斗山LSC移动照明灯塔DIPP-LS-1211
- 格式:docx
- 大小:766.50 KB
- 文档页数:2
升降灯塔高杆灯技术规格书June 8th, 2022, what a day of hard work.升降式投光灯塔技术规格书一、总则1灯塔适用于铁路编组站,货场,存车场等多股道需要照明的场所;2 投标厂家注册资金在3000万以上,灯塔通过铁道部科研部门检测,并提供铁道部相关部门出具的检测报告原件备查,并满足招标地区抗风等级要求;3.投标厂家负责灯塔、灯具施工安装,必须具有省部级以上照明施工资质三级以上的证书含三级,并提供省部级出具的安全生产许可证;二.升降式投光灯塔技术要求2.1环境使用条件:满足第一章有关要求2.2电气性能1额定值a.额定工作电压:220Vb.额定绝缘电压:500Vc.额定频率:50Hzd.额定功率:400W/盏e.噪声:<55dBA离灯具前、后、左、右、1米处2 湿态绝缘电阻:用500V摇表测量湿态绝缘电阻不小于2MΩ;3 湿态介电强度:能承受交流50Hz,1500V有效值试验电压历时1min应无击穿或闪络现象;4 防触电保护类别:Ⅰ类5 灯具接线方式:三相五线或单相三线制设专用接地线2.3结构1 基本结构:升降式投光灯塔应由塔身、升降灯架、升降传动机构、照明灯具及控制系统构成;灯塔及其主要构件应为耐用结构,由能承受一定的机械应力,电动应力及热应力的材料构成,此材料和电器元件应采用防潮,无自爆,耐火或阻燃产品;2 灯塔的所有外露金属表面均应采用热浸镀锌层防护,镀锌层均匀且厚度不小于85μm;3 灯塔结构装配的质量应满足下列要求:塔身高度允许偏差±200mm;塔身截面尺寸允许偏差±3mm;塔身安装后塔轴线位移允许偏差±5mm;塔身垂直允许偏差为塔身高度的1/1000;升降灯架内廓尺寸应协调一致,桁架塔塔身应对灯架升降起到良好的导向、定位作用;钢结构的联接螺栓应简单统一,螺栓规格宜采用M16,连结应有防松动措施,且牢固可靠;灯塔所有焊接处焊缝应符合标准要求,表面应光滑平顺,无气孔、焊渣、虚焊及漏焊等缺陷;在满足最大风荷载强度的条件下,塔身顶部的位移绕度值应不小于塔身高度的1/200.4 灯塔具备防雷功能;灯具的非带电金属形成整体,通过外壳上的接地螺栓与接地线连接;5 灯具外壳的防护等级不小于:IP55,灯塔其它部分的防护等级应满足露天使用环境的要求;6灯塔的升降灯架应能实现电动和手动升降,升降过程应保持匀速、平稳、安全,在升降速度为8m/min的条件下,电动机功率应≤450W;手动扭转应≤40N.m;7当升降灯架提升至规定高度后,牵引钢丝绳应卸荷,并由定位装置承受灯架的重量;8在灯架升、降的过程中,采用角钢拼组桁架结构,电缆随灯盘移动;9灯塔应设有可靠接地装置,其接地电阻应≤10欧姆;10牵引钢丝绳的安全系数应不小于5,钢丝绳采用不锈钢,直径应大于Φ6mm;11导向滑轮组应转动灵活、平滑及无卡阻;12灯塔基础的型式和尺寸应根据灯塔安装处的地震烈度、风荷载强度、地质条件及用户提出的具体要求确定,设备供应者应按照上述要求提供具体安装图样及必要的施工要求具体应包含:基础混凝土强度不得低于C20;基础顶部应预埋M24地脚螺栓,螺栓露出基础高度应不小于100mm,螺栓的预埋位置偏差不得大于±2mm;引入电缆预埋钢管的位置及规格等;13灯塔的室外控制开关箱应采用不锈钢箱体,并对其表面作喷塑处理;灯塔生产厂家应提供配电箱3C 认证证书及国家权威检测机构出具的检测报告;2.4其它技术要求1 升降式投光灯塔电源应采用交流三相四线380V电缆引入;2 升降式投光灯塔应选用6400W高压钠灯;3 照明灯具光学参数如下:a.灯泡效率:不小于70%b.高压钠灯光通量: 48000Lm4 照明所用的灯具应能互换,反射器也能互换;5 灯具外壳由不小于2.0mm厚的整块高压铝合金板含铜<0.4%冲压而成,并装有焊接端帽,外表面应光滑以防污物堆积和便于清洗;所有金工成品表面涂层应能承受机械压力和湿气、废气及清洗剂的腐蚀;挤压成型的外壳后部应能结合支撑架,从而避免现场钻孔;6 灯具设备底盘应衔接在外壳上,配有安全接地线,并设计成整体;设备底盘应用铝合金制成,电气抛光后涂漆;灯座底部经抗震设计,能抵抗营运中的高频震动;7 灯具的正面采用不小于5mm厚的不散光耐温钢化玻璃作面盖、钢化玻璃四周应衬以密封垫片,密封垫应便于更换;玻璃面盖应不用工具也能打开;所有的插销、铰链、暗栓等均应采用不锈钢制成;垫片应为合成橡胶或是经过批准的同等材料,它应是耐温、不老化、并能抗御腐蚀性气体的材料;8 反射器应为经电镀处理光亮并经特殊的防眩光表面处理,厚度不小于0.8mm 的铝板制成,且结构坚固,能经受清洗,搬动不变形;9 控制设备装在设备盘上,并应备有保险插头和插座等固定断电装置,以便取下设备底盘时,无需拆卸电缆;10 灯具内应安装高压钠灯灯泡、镇流器以及与灯泡输出功率配套的触发器,以便短暂停电后在60秒内恢复启动灯泡重新发光,并装有电容器,使功率因数达到0.85以上,所配镇流器应为低损耗型号;11 