供应商质量控制计划审核表
- 格式:pdf
- 大小:183.51 KB
- 文档页数:2
节拍生产标准1960-B 节拍生产标准1927-16供应商质量过程控制计划审核汇总表Date:Supplier Name:供应商名称Mfg.DUNS:Plant Location &Country:公司地址/国家Auditor:(SQE,SQI)Auditor Phone:评审员评审员电话Auditor:E-Mail:评审员邮箱通用分部Part Number (s):Part Name:零件编号Drawing Date:图面日期设计变更单号PPAP/In terim/Be nestare Status:Progra m 生产件批准车型年份项目Creativit y Team:开发项目,样商品Reason For 评审依据保安件Type of Audit:WWP Supplier QualityGM 1960-B Process Control Plan Audit Summary SheetGM 1927-16Supplier Phone:供应商电话GM Division:EWO #: / ODM #Eng. Change Level:Model Year:Commodity:Safety Related Part ?Product Validation/Qualification Complete:FutureLaunchCurrentPartialOtherInitial Follow Up Run at Rate (GP9 Attachement B)Yes NoYes No N/AN/A评审类型产品有效期质量完成情况Driver of Audit:评审范围Focus of Audit:评审要点Approve d 批准批准,同时需要文档没批准复评日期YesNoN/A1.2.3.4.5.6.7.8.9.10.11.12.13.14.15.Approved, but need Documentation Not Approved Follow-Up Audit Date:TECHNICAL INFORMATION AVAILABILITYCommentsAre actual drawings availabe at production facility with the latest最后一次设变的生产设备的实际图纸是否为有效版本?Does the supplier have the final customer approved drawing?供应商是否有最终顾客批准的图纸?Is the print complete (Tolerances, GD&T, Correct Datums, KPCs,图纸内容是否完整?Are all technical regulations/CTS/SSTS available?所有的技术标准是否有效?If supplier is design responsible, has DFMEA been used todevelop the PFMEA?如果供方有设计责任,是否参照DFMEA作PFMEA?QUALITY SYSTEM DOCUMENTATION Is a Process Flow Diagram available?过程流程图是否有效?Does the Process Flow Diagram include receiving?过程流程是否包括让步接收?Does the Process Flow Diagram include rework?过程流程是否包括返工返修?Does the Process Flow Diagram include scrap?过程流程是否包括报废?Does the Process Flow Diagram include gauging/inspection?过程流程是否包括计量器具?Does the Process Flow Diagram include shipping?过程流程是否包括交付?Does the Process Flow Diagram include labeling and Part ID atreceiving, WHIP, finished good and shipping areas?过程流程是否包括产品标识和接受零件代码,whip,成品,发货区域?Is there a PFMEA available?是否有有效的PFMEA?Is the PFMEA acceptable (RPNs, numbers match Process flowand include KPCs/PQCs/KCCs)?PFMEA 是否可接收?Is there any evidence that it is kept up to date?是否有改进的证据?APQP Confirmation Mgmt. Request Plant Request Run @ RateTop FocusCSL-1CSL-2Major Disruption DD&WComponent Check Plan Critical Fastner (D02)D/PFMEAShutdown/Start Up Audit CPIP/WarrantyOtherPart / Assembly Line /Cell Operation / MachineComplete Mfg. SystemQuality System -Ongoing Documentation16.17.18.19.20.21.22.23.24.25.26.27.28.29.30.31.32.33.34.35.36.Is there a Process Control Plan (PCP) available?是否有有效的过程控制计划?Is the Process Control Plan (PCP) acceptable (numbers match PFMEA and Process Flow, including KPCs/PQCs/KCCs, GP-12 if applicable and latest EWO/ODM included)?过程控制计划是否可接收(与PFMEA匹配的参数和流程,包括过程特性/产品特性,如早期生产限制合适,是否包括最新的EWO/ODM)?Are all "Current Controls" listed on the PFMEA detailed on the所有PFMEA 中标注的当前的控制方法是否具体体现在控Are process controls in place in the PCP to address the high PFMEA Risk Priority Numbers?PFMEA中涉及的高风险控制要求是否体现在控制计划中?Is there a procedure/process for Continuous Improvement for是否建立了优先减少风险的持续改进过程?Are KPCs/PQCs/KCCs called out on the PCP?