口罩打片机二级维护计划表
- 格式:xlsx
- 大小:11.38 KB
- 文档页数:1
生产设备二级保养计划模板英文回答:Second Level Maintenance Plan Template for Production Equipment.Objective:To provide a comprehensive template for the development and implementation of a second level maintenance plan for production equipment.Scope:This plan applies to all production equipment within the organization.Responsibilities:Plant Manager: Overall responsibility for thedevelopment and implementation of the plan.Maintenance Manager: Development and execution of specific maintenance tasks.Production Supervisor: Coordination with Maintenance to ensure minimal disruption during maintenance activities.Operators: Reporting of equipment issues and following established maintenance schedules.Plan Elements:1. Equipment Inventory and Condition Assessment.Create a comprehensive inventory of all production equipment.Assess the current condition of each equipment unit through visual inspections, performance monitoring, and diagnostic tests.2. Maintenance Schedule.Establish a regular schedule for preventive maintenance tasks, such as lubrication, cleaning, calibration, and minor repairs.Determine the frequency of maintenance tasks based on equipment usage, manufacturer's recommendations, and historical data.3. Procedures and Work Instructions.Develop detailed procedures and work instructions for each maintenance task.Ensure that instructions are clear, concise, and easily accessible to maintenance personnel.4. Parts Management.Establish an inventory of spare parts and consumables required for maintenance activities.Implement a system for tracking and replenishing parts inventory.5. Training and Certification.Train maintenance personnel on the specific maintenance procedures and work instructions.Obtain necessary certifications to ensure compliance with industry standards.6. Documentation.Maintain detailed records of all maintenance activities, including dates, tasks performed, parts replaced, and any observations.Use this documentation for trend analysis and improvement initiatives.7. Performance Monitoring.Regularly review maintenance records to assess the effectiveness of the plan.Identify areas for improvement and make necessary adjustments to maximize equipment uptime and minimize maintenance costs.8. Continuous Improvement.Foster a culture of continuous improvement by soliciting feedback from maintenance personnel and production operators.Implement best practices and emerging technologies to enhance maintenance efficiency.中文回答:生产设备二级保养计划模板。
1目的建立全自动口罩机的操作规范与维护程序,以规范员工的操作,起到指导作用。
2范围本规程适用于对本公司的全自动口罩机和国产全自动口罩机的操作与维护。
3职责3.1 生产操作人员需按照本操作规程设定参数、进行生产操作。
3.2 维修人员需按照本操作规程定期维护保养。
4安全要求4.1 操作员必须在培训考核合格后才能上岗作业。
4.2 操作中若出现异常响动或故障先兆,先按下停止按钮切断电源并及时联系维修并上报部门主管。
4.3 操作人员在穿3层布、包边、铝条时注意手与机器的位置,小心手被擦伤。
4.4 机器运行时禁止手接触折叠、成型、切片、剪刀等压合位置,以及静电消除器等电器部位。
4.5 口罩片在通道内被气缸压住后必须停机后把气阀关上后才能取出,以免被气缸压伤。
4.6 禁止人员在机器工作范围内嬉闹追逐。
4.7 一定要在电源切断的情况下进行维修。
4.8 停机清扫时,必须关闭电源。
5操作流程5.1 开机准备(台湾全自动口罩机)5.1.1 电源:打开本体机、控制箱、三台外耳带点焊机的电源。
5.1.2 气源及温度:开启压缩空气开关,按工艺标准设置气压及超声波成型处的工艺参数。
5.1.3 工艺参数5.1.4 原料的穿引:操作人员除去原料卷外包装纸后,应先检查原料是否有质量问题,边缘部分是否有撕裂破损,用刀裁去有缺陷的原料。
将五种原料安装至相应卷轴的位置,并固定。
5.1.5 原料穿引参考附录1 -“口罩机原料穿引图”KANGGU 全自动口罩机操作及维护规程文件编号SOP-HW-014-00页码2/7口罩机原料穿引图5.1.6 将原料拉出,经过导料处至折边位置。
先将第一层布拉过熔接轮组,并将机器开启,以慢速运转,使第一层布经过折边位置并熔接。
第一层材料运送顺畅并熔接后,再将第三层布以相同的方式拉过熔接轮组,与第一层熔接。
等两层材料完全熔接并运转,运转顺畅后,再将第二层夹于第一、三层中间,继续让机器运转,并以手轻轻夹住三层材料辅助运送材料,至三层材料完全熔接。
