透明玻璃隔热涂料施工流程 - Curtain Coating 施工工序:
- 格式:pdf
- 大小:223.03 KB
- 文档页数:16
透明玻璃隔热涂料施工流程Painting Guide of Transparent Glass Heat Insulation Paint自流法Curtain Coating施工工序:Painting Procedure1、玻璃清洁 Glass cleaning2、涂料调配 Mixing paint3、贴胶纸及回收槽Stick glue paper and recovery tank4、涂玻璃涂料Curtaining the glass paint5、拆除胶纸及回收槽Tear glue paper and recovery tank6、清洁现场 Cleaning surroundings一、玻璃清洁流程Glass Cleaning Procedure玻璃清洁工具:Glass Cleaning Tools钢丝球、海绵清洁球、清洁水、磨擦剂、喷水壶、水桶、玻璃雨刮、玻璃铲刀、裁纸刀、无纺布、毛巾、酒精等Wire wool, Sponge cleaning ball, Cleaning water, Abrasive, Water can, Water barrel, Glass spatula, Paper knife, Non-woven fabric, Washcloth, Alcohol, etc.清洁前的准备Preparation before cleaning1、整理、清洁施工现场(一般直径在一米范围内),适当时允许地面有微量洒水Clean up the painting place (within one square meter), sometimes need watering2、地面无油脂、异物、灰尘Without grease, dust, smudginess3、准备好清洁用的所有工具及清洁用品,整齐摆放Prepare all cleaning tools and cleaning things, put in order玻璃清洁程序及要求Glass Cleaning Procedure and Requirement1、用手动喷水壶喷洒清水在玻璃表面,玻璃铲刀在玻璃表面从上到下清理顽固异质。
Watering on the glass surface, then clean out the smudginess attached on the glass surface with the glass spatula.2、用玻璃清洁剂喷洒水在玻璃表面,用普通清洁球在玻璃表面从上到下清洁,然后用玻璃雨刮刮除玻璃上的杂物Use the glass cleanser and cleaning ball to clean up the glass surface, then clean out the smudginess attached on the glass surface with the glass spatula.3、用手动喷水壶喷洒清水在玻璃表面,用玻璃雨刮刮除玻璃面上的水分。
重复2次,让玻璃彻底清洁干净。
Watering on the glass surface, then clean out the water attached on the glass surface with the glass spatula, repeat two times, make the glass clean completely.4、让玻璃自然干燥10分钟,用白色无纺布加上工业酒精后再擦一遍。
Make the glass natural dry 10 minutes, then use the non-woven fabric and alcohol wipe the glass again.注意事项Remarks1):玻璃有裂痕不得施工Do not painting if the glass has crack.2):玻璃表面有不规则或异样应向用户明确反映和说明事实情况Explain the factual circs for customers when the glass has abnormity.3):彻底清洁玻璃表面Cleaning the glass surface completely.4):彻底清洁玻璃表面四周Cleaning the glass around completely.5):彻底铲除和清洁玻璃表面四周不明显的玻璃胶脂Clean up the unconspicuous glass resin attached on the glass surface and around二、涂料调配流程Mixing the paint调配工具:Mixing Tools量杯、磁力搅拌器、涂料(A、B组)、400目过漏纱布、漏斗、针管Measuring cup, Magnetic force stirrer, Glass paint (A,B group), Filtration cloth for 400 mesh, filler, Needle syringes调配前的准备Preparation before mixing按工程大小准备好足够的涂料和所用工具Prepare enough paint and tools according to the project涂料调配程序及要求Procedure and Requirement of Mixing the Paint1、将A组份水性涂料倒入量杯并将磁力搅拌器的磁铁放入量杯中,放在磁力搅拌器上均衡搅拌3-5分钟Put the A group paint and magnetic stick into the measuring cup, the put it on the magneticforce stirrer and stir the paint 3-5 minutes.2、按比例9︰1加入B组份水性涂料继续均衡搅拌8-10分钟Put the B group into the measuring cup according to the proportion of A:B=9:1 and stir the two group 8-10 minutes3、搅拌完成后,通过400目过漏纱布和漏斗将搅拌好涂料装进施工专用的压力喷壶中并盖上封口。
