辨认、评估、处理工程项目风险的措施和方法。 3、《试述工程项目风险管理》,王力颖,中国外资2010 (02)工程项目建设过程是一个周期长、投资多、技术要求高、系统复杂的生产消费过程,与此相对应.工程项目风险管理也是一个复杂的、庞大的、动态的系统工程.是一个符合一般管理逻辑的连续过程。其主要包括风险识别、风险评估、风险控制三方面内容。1、风险分析与识别的方法: (1)德尔菲法德尔菲法本质上是一幢反馈匿名函询法。其作法是,在对所要预测的问题争得专家的意见之后,进行整理、归纳、统计,在匿名反馈给各专家,再次征求意见,再集中,再反馈,直到得到稳定的意见。它有区别于其他专家预测方法的是匿名性,多次反馈,小组统计回答。 (2)技术分析法 是一种系统分析方法。用来确定项目内部的优势()、劣势()和项目外部的机会(啪、威胁(),从而将工程项目与内部资源、外部环境有机结合。 此外,风险分析与识别还有核对表法、头脑风暴法、敏感性分析法、事故树分析法等等。

工程管理制度专业外文文献翻译(中英文)

工程管理制度专业外文文献翻译(中英文)

————————————————————————————————作者:————————————————————————————————日期: 2

xxxxxx 大学本科毕业设计外文翻译 Project Cost Control: the Way it Works 项目成本控制:它的工作方式 学院(系): xxxxxxxxxxxx 专业: xxxxxxxx 学生姓名: xxxxx 学号: xxxxxxxxxx 指导教师: xxxxxx 评阅教师: 完成日期: xxxx大学

项目成本控制:它的工作方式 在最近的一次咨询任务中,我们意识到对于整个项目成本控制体系是如何设置和应用的,仍有一些缺乏理解。所以我们决定描述它是如何工作的。理论上,项目成本控制不是很难跟随。 首先,建立一组参考基线。然后,随着工作的深入,监控工作,分析研究结果,预测最终结果并比较参考基准。如果最终的结果不令人满意,那么你要对正在进行的工作进行必要的调整,并在合适的时间间隔重复。如果最终的结果确实不符合基线计划,你可能不得不改变计划。更有可能的是,会 (或已经) 有范围变更来改变参考基线,这意味着每次出现这种情况你必须改变基线计划。 但在实践中,项目成本控制要困难得多,通过项目数量无法控制成本也证明了这一点。正如我们将看到的,它还需要大量的工作,我们不妨从一开始启用它。所以,要跟随项目成本控制在整个项目的生命周期。 同时,我们会利用这一机会来指出几个重要文件的适当的地方。其中包括商业案例,请求(资本)拨款(执行),工作包和工作分解结构,项目章程(或摘要),项目预算或成本计划、挣值和成本基线。所有这些有助于提高这个组织的有效地控制项目成本的能力。 业务用例和应用程序(执行)的资金 重要的是要注意,当负责的管理者对于项目应如何通过项目生命周期展开有很好的理解时,项目成本控制才是最有效的。这意味着他们在主要阶段的关键决策点之间行使职责。他们还必须识别项目风险管理的重要性,至少可以确定并计划阻止最明显的潜在风险事件。 在项目的概念阶段 ?每个项目始于确定的机会或需要的人。通常是有着重要性和影响力的人,如果项目继续,这个人往往成为项目的赞助。 ?确定潜在项目的适用性,大多数组织呼吁编制“商业案例”和“量级”成本,用来证明项目的价值,以便使其可以与其他所有的项目竞争。这项工作是在项目的概念阶段进行,并且作为组织管理整个项目管理的投资组合的一部分被完成。 ?准备商业案例的工作的成本通常包括企业管理开销,但是它可以作为最终项目的一个会计成本来结转。毫无疑问,因为这将为该组织提供一个税收优惠。问题是,那么你如何占有所有不结转的项目? ?如果业务有足够的价值,将批准继续发展和定义阶段。