灯具内部接线应用低烟无卤材料绝缘的耐热电缆,并备有连接终端,以便于衔接4mm2以上的导体;灯具应有特设的导线出入口密封装置,以便连接按规定选用的进出线电缆,导线出入口应由工厂冲压成型,并备有IP20规定的丝口密封盖,以便不用时封堵;12 灯具接线盒应为黑色并配有活动盖板,接线盒内设大小适当的接线端子板,供分支电缆T接连接或连接分支电缆终端,还应有接地端子,供连接接地线,以保证接地连续性;13 所有灯具应能在额定电压220V波动范围的+6%~-8%内启动并运行;14 灯具应包含配套供应的配件,所有配件应由工厂事先制成,并附有接地螺栓,以便接引安全地线;15灯塔灯具的控制应能实现就地和远方控制;2.5所有投光灯塔材料按满足沿海、新疆最大风速 40m/s 的结构进行设计,投标商提供近 3 年在路局范围内满足最大风速不小于 40m/s 地区使用过的证明材料并提供铁道部出具的40m/s的检测报告;3.试验方法与检验规则3.1性能试验3.3检验在产品出厂运往现场安装后逐台进行检验,检验内容如下:升降式高杆灯技术规格书一、总则1 升降式高杆灯适用于铁路编组站,大型货场,存车场, 集装箱﹑港口﹑物流等需要照明的场所,并提供相关业绩证明;2 投标厂家注册资金在3000万以上,升降式高杆灯通过权威部门检测,并提供省部级出具的相关部门出具的检测报告;3.投标厂家负责升降式高杆灯、灯具施工安装,必须具有省部级以上照明施工资质三级以上的证书含三级及安全生产许可证原件备查;二.一般规定满足下列规定要求:2.1 GB 50054-95 低压配电设计规范;2.2 GB 50052-95 供配电系统设计规范;2.3 GB 50055-93 通用用电设备配电设计规范;2.4 GB 50057-94 建筑物防雷设计规范;2.5 TB 494-87 铁路电气照明照度标准;2.6 TB/T2865-1997铁路升降式投光灯塔技术条件;三.技术规格3.1灯杆32米;°;‰;μm,等于或大于5mm以上时,不应低于86μm;3.2灯盘3.3 灯具及光源≥IP65;°,上向角90°,旋转角180°;12400W具体数量见设计图纸;3.4 升降系统3.5 配电及控制生产厂家应提供配电箱3C 认证证书及国家权威检测机构出具的检测报告;3.6 保护接地和避雷装置四.产品要求4.1升降式高杆灯的使用寿命在20年以上,产品的质量保证期为产品交付运营后一年;4.2生产厂商负责提供地耐力为15t/m2设备安装基础图,并提供具有省部级以上照明施工资质三级以上的证书,并提供安全生产许可证;。
L11产品规格书产品概述应用环境:室内、户外产品尺寸图(单位:mm)L11线条灯是专为户外景观亮化设计的一款小功率LED 条形产品。
采用航空级6063挤压铝外壳,阻燃塑胶PC端盖,通过高导热耐候PU胶灌封防水;灯条体积小,外观精致;灯条间通过国标定制柔性线缆连接;产品长度、顔色可定制,能适应大曲线或曲面的安装;适用于建筑物立面轮廓勾边,内外表面装饰亮化。
产品特点:★新一代T T L串行技术设计★标准D M X512控制协议★行业领先的无线扣式防拽连接设计★高导热胶全灌封防水设计★户外防雷及静电(E S D)专用防护设计★产品的上盖可选:支持P C透明或乳白弧盖★产品采用独创的隐藏式安装滑块★支持R G B/W电流单独可调(低亮高灰)技术参数产品选型表基 本 参 数 色 彩/灰 度 RGB/W 各256级灰度; 光 源 类 型 3535 /5050 /2835 光 源 数 量48-72pcs/米 (0.25米-1米,长度可以按要求定制)材 质 铝喷涂外壳 / 阳极氧化 + 光学PC 罩寿 命 50,000h 重 量 710g/米 光 电 参 数 工 作 电 压 DC24V最 大 功 率 12-20W/米 RGB 光 强 180cd/米白 光 360cd/米 光 束 角 30° / 45° / 60° / 90° / 120°电 气 等 级 III 类其 它 参 数 工 作 温 度 -20°C to 50°C 储 存 温 度 -40°C to 70°C 防 护 等 级IP66配光曲线规格型号 光源 数量 光源类型 颜色控制类型 DC 工作电压 功率 白色 光强 DA028-48AT 48PCS 3535 RGB/W 单线串行TTL 24V 12W 120cd DA028-48AD 48PCS 3535 RGB/W DMX512 24V 12W 120cd DA028-48XD 48PCS 5050 RGBW DMX512 24V 15W 180cd DA028-48CN 48PCS 3535 2835 W 无控制 24V 12W 240cd DA028-60AT 60PCS 3535 RGB/W 单线串行TTL 24Vz 15W 150cd DA028-60AD 60PCS 3535 RGB/W DMX512 24V 15W 150cd DA028-60XD 60PCS 5050 RGBW DMX512 24V 20W 225cd DA028-60CN 60PCS 3535 2835 W 无控制 24V 15W 300cd DA028-72AT 72PCS 3535 RGB/W 单线串行TTL 