在控制计划中是否标注了关键控制特性和关键产品特Are sample sizes and check frequency for each operation是否合理的规定了每个过程的样品尺寸和检验频次?Do your supplier's provide evidance of approved material for all components needed for the assembled part?供应商是否获得协力厂商提供的零组件材质证明和试验报告等证据?Are controls in place to ensure only approved incoming material released for production?是否依据协力厂商提供的检验证明实施进料检验?When parts require traceability, do controls link component traceability to the final part?当零部件有可追溯性要求时,是否作了标识并能追溯到产品形成的过程?Is the workplace properly configured and matches Process Flow 是否配置了合理的工作场所并与过程流程图相符合?Are all tools and gauges properly identified?所有配置的工具和量检具其准确度和精度是否满足要Are all gauges calibrated?所有量检具是否定期校验?Are all tools and gauges certified?所有配置的工具和量检具能否提供表明校验状态的合格证明?Is gauge Repeatability and Reproducabilty less than 10%?所有量检具的重复性和再现性是否小于10%?Do all gauges have proper operator instructions?所有量检具是否有合适的操作规程或作业指导书?Are proper operator instructions available for each operation?操作规程或作业指导书是否对每个操作过程都有效?Are Standardized Work instructions detailed to run the job properly, including handling of non-conforming parts?作业指导书是否详细标注了正常操作所需的内容(包括手工制品)Is there Standardized Work?是否将作业指导书配挂在现场?Is the Standradized Work being followed?是否按作业指导书操作?Do the operators understand the instructions?37.38.39.40.41.42.43.44.45.46.47.48.49.50.51.52.53.54.55.56.57.58.59.60.61.操作员是否了解作业指导书内容?Have operators been properly trained?操作者是否经过适当的培训Are boundary samples (BS) available to operators?操作者是否有合适的限度样件?Are boundary samples (BS) in use?限度样件是否在现场使用?Are Master Parts or samples available to confirm inspection?是否依据标准样件进行确认检验?Are Master Parts available for error proofing devices?标准样件对防呆装置是否有效?Is there a Preventive Maintenance (PM) plan on tools and is it是否建立了工具的预防性维护计划并付诸实施?Is there a Preventive Maintenance (PM) plan on equipment and 是否建立了设备的预防性维护计划并付诸实施?Are listed tests and inspections per control plan, actually每个控制计划是否规定了检验和实验项目并按规定执行?Where the Process Control Plan calls for SPC are the data控制计划规定的SPC能否提供合适数据记录?Are the Upper Control Limits (ULC) current?控制图的上控制限是否为现行的?Are the Lower Control Limits (LCL) current?控制图的下控制限是否为现行的?Does the data make sense and are reasonable control limits数据是否合理,数据限(线)是否依据数据计算?Are out of control points noted with the corrective action taken?对超出控制限的点是否采取适当的对策?Are product audits showing acceptable results for Final Product?产品最终审核的结果是否满足接受准则?Does the manufacturing process demonstrate the required capability or performance?制造过程是否显示了所要求的能力和性能?Does packaging and material handling protect parts from包装和包装材料是否起到有效的防护作用?Are instructions for handling Work In Process (WIP) and final product followed throughout the process to shipping area; including repair/rework areas?在制品和最终产品是否按规定存放在指定的区域,包括返工返修Are all parts and components labeled properly?所有零部件是否正确标识?QUALITY SYSTEM IMPLEMENTATION BY MANAGEMENT Is there a process for documenting and tracking Downtime?