摘要为满足某县城市排涝的需要,计划在距县城以东15km的新沟河上兴建排涝泵站。
该泵站设计流量为14.0m3/s,设计扬程4.8m,最大扬程6.5m。
选用900ZLB-85型立式轴流泵配JSL14-12型250kW电动机5台套。
站房采用墩墙式湿室型结构,主要建筑物包括正向进水前池,进水池、泵房、隔墩、出水池等。
本论文为新沟河排涝泵站的初步设计,报告内容包括水泵的选型,辅助设备选择,主要建筑物设计,稳定计算,结构计算等。
关键词:泵站,轴流泵,流量,扬程AbstractIn order to satisfythe need of some city’s flood control , a new construction of drainage ditch river pumping station is built in 15 km east of the county in the Xingou riwer.The design flow rate is 14.4m3/s and design head is 4.2m, maximum head is 6.3m.Choose vertical axial flow pump of 900ZLB-85,with 5 sets of JSL14-12 and 250kW motor. The type of station house is wet room wall-type. The main building include the forbay, sump, pumping station,pier, the outlet pool,and so on. The pumping station, will play an important role in Flood control systemThe report includes the selection of pumps, auxiliary equipment selection, the main building design, stability analysis, structure calculation, and so on.Key Words:pumping station; axial-fiow pump; flow; head目录1 综合说明 (1)1.1兴建缘由 (1)1.2工程水位情况 (1)1.3工程地质资料 (1)2.设计参数确定 (2)2.1设计流量 (2)2.2水位分析与特征扬程 (2)2.3建筑物等级 (2)3.主机组选型 (3)3.1水泵选型原则 (3)3.2水泵选型资料 (3)3.3水泵选型方案 (3)3.4动力机配套 (5)3.4.1 动力机类型选择 (5)3.4.2 传动装置选择 (5)3.4.3 电动机的安装形式 (5)3.2.4 配套功率的计算 (5)4.枢纽布置及进出水建筑物设计 (7)4.1枢纽布置及站房结构型式 (7)4.1.1 泵站枢纽布置 (7)4.1.1 上下游地面高程确定 (7)4.2.1前池设计 (8)4.2.2进水池设计 (9)4.3出水设计 (11)4.3.1出水池设计 (11)4.3.2出水池与干渠的渐变段 (12)4.3.3干渠护砌长度 (12)5.泵房布置 (14)5.1站房结构型式与布置 (14)5.2站房各部分高程的确定 (14)5.2.1叶轮中心高程▽叶 (14)5.2.2底板高程▽底 (14)5.2.3电机层楼板高程▽电 (14)5.2.4屋面大梁下缘高程▽梁 (14)5.3站房平面尺寸的确定 (15)5.3.1泵房长度确定 (15)5.3.2泵房宽度确定 (15)5.4拦污栅、检修门设计 (16)5.4.1拦污栅设计 (16)5.4.2检修门设计 (16)6.工况点校核 (17)6.1管路阻力损失计算 (17)6.1.1局部损失计算 (17)6.2扬程校核 (18)7.泵房稳定计算 (20)7.1.1校核渗径长度 (20)7.1.2计算渗流出口逸出坡降 (21)7.2稳定计算 (23)7.2.1作用荷载计算 (23)7.2.2抗滑稳定计算 (27)7.2.3地基稳定计算 (28)8.附属设备选择和布置 (30)8.1供、排水设备布置 (30)8.2通风布置 (30)8.3起重设备选择 (30)8.4拦污清污设备 (30)9.泵房结构设计及配筋计算 (30)9.1底板结构计算 (30)9.1.1荷载计算 (31)9.1.2底板配筋 (32)9.2中墩结构计算 (35)9.2.1受力分析 (35)9.2.2配筋计算 (36)9.2.3抗裂验算 (37)9.3边墩结构计算 (38)9.3.1受力分析 (38)9.3.2各工况内力组合 (39)9.3.3配筋计算 (40)9.3.4抗裂验算 (41)9.4.1受力分析 (43)9.4.2内力计算 (44)9.4.3配筋计算 (45)9.5出水翼墙木47致谢 (66)参考文献 (68)1综合说明1.1兴建缘由为满足某县城市排涝的需要,计划在距县城以东15km的新沟河上兴建排涝泵站。
泵站毕业设计
泵站毕业设计通常涉及设计和优化涉及液体或气体输送的泵站系统。
以下是包含在泵站毕业设计中的一些关键方面:
1.系统设计:描述整个泵站系统的设计,包括泵、管道、阀门等组件的选择和布局。
2.泵的选择与性能分析:对泵进行选择,考虑流量、扬程、效率等参数。
对泵的性能进行分析和优化。
3.管道网络设计:确定管道的直径、长度、布局,以确保流体能够有效输送到目标点。
4.控制系统:考虑自动控制系统,以监测和调整泵站运行,确保系统的稳定性和高效性。
