精益六西格玛英文缩略语
- 格式:doc
- 大小:188.00 KB
- 文档页数:13
质量管理术语缩写汇总1. QS:Quality System2. FMEA:Failure Mode and Effects Analysis3. SPC:Statistical Process Control4. MSA:Measurement System Analysis5. CIP:Continuous Improvement Process6. ISO:International Organization for Standardization7. PDCA:Plan-Do-Check-Act8. APQP:Advanced Product Quality Planning9. PPAP:Production Part Approval Process10. 6Sigma:Six Sigma11. DOE:Design of Experiments12. MTBF:Mean Time Between Failures13. MTTR:Mean Time To Repair15. QFD:Quality Function Deployment16. TQM:Total Quality Management17. 5S:Sort, Straighten, Shine, Standardize, Sustain18. FIT:Failure in Time19. GAGE R&R:Gage Repeatability and Reproducibility20. OEE:Overall Equipment Effectiveness21. RCA:Root Cause Analysis22. SQC:Statistical Quality Control23. 8D:8 Disciplines24. AQL:Acceptable Quality Level25. CP:Control Plan26. CTQ:Critical to Quality27. CPK:Process Capability Index28. CCPM:Critical Chain Project Management29. CEDAC:Causal Effective Diagram with the Addition of Cards30. QCC:Quality Control Circle31. AFC:Adaptive Feedback Control32. GQM:Goal – Question – Metric33. KPI:Key Performance Indicator34. TQC:Total Quality Control35. VDA:Verband der Automobilindustrie36. WCM:World Class Manufacturing37. CAR:Corrective Action Request38. FVA:Failure Mode and Effects Analysis39. KAIZEN:Continual Improvement40. 5W2H:What, Why, Who, When, Where, How and How Many41. BOM:Bill of Materials42. IHI:Institute for Healthcare Improvement43. QMS:Quality Management System44. VSM:Value Stream Mapping45. VSM:Vital Sign Monitoring46. SGA:Statistical Gage Analysis47. SPC:Statistical Process Control48. SMED:Single-Minute Exchange of Die49. LPA:Leadership Performance Assessment50. DFMEA:Design Failure Modes and Effects Analysis51. DFM:Design for Manufacturability52. DFX:Design for Excellence53. GPP:Good Practices Protocol54. CSI:Continuous Improvement System55. SLA:Service Level Agreement56. MOC:Management of Change57. MRP:Material Requirements Planning58. GMP:Good Manufacturing Practices59. LSS:Lean Six Sigma60. SIPOC:Suppliers, Inputs, Process, Outputs, Customers61. ECRS:Error Cause Removal System62. GEMBA:Go and See64. PCP:Process Capacity Plan65. QCDSM:Quality, Cost, Delivery, Safety, Morale66. ROI:Return on Investment67. TOC:Theory of Constraints68. TPM:Total Productive Maintenance70. TS: Technical Specification71. PCM:Process Control Management72. SIPOC:Supplier-Input-Process-Output-Customer73. DAR:Design of Experiments-Analysis of Results74. RSPT:Response Surface and Parameter Design Techniques75. GAP:Goal-Analysis-Plan76. GS:Goals-Strategies77. SQA:Software Quality Assurance78. JIT:Just in Time79. VRM:Value Re-engineering and Methodology80. LFA:Logical Failure Analysis81. DOS:Design of Simulation82. SVA:Systematic Variation Analysis83. SMT:Simultaneous Multi-Tasking84. IPA:Interactive Problem Analysis85. SPCA:Statistical Process Control Analysis86. DOE:Design of Experiments87. QCI:Quality Cost Index88. SCM:Supply Chain Management89. GAMP:Good Automated Manufacturing Practice。
1 SPC 统计制程管制Statistical Process Control2USL 规格上限Upper Specification Limit3 LSL 规格下限Lower Specification Limit4 UCL 管制上限Upper control limit5 LCL 管制下限Lower control limit6 PCL 前置管制中心限Per-control Central Limit7 UPCL 前置管制上限Upper Per-control Limit8 LPCL 前置管制下限Lower Per-control Limit9 Ca10 Cp 潜在过程能力指数Capability11 Pp12 Ppk13 CIP 持续改进过程模式Continuous Improvement Process Model14 ANOVA 变异数分析Analysis of Variance15 BSC 平衡计分卡Balanced Scoredoard16 信赖区间Confidence interval17 管制图Control chart18 CTQ 品质关键Critical to quality19 DPMO 每百万个机会的缺点数Defects per million opportunities20 DPM 每百万单位的缺点数Defects per million21 DPU 单位缺点数Defects per unit22 DFSS 六个希格玛设计Design for six sigma23 DOE 实验设计Design of experiment24 DOM制造设计Design of manufactring25 FMEA 故障型态与效应分析Failure mode and effect analysis26 故障率Failure rate27 Gage R&R 量规重复能力与重制能力Gage repeatability & reproducibility28 直方图Histogram29 假设检定Hypothesis testing30 KM 知识管理Knowledge Management31 MRP 物料需求规划Material require planning32 常态分配Normal distribution33 QFD 品质机能展开Quality function deployment34 6σ六个希格玛Six Sigma35 σ, s 标准差Standard deviation36 σ2, S2 变异数Variance37 ABC 作业制成本制度Activity-Based Costing38 BTF 计划生产Build To Forecast39 BTO 订单生产Build To Order40 CPM 要径法Critical Path Method41 CPM 每一百万个使用者会有几次抱怨Complaint per Million42 CRM 客户关系管理Customer Relationship Management43 CRP 产能需求规划Capacity Requirements Planning44 CS 顾客满意度Customer Satisfaction45 CTO 客制化生产Configuration To Order46 DVT 设计验证Design Verification Testing47 DSS 决策支持系统Decision Support System48 EC 设计变更/工程变更Engineer Change49 EC 电子商务Electronic Commerce50 EMC 电磁相容Electric Magnetic Capability51 EOQ 基本经济订购量Economic Order Quantity52 ERP 企业资源规划Enterprise Resource Planning53 FMS 弹性制造系统Flexible Manufacture System54 FQC 成品质量管理Finish or Final Quality Control55 IPQC 制程质量管理In-Process Quality Control56 IQC 进料质量管理Incoming Quality Control57 ISO 国际标准组织International Organization for Standardization58 ISAR 首批样品认可Initial Sample Approval Request59 JIT 实时管理Just In Time60 MES 制造执行系统Manufacturing Execution System61 MO 制令Manufacture Order62 MPS 主生产排程Master Production Schedule63 MRO 请修(购)单Maintenance Repair Operation64 MRP 物料需求规划Material Requirement Planning65 MRPII 制造资源计划Manufacturing Resource Planning66 NFCF 更改预估量的通知Notice for Changing Forecast67 OEM 委托代工Original Equipment Manufacture68 ODM 委托设计与制造Original Design & Manufacture69 OPT 最佳生产技术Optimized Production Technology70 OQC 出货质量管理Out-going Quality Control71 PDCA PDCA管理循环Plan-Do-Check-Action72 PO 订单Purchase Order73 QA 品质保证Quality Assurance74 QC 质量管理Quality Control75 QCC 品管圈Quality Control Circle76 QE 品质工程Quality Engineering77 RMA 退货验收Returned Material Approval78 ROP 再订购点Re-Order Point79 SCM 供应链管理Supply Chain Management80 SFC 现场控制Shop Floor Control81 SO 订单Sales Order82 SOR 特殊订单需求Special Order Request83 TOC 限制理论Theory of Constraints84 TPM 全面生产管理Total Production Management85 TQC 全面质量管理Total Quality Control86 TQM 全面品质管理Total Quality Management87 WIP 在制品Work In Process质量项目管理Project Quality management质量规划Quality Planning实施质量保证Perform Quality Assurance实施质量控制Perform Quality Control帕累托图Pareto Diagram镀金Gold Plating全面质量管理Total Quality Management,TQM质量审核Quality Audit持续改进Continuous Improving一致性成本和非一致性成本Cost of Conformance and Non-Conformance 鱼骨图Fishbone Diagram收益/成本分析Benefit/Cost Analysis基准对照Bench marking零库存Just in time试验设计Design of Experiment统计抽样Statistical Sampling质量哲学Quality Philosophy精密度Precision准确度Accuracy预防胜于检验Prevention Over Inspection质量和等级Quality & Grade质量管理Quality Management质量方针Quality Policy过程分析Process Analysis因果图Cause & Effect Diagram检验Inspection流程图Flow chart控制图Control Chart控制图Control Chart直方图Histogram趋势图Run Diagram散点图Scatter Diagram缺陷修理审查Defect Repair Review规划Planning培训Training过程控制Process Control设计确认Quality Validation过程确认Processing Validation测量与评估Test & Evaluation维护与校准Maintenance & Calibration废品Scrap返工Rework额外材料与库存Additional Material or Inventory 现场服务Field Service保修成本Warranty Repair投诉处理Complaint Handling责任判定Liability Judgment产品召回Product Recall产品修正措施Product Corrective Action预防成本Preventive Cost缺陷成本Failure Cost随机因素Random Cause均值Means控制界限Control Limit规格界限Specification Limit受控In Control失控Out of Control七点原则Rule of Seven趋势分析Trend Analysis属性抽样Attribute Sampling变量抽样Variable Sampling质量职责Responsibility of Quality边际分析Marginal Analysis故障模式和影响分析Failure Mode & Effect Analysis,FMEA总体Population概率Probability统计独立性Statistical Independence互斥Mutually Exclusive戴明环即PDCA——Plan计划;Do执行;Check检查;Action行动零缺陷Zero Defect质量免费Quality Is Freenon confirming report的简写,中文名称是不一致报告其实就是图纸和现场制造不一致等质量管理体系quality management system质量目标quality objective质量改进quality improvement有效性effectiveness设计和开发design and development质量特性quality characteristic合格(符合)conformity预防措施preventive action纠正措施corrective action降级regrade质量手册quality manual鉴定过程qualification process审核方案audit programme审核准则audit criteria审核证据audit evidence审核结论audit conclusion审核委托方audit client审核组audit team测量控制体系measurement control system测量设备measuring equipment计量特性metrological characteristic技术专家technical expert质量改进quality improvement供方supplier偏离许可deviation permitCAR:纠正行动要求。
六西格玛管理术语名词及解释(上)(1)DFSS:DFSS(六西格玛设计)描述六西格玛工具在产品开发和过程设计中的应用,DFSS的目标是把六西格玛绩效能力“设计其中”。
(2)DMAIC:DMAIC是界定(Define), 测量(Measure,)分析(Analyze) , 改进(Improve)和控制(Control)的首写字母缩写形式,代表过程改进/管理系统,为过程改进、设计或再设计提供了行动框架(步骤)。
(3)DPMO:每百万次机会缺陷数,是用于六西格玛过程改进行动中的一种计算,表示过程中每100万次机会中出现的缺陷数;缺陷数除以总缺陷机会数等于DPO,DPO乘以100万等于DPMO,参见DPO、六西格玛、缺陷机会。
(4)单位机会缺陷数:是用于过程改进中确定单位缺陷机会缺陷数的一种计算,缺陷数除以总缺陷机会数等于DPO,参见缺陷、缺陷机会。
(5)ISO9000:用于确认组织在形式与执行文件规范的过程方面具有能力的标准和指导原则,大多内容与质量保证体系相联系,而与质量改进无关。
(6)SIPOC:SIPOC是供应方(suppliers)、输入(inputS)、过程(process)、输出(outputS)和顾客(customer)的首先母缩写形式,是一种高度概括的过程绘图方法。
(7)SPC:统计过程控制,通过数据收集和分析来监控过程,确认过程运行问题,并判别过程变异性或能力,参见走势图、控制图。
(8)Variation:变异,是指决定过程稳定程度和可预报程度的某个具体特性的变化或波动;过程变异受环境、人员、机器/设备、方法/程序、测量和原材料的影响;任何过程改进活动都应当减少或消除变异,参见常规原因、特殊原因。
(9)Yield:产出率,是经过过程的所有步骤正确生产的全部产品。
(10)Common cause:常规原因,过程受到的日常影响,一般很难消除,除非对过程进行改变。
由常规原因导致的问题被称为“慢性病”,参见控制图、走势图或时间序列图、特殊原因、变异。
质量管理体系中英文缩写与其解释Engineering 工程/ Process 工序(制程)Man, Machine, Method, Material, 人,机器,方法,物料,环境- 可能导 4M&1E Environment 致或造成问题的根本原因 AI Automatic Insertion 自动插机ASSY Assembly 制品装配ATE Automatic Test Equipment 自动测试设备 BL Baseline 参照点 BM Benchmark 参照点BOM Bill of Material 生产产品所用的物料清单C&ED/C Cause and Effect Diagram 原因和效果图AED CA Corrective Action 解决问题所采取的措施电脑辅助设计.用于制图和设计3维物体 CAD Computer-aided Design 的软件对文件的要求进行评审,批准,和更改 CCB Change Control Board 的小组依照短期和长期改善的重要性来做持续CI Continuous Improvement 改善 COB Chip on Board 邦定-线焊芯片到PCB板的装配方法. CT Cycle Time 完成任务所须的时间 DFM Design for Manufacturability 产品的设计对装配的适合性设计失效模式与后果分析--在设计阶段 Design Failure Mode and Effect DFMEA 预测问题的发生的可能性并且对之采取Analysis 措施六西格玛(6-Sigma)设计 -- 设计阶段预 DFSS Design for Six Sigma 测问题的发生的可能性并且对之采取措施并提高设计对装配的适合性 DFT Design for Test 产品的设计对测试的适合性实验设计-- 用于证明某种情况是真实 DOE Design of Experiment 的根据一百万件所生产的产品来计算不良DPPM Defective Part Per Million 品的标准 Design Verification / Design DV 设计确认 Validation 客户要求的工程更改或内部所发出的工 ECN Engineering Change Notice 程更改文件 ECO Engineering Change Order 客户要求的工程更改静电发放-由两种不导电的物品一起摩 ESD Electrostatic Discharge 擦而产生的静电可以破坏ICs和电子设备在生产线上或操作中由生产操作员对产 FI Final Inspection 品作最后检查 F/T Functional Test 测试产品的功能是否与所设计的一样 FA First Article / Failure Analysis 首件产品或首件样板/ 产品不良分析功能测试-检查产品的功能是否与所设 FCT Functional Test 计的一样符合产品的装配,形状和外观及功能要 FFF Fit Form Function 求 FFT Final Functional Test 包装之前,在生产线上最后的功能测试失效模式与后果分析-- 预测问题的发 FMEA Failure Mode and Effect Analysis 生可能性并且对之采取措施 FPY First Pass Yield 首次检查合格率 FTY First Test Yield 首次测试合格率 FW Firmware 韧体(软件硬化)-控制产品功能的软件在波峰焊接之前,将PTH元件用手贴装 HL Handload 到PCB 上,和手插机相同 I/O Input / Output 输入 / 输出 iBOM Indented Bill of Material 内部发出的BOM(依照客户的BOM)线路测试-- 用电气和电子测试来检查 ICT In-circuit Test PCBA短路,开路,少件,多件和错件等等不良情报联络书-反馈信息所使用的一种表 IFF Information Feedback Form 格 IR Infra-red 红外线主要制程输入可变因素-在加工过程中, KPIV Key Process Input Variable 所有输入的参数/元素,将影响制成品的质量的可变因素主要制程输出可变因素-在加工过程中, KPOV Key Process Output Variable 所有输出的结果,所呈现的产品品质特征。
精益管理六西格玛——常用专业术语:筛选根据精益学习情况可随时补充专业术语什么是六西格玛西格玛大写Σ,小写σ是希腊文的字母,其小写“σ”在统计学中称为标准差;在六西格玛方法中,用来表示过程的质量水平,其中4σ=6210 /百万,5σ=230/百万,6σ=3.4/百万;一般企业的产品瑕疵率大约是3~4σ,以4σ而言,相当于每一百万个机会里有6210次误差;如果企业不断改进流程,达到6σ的程度,即在一百万个机会里只找得出3.4个瑕疪,这样的绩效已经近于完美;六西格玛作为流程改进方法论,最早是由摩托罗拉公司的比尔·史密斯于1986年提出,于20世纪90年代通过通用电气公司的实践得以发展和完善;它通过精确的数理统计和分析,找出影响质量的因素并解决问题,力求使产品和服务的质量接近6σ水平;随着实践的经验积累,六西格玛现在已不仅仅是一个衡量业务流程能力的标准和业;;;,5S管理:五个都以“S”开头的相关术语,用来描述可视化控制,及精益生产的现场操作;在日语里这五个术语是:——整理Seiri:从必要的项目¬——工具,零件,材料,文件中分离,并丢弃那些不必要的东西——整顿Seiton:整洁地布置工作区域,把所有东西放到它们应该在的位置上——清扫Seiso:打扫与清洗——清洁Seitetsu:常规性的执行前三个S所导致的清洁——纪律Shitsuke:执行前四个S的纪律Seven Wastes 七种浪费把大规模制造方法的浪费划分成七个主要类别:1.过量生产:制造多于下一个工序,或是顾客需求的产品;这是浪费形式中最严重的一种,因为它会导致其它六种浪费2.等待:在生产周期中,操作员空闲的站在一旁;或是设备失效;或是需要的零部件没有运到等3.搬运:不必要的搬运零件和产品,例如两个连续的生产工序,将产品在完成一个工序后,先运到仓库,然后再运到下一个工序;较理想的情况是让两个工序的位置相邻,以便使产品能够从一个工序立即转到下一个工序4.返工:进行不必要的修正加工,通常是由于选用了较差的工具或产品缺陷而导致生产分析板问题解决板 Production Analysis Board生产控制 Production Control生产准备过程3P Production Preparation Process标准库存 Standard Inventory自动化Jidoka标准化操作Standardized Work标准化操作表Standardized Work Chart标准化操作组合表Standardized Work Combination Table产品系列矩阵Product Family Matrix政策实施Policy Deployment为每个产品做计划PFEP Plan For Every Part单位制造时间Pitch产品的先进先出FIFO First In, First Out停工期 Downtime节拍时间 Takt Time库存超市 Supermarket库存超市拉动系统 Supermarket Pull System拉动生产 Pull Production库存Inventory安全库存Safety Stock:在任何工位上存放的货物原材料,在制品,或成品,用来预防因为上游工序生产能力不足,导致的缺货、断货的问题;通常也称为紧急库存;装运库存Shipping Stock:在价值流末端工厂的库房里,那些已经准备好可以随时下一次出货的产品这些库存通常是装运批量的一部分;在制品WIP Work-in-Process:工厂内各个工序之间的半成品;在精益系统里,标准的在制品数量,是指能够保证价值流在生产单元内,平稳流动所需要的最少的数量;。
品管常用英文缩写名词3C:Computer,Communication,Consumer Electronics产业整合4M:就是人(Man), 机(Machine), 料(Material), 法(Method)5M:制造工程的方法(Method)、材料(Material)、机械(Machine)、人员(Man)、量测(Measurement) 5S:整理(Seiri)、整顿(Seiton)、清扫(Seiso)、清洁(Seiketsu)、素养(Shitsuke)5W1H:5W是Why What Where When Who1H是How6 sigma:〝6个标准偏差〞或〝6倍标准偏差〞(6σ管理)8D:DisciplineDiscipline 1 - Organize and Plan组成小组团队Discipline 2 - Describe the Problem问题描述Discipline 3 - Containment Plan临时遏止措施Discipline 4 - Describe the Cause原因分析Discipline 5 - Permanent Corrective Action Plan永久改善对策Discipline 6 - Verification of Corrective Action改善效果确认Discipline 7 - Prevention of Recurrence预防再发对策Discipline 8 - Communicate Success成功经验的传递ABS:Anti-lock Brake System防死锁煞车系统ACC:Acceptable允收AI:Artificial Intelligence人工智能API:连展生产力改善活动(Acon Productivity Improvement)APQP:(advanced product quality planning and control plan)先期产品质量规划AOQL:Average Outgoing Quality Limit平均出厂质量界限AQL:Acceptable Quality Level允收质量水平AVL:物料承认合格厂商名录(Approved Vendor List)BOM:物料清单(Bill of material)BPM:流程管理or业务流程管理(Business Process Management)BVT:基本验证测试(Build Verification Test),,对完成的代码进行编译和连接,产生一个构造,以检查程序的主要功能是否会像预期一样进行工作。