项目风险管理作业

一.概念解释 1.答:风险的可预测性:根据经验,可以预见其发生,但不可预见其后果的风险。可预测风险或可控制风险,在工作之前对工作过程中以及工作结果可能出现的事物异常进行预测制订对策从而预防事故发生的一种措施 2.答:风险辨识德尔菲法:它是依靠专家的直观能力对风险进行识别的方法,用德尔菲方法进行项目风险识别的过程是由项目风险小组选定项目相关领域的专家,并与这些适当数量的专家建立直接的函询联系,通过函询收集专家意见,然后加以综合整理,再匿名反馈给各位专家,再次征询意见。这样反复经过四至五轮,逐步使专家的意见趋向一致,作为最后识别的根据。 3. 答:风险估计:是指在对不利事件所导致损失的历史资料分析的基础上,运用概率统计等方法对特定不利事件发生的概率的以及风险事件发生所造成的损失作出定量估计的过程 4.答:风险规避:是在考虑到某项活动存在风险损失的可能性较大时,采取主动放弃或加以改变,以避免与该项活动相关的风险的策略。 5.答:风险评价模糊数学方法:采用模糊数学模型,须先进行单项指标的评价,然后分别对各单项指标给予适当的权重,最后应用模糊矩阵复合运算的方法得出综合评价的结果。 6.答:风险的相对性:风险性质会因时空各种因素变化而有所变化 7.答:工程保险标的:工程保险是承保建筑安装工程期间一切意外物质损失和对第三人经济赔偿责任的保险。包括建筑工程一切险与安装工程一切险,属综合性保险。保险标的为工程项目主体、工程用的机械设备以及第三者责任,此外尚有些附带项目 8. 答:安装工程一切险:是指针对各种设备、装置的安装工程(包括电气、通风、给排水以及设备安装等工作内容,工业设备及管道等往往也涵盖在安装工程的范围内。 9. 答:雇主责任险:指被保险人所雇佣的员工在受雇过程中从事与保险单所载明的与被保险人业务有关的工作而遭受意外或患与业务有关的国家规定的职业性疾病,所致伤、残或死亡,被保险人根据《中华人民共和国劳动法》及劳动合同应承担的医药费用及经济赔偿责任,包括应支出的诉讼费用,由保险人在规定的赔偿限额内负责赔偿的一种保险。 10.答:工程保险:是承保建筑安装工程期间一切意外物质损失和对第三人经济赔偿责任的保险。包括建筑工程一切险与安装工程一切险,属综合性保险。 11.答:投保单:亦称“要保单”或“投保申请书”。投保人申请保险的一种书面形式。通常由保险人提供,即由投保人填明订立保险单所需要的项目。主要内容包括:被保险人的名称; 保险标的名称及存放地点(如投保运输工具或运输货物,还须注明运输工具名称、货物数量及目的地等)

