chapter2.4【VIP专享】
- 格式:ppt
- 大小:503.51 KB
- 文档页数:11


The printed copy is uncontrolled
MAINTENANCE MANAGEMENT MANUAL
CAAC CERTIFICATED MAINTENANCE ORGANIZATION # D.101131 Aircraft Maintenance and Engineering Corporation, Beijing
REV –17 CHAPTER 15
DATE:Aug.24th, 2012 Page 1
CHAPTER 15
SAFETY MANAGEMENT SYSTEM
TABLE OF CONTENTS
PARAGRAPH PAGE No.
1. MANAGEMENT COMMITMENT AND PLANING........................3
1.1 GENERAL REQUIREMENTS...........................................3
1.2 SAFETY POLICY AND SAFETY OBJECT.......................5
1.3 QUALITY POLICY.............................................................6
1.4 SAFETY PLANNING.........................................................6
1.5 ORGANIZATIONAL STRUCTURE AND RESPONSIBILITIES
.................................................................................................8
1.6 COMPLIANCE WITH LEGAL AND OTHER REQUIREMENTS
第五章 物 料 平 衡
催化裂化装置的物料平衡可以用来衡量装置的运行水平。相同的原料生产出来的目的产品愈多说明运行水平愈高。催化裂化一般要衡量汽油收率、轻质油收率、液化气(气体)收率或轻烯烃收率。
催化裂化反应部分的物料平衡又是催化裂化装置众多平衡中最为重要的。可靠的反应物料平衡是求得其他平衡(如热平衡等)的依据。
不同原料不同操作条件可以得到不同的产品产率,新装置设计第一步就是预测物料平衡数据,有关内容请参见本书第二章。
本章重点介绍催化裂化生产装置如何获得公正客观的物料平衡数据,采用的技术分析方法如氢平衡等也适用于新装置设计数据的合理性验证。
第一节 装置物料平衡及产品收率
对生产装置而言,只根据计量做出装置的物料平衡有一定难度。在生产标定中,应通过各种措施,使标定反映客观准确的情况,物料平衡至少应在100±2%之间,否则就应视为不平衡。下面对标定时物料平衡各个环节进行详细论述。
一 计量
(一)油品计量
1 油罐检尺
物料量以油罐检尺较准。油罐检尺应有专人负责,检尺前应对油罐进行脱水。在对产品分布进行标定时,最好不要换罐,以免因多次检尺造成不必要的误差。在标定前后,需对油罐进行检尺及取油样,测定密度,同时测定油罐温度。油样应取罐的上、中、下三点的混合样品。油罐尺寸应定期请有关单位检验或标定。
本章介绍的检尺数据换算为实际物料量的方法,为工程计算中实用的简算方法,在实际条件许可时,应按有关的标准进行精确校正。
[例5-1] 已知某催化裂化装置标定时,油品罐区的检尺数据如下:
① 相对密度
馏分油 d420 : 0.8513,0.8508
DAO d420:0.8802,0.8808
汽油 d420:0.7165,0.7177
轻柴油 d420:0.8715,0.8732
② 24小时油罐检尺量
馏分油:前尺:V=8686.081m3 t=81℃
SIMATIC
STEP 7 V5.4 Programming Software for SIMATIC S7 / M7 /
C7
Notes on Installation and Usage
These notes should be considered more up-to-date than the information in other
documents. Read the notes carefully, because they contain information on installing
and using STEP 7 V5.4.
Note when printing the file that the left and right margins are set to a width of 25 millimeters for A4 portrait format.
Contents
Notes on Installation
1 Contents of the Consignment
2 Hardware Requirements
3 Software Requirements
3.1 Operating Environment
3.2 Memory Requirements
3.3 Compatibility with Other Software Products
3.3.1 Rational ClearCase
3.3.2 Network Settings when Using other Software Products
3.3.3 Interdependency with An Installed S7 Fault-tolerant System
3.4 Online Documentation
3.5 Upgrading from an earlier STEP 7 version and changing over from STEP 7 Lite
VDA Structure Component Requirement Specification Module I CRS Universal Requirements