AA 分析阶段Affinitize 亲和:一种收集和分类头脑风暴想法的方法。
用于编辑从客户获得的定性数据。
为质量功能展开(QFD)作准备。
Affinity Diagrams:亲和图。
亲和图就是当头脑风暴的各种想法按照主题分组是使用的可视工具。
它不像主要与收集和分析硬性数据相关的旨在改进的基础工具,这个工具主要集中用于问题和想法等软性数据。
Alternate Hypothesis 备选假设:假设检验的一部分,一般假定两个或者更多代表总体的样本的不同Analyze phase:分析阶段。
DMAIC 流程的第三个阶段。
检验所收集的在流程中影响输出的变量变化的数据,确定出产生变化源的优先权排列顺序。
ANOV A:方差检验。
是用于比较两个或者多个变量数据的样本,来确定它们之间的差别是简单随机的,或者是由于流程之间统计上显著的差别所致。
ARB:Assembly Review Board 装配检查板ARMI:Authority/Resource/Members/Interested Parties。
人可在项目团队中能起到作用的不同角色。
批准人/资源/成员/利益相关方。
Assets:资产。
对已有业务潜在地可用于提供服务和使用的项。
Attribute Data:非连续性数据:可以某种非数值性特征而区成不同类型的分类型、定性数据。
用于描述项目计数缺陷或者区分型缺陷。
BBalance Sheet:平衡表:展示一个公司在特定时间点的财务状况的财务表。
Bar Chart:柱形图:用水平或者垂直柱的长度来代表若干个量的值的相对量度的图形比较工具。
通过柱的相对长度来展示各个量的比较。
Base Cost:基本成本。
是业务基本运行相关的与业务输出产品和服务的总量几乎无关的成本。
例如:大楼的租金,办公室电费。
常被称为固定成本。
BB:Black Belt 黑带Benchmarking:标杆学习。
是一家公司将自己的业绩与一流公司相对比来确定这些公司能达到他们的业绩表现水平,并应用这些信息来改进自己业绩表现的改进的流程。
企业管理常用缩写术语中英文对照5S:5S管理6σ:六西格玛管理AABC: 作业制成本制度(Activity-Based Costing)ABB: 实施作业制预算制度(Activity-Based Budgeting)ABM: 作业制成本管理(Activity-Base Management)APS: 先进规划与排程系统(Advanced Planning andScheduling)ASP: 应用程序服务供货商(Application ServiceProvider)ATP: 可承诺量(Available To Promise)AVL: 认可的供货商清单(Approved Vendor List)BBOM:物料清单(Bill Of Material)BPR:企业流程再造(Business Process Reengineering)BSC:平衡记分卡(Balanced ScoreCard)BTF:计划生产(Build To Forecast)BTO:订单生产(Build To Order)CCPM:要径法(Critical Path Method)CPM:每一百万个使用者会有几次抱怨(Complaint perMillion)CRM:客户关系管理(Customer RelationshipManagement)CRP:产能需求规划(Capacity RequirementsPlanning)CTO:客制化生产(Configuration To Order)DDBR:限制驱导式排程法(Drum-Buffer-Rope)DMT:成熟度验证(Design Maturing Testing)DVT:设计验证(Design Verification Testing)DRP:运销资源计划(Distribution Resource Planning)DSS:决策支持系统(Decision Support System)EEC:设计变更/工程变更(Engineer Change)EC:电子商务(Electronic Commerce)ECRN: 原件规格更改通知(Engineer Change RequestNotice)EDI:电子数据交换(Electronic Data Interchange)EIS:主管决策系统(Executive Information System)EMC:电磁相容(Electric Magnetic Capability)EOQ:基本经济订购量(Economic Order Quantity)ERP:企业资源规划(Enterprise Resource Planning) FFAE:应用工程师(Field Application Engineer)FCST: 预估(Forecast)FMS:弹性制造系统(Flexible Manufacture System)FQC:成品质量管理(Finish or Final Quality Control) IIE: 工业工程师(Industrial Engineering)IPQC:制程质量管理(In-Process Quality Control)IQC:进料质量管理(Incoming Quality Control)ISO:国际标准组织(International Organization forStandardization)ISAR:首批样品认可(Initial Sample Approval Request)JJIT:实时管理(Just In Time)KKM:知识管理(Knowledge Management)LL4L:逐批订购法(Lot-for-Lot)LTC:最小总成本法(Least Total Cost)LUC:最小单位成本(Least Unit Cost)MMES:制造执行系统(Manufacturing ExecutionSystem)MO:制令(Manufacture Order)MPS:主生产排程(Master Production Schedule)MRO:请修(购)单(Maintenance Repair Operation)MRP:物料需求规划(Material RequirementPlanning)MRPII: 制造资源计划(Manufacturing ResourcePlanning)NNFCF:更改预估量的通知(Notice for ChangingForecast)OOEM:委托代工(Original Equipment Manufacture)ODM:委托设计与制造(Original Design &Manufacture)OLAP:在线分析处理(On-Line AnalyticalProcessing)OLTP:在线交易处理(On-Line TransactionProcessing)OPT:最佳生产技术(Optimized ProductionTechnology)OQC:出货质量管理(Out-going Quality Control) PPDCA:PDCA管理循环(Plan-Do-Check-Action)PDM:产品数据管理系统(Product DataManagement)PERT: 计划评核术(Program Evaluation and ReviewTechnique)PO:订单(Purchase Order)POH:预估在手量(Product on Hand)PR:采购申请(Purchase Request)QQA:质量保证(Quality Assurance)QC:质量管理(Quality Control)QCC:品管圈(Quality Control Circle)QE:质量工程(Quality Engineering)RRCCP:粗略产能规划(Rough Cut Capacity Planning)RMA:退货验收Returned Material ApprovalROP:再订购点(Re-Order Point)SSCM:供应链管理(Supply Chain Management)SFC:现场控制(Shop Floor Control)SIS:策略信息系统(Strategic Information System)SO:订单(Sales Order)SOR:特殊订单需求(Special Order Request)SPC:统计制程管制(Statistic Process Control)SQE:供应商质量工程师(Supplier Quality Engineer)TTOC:限制理论(Theory of Constraints)TPM:全面生产管理Total Production ManagementTQC:全面质量控制(Total Quality Control)TQM:全面质量管理(Total Quality Management)WWIP:在制品(Work In Process)BOM(Bill Of Material,物料清单)BOM的概念物料清单(Bill Of Material 简称BOM)是MRP的重要文件,几乎所有的管理部门都要到它。
精益六西格玛英文缩略语Lean Sigma Glossary / Abbreviation ListAcronym Definition Descriptionα Alpha The maximum risk or probability ofmaking a Type I Error. Thisprobability is always greater thanzero and is usually established at5%. The researcher makes thedecisions to the greatest level ofrisk that is acceptable for arejection of Ho.β Beta The risk or probability of making aType II Error, or overlooking aneffective treatment or solution tothe problem.μ Population mean Symbol used to describe theaverage for an entire populationσ Population standard deviation Symbol used for standard deviationof entire population. Measure ofthe spread of the process (width ofthe distribution).% R & R Gage % Repeatability andReproducibility Addresses what percent of the Total Variation is taken up by measurement error.Affinity Diagram A management tool that assistswith general planning. It makesdisparate language informationunderstandable by placing it oncards and grouping the cardstogether in a creative manner."Header" cards are used tosummarize each group.ANOVA Analysis of Variance Hypothesis test used to analyze thedifference in means between two ormore samples.Assessment A systematic process of collectingand analyzing data to determine thecurrent, historical or projectedstatus of an organization.Assignable Cause The name for the source of variationin a process that is not due tochance and therefore can beidentified and eliminated.Audit "The inspection and examination ofa process or quality system toensure compliance to requirements.Audit can apply to an entireorganization or be specific to afunction or production step." (Dr.Page 2 of 16 Printed: 9/1/2020Joseph M. Juran)Baseline Measurement A beginning point based on anevaluation of the output over aperiod of time to determine how theprocess performs prior to anyimprovement effort.Benchmarking The process of finding and adaptingbest practices to improveorganizational performance.Best Practice A superior method or innovativepractice that contributes toimproved performance.BB Black Belt A process improvement projectteam leader who is trained andcertified in the Six Sigmabreakthrough methodology andtools and who is responsible forproject execution.Boxplot "A graphic summary of adistribution where the overalldispersion and the central tendencyor mean of the data arehighlighted." (Arturo Onnias) Brainstorming An idea-generating technique thatuses group interaction to generatemany ideas in a short time period.Ideas are solicited in anon-judgmental, unrestrictedmanner from all members of agroup.process. Designates a process stepthat the business requires to stay inbusiness.Capability The total range of inherent variationin a stable process. It isdetermined using data from controlcharts.Capability index A calculated value used to compareprocess variation to a specification.Examples are Cp, Cpk. Can also beused to compare processes to eachother.Cause An established reason for theexistence of a defect or a problem. C/E or C&E Cause and Effect Matrix Prioritization matrix used to assistin focusing in on the root causes ofprocess problems.Central Tendency The tendency of data gathered froma process to cluster toward a middlePage 3 of 16 Printed: 9/1/2020and low values of measurement.Champion An upper level business leader whofacilitates the leadership,implementation, and deployment ofthe process quality initiative andbreakthrough philosophies.Charter A written commitment bymanagement stating the scope ofauthority for an improvementgroup. Resources, including timeand money, are specificallyaddressed.Checksheet A form for recording data on whichthe number of occurrences of anevent can be recorded as ticks orchecks.Code of Conduct Expectations of behavior mutuallyagreed upon by a team. (Also called"norms" or "rules of engagement.")inherent to the process and iscommon to all the data.CI Confidence Interval An interval that can be said, withX% certainty, to contain the trueprocess mean or standard deviation.“We are 95% confident that thetrue process mean is in thisinterval.”Conformance The state of meeting and/orexceeding customer requirementsand expectations.Consensus A state where everyone in the groupsupports an action or decision, evenif some of them don't fully agreewith it.Consensus Decision A decision made after all aspects ofan issue, both positive and negative,have been reviewed or discussed tothe extent that everyone openlyunderstands, supports andparticipates in the decision.Control Keeping a process withinboundaries; minimizing thevariation of a process.Control Chart A problem solving statistical toolthat indicates whether the system isin or out of control, as determinedby computed control limits.Control Limits "Defines natural boundaries of aPage 4 of 16 Printed: 9/1/2020levels" [upper control limit (UCL),and lower control limit (LCL)defined on a control chart]. (J. R.Russell)benefits of plans. Can be used forcomparing the financial outcomes ofdifferent actions and determining ifa particular action makes sensefinancially.COPQ Cost of Poor Quality Cost associated with poor qualityproducts or services. Examples:Product inspection, Sorting, Scrap,Rework, and Field Complaints.Cp Process Capability Index A calculated value used to compareprocess variation to a specification.Can also be used to compareprocesses to each other.CPD Customer Percent Defective The percentage of products orservices that are successfullycompleted on the first attemptwithout requiring remedial action orrework.Cpk Process Capability Index – notcentered A calculated value used to compare process variation to a specification. Can also be used to compare processes to each other.root cause of a problem.Critical Characteristic A characteristic dependent on thefunctioning of budget constraints,competitive edge and/or customersatisfaction of the product.Critical Dependencies The interrelationships existingwithin or among processes that areprimary drivers of defects or errorsin a product or service.CPIV Critical Process Input Variable The vital few process input variablesthat have the greatest effect on theoutput variable(s) of interest.They are called “X’s”, normally 2 – 6true critical variables.Cross Functional A term used to describe individualsfrom different organizational unitsor functions that are part of a teamto solve problems, plan, and developsolutions affecting the organizationas a system.CVA Customer Value Added Term used in Value Analysis of aPage 5 of 16 Printed: 9/1/2020that the customer is willing to payfor.CT Cycle Time The average time from a unitentering the process until it iscompleted as a finished good.CTQ Critical to Quality A requirement that a customervalues is considered Critical toQuality. What the customer paysfor.Defect Any instance or occurrence wherethe product or service fails to meetcustomer requirementsDefect Opportunity A type of potential defect on a unitof throughput (output) that isimportant to the customer (i.e.Specific fields on a form that createsand opportunity for error that wouldbe important to the customer).See also DefectsDMAIC Define, Measure, Analyze, Improve,Control5 steps during a Six Sigma projectDMADV or DMADVI Define, Measure, Analyze, Design,Validate or Define, Measure, Analyze,Design, Verify, ImplementNew process design tool.Commonly used acronym for Designfor Six Sigma methods.DOTWIMP Defects, Overproduction,Transportation, Waiting, Inventory,Motion, ProcessingSeven wastesDPMO Defects Per Million Opportunities The number of defects in everymillion opportunities. By takinginto account opportunities fordefects, and not just defects, we cancompare processes of differingcomplexity.DPU Defects Per Unit The number of defects in a unit orproduct. This measure does nottake into account the number ofopportunities for defects, just thenumber of defects.DOE Design of Experiments An efficient method ofexperimentation which identifies,with minimum testing, factors (keyprocess input variables) and theiroptimum settings that affect themean and variation.Empowerment Act of placing accountability,authority, and responsibility forprocesses and products at thePage 6 of 16 Printed: 9/1/2020not a person is truly empowereddepends on their acceptance ofresponsibility and accountability,their capabilities, and theseriousness of the consequences.be.External Failure Nonconformance identified byexternal customers.Y = F(x1, x2, x3, ……)F Function relating process inputs toprocess outputsFMEA Failure Modes and Effects Analysis Method used in measure tounderstand risks of failure in aprocess.Fire Fighting "The activity of getting rid ofsporadic quality troubles andrestoring the status quo." (Dr.Joseph M. Juran)FPY First Pass Yield The percentage of products orservices that are successfullycompleted on the first attemptwithout requiring remedial action orrework.cause(s) of a problem and showingthe relationship of causes byrepeatedly asking the question"Why?"Gage bias (Accuracy) The difference between the true orreference value and the observedaverage of multiple measurementsof the identical characteristic on thesame part.Gage repeatability The variation in measurementsobtained with one measurementinstrument when used several timesby one appraiser while measuringthe identical characteristic on thesame part.Gage reproducibility The variation in the average of themeasurements made by differentappraisers using the samemeasuring instrument whenmeasuring the identicalcharacteristic on the same part.Gap Analysis The comparison of a currentPage 7 of 16 Printed: 9/1/2020condition to the desired state.Goal "A broad statement describing adesired future condition orachievement without being specificabout how much and when."