建设工程英文合同范本

  • 格式:doc
  • 大小:21.00 KB
  • 文档页数:4

建设工程英文合同范本

CONSTRUCTION CONTRACT

This Construction Contract (the "Contract") is made and entered into as of

[Contract Date] and between [Owner's Name] (the "Owner") and [Contractor's

Name] (the "Contractor").

Article 1 Project Description

The Owner intends to undertake a construction project (the "Project") at

[Project Location]. The Project shall consist of [Brief description of the scope of

work, including but not limited to the type of construction, structures to be built,

and any other relevant detls].

Article 2 Contract Price and Payment Terms

2.1 The total contract price for the Project is [Contract Price] (inclusive of all

taxes, duties, and other charges).

2.2 The Owner shall make progress payments to the Contractor as follows:

[Describe the payment schedule, including milestones and the percentage of

the contract price to be pd at each milestone].

Final payment shall be made upon pletion and acceptance of the Project,

subject to the provisions of Article [Article Number] of this Contract.

Article 3 Project Schedule

3.1 The Contractor shall mence the Project on or before [Commencement

Date] and shall plete the Project [Completion Date].

3.2 The Contractor shall submit a detled project schedule to the Owner

within [Number of Days] after the execution of this Contract. The schedule shall

include the start and pletion dates of each major activity and shall be subject to

the Owner's approval.

Article 4 Workmanship and Materials

4.1 The Contractor shall perform the work in a good and workmanlike

manner, in accordance with the applicable industry standards and the

requirements of this Contract. 4.2 The Contractor shall use only new and quality materials in the

performance of the work. All materials shall be subject to the Owner's inspection

and approval prior to use.

Article 5 Changes and Extra Work

5.1 Any changes to the scope of work or additional work required the

Owner shall be subject to a written change order. The change order shall specify

the nature and extent of the change, the impact on the contract price and project

schedule, and any other relevant terms and conditions.

5.2 The Contractor shall not proceed with any change or extra work without

a written change order from the Owner.

Article 6 Inspection and Acceptance

6.1 The Owner or its representative shall have the right to inspect the work at

any time during the progress of the Project.

6.2 Upon pletion of the Project, the Contractor shall notify the Owner in

writing that the Project is ready for final inspection and acceptance. The Owner

shall conduct the final inspection within [Number of Days] after receipt of the

notice.

6.3 If the Project is found to be in pliance with the requirements of this

Contract, the Owner shall issue a written acceptance certificate. If the Project is

not in pliance, the Contractor shall be required to make the necessary corrections

and resubmit the Project for final inspection.

Article 7 Warranties and Guarantees

7.1 The Contractor warrants that the work performed under this Contract

shall be free from defects in workmanship and materials for a period of

[Warranty Period] from the date of final acceptance.

7.2 The Contractor shall also guarantee that the Project will meet the

performance specifications and requirements set forth in this Contract for a

period of [Guarantee Period] from the date of final acceptance.

Article 8 Insurance and Bonds

8.1 The Contractor shall obtn and mntn, at its own expense, the following

insurance policies: Workers' pensation insurance as required law.

General liability insurance with a minimum coverage of [Insurance Amount].

Builder's risk insurance to cover the Project during the construction period.

8.2 The Contractor shall also provide a performance bond and a payment

bond in the amounts of [Bond Amount] to guarantee the fthful performance of

the Contract and the payment of all subcontractors and suppliers.

Article 9 Dispute Resolution

9.1 In the event of a dispute arising out of or in connection with this Contract,

the parties shall attempt to resolve the dispute through friendly negotiation.

9.2 If the dispute cannot be resolved through negotiation within [Number of

Days], either party may submit the dispute to arbitration in accordance with the

rules of the [Arbitration Institution]. The arbitration award shall be final and

binding on both parties.

Article 10 Termination of Contract

10.1 Either party may terminate this Contract in the event of a material

breach the other party. A material breach shall include, but not be limited to, the

flure to perform the work in accordance with the requirements of this Contract,