是否建立了偶发事故应急处理过程文件(计划和记Is there a process for documenting and tracking Scrap?是否建立了废品控制过程的文件?Is there a process for documenting and tracking Premium是否建立了超额费用的文件?Is there a process for documenting and tracking Plant Problem 是否建立了设备停机故障的文件?Does leadership ensure that Out of Control Conditions are领导层能否确保超出控制范围的项目得到管理?Are Action Plans (AP) followed?是否实施了反应计划?Is responsibility for implementation assigned and do peopleunderstand their responsibility?是否明确了所有人员的职责权限,他们是否理解?62.63.64.65.66.67.Auditors Comme nts:Supplier Represe ntative Signatur e GMReprese ntative Signatur eAre problems quickly communicated to people who can help?是否建立了有效的内部沟通系统?Does the support system respond to the operator?操作者是否熟悉操作系统?If more than one shift, does information part passes across是否所有的结果都有记录?Are suitable actions taken in case of deviations?当结果偏离基准或规定时,是否采取合适的措当多班轮换时,能否将当班的产品信息传递给Are all checks to be done under the PCP requirements所有在 PCP要求下的检查记录是否得到执行?Are results properly documented?。
供应商质量管理体系审核表供应商基本情况1、公司名称:______________________________________________________________________________2、公司地址:____________________________________________________________________________________________________________________________________________________________________3、电话号码:____________________________________传真号码:_________________________________4、网址:____________________________________电邮:_________________________________5、生产建筑面积: 平方米其它: 平方米6、员工总数:人,其中工程技术人员人,品管人员人,生产人员人。
7、主要部门负责人:总经理业务部/市场部开发部/工程部资财部/物控部品管部生产部8、主要产品:9、主要设备:10、主要的客户和为其提供的产品(列举2-3家)11、公司成立于哪一年:创始人:12、公司营业额:去年:今年计划:13、公司有无获得质量管理体系认证?如有,请说明哪一年?获得哪一家认证机构?什么样的证书?:14、有受过哪些主要客户的审核:审核员:________________ 审核日期: ___________________一、适用范围适用于所有新的和现有的供应商有关质量体系评审。
二、评分标准a) 如果该厂商质量管理体系审核的总评价得分率为70%以上,则判该厂商质量管理体系合格。
b) 如果审核的总评价得分率为60%以上,可判为初步合格,同时要求该厂商回复改善要求报告,并对该厂商进行持续的不定期审核直至其达到a)项要求。
Chec供给商名称 /supplier name产品型号/part no.1、平面部署图和过程流程图/Plant Layout and Process Flow Diagram NO.文件要求/document questions可否有最新版平面部署图?is there a dated copy of the current floor plan readily available?平面部署图上可否有全部装置、生产和检测岗位、原资料、半成品、成品的地域划分?does the floor plan identify the following :all required assembly, process and inspection stations? locations for all raw material, work in process(WIP) and finished product?流程图是否是最新版本的并注明有日期?are process flowcharts dated and current?操作要求/implementation/process questions 生产过程中,资料和产品流动可否与过程流程图一致?does the actual material and production flow follow the process flowchart?2、设计和过程 FMEA/design and process FMEA审察日期 /audit date议论记录 /comments evaluateNO.文件要求/document questions议论记录 /comments DFMEA 〔含有设计职责〕/DFMEA(if supplier is design responsible)2.1 DFMEA 的部件编号、校正版本、原始日期和判定日期可否正确?evaluateChec供给商名称 /supplier name产品型号/part no.审察日期/audit date does the DFMEA have the correct Part#, Revision Level, Orig. Date and Rev. Date?2.2 DFMEA 可否包括了顾客的全部性能要求、外观标准、特别特点和安全要求?does the DFMEA include all functional specifications, appearance specifications, SCsand Safety Requirements as defined by customer drawings?