5.能耗分析:对泵站整体能耗进行评估,提出降低能耗的建议和优化方案。
6.安全性与环保考虑:考虑泵站的安全性,制定应对事故的紧急处理措施,并关注环境友好的设计。
7.经济性分析:对整个泵站项目的经济性进行评估,包括成本估算、回收期等经济指标的计算。
8.技术创新:探讨在泵站设计中的新技术应用,以提高系统的效率和可靠性。
9.环境影响评估:对泵站建设和运行可能对周围环境产生的影响进行评估,并提出减缓或避免负面影响的方案。
10.项目管理:制定泵站项目的计划,包括时间表、资源分配等,确保项目按时完成。
这些方面综合考虑,有助于完成一份全面而实用的泵站毕业设计。
具体的设计内容和重点可能会根据具体项目、学校的要求以及学生的兴趣和专业方向而有所不同。
遂宁市安居区石榴坝集中供水站取水泵站工程设计摘要专业:农业水利工程姓名:李定钟指导老师:李乃稳根据设计资料确定出泵站修建的地址,确定取水泵房的规模。
进而通过技术经济综合比较出泵站所选用水泵类型,通过计算确定出泵房以及其附属设施的尺寸,及布置方式,再进行泵房的稳定性验算,根据需要配筋。
首先确定出水泵的流量和扬程,选择合适的泵房类型和水泵类型。
然后进行进出水管、引水建筑物等的详细设计。
对水泵工况点进行校核之后,确定水泵的终选类型。
接着对泵房的辅助设备进行具体布置,确定出水泵的安装高程以及泵房的具体尺寸。
确定出泵房的具体布置以及尺寸之后,就可以对泵房的稳定性进行验算。
达到稳定性要求就可以进行结构计算,算出泵房各结构的钢筋用量以及配筋方式。
最后对泵房的施工组织做出简单的介绍。
关键词:取水泵站、离心泵、供水方案。
AbstactAccording to the design information to determine the address of the pumping station and the size of the pumping prehensive comparison of the pumping station through the technical and economic choose the type of pump, determined the size of the pumping station and its ancillary facilities, and the layout by calculating,then check the stability of the pumping station, calculate the reinforcement configuration.First, determine the pump flow and head, and select the appropriate type of pumping station and pump type. And then proceed to the detailed design of access to water diversion structures. After checking the pump operating point to determine the ultimate choice type of pump. Followed by the specific arrangement of the pumping station auxiliary equipment to determine the elevation of the pump installation and the specific dimensions of the pumping station. Determine the specific layout and size of the pumping station, checking the stability of the pumping station. Achieve the stability requirements can be carried out structural calculations to calculate the pumping station structure steel consumption and reinforcement. Finally, make a simple introduction. about the pumping station construction organization .Key words: water pumping station, centrifugal pumps, water supply scheme.目录1概述 (4)1.1 区域水资源概况 (4)1.2 地质情况 (4)1.3 建筑材料 (4)1.4 对外交通、通讯情况 (5)1.5 组织机构及配套资金落实情况 (5)1.6 群众参与情况 (5)2工程建设条件 (5)2.1 地形地貌 (6)2.2 地质及土壤 (6)2.3 气候 (6)2.4 水文 (6)2.4.1 降水 (7)2.4.2 径流 (7)2.5 水质 (7)2.6 自然植被 (8)2.7 水资源状况 (8)3工程建设的必要性 (9)4站址选择 (9)5用水量预测及设计规模 (10)6方案选择 (12)6.1 泵站基本参数 (12)6.2 离心泵方案 (12)6.3 潜水泵方案 (16)7推荐方案设计 (19)7.1 离心泵泵型选择 (19)7.2泵房类型选择 (19)7.3 泵站进出水管设计 (20)7.4引水建筑物 (21)7.5进水池设计 (21)7.6引渠方案和引水管方案对比 (22)7.6.1引渠方案 (22)7.6.2引水管方案 (26)7.6.3选择引水建筑物方案 (27)7.7 泵房具体布置 (27)7.7.1配电设备布置 (27)7.7.2管路布置 (27)7.7.3泵房辅助设备 (28)7.7.4泵房尺寸设计 (28)7.8 水泵工况点校核 (31)7.9泵房稳定及结构计算 (32)7.9.1抗浮稳定计算 (33)7.9.2 地基承载力校核 (36)7.9.3泵房结构及配筋计算 (37)8施工组织设计 (39)8.1 地基与基础 (39)8.2排水与降低地下水位 (39)8.3基坑开挖 (40)8.4泵房施工 (42)8.5钢管管道施工 (44)9参考文献 (45)1概述1.1 区域水资源概况项目内主要河流有琼江河。