(Government Performance andResults Act of 1993)project team leader who is trainedand certified in the Six Sigmabreakthrough methodology andtools and who is responsible forproject execution. Typically workson smaller scoped projects thanBB’s.odifference. This statement isassumed true until sufficientevidence is presented to reject it.“If p is low, Ho has to go”H a Alternate Hypothesis A statement of change or difference.This statement is considered true ifHo is rejected.Hawthorne effect Every change results (initially, atleast) in increased productivity.Often occurs early in a project,where process participants realizethe process is under study.Histogram A graphic way of summarizing databy plotting possible values on oneaxis and the observed frequenciesfor those values on the other axis.It helps one visualize the centraltendency and dispersion of the data.House of Quality A product-planning matrixdeveloped during quality functiondeployment that shows therelationship of customerrequirements to the means ofachieving these requirements. Thematrix indicates the impact each ofthe means has on one another.Implementation A structured approach thataddresses all aspects (who, what,when, where, why, and how) ofincorporating improvements intothe process or system.Improvement The organized creation of beneficialchange; the attainment ofunprecedented levels ofPage 8 of 16 Printed: 9/1/2020improvement range fromincremental to major; e.g.,"breakthrough" improvement.I/O Input Output Type of process map that includesprocess steps and their inputs andoutputs.Inspection Process of measuring, examining ortesting a product service againstsome requirement to identifynonconformance before it reaches acustomer.Internal failures "Product failures that occur beforethe product is delivered to externalcustomers." (Dr. Joseph M. Juran) ISO International Standards Organization ISO9000 is an internationalstandard for documentation ofstandardized processes.JIT Just In Time A concept where an item isdelivered, just-in-time, where andwhen it is needed.Kaizen In the business world, The wordKaizen has been utilized by theJapanese to characterize a businessstrategy involves everyone in anorganization working together tomake improvements 'without largecapital investments'Kanban "A communications tool in the'just-in-time' production and controlsystem. A kanban, or signboard, isattached to specific parts in aproduction line signifying thedelivery of a given quantity. Whenall parts have been used, the samesign is returned to its origin where itbecomes an order for more."(Kaizen Institute)KJ Jiro Kawakita Name of a noted Japaneseanthropologist. Created methodfor summarizing and characterizinglarge quantities of anthropologicaldata gathered during hisexpeditions.KPIV Key Process Input Variable The vital few process input variablesthat have the greatest effect on theoutput variable(s) of interest.They are called “X’s”, (normally 2 –6)Page 9 of 16 Printed: 9/1/2020They are called the “Y’s”, (usually1). May be process performancemeasures or productcharacteristics.expected variability. Pointsoutside of control limit should beinvestigated to determineassignable cause. Formula is(process sample mean – 3 x samplestandard deviation). 99% of theprocess variation falls within thelower and upper control limits.Little’s Law CT = CT * THmeasurement customer is willing toaccept. Lower limit of customerrequirement.MBB Master Black Belt A person who is “expert” in SixSigma breakthrough techniques andproject implementation. MBBsplay a key role in training andcoaching Black Belts.Measurement System The complete process used to obtainmeasurements. It consists of thecollection of operations,procedures, gages and otherequipment, software, and personnelused to assign a number or value tothe characteristic being measured. MSA Measurement System Analysis Method to understand the capabilityof the measurement system.Metric A measurement, taken over a periodof time that communicates vitalinformation about a process oractivity. A metric should driveappropriate leadership ormanagement action. Physically, ametric package consists of anoperational definition,measurement over time andpresentation.MTB Minitab A statistical software program usedto assist in data analysis.study that impact your Y’s. A graphicway of depicting variation within asingle entity, machine or process, orbetween entities (produced at thePage 10 of 16 Printed: 9/1/2020the study of process inputs andoutputs in a passive mode (naturalday-to-day process).Multi-vari Chart A graphic way of depicting variationwithin a single part, machine orprocess, or between parts(produced at the same time or overtime). Allows the study of processinputs and outputs in a passivemode (natural day-to-day process).Multivoting A structured voting process used toreduce a large number of items,usually ideas, to a more manageablenumber for further processing oranalysis.NGT Nominal Group Technique A tool for generating a list of ideasor opportunities (allows individualsto express their opinion). Votingand ranking determine priorities. NVA Non-Value Added Term used in Value Analysis of aprocess. Designates a process stepthat is not required by the businessor the customer.Normal distribution A continuous, symmetrical, bellshaped frequency distribution forvariable data.variations that fluctuate outside thecomputed control limits. Thiscondition normally indicates theprocess is not operating as desiredor that external factors have beenintroduced. A process "out ofcontrol" is not stable and thereforeis not predictable.p p-value Test statistic used in Hypothesistesting. “If p is low, Ho has to go.”P/T Precision to customer tolerance ratio Addresses what percent of thetolerance is taken up bymeasurement error.Includes both repeatability andreproducibility.Paradigm A set of rules and regulations thatdefines boundaries and tells what todo to be successful within theseboundaries.Pareto Chart A statistical method ofmeasurement to identify the mostdifferent measurement scales; e.g.,frequency, cost, etc. It directsattention and efforts to the mostsignificant problems.PPM Parts Per Million Same as DPMO.PDSA Plan Do Study Act Plan-Do-Study-Act: a structured,cyclical methodology for developingand implementing actions of anytype: Plan for the action bycollecting and analyzing data anddeveloping alternatives; Do,implement the selected alternative(preferably on a small scale); Study,evaluate results and compareexpected values; Act, standardizeaction and/or start over. (ShewhartCycle, Deming Wheel)Prevention A quality assurance strategy thatattempts to identify and correctunacceptable service or productcharacteristics during the design,development or production phases.or a condition occurring in a randomtrial.Process The combination of people,equipment, materials, methods, andenvironment that produce output –a given product or service. It is theparticular way of doing something.Process map A step-by-step pictorial sequence ofa process showing process inputs,process outputs, cycle time reworkoperations, and inspection points. POV Process Output Variable The outputs of interest, sometimesreferred to as the customerrequirements. They are called the“Y’s”, (usually 1). May be processperformance measures or productcharacteristics.Process Spread The extent to which the distributionof individual values of the processcharacteristic (input or outputvariable) vary; often shown as theprocess average plus and minussome number of standarddeviations. Other relatedmeasures of spread include therange, and variance.QA Quality Assurance Used to describe either a company’squality methods or qualitydepartment. Assurance is typicallymore proactive.Quality Audit "A systematic, independentexamination and review todetermine whether quality activitiesand related results comply withplanned arrangements and whetherthe arrangements are implementedeffectively and are suitable toachieve the objectives." (ASQCQuality Progress, Feb 92)QC Quality Control Used to describe either a company’squality methods or qualitydepartment. Control is typicallymore reactive.QFD Quality Function Deployment A system that translates customerrequirements (voice of thecustomer) into technicalrequirements for each stage ofdevelopment and/or production.R Range The difference between themaximum and minimum data pointsin a sample.R & R Repeatability and Reproducibility Repeatability: The variation inmeasurements obtained with onemeasurement instrument whenused several times by one appraiserwhile measuring the identicalcharacteristic on the same part.Reproducibility: The variation in theaverage of the measurements madeby different appraisers using thesame measuring instrument whenmeasuring the identicalcharacteristic on the same part. RSM Response Surface Methods Method for using DOE to optimizeprocess parameter settings.Allows for fine process adjustmentfor ultimate optimization.r b Rate of Bottleneck Process bottleneck rate or rate ofthe workstation having the highestlong term utilization in that process.Calculated by multiplying theSeverity of the Effect, theprobability of Occurrence of theFailure. RPN = S x O x DRTY Rolled Throughput Yield The multiplication of all theindividual first pass yields of eachstep of the entire process.s Sample Standard Deviation A measure of the average variationof a sample (width of thedistribution).SBTI Sigma Breakthrough Technologies,Inc. A consulting firm that specializes in Six Sigma implementation.SMED Single Minute Exchange of DieSIPOC SIPOC Map - Suppliers Inputs ProcessOutputs Customers Single page process map that shows the scope of the process your project is examining.SD Standard Deviation A measure of the spread of theprocess (width of the distribution). SOP Standard Operating Procedure Standardized procedure that isdocumented and used by all processparticipants.SPACER Safety, Purpose, Agenda, Code ofConduct, Expectations and Roles Meeting effectiveness technique. Every meeting should begin with review of safety procedures, meeting purpose, agenda, meeting code of conduct, meeting expectations and meeting roles.Spec Specification The customer requirement forjudging acceptability of a particularcharacteristic.or s Standard deviation A measure of the spread of theprocess (width of the distribution).Statistical control The condition describing a processfrom which all special/assignablecauses of variation have beeneliminated and onlycommon/random causes remain.Applies to both the mean (location)and standard deviation (spread). SPC Statistical Process Control Method that uses control charting tomanage a process as it occurs.Storyboard Technique to graphically display themethodology used and progressmade by a process action team; aboard, specifically designated todisplay informationTakt time The pace of the process required tomeet customer requirements.(Average work time / AverageDemand).Tampering The process of adjusting a stableprocess to try to compensate for aresult that is extra good, the outputthat follows will be worse than if thetamperer had left the process alone. TOC Theory of Constraints A management philosophy thatfocuses the organizations scarceresources on improving theperformance of the true constraint,and therefore the bottom line of theorganization.TCS Total Customer SatisfactionT, TH T o Throughput The average output of a productionprocess per unit of time.Average time it takes a single unitto traverse an empty productionprocessUCL Upper Control Limit Demonstrates upper limit ofexpected process variability.Points outside of control limitshould be investigated to determineassignable cause. Formula is(process sample mean + 3 *s).99% of the process variation fallswithin the lower and upper controllimits.USL Upper Specification Limit Highest acceptable value ormeasurement customer is willing toaccept. Upper limit of customerrequirement.U Utilization Utilization of any workstation,capital, process or line is usuallydefined as percent of time runningdivided by available time to run.VA Value Added Term used in Value Analysis of aprocess. Designates a process stepthat is deemed valuable either bythe business or the customer.VSM Value Stream Map Type of process map that showsproduct and information flow. Alsoshows process data.Variation Difference between individualmeasurements. Differences areattributed to common and/orspecial causes.VOB Voice of the Business Business requirementsWIP W o Work In Process The inventory between the start andend points of a production processor series of processes necessary toproduce a finished good.WIP level for which the processachieves maximum throughput.X Process Input variable In a Six Sigma project, wedetermine the inputs (X’s) thatimpact our process outputs (Y’s).or X-bar Sample mean Symbol used to describe theaverage of a population sample.determine the inputs (X’s) thatimpact our process outputs (Y’s).。
