7.12
Hale Waihona Puke Job (Shop) Order or Related Customer or Internal Reference Documentation PSA Question # Requirement客户或内部要 Requirement工作(车间)指 相关PSA问题# 求 令单或参考文件要求 1.2 1.4 1.6 1.2 1.4 1.6 1.11 1.17 2.11 2.13 1.17 2.6
2.9 2.9
2.3 2.3 2.9
Question Number问 题编号# 7.11
Job Audit Question作业审核问题 Were steps/operations performed that were not documented in the Control Plan? 有没有执行控制计 划中没有的步骤/操作? If additional steps were performed, were they authorized?如果有另外的步骤被执行,这些步骤是否 被授权?
7.2
7.3 7.4
7.5 7.6
7.7
7.8
7.8.1
7.8.2
7.8.3
Requirement: Hydrogen Embrittlement Relief (if Applicable)要求:氢脆释放(如适用)
This includes the transition time from the plating bath to the oven plus heating time. The time to temperature is different for different customers. The most strict (shortest heating time) requirements shall be met. 这包括零件 从电镀槽到烘箱的时间加 上加温的时间,不同的顾 客对到达温度的时间要求 会不同。应满足最严厉的 要求(最短的加温时间)
Actual Condition Pass / Fail / N/A (Objective Evidence) 通过/不通过/不 实际情况(客观证据) 适用
If the order was certified, did the certification accurately reflect the process performed?如果订单被 确认,确认书是否准确反映其操作流程? Was the certification signed by an authorized 7.14 individual?确认书的签署人是否被授权? Are the parts and containers free of foreign objects or 7.15 contamination?零部件和装载容器是否与避免外来物 体或污染物? Packaging Requirements包装要求 Are packaging requirements identified? 7.16 是否有明确的包装要求? Are parts packaged to minimize mixed parts (parts 7.17 packed over height of container)?零件包装是否尽量 减少零件混装(包装零件高度大于装载容器) Shipping Requirements发运要求 Were the parts properly identified? 7.18 零件是否进行适当识别? 7.19 Were the containers properly labeled?运载容器是否 有标签标识? 7.13
CQI-11内部审核检查表(续)
Section7 - Job Audit - Finished Product Review第7部分-作业审核-成品检查
Job Identity工作性质: Customer客户: Shop Order Number车间订单号: Part Number零件号: Part Description零件名称: Material材质: Plating Requirements电镀要求: Question Number问 题编号# 7.1 Job (Shop) Order or Related Customer or Internal Actual Condition Pass / Fail / N/A Reference Documentation PSA Question # Requirement客户或内部要 (Objective Evidence) 通过/不通过/不 Requirement工作(车间)指 相关PSA问题# 实际情况(客观证据) 求 适用 令单或参考文件要求 Are contract review, advance quality planning, FMEA, 1.2 Control Plans, etc., performed by qualified 1.3 1.4 individuals? 有相关资格的人员是否进行合同评审,先 1.17 期质量策划,FMEA,控制计划等? Does the plater have the proper customer 1.5 specifications for the part?电镀厂是否拥有有关客户对 零部件的具体要求? Is a shop traveler created to meet customer 1.6 2.1 requirements?是否根据客户要求编制车间导视图? Is material identification (part numbers, lot numbers, 2.2 contract numbers, etc.) maintained throughout the 2.3 plating process?电镀过程中是否保持物料识别(零部件 2.4 编号,批号,合同号等) Is there documented evidence of Receiving 2.1 Inspection?是否有文件化的进料检查证明? 1.6 Are the Loading / Racking requirements identified?是 2.7 否明确装载/上挂要求 2.9 Is the proper procedure or process specification 1.5 used? Refer to Process Tables for specific 1.6 parameters. List parameters that were verified in this 2.1 audit in the spaces provided below.是否采用适当的程 2.11 序或工艺规范?具体参数参考过程表。列出审核中检 2.13 查的参数,填入下列空格内 Each part may have one or more requirements determined by the plating specification. Parts What are the product inspection requirements?产品 2.13 must meet each requirement. List each requirement below and validate.根据电镀规范,每个零 检查要求是什么 件都有1个或多个要求,零件必须达到场每一项要求。将每一项要求列在下方,并进行查验。 Job Audit Question作业审核问题 Requirement: Plate Thickness要求:镀层厚度 Test Method检验方法: Test frequency or quantity 检验频率或数量: Selection of samples样本选择: Specification规范: Requirement: Corrosion Resistance要求:耐蚀性 Test Method检验方法: Test frequency or quantity 检验频率或数量: Selection of samples样本选择:
N/A
Test Method检验方法: Test frequency or quantity 检验频率或数量: Selection of samples样本选择: Specification规范: Requirement: Adhesion Test要求:附着力测试 Test Method检验方法: Test frequency or quantity 检验频率或数量: Selection of samples样本选择: Specification规范: Operator or Inspector Responsibilities 7.8.4 7.9 Were appropriate process steps signed off? 相应的工 序步骤是否被批准? 7.10 Were all inspection steps, as documented in the Control Plan performed?控制计划中规定的所有检查 步骤是否被执行? 1.4 2.2 2.3 2.11 1.2 1.4