全套成本核算表格 - 副本
- 格式:xls
- 大小:89.50 KB
- 文档页数:2
成本核算表格范例1、生产部/车体总装科部门名称生产部/车体总装科填表日期 2001年1月30日资源名称计划数(实际数)总金额动因名称计量单位总动因数量分配权数成本对象名称分配金额100000 人工小时小时 20000 3000 WMC100/M1 15000.00 工资4000 WMC125/M4 20000.005000 WMC150/M6 25000.001000 质量预防成本 5000.003000 质量内部故障损失成本 15000.001500 非正常效率损失成本 7500.002500 正常效率损失成本 12500.003000 按金额分配人民币 3000 3000 废品质量内部故障损失成本 3000.00 次品 1000 按金额分配人民币 1000 1000 质量内部故障损失成本 1000.00半成品占用利息 5000 按金额分配人民币 5000 5000 资金占用成本 5000.00 说明:填表人审核人部门负责人生产部/车体总装科成本汇总:helping build the team, set up an accurate poverty alleviation mechanisms, implementing the requirements of accurate poverty alleviation. Four is the enterprise attaches great importance topeople's livelihood. More limited financial resources on the people's livelihood, actively promote the development of social undertakings suchas education, medical and health, completed the "ten's project" strengthening of low-income housing, public rental housing, renovate rural and earthquake resistant housing projects to improve people's housing conditions; further prosperity and development of cultural undertakings and cultural inheritance, protection, rescue and development. Five is fully engaged in the urban and rural environment. Working casually parked vehicles, trash, littering or abandoning, noise is disturbing, and so on. Completed the Township resident Street solar street lights, clear drains sludge, construction of latrines, waste incineration pool, advancing street lighting, landscaping, cleaning, hardening, improve rural human settlement environment. The six are working together to fight against natural disasters. To respond calmly and properly "8.05" wangji du Village and "8.20" ancient village torrent debris flow disasters. Before the disaster, and township Party Committee team members, party members and cadres reserve militia, armed police officers and men, the courage to dash the danger zone, dared to 合计项目计划金额实际金额金额差异(计划-实际)WMC100/M1 15000.00 15000.00 0.00WMC125/M4 20000.00 20000.00 0.00WMC150/M6 25000.00 25000.00 0.00质量预防成本 5000.00 5000.00 0.00质量内部故障损失成本 19000.00 19000.00 0.00非正常效率损失成本 7500.00 7500.00 0.00正常效率损失成本 12500.00 12500.00 0.00资金占用成本 5000.00 5000.00 0.00合计 109000.00 109000.00 0.002、生产部/发动机装配科部门名称生产部/发动机装配科填表日期 2001年1月30日资源名称计划数(实际数)总金额动因名称计量单位总动因数量分配权数成本对象名称分配金额43000 人工小时小时 10000 1000 100发动机 4300.00 工资2000 125发动机 8600.003000 150发动机 12900.00500 质量预防成本 2150.001000 质量内部故障损失成本 4300.001500 非正常效率损失成本 6450.001000 正常效率损失成本 4300.00废品 2000 按金额分配人民币 2000 2000 质量内部故障损失成本 2000.00 次品 500 按金额分配人民币 500 500 质量内部故障损失成本 500.00 helping build the team, set up an accurate poverty alleviation mechanisms, implementing the requirements of accurate poverty alleviation. Four is the enterprise attaches great importance topeople's livelihood. More limited financial resources on the people's livelihood, actively promote the development of social undertakings such as education, medical and health, completed the "ten's project" strengthening of low-income housing, public rental housing, renovate rural and earthquake resistant housing projects to improve people's housing conditions; further prosperity and development of culturalundertakings and cultural inheritance, protection, rescue and development. Five is fully engaged in the urban and rural environment. Working casually parked vehicles, trash, littering or abandoning, noise is disturbing, and so on. Completed the Township resident Street solar street lights, clear drains sludge, construction of latrines, waste incineration pool, advancing street lighting, landscaping, cleaning, hardening, improve rural human