设备验收报告

Equipment Acceptance Report

序号No.:

项目名称

Project Name 项目编号

Project no.

项目完成时间

Project finish time 项目试运行时间

Project trial run time

设备名称

Equipment name 规格/型号

spec./type

设备编号

Equipment no. 制造单位

Manufacturer

出厂日期

Date of Manufacture 出厂编号 Manufacture

no.

使用部门

Use Department 放置地点/工序

installationlocation/process

一、项目中设备验收情况Project equipment acceptance

1、 设备开箱检查、安装质量和安全检查

Equipment case-open inspection, installation quality and safety inspection:

是否含有可拆分的、单独的计算机设备? □Yes, □ No, 如果有则执行7.

Is there any detachable or individual computer equipment? If there is, implement point 7

检查结论Inspection Conclusion:

工程部/采购部/项目执行者

Infrastructure Dept, Purchase Dept, Project Executer: 审核Check:

2、 设备运行前进行接地电阻检查,确保设备的安全。验收后纳入每年度的接地电阻的检查。

Before being put into operation, the equipment shall be checked for its ground resistance for safety

consideration. After acceptance, the ground resistance of equipment shall be checked every year.

测量值measured value: 结论conclusion: 正常normal □ 不正常abnormal□

(标准standard≤4 Ω )

工程部主管审核Checked by electrical supervisor of Infrastructure Dept:

3、 设备运行记录Equipment Operation Record:

a. 设备设置运行各种参数varied operation data:

实际显示数字对比情况compared to real data:

b. 设备运行情况operation status: □ 正常normal □异常,出现故障abnormal, failure

c.工序能力processing capability:

d.其他others:

使用部门审核 use dept. Check:

4、设备的计量情况equipment metering condition:

(必要时可附设备的校准记录)if necessary, equipment calibration record can be attached

质量部审核 Quality Check:

5、生产产品、试件质量检查状况: (可附材料/零件试用报告或产品检验报告)

检查项目

Inspection characteristics 实测情况measurements 标准

criterion 结论

conclusions

质量部审核Quality Check:

6、设备是否适合工艺技术要求?

Equipment meet process technical requirements or not?

技术部审核Tech. Check: 7、计算机及软件的验收?Acceptance of computer and softwares :

IT部门审核IT Check:

是否涉及环境影响?(是,请填下表;没有不填下表内容) □ No □Yes

Environmental impact involved? (if yes, fill in the following form)

二、项目涉及环境/安全影响的措施实施验收及评价情况

The Execution, Acceptance and Evaluation of environment/safety impact related measures

核对需要政府主管部门登记或批准的手续是否齐全和有效Check the

completeness and validity of documents for the approval of government 环境主管部门登记或批准的手续完成情况

(in environmental government)

环保主管(E.P. supervisor): 日期Date:

1、评价项目实施过程中减少环境影响的措施落实情况check the

implementation of

measures of reducing

environment impact

2、评价职业健康的措施落实情况Check the

implementation of

measures of health

环保主管(E.P. supervisor): 日期Date:

1、此设备为国家规定的特种设备需要在质检局进行登记备案的完成情况

(in Safety government)

2、评价项目实施过程中安全措施落实情况check

the implementation status of safety measures during the construction of project

安全主管签字(Safety supervisor ) 日期Date:

EHS经理审核意见: EHS Manager check

EHS经理(EHS Manager) 日期Date:

投入运行后纳入下一步管理工作的责任部门Responsibility after the project running

责任部门归属Responsibility:

□工程部infrastr. □环保E.P. □安全Safety □其它部门Other Dept

审批结论Factory manager’s conclusion:

一、项目中设备验收Project equipment acceptance

□验收通过pass □不通过no pass

总经理签字/日期(CEO/Date): 二、项目涉及E.H.S影响措施实施验收

The Execution, Acceptance and Evaluation of E.H.S

impact related measures

□验收通过pass □不通过no pass

备注:开箱检查根据设备清单和资料清单(包括说明书、合格证、图纸资料、电气资料、附件及工具清单)进行。

Remarks: case open inspection shall be carried out per the list of equipment and list of documents (incl. Usage description manual,

certificate of conformity, drawings and data, electrical documents, annex and list of tools)

表格编号form no.:A-PQEO-12/1-2/02

注note:本表一式三份,工程部门、EHS部门、财务部门各一份3 copies total1, 1 copy for Infra dept, 1 for Purchase dept and 1 for

Financial dept. respectively.