生产设备二级保养计划模板英文回答:Production Equipment Level 2 Maintenance Plan Template.Introduction.A Level 2 maintenance plan is a comprehensive schedule of maintenance tasks designed to keep production equipment running smoothly and efficiently. This plan typically includes tasks that require more specialized skills and equipment than Level 1 maintenance tasks.Purpose of Level 2 Maintenance.The primary purpose of Level 2 maintenance is to:Prevent breakdowns and minimize unplanned downtime.Extend the life of equipment.Improve performance and efficiency.Maintain safety and regulatory compliance.Scope of Level 2 Maintenance.Level 2 maintenance typically includes the following tasks:Detailed inspection and cleaning of equipment components.Lubrication and adjustment of moving parts.Replacement of worn or damaged parts.Minor repairs and troubleshooting.Calibration and testing.Frequency of Level 2 Maintenance.The frequency of Level 2 maintenance depends on the type of equipment, operating conditions, and manufacturer recommendations. However, it is generally recommended to perform Level 2 maintenance every 3-6 months.Procedure for Level 2 Maintenance.The procedure for Level 2 maintenance typically includes the following steps:1. Preparation: Shut down the equipment, isolate it from power, and lock out/tag out to ensure safety.2. Inspection: Conduct a thorough inspection of all equipment components, including visual inspection, vibration analysis, and temperature monitoring.3. Cleaning: Clean all equipment components to remove dirt, debris, and contaminants.4. Lubrication and Adjustment: Lubricate moving partsaccording to manufacturer specifications and adjust them as needed to ensure smooth operation.5. Replacement: Replace any worn or damaged parts with new or refurbished parts.6. Repair: Perform minor repairs and troubleshooting to restore equipment to proper operating condition.7. Calibration and Testing: Calibrate sensors and instruments, and perform functional testing to verify that the equipment is operating correctly.8. Documentation: Document all maintenance tasks performed, including parts replaced, adjustments made, and any abnormalities found.Benefits of Level 2 Maintenance.Implementing a Level 2 maintenance plan can provide numerous benefits, including:Reduced downtime and increased productivity.Improved equipment reliability and longevity.Lower maintenance costs over the long term.Enhanced safety and compliance with regulatory requirements.Conclusion.A well-structured Level 2 maintenance plan is essential for maintaining the efficiency, reliability, and longevity of production equipment. By following a comprehensive maintenance schedule, businesses can prevent breakdowns, minimize downtime, and extend the life of their assets.中文回答:生产设备二级保养计划模板。
1.目的:建立一个全自动口罩机(一拖二)使用及维护标准操作规程。
2.范围:适用于全自动口罩机(一拖二)的操作及维护。
3.责任人:生产部操作人员。
4.规程:4.1设备操作规程4.1.1开机步骤:打开空气压缩机电源和空气开关,每台设备上按“复位”按钮让设备进行复位,复位完成后,把设备上和“手 /自动”拔到自动状态;4.1.2将物料至于物料架上面,开启片料成型机电源;4.1.3初始化片料成型机后,启动片料成型机;慢速运行布料至压片成型位置牵引口罩片正常后暂停片料成型机;4.1.4开启耳带焊接机电源,4.1.5初始化焊耳机后,调至手动模式,将耳带穿好牵引正常;4.1.6按绿色启动键。
开启分片机电源,初始化分片机后,按绿色启动键;4.1.7开启片料成型机,调整调速开关,检查出片是否正常。
4.1.8开启联机操作。
4.1.9常见故障处理:设备上有全中文触摸屏,自动运行中如有异常发生,只需按触摸屏上的异常信息排除异常后按“启动”键,设备将继续自动运行!4.1.10触摸操作说明:在手动状态上可以点相对应的键进行手动操作,一般是初次调试的使用,正常生产过程中不会用到手动操作。
4.1.11参数页面(进入需要密码),是设备自动运行时需要设定的相关参数,一般出厂时都设定好了,一般不得修改,一定要修改时,应先记录好当前参数再修改,不合适时再按修改前的参数设置。
4.2维护和保养4.2.1每日操作,由生产操作员工完成,并填写设备使用记录。
4.2.1.1经常检查对辐部分,清洁杂物碎屑。
4.2.2每月维护保养两次,由设备检修员完成,并填写《设备维护保养记录表》。
4.2.2.1检查部件完好情况:查看紧固部件有无松动开关是否正常工作。
如有损坏,应及时更换。
4.2.2.2对设备进行大清理时,清除所有的积粉。
把各个机构用干净的干布擦拭干净。
电器箱内部应使用吸尘器吸干净。
4.2.2.3对传动系统及其他润滑点进行加油润滑,以保证系统运转稳定。
生产设施保养检修计划表QR(6.3)04NO:1设备名称:冲床保养类型检查内容计划时间备注每日1)清洁机器表面。
每日上午10:00前检查,下班进行保养2)检查油压。
3)检查各开关及功能按键是否正常。
4)检查机器运转是否正常。
5)检查各安全防护装置是否正常。
每周1)清洁并加黄油于滑轨及丝杆。
每周日下班进行保养每月1)清洁并加黄油于线性滑轨、丝杆及滑块。
每月30号下班进行保养2)清洁各输油管。
3)检查并清洁主机箱。
4)清洁配电箱。
5 )清洁各控制箱。
每季度1)检查保险块是否正常。
3月、6月、9月、12月15日为季度保养日2)检查近接开关的安装是否稳固。
3)检查丝杆上下刻度是否精确。
每年1)检查机械部分的固定螺丝是否有松动。
春节放假前进行保养2)清洗油冷却器。
3)清洗油箱。
4)清洗滤油器。
5)检查液压油是否需要更换。
6)注入润滑油脂在轴承上。
7)检查机身外面的电线。
如损伤须更换。
8)检查油压马达部分轴承组合是否有噪音发出,重新注入润滑油脂或更换新轴承。
9)重新检查机身水平。
10)重新检查锁模固定板与移动板之间的平行度。
11)检查压力,速度的线性比例,如有需要可重新调整。
12)检查系统压力是否有过高或过低。
13)检查机器个部分是否有漏油现象。
生产设施保养检修计划表QR(6.3)04NO:2设备名称:电阻焊机保养类型检查内容计划时间备注每日1)清洁机器表面。
每日上午10:00前检查,下班进行保养2)检查气压。
3)检查各开关及功能按键是否正常。
4)检查机器运转是否正常。
5)检查各安全防护装置是否正常。
每周1)检查并清洁电极头。
每周日下班进行保养每月1)清洁并加黄油于线性滑轨、滑块。
每月30号下班进行保养2)清洁各气道。
3)检查并清洁主机箱。
4)清洁配电箱。
5)清洁各控制箱风扇。
每季度1)?检查冷水箱散热效果。
3月、6月、9月、12月15日为季度保养日2)检查各润滑部位的运行情况。
3)设备生产中有无异常响声。