当前位置:文档之家› 沉箱内力计算

沉箱内力计算

沉箱内力计算
沉箱内力计算

六、墙后土压力计算已知信息

水的重度γ:10.25KN/m 3

9.8

N/kg α

0码头后填料:块石

17KN/m 3

填料水下重度10

4.445

m

Kan ==

0.172沉箱顶面以下考虑δ=φ/3=

15

°

tg δ=0.267949

Kan =

Kax ==0.15455Kay ==

0.04141

E H

=

(e n1+e n2)h n /2cos α

E V =E H tg δcos α=1

<1>码头后填料土压力1.极端高水位

e 4.5=0.00e 3.68= 2.39kpa

0.98061e 1.4= 6.30kpa 9.91266e 1.4’=

5.68kpa

e -18

=32.14kpa

366.804

土压力引起的水平向作用

E H =377.70KN/m M EH =2951.605825E V

=101.20KN/m M EV

=

1862.147258

2.设计高水位

e 4.5

=0.00e 2.64= 5.43kpa 5.04537e 1.4=7.55kpa 8.04622e 1.4’=

6.80kpa

e -18

=34.87kpa

404.222

土压力引起的水平向作用

E H =417.31KN/m M EH =3308.788109E V

=111.82KN/m M EV =

2057.466053

2.设计低水位

e 4.5

=0.00E H

e 1.4

=

9.04kpa

14.0149

矩形仓的横截面内缘的最大边长L:tg 2(45°-φ/2)0.16Kancos(δ+α)重力加速度g:填料重度γ:e n2=

e n1=(一)码头后填料土压力

e 1.4’=8.14kpa e 0.2=

11.30kpa

11.6653e -18

=39.43kpa

461.577

土压力引起的水平向作用

E H =487.26KN/m

M EH =3929.227519E V

=

130.56KN/m

M EV

=

2402.305048

e 4.5~1.4=8.578644kpa

e 1.4~-18=7.727407kpa 水平作用176.5055KN/M

26.59379566149.9116882

竖向作用

Eq V =47.2945KN/M 倾覆力矩

M EH =

3465.427KN.m M EV =

870.2188KN.m

(二)堆货荷载土压力Eq H

=

(三)门机荷载土压力

°

KN/m3填料内摩擦角φ:45°

KN.m

KN.m

KN.m

KN.m

KN.m KN.m

相关主题
文本预览
相关文档 最新文档