马鹿塘二期工程混凝土面板堆石坝施工管理概要
- 格式:pdf
- 大小:326.65 KB
- 文档页数:4
马鹿塘水电站二期工程地下厂房工程水文地质条件评价及其应对处理措施的建议周华冰1何树明2(中国水电顾问集团昆明勘测设计研究院,云南昆明650051)摘要:马鹿塘水电站二期工程地下厂房埋藏较深,工程规模较大,围岩完整性好,地下水径、排通道不畅通,相对于厂房洞室的地下水外水压力水头较高,较大的地下水压力长期作用于洞室开挖岩壁将对洞室围岩的长期稳定性产生不利因素。
为主要确保厂房围岩的长期稳定和电站长期安全运行,本文根据厂区施工开挖揭露的水文地质工程地质情况并结合前期地质勘测成果,对厂区水文地质条件进行客观评价并建议出应对处理措施。
关键词:地下厂房;地下水;地质条件;围岩稳定;评价;处理措施建议Appraisal and recommended corresponding treatment measure on hydrological condition of the underground powerhouse for Phase II project of Malutang Hydropower StationZHOU Hua-bing1HE Shu-ming2(Kunming Hydropower Investigation,Design and Research Institute,CHECC,Kunming 650051)Abstract: The underground powerhouse for Phase II project of Malutang Hydropower Station is hidden deeper,bigger scale,and the surrounding rock integrity is good。
The passage for the underground water are non-smooth is impeded。
The external water pressure head of groundwater relativing to the project is higher, and the bigger groundwater pressure act on palisades for a long time,which will produce unfavourable factors to the long-time stabilization of the surronding rock. Be to ensure the long-time stabilization of the surronding rock of underground powerhouse and the long-time safe operation of the hydroelectric station , the article objectively evaluate the hydrological condition of the underground powerhouse and suggest the corresponding treatment measure,accoding to the excavation revealed geological conditions during the construction phase and the advance Geological exploration Results.Key words:underground powerhouse;groundwater ;geological condition;surronding rock stability;appraisal;recommended treatment measure1 地下厂房工程概况马鹿塘水电站位于云南省文山州麻栗坡县境内的盘龙河上,采用混合式开发。
文山马鹿塘水电站二期工程大坝面板浇筑完工
佚名
【期刊名称】《云南水力发电》
【年(卷),期】2009(025)B09
【摘要】日前,由水电十四局有限公司曲靖分公司承担施工的云南文山马鹿塘水电站二期工程大坝面板混凝土浇筑顺利结束,标志着该大坝面板完工。
该面板分为两期浇筑,一期浇筑于去年5月9日结束。
二期浇筑从今年4月27日开浇,在45d的施工中进展顺利,各项控制指标达到要求。
【总页数】1页(P79)
【正文语种】中文
【中图分类】TV223.6
【相关文献】
1.马鹿塘水电站二期工程大坝面板水下检查 [J], 赵磊
2.马鹿塘水电站二期工程大坝渗水成因浅析 [J], 赵磊
3.马鹿塘水电站二期工程大坝位移监测设计及成果分析 [J], 王建英;黄德武
4.马鹿塘水电站二期工程进水塔砼浇筑施工方案 [J], 宋立新
5.马鹿塘水电站二期工程蓄水初期混凝土面板堆石坝监测 [J], 刘伟; 覃珊珊
因版权原因,仅展示原文概要,查看原文内容请购买。
混凝土面板堆石坝施工规定
1、当确定未浇筑混凝土面板的坝体挡水时,必须对上游坡面进行碾压砂浆、喷射混凝土或喷洒阳离子乳化沥青等防渗固坡处理。
2、堆石坝填筑开始前,应进行坝料碾压试验,优化相应的填筑压实参数。
碾压试验的压实参数,主要为铺料厚度、碾压遍数、加水量等。
3、施工中应严格控制填筑压实参数,并应进行抽样检查。
对规定的铺料厚度应经仪器检查。
4、坝料碾压必须采用振动碾,并按材料分区分段进行。
碾压过程中应保证振动碾的规定工作参数。
垫层区的水平碾压,振动碾距上游边缘的距离不宜大于40cm。
5、面板混凝土配合比除满足面板设计性能外,尚应满足施工工艺要求:
(1)水灰比应通过试验确定。
(2)掺用减水、引气、调凝等外加剂及适量的掺合料时,其掺量应通过试验确定。
(3)坍落度应根据混凝土的运输、浇筑方法和气温条件决定。
6、趾板混凝土浇筑应在墓岩面开挖、处理完毕,并按隐蔽工程质量要求验收合格后方可进行。
趾板混凝土浇筑,应在相邻区堆石填筑前完成。