1 SPC 统计制程管制Statistical Process Control2USL 规格上限Upper Specification Limit3 LSL 规格下限Lower Specification Limit4 UCL 管制上限Upper control limit5 LCL 管制下限Lower control limit6 PCL 前置管制中心限Per-control Central Limit7 UPCL 前置管制上限Upper Per-control Limit8 LPCL 前置管制下限Lower Per-control Limit9 Ca10 Cp 潜在过程能力指数Capability11 Pp12 Ppk13 CIP 持续改进过程模式Continuous Improvement Process Model14 ANOVA 变异数分析Analysis of Variance15 BSC 平衡计分卡Balanced Scoredoard16 信赖区间Confidence interval17 管制图Control chart18 CTQ 品质关键Critical to quality19 DPMO 每百万个机会的缺点数Defects per million opportunities20 DPM 每百万单位的缺点数Defects per million21 DPU 单位缺点数Defects per unit22 DFSS 六个希格玛设计Design for six sigma23 DOE 实验设计Design of experiment24 DOM制造设计Design of manufactring25 FMEA 故障型态与效应分析Failure mode and effect analysis26 故障率Failure rate27 Gage R&R 量规重复能力与重制能力Gage repeatability & reproducibility28 直方图Histogram29 假设检定Hypothesis testing30 KM 知识管理Knowledge Management31 MRP 物料需求规划Material require planning32 常态分配Normal distribution33 QFD 品质机能展开Quality function deployment34 6σ六个希格玛Six Sigma35 σ, s 标准差Standard deviation36 σ2, S2 变异数Variance37 ABC 作业制成本制度Activity-Based Costing38 BTF 计划生产Build To Forecast39 BTO 订单生产Build To Order40 CPM 要径法Critical Path Method41 CPM 每一百万个使用者会有几次抱怨Complaint per Million42 CRM 客户关系管理Customer Relationship Management43 CRP 产能需求规划Capacity Requirements Planning44 CS 顾客满意度Customer Satisfaction45 CTO 客制化生产Configuration To Order46 DVT 设计验证Design Verification Testing47 DSS 决策支持系统Decision Support System48 EC 设计变更/工程变更Engineer Change49 EC 电子商务Electronic Commerce50 EMC 电磁相容Electric Magnetic Capability51 EOQ 基本经济订购量Economic Order Quantity52 ERP 企业资源规划Enterprise Resource Planning53 FMS 弹性制造系统Flexible Manufacture System54 FQC 成品质量管理Finish or Final Quality Control55 IPQC 制程质量管理In-Process Quality Control56 IQC 进料质量管理Incoming Quality Control57 ISO 国际标准组织International Organization for Standardization58 ISAR 首批样品认可Initial Sample Approval Request59 JIT 实时管理Just In Time60 MES 制造执行系统Manufacturing Execution System61 MO 制令Manufacture Order62 MPS 主生产排程Master Production Schedule63 MRO 请修(购)单Maintenance Repair Operation64 MRP 物料需求规划Material Requirement Planning65 MRPII 制造资源计划Manufacturing Resource Planning66 NFCF 更改预估量的通知Notice for Changing Forecast67 OEM 委托代工Original Equipment Manufacture68 ODM 委托设计与制造Original Design & Manufacture69 OPT 最佳生产技术Optimized Production Technology70 OQC 出货质量管理Out-going Quality Control71 PDCA PDCA管理循环Plan-Do-Check-Action72 PO 订单Purchase Order73 QA 品质保证Quality Assurance74 QC 质量管理Quality Control75 QCC 品管圈Quality Control Circle76 QE 品质工程Quality Engineering77 RMA 退货验收Returned Material Approval78 ROP 再订购点Re-Order Point79 SCM 供应链管理Supply Chain Management80 SFC 现场控制Shop Floor Control81 SO 订单Sales Order82 SOR 特殊订单需求Special Order Request83 TOC 限制理论Theory of Constraints84 TPM 全面生产管理Total Production Management85 TQC 全面质量管理Total Quality Control86 TQM 全面品质管理Total Quality Management87 WIP 在制品Work In Process质量项目管理Project Quality management质量规划Quality Planning实施质量保证Perform Quality Assurance实施质量控制Perform Quality Control帕累托图Pareto Diagram镀金Gold Plating全面质量管理Total Quality Management,TQM质量审核Quality Audit持续改进Continuous Improving一致性成本和非一致性成本Cost of Conformance and Non-Conformance 鱼骨图Fishbone Diagram收益/成本分析Benefit/Cost Analysis基准对照Bench marking零库存Just in time试验设计Design of Experiment统计抽样Statistical Sampling质量哲学Quality Philosophy精密度Precision准确度Accuracy预防胜于检验Prevention Over Inspection质量和等级Quality & Grade质量管理Quality Management质量方针Quality Policy过程分析Process Analysis因果图Cause & Effect Diagram检验Inspection流程图Flow chart控制图Control Chart控制图Control Chart直方图Histogram趋势图Run Diagram散点图Scatter Diagram缺陷修理审查Defect Repair Review规划Planning培训Training过程控制Process Control设计确认Quality Validation过程确认Processing Validation测量与评估Test & Evaluation维护与校准Maintenance & Calibration废品Scrap返工Rework额外材料与库存Additional Material or Inventory 现场服务Field Service保修成本Warranty Repair投诉处理Complaint Handling责任判定Liability Judgment产品召回Product Recall产品修正措施Product Corrective Action预防成本Preventive Cost缺陷成本Failure Cost随机因素Random Cause均值Means控制界限Control Limit规格界限Specification Limit受控In Control失控Out of Control七点原则Rule of Seven趋势分析Trend Analysis属性抽样Attribute Sampling变量抽样Variable Sampling质量职责Responsibility of Quality边际分析Marginal Analysis故障模式和影响分析Failure Mode & Effect Analysis,FMEA总体Population概率Probability统计独立性Statistical Independence互斥Mutually Exclusive戴明环即PDCA——Plan计划;Do执行;Check检查;Action行动零缺陷Zero Defect质量免费Quality Is Freenon confirming report的简写,中文名称是不一致报告其实就是图纸和现场制造不一致等质量管理体系quality management system质量目标quality objective质量改进quality improvement有效性effectiveness设计和开发design and development质量特性quality characteristic合格(符合)conformity预防措施preventive action纠正措施corrective action降级regrade质量手册quality manual鉴定过程qualification process审核方案audit programme审核准则audit criteria审核证据audit evidence审核结论audit conclusion审核委托方audit client审核组audit team测量控制体系measurement control system测量设备measuring equipment计量特性metrological characteristic技术专家technical expert质量改进quality improvement供方supplier偏离许可deviation permitCAR:纠正行动要求。
制造企业常用术语英文缩写及全称制造企业常用术语英文缩写及全称英文縮寫中文名稱英文全文SC策略確認Strategic confirmation6 σ六個希格瑪Six SigmaABB实施作业制预算制度Activity-Based BudgetingABC作业制成本制度Activity-Based CostingABM作业制成本管理 Activity-Base ManagementAIAG汽车工业行动集团Automotive Industry Action GroupAIT自动验证技术Automated IDentification Technologies ANOVA 變異數分析Analysis of VarianceAPS先进规画与排程系统Advanced Planning and Scheduling APS高级计划系统Advanced Planning SystemASN预先发货通知Advanced Shipment NoticeASP应用程序服务供货商Application Service ProviderASRS自动存贮与检索系统Automatic Storage and Retrieval SystemATP可承诺量 Available To PromiseAVL认可的供货商清单Approved Vendor ListBI 商业智能Business IntelligenceBOM物料清单Bill of MaterialBPR企业流程再造Business Process ReengineeringBSC平衡记分卡Balanced ScoreCardBTF计划生产Build To ForecastBTF 計劃生產Build To ForecastBTO訂單生產Build To OrderBTO订单生产Build-to-OrderCAD计算机辅助设计Computer Added DesignCAPA纠正和预防措施Corrective And Preventive ActivityCAPP算机辅助工艺设计Computer Aided Process PlanningCFT横向职能小组CMMS电脑化维修管理系统computerized maintenance management system CPG消费包装产品Customer Packaged GoodsCPM每一百萬個使用者會有幾次抱怨 Complaint per MillionCPM 要徑法 Critical Path MethodCRM客戶關係管理 Customer Relationship ManagementCRP产能需求规划Capacity Requirements Planning CS 顧客滿意度 Customer SatisfactionCTO客製化生產Configuration To OrderCTQ品質關鍵 Critical to qualityDBR限制驱导式排程法 Drum-Buffer-RopeDCP动态控制计划(尺寸控制计划)DFMEA设计失效模式及后果分析DFSS 六個希格瑪設計 Design for six sigmaDHR器械历史文件Device History RecordDMT成熟度验证Design Maturing TestingDOE實驗設計 Design of experimentDOE试验设计DPM每百萬單位的缺點數Defects per millionDPMO每百萬個機會的缺點數Defects per million opportunities DPU單位缺點數Defects per unitDRP运销资源计划Distribution Resource Planning DSS決策支援系統Decision Support SystemDVP&R设计验证计划和报告DVT設計驗證Design Verification T esting EBOM工程设计BOMEC設計變更/工程變更Engineer ChangeEC电子商务Electronic CommerceECRN原件规格更改通知Engineer Change Request Notice EDI 电子数据交换Electronic Data Interchange) EIS主管决策系统Executive Information System EMC電磁相容Electric Magnetic Capability EMEA欧洲、中东和非洲EOQ基本经济订购量 Economic Order QuantityERP企业资源规划Enterprise Resource Planning ETO按订单设计FAE应用工程师Field Application Engineer FCST预估Forecast FMA失效模式分析FMEA故障型態與效應分析Failure mode and effect analysis FMS弹性制造系统Flexible Manufacture System FQC成品质量管理Finish or Final Quality ControlFTC首次能力Gage R & R 量規重複能力與重製能力Gage repeatability & reproducibilityGR&R 量具的重复性和再现性HMI人机界面Human Machine InterfaceIP网际协议Internet ProtocolIPQC制程质量管理In-Process Quality ControlIQC 進料品質管制 Incoming Quality ControlIRR内部收益率Internal Rate of ReturnISAR首批样品认可Initial Sample Approval RequestISO國際標準組織International Organization for Standardization JIT实时管理Just In TimeKM 知識管理Knowledge ManagementKPI关键绩效指标Key Performance IndexL4L逐批订购法Lot-for-LotLAN局域网Local Area NetworkLCL管制下限Lower control limitLDAP轻量级目录访问协议Lightweight Directory AccessProtocol LPCL 前置管制下限Lower Per-control LimitLSL規格下限Lower Specification LimitLTC最小总成本法 Least Total CostLUC最小单位成本Least Unit CostMAN城域网Metropolitan Area NetworkMBOM生产制造物料清单MCT制造周期时间Manufacturing Cycle TimeMDM制造数据管理Manafacturing Data ManagementMES制造执行系统Manufacturing Execution SystemMHE物料处理设备Manufacturing Execution SystemMO制令Manufacture OrderMPS主生产排程 Master Production ScheduleMRO请修(购)单Maintenance Repair OperationMRP物料需求規劃 Material require planningMRP物料需求规划Material Requirement PlanningMRPII制造资源计划 Manufacturing Resource PlanningMTO按订单生产Make to OrderMTS库存生产Make-to-StockNCR—不合格Non-conformanceNFCF更改预估量的通知Notice for Changing ForecastNPV净现值Net Present ValueOBOM订单BOMODM 委託設計與製造Original Design & ManufactureOEM委托代工Original Equipment ManufactureOEM原始设备制造商Original Equipment ManafacturerOLAP在线分析处理On-Line Analytical ProcessingOPC用于过程控制的对象链接和嵌入OLE for Process Control OPT最佳生產技術 Optimized Production TechnologyOQC出貨品質管制Out-going Quality ControlPA 專案核准Program approvalPAPC生产和流程控制Production and Process ControlPBOM工艺规划BOMPCL 前置管制中心限 Per-control Central LimitPDCA PDCA管理循環 Plan-Do-Check-ActionPDM产品数据管理Product Data ManagementPDM产品数据管理系统Product Data ManagementPERT计划评核术 Program Evaluation and Review Technique PFMEA过程失效模式及后果分析PLM产品生命周期管理Product Lifecycle ManagementPO訂單Purchase OrderPO订单Purchase OrderPOH预估在手量Product on HandPP回收期Payback PeriodPQP产品质量策划PQPT 产品质量策划小组PR采购申请Purchase RequestPR 產品確認Product readinessQA 品質保證 Quality AssuranceQC 品質管制Quality ControlQCC 品管圈 Quality Control CircleQE品质工程Quality EngineeringQFD品質機能展開 Quality function deploymentQFD质量功能展开QSR质量体系要求RCCP粗略产能规划 Rough Cut Capacity PlanningRMA 退貨驗收 Returned Material ApprovalROP再訂購點Re-Order PointROP再订购点 Re-Order PointSBOM销售BOMSCADA数据采集和监视控制Supervisory Control and DataAcquisition SCM 供應鏈管理Supply Chain Management SCV供应链可见性Supply Chain VisibilitySFA自动销售Sales Force AutomationSFC 現場控制 Shop Floor ControlSFMEA 系统失效模式及后果分析SI策略形成 Strategic intentSIS策略信息系统 Strategic Information SystemSO 訂單 Sales OrderSOA面向服务架构Service Oriented ArchitectureSOR 特殊訂單需求 Special Order RequestSPC统计过程控制Statistic process controlSPC 統計制程管制Statistical Process ControlTAV全部资产可视化Total Assets VisualizationTCP传输控制协议Transfer Control ProtocolTGR 运行情况良好TGW 运行情况不良Time to Market即时上市/及时切入生产Time to Money即时变现/及时大量交货Time to Volume即时量产/及时大量生产TOC 限制理論 Theory of ConstraintsTPM全面生产管理Total Production ManagementTQC 全面品質管制T otal Quality ControlTQM 全面品質管理 Total Quality ManagementUCL 管制上限Upper control limitUPCL前置管制上限Upper Per-control LimitUSL規格上限Upper Specification LimitVE/VA价值工程/价值分析VMI供货商免费存放Vendor Managed InventoryWAN广域网Wide Area NetworkWIP在製品Work In Processσ, s 標準差 Standard deviationσ2, S2 變異數 VariancePP生产验证Production ProveoutTTO工装设备试运行 Tool Try-Out(J1)整车投产Job 1DFMEA故障模式影响分析设计Design Failure Mode Effects AnalysisDVP设计验证计划Design Verification PlanDVP&R设计验证计划和结果 Design Verification Plan & Report FMEA故障模式影响分析Failure Mode Effects AnalysisFPDS福特产品开发系统 Ford Product Development System GYR 绿-黄-红 Green-Yellow-RedMRD 物料要求到厂日Material Required DateOTT可以开模 OK-TO-TOOLTKO工装启动T ooling-Kick-OffOEM 设备最初制造厂 Original Equipment ManufacturerFtF/F2F面对面会议 Face To FacePV 产品验证 Production ValidationOTS 完全工装样件Off-Tooling-SampleQOS质量运作体系Quality Operating SystemTS-16949 技术规范-16949Technical Specification – 16949APQP 先期产品质量计划Advanced Product Quality Planning IPD进厂日 In Plant DatePPM零件的百万分比率(适用于供应商不合格零件)Parts per Million (applied to defective Supplier parts) PPAP 生产件批准程序Production Part Approval ProcessPre-PV 产品预先验证Pre -Production ValidationDMAIC定义、测量、分析、改进、管理CTQ质量特性值FMEA故障模式及影响分析QFD质量功能展开PTS 课题跟踪系统Project Tracking SystemDPU单位产品缺陷数DPO每个机会的缺陷数;VOC顾客的要求(voice of the customer)Project课题Process过程Procedures程序Sample样本QCD质量、成本、交货期Quality, Cost, DeliveryTarget公差中心COPQ劣质成本R&R重复性和再现性Cp短期过程能力指数,以 Process Capability Index表示过程能力指数.(Cp=T/6σ,T为技术规范的公差幅度);Cpk长期过程能力指数,平均值与目标值不同时(产品质量分布的均值与公差中心不重合时)的过程能力指数。
质量管理专用英语序号英文缩写中文名称英文全称1 S PC 统计过程控制Stati stica l Pro cessContr ol2USL 规格上限U pperSpeci ficat ion L imit3 LSL规格下限 Lowe r Spe cific ation Limi t4 U CL 控制上限 Up per c ontro l lim it5LCL 控制下限L owercontr ol li mit6 PCL前置控制中心限 Pe r-con trolCentr al Li mit7 UPCL前置控制上限 Up per P er-co ntrol Limi t8 L PCL 前置控制下限 Lowe r Per-cont rol L imit9 Ca10 Cp 潜在过程能力指数 Ca pabil ity11 Pp12 Ppk13 CIP持续改进过程模式Conti nuous Impr oveme nt Pr ocess Mode l14ANOVA变异数分析 Ana lysis of V arian ce15 BSC平衡计分卡 Bala ncedScore doard16 可信区间 Conf idenc e int erval17 控制图Contr ol ch art18 CTQ品质鉴定 Crit icalto qu ality19 D PMO 每百万个机会的缺陷数Defec ts pe r mil lionoppor tunit ies20 DPM每百万单位的缺陷数 Defe cts p er mi llion21 D PU 单位缺陷数D efect s per unit22 D FSS 六个希格玛设计 Des ign f or si x sig ma23 DOE实验设计Desig n ofexper iment24 制造设计 Desi gn of manu factr ing25 FME A 故障型态与效应分析 Fai luremodeand e ffect anal ysis26 故障率F ailur e rat e27GageR&R 量规重复能力与重制能力 Gage repe atabi lity& rep roduc ibili ty 28直方图 His togra m29假设检定 Hyp othes is te sting30 K M 知识管理 Kno wledg e Man ageme nt31 MRP物料需求规划 Mat erial requ ire p lanni ng32常态分配 No rmaldistr ibuti on33 QFD品质机能展开 Qua lityfunct ion d eploy ment34 6σ六个希格玛 Six Sigm a35σ, s标准差S tanda rd de viati on36 σ2,S2 变异数 Var iance37 A BC 作业制成本制度 Acti vity-Based Cost ing38 BTF计划生产 Buil d ToForec ast39 BTO订单生产 Buil d ToOrder40 C PM 要径法 Cri tical Path Meth od41 CPM每一百万个使用者会有几次抱怨Compl aintper M illio n 42CRM 客户关系管理 Cust omerRelat ionsh ip Ma nagem ent43 CRP产能需求规划 Ca pacit y Req uirem entsPlann ing44 CS顾客满意度 Cust omerSatis facti on45 CTO客制化生产 Con figur ation To O rder46 DV T 设计验证 Des ign V erifi catio n Tes ting47 DS S 决策支持系统D ecisi on Su pport Syst em48 EC 设计变更/工程变更E ngine er Ch ange49 EC电子商务 Elec troni c Com merce50 E MC 电磁相容 El ectri c Mag netic Capa bilit y51EOQ 基本经济订购量 Eco nomic Orde r Qua ntity52 E RP 企业资源规划Enter prise Reso urcePlann ing53 FMS弹性制造系统 Fl exibl e Man ufact ure S ystem54 F QC 成品质量管理Finis h orFinal Qual ity C ontro l55IPQC制程质量管理 In-Proce ss Qu ality Cont rol56 IQC进料质量管理 In comin g Qua lityContr ol57 ISO国际标准组织 Int ernat ional Orga nizat ion f or St andar dizat ion 58 ISA R 首批样品认可I nitia l Sam ple A pprov al Re quest59 J IT 实时管理 Ju st In Time60 M ES 制造执行系统Manuf actur ing E xecut ion S ystem61 M O 制令Manuf actur e Ord er62 MPS主生产排程 