项目风险管理文献综述

项目风险管理文献综述 学生:卫山峰,高新萍班级:工管081 摘要: 风险:指由于当事者不可预见的因素,使得最终结果与当事者的期望产生较大悖离,并存在使当事者蒙受损失的可能性。 风险贯穿于工程项目建设全过程,这些风险造成工程项目实施的失控现象,如工期延长、成本增加、计划修改等,最终导致项目经济效益降低,甚至项目失败。因此工程风险管理是决定工程项目是否成功的关键。 项目风险管理是保证项目按照按期、按质完成的项目目标的关键管理环节。现代工程项目管理中最重要的任务是对不确定性或风险性问题的分析和控制。 一、引言: 项目的实现过程是一个存在着很多不确定性的过程,因为这一过程是一个复杂的、一次性的、创新性的并且涉及许多关系与变数的过程。 项目风险管理是为了最好地达到项目的目标,识别、分配、应对项目生命周期内风险的科学与艺术,是一种综合性的管理活动,其理论和实践涉及到自然科学、社会科学、工程技术、系统科学、管理科学等多种学科。项目风险管理的目标可以被认为是使潜在机会或回报最大化、使潜在风险最小化。 针对当前我国工程建设中,对风险认识和估计不足,在建设过程中又没有有效的风险防范措施等情况。本文着重从风险的认识、特点、产生原因进行分析,介绍了它的基本概念及其常用的几种风险识别、风险评价和风险应对和监控的方法,提出控制风险的对策措施。 关键词:项目管理工程项目风险管理项目风险管理风险的产生与特点风险管理对策 二、风险管理理论国内外研究 1.风险管理理论的发展 风险管理作为系统科学产生于二十世纪初的西方工业化国家。问题的提出最先起源于第一次世界大战中战败的德国,最初是企业为控制偶然损失而作出的有组织的集体努力,是企业内部管理功能的延伸。 比较系统的风险管理理论源于美国。1931年美国管理协会首先倡导风险管理,其后以学术会议及研究班等多种形式集中探讨和研究风险管理问题,但在这段时间内,风险管理的内容和范围都是十分狭窄的。 1955至1964年,诞生了现代学术性和职业化的风险管理,此后,对风险管理的研究逐步趋向系统化、专业化、风险管理己逐渐成为一门独立的学科。 我国的风险管理实践和教学研究起步较晚,20世纪80年代后期,风险管理的知识才开始进入中国,90年代初,外商率先在工程项目中使用风险管理,其后,不少的外国风险管理顾问公司的进入中国。目前,国内已有不少的大型项目进行了风险管理实践理论研究,也取得了丰硕的成果。上海地铁工程、小浪底等工程都运用了项目风险管理办法。

项目风险管理·平时作业2020春华南理工大学网络教育答案

项目风险管理作业 作业要求: 1、根据自己的学习计划做作业,不允许抄袭,发现抄袭,平时成绩60分以下处理; 2、按时提交作业,系统关闭不允许上传,没有平时成绩。 一.概念解释 1.风险的可预测性:计算出较为准确的损失概率,可以是风险管理者事先安排,降低损失的不确定性.对损失程度的预测,可以使风险管理者了解风险所带来的损失后果,进而集中力量处理损失后果严重的风险,对企业影响小的风险则不必过多投入。 2.风险辨识德尔菲法:德尔菲法起源于20世纪40年代末期,最初由美国兰德公司(Rand Corporation)首先使用,很快就在世界上盛行起来。现在此法的应用已遍及经济、社会、工程技术等各个领域。用德尔菲方法进行风险项目预测和辨识的过程是由项目风险小组选定与该项目有关的专家,并与这些适当数量的专家建立直接的函询联系,通过函询收集专家意见,然后加以综合整理,再匿名反馈给各位专家,再次征询意见。这样反复经过四至五轮,逐步使专家的意见趋向一致,作为最后预测和识别的根据。 3. 风险估计:从工程项目的风险管理周期来看,风险辨识是风险管理的基础,通过风险辨识将工程中可能存在的风险定性地识别出来。但仅仅知道风险载体可能存在的风险还不够,还要掌握风险发生的可能性的大小、风险一旦发生可能造成的损害程度等。这些问题需要风险估计来解决,因而风险估计是工程风险管理量化和深化的过程,也是工程风险管理不可或缺的环节。 4.风险规避:风险潜在威胁发生的可能性较大,后果非常严重,其他策略不可行时,主动放弃工程项目或变更项目计划,从而消除工程项目风险或产生风险的条件,保障工程项目目标免遭风险的影响。是指中断风险源,遏制风险事件的发生。通过主动放弃、终止承担某一任务。主要应用于项目的初始阶段和中间的施工环节机会成本较大,规避了风险也失去了收益的可能性。 5.风险评价模糊数学方法:模糊数学是近30年来发展起来的一门新兴学科,是使用数学方法来研究和处理模糊现象的科学。它以崭新的理论和独特的方法,冲破了精确数学的局限,巧妙地处理了客观世界中存在的模糊现象,正越来越多地发挥其在方法论上的指导作用。它不仅扩充了经典数学的内容,而且被广泛地应用于实践中。目前,在管理科学、自动控制、天气预报、商品质量评估等自然科学和社会科学和许多领域取得了令人瞩目的成果,显示出强大的生命力和渗透力。近年来,在建设项目风险管理方面,也得到了非常广泛的应用,成为了该研究领域中的热点之一。 工程项目具有相对明确的质量、进度、造价、安全控制的系统综合目标,而实现这一综合目标所需的时间是漫长的。重大工程建设项目往往经历几年甚至几十年的建设周期,在这个周期内,将会遭遇大量的不确定性因素,或者说风险因素,而这些不确定的风险因素往往难以用准确的定量方法来描述。可以说,绝大多数工程的风险都是模糊的,难以准确定义。因此,非常适宜于用模糊方法对其进行分析和评估。 采用通常的方法进行风险评估,其结果是单一的,评估的结果往往用一个数值来表示,即风险的影响用大、中、小等来衡量,这显然不是完全合理和适用的。在项目的风险评估过程中,往往要考虑很多因素。不同的风险因素重要程度不同,评级标准和自然状态模糊,也就是说,在做出任何一个评估时,都必须对多个相关因素作综合考虑,而且评估的结果也往往不是用