settlement environment. The six are working together to fight against natural disasters. To respond calmly and properly "8.05" wangji du Village and "8.20" ancient village torrent debris flow disasters. Before the disaster, and township Party Committee team members, party members and cadres reserve militia, armed police officers and men, the courage to dash the danger zone, dared to 半成品占用利息 3000 按金额分配人民币 3000 3000 资金占用成本 3000.00 说明:填表人审核人部门负责人生产部/发动机装配科成本汇总:合计项目计划金额实际金额金额差异(计划-实际)100发动机 4300.00 4300.00 0.00125发动机 8600.00 8600.00 0.00150发动机 12900.00 12900.00 0.00质量预防成本 2150.00 2150.00 0.00质量内部故障损失成本 6800.00 6800.00 0.00非正常效率损失成本 6450.00 6450.00 0.00正常效率损失成本 4300.00 4300.00 0.00资金占用成本 3000.00 3000.00 0.00合计 48500.00 48500.00 0.003、品质管理部helping build the team, set up an accurate poverty alleviation mechanisms, implementing the requirements of accurate poverty alleviation. Four is the enterprise attaches great importance topeople's livelihood. More limited financial resources on the people's livelihood, actively promote the development of social undertakings such as education, medical and health, completed the "ten's project" strengthening of low-income housing, public rental housing, renovate rural and earthquake resistant housing projects to improve people's housing conditions; further prosperity and development of cultural undertakings and cultural inheritance, protection, rescue and development. Five is fully engaged in the urban and rural environment. Working casually parked vehicles, trash, littering or abandoning, noise is disturbing, and so on. Completed the Township resident Street solar street lights, clear drains sludge, construction of latrines, waste incineration pool, advancing street lighting, landscaping, cleaning, hardening, improve rural human settlement environment. The six are working together to fight against natural disasters. To respond calmly and properly "8.05" wangji du Village and "8.20" ancient village torrent debris flow disasters. Before the disaster, and township Party Committee team members, party members and cadres reserve militia, armed police officers and men, the courage to dash the danger zone, dared to部门名称: 品质管理部填表日期: 2001年1月30日资源名称计划数(实际数)总金额动因名称计量单位总动因数量分配权数成本对象名称分配金额工资 57270.24 按比例分配比例 100 40 质量预防成本 22908.1060 质量鉴定成本 34362.141467 按金额分配人民币 1467 0 差旅费质量预防成本 0.001467 质量鉴定成本 1467.00试验检验费 595.3 按金额分配人民币 595.3 595.3 质量鉴定成本 595.30 其他 12571.64 按金额分配人民币 12571.64 12571.64 质量鉴定成本12571.64按金额分配人民币 20000 20000 20000 质量内部故障损失成本 20000.00 处理质量事故费用说明:1、质量管理直接费用/工资(应发)= 部室 + 车体品质科 + 发动机测功室 + 发动机品质科 + 发动机收货组 + 返聘 + 附加2、质量管理直接费用/其他= 折旧+文具+办公费+电话+业务招待+公务车+低值品+劳动保护填表人: 审核人部门负责人品质管理部成本汇总:项目计划金额实际金额金额差异(计划-实际)质量预防成本 22908.10 22908.10 0.00质量鉴定成本 48996.08 48996.08 0.00质量内部故障损失成本 20000.00 20000.00 0.00合计 91904.18 91904.18 0.004、配套部(表1)helping build the team, set up an accurate poverty alleviation mechanisms, implementing the requirements of accurate poverty alleviation. Four is the enterprise attaches great importance topeople's livelihood. More limited financial resources on the people's livelihood, actively promote the development of social undertakings such as education, medical and health, completed the "ten's project" strengthening of low-income housing, public rental housing, renovate rural and earthquake resistant housing projects to improve people's housing conditions; further prosperity and development of cultural undertakings and cultural inheritance, protection, rescue and development. Five is fully engaged in the urban and rural environment. Working casually parked vehicles, trash, littering or