After mixing, put the mixing paint into the special watering can with the 400 mesh filtration cloth and filler.将装有涂料的喷壶静置3-5分钟,进入施工状态。
Put the filled watering can 3-5 minutes, then ready to painting.注意事项Remarks1、涂料调配过程中可适当加入1%的蒸馏水,但一定是在加入B组份水性涂料后2-5分钟内一次性完成并继续均衡搅拌;It can add 1% distilled water when mixing the paint after adding B group 2-5 minutes.2、磁力搅拌器不能加热和保温Do not heat up and heat preserve the magnetic force stirrer.3、400目过漏纱布始终保持潮湿,并且当过滤纱布在过滤完涂料后应立即水清洗纱布.Keep the 400 mesh filtration cloth wet, cleaning it immediately after using it.4、A+B=5公斤标准调配,循环施工使用According to the standard proportion of A+B=5 kg, circular painting.三、贴胶纸及回收槽流程Stick glue paper and recovery tank工具:Tools小型气泵、下料盛料器、下料塑料管、下料调节开关、扁形出料口、铝铂纸、收料器、美工纸、胶纸、收料槽、平面地胶、锡泊纸、塑料胶管刷子Minitype pump, Container for paint, Plastic pipe, Adjust switch, Flat discharge hole, Foil paper, Incoming equipment, Art design paper, Glue paper, Incoming tank, Silver paper, Brush, etc.贴胶纸及回收槽程序及要求Procedure and Requirement of Sticking Glue Paper and Recovery Tank1、玻璃两边框架粘贴专用胶纸Stick special glue paper on glass frame both sides.2、玻璃上面框架粘贴专用美工纸Stick special art design paper on the top glass frame.3、玻璃下面框架粘贴专用收料槽Stick special incoming tank on the underside glass frame.注意事项Remarks1、粘贴部位无气泡No air bubble on the stickup place.2、粘贴部位间隙大小误差不得大于1毫米The size error of stickup place is not more than 1 mm.3、粘贴胶纸与玻璃接触面应在2毫米范围内The glass interface and stickup glue paper should within 2 mm bound.4、粘贴胶纸后一定要用塑料刮刀收理粘贴部位Use the glass spatula to clean up the stickup place after sticking the glue paper.5、玻璃下方框架粘贴专用收料槽,四周应稳固无气泡Stick special incoming tank on the underside glass frame, it should fixing and no air bubble.四、涂玻璃涂料流程Procedure of Curtaining the Glass Paint工具Tools专用喷壶Special watering can涂料前的准备Preparation before painting淋涂玻璃涂料的程序及要求Procedure and Requirement of Curtaining the Glass Paint1、将调配好的涂料过滤到专用喷壶加压Filtrate the mixing paint into the special watering can.2、向喷壶内加压,并静置2-3分钟;Adding pressure for watering can, the put 2-3 minutes.3、用干的白色无纺布将玻璃表面再抹擦一次Clean up the glass surface again with the dry non-woven fabric.4、左肩背涂料喷壶,右手持枪,大母指控制枪栓Take the watering can on the left shoulder, hold the spray gun with the right hand, control the gun bolt with the thumb.5、试枪,枪头放置玻璃左边底部(长1.5米以下玻璃)或玻璃左边中部(长1.5米以上玻璃)大拇指缓慢开动枪栓,枪头均匀缓慢向上部移动至上部美工纸处;Test the spray gun, put the gun mouth on the bottom of left side of glass (less than 1.5 meter height glass) or on the middle of left side of glass (more than 1.5 meter height glass), open the gun bolt slowly, then move the gun mouth to the top of the glass.6、均匀、缓慢、平滑向玻璃右部移动至玻璃最右部,枪头停留、紧靠玻璃最右部框架2-3秒钟后向玻璃右边底部均匀、缓慢、平滑移动,目测涂膜无流到之处应将枪头移至该处补枪(涂料)直到整块玻璃完全均匀涂上涂料为止。