1. 资料收集1.1 资料整理某抽水站地处镇江市东郊,江南大运河长江入口处,通过大运河与丹金溧漕河、扁担河、武宜运河和洮滆两湖相连,水系贯通镇江、丹徒、句容、高淳、丹阳、金坛、溧阳、宜兴、武进等县市,它与谏壁节制闸、谏壁船闸等组成谏壁水利枢纽工程。
某抽水站主体工程包括站房、机电设备、110KV变电所,上下游引河及交通桥等,站房内安装 2.8CJ-70型立式全调节轴流泵6台,单机设计流量20m3/s,配套TL800-20/2150型立式同步电动机,功率800KW,设计总引排流量为120m3/s,总装机容量为4800KW。
站身采用X型双向流道结构,断流方式为快速平板钢筋砼闸门,共36扇,其中出水流道12扇,进水流道24扇,采用液压启闭机集中控制表1-1 主电动机技术参数型号容量(kW)额定电压(kV)额定电流(A)起动电流倍数额定转数(r/min)TL800-20/2150 6 800 10 54.6 5 300起动转矩/额定转矩牵入转矩/额定转矩最大转矩/额定转矩励磁电压(V)励磁电流(A)负荷系数(K1)0.5 1.1 1.8 81 164 0.81.2 气象、地质资料最热月平均最高气温:32.8℃最热月平均气温:28.4℃最高气温:41℃;最低气温:-10℃;最热月地面下0.8m处土壤平均温度:27.7℃雷暴日数:36日/年1.3 站用电负荷各种站用电设备的容量、台数和负荷性质如下表1-2所示。
1.4 电源情况某站主供电源采用110kV华能电厂专线供电,备用电源及发电出线采用10kV线路至城南变。
工程等级为二等泵站工程,总投资1.3亿元人民币,2002年6月30日竣工。
该站由距该站7 km变电所供电,采用架空高压导线输电,引入110KV电源或10KV。
请根据经济技术比较后选定。
110kV母线在最大运行方式下三相短路容量1000MVA,最小运行方式下三相短路容量800MVA。
10kV母线在最大运行方式下三相短路容量800MVA,最小运行方式下三相短路容量500MVA。
文县北山泵站提灌绿化工程设计————二级泵站提灌工程设计(甘肃农业大学工学院 2007级农业水利工程专业赵瑞)摘要:本次设计绿化面积920亩,相应控制灌溉面积920亩, 灌溉设计保证率75%,灌溉方式采用泵站提水,自压喷灌,供水管网管道为PE管,计划建蓄水池18座,提水泵站2座。
文县北山绿化灌溉工程设计水源取水采用大口井、电力提灌取水,蓄水池蓄水,供水管网自压喷灌灌溉。
本工程属V等小(2)型工程,主次要建筑物设计标准均为5级。
进行灌溉制度的计算,根据地形布置提水泵站2级。
第一级泵站选用HD-50-240-55型井用泵2台,采用150毫米压力钢钢管输水。
第二级泵站以第一级泵站蓄水池为吸水池,选用D85-45型多级单吸式离心泵一台,采用150毫米压力钢管输水至主2#蓄水池。
主要布置高位蓄水池6座,减压池8座,调节池5座,布置灌区5处。
喷灌设计1#、3#、4#、5#主蓄水池由2#主蓄水池串联供水,供水主管长1468m,采用140mmPE管。
各灌区支管布置采用“丰”字形布置,均采用90mmPE管,设计压力为1.0Mpa,埋设深度不小于0.6m。
其中对大口井配筋、泵房配筋和200立方米蓄水池配筋作了详细计算。
关键词:泵站蓄水池自压喷灌管网布置设计目录1 自然概况 (1)1.1 自然条件 (1)1.2 社会经济 (1)2 水文、气象概况 (2)2.1 概况 (2)2.2 径流 (2)2.3 洪水 (2)2.4 泥沙 (2)3 工程规划设计 (3)3.1 工程区基本情况 (3)3.2 工程等级和设计标准 (3)3.3 绿化灌溉区需水量计算 (3)3.4 喷灌系统计算 (4)3.5 绿化灌溉区水源地水量计算 (6)4 工程布置及建筑物设计 (6)4.1 工程布置 (6)4.2 建筑物设计 (8)4.2.1 一级泵站设计 (7)4.2.2 二级泵站设计 (13)4.2.3 管网设计 (15)4.2.4 蓄水池设计 (18)5 工程概预算 (21)6 效益评价 (24)6.1 生态效益 (24)6.2 经济效益 (24)6.3 社会效益 (24)参考文献 (26)致谢 (27)1、自然概况1.1 自然条件文县位于甘肃省东南麓,东接四川广元市,西连陇南文县县,南达九寨风景区,北邻陕西与宁强县隔江相望.地处东径104° 16' 16'' -105° 27' 29'' ,北纬度32° 35' 43'' -33° 20' 36''。
取水构筑物及送水泵站毕业设计目录摘要 ........................................... 错误!未定义书签。
Abstract ....................................... 错误!未定义书签。