关于项目风险管理的文献综述

关于项目风险管理的文献综述 【摘要】项目风险管理是保证项目按照按期、按质完成的项目目标的关键管理环节。本文对项目风险管理的基本概念进行了详细的解析,介绍了它的基本概念及其常用的几种风险识别、风险评价和风险应对和监控的方法,总结了项目风险管理系统知识,表明了项目风险管理的重要性。 一、引言 项目风险管理是为了最好地达到项目的目标,识别、分配、应对项目生命周期内风险的科学与艺术,是一种综合性的管理活动,其理论和实践涉及到自然科学、社会科学、工程技术、系统科学、管理科学等多种学科。项目风险管理的目标可以被认为是使潜在机会或回报最大化、使潜在风险最小化。 本文主要采用文献调研法系统了解项目风险管理的概念、内涵,以项目风险、管理、策略等为检索词,对中国期刊全文数据库、知网中文科技期刊数据库、全国优秀硕士论文库等进行匹配检索,通过分析众多的优秀文献,筛选出将对本文研究有较大帮助的文献进行阅读,并在学校图书馆进行文献查阅。 二、什么是项目风险管理 风险管理是人们对潜在的意外损失进行规划、识别、估计、评价、应对和监控的过程,它是对项目目标的主动控制。风险管理是项目管理的重要组成部分,它贯穿于项目生命周期的始终,了解和掌握项目风险的来源、和性质和发生规律,强化风险意识,进行有效的风险管理对项目的成功具有重要意义。项目风险管理是现代管理科学的重要分支,是一门新兴的经济管理科学,是在经济学、管理学、行为科学、运筹学、概率统计、计算机科学、系统论、控制论、信息论等学科和现代工程技术的基础上,结合社会发展和科技进步而逐渐形成的边缘性学科。项目风险管理问题起源于第一次世界大战中战败的德国,20世纪30年代在美国得到了发展,50年代以来受到了欧美各国的普遍重视和广泛应用,特别是20世纪80年代以来,高新技术的快速发展,世界经济的全球化,一方面,项目风险管理的研究逐步向系统化、专业化的方向发展,另一方面,项目风险管理的范围和应用领域不断扩展,特别在工程领域、金融领域得到了高度重视和快速发展。在我国,随着改革开放的不断深化和社会主义市场经济体制的逐步建立,项目管理环境发生了根本性变化,项目风险显著提高,项目管理模式的广泛应用,项目招投标制、项目业主责任制和风险投资机制的逐步推行,以及国际保险市场的局限性和我国保险市场发展的相对滞后,都要求各项目组织加强自身的风险管理。而我国目前对项目风险管理的研究仍是一个薄弱环节,风险意识不强,风险管理机制不健全,殛待加强项目风险管理研究。因此,项目风险管理的研究、培训及推广对促进我国经济稳定、持续、快速的发展具有重大的现实意义。 三、项目风险产生的原因 1.生产极度复杂的产品; 2.依赖多种数据来源; 3.采用功能交叉的方法; 4.项目管理与企业战略的紧密结合; 5.产品从概念到市场的时间缩短; 6.满足顾客需求; 7.市场的国际化; 8.鼓励参与者取得更大的合伙权和所有权; 9.分散经营; 10.应用更多专业技术; 11.依赖更复杂的工具; 四、风险的类型 根据不同的需要,从不同的角度,按不同的标准,可以对风险进行不同的分类。其目的在于理论上便于研究,实践上便于根据不同类别的风险采取不同的管理策略。按风险的潜在损失形态可将风险分为财产风险、人身风险和责任风险;按风险事故的后果可将风险分为纯粹风险和投机风险;按风险产生的原因可将风险分为静态风险和动态风险;按风险波及的范围可将风险分为特定风险和基本风险;按损失产生的原因可将风险分为自然风险