24V 18W 180cd DA028-72AD 72PCS 3535 RGB/W DMX512 24V 18W 180cd DA028-72CN72PCS3535 2835W无控制24V18W360cd安装件外观尺寸安装底座尺寸图(单位mm);固定式安装底座安装方式示意:①安装载体钻孔,装膨胀胶塞:在载体上按灯具安装位置做好记号,并钻孔(建议用6mm钻头);把膨胀胶塞用锤子敲入钻孔里(注:胶塞不可松动);②固定灯具安装底座:将灯具安装底座孔位对准膨胀胶塞孔,选用合适的自攻螺丝将灯具安装底座固定到安装载体上;③灯具安装:将灯具对准灯具安装底座,并扣到灯具安装底座上;④灯具加固,完成安装:装好灯具后,从侧下边打两个自攻螺丝将型材上盖与型材安装底座固定在一起,防止型材上盖坠落。
PORT-A-LITE AUSTRALIAN STANDARD OPERATOR’SMANUALALLMAND BROTHERS INC.P.O. BOX 888HOLDREGE, NE 68949PHONE: (308) 995- 4495, 1- 800- 562- 1373 ALLMAND FAX: (308) 995– 5887 ALLMAND PARTS DEPT. FAX : (308) 995– 4883PART NO 103586 REVISED JANUARY 2012PORT-A-LITERECORD IMPORTANT INFORMATIONRecording the equipment information will help when placing an order for replacement parts and/ordecals.COMPANY Equip MENT No:Unit Model No:Unit Vin:Accessories:TABLE OF CONTENTSINTRODUCTION 4 SAFETY DEFINITIONS 5 SAFETY PRECAUTIONS 5 SAFETY LABELS 7 PREPARING THE UNIT FOR DELIVERY 7 OPERATION PROCEDURES 8-10 SCHEMATIC 11 WARRANTY 12NOTE: NS = NOT SHOWN. WHEN ORDERING, SPECIFY THE COLOR WANTED ON PARTS CONTAINING THE LETTER “P”INTRODUCTIONABOUT THIS MANUALTAKE TIME TO READ THIS MANUAL THOROUGHLYThis instruction manual provides necessary instructions for the PORT-A-LITE light tower.The information found in this manual is in effect at the time of printing. Allmand Bros Inc. may change contents without notice and without incurring obligation.If you are uncertain about any of the information in the manual, contact Allmand service department at 1-800-562-1373, for clarification.SAFETY DEFINITIONSSafety statements are one of the primary ways to call your attention to potential hazards. Fol-low the precautions listed throughout the man-ual before operation, during operation and dur-ing periodic maintenance procedures for your safety, the safety of others and to protect the performance of equipment. Keep the decals from becoming dirty or torn and replace them if they are lost or damaged. Also, if a part needs to be replaced that has a decal attached to it, make sure to order the new part and decal at the same time.Indicates a hazardous situation which, if not avoided, will result in death or serious injury.Indicates