Mast er Pr oduct ion S chedu le63 MRO请修(购)单 Mai ntena nce R epair Oper ation64 M RP 物料需求规划Mater ial R equir ement Plan ning65 MR PII 制造资源计划 Manu factu ringResou rce P lanni ng66 NFCF更改预估量的通知Notic e for Chan gingForec ast67 OEM委托代工 Orig inalEquip mentManuf actur e68ODM 委托设计与制造 Ori ginal Desi gn &Manuf actur e69OPT 最佳生产技术 Opti mized Prod uctio n Tec hnolo gy70 OQC出货质量管理 Out-goin g Qua lityContr ol71 PDCA PDCA管理循环Plan-Do-Ch eck-A ction72 P O 订单Purch ase O rder73 QA品质保证 Qual ity A ssura nce74 QC质量管理Quali ty Co ntrol75 Q CC 品管圈 Qua lityContr ol Ci rcle76 QE品质工程 Qual ity E ngine ering77 R MA 退货验收 Re turne d Mat erial Appr oval78 RO P 再订购点 Re-Order Poin t79SCM 供应链管理Suppl y Cha in Ma nagem ent80 SFC现场控制 Shop Floo r Con trol81 SO订单S alesOrder82 S OR 特殊订单需求Speci al Or der R eques t83TOC 限制理论T heory of C onstr aints84 T PM 全面生产管理Total Prod uctio n Man ageme nt85 TQC全面质量管理 Tot al Qu ality Cont rol86 TQM全面品质管理 To tal Q ualit y Man ageme nt87 WIP在制品W ork I n Pro cessmy6sq博客作者: sp ring797 发布日期:2006-4-13企业常用缩写5S : 5S管理A BC :作业制成本制度 (A ctivi ty-Ba sed C ostin g)AB B : 实施作业制预算制度(Activ ity-B asedBudge ting)ABM: 作业制成本管理(Acti vity-BaseManag ement)APS : 先进规画与排程系统 (A dvanc ed Pl annin g and Sche dulin g) AS P : 应用程序服务供货商(A pplic ation Serv ice P rovid er)A TP :可承诺量(Avai lable To P romis e)AV L : 认可的供货商清单(Ap prove d Ven dor L ist)BOM :物料清单 (Bil l OfMater ial)BPR :企业流程再造 (B usine ss Pr ocess Reen ginee ring)BSC: 平衡记分卡 (B alanc ed Sc oreCa rd)B TF :计划生产(Buil d ToForec ast)BTO :订单生产 (Bui ld To Orde r)CP M : 要径法 (C ritic al Pa th Me thod)CPM: 每一百万个使用者会有几次抱怨(Com plain t per Mill ion)CRM :客户关系管理 (C ustom er Re latio nship Mana gemen t)CR P : 产能需求规划 (Cap acity Requ ireme nts P lanni ng)C TO :客制化生产 (Con figur ation To O rder)DBR: 限制驱导式排程法 (Dru m-Buf fer-R ope)DMT :成熟度验证(Des ign M aturi ng Te sting)DVT : 设计验证(De signVerif icati on Te sting)DRP : 运销资源计划(Dist ribut ion R esour ce Pl annin g)DS S : 决策支持系统 (Dec ision Supp ort S ystem)EC: 设计变更/工程变更 (En ginee r Cha nge)EC :电子商务(Elec troni c Com merce)ECR N : 原件规格更改通知(En ginee r Cha nge R eques t Not ice)EDI :电子数据交换 (E lectr onicDataInter chang e)EI S : 主管决策系统 (Exe cutiv e Inf ormat ion S ystem)EMC : 电磁相容(El ectri c Mag netic Capa bilit y)EO Q : 基本经济订购量 (Ec onomi c Ord er Qu antit y)ER P : 企业资源规划 (Ent erpri se Re sourc e Pla nning)FAE : 应用工程师(F ieldAppli catio n Eng ineer)FCS T : 预估(For ecast)FMS : 弹性制造系统(Flex ibleManuf actur e Sys tem)FQC :成品质量管理 (F inish or F inalQuali ty Co ntrol)IPQ C : 制程质量管理 (In-Proce ss Qu ality Cont rol)IQC :进料质量管理 (I ncomi ng Qu ality Cont rol)ISO :国际标准组织 (I ntern ation al Or ganiz ation forStand ardiz ation) ISA R : 首批样品认可(Init ial S ample Appr ovalReque st)J IT :实时管理(Just In T ime)KM :知识管理(Know ledge Mana gemen t)L4L : 逐批订购法(Lot-for-L ot)L TC :最小总成本法 (Le ast T otalCost)LUC: 最小单位成本(Least Unit Cost)MES : 制造执行系统(Manu factu ringExecu tionSyste m)MO : 制令(Manu factu re Or der)MPS :主生产排程 (Ma sterProdu ction Sche dule)MRO: 请修(购)单(M ainte nance Repa ir Op erati on)M RP :物料需求规划 (Ma teria l Req uirem ent P lanni ng)M RPII: 制造资源计划(Manuf actur ing R esour ce Pl annin g)N FCF :更改预估量的通知N otice forChang ing F oreca stOE M : 委托代工(Origi nal E quipm ent M anufa cture)ODM : 委托设计与制造 (Ori ginal Desi gn &Manuf actur e)OL AP :在线分析处理 (On-Line Anal ytica l Pro cessi ng)O LTP :在线交易处理 (O n-Lin e Tra nsact ion P roces sing)OPT: 最佳生产技术(Optim izedProdu ction Tech nolog y)OQ C : 出货质量管理 (Out-goin g Qua lityContr ol)P DCA : PDCA管理循环(Plan-Do-C heck-Actio n)PD M : 产品数据管理系统 (P roduc t Dat a Man ageme nt)P ERT :计划评核术 (Pr ogram Eval uatio n and Revi ew Te chniq ue) P O : 订单(Pur chase Orde r)PO H : 预估在手量(Prod uct o n Han d)PR : 采购申请Pur chase Requ estQ A : 质量保证(Q ualit y Ass uranc e)QC : 质量管理(Qu ality Cont rol)QCC :品管圈(Qual ity C ontro l Cir cle)QE :质量工程(Quali ty En ginee ring)RCCP : 粗略产能规划(Roug h Cut Capa cityPlann ing)RMA :退货验收Retur ned M ateri al Ap prova lROP : 再订购点 (R e-Ord er Po int)SCM :供应链管理 (Su pplyChain Mana gemen t)SF C : 现场控制(ShopFloor Cont rol)SIS :策略信息系统 (S trate gic I nform ation Syst em)S O : 订单(Sal es Or der)SOR :特殊订单需求(Sp ecial Orde r Req uest)SPC: 统计制程管制(Stati sticProce ss Co ntrol)TOC : 限制理论 (T heory of C onstr aints)TPM : 全面生产管理T otalProdu ction Mana gemen tTQC : 全面质量管理(Tota l Qua lityContr ol)T QM :全面质量管理 (To tal Q ualit y Man ageme nt)W IP :在制品(WorkIn Pr ocessESD=Echo-Soun dingDevic e 回声探测仪;E lectr o Spa rk De tecto r 电火花检测器;Elect ronic Syst ems D ivisi on 电子系统部[美];El ectro stati c Sto rageDefle ction静电存贮偏转;El ectro-Stat ic di schar ge 静电放电;E merge ncy S hutdo wn 事故切断, 紧急停车;Estim atedShipp ing D ate 预计装运日期;Exp ort S ervic es Di visio n出口服务部([英]DTI);Exte rnalSymbo l Dic tiona ry 外部符号字典(计算机处理); Ex tra S uperDural umin(allo y) 超硬铝合金预计装运日期和静电放电应该用的最多吧s mt---surfa ce mo unt t echno logy表面着装技术。
Lean Sigma Glossary / Abbreviation ListAcronym Definition Descriptionα Alpha The maximum risk or probability ofmaking a Type I Error. This probabilityis always greater than zero and is usuallyestablished at 5%. The researcher makesthe decisions to the greatest level of riskthat is acceptable for a rejection of Ho. β Beta The risk or probability of making a TypeII Error, or overlooking an effectivetreatment or solution to the problem.μ Population mean Symbol used to describe the average foran entire populationσ Population standard deviation Symbol used for standard deviation ofentire population. Measure of thespread of the process (width of thedistribution).% R & R Gage % Repeatability and Reproducibility Addresses what percent of the TotalVariation is taken up by measurementerror.Affinity Diagram A management tool that assists withgeneral planning. It makes disparatelanguage information understandable byplacing it on cards and grouping the cardstogether in a creative manner. "Header"cards are used to summarize each group. ANOVA Analysis of Variance Hypothesis test used to analyze thedifference in means between two or moresamples.Assessment A systematic process of collecting andanalyzing data to determine the current,historical or projected status of anorganization.Assignable Cause The name for the source of variation in aprocess that is not due to chance andtherefore can be identified andeliminated.Audit "The inspection and examination of aprocess or quality system to ensurecompliance to requirements. Audit canapply to an entire organization or bespecific to a function or production step."(Dr. Joseph M. Juran)Baseline Measurement A beginning point based on an evaluationof the output over a period of time todetermine how the process performsprior to any improvement effort.Benchmarking The process of finding and adapting bestperformance.Best Practice A superior method or innovative practicethat contributes to improvedperformance.BB Black Belt A process improvement project teamleader who is trained and certified in theSix Sigma breakthrough methodologyand tools and who is responsible forproject execution.Boxplot "A graphic summary of a distributionwhere the overall dispersion and thecentral tendency or mean of the data arehighlighted." (Arturo Onnias)Brainstorming An idea-generating technique that usesgroup interaction to generate many ideasin a short time period. Ideas are solicitedin a non-judgmental, unrestrictedmanner from all members of a group.Designates a process step that thebusiness requires to stay in business.Capability The total range of inherent variation in astable process. It is determined usingdata from control charts.Capability index A calculated value used to compareprocess variation to a specification.Examples are Cp, Cpk. Can also be usedto compare processes to each other.Cause An established reason for the existence ofa defect or a problem.C/E or C&E Cause and Effect Matrix Prioritization matrix used to assist infocusing in on the root causes of processproblems.Central Tendency The tendency of data gathered from aprocess to cluster toward a middle value,somewhere between the high and lowvalues of measurement.Champion An upper level business leader whofacilitates the leadership,implementation, and deployment of theprocess quality initiative andbreakthrough philosophies.Charter A written commitment by managementstating the scope of authority for animprovement group. Resources,including time and money, are specificallyaddressed.Checksheet A form for recording data on which thenumber of occurrences of an event canbe recorded as ticks or checks.Code of Conduct Expectations of behavior mutually agreedupon by a team. (Also called "norms" or"rules of engagement.")Common Cause A source of process variation that isinherent to the process and is common toall the data.CI Confidence Interval An interval that can be said, with X%certainty, to contain the true processmean or standard deviation. “We are95% confident that the true processmean is in this interval.”Conformance The state of meeting and/or exceedingcustomer requirements and expectations.Consensus A state where everyone in the groupsupports an action or decision, even ifsome of them don't fully agree with it.Consensus Decision A decision made after all aspects of anissue, both positive and negative, havebeen reviewed or discussed to the extentthat everyone openly understands,supports and participates in the decision.Control Keeping a process within boundaries;minimizing the variation of a process.Control Chart A problem solving statistical tool thatindicates whether the system is in or outof control, as determined by computedcontrol limits.Control Limits "Defines natural boundaries of a processwithin specified confidence levels" [uppercontrol limit (UCL), and lower control limit(LCL) defined on a control chart]. (J. R.Russell)Cost-benefit Analysis A way to compare the costs and benefitsof plans. Can be used for comparing thefinancial outcomes of different actionsand determining if a particular actionmakes sense financially.COPQ Cost of Poor Quality Cost associated with poor qualityproducts or services. Examples:Product inspection, Sorting, Scrap,Rework, and Field Complaints.Cp Process Capability Index A calculated value used to compareprocess variation to a specification. Canalso be used to compare processes toeach other.CPD Customer Percent Defective The percentage of products or servicesthat are successfully completed on thefirst attempt without requiring remedialaction or rework.process variation to a specification. Canalso be used to compare processes toeach other.Countermeasure Action taken to counter the verified rootcause of a problem.Critical Characteristic A characteristic dependent on thefunctioning of budget constraints,competitive edge and/or customersatisfaction of the product.Critical Dependencies The interrelationships existing within oramong processes that are primary driversof defects or errors in a product orservice.CPIV Critical Process Input Variable The vital few process input variables thathave the greatest effect on the outputvariable(s) of interest. They are called“X’s”, normally 2 – 6 true criticalvariables.different organizational units or functionsthat are part of a team to solve problems,plan, and develop solutions affecting theorganization as a system.CVA Customer Value Added Term used in Value Analysis of a process.Designates a process step that thecustomer is willing to pay for.CT Cycle Time The average time from a unit enteringthe process until it is completed as afinished good.CTQ Critical to Quality A requirement that a customer values isconsidered Critical to Quality. What thecustomer pays for.Defect Any instance or occurrence where theproduct or service fails to meet customerrequirementsDefect Opportunity A type of potential defect on a unit ofthroughput (output) that is important tothe customer (i.e. Specific fields on aform that creates and opportunity forerror that would be important to thecustomer).Defective Any unit with one or more defects. Seealso DefectsDMAIC Define, Measure, Analyze, Improve, Control 5 steps during a Six Sigma projectDMADV or DMADVI Define, Measure, Analyze, Design, Validateor Define, Measure, Analyze, Design, Verify,ImplementNew process design tool. Commonlyused acronym for Design for Six Sigmamethods.DOTWIMP Defects, Overproduction, Transportation, Seven wastesWaiting, Inventory, Motion, ProcessingDPMO Defects Per Million Opportunities The number of defects in every millionopportunities. By taking into accountopportunities for defects, and not justdefects, we can compare processes ofdiffering complexity.DPU Defects Per Unit The number of defects in a unit orproduct. This measure does not takeinto account the number of opportunitiesfor defects, just the number of defects. DOE Design of Experiments An efficient method of experimentationwhich identifies, with minimum testing,factors (key process input variables) andtheir optimum settings that affect themean and variation.Empowerment Act of placing accountability, authority,and responsibility for processes andproducts at the lowest possible level.Whether or not a person is trulyempowered depends on their acceptanceof responsibility and accountability, theircapabilities, and the seriousness of theconsequences.ENT Entitlement The best a process measure could be.External Failure Nonconformance identified by externalcustomers.Y = F(x1, x2, x3, ……)F Function relating process inputs to processoutputsFMEA Failure Modes and Effects Analysis Method used in measure to understandrisks of failure in a process.quality troubles and restoring the statusquo." (Dr. Joseph