目录 .. (I)第1章给水系统的选择及给水管网方案定线比较 (3)1.1 给水系统的选择 (3)1.2 给水管网方案定线比较 (3)第2章系统最高日最高时用水量 (5)2.1 工程规模 (5)2.2工程规模确定 (6)2.1 2.3日变化系数和时变化系数 (6)第3章环网水力计算 (8)3.1 给水管网设计要求 (8)3.2 节点流量计算 (10)一、管网水力计算步骤如下: (10)三、节点流量计算: (11)3.3 最高时管网平差 (14)二、环状管网平差步骤: (14)第4章取水构筑物的设计 (23)4.1 设计资料 (23)4.2 取水头及构筑物类型选择 (23)4.3 取水构筑物计算 (25)4.4 取水头及构筑物类型选择 (28)第5章净水厂工艺设计 (36)5.1 水厂厂址的选择与工艺流程的确定 (36)5.2 稳压井设计 (37)5.3 投药系统 (39)5.4 混合及混合设备选择 (43)5.5 折板絮凝池工艺设计 (46)5.6 斜板沉淀池工艺设计 (50)5.7 均质滤料滤池工艺设计 (55)5.8 消毒系统 (61)5.9 清水池工艺设计 (63)5.10 吸水井工艺设计 (64)5.11 水厂平面及高程布置 (65)5.11.1 水厂平面 (65)5.11.2 高程布置 (67)第6章送水泵站设计 (68)6.1 设计流量 (68)6.2 设计扬程的计算 (69)6.3 初选水泵: (69)6.4 吸水管路与压水管路的计算 (71)6.5 泵房高度的确定 (72)6.6 泵房高程的确定 (73)6.7 附属设备的选择 (73)第7章致谢 .................................... 错误!未定义书签。
灌区泵站毕业设计灌区泵站毕业设计随着农业的发展和城市化进程的加快,灌区泵站在农田灌溉中的作用日益凸显。
作为农田灌溉系统中的重要组成部分,灌区泵站的设计与建设对于提高农田灌溉效率、保障农业生产具有重要意义。
本文将围绕灌区泵站的毕业设计展开讨论,从设计原理、设备选择、运行管理等方面进行探究。
一、设计原理灌区泵站的设计原理主要包括水源选择、泵站布置、泵站井深、泵站流量等方面。
首先,水源选择是灌区泵站设计的基础。
合理选择水源可以有效保证泵站的供水能力和稳定性。
其次,泵站布置需要考虑到灌区的地理条件和农田的布局,合理安排泵站的位置和数量,以确保供水的均匀性和高效性。
此外,泵站井深的设计也是关键因素之一,需要根据地下水位和灌溉需求来确定井深,以保证泵站的正常运行。
最后,泵站流量的设计要根据农田的面积、作物的需水量和灌水周期来确定,以确保供水的充足性和稳定性。
二、设备选择灌区泵站的设备选择是毕业设计的重要环节。
主要包括泵的选择、电机的选择和控制系统的选择。
泵的选择需要考虑到供水流量、扬程和功率等因素,以满足灌溉的需求。
电机的选择需要根据泵的功率和供电条件来确定,以确保泵站的正常运行。
控制系统的选择则需要考虑到自动化程度、可靠性和维护便捷性等因素,以提高泵站的运行效率和管理水平。
三、运行管理灌区泵站的运行管理是毕业设计的关键环节。
主要包括泵站的日常运行、设备的维护和故障处理等方面。
泵站的日常运行需要进行定期巡检和维护,确保设备的正常运行和供水的稳定性。
设备的维护包括润滑、清洗和更换易损件等工作,以延长设备的使用寿命。
故障处理需要及时发现故障原因并采取相应措施,以确保泵站的正常运行和供水的连续性。
综上所述,灌区泵站的毕业设计需要综合考虑设计原理、设备选择和运行管理等方面。
合理设计和建设灌区泵站可以提高农田灌溉效率、保障农业生产,对于实现农田现代化和农业可持续发展具有重要意义。
通过深入研究和实践,毕业设计者可以在灌区泵站设计与建设方面做出自己的贡献,为农田灌溉事业的发展做出积极的贡献。
送水泵站设计()摘要泵站是为水提供势能和压能,解决无自流条件下的排灌、供水和水资源调配问题的唯一动力来源,是解决洪涝灾害、干旱缺水的重要工程措施和实现水利现代化的重要标志之一。
送水泵站也称为二级泵站,其作用是净水构筑物净化后的水输送给千家万户。
本设计主要是送水泵站,根据设计资料,通过流量和扬程,反复分析比较,参考水泵型谱图,最终选择300S58型水泵五台,四台工作,一台备用。
由钢管水力计算表,吸水管管径选择D=500mm,压水管管径选择D=400mm,输水干管D=600mm。
根据清水池最低水位标高和水泵H S的条件,确定泵房为矩形半地下式。
水泵机组采用单排横向排列形式布置泵房左端设一进出设备的大门,控制室、配电室、值班室设在泵房右侧地上一层。
水泵间距2.5m,水泵与配电设备间距2.5m,水泵距大门口7.0m;水泵距吸水管侧墙2.0m;泵房长21.0m,宽7m,高6.0m;清水池长11.0m,宽2.6m,高7.0m;将吸水井长度确定为12m,吸水井宽度最终调整为2.7m,吸水井高度为2.8m。