abandoning, noise is disturbing, and so on. Completed the Township resident Street solar street lights, clear drains sludge, construction of latrines, waste incineration pool, advancing street lighting, landscaping, cleaning, hardening, improve rural human settlement environment. The six are working together to fight against natural disasters. To respond calmly and properly "8.05" wangji du Village and "8.20" ancient village torrent debris flow disasters. Before the disaster, and township Party Committee team members, party members and cadres reserve militia, armed police officers and men, the courage to dash the danger zone, dared to 部门名称配套部填表日期 2001年1月30日资源名称计划数(实际数) 总金额动因名称计量单位总动因数量分配权数成本对象名称分配金额工资 36000 按比例分配比例 100 20 发动机零部件采购 7200.0080 车体零部件采购 28800.0010000 按比例分配人民币 100 20 发动机零部件采购 2000.00 其他80 车体零部件采购 8000.00质量管理差旅费 4000 按金额分配人民币 4000 1000 质量预防成本 1000.00 3000 质量内部故障损失成本 3000.0020000 按金额分配人民币 20000 20000 原材料占用利息资金占用成本20000.00填表人审核人部门负责人配套部(表2)部门名称配套部填表日期 2001年1月30日作业名称计划数(实际数)总金额动因名称计量单位总动因数量分配权数成本对象名称分配金额发动机零部件采购 9200 人工小时小时 3000 600 100发动机 1840.00 900 125发动机 2760.001500 150发动机 4600.00车体零部件采购 36800 人工小时小时 20000 3000 WMC100/M1 5520.004000 WMC125/M4 7360.005000 WMC150/M6 9200.00填表人审核人部门负责人配套部成本汇总:helping build the team, set up an accurate poverty alleviation mechanisms, implementing the requirements of accurate poverty alleviation. Four is the enterprise attaches great importance topeople's livelihood. More limited financial resources on the people'slivelihood, actively promote the development of social undertakings such as education, medical and health, completed the "ten's project" strengthening of low-income housing, public rental housing, renovate rural and earthquake resistant housing projects to improve people's housing conditions; further prosperity and development of cultural undertakings and cultural inheritance, protection, rescue and development. Five is fully engaged in the urban and rural environment. Working casually parked vehicles, trash, littering or abandoning, noise is disturbing, and so on. Completed the Township resident Street solar street lights, clear drains sludge, construction of latrines, waste incineration pool, advancing street lighting, landscaping, cleaning, hardening, improve rural human settlement environment. The six are working together to fight against natural disasters. To respond calmly and properly "8.05" wangji du Village and "8.20" ancient village torrent debris flow disasters. Before the disaster, and township Party Committee team members, party members and cadres reserve militia, armed police officers and men, the courage to dash the danger zone, dared to 合计项目计划金额实际金额金额差异(计划-实际)WMC100/M1 5520.00 5520.00 0.00WMC125/M4 7360.00 7360.00 0.00WMC150/M6 9200.00 9200.00 0.00100发动机 1840.00 1840.00 0.00125发动机 2760.00 2760.00 0.00150发动机 4600.00 4600.00 0.00质量预防成本 1000.00 1000.00 0.00质量内部故障损失成本 3000.00 3000.00 0.00资金占用成本 20000.00 20000.00 0.00合计 55280.00 55280.00 0.005、营业部/销售一科部门名称营业部/销售一科填表日期 2001年1月30日资源名称计划数(实际数)总金额动因名称计量单位总动因数量分配权数成本对象名称分配金额工资 8000 按比例分配比例 100 20 销售地区/江西 1600.0020 销售地区/江苏 1600.0020 销售地区/山东 1600.0020 销售地区/浙江 1600.0020 销售地区/安徽 1600.00促销奖 12000 按比例分配比例 100 15 销售地区/江西 1800.00 helping build the team, set up an accurate poverty alleviation mechanisms, implementing the requirements of accurate poverty alleviation. Four is the enterprise attaches great importance to people's livelihood. More limited financial resources on the people's livelihood, actively promote the development of social undertakings such as education, medical and health, completed the "ten's project" strengthening