M. Juran)FPY First Pass Yield The percentage of products or servicesthat are successfully completed on thefirst attempt without requiring remedialaction or rework.Five “whys” A technique for discovering the rootcause(s) of a problem and showing therelationship of causes by repeatedlyasking the question "Why?"Gage bias (Accuracy) The difference between the true orreference value and the observedaverage of multiple measurements of theidentical characteristic on the same part.Gage repeatability The variation in measurements obtainedwith one measurement instrument whenmeasuring the identical characteristic onthe same part.Gage reproducibility The variation in the average of themeasurements made by differentappraisers using the same measuringinstrument when measuring the identicalcharacteristic on the same part.Gap Analysis The comparison of a current condition tothe desired state.Goal "A broad statement describing a desiredfuture condition or achievement withoutbeing specific about how much andwhen." (Government Performance andResults Act of 1993)GB Green Belt A part-time process improvement projectteam leader who is trained and certifiedin the Six Sigma breakthroughmethodology and tools and who isresponsible for project execution.Typically works on smaller scopedprojects than B B’s.H o Null Hypothesis A statement of no change or difference.This statement is assumed true untilsufficient evidence is presented to rejectit. “If p is low, Ho has to go”aThis statement is considered true if Ho isrejected.Hawthorne effect Every change results (initially, at least) inincreased productivity. Often occursearly in a project, where processparticipants realize the process is understudy.Histogram A graphic way of summarizing data byplotting possible values on one axis andthe observed frequencies for those valueson the other axis. It helps one visualizethe central tendency and dispersion ofthe data.House of Quality A product-planning matrix developedduring quality function deployment thatshows the relationship of customerrequirements to the means of achievingthese requirements. The matrixindicates the impact each of the meanshas on one another.Implementation A structured approach that addresses alland how) of incorporating improvementsinto the process or system.Improvement The organized creation of beneficialchange; the attainment of unprecedentedlevels of performance. Levels ofimprovement range from incremental tomajor; e.g., "breakthrough"improvement.I/O Input Output Type of process map that includesprocess steps and their inputs andoutputs.Inspection Process of measuring, examining ortesting a product service against somerequirement to identify nonconformancebefore it reaches a customer.Internal failures "Product failures that occur before theproduct is delivered to externalcustomers." (Dr. Joseph M. Juran)documentation of standardizedprocesses.JIT Just In Time A concept where an item is delivered,just-in-time, where and when it isneeded.Kaizen In the business world, The word Kaizenhas been utilized by the Japanese tocharacterize a business strategy involveseveryone in an organization workingtogether to make improvements 'withoutlarge capital investments'Kanban "A communications tool in the'just-in-time' production and controlsystem. A kanban, or signboard, isattached to specific parts in a productionline signifying the delivery of a givenquantity. When all parts have been used,the same sign is returned to its originwhere it becomes an order for more."(Kaizen Institute)KJ Jiro Kawakita Name of a noted Japaneseanthropologist. Created method forsummarizing and characterizing largequantities of anthropological datagathered during his expeditions.KPIV Key Process Input Variable The vital few process input variables thathave the greatest effect on the outputvariable(s) of interest. They are called“X’s”, (normally 2 – 6)are called the “Y’s”, (usually 1). May beprocess performance measures orproduct characteristics.LCL Lower Control Limit Demonstrates lower limit of processexpected variability. Points outside ofcontrol limit should be investigated todetermine assignable cause. Formula is(process sample mean – 3 x samplestandard deviation). 99% of theprocess variation falls within the lowerand upper control limits.Little’s Law CT = CT * THLSL Lower Specification Limit Lowest acceptable value or measurementcustomer is willing to accept. Lowerlimit of customer requirement.MBB Master Black Belt A person who is “expert” in S ix Sigmabreakthrough techniques and projectimplementation. MBBs play a key role intraining and coaching Black Belts.Measurement System The complete process used to obtainmeasurements. It consists of thecollection of operations, procedures,gages and other equipment, software,and personnel used to assign a numberor value to the characteristic beingmeasured.MSA Measurement System Analysis Method to understand the capability ofthe measurement system.time that communicates vital informationabout a process or activity. A metricshould drive appropriate leadership ormanagement action. Physically, a metricpackage consists of an operationaldefinition, measurement over time andpresentation.assist in data analysis.Multi-Vari Type of multiple variable process study Assists in identifying the primary x’s thatimpact your Y’s. A graphic way ofdepicting variation within a single entity,machine or process, or between entities(produced at the same time or overtime). Allows the study of processinputs and outputs in a passive mode(natural day-to-day process).Multi-vari Chart A graphic way of depicting variationwithin a single part, machine or process,or between parts (produced at the sameprocess inputs and outputs in a passivemode (natural day-to-day process).Multivoting A structured voting process used toreduce a large number of items, usuallyideas, to a more manageable number forfurther processing or analysis.NGT Nominal Group Technique A tool for generating a list of ideas oropportunities (allows individuals toexpress their opinion). Voting andranking determine priorities.NVA Non-Value Added Term used in Value Analysis of a process.Designates a process step that is notrequired by the business or the customer.Normal distribution A continuous, symmetrical, bell shapedfrequency distribution for variable data.Out of control Describes a process that has variationsthat fluctuate outside the computedcontrol limits. This condition normallyindicates the process is not operating asdesired or that external factors have beenintroduced. A process "out of control" isnot stable and therefore is notpredictable.p p-value Test statistic used in Hypothesis testing.“If p is low, Ho has to go.”P/T Precision to customer tolerance ratio Addresses what percent of the toleranceis taken up by measurement error.Includes both repeatability andreproducibility.Paradigm A set of rules and regulations that definesboundaries and tells what to do to besuccessful within these boundaries.Pareto Chart A statistical method of measurement toidentify the most important problemsthrough different measurement scales;e.g., frequency, cost, etc. It directsattention and efforts to the mostsignificant problems.PPM Parts Per Million Same as DPMO.PDSA Plan Do Study Act Plan-Do-Study-Act: a structured, cyclicalmethodology for developing andimplementing actions of any type: Planfor the action by collecting and analyzingdata and developing alternatives; Do,implement the selected alternative(preferably on a small scale); Study,evaluate results and compare expectedvalues; Act, standardize action and/orWheel)Prevention A quality assurance strategy thatattempts to identify and correctunacceptable service or productcharacteristics during the design,development or production phases.Probability The chance of an event happening or acondition occurring in a random trial.Process The combination of people, equipment,materials, methods, and environmentthat produce output – a given product orservice. It is the particular way of doingsomething.Process map A step-by-step pictorial sequence of aprocess showing process inputs, processoutputs, cycle time rework operations,and inspection points.referred to as the customerrequirem ents. They are called the “Y’s”,(usually 1). May be processperformance measures or productcharacteristics.Process Spread The extent to which the distribution ofindividual values of the processcharacteristic (input or output variable)vary; often shown as the process averageplus and minus some number of standarddeviations. Other related measures ofspread include the range, and variance. QA Quality Assurance Used to describe either a company’squality methods or quality department.Assurance is typically more proactive.Quality Audit "A systematic, independent examinationand review to determine whether qualityactivities and related results comply withplanned arrangements and whether thearrangements are implementedeffectively and are suitable to achieve theobjectives." (ASQC Quality Progress, Feb92)QC Quality Control Used to describe either a company’squality methods or quality department.Control is typically more reactive.QFD Quality Function Deployment A system that translates customerrequirements (voice of the customer) intotechnical requirements for each stage ofdevelopment and/or production.and minimum data points in a sample.R & R Repeatability and Reproducibility Repeatability: The variation inmeasurements obtained with onemeasurement instrument when usedseveral times by one appraiser whilemeasuring the identical characteristic onthe same part.Reproducibility: The variation in theaverage of the measurements made bydifferent appraisers using the samemeasuring instrument when measuringthe identical characteristic on the samepart.RSM Response Surface Methods Method for using DOE to optimizeprocess parameter settings. Allows forfine process adjustment for ultimateoptimization.r b Rate of Bottleneck Process bottleneck rate or rate of theworkstation having the highest long termutilization in that process.RPN Risk Priority Number Metric used in FMEA to quantify risk.Calculated by multiplying the Severity ofthe Effect, the probability of Occurrenceof the Failure and the ability to Detect theFailure. RPN = S x O x DRTY Rolled Throughput Yield The multiplication of all the individual firstpass yields of each step of the entireprocess.s Sample Standard Deviation A measure of the average variation of asample (width of the distribution).SBTI Sigma Breakthrough Technologies, Inc. A consulting firm that specializes in SixSigma implementation.SMED Single Minute Exchange of DieSIPOC SIPOC Map - Suppliers Inputs ProcessOutputs Customers Single page process map that shows the scope of the process your project is examining.SD Standard Deviation A measure of the spread of the process(width of the distribution).SOP Standard Operating Procedure Standardized procedure that isdocumented and used by all processparticipants.SPACER Safety, Purpose, Agenda, Code of Conduct,Expectations and Roles Meeting effectiveness technique. Every meeting should begin with review of safety procedures, meeting purpose, agenda, meeting code of conduct, meeting expectations and meeting roles.Spec Specification The customer requirement for judgingacceptability of a particular characteristic.or s Standard deviation A measure of the spread of the process(width of the distribution).Statistical control The condition describing a process fromwhich all special/assignable causes ofvariation have been eliminated and onlycommon/random causes remain.Applies to both the mean (location) andstandard deviation (spread).SPC Statistical Process Control Method that uses control charting tomanage a process as it occurs.Storyboard Technique to graphically display themethodology used and progress made bya process action team; a board,specifically designated to displayinformationTakt time The pace of the process required to meetcustomer requirements. (Average worktime / Average Demand).Tampering The process of adjusting a stable processto try to compensate for a result that isundesirable or for a result that is extragood, the output that follows will beworse than if the tamperer had left theprocess alone.TOC Theory of Constraints A management philosophy that focusesthe organizations scarce resources onimproving the performance of the trueconstraint, and therefore the bottom lineof the organization.TCS Total Customer SatisfactionT, TH T o Throughput The average output of a productionprocess per unit of time.Average time it takes a single unit totraverse an empty production processprocess variability. Points outside ofcontrol limit should be investigated todetermine assignable cause. Formula is(process sample mean + 3 *s). 99% ofthe process variation falls within thelower and upper control limits.measurement customer is willing toaccept. Upper limit of customerrequirement.U Utilization Utilization of any workstation, capital,process or line is usually defined aspercent of time running divided byVA Value Added Term used in Value Analysis of a process.Designates a process step that is deemedvaluable either by the business or thecustomer.VSM Value Stream Map Type of process map that shows productand information flow. Also showsprocess data.Variation Difference between individualmeasurements. Differences areattributed to common and/or specialcauses.VOC Voice of the Customer Customer requirementsWIP W o Work In Process The inventory between the start and endpoints of a production process or series ofprocesses necessary to produce afinished good.WIP level for which the process achievesmaximum throughput.X Process Input variable In a Six Sigma project, we determine theinputs (X’s) that impact our processoutputs (Y’s).or X-bar Sample mean Symbol used to describe the average of apopulation sample.Y Process Output variable In a Six Sigma project, we determine theinputs (X’s) that impact our processoutputs (Y’s).。