字数不够关键词送水泵站;参数;泵房;辅助设备;设计计算;IDesign of water pump station()AbstractPump station is to provide potential energy water and energy, under no-flow conditions of irrigation and drainage, water supply and water resource allocation problem in single power source. Pump station is to address important measures of floods, droughts and water shortages and realizing water conservancy modernization of one of the important symbols. Also known as the second-stage pumping station of water pumping station, water purification structures whose role is to purify water after being administered to millions of households.This design is mainly a water pump station, according to the design data through the flow and lift, repeated analysis and comparison, refer to the pump-spectra before choosing the type 300S58 pumps five. Hydraulic calculation of pipe form, select D=500mm suction pipe diameter, pipe diameter selection D=400mm, water pipe D=7600mm. Under the pool minimum water level elevation and water pump HS conditions to determine whether the pump room is rectangular half-underground. Pumps with single row of transverse arrangement features pumping stations left one in and out of the door, control room, switch room, call room located in the right side of the pumping station on the ground floor. Water pump 2.5m interval, water pumps and power distribution unit spacing 2.5m, pumps from the gate of 7.0m side wall of water pump from the suction pipe 2.0m. Pumping station 21.0m, width 7m, high6.0m, and clear water ponds 11.0m, width 2.6m, high7m. The suction wells length of 12m. Wells eventually adjusted to the width 2.7m, wells is2.8m.IIKey words: The pumping station; Parameter; Pump room; Auxiliary equipment; Design computingIII目录1前言 (1)1.1 泵 (1)1.2泵站 (2)1.3送水泵站 (7)2设计内容 (9)2.1设计资料 (9)2.2工艺流程 (9)2.3设计内容 (9)3设计计算 (12)3.1水泵机组的选择 (12)3.2 泵站设计参数的确定 (13)3.3选择水泵 (13)3.4水泵机组的基础设计 (16)3.5水泵吸水管路和压水管路设计 (18)3.6布置机组 (19)3.7吸水井的设计 (22)3.8各工艺标高的设计 (22)3.9复核水泵和电机 (24)3.10消防校核 (24)3.11辅助设备的选择 (25)3.12泵房形式、建筑高度和平面尺寸的确定 (27)4.结论 (30)致谢 (31)参考文献 (32)IV1 前言1.1 泵1.1.1 泵的定义和作用从能量的观点来看,泵是一种能量转换机械,它将动力机的机械能量转给液体。
取水泵站毕业设计论文摘要泵站工程作为国民经济建设中的一部分,已在机电灌排、跨流域调水、城乡供水、电厂供水及输油系统等工程得到了广泛的应用。
为促进工业生产的发展和人民生活水平的提高发挥了重要作用,而离心泵由于其扬程较高,流量范围广,在实际中更是获得了广泛的应用。
本设计所设计的为一取水泵站(有隔墩的进水池),其作用是排灌供水,将低处的水输送到高处,供灌溉和饮用,从而实现能量从机械能到势能的转化。
本论文为某供水泵站的初步设计,主要根据泵站设计规范对水泵、泵房、进出水池、管路系统及其他配套设施进行了初步的设计,列出了离心泵站设计的一般设计方法及步骤。
其中对水泵的选型、水泵的安装高程、泵房的设计和水锤等给出了详细的设计说明及计算步骤,并附有各部分结构示意图和泵站剖面图。
从设计结果上来看本设计技术上可行,满足《泵站设计规范》的要求。