a hazardous situation which, if not avoided, could result in death or serious in-jury.Indicates a hazardous situation which, if not avoided, could result in minor or serious in-jury.This safety alert symbol appears with most safety statements. Itmeans attention,become alert, your safety is in-volved! Read and abide by the mes-sage that follows the safety alertsymbol. Indicates a situation which can cause damage to the equipment, personal property and/or the environment, or cause the equipment to oper-ate improperly.NOTE : provides key information to make pro-cedures easier or clearer.SAFETY PRECAUTIONSThere is no substitute for common sense and careful practices. This information contains gen-eral safety precautions and guidelines that must be followed to reduce risk to personal safety. Special safety precautions are listed in specific procedures. Read and understand all of the safety precautions before operating or perform-ing repairs or maintenance. This safety section cannot cover every situation that may occur that is incidental to the use of the equipment.If you are uncertain about any of the information in the manual, contact Allmand service depart-ment at 1-800-562-1373, for clarification.The safety statements that follow haveDANGER level hazards.ELECTROCUTION HAZARD∙ Do not operate the light tower if the insulation on the electrical cord or other electrical wiring is cut or worn or if bare wires are exposed. Repair or replace damaged wiring before usingthe unit.The safety statements that follow haveWARNING level hazards.UNSAFE OPERATION HAZARD∙ Read and understand this Operator’s Manual, the Engine Operator’s Manual before operating or servicing the light tower to ensure that safe operating practices and maintenance procedures are followed.∙ Never permit anyone to install or operate the equipment without proper training. ∙ Safety signs and decals are additional reminders for safe operating and maintenance techniques.MODIFICATION HAZARD∙ Never modify the equipment without written consent of the manufacturer. Any modification can effect the safe operation of the equipment.EXPOSURE HAZARD∙ Always wear personal protec-tive