目录Contend一、技术文件编制说明Description on Technical Documents Formulation (3)1、编制说明 Description on formulation (3)2、编制依据 Basis of formulation (4)二、工程描述 Engineering Description (6)1、项目概况 Project General Condition (6)2、投标范围 Bidding Scope (7)3、工期要求Construction period (8)三、注册文件Registration Documents (9)四、组织机构Organization (20)五、直接劳动力计划表Resolution Table of Plan of DirectLabor (23)六、拟派主要管理人员Construction Team Organization Plan (23)七、施工方案Construction Process (32)1、电气施工安装 Electrical construction and installation (32)2、给排水管道安装 Water Supply & Drainage Pipeline Installation1183、工艺管道安装 Process Pipeline Installation (133)4、暖通工程安装HVAC engineering, installation (160)八、施工质量进度计划控制措施 Schedule construction quality controlmeasures (194)九、施工组织、部署和协调The Organization, Disposition and Coordinationof the Construction (199)十、现场临时设施方案Temporary Facilities Plan on Site (204)十一、施工主要设备 Main Construction Equipment (207)十二、主要工程材料表The main construction material List (215)十三、分包计划与管理 Subcontract and Management (218)十四、安全健康环境和卫生方案 Safty health environment and sanitationplan (225)一、技术文件编制说明Description on Technical Documents Formulation1、编制说明 Description on formulation1.1我公司接受招标文件后,对招标文件提供的设计图纸、技术说明、相关附件等进行认真的研究。
为确保本招标工程的施工质量与进度,结合现场实际情况及我单位施工力量,初步拟订了本技术投标文件,用于指导和组织施工。
本技术投标文件未尽之处均参照现行国家有关规程、规范及招标文件的技术要求。
After receiving the bidding documents, our Company has carried out careful study on the designing drawings, technical specificationsand relevant appendixes provided in the tender documents. In orderto ensure the construction quality and schedule of the tenderingengineering, we have, binding with the site actual situation andconstruction force of our facility, initially formulated thistechnical tender documents as instructions and constructionarrangement. Refer to the state present regulations, standards andtechnical requirements of the bidding documents for matters notmentioned in the tender documents.1.2如果我单位有幸中标,则在实际施工过程中,严格执行现行规范和标文中技术说明的要求和做法;在施工程序的安排上,合理组织,切实可行;贯彻执行ISO9000系列标准,以质量保证体系、HSE安全保证体系的正常运行来保证工程优质、安全完成。
In case we are lucky and successful in the bid, we shall be strictly comply with the existing standards and the technical specifications requirements and practices in the bidding documents during the actual construction process;Reasonably arrange construction procedures to ensure their practical feasibilities; implement ISO9000 series standards, ensure a high quality and safety completion of the engineering backing on the normal operation of quality assurance system and HSE safety assurance system.1.3我单位将严格执行管理公司的统筹控制计划,确保本工程中标后立即进入施工状态,并加大劳动力投入,加快施工进度,确保按时竣工。
We will follow strictly the whole control plan of the Owner, ensure animmediate starting after the successful bidding of the engineering, and laborforce shall be increased to speed up construction schedule and ensure on timecompletion of the engineering.1.4根据管理公司的施工计划和管理要求,我公司将派出精干的管理、保证施工人员的整体素质符合该工程的要求。
We will send our exquisite management as per the requirements of constructionplan and management requirements to ensure the compliance of whole constructionworkers with the requirements of the engineering.2、编制依据 Basis of formulation2.1 招标单位提供的招标图纸以及招标文件中的技术说明和附件Technical specifications and appendixes of the bidding drawings and biddingdocuments provided by the Tenderee.2.2《建筑地基基础工程施工质量验收规范》 GB50202-2002Code For Acceptance of Construction Quality of Building Foundatio2.3《工程测量规范》 Code for Engineering Surveying GB50026-932.4《建筑地基基础工程施工质量验收规范》 GB50202-2002Code For Acceptance of Construction Quality of Building Founda2.5《混凝土结构试验方法标准》 GB50152-92Testing Methods of Concrete Structure2.6《混凝土质量控制标准》 GB50164-92Standard of Quality Control of Concrete2.7《砌体工程施工质量验收规范》 GB50203-2002Code For Acceptance of Construction Quality of Masonry Engineering2.8《屋面工程施工质量验收规范》 GB50207-2002Code For Acceptance of Construction Quality of Roof Engineering2.9《建筑地面工程施工质量验收规范》 GB50209-2002 Code For Acceptance of Construction Quality of Ground Engineering2.10《建筑装饰装修工程质量验收规范》 GB50210-2001Code For Acceptance of Construction Quality of Architectural Decoration andOrnamentation Engineering2.11《钢筋焊接及验收规程》 JGJ18-2003Specification For Welding and Acceptance of Reinforcing Steel Bars 2.12《建筑给水排水及采暖工程施工质量验收规范》 GB50242-2002Code For Acceptance of Construction Quality of Water Supply Drainage andHeating Works GB50242-20022.13《给排水管道工程施工验收规范》 GB50268-97Code For Construction and Acceptance of Water Supply and Sewerage Pipelines 2.14 《钢结构工程施工质量验收规范》 GB50205-2002Code For Acceptance of Construction Quality of Steel Structure Engineering 2.15《建筑钢结构焊接技术规程》 JGJ81-2002Technical specification for Welding of Steel Structure of Building 2.16 《钢结构高强度螺栓连接设计、施工及验收规程》 JGJ82-91Code For Design, Construction and Acceptance of High Strength Bolt JointFor Steel Structure2.17《压型金属板设计施工规程》 YBJ216-83Codefor Designand Construction of PressingSheet Metal2.18《建筑电气工程施工质量验收规范》 GB50303-2002Code For Acceptance of Construction Quality of Building Elec Engineering2.19《通风与空调工程施工质量验收规范》 GB50243-2002Code For Acceptance of Construction Quality of VAC Engineering2.20《建筑工程施工质量验收统一标准》 GB50300-2001Unified Standard For Constructional Quality Acceptance of BuildingEngineering GB50300-20012.21《建筑施工安全检查标准》 JGJ59-99Standardof Construction Safety Inspection JGJ59-992.22《建筑施工高处作业安全技术规范》 JGJ80-91Technical Code For Safety of High Altitude Operation of Building Construction2.23《建筑施工扣件式钢管脚手架安全技术规范》 JGJ130-2001Technical Code For Safety of Steel Tubular Scaffold With Couplers InConstruction2.24《建筑机械使用安全技术规范》 JGJ33-2001Technical Specification For Safety Operation of Construction Machinery 2.25《施工现场临时用电安全技术规范》 JGJ46-88Safety Management For Temporary Electricity Usage In Construction Site 2.26《建设工程施工现场供用电安全规范》 GB50194-1993Safety Code of Power Supply and Consumption For Installation ConstructionEngineering二、工程描述Engineering Description1、项目概况 Project General Condition项目名称:XXX电消防工程Project name :Second phase project of TRUMPF Machine Tools (China) Co., Ltd该项目位于XXXXThis project is located in No 68, Nanjing Road, Taicang City, Jiangsu Province, China,and the owner of this project is Trumpf (China) Co., Ltd.本工程为工业厂房,设计范围为二期厂房(4号建筑)、二期门卫(5号建筑)、二期自行车棚(6号建筑)、二期吸烟棚(7号建筑)。