Fire Fighting System Maintenance Checklist/消防灭火系统维护清单 PART III: Quarterly Check Item/第三部分:季度检查表 Quarterly Checklist for Fire Fighting System 消防系统季度检查表
No Item/检查项目 Inspection Results 检查结果 Note/备注
Fire Alarming System/火灾自动报警系统 Fire Detectors/火灾探测器①
1 If voltage is 24V 工作电压是否正常(24V)
2 Installation angle < 45°② 安装角度小于45°
3 Good contact with foundation② 和底座接触良好
4 Surface clean and not obstructed 表面清洁,未被阻挡
5 No obstructions in 0.5m 在0.5m的范围内无障碍物
6 If power supply is OK 电源指示灯是否闪亮
7 Alarm functional test 报警功能测试
8 Signal transition and alarm function 信号传输及报警功能
Interaction control Facilities/ 联动控制设备③
1 Heat and smoke release system functional test (auto and manual mode) 防排烟设备功能测试(手动及自动) Semi-yearly/每半
年
2 Fire rolling shutter functional test (auto and manual mode) 防火卷帘门功能测试(手动及自动)
3 No obstructions under fire rolling shutter 防火卷帘门下无障碍物
4 Fire alarming system and emergency lighting system functional test 火灾事故广播及事故照明系统功能测试(手动及自动)
5 No obstructions to fire emergency lighting system 在事故照明系统周围没有障碍物阻碍视线 6 Signal transition and alarm function 信号传输以及报警功能测试 Yearly/每年
Fire Incident Communication/ 消防通讯设备
1 Communication with central fire control panel 消控中心与各点通讯正常
Quarter 1 Fire Fighting System Maintenance Checklist/消防灭火系统维护清单 Fire Alarm Button/手动报警按钮 1 If fixed firmly/ 安装是否牢固
2 If there is enough clearance 周围是否有足够操作空间
3 Any damage or broken 是否有破损
4 If quantity enough 数量是否足够
5 Alarm functional test 报警功能测试
Randomly pick 2
sets 任选两组
Power Supply System/供电系统 1 Auto switch function test 主、备电源自动切换装置功能正常 1~3 test 测试1~3次
2 Backup power system recharging test 备用电源充放电试验 1~2 test 测试1~2次
3 Conjunction box/ 接线盒
4 No loose connection/ 接线端子连接牢固
5 Clean surface/ 表面清洁
6 No damage/ 无破损
Auto-Switch Function/自动切换功能 1 Non fire fighting power shut off test③ 强制切断非消防电源功能试验
Fire Alarm Control Panel/火灾控制盘(柜) 1 No loose connection/ 接线端子连接牢固
2 Clean surface/ 表面清洁
3 No damage/ 无破损
4 If there is enough clearance 周围是否有足够操作空间
5 If grounding well/ 是否有可靠接地
6 If fixed firmly/ 安装是否牢固
Alarm valve station functional test/ 报警阀组功能测试
1 Water Pressure (bar)/ 水压(bar) Meet design spec. 符合设计要求 Fire Fighting System Maintenance Checklist/消防灭火系统维护清单 2 Alarm functional test 水力警铃报警性能
3 Water flow indicator functional test④ 水流指示器功能测试
4 Presser switch functional test④ 压力开关功能测试
5 Fire pump start test/ 消防泵是否启动 > 5min 运转大于5min
6 If pressure before and after valve balanced 阀站前后压差是否平衡
Outdoor Control valve/室外控制阀门 1 In the correct Open-close status 开关状态正常
2 If valves were secured by chain or other devices 阀门是否被锁链或其他装置锁定
3 Lubricant Oil/ 是否已添加润滑油
4 Housekeeping in valves wells 室外阀门井中是否有其他杂物
5 If valves were broken 阀门是否有破损
Indoor Fire Hydrant System/室内消防栓系统 1 No missing components 消火栓、水枪、水带、消防水喉,垫圈是否齐全
2 No rust on surface/ 表面无锈蚀
3 No broken parts/ 外观无损坏,
4 No malfunction on alarm control 报警控制线路无故障
5 Lubricant oil/ 润滑油已添加
6 Pump could be start within 5min after fire alarm⑤ 水泵在报警5分钟之内启动
Fire Hydrant System/室外消防栓系统 1 No obstruction around fire hydrant 消防栓周围无杂物
2 No broken parts / 消防栓外观无损坏
3 Feed pressure is ok/ 水压符合要求
4 No water leakage/ 消防栓不漏水 Fire Fighting System Maintenance Checklist/消防灭火系统维护清单 Malfunction Elimination Status/故障排除情况 No. Item Description/情况描述
Respon. Person 负责人 Completion Date
完成日期
Inspected By/检查人 :_____________________ Date/日期:________________________ Reviewed By/审核人⑥:_____________________ Date/日期:________________________ Note/说明
1. 25% spot checks should be conducted every quarter, all fire detectors should be covered in a yearly base 每季度抽检25%火灾探测器,每年对所安装的火灾探测器检查一次 2. Visual inspection in case there is no safe access to fire detectors 在无安全通道的条件下,可采取目测检查 3. Should be conducted in precondition of no significant adverse impact to normal production and no damage to tested equipments 应在对生产没有不良影响和对设备没有损坏的条件进行测试。 4. Both alarm and signal transmission function should be checked 警报以及信号传输功能检查 5. Should be conducted in precondition of no damage to fire alarm button 应在对火灾报警按钮无损坏的前提下进行 6. Inspection results and malfunction elimination status must be reviewed by plant fire safety responsible person.
每次检查结果和故障消除情况必须由工厂消防安全负责人审核。