equipment, including appropriate clothing, gloves, work shoes, and eye andhearing protection, as required by the task at hand.ALCOHOL AND DRUG HAZARD∙ Never operate the light tower while under the influence of alcohol or drugs, or when ill.BURN HAZARD∙ Handle hot components, such as light fixtures, with heat resistant gloves.The safety messages that follow haveCAUTION level hazards.TOOL HAZARD∙ Always use tools appropriate for the task at hand and use the correct size tool for loosening or tightening equipment parts.The safety statements that follow haveNOTICE level .∙Any part which is found defective as a result of inspection or any part whose measured value does not satisfy the standard or limit MUST be replaced.∙ Only use replacement parts specified. Other replacement parts may effect warranty cov-erage.SAFETY LABELSRefer to these representations of the safety warning decals used on the PORT-A-LIGHT light tower to insure correct ordering if replace-ment becomes necessary.PREPARING THE UNIT FOR DELIVERY OR RENTALThe PORT-A-LITE light tower should be oper-ated properly and maintained properly for maxi-mum service life. Never deliver or put machine into service with known defects or missing in-structions or decals. Always instruct the cus-tomer in proper operation and safety proce-dures as described in this Operator’s Manual. Always provide the manual with the equipment for proper and safe operation.CHECK LIST∙ Visually inspect the equipment to ensure that all instructions and decals are in place and legible.∙ Inspect the light tower spring latch assembly which locks the light tower in the vertical po-sition for proper operation.∙ Inspect the light assemblies for damage and test for proper operation.∙ Inspect the electrical wiring for signs of damage.∙ Check to make sure the Operator’s Manual is with the equipment.