可否对每个无效模式的RPN都进行了计算,并对RPN值高的采用了建议措施?are there RPN calculations for each failure mode and recommended actions for high RPNs ?PFMEAPFMEA 可否按图纸的规定包括了全部顾客和内部要求的特别特点和安全要求?does the PFMEA include all customer and interal Scs and Safety Requirements as defined bycustomer drawings and interal requirements?可否对每个无效模式的RPN都进行了计算,并对RPN值高的采用了建议措施?are there RPN calculations for each failure mode and recommended actions for high RPNs ?PFMEA 可否与流程图一致?Does the PFMEA follow the process flow?3、控制方案 /Control PlanNO.文件要求 /document questions议论记录 /comments evaluate控制方案可否有正确的产品编号、校正号、原始日期和校正日期?Does the Control Plan have the correct Part #, Revision Level, Orig. Date and Rev. Date?Chec供给商名称 /supplier name产品型号/part no.审察日期 /audit date 控制方案是不可否与流程图一致?Does the control plan follow the process flowchart?控制方案内可否包括了:进料检验、过程检验和控制、出厂检验以及返工/返修要求?Does the Control Plan include the following: Incoming Inspection, In-process Inspection& Controls, Final inspection and rework/repair Requirements?控制方案可否按顾客图纸的要求包括了全部顾客的特别特点和产品安全要求?Does the Control Plan include all the customer SCs and Safety Requirements as definedby customer drawings?3.5 PFMEA 中视其余潜藏无效模式可否经过控制方案进行获取控制?Are appropriate potential failure modes, as identified in the PFMEA, addressed throughthe control plan?控制方案中可否包括了检验和试验的要求?〔包括数量、频次、以及标准要求〕Does Control Plan include both gage and test requirements?(including quantity, frequency, and required specifications?)操作要求 /implementation/process questions全部控制方案中要求的控制〔包括SPC〕可否在生产过程中获取推行?Are all controls (including SPC), identified on the Control Plan, being used in theproduction process?全部控制可否获取按期考据以保证到达预期的结果?Chec供给商名称 /supplier name产品型号/part no.审察日期/audit date Are all controls verified on a periodic basis to ensure desired results?4、检验和试验 /Inspection and TestingNO.文件要求 /document questions议论记录 /comments evaluate接受准那么不是零弊端的计数数据,供方可否将接受准那么形成文件并由顾客赞同?for attribute data with acceptance criteria other than zero defects, does the supplier document acceptance criteria and have customer approval?可否只有被检查和考据过的产品才能够被投入生产?how does the supplier assure that incoming product has been inspected or otherwise verified to meet requirements, prior to release for production?没有考据而用于生产的的原资料可否被明确表记并作好记录?is positive identification provided and recorded for material used in production but not verified?检验指导书中可否包括抽样方案、检验频次以及检测内容和标准要求〔包括进料、过程、最后〕does the inspection instructions include samling quantity, frequency, inspection itemsand required specifications(incoming\process\out-going).来料接受方案必定包括以下一种或多种方法:1、进行统计数据接收与议论;2、进货检验和/或试验〔依照性能的抽样〕;3、当有可接收质量性能的记录时,由第二方或第三方评审或审察。
供应商审核计划编制:
审核:
批准:
年月
供应商审核计划
1、通过此次审核,证实供应商在质量管理体系的运行是否符合我公司的要求;
2、针对此次审核中暴露出来的供应商在体系、过程和产品存在的缺陷和问题,要求其制定有效的纠正预防措施并予以执行,提高供应商的质量管理体系运行有效性和效率,为产品质量的稳定和提升提供有力的质量管理体系保证。
江苏双菊汽车配件有限公司供方现场审核标准及其评分法则。
(见附件1)
审核组长:
审核组成员:
审核时间: 年月日
首次会议,审核开始
末次会议,审核结束
六、审核记录和报告
审核组成员在审核过程中应做好记录,审核完毕作出审核结论并形成报告.