项目风险管理计划

厦门理工学院新建公寓楼项目风险管理计划书 编制 审核

时间2013年4月15日 一、项目基本情况 项目名称:厦门理工学院公寓楼修建制作日期:2013年4月15日 制作人:签发人: 二、风险管理策略 1.风险管理的总体思想和原则 风险管理的总体思想——以最小的风险管理成本获得最大的安全保障,从而实现经济单位价值最大化。成本,是指经济单位在风险管理过程中,各项经济资源的投入,其中包括人力、物力、财力,乃至放弃一定的收益机会。安全保障,则是指风险管理的效果。纯粹风险管理,安全保障包括:风险损失的减

少,即对风险的有效控制;实际损失能及时充分并有效的得到补偿。 风险管理原则: A.强调事前管理 B.数量化佐证以衡量风险程度 C.预设最坏的情景 D.模拟评估 E.弹性化调整 2.定义风险假设 (1)风险是损失发生的不确定性(两个要素) (2)风险是在一定条件下、一定时期内,某一事件其预期结果与实际结果间的变动程度。变动程度越大,风险越大,反之,风险越小。 3.定义风险管理的责任人 在规划风险管理过程所制定的风险管理计划中,需要对风险管理工作进行角色和职责的分配(如确定风险经理)。这个分配不是针对一个一个具体的风险的。针对各具体风险的风险责任人(risk owner)的确定,那是规划风险应对过程的工作。在规划风险应对过程中,需要制定风险应对措施,并确定每个已识别风险的责任人(应该从参与规划风险应对过程的成员中选择)。风险责任人必须参与规划风险应对过程。 4. 定义风险分析技术

(1)以信任为基础进行风险沟通。 (2)以伙伴关系为关键要素进行风险沟通。 (3)运用双向模式进行风险沟通。 6.项目风险监控: 定义:跟踪已识别的风险,监视剩余风险和识别新的风险,保证风险计划的执行,并评估消减风险的有效性。 目的:通过对项目风险的识别和分析,以及对风险信息的收集,就可以采取正确的风险应对措施,从而实现对项目风险的有效控制。 三、风险分类 按风险因素的主要方面,又可将风险分为技术、环境方面的风险与经济方面的风险以及合同签订和履行方面的风险等三种。它们主要有以下几类:(一)技术与环境方面的风险 1、地质地基条件。工程发包人一般应提供相应的地质资料和地基技术要