∙ Inspect the machine physically for damage and repair if necessary.OPERATION PROCEDURESBefore operating the tower light, review Safety on page 5-6.To remove light fixture from storage on base and attach light fixture to mast prior to use:1. Remove the light fixture nut handle and the three washers retaining the light fixture to the base unit and remove the light fixture from the storage bolt.SHO NUT HANDLELIGHT FIXTURE2. Place one of the plastic washers on top of the mast bolt. Then set the light fixture on top of the mast aligning the hole in the light fixture yoke with the mast bolt, place the other plastic washer, one metal washer and the nut handle, then tighten to secure the light fixture on the mast.MAST BOLT4. Connect the male three-pin connector on light fixture cord to the female three-pin con-nector on the base unit cord. Screw on the retaining collar until tight.MALE THTREE-PIN CONNECTORFEMALE THREE-PIN CONNECTOR5. Move the light fixture to the desired position. By rotating the lens and reflector and/or by the light fixture mount.To raise tower to desired height:1. Pull spring latch pin ring out. Raise thetower to the desired height. Retain height by allowing the spring latch pin to engage into one of the three holes in the inner mast sec-tion.TIPPING HAZARDBe sure to keep the base unit level before elevating tower. If the base unit is not level, the entire unit could become unstable and prone to tipping when extending the tower. SPRING LATCH PINHOLES IN INNER MASTGRASP LIGHT FIXTURE HERE TO POSITION RIGHT OR LEFTGRASP LIGHT FIXTURE HERE TO POSITION UP OR DOWNTo operate light fixture:1. Plug base unit cord into wall socket or gen-erator outlet (240V, 50Hz) only.2. Using ON/OFF switch located on the baseunit move switch to ON position.3. The light will begin to illuminate after a briefwarm-up period.To shutdown the unit:1. Using the ON/OFF switch located on thebase turn the switch to the OFF position. 2. Unplug the unit from the (204V, 50Hz) wallsocket or generator outlet.NOTICE:∙ When disconnecting cords, pull on the plug and not the cord.∙ The bulb and light fixture need to cool-down before it can be re-illuminated. Allow 10-15minutes after shut-down before turning thelight fixture on again. ON/OFF SWITCH CORD (240V )ELECTROCUTION HAZARDDo not operate the light tower if the insulation on the electrical cord or other electrical wiring isELECTROCUTION HAZARD Positioning the unit or cord in water can cause electrocution. Always