七、附加说明
1,本计划由江苏双菊汽车配件有限公司质量部负责编制.
2,本计划如有变动,将通过适当方式通知受审核方和审核组成员.
附件1,
供应商现场审核评价评分表
评审人员签字:
签名:。
供应商质量控制计划审核表供应商质量控制计划审核表1供应商质量控制计划审核表1. 供⽅处是否为最新更改⽔平的图纸?2. 供⽅处图纸是否经最终⽤户正式批准?3. 供⽅处图纸是否完整(耐久性、⼏何尺⼨、外观、测量数据记录、产品关键特性,正确的定位基准等)4. 所有相关技术⽂件、资料、标准及政府法规是否齐全?是否应⽤了所有技术标准/零件技术标准/下级零件技术标准5. 如果由供应商负责设计, 使⽤设计故障模式和后果分析来产⽣⽣产流程故障模式和后果分析么? ( 解释: 该项⽬是要求项⽬, 如果是供⽅负责设计, 要求供⽅做DFMEA)质量体系⽂件6. 过程流程图是否能够接受(包括接收, 返⼯, 返修, 贴标签, 废品区,检验/检测/测量和运输)?27. PFMEA是否能够接受(风险顺序数值, 编号与流程图⼀致, 包括关键产品特性KPC) 、和参数( 关键过程参数KCC) , 产品质量特性( PQC) , 过程监控点( PMP) 等);是否有证据有表明此⽂件动态更新?是否有FMEA,令⼈满意么? ( 从潜在风险系数、与⽣产流程相符的数量, 及是否包括⽣产和程序要求的规定等⽅⾯考虑) 有证据表明这⼀⽂件正在使⽤么? 是否有证据表明该⽂件是⼀个变动的⽂件? ( FMEA, ⽆论DFMEA还是PFMEA,都应该仔细的进⾏分析, 查看每⼀个步骤, 看是否合理, 包括潜在失效模式、失效的起因机理、现⾏控制⽅法、严重度等。
其中失效机理以及现⾏控制⽅法是关键, 直接能够让⼈了解是否能够真正的解决出现的问题。
FMEA是⼀个变动的⽂件,当接到顾客的抱怨或⾃⼰发现问题之后,应该进⾏分析原因,同时更新PFMEA,调整控制计划。
)8. 有⽆过程控制计划 (PCP),3是否合格并及时更新(编号与PFMEA和流程图⼀致, 包括KPC/PQC/KCC, GP-12 -适⽤时,最新的ODM)? 现⾏版本如涉及⼯艺、过程、材料等的更改, 是否经富佳的书⾯确认?过程控制计划是否有效并能够接受么? ( 数值与PFMEA和⼯艺流程相匹配、包括产品关键特性KPC/PQC/KCC、如果适⽤的话, 以及是否包括最新的⼯程修改单等⽅⾯的考虑。
供方名称:评估产品:企业地址:评估人员:主要产品:评估日期:评估项目总分评估内容一、配套情况(总分:5分)51、当前主机厂配套情况(5分)(3分)(1分)52、体系证书(5分)(4分)(3分)(2分)(2分)63、质量管理体系运行(1分)(2分)(2分)(1分)64、质量目标管理(1分)(1分)(2分)(2分)56、员工技能及培训(1分)(1分)(1分)(1分)(1分)47、项目管理(1分)(1分)(1分)(1分)58、变更管理(1分)(1分)(1分)(1分)(1分)二、质量管理体系(总分:29分)三、开发及流程管理(总分:14分)1、是否有完整的项目开发管理流程2、是否按开发管理流程实施3、相关项目管理的实施记录4、开发文件满足顾客节点要求,项目开发问题在量产前100%关闭1、建立变更管理流程2、在实施变更前,对变更效果进行了充分的验证3、对相关联的作业要求和文件进行了同步更新4、对变更前后的产品批次进行了有效断点5、4M管理看板为最新状态1、合资或外资主机厂配套2、普通主机厂配套3、汽车行业配套零部件供应商1、有IATF16949质量体系认证证书、ISO14000认证证书、ISO18001认证证