关键词:水泵选型水锤工作点安装高程IABSTRACTPumping station as part of the national economic construction has been widely used in irrigation and drainage in mechanical and electrical, water transfer, urban and rural water supply and oil systems. It plays an important role in promoting the development of industrial production and the improvement of living standards,and the centrifugal pump have gained wide application in practice for its higher head and bigger flow range.This design is designed for a water pumping station (with isolated pier into the pool ) , whose role is to drainage and irrigation water supply, will lower the water delivered to the height , for irrigation and drinking , in order to achieve the conversion of energy from mechanical energy to potentialenergy .This paper preliminary design for a water supply pump station, I basically according to pump station design specification of pump, pump room, in and out pool, pipeline system and other auxiliary facilities for a preliminary design, lists the centrifugal pump station design general design methods and steps. Among them on the pump selection, pump installation elevation, the design and water hammer pump are the details of the design specifications and calculation steps, attached parts structure schematic diagram and pumping stations section. Judging from the design results this design technically feasible, satisfy the requirements of “ Pumping station design of the standards”.Key words:Pump Selection water hammer pump operating point elevation for pump install目录前言 (1)1 绪论 (2)1.1 泵站的地位与作用 (2)1.2 泵站的现状 (2)1.3 泵站工程概论 (4)1.4 未来泵站发展的主要目标和具体目标 (5)1.5 离心泵的工作原理、分类和构造 (7)1.5.1 离心泵的工作原理 (7)1.5.2 离心泵的分类和构造 (8)1.6 本设计目的及意义 (9)2设计基本资料 (10)3水泵选型与设备配套 (11)3.1 水泵选型 (11)3.1.1 确定设计流量 (11)3.1.2 确定设计扬程 (11)3.1.3 拟选泵型方案 (11)3.1.4 确定水泵台数及方案比较 (12) 3.2 动力机选型及配套 (12)3.2.1 电动机的类型选择 (13)3.2.2 电动机的功率和转速 (13)3.3 管路配套 (13)3.3.1 吸水管路及配件选配 (13)3.3.2 出水管路及附件选配 (14)3.4 确定水泵安装高程 (15)3.4.1沿程水头损失 (15)3.4.2 局部水头损失 (15)3.4.3 水泵安装高程 (16)3.5 真空泵选型 (17)3.5.1 抽气体积计算 (17)3.5.2 真空泵抽气量计算 (17)3.5.3 真空度确定 (18)3.5.4 真空泵选型 (18)3.6水泵汽蚀及预防措施 (18)3.6.1 水泵的汽蚀 (18)3.6.2 汽蚀的危害及预防措施 (199)4 泵房设计 (21)4.1 泵房结构型式确定 (21)4.1.1 水泵有效吸程H效吸值计算 (21) 4.1.2 水源水位变幅△H (21)4.1.3 泵房结构型式确定 (21)4.2 内部设备布置 (21)4.2.1 主机组布置 (212)4.2.2 辅助设备布置 (222)4.2.3 泵房尺寸拟定 (255)5 泵站进出水建筑物 (30)5.1 前池 (30)5.1.1 平面扩散 (30)5.1.2 立面扩散 (30)5.1.3 细部构造尺寸 (30)5.2 进水池 (31)5.2.1 型式 (31)5.2.2 尺寸确定 (31)5.3 出水建筑物 (34)5.3.1 出水池设计 (34)5.3.2 干渠的设计 (366)5.3.3 连接段设计 (377)5.3.4 细部构造设计 (388)6 管路工程 (40)6.1 进水管 (40)6.2 出水管路 (40)6.2.1 出水管线布置 (40)6.2.2 出水管线长度 (40)6.2.3 管材与管壁厚度确定 (411)6.2.4 镇墩尺寸 (411)6.3 泵站管路水锤计算及防护措施 (422)7 水泵运行工况分析 (50)7.1 水泵运行工作点 (50)H、Q)计算 (50)7.1.1 装置性能参数(需7.1.2 水泵性能参数 (51)7.1.3 水泵工作点推求 (52)7.2 泵站总流量核算 (52)7.3 泵站运行效率 (53)8 机组基础尺寸 (54)8.1 平面尺寸 (54)8.1.1 基础长度L (54)8.1.2 基础宽度B (544)8.2 立面尺寸 (544)8.2.1 水泵基础高度H (544)8.2.2 电机基础高度H (545)设计结果 (56)致谢 (58)参考文献 (59)前言水泵及泵站工程是关系社会发展、国民经济建设和人民生活水平提高的重要基础设施,被广泛应用于城乡给水排水、农业灌溉、防洪排涝等领域。