position the unit and cordon dry ground.SCHEMATICSWARRANTYPORT-A-LITE AUSTRALIAN STANDARD PARTS MANUALALLMAND BROTHERS INC.P.O. BOX 888HOLDREGE, NE 68949PHONE: (308) 995- 4495, 1- 800- 562- 1373 ALLMAND FAX: (308) 995– 5887 ALLMAND PARTS DEPT. FAX : (308) 995– 4883PART NO. 103586 REVISED JANUARY 2012TABLE OF CONTENTSSHO 1000W LAMP 3 SHO LAMP HOLDER 4 MAST SECTIONS 5 BALLAST AND CAPACITOR 6 BASE 7 DECALS 8SHO 1000W LAMP1/27/12PORT-A-LITE530555 – 1000W LAMP ASSEMBLY1/27/12 SHO LAMP HOLDERPORT-A-LITEMAST SECTIONS1/27/12 PORT-A-LITEBALLAST AND CAPACITOR1/27/12 PORT-A-LITEBASE1/27/12 PORT-A-LITEDECALS1/27/12 PORT-A-LITE。
DSJ-2000B 全方位移动照明灯使用说明*当你使用本产品时,务必请先阅读本说明书,以避免您的误操作而损坏或发生其他意外。
*请将发票及时粘贴到保修卡上,以便妥善保管。
* 本产品如有改进,本说明书内容可能有所更改,届时恕不另行通知。
产品执行标准:Q/320981 01-2008简介:DSJ-2000B 升降灯是由升降系统、照明系统、控制柜、发电机组和移动小车组成的移动照明设备。
气缸支架采用硬质氧化特殊工艺处理的铝合金精致而成,可支撑20Kg 重量的各种设备,升降高度有4.2m ,使用极为方便。
电器控制箱配有手动和自动两种控制功能,可根据各种的实际情况进行选择使用。
移动式发电机组选用优质发电机。
移动小车底部配备了万向轮和铁轨轮,可在坑洼不平的路面及铁轨上运行,亦可在斜坡角度不超过15 度的地面固定使用。
灯盘采用4 个5000W 飞利浦泛光灯头作为照明装备,照射范围可达45m 。
四盏灯头可以上下左右任意调节,灯头的外壳防护等级为IP65 。
DSJ-2000B自动升降灯技术参数使用说明1、左手将锁紧器插销手轮向外拉,右手将伸缩气缸直立竖起,左手松开。
插销自动横插伸缩气缸下端,锁扣并锁紧。
2、把灯盘中心轴碟形螺母松开,将中心轴向下成直角竖起,锁紧固定螺母。
将中心轴插进伸缩气缸上端孔内,旋紧固定螺丝。
然后再将伸缩气缸上端三孔航空插头插入灯盘背面三爪航空插座内。
3、将四只灯头按需要的角度竖起(可调任意角度),锁紧所有固定件。
4、旋开伸缩气缸下端气嘴锁紧螺母,将电器上的气管插入气嘴,旋紧螺母,再将伸缩气缸下端的三爪航空插头插进电器箱三孔航空插座内。
5、检查是否按照要求加注机油,如油位低于机油尺下限时发动机不会起动。
6、加注燃油(97# 无铅汽油),将燃油阀置于“ ON ”位置。
7、将阻风门关闭(向左方向扳移)。
8、将引擎开关置于“ ON ”位置,断路开关置于“ OFF”位置。
9、轻轻拉启动抓手直到感到阻力为止,然后用力拉起。
一、夜间施工全方位移动照明灯塔全称:SFW6130B全方位移动照明灯塔定位:全球范围高端户外照明灯塔光源:美标金卤灯功率:1000W光通量:110000lm防护等级:IP65升起高度:10m发动机组输出功率:7.2KW连续工作时间:45小时抗风等级:8级采用1000瓦的美标金卤灯,光通量可达110000lm灯杆升起10米后,照射半径可达120m —150m灯塔配置久保田发动机和斯坦福发电机,功率可到7.2千瓦,高扭矩,易维护,易启动机组结构紧奏,机组与底座之间采用减震设计,减少震动,使运行更加安全稳定、高效节能。
全封闭式设计,进一步降噪。
整体机组,低噪音,低排放,适用于夜间作业、住宅、办公场所等对噪音,尾气排放有严格要求的场所应用,确保清洁、环保。
灯杆可在水平方向作360旋转调节,360照射无死角,灯头可在垂直方向0-90范围内任意改变投射角度。
控制系统集成化,控制开关,控制显示屏,指示仪表全部集成与同一面板上,方便操作人员操作和实时监控。
全自动操作设计,发动机组启动、灯杆升降、4个液压支脚收放、灯具开关等等全部独立自动控制,操作简便快捷。
液压支脚展开面积大,支撑力强,加上先进的整机一体化配重设计,具有良好的抗风性能,可保证在8级大风下可靠工作。
多种移动方式,可采用拖车系统,也可采用叉车、吊车进行移动和运输。
SFE6130B灯具的最大照射覆盖半径可达120米—150米。
灯塔既可以作为一台发电机供外部设备使用,还可以连接市电操作。
塔的机组噪音为65分贝,排气量低,为绿色环保机组。
灯塔实际重量1吨左右,采取多种移动方式,可采用拖车系统经行拖运,也可采用叉车、吊车迚行移动和运输。