6西格玛管理什么是6西格玛"σ"是希腊文的字母,是用来衡量一个总数里标准误差的统计单位。
一般企业的瑕疵率大约是3到4个西格玛,以4西格玛而言,相当于每一百万个机会里,有6210次误差。
如果企业不断追求品质改进,达到6西格玛的程度,绩效就几近于完美地达成顾客要求,在一百万个机会里,只找得出3.4个瑕疪。
6西格玛(6Sigma)是在九十年代中期开始从一种全面质量管理方法演变成为一个高度有效的企业流程设计、改善和优化技术,并提供了一系列同等地适用于设计、生产和服务的新产品开发工具。
继而与全球化、产品服务、电子商务等战略齐头并进,成为全世界上追求管理卓越性的企业最为重要的战略举措。
6西格玛逐步发展成为以顾客为主体来确定企业战略目标和产品开发设计的标尺,追求持续进步的一种质量管理哲学。
6西格玛的主要原则在推动6西格玛时,企业要真正能够获得巨大成效,必须把6西格玛当成一种管理哲学。
这个哲学里,有六个重要主旨,每项主旨背后都有很多工具和方法来支持:1.真诚关心顾客。
6西格玛把顾客放在第一位。
例如在衡量部门或员工绩效时,必须站在顾客的角度思考。
先了解顾客的需求是什么,再针对这些需求来设定企业目标,衡量绩效。
2. 根据资料和事实管理。
近年来,虽然知识管理渐渐受到重视,但是大多数企业仍然根据意见和假设来作决策。
6西格玛的首要规则便是厘清,要评定绩效,究竟应该要做哪些衡量(measurement),然后再运用资料和分析,了解公司表现距离目标有多少差距。
3. 以流程为重。
无论是设计产品,或提升顾客满意,6西格玛都把流程当作是通往成功的交通工具,是一种提供顾客价值与竞争优势的方法。
4.主动管理。
企业必须时常主动去做那些一般公司常忽略的事情,例如设定远大的目标,并不断检讨;设定明确的优先事项;强调防范而不是救火;常质疑「为什么要这么做」,而不是常说「我们都是这么做的。
5. 协力合作无界限。
改进公司内部各部门之间、公司和供货商之间、公司和顾客间的合作关系,可以为企业带来巨大的商机。
质量管理体系中英文缩写与其解释Engineering 工程/ Process 工序(制程)Man, Machine, Method, Material, 人,机器,方法,物料,环境- 可能导 4M&1E Environment 致或造成问题的根本原因 AI Automatic Insertion 自动插机ASSY Assembly 制品装配ATE Automatic Test Equipment 自动测试设备 BL Baseline 参照点 BM Benchmark 参照点BOM Bill of Material 生产产品所用的物料清单C&ED/C Cause and Effect Diagram 原因和效果图AED CA Corrective Action 解决问题所采取的措施电脑辅助设计.用于制图和设计3维物体 CAD Computer-aided Design 的软件对文件的要求进行评审,批准,和更改 CCB Change Control Board 的小组依照短期和长期改善的重要性来做持续CI Continuous Improvement 改善 COB Chip on Board 邦定-线焊芯片到PCB板的装配方法. CT Cycle Time 完成任务所须的时间 DFM Design for Manufacturability 产品的设计对装配的适合性设计失效模式与后果分析--在设计阶段 Design Failure Mode and Effect DFMEA 预测问题的发生的可能性并且对之采取Analysis 措施六西格玛(6-Sigma)设计 -- 设计阶段预 DFSS Design for Six Sigma 测问题的发生的可能性并且对之采取措施并提高设计对装配的适合性 DFT Design for Test 产品的设计对测试的适合性实验设计-- 用于证明某种情况是真实 DOE Design of Experiment 的根据一百万件所生产的产品来计算不良DPPM Defective Part Per Million 品的标准 Design Verification / Design DV 设计确认 Validation 客户要求的工程更改或内部所发出的工 ECN Engineering Change Notice 程更改文件 ECO Engineering Change Order 客户要求的工程更改静电发放-由两种不导电的物品一起摩 ESD Electrostatic Discharge 擦而产生的静电可以破坏ICs和电子设备在生产线上或操作中由生产操作员对产 FI Final Inspection 品作最后检查 F/T Functional Test 测试产品的功能是否与所设计的一样 FA First Article / Failure Analysis 首件产品或首件样板/ 产品不良分析功能测试-检查产品的功能是否与所设 FCT Functional Test 计的一样符合产品的装配,形状和外观及功能要 FFF Fit Form Function 求 FFT Final Functional Test 包装之前,在生产线上最后的功能测试失效模式与后果分析-- 预测问题的发 FMEA Failure Mode and Effect Analysis 生可能性并且对之采取措施 FPY First Pass Yield 首次检查合格率 FTY First Test Yield 首次测试合格率 FW Firmware 韧体(软件硬化)-控制产品功能的软件在波峰焊接之前,将PTH元件用手贴装 HL Handload 到PCB 上,和手插机相同 I/O Input / Output 输入 / 输出 iBOM Indented Bill of Material 内部发出的BOM(依照客户的BOM)线路测试-- 用电气和电子测试来检查 ICT In-circuit Test PCBA短路,开路,少件,多件和错件等等不良情报联络书-反馈信息所使用的一种表 IFF Information Feedback Form 格 IR Infra-red 红外线主要制程输入可变因素-在加工过程中, KPIV Key Process Input Variable 所有输入的参数/元素,将影响制成品的质量的可变因素主要制程输出可变因素-在加工过程中, KPOV Key Process Output Variable 所有输出的结果,所呈现的产品品质特征。
精益六西格玛精益六西格玛精益六西格玛((Lean Six Sigma,简写为LSS)什么是精益六西格玛精益六西格玛是一种集成了两种非常重要又相互补充的改进技术的综合方法论.精益六西格玛同时关注减少浪费和消除变异。
精益六西格玛是精益生产与六西格玛管理的结合,其本质是消除浪费。
精益六西格玛管理的目的是通过整合精益生产与六西格玛管理,吸收两种生产模式的优点,弥补单个生产模式的不足,达到更佳的管理效果。
精益六西格玛不是精益生产和六西格玛的简单相加,而是二者的互相补充、有机结合。
按照所能解决问题的范围,精益六西格玛包括了精益生产和六西格玛管理。
根据精益六西格玛解决具体问题的复杂程度和所用工具,我们把精益六西格玛活动分为精益改善活动和精益六西格玛项目活动,其中精益改善活动全部采用精益生产的理论和方法,它解决的问题主要是简单的问题。
精益六西格玛项目活动主要针对复杂问题,需要把精益生产和六西格玛的哲理、方法和工具结合起来。
传统六西格玛项目主要解决与变异有关的复杂问题,例如控制一个过程的产品一次通过率;而精益六西格玛项目解决的问题不仅包括传统六西格玛所要解决的问题,而且要解决那些与变异、效率等都有关的“综合性”复杂问题,例如不但要控制一个过程的产品一次通过率,还要优化整个生产流程,简化某些动作,缩短生产提前期,而且简化这些动作和过程变异的控制有直接联系。
通过实施精益六西格玛,组织流程可以在以下方面获得收益:减小业务流程的变异、提高过程的能力和稳定性、提高过程或产品的稳健性;少在制品数量、减少库存、降低成本; 减缩短生产节拍、缩短生产准备时间、准确快速理解和响应顾客需求;改善设施布置、减小生产占用空间、有效利用资源;提高顾客满意度、提高市场占有率。
精益生产精益生产源于20世纪六、七十年代早期的丰田生产方式,在丰田经过多年不懈的努力取得巨大成功之后,美国研究机构对丰田生产方式进行研究分析之后提炼出了这种生产方式的精髓,那就是精益生产。
Lean Sigma Glossary / Abbreviation ListAcronym Definition Descriptionα Alpha The maximum risk or probability ofmaking a Type I Error. This probabilityis always greater than zero and is usuallyestablished at 5%. The researcher makesthe decisions to the greatest level of riskthat is acceptable for a rejection of Ho. β Beta The risk or probability of making a TypeII Error, or overlooking an effectivetreatment or solution to the problem.μ Population mean Symbol used to describe the average foran entire populationσ Population standard deviation Symbol used for standard deviation ofentire population. Measure of thespread of the process (width of thedistribution).% R & R Gage % Repeatability and Reproducibility Addresses what percent of the TotalVariation is taken up by measurementerror.Affinity Diagram A management tool that assists withgeneral planning. It makes disparatelanguage information understandable byplacing it on cards and grouping the cardstogether in a creative manner. "Header"cards are used to summarize each group. ANOVA Analysis of Variance Hypothesis test used to analyze thedifference in means between two or moresamples.Assessment A systematic process of collecting andanalyzing data to determine the current,historical or projected status of anorganization.Assignable Cause The name for the source of variation in aprocess that is not due to chance andtherefore can be identified andeliminated.Audit "The inspection and examination of aprocess or quality system to ensurecompliance to requirements. Audit canapply to an entire organization or bespecific to a function or production step."(Dr. Joseph M. Juran)Baseline Measurement A beginning point based on an evaluationof the output over a period of time todetermine how the process performsprior to any improvement effort.Benchmarking The process of finding and adapting bestperformance.Best Practice A superior method or innovative practicethat contributes to improvedperformance.BB Black Belt A process improvement project teamleader who is trained and certified in theSix Sigma breakthrough methodologyand tools and who is responsible forproject execution.Boxplot "A graphic summary of a distributionwhere the overall dispersion and thecentral tendency or mean of the data arehighlighted." (Arturo Onnias)Brainstorming An idea-generating technique that usesgroup interaction to generate many ideasin a short time period. Ideas are solicitedin a non-judgmental, unrestrictedmanner from all members of a group.Designates a process step that thebusiness requires to stay in business.Capability The total range of inherent variation in astable process. It is determined usingdata from control charts.Capability index A calculated value used to compareprocess variation to a specification.Examples are Cp, Cpk. Can also be usedto compare processes to each other.Cause An established reason for the existence ofa defect or a problem.C/E or C&E Cause and Effect Matrix Prioritization matrix used to assist infocusing in on the root causes of processproblems.Central Tendency The tendency of data gathered from aprocess to cluster toward a middle value,somewhere between the high and lowvalues of measurement.Champion An upper level business leader whofacilitates the leadership,implementation, and deployment of theprocess quality initiative andbreakthrough philosophies.Charter A written commitment by managementstating the scope of authority for animprovement group. Resources,including time and money, are specificallyaddressed.Checksheet A form for recording data on which thenumber of occurrences of an event canbe recorded as ticks or checks.Code of Conduct Expectations of behavior mutually agreedupon by a team. (Also called "norms" or"rules of engagement.")Common Cause A source of process variation that isinherent to the process and is common toall the data.CI Confidence Interval An interval that can be said, with X%certainty, to contain the true processmean or standard deviation. “We are95% confident that the true processmean is in this interval.”Conformance The state of meeting and/or exceedingcustomer requirements and expectations.Consensus A state where everyone in the groupsupports an action or decision, even ifsome of them don't fully agree with it.Consensus Decision A decision made after all aspects of anissue, both positive and negative, havebeen reviewed or discussed to the extentthat everyone openly understands,supports and participates in the decision.Control Keeping a process within boundaries;minimizing the variation of a process.Control Chart A problem solving statistical tool thatindicates whether the system is in or outof control, as determined by computedcontrol limits.Control Limits "Defines natural boundaries of a processwithin specified confidence levels" [uppercontrol limit (UCL), and lower control limit(LCL) defined on a control chart]. (J. R.Russell)Cost-benefit Analysis A way to compare the costs and benefitsof plans. Can be used for comparing thefinancial outcomes of different actionsand determining if a particular actionmakes sense financially.COPQ Cost of Poor Quality Cost associated with poor qualityproducts or services. Examples:Product inspection, Sorting, Scrap,Rework, and Field Complaints.Cp Process Capability Index A calculated value used to compareprocess variation to a specification. Canalso be used to compare processes toeach other.CPD Customer Percent Defective The percentage of products or servicesthat are successfully completed on thefirst attempt without requiring remedialaction or rework.process variation to a specification. Canalso be used to compare processes toeach other.Countermeasure Action taken to counter the verified rootcause of a problem.Critical Characteristic A characteristic dependent on thefunctioning of budget constraints,competitive edge and/or customersatisfaction of the product.Critical Dependencies The interrelationships existing within oramong processes that are primary driversof defects or errors in a product orservice.CPIV Critical Process Input Variable The vital few process input variables thathave the greatest effect on the outputvariable(s) of interest. They are called“X’s”, normally 2 – 6 true criticalvariables.different organizational units or functionsthat are part of a team to solve problems,plan, and develop solutions affecting theorganization as a system.CVA Customer Value Added Term used in Value Analysis of a process.Designates a process step that thecustomer is willing to pay for.CT Cycle Time The average time from a unit enteringthe process until it is completed as afinished good.CTQ Critical to Quality A requirement that a customer values isconsidered Critical to Quality. What thecustomer pays for.Defect Any instance or occurrence where theproduct or service fails to meet customerrequirementsDefect Opportunity A type of potential defect on a unit ofthroughput (output) that is important tothe customer (i.e. Specific fields on aform that creates and opportunity forerror that would be important to thecustomer).Defective Any unit with one or more defects. Seealso DefectsDMAIC Define, Measure, Analyze, Improve, Control 5 steps during a Six Sigma projectDMADV or DMADVI Define, Measure, Analyze, Design, Validateor Define, Measure, Analyze, Design, Verify,ImplementNew process design tool. Commonlyused acronym for Design for Six Sigmamethods.DOTWIMP Defects, Overproduction, Transportation, Seven wastesWaiting, Inventory, Motion, ProcessingDPMO Defects Per Million Opportunities The number of defects in every millionopportunities. By taking into accountopportunities for defects, and not justdefects, we can compare processes ofdiffering complexity.DPU Defects Per Unit The number of defects in a unit orproduct. This measure does not takeinto account the number of opportunitiesfor defects, just the number of defects. DOE Design of Experiments An efficient method of experimentationwhich identifies, with minimum testing,factors (key process input variables) andtheir optimum settings that affect themean and variation.Empowerment Act of placing accountability, authority,and responsibility for processes andproducts at the lowest possible level.Whether or not a person is trulyempowered depends on their acceptanceof responsibility and accountability, theircapabilities, and the seriousness of theconsequences.ENT Entitlement The best a process measure could be.External Failure Nonconformance identified by externalcustomers.Y = F(x1, x2, x3, ……)F Function relating process inputs to processoutputsFMEA Failure Modes and Effects Analysis Method used in measure to understandrisks of failure in a process.quality troubles and restoring the statusquo." (Dr. Joseph M. Juran)FPY First Pass Yield The percentage of products or servicesthat are successfully completed on thefirst attempt without requiring remedialaction or rework.Five “whys” A technique for discovering the rootcause(s) of a problem and showing therelationship of causes by repeatedlyasking the question "Why?"Gage bias (Accuracy) The difference between the true orreference value and the observedaverage of multiple measurements of theidentical characteristic on the same part.Gage repeatability The variation in measurements obtainedwith one