7、金属止水片就位后,与聚氯乙烯垫片接触的缝隙,必须作防止混凝土砂浆浸入其间的封闭处理。
金属止水片中心线与设计线的最大偏移量,不得超过5mm。
浇筑混凝土时,应防止止水片产生形变、变位或遭到破坏。
谈云南马鹿塘水电站二期工程地下厂房洞室开挖施工与管理作者:农定明来源:《现代装饰·理论》2012年第05期摘要:云南马鹿塘水电站二期工程地下厂房规模大,开挖层数多,开挖工程量巨大。
针对其开挖施工方案,着重分析了其难点和重点以及特殊情况,提出了相应的处理对策。
关键词:地下厂房;开挖;施工管理1.工程概况马鹿塘水电站二期工程地下厂房位于猛洞河口上游0.28km处的盘龙河右岸山体内,厂址区山体雄厚,地形完整,仅在上、下游发育有小冲沟,自然山坡稳定。
厂址区岩性为眼球状花岗质黑云混合片麻岩夹少量白岗岩,公路以下陡坡上基岩多裸露。
地下主、副厂房埋深约150m~160m,围岩为新鲜岩体,构造、节理不发育。
仅在厂房顶拱处推测有一条属Ⅲ级结构面断层通过,断层角较陡,且埋深位置较大,断层规模较小,估计影响范围极为有限。
洞室围岩节理面平粗多闭合,具块状~整体结构,属Ⅰ类围岩。
主副厂房开挖支护主要工程量如下表1。
2.开挖措施地下厂房共分为六层进行开挖,Ⅰ层:从厂顶1#施工支洞进入,为顶拱开挖,轮廓开挖质量要求高,喷锚支护和观测仪器埋设量大,结合施工通道及设备的能力,开挖高度定为6.991m。
Ⅱ层:从1#施工支洞进入,该层是岩壁吊车梁所在的部位,开挖施工质量要求较高,是地下厂房施工的难点,为方便岩壁吊车梁施工,开挖高度定为7.4m。
Ⅲ层:从进厂交通洞进入,为了保护已经浇筑完毕的岩锚梁砼,采用预先进行边墙预裂,梯段开挖的施工方式,层高定为6.0m。
Ⅳ层:从进厂交通洞降12%下去进行开挖,然后退挖,根据液压反铲可以退挖4m 深,其碴料可以完全通过交通洞进行运输,层高定为8.0m。
Ⅴ层:利用引水隧洞进行出碴,层高为5.4m,如引水隧洞受其标段影响无法利用时,则利用3#施工支洞进行出碴,从3#施工支洞升坡12%上来进行开挖。
Ⅵ层:利用3#施工支洞进行出碴,层高为8.5m,其中底部预留1.5m作为保护层开挖。
严格控制开挖质量是确保厂房系统围岩稳定的重要保证。
水利工程混凝土面板堆石坝坝体填筑施工技术要点分析彭敏发布时间:2023-05-28T03:33:39.535Z 来源:《建筑实践》2023年6期作者:彭敏[导读] 目前,由于世界经济进步迅速,我国的水利建设的综合能力已经取得了提升,水利工程建设作为一项经济惠民项目,被涵盖在部分水资源丰富的重要区域。
云南建投第一水利水电建设有限公司云南昆明 650217摘要:目前,由于世界经济进步迅速,我国的水利建设的综合能力已经取得了提升,水利工程建设作为一项经济惠民项目,被涵盖在部分水资源丰富的重要区域。
在混凝土面板堆石坝建设中,常常使用到施工技术是高强度填筑法,我们将深入分析并归纳这项技术各个应用阶段的要点,明确其实施步骤要点,以供相关技术人员借鉴。
关键词:水利工程;混凝土面板;堆石坝坝体填筑;施工技术引言由于当前的水利工程种类与规模均呈现出与日俱增的发展趋势,因此就需要提高混凝土面板堆石坝工艺的应用,由于这种工艺具备着作业简便,成本低,而且技术稳定能够保证施工安全的优点,所以在水利与水电施工中的应用越来越普遍。
所有的建设工程都需要提高其施工效率,而水利工程作为惠及人民的重大建设工程,可以给广大市民的工作生活提供方便,所以在所实施的重大工程中质量的保证必须放在第一位。
因此,我们有必要研究发展混凝土面板堆石坝工艺,以适应水利工程的需要,进而推动水利建设工程的可以按质按量如期验收,从而造福社会百姓。
1.混凝土面板堆石坝坝体填筑基本状况混凝土面板堆石坝在我国水利工程建设中得到广泛应用。
与传统方法相比,这种施工技术资金的使用较少,材料的应用比较方便,施工时间较短,有利于水利工程的建设,应该尽快投入使用。
混凝土墙堆石坝填筑时,有必要划分施工区域,各区域的具体填筑要求也各不相同。
在这种情况下,相应的填充作业将继续采用分层填充模式。
填充完毕后,为了提高整体稳定性,有必要应用装配辊的手段。
为了保证基本建设后的质量能符合应用要求,必须保证质量检测程序符合项目要求。
四川省凉山州盐源县马鹿塘水库枢纽工程坝体填筑专项方案中国葛洲坝集团股份有限公司四川省凉山州盐源县马鹿塘水库枢纽工程项目经理部2020年4月目录1、概述 (1)2、施工布置 (2)2.1 施工道路布置....................................................................................................................... - 2 -2.2 施工水、电布置................................................................................................................... - 3 -2.2.1 施工供水............................................................................................................................ - 3 -2.2.2 施工供电............................................................................................................................ - 3 -3、碾压试验成果 (3)4、填筑规划 (5)4.1 大坝填筑规划原则............................................................................................................... - 5 -4.2 