拖行行驶速度60-80KM/H,适用于移动到各种野外环境作业。
灯塔车体底盘系统采用与轿车系统一样的减震车杆、轮毂、轮胎,经济耐用;牵引杆附带行车制动、驻车制动双重制动,并配有行驶尾灯,行驶时安全可靠。
升降灯杆双重钢丝绳牵引,保险安全。
灯桥灯塔安装方案1. 引言灯桥灯塔是一种常用于桥梁、码头、航道等场所的警示设备,用于指示船只或车辆在夜间或恶劣天气条件下的航行方向。
本文将介绍灯桥灯塔的安装方案。
2. 设备准备在开始安装灯桥灯塔之前,需要准备以下设备和材料:•灯塔本体及固定支架•电源线及连接器•控制器•其他配件(如防护罩、防雷器等)•手持钻、螺丝刀、扳手等工具•电缆槽或管道(根据具体环境)3. 安装步骤3.1 安装定位首先,需要根据实际需要确定灯桥灯塔的安装位置。
一般来说,灯桥灯塔应该安装在能够被船只或车辆远距离见到的位置,例如桥梁的顶部或码头入口等。
3.2 固定支架安装根据灯塔的型号和规格,选择合适的固定支架。
在确定好安装位置后,使用手持钻和螺丝刀等工具将固定支架固定在相应的地面或物体上。
确保固定支架稳固可靠。
3.3 连接电源线将灯塔的电源线与控制器连接,并确保连接稳固。
如果需要,在电源线上可以设置防护罩或防雷器等设备,以提高电线的安全性和稳定性。
3.4 安装灯塔本体将灯塔本体安装在固定支架上,并使用扳手等工具将其固定。
在固定过程中,需要确保灯塔本体在垂直方向上保持平衡,以保证灯光的指示效果。
3.5 连接控制器将控制器与灯塔的电源线连接,并确保连接稳固可靠。
在连接过程中,需要根据控制器的操作说明进行正确的接线,以确保灯塔的正常工作。
3.6 电缆布线根据具体的安装环境,选择合适的电缆槽或管道,将电源线和控制器之间的电缆进行布线。
在布线过程中,注意保持电缆整齐,避免出现压扁、过度拉伸等情况。
4. 功能测试安装完成后,需要进行功能测试,以确保灯桥灯塔能够正常工作。
测试内容包括:•灯塔的开关控制:通过控制器对灯塔进行开关操作,观察灯光是否正常亮起或关闭。
•灯光的亮度调节:通过控制器对灯塔的亮度进行调节,观察灯光的变化情况。
•灯光指示效果:观察灯桥灯塔在不同角度和距离下的指示效果,确认其能够满足实际要求。
如果测试过程中出现问题,应及时检查连接线路、控制器设置等,并进行相应的调整和修复。
LSC灯光控制台
LSC LX系列灯控制台可无缝整合常规灯、LED屏幕、摇头灯、媒体服务器等所有控制任务。
该产品是LSC Lighting Systems公司和OpenClear软件公司30年灯光控制技术的结晶。
其强大的软件功能和迅速而有逻辑的操作流程,让操作员的工作事半功倍。
该产品具有许多独特功能,如克隆电脑灯、复制/粘贴和Freesets,可使一场演出的编程节省2 h~3 h。
MaXim系列灯光控制台,集操作简单、功能强大、高投资回报率等特点于一身。
具备独特的PaTPadTM摇头灯控制模块、全效果电机(Full Effects engine)、通用电源(UPS)和操作简易的“一杆对一灯”(fader per light)操作模式等功能,适合流动演出。
灯塔照明工程施工方案一、工程概述灯塔是一种用于指引航行船只的建筑物,其重要性不言而喻。
灯塔照明工程的施工是确保灯塔正常运行,保障航行安全的关键环节。
本工程施工方案将对灯塔照明工程的具体施工过程、要求及注意事项进行详细说明,确保施工进程顺利进行。
二、施工准备工作1. 项目经理成立专门施工团队,确定施工的计划和进度。
2. 对施工所需设备和材料进行统一采购,并进行验收。
3. 确保所有工人具有相关的从业资格证书,并进行安全教育培训。
4. 制定详细的施工方案和施工图,包括具体工序和工艺标准。
三、具体施工过程1. 灯塔照明设备安装a. 将灯塔内部的照明设备和电缆吊装至指定位置。
b. 进行照明设备的连接和调试,确保其正常运行。
c. 对照明设备进行保养和维护,确保其长期稳定运行。
2. 灯塔灯光照射a. 对灯塔周围进行照明设计,保证其夜间照明效果。
b. 进行灯光的灯泡更换和光源调整,确保其照明效果达到要求。
3. 灯塔外观美化a. 对灯塔外观进行清洁和喷漆处理,保持其良好的外观状态。
b. 对灯塔周围进行环境美化,提升其整体形象。
四、注意事项1. 在施工过程中,必须严格遵守相关安全规定,确保工人的人身安全。
2. 施工时应注意保护好灯塔周围的环境,避免造成污染。
3. 在使用设备和材料时应严格按照施工图纸和要求进行,确保施工质量。
4. 施工期间需与相关部门保持良好的沟通和协调,及时解决遇到的问题。
五、验收及交付1. 施工完成后,需对灯塔照明工程进行全面的验收,确保其各项指标达到要求。
2. 完成验收后,项目经理将向业主提交最终的验收报告,并准备进行交付。
【总结】通过以上方案的详细规划和执行,灯塔照明工程的施工进程将得到有效地控制和监督,确保灯塔的正常运行和航行安全。
施工团队将秉承“安全第一、质量至上、顾客至上”的原则,全力以赴,确保工程质量,体现团队的高效和专业。
愿我们的工程能够顺利完成,为航行安全贡献一份力量。