本科毕业论文(设计)题目:某抽水泵站设计院(系):金坛学习中心专业:土木工程指导教师:李洪年职称:高级工程师评阅人:职称:2006 年11 月本科生毕业论文(设计)原创性声明本人以信誉声明:所呈交的毕业论文(设计)是在导师指导下进行的研究设计及取得的设计成果,论文中引用他人的文献、数据、图件、资料均已明确标注出,论文中的结论和结果为本人独立完成,不包含他人成果及为获得中国地质大学或其他教育机构的学位或证书而使用过的材料。
对与我一同工作的同志对本设计所做的任何贡献表示了谢意。
毕业论文作者(签字):签字日期:年月日中文摘要某市拟拆除土桥旧站,新建一座抽水站,作为江堤达标建设的附属配套工程,兼挡洪、灌溉、排涝于一体,设计流量22m3s。
该站的主要任务是与十二圩泵站联合运行,抽引江水,补给淮水水源的不足,解决该市境内13个乡近50万耕地的灌溉用水,并结合仪扬河以南圩区64平方公里面积的排涝任务,要求在上下游水位组合允许时,能实现自流和自排,保证该地区社会与经济的可持续发展。
本设计泵站以灌溉为主,属中型泵站,选用块基型结构的泵房,即进水流道与泵房底板整体浇筑,形成一块状基础结构作为整个泵房的基础。
考虑泵站的多重任务,本设计采用双向进出水流道,以满足泵站自引、自排及双向提水的要求。
进水流道能够为水泵提供良好的进水条件。
双向流道布置具有占地面积小、节省工程投资、便于集中管理等优点。
本设计泵站以灌溉为主,兼有挡洪、排涝任务,属中型泵站,选用块基型结构的泵房,即进水流道与泵房底板整体浇筑,形成一块状基础结构作为整个泵房的基础。
本设计采用正向进水前池,前池的水流方向和与进水池的水流方向一致,水流的流态平顺,池的结构简单、施工方便。
本设计采用双向进出水流道,以满足泵站自引、自排及双向提水的要求。
进水流道能够使水流从前池进入水泵叶轮室的过程中更好地转向和加速,为水泵提供良好的进水条件。
双向流道布置具有占地面积小、节省工程投资、便于集中管理等优点;缺点是对进水流道设计要求较高,否则,容易增加阻力损失,进水流道易产生涡带,导致水泵及站房振动,严重时可能危及机组和站身安全。
本设计将检修间和配电间分别布置在泵房的两端。
在泵站排涝期间,为防止水草等杂物进入进水流道,在内河侧设置清污机,以保证泵站的有效运行。
清污机具有自动化程度高、工作效率高等优点。
关键词:泵站灌溉AbstractSome cities intend to dismantle the old station of soil bridge , one Xin Jian pump station , are 22 m3s blocking flood , irrigation , draining waterlogged farmland in an integral whole , designing rate of flow concurrently as the affiliation auxiliary projects that the river dike builds up to the standard. Be the major task standing's turn to be to unite with twelve country fair pump stations working , to shrink to attract river water, deficiency replenishing Huaihe River water with a irrigation resolving that city within the territory uses water , join draining waterlogged farmland spreading River 64 square kilometers to the south country fair area area combining with an instrument the mission, can realize the sustainable development flowing by itself and swear to owe area society and economy from the row when requiring that water level combination allows in upper lower reaches,. Originally, design that the pump station gives first place to irrigation , belong to the medium-sized pump station , select and use a pieceConsider multiple pump station mission , design is adopted two-way pass in and out of