大坝填筑单元的划分........................................................................................................... - 5 -5、施工流程 (6)5.1 基础清理与验收................................................................................................................... - 6 -5.2 测量放线............................................................................................................................... - 6 -5.3 坝料运输、铺筑................................................................................................................... - 7 -5.3.1 坝料运输与卸料................................................................................................................ - 7 -5.3.2 铺料.................................................................................................................................... - 8 -5.4 填筑料洒水........................................................................................................................... - 9 -5.5 碾压作业............................................................................................................................... - 9 -5.5.1 水平碾压............................................................................................................................ - 9 -5.5.2 边角部位碾压.................................................................................................................. - 10 -5.6 特殊部位处理..................................................................................................................... - 10 -5.6.1坝体分区交界面............................................................................................................... - 10 -5.6.2 坝内层间接缝部位.......................................................................................................... - 11 -5.6.3 坝体与岸坡接坡部位...................................................................................................... - 11 -5.6.4 上坝路与坝体结合部位.................................................................................................. - 12 -5.6.5坝面试坑部位................................................................................................................... - 12 -5.7 大坝各分区料的填筑施工................................................................................................. - 12 -5.7.1 大坝垫层料区(2A)的填筑 ......................................................................................... - 12 -5.7.2特殊垫层区(2B)的填筑 .............................................................................................. - 12 -5.7.3 大坝过渡料区(3A)的填筑 ......................................................................................... - 