书2、有IATF16949质量体系认证证书、ISO14000认证证书3、有IATF16949质量体系认证证书4、有ISO9001质量体系认证证书5、有质量体系文件,有认证计划6、3C证书(专用3C件:必须有3C证书,如没有,本大项0分)1、内审人员经体系认证培训,并获得内审员证书2、有产品、过程、体系、管理评审审核计划,并实施输出报告3、对于审核输出项持续改善的4、1~4级质量管理体系文件清单齐全1、有质量方针和目标并且按过程分解2、定期对分解目标进行监控的3、并对未达标项目进行分析整改及有效测量最终效果4、质量方针和质量目标被员工100%所理解1、内外部年度培训计划2、培训计划有效实施,记录齐全3、员工技能矩阵表、顶岗计划表4、关键岗位清单及资格证书5、入职培训和转岗培训记录评分标准供应商自评得分评估人评估得分供应商评估表-质量评估基本信息59、过程流程图/FMEA/特殊特性清单/CP/SOP评审(1分)(1分)(1分)(1分)(1分)610、分供方管理(1分)(1分)(1分)(1分)(1分)(1分)611、进货质量控制(2分)(2分)(2分)五、检测设备/测量系统管理(总分:10)1012、检测设备/测量系统管理(2分)(2分)(2分)(2分)(2分)613、可追溯性管理(2分)(2分)(2分)1414、生产过程管理(2分)(2分)(2分)(2分)(2分)(2分)(2分)315、现场管理(1分)(1分)(1分)四、二级供应商控制(总分:12分)六、过程能力展现(总分:23)1、有年度MSA分析计划,并且按计划实施2、有量检具台账、校准计划、维护计划,并有实施记录3、量检具状态标签是否齐全(合格、待修、停用、校验标签)4、现场确认检具完好且有效,检验报告与实测一致,人员按照作业指导书操作5、自有或者有合作单位进行功能性和耐久性试验1、建立了批次管理程序2、实施部件,原料、产品的批次管理,从入库材料到出厂产品,是否能追溯3、能够保证先进先出原则1、设备先进(进口自动化设备、数控设备等)2、生产设备、工装、模具合理性,有维护保养计划,并按照计划执行,且记录完整规范3、员工生产过程严格执行了各项作业指导书4、对关键产品特性和过程特性进行了特别控制5、自互专、首中末检验按照标准执行,检验记录完善,首中末件进行管理6、对不合格品和可疑品进行了标识、隔离、判断和处置7、按照规定实施了出厂检验和试验1、现场5S很好:干净整洁,划线清晰,工具、产品、物料摆放规范2、生产场所是否布置有序、照明、空气流通、物流是否适宜3、5S评价结果激励、不符合事项改善、目视化管理1、过程流程图/FMEA/特殊特性清单/CP/作业指导文件是否齐全2、过程流程图/FMEA/特殊特性清单/CP/作业指导文件是否及时更新3、过程流程图、FMEA、生产现场的控制计划、作业指导文件等一致性相符4、特殊特性在FMEA、CP、流程图、特殊特性清单、操作指导书体现并且一致5、现场是否按照CP、作业指导文件进行控制1、新供应商有准入流程,且按照要求执行2、有分供方APQP/PPAP管理流程3、分供方参与APQP,且满足项目时间节点要求4、分供方绩效评估包含且不限于开发、质量、交付、售后等,分供方绩效评估记录详细5、有分供方质量问题处理流程,按类似8D工具解决6、分供方反馈的8D报告完整。