streams saying that self quotes from a row in order to satisfying a pump station ,and two-way request carrying water. Enter streams being able to be that the water pump provides fine water-entering condition. Two-way runner arrangement field area merit such as small , economizing project investment ,centralized management easy to.Design that the pump station gives first place to irrigation originally , simultaneously, waterlogged farmland the mission, belongs to the medium-sized pump station ,select and use a piece base the architectural pump front pool, front pool streams direction and the streams direction with entering pool are consistent, thestreams stream state smooth-going, the pool structure is simple , construction is convenientDesign is adopted two-way pass in and out of streams saying that self quotes from a row in order to satisfying a pump station ,and two-way request carrying water. Enter streams being able to make streams before, get lost much better and speed up providing fine water-entering condition, for the water pump in pool entrance water pump impeller room process. Two-way runner arrangement field area merit such as small , economizing project investment , centralized management easy to; The shortcoming is to say that design demand is , may endanger the aircraft crew and station body safety when grave.Design the both ends will overhaul a room and arranging respectively among powerdistribution in the pump drainswaterlogged farmland, be prevent waterweeds from waiting for varia entrance to enterstreams saying, effective operation setting up clear filth machine,to ensure that thepump stands in inland river side. Clear filth machine automationdegree Irrigation目录第一章工程提要 (1)第二章设计依据与基本资料 (2)第三章水泵选型与工况校核 (4)第一节水泵选型 (4)第二节动力机选配 (5)第三节水泵工况校核 (6)第四章枢纽总体布置............................ 错误!未定义书签。
第五章泵房设计................................ 错误!未定义书签。
第一节选定泵房结构形式.................... 错误!未定义书签。
第二节泵房尺寸拟定........................ 错误!未定义书签。
第三节泵房主要构件材料和尺寸 (8)第六章进出水建筑物设计 (14)第一节进水流道的设计 (14)第二节出水流道的设计 (15)第三节引渠的设计 (15)第四节前池的设计 (16)第七章泵房附属设施选择 (17)第一节起重设备 (17)第二节配电柜 (17)第三节电缆沟 (18)第四节起动供水设施 (18)第五节检修工作桥 (19)第六节清污机 (19)第七节闸门与启闭机 (19)第八章泵房整体稳定计算 (22)第一节渗透稳定验算 (22)第二节地基容许承载力计算 (23)第三节泵房基底压应力计算 (24)第四节泵房抗滑稳定计算 (30)第五节泵房稳定计算成果汇总 (31)第九章结构计算 (31)第一节底板内力计算 (32)第二节底板配筋计算 (35)结束语 (36)致谢词 (37)参考文献: (39)第一章工程提要某市拟拆除土桥旧站,新建一座抽水站,作为江堤达标建设的附属配套工程,兼挡洪、灌溉、排涝于一体,设计流量22m3s。