文档管理系统介绍(英文版)PPT课件
- 格式:ppt
- 大小:12.21 MB
- 文档页数:98
CONTENT1. PURPOSE (3)2. SCOPE (3)3. DEFINITION ............................................................................ (3)4. RESPONSIBILITY............................................... ............................. (3)5. DOCUMENT HANDLING POINT ............................................. .. .. (4)6. PROCEDURE ................................................................................... . (4)7. REGISTRATION/RECORD ....................... ............................. .. (5)1. Purpose1.1 To ensure that all documents related to the Project are:-Prepared in accordance with the requirements of the contract, and (format, identification,etc.) legible, clear, dated, reviewed and authorized prior to release;-Easily traceable and retrievable;-Distributed to appropriate personnel in accordance with a documented distributionlisted; and-Retained (archived) as per requirements of the contract and protected againstdestruction and deterioration.1.2 To ensure that revised documents are properly controlled so that the right documentsare in use and that obsolete documents are prevented from being used.2. ScopeThis procedure applies to all correspondence and documents generated by XXXX and to be submitted to the owner, Class and third party if necessary formally from XXXX3. Definition3.1 Project:3.2 Files: Any written communication on the Project, including letters, faxes etc.3.3 Documents: Procedures, reports, meeting minutes, manuals, certificate and data sheet,QC inspection reports and records and others formally issued as part of the project works.3.4 Drawing: Technical drawings issued by shipyard, review or approved by owner/Class,and used for construction activity.4. Responsibility4.1 Project Manager: The Project Manager is responsible for ensuring that the documentcontrol, file management and maintenance of correspondence/document registers forthe Project are operated in accordance with this procedure.4.2 Document Controller: The document controller is responsible for:-Receiving, distribution and filing of the incoming and outgoing documents, files and drawings in proper channel;-Collect back any obsolete document or drawing to prevent from being used-Registration or record for the document handling is maintained.-Revising the document control procedure to meet the requirement andpractical operation, if necessary4.3 Project Team Members: All personals of XXXX involved in this project areresponsible for ensuring the procedure being properly implemented.5. Document Handling Point5.1 Document Controller is the only person assigned to receive and transmit document/ file/drawing in Project Team and Technical Department.6. Procedure6.1 Document / file coding6.1.1 A procedure for document or file coding and numbering is established,controlled by project manager and implement by the designated DocumentController6.1.2 All outgoing document / files from project team or Technical Center will beproperly numbered uniquely6.2 Document Transmission6.2.1 All outgoing document/files should be approved by project manager or designatedperson before sending out6.2.2 As per transmission procedure, the transmittal should be prepared and properlyapproved6.2.3 The transmittal should be signed by the receiver once the documents / files /drawings handed over.6.3 QA/QC Inspection WorksheetInspection request form and inspection reports and record for QC daily activities shouldbe prepared and submitted to owner and Class for filing by hardcopy, no transmittal isapplied.The QA/QC engineer and inspector will be the person to be responsible for suchworksheet handover.6.4 Filing6.4.1 All files, documents and drawings should be maintained one hardcopy indocument controller room6.4.2 All files, documents and drawing should be organized and classified as per type ofthe document6.4.3 Intermediate document for QA/QC can be temporarily kept in QA/QC engineer.Final or closed QA/QC document should be sent to Document Controller for filing.6.5 Control Flow chart6.5.1Drawing Submission for Approval/Review6.6 Internal Document Flow chart7.Registration/Record7.1 Document Controller is responsible for registering of incoming, outgoing and internallycirculated files, documents and drawing etc.7.2 The record should be stored in computer in spreadsheet and organized for easysearching。
65系统结构图文档管理系统(DMS)Out trayIn tray IIS ServerDatabaseGSM ModemStaff A Staff BTransporterComputerStaff A’s desk Out tray In tray ComputerStaff B’s deskOut trayIn trayNetworkRFID 文件托盘检测界面文档管理系统(DMS)是专为大规模文件管理设计的采用RFID技术的管理系统。
它依赖于远程存储和使用RFID标签的数据检索。
不需要直接接触式或对应角度方式来获取数据进行通信。
-文件流控制Staff ARegister Document Place DocumentReceived DocumentDocument DetectedComputerOut trayTake DocumentOut trayTransporterE-mailStaff BStaff AIn trayIIS ServerStaff B E-mailSMSStaff BTransporterIIS Server对文件的管理是从将贴有标签的文件放入内嵌RFID模块的托盘中开始的。
信号转交到集中管理色数据库,同时,电子邮件通知发送到收件人和助理人,负责文件的提取(SMS通知是可选的,如果GSM 调制解调器安装)。
文件闲置逾期后,系统将自动提醒预警。
一旦文件已被收集并被收件人重新放置时,系统会在授权范围内使用电子邮件通知返回给文件的提交人。
通过预先警报设置,在出现错误交接的文件,错误放置的文件,以及逾期申请的和逾期交付的文件时,系统将自动报警或提醒。
此外,在每次文件被处理的时候,系统将为文件附上无法篡改的与每台PC的系统日期时间和用户名关联的时间属性标签。
这提供了一个有效的方法跟踪和追踪文件,从而颠覆了传统的贴标签与封条的管理机制。