供应商名称: 日期:邓白氏号码.: 审核员 (SQE):零件名: 零件组别: 前期准备小组:零件号: 车型: 项目名:图纸日期: 工程更改水平:工程更改号:PPAP状态: 产品认证状态:是否动力总成零件:是否是否安全件:是否审核类型: 覆盖所有区域或部分区域:1. 供方处是否为最新更改水平的图纸? *2. 供方处图纸是否经最终用户正式批准?3. 供方处图纸是否完整(公差, GD&T, KPC,正确的定位基准等)4. 所有相关技术文件、资料、标准及政府法规是否齐全?5. 如供方设计产品,是否应用DFMEA并更新PFMEA?*质量体系文件6. 过程流程图是否可以接受 (包括接收,返工,返修,贴标签,废品区,检验/检测/测量和运输)?**7.PFMEA是否可以接受(风险顺序数值, 编号与流程图一致,包括 KPC/PQC/KCC等); 是否有证据有表明此文件动态更新?*8. 有无过程控制计划 (PCP), 是否合格并及时更新(编号与PFMEA和流程图一致,包括KPC/PQC/KCC,GP-12 -适用时,最新的EWO/ODM)? 现行版本如涉及工艺、过程、材料等的更改,是否经SGM的书面确认?9. 是否PFMEA中所有“现行过程控制”项目在控制计划中具体规定?*10. 控制计划是否针对高PFMEA风险顺序数项目采取适当的过程控制? *11. 控制计划中所有的 KPC/PQC/KCCs 项目是否明确检测方法、频次和样本数? *12. 各工位检验频次和样本数是否合理? *质量体系实施13. 原材料及零件分供方是否已经批准(与PPAP中的材料清单是否一致)?*14. 在生产使用前能否确保使用合格的(原)材料? *15.当零件有追溯性要求时,是否可实现零件到最终产品的追溯?*16. 工作场所布置是否适当并与流程图一致?17. 所有工装、量具是否可获得并正确标识、标定和验证? *18. 各工位有无适当的操作指导书以确保正确进行操作? *― -- 足够正确操作,包括对不合格品的处置?*―-- 操作人员有无合格的边界样品,是否使用? *19. 是否所有量具/检具都附有操作指导书并置于明显位置? *20. 操作人员是否正确理解操作指导书,操作人员是否经适当培训? *21.是否有标准样品以确认检验和防错设施是否正常工作?*22. 有无针对设备和工装、辅助设备的预防性维修计划,是否按计划实施? *23. 操作指导书是否与控制计划一致? *24. 各试验、检测项目是否按文件实施? *25. 操作人员是否清楚相关的 KPCs/KCCs?26. 如控制计划有SPC要求,数据是否正确采集和记录? *SPC 数据是否合理,控制限是否合理? *27. 超控制限的点是否采取适当的纠正措施? *28. 过程审核的结果是否可以接受(来料,在制品,成品)?*29. 制造过程的能力 (Ppk,Cpk,Cmk)是否合格? *30. 零件包装、搬运和处置能否避免零件受损? *31. 对在制品的处置 (WIP)有无文件规定,是否遵照执行?包括返工、返修区域?*32.供应商是否对待发运的产品进行“代表顾客的审核”管理层质量体系实施33. 是否跟踪停线时间、报废、额外运费、工厂问题报告?*34. 有无针对过程失控的管理? 是否按计划实施纠正/整改措施?-- 对问题解决是否指定实施责任人?相关人员是否明确其职责?*35. 发生问题后,是否能迅速与相关人员沟通? *-- 支持人员能否对操作人员要求快速响应? *36. 如果有两班以上,班间信息是否能正确传递和沟通? *37. 质量成本: 对所有质量问题(顾客抱怨, PR/R, 售后质量等.)是否分析PFMEA和控制计划,以确定质量体系失效原因?38.PFMEA,过程流程图和控制计划是否更新?供应商名称: 日期:DUNS 号.: 审核员 (SQE):零件名: 组别:零件号: 车型年: 项目复印件发放至: (供方代表)。