measurement instrument whenmeasuring the identical characteristic onthe same part.Gage reproducibility The variation in the average of themeasurements made by differentappraisers using the same measuringinstrument when measuring the identicalcharacteristic on the same part.Gap Analysis The comparison of a current condition tothe desired state.Goal "A broad statement describing a desiredfuture condition or achievement withoutbeing specific about how much andwhen." (Government Performance andResults Act of 1993)GB Green Belt A part-time process improvement projectteam leader who is trained and certifiedin the Six Sigma breakthroughmethodology and tools and who isresponsible for project execution.Typically works on smaller scopedprojects than B B’s.H o Null Hypothesis A statement of no change or difference.This statement is assumed true untilsufficient evidence is presented to rejectit. “If p is low, Ho has to go”aThis statement is considered true if Ho isrejected.Hawthorne effect Every change results (initially, at least) inincreased productivity. Often occursearly in a project, where processparticipants realize the process is understudy.Histogram A graphic way of summarizing data byplotting possible values on one axis andthe observed frequencies for those valueson the other axis. It helps one visualizethe central tendency and dispersion ofthe data.House of Quality A product-planning matrix developedduring quality function deployment thatshows the relationship of customerrequirements to the means of achievingthese requirements. The matrixindicates the impact each of the meanshas on one another.Implementation A structured approach that addresses alland how) of incorporating improvementsinto the process or system.Improvement The organized creation of beneficialchange; the attainment of unprecedentedlevels of performance. Levels ofimprovement range from incremental tomajor; e.g., "breakthrough"improvement.I/O Input Output Type of process map that includesprocess steps and their inputs andoutputs.Inspection Process of measuring, examining ortesting a product service against somerequirement to identify nonconformancebefore it reaches a customer.Internal failures "Product failures that occur before theproduct is delivered to externalcustomers." (Dr. Joseph M. Juran)documentation of standardizedprocesses.JIT Just In Time A concept where an item is delivered,just-in-time, where and when it isneeded.Kaizen In the business world, The word Kaizenhas been utilized by the Japanese tocharacterize a business strategy involveseveryone in an organization workingtogether to make improvements 'withoutlarge capital investments'Kanban "A communications tool in the'just-in-time' production and controlsystem. A kanban, or signboard, isattached to specific parts in a productionline signifying the delivery of a givenquantity. When all parts have been used,the same sign is returned to its originwhere it becomes an order for more."(Kaizen Institute)KJ Jiro Kawakita Name of a noted Japaneseanthropologist. Created method forsummarizing and characterizing largequantities of anthropological datagathered during his expeditions.KPIV Key Process Input Variable The vital few process input variables thathave the greatest effect on the outputvariable(s) of interest. They are called“X’s”, (normally 2 – 6)are called the “Y’s”, (usually 1). May beprocess performance measures orproduct characteristics.LCL Lower Control Limit Demonstrates lower limit of processexpected variability. Points outside ofcontrol limit should be investigated todetermine assignable cause. Formula is(process sample mean – 3 x samplestandard deviation). 99% of theprocess variation falls within the lowerand upper control limits.Little’s Law CT = CT * THLSL Lower Specification Limit Lowest acceptable value or measurementcustomer is willing to accept. Lowerlimit of customer requirement.MBB Master Black Belt A person who is “expert” in S ix Sigmabreakthrough techniques and projectimplementation. MBBs play a key role intraining and coaching Black Belts.Measurement System The complete process used to obtainmeasurements. It consists of thecollection of operations, procedures,gages and other equipment, software,and personnel used to assign a numberor value to the characteristic beingmeasured.MSA Measurement System Analysis Method to understand the capability ofthe measurement system.time that communicates vital informationabout a process or activity. A metricshould drive appropriate leadership ormanagement action. Physically, a metricpackage consists of an operationaldefinition, measurement over time andpresentation.assist in data analysis.Multi-Vari Type of multiple variable process study Assists in identifying the primary x’s thatimpact your Y’s. A graphic way ofdepicting variation within a single entity,machine or process, or between entities(produced at the same time or overtime). Allows the study of processinputs and outputs in a passive mode(natural day-to-day process).Multi-vari Chart A graphic way of depicting variationwithin a single part, machine or process,or between parts (produced at the sameprocess inputs and outputs in a passivemode (natural day-to-day process).Multivoting A structured voting process used toreduce a large number of items, usuallyideas, to a more manageable number forfurther processing or analysis.NGT Nominal Group Technique A tool for generating a list of ideas oropportunities (allows individuals toexpress their opinion). Voting andranking determine priorities.NVA Non-Value Added Term used in Value Analysis of a process.Designates a process step that is notrequired by the business or the customer.Normal distribution A continuous, symmetrical, bell shapedfrequency distribution for variable data.Out of control Describes a process that has variationsthat fluctuate outside the computedcontrol limits. This condition normallyindicates the process is not operating asdesired or that external factors have beenintroduced. A process "out of control" isnot stable and therefore is notpredictable.p p-value Test statistic used in Hypothesis testing.“If p is low, Ho has to go.”P/T Precision to customer tolerance ratio Addresses what percent of the toleranceis taken up by measurement error.Includes both repeatability andreproducibility.Paradigm A set of rules and regulations that definesboundaries and tells what to do to besuccessful within these boundaries.Pareto Chart A statistical method of measurement toidentify the most important problemsthrough different measurement scales;e.g., frequency, cost, etc. It directsattention and efforts to the mostsignificant problems.PPM Parts Per Million Same as DPMO.PDSA Plan Do Study Act Plan-Do-Study-Act: a structured, cyclicalmethodology for developing andimplementing actions of any type: Planfor the action by collecting and analyzingdata and developing alternatives; Do,implement the selected alternative(preferably on a small scale); Study,evaluate results and compare expectedvalues; Act, standardize action and/orWheel)Prevention A quality assurance strategy thatattempts to identify and correctunacceptable service or productcharacteristics during the design,development or production phases.Probability The chance of an event happening or acondition occurring in a random trial.Process The combination of people, equipment,materials, methods, and environmentthat produce output – a given product orservice. It is the particular way of doingsomething.Process map A step-by-step pictorial sequence of aprocess showing process inputs, processoutputs, cycle time rework operations,and inspection points.referred to as the customerrequirem ents. They are called the “Y’s”,(usually 1). May be processperformance measures or productcharacteristics.Process Spread The extent to which the distribution ofindividual values of the processcharacteristic (input or output variable)vary; often shown as the process averageplus and minus some number of standarddeviations. Other related measures ofspread include the range, and variance. QA Quality Assurance Used to describe either a company’squality methods or quality department.Assurance is typically more proactive.Quality Audit "A systematic, independent examinationand review to determine whether qualityactivities and related results comply withplanned arrangements and whether thearrangements are implementedeffectively and are suitable to achieve theobjectives." (ASQC Quality Progress, Feb92)QC Quality Control Used to describe either a company’squality methods or quality department.Control is typically more reactive.QFD Quality Function Deployment A system that translates customerrequirements (voice of the customer) intotechnical requirements for each stage ofdevelopment and/or production.and minimum data points in a sample.R & R Repeatability and Reproducibility Repeatability: The variation inmeasurements obtained with onemeasurement instrument when usedseveral times by one appraiser whilemeasuring the identical characteristic onthe same part.Reproducibility: The variation in theaverage of the measurements made bydifferent appraisers using the samemeasuring instrument when measuringthe identical characteristic on the samepart.RSM Response Surface Methods Method for using DOE to optimizeprocess parameter settings. Allows forfine process adjustment for ultimateoptimization.r b Rate of Bottleneck Process bottleneck rate or rate of theworkstation having the highest long termutilization in that process.RPN Risk Priority Number Metric used in FMEA to quantify risk.Calculated by multiplying the Severity ofthe Effect, the probability of Occurrenceof the Failure and the ability to Detect theFailure. RPN = S x O x DRTY Rolled Throughput Yield The multiplication of all the individual firstpass yields of each step of the entireprocess.s Sample Standard Deviation A measure of the average variation of asample (width of the distribution).SBTI Sigma Breakthrough Technologies, Inc. A consulting firm that specializes in SixSigma implementation.SMED Single Minute Exchange of DieSIPOC SIPOC Map - Suppliers Inputs ProcessOutputs Customers Single page process map that shows the scope of the process your project is examining.SD Standard Deviation A measure of the spread of the process(width of the distribution).SOP Standard Operating Procedure Standardized procedure that isdocumented and used by all processparticipants.SPACER Safety, Purpose, Agenda, Code of Conduct,Expectations and Roles Meeting effectiveness technique. Every meeting should begin with review of safety procedures, meeting purpose, agenda, meeting code of conduct, meeting expectations and meeting roles.Spec Specification The customer requirement for judgingacceptability of a particular characteristic.or s Standard deviation A measure of the spread of the process(width of the distribution).Statistical control The condition describing a process fromwhich all special/assignable causes ofvariation have been eliminated and onlycommon/random causes remain.Applies to both the mean (location) andstandard deviation (spread).SPC Statistical Process Control Method that uses control charting tomanage a process as it occurs.Storyboard Technique to graphically display themethodology used and progress made bya process action team; a board,specifically designated to displayinformationTakt time The pace of the process required to meetcustomer requirements. (Average worktime / Average Demand).Tampering The process of adjusting a stable processto try to compensate for a result that isundesirable or for a result that is extragood, the output that follows will beworse than if the tamperer had left theprocess alone.TOC Theory of Constraints A management philosophy that focusesthe organizations scarce resources onimproving the performance of the trueconstraint, and therefore the bottom lineof the organization.TCS Total Customer SatisfactionT, TH T o Throughput The average output of a productionprocess per unit of time.Average time it takes a single unit totraverse an empty production processprocess variability. Points outside ofcontrol limit should be investigated todetermine assignable cause. Formula is(process sample mean + 3 *s). 99% ofthe process variation falls within thelower and upper control limits.measurement customer is willing toaccept. Upper limit of customerrequirement.U Utilization Utilization of any workstation, capital,process or line is usually defined aspercent of time running divided byVA Value Added Term used in Value Analysis of a process.Designates a process step that is deemedvaluable either by the business or thecustomer.VSM Value Stream Map Type of process map that shows productand information flow. Also showsprocess data.Variation Difference between individualmeasurements. Differences areattributed to common and/or specialcauses.VOC Voice of the Customer Customer requirementsWIP W o Work In Process The inventory between the start and endpoints of a production process or series ofprocesses necessary to produce afinished good.WIP level for which the process achievesmaximum throughput.X Process Input variable In a Six Sigma project, we determine theinputs (X’s) that impact our processoutputs (Y’s).or X-bar Sample mean Symbol used to describe the average of apopulation sample.Y Process Output variable In a Six Sigma project, we determine theinputs (X’s) that impact our processoutputs (Y’s).。