13 -5.7.4 大坝主堆石区(3B)的填筑 ......................................................................................... - 13 -5.7.5 大坝下游堆石区(3C)的填筑 ..................................................................................... - 13 -5.7.6 坝前铺盖、盖重料填筑.................................................................................................. - 14 -6雨季施工措施 (14)7、施工进度计划 (15)7.1施工进度计划...................................................................................................................... - 15 -7.2 施工强度分析..................................................................................................................... - 15 -8、主要施工设备及劳动力配置 (15)9、主要工序质量控制 (17)9.1 料源质量控制..................................................................................................................... - 17 -9.2 铺料质量控制..................................................................................................................... - 18 -9.3 洒水质量控制..................................................................................................................... - 18 -9.4 水平碾压质量控制............................................................................................................. - 18 -9.5 填筑质量检测..................................................................................................................... - 18 -9.6 测量控制............................................................................................................................. - 19 -9.7 质量管理控制措施............................................................................................................. - 19 -10、施工安全措施 (20)11、施工进度措施 (21)12、附件: (23)混凝土面板堆石坝坝体填筑施工方案1、概述工程混凝土面板堆石坝,坝顶高程为2716.6m,坝顶宽10.0m,坝顶长度263.5m,最大坝高60.6m。
混凝土面板堆石坝施工规范混凝土面板堆石坝施工规范目次l 总则2 导流与渡汛3 坝基与岸坡处理4 筑坝材料5 堆石坝填筑6 面板与趾板施工7 止水设施8 观测仪器埋设9 质量控制附录A 质量检查的主要项目及技术要求条文说明1 总则1.0.1 本规范适用于一、二、三级混凝土面板堆石坝(含砂砾石填筑的坝)的施工。
四、五级混凝土面板堆石坝施工,可参照执行。
对于坝高超过70m的混凝土面板堆石坝,不论工程等级均应按本规范执行。
1.0.2 施工中应用的新技术、新工艺、新材料,应积极试验论证,经主管部门审定批准后采用。
1.0.3 混凝土面板堆石坝施工除执行本规范外,尚应执行相应的现行国家标准和行业技术标准。
2 导流与渡汛2.0.1 应充分研究坝址区的水文、气象、地质及施工条件的特点,慎重确定施工导流与渡汛方案。
2.0.2 施工导流方案的选择,应充分利用下列有利因素:(1)未浇筑混凝土面板的坝体上游垫层坡面经防渗固坡处理后可直接挡水。
(2)施工初期,对下游坝坡采取可靠的防护措施后,允许坝体过流。
2.0.3 当确定未浇筑混凝土面板的坝体挡水时,必须对上游坡面进行碾压砂浆、喷射混凝土或喷洒阳离子乳化沥青等防渗固坡处理。
2.0.4 当确定坝体过流时,宜用加筋堆石或钢筋石笼等,对下游坝坡进行保护。
石笼块石必须符合设计要求。
坝体过流后,应对坝面进行认真处理,经检验合格后,方可继续填筑。
2.0.5 选择导流、渡汛方案时,宜首先研究以低过水围堰保护、枯水期正常施工和汛期利用坝体与导流建筑物共同泄流方案的可行性。
2.0.6 采用临时断面挡水渡汛时,应对临时断面进行设计。
3 坝基与岸坡处理3.1 一般规定3.1.1 坝基、趾板地基及岸坡的处理,均属隐蔽工程,应按设计与规范要求认真施工。
处理过程中地质人员应如实、准确地进行地质描绘、编录及整理。
如发现新的地质问题,应及时研究处理。
3.1.2 处理岸坡时,应采取截流排水等措施,防止两岸山坡雨水冲刷垫层。