of low-income housing, public rental housing, renovate rural and earthquake resistant housing projects to improve people's housing conditions; further prosperity and development of cultural undertakings and cultural inheritance, protection, rescue and development. Five is fully engagedin the urban and rural environment. Working casually parked vehicles, trash, littering or abandoning, noise is disturbing, and so on. Completed the Township resident Street solar street lights, clear drains sludge, construction of latrines, waste incineration pool, advancing street lighting, landscaping, cleaning, hardening, improve rural human settlement environment. The six are working together to fight against natural disasters. To respond calmly and properly "8.05" wangji du Village and "8.20" ancient village torrent debris flow disasters. Before the disaster, and township Party Committee team members, party members and cadres reserve militia, armed police officers and men, the courage to dash the danger zone, dared to20 销售地区/江苏 2400.0010 销售地区/山东 1200.0045 销售地区/浙江 5400.0010 销售地区/安徽 1200.00广告费 180000 按比例分配比例 100 15 销售地区/江西 27000.0020 销售地区/江苏 36000.0010 销售地区/山东 18000.0045 销售地区/浙江 81000.0010 销售地区/安徽 18000.00 销售费用/运杂费 16000 按金额分配人民币16000 2000 销售地区/江西 2000.005000 销售地区/江苏 5000.004000 销售地区/山东 4000.002000 销售地区/浙江 2000.001000 销售地区/安徽 1000.002000 非正常效率损失成本 2000.00 成品占用利息 6000 按比例分配比例100 100 资金占用成本 6000.00 说明:促销奖的分配权数按实际发生数构成分配,该实际发生数与当地销售数量从正比。
成本合计每单成本数量单价 小计数量单价 小计数量单价 小计C-0001产品1***台3512.00 420.001629.00 464.002610.00 260.00 1,144.00C-0002产品2***台4617.00 782.003030.00 900.001921.00 399.00 2,081.00C-0003产品3***台4017.00 680.001024.00 240.002326.00 598.00 1,518.00C-0004产品4***台4024.00 960.002427.00 648.001429.00 406.00 2,014.00C-0005产品5***台3018.00 540.001810.00 180.001910.00 190.00 910.00C-0006产品6***台2523.00 575.001325.00 325.002828.00 784.00 1,684.00C-0007产品7***台3512.00 420.001121.00 231.002112.00 252.00 903.00C-0008产品8***台7316.00 1,168.001425.00 350.001513.00 195.00 1,713.00C-0009产品9***台2812.00336.001015.00150.001026.00260.00 746.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用成本合计每单成本数量单价小计数量单价小计数量单价小计 成本合计备注制造费用订单号品名规格单位12,713.001,412.56直接材料直接人工3488元3344元直接人工制造费用46%直接材料27%直接人工26%制造费用。
完整成本核算表模板
温馨提示:文档内容仅供参考
以下是一个基本的完整成本核算表模板:
成本项目金额
原材料成本
直接人工成本
制造费用
- 间接人工费用
- 工厂租金
- 设备折旧
- 能源消耗
销售费用
- 广告费用
- 销售人员工资
- 物流费用
管理费用
- 行政人员工资
- 办公用品费用
- 保险费用
其他费用
- 税金及附加费
- 利息费用
- 其他杂项费用
总成本
这个模板列出了常见的成本项目,你可以根据你的具体业务需求进行调整和添加。
在每个成本项目的金额栏中填写实际的成本金额。
最后,计算所有成本项目的金额总和,得到总成本。
请注意,这只是一个基本的模板,你可能需要根据你的业务需要进行自定义调整。
另外,确保你按照适用的会计准则和法规进行成本核算,以确保准确性和合规性。
例:公司专门大批量生产和销售猪肉包子。
在制品(也可叫半成品等)材料重量实际单价(按上面的出库加权平均单价)面粉83.25斤 2.80 猪肉8.325斤11.00 葱花5.55斤1.50合计这个表只是考虑了直接材料,还有工人工资和制造费用两部分,全部由当月555个成品包子来承担好的面团、擀好的面皮、没有入笼的包子等在制品不分摊工资和制造费用,只分担原材料。
这个表格的目的就是为了倒挤出在制品的原材料消耗情况。
在制品=月初在制品+本月领用原材料-本月完工包子所消耗的原材料=0+360-333=27元完工包子总成本=消耗的原材料成本+生产成本-直接人工+生产成本-制 =333+200+165=698元在制品的成本 =直接材料+直接人工+制造费用-完工包子总成本 =360+200+165-698=27单位包子的成本=完工包子总成本÷完工包子数量=698÷555=1.28元/个《成品调拨单》《销货出库单》《成品入库单》7、包子555个从车间调到包子铺8、卖包子5元/个制造费用《制造费用分摊表》5、结转制造费用6、包子完工,实际做了包子555个,根据BOM,555个包子需要面粉83.25斤、猪肉8.325斤、葱花5.55斤165.00165.00698.00 计算出来的在制品27元钱,不需要做分录698.00698.00 698.00 2,775.00 2,775.00金额233.10 91.58 8.33 333.00这两个计算方法结果是一样的。
用两部分,全部由当月555个成品包子来承担,而揉摊工资和制造费用,只分担原材料。
这个表格的目月初在制品+本月领用原材料-本月完工包子所消耗本-制造费用÷555=1.28元/个贷:主营业务收入——外销收入仓库销售部门,财务复核贷:库存商品(车间仓库)借:现金借:库存商品贷:生产成本——直接材料/直接人工/制造费用费/加工费借:库存商品(店铺)借:生产成本——制造费用贷:制造费用——折旧费、低耗品、维修费、水费财务部仓库制作:端云抱鹤QQ :158003219版权所有,转载不究.8+10*11+10*1.5.8+10*11+10*1.5面粉成本,加权平均成本=(期初库存+本月入库)/(期初数量+本月入库数量)=(0+100*2.8)/(0+100)=2.8元/斤,出库90斤的成本=90*2.8=252来的在制品27元钱,不需要做分录.8元/斤,出库90斤的成本=90*2.8=252。