抽水蓄能机组背靠背启动中跳闸技术改造方案常永亮;张兵海;王勇;何忠华【摘要】针对抽水蓄能机组在背靠背拖动过程中若发生电气或机械故障跳闸,当跳开拖动机组和被拖动机组的灭磁开关的时间差过大时,会在启动回路中产生很大的短路电流,引起继电保护误动作,严重时会损毁启动回路的电气设备,提出一种抽水蓄能机组背靠背跳闸技术改造方案,通过在机组保护系统中添加“跳相邻机组单元”接点,与“跳本机组”接点同时动作,达到同时跳开拖动和被拖动机组灭磁开关的目的.技术改造后的试验证明了方案的正确性和有效性.%When the trip is occurred during the back-to-back starting of pumped-storage units as electrical or mechanical faults and there is a larger time difference between the field breaking switches, the large short -circuit current will be generated in the starting circuits and leads to the malfunction of relay protection, even to damage the electrical equipments of starting circuit in a severe condition.A trip transformation was presented for the back-to-back starting of pumped-storage units, in which, the contact of "Breaking adjacent unit" was added in protection system and will be simultaneously operated with the contact of "Breaking local unit" to meet the requirements on breaking the units on the same time. The tests show that the transformation program is effective.【期刊名称】《水力发电》【年(卷),期】2011(037)007【总页数】3页(P34-36)【关键词】抽水蓄能机组;背靠背启动;故障跳闸;技术改造方案【作者】常永亮;张兵海;王勇;何忠华【作者单位】河北省电力研究院,河北石家庄050021;河北省电力研究院,河北石家庄050021;河北张河湾蓄能发电有限责任公司,河北井陉050300;河北张河湾蓄能发电有限责任公司,河北井陉050300【正文语种】中文【中图分类】TV737;TV743(222)0 引言水泵工况启动是可逆式抽水蓄能机组重要的工况转换过程,而背靠背启动方式是抽水蓄能机组水泵启动的重要启动方式之一,该方式涉及拖动设备的选择、拖动机组和被拖动机组的流程控制、励磁、调速器以及保护配合等相关设备的联合控制,是一个复杂的机电协调控制过程,背靠背启动成功与否直接关系到抽水蓄能机组和电网的安全稳定运行。
Equipment&unit总第332期(设备与机组:某抽水蓄能电站首次背靠背拖动试验介绍刘攀(中国葛洲坝集团机电建设有限公司成都611130)摘要:本文介绍了背靠背拖动试验时励磁系统、调速器、保护系统的参数设定思路,并对某抽水蓄能电站首次背靠背拖动试验时产生的现象进行了阐述与分析,对励磁系统、调速器、保护系统的参数进行了优化,经优化后的参数成功将被拖动机组拖至额定转速并网,提高了本电站背靠背拖动方式的开机成功率及可靠性和稳定性.关键词:抽水蓄能背靠背拖动BTB调速器励磁中图分类号:TM312文献标识码:B文章编号:1002-3607(2020)02-0027-03机组抽水调相启动问题在抽水蓄能电站机组的日常运行中占据非常重要的地位。
目前最常用的抽水调相启动方式是以静止变频器启动为主,背靠背拖动为辅。
背靠背拖动作为静止变频器的一种辅助备用方式,仍然是不可或缺的。
在电网或变频系统出现故障时,采用背靠背拖动可保证机组的正常运行,能提高蓄能电站机组运行的可靠性和稳定性。
背靠背拖动就是拖动机组(以发电机方式运行)与被拖动机组(以电动机方式运行)同步起动的一种启动方式。
通常,抽水蓄能电站需经过多次背靠背拖动试验后才会成功将被拖动机组拖至同步并网。
1背靠背拖动试验主要系统参数设定思路1.1励磁电流的设定背靠背拖动过程可以分为两个阶段:从拖动机的导叶开启到被拖动机达到同步为止的拖动同步阶段;被拖动机组与拖动机组达到同步后直到被拖动机组同期并网的同步加速阶段。
背靠背拖动的拖动同步阶段,励磁电流的作用在于保持拖动机和被拖动机的同步,励磁电流过小会导致转子磁场过弱,影响两机的同步。
理论和工程实践都表明,背靠背方式拖动过程中,如果两台机组参数相同(两台机组参数不相同的情况比较少见),励磁电流宜设定为接近额定空载励磁电流。
各电站励磁电流取值不尽相同,最佳的励磁电流应通过试验确定,大致为0.45~0.65倍额定负载励磁电流。
运行与维护2019.13 电力系统装备丨115Operation And Maintenance2019年第13期2019 No.13电力系统装备Electric Power System Equipment 通过上述的分析可知,改进后的控制回路通过增加了时间继电器及其他元件实现了在温度条件达不到要求而又不恶劣(15~30℃)时两个加热器自动切换工作;在温度条件恶劣(低于15℃)时两个加热器同时工作。
这既保证了汇控柜内能始终处于额定的工作温度条件下,也很好地解决了目前加热器工作时间严重失衡存在的加热效果不佳和局部高温风险。
从而达到改善加热器工作条件,延长其寿命,降低故障率,提高了加热效果和加热器的循环使用效率。
3 220 kV 变电站HGIS 汇控柜温湿度控制系统的改造实施根据上文所提出的改进措施,制定出实施对策,实施步骤为:(1)准备装置备品,包括循环延时时间继电器、指示灯、空气开关、暂停、复位开关、中间继电器等。
(2)搭建模拟回路(如图4所示)。
(3)模拟回路性能测试。
模拟测试中,指示灯模拟现场中的加热器;空气开关模拟温湿度控制器。
最终测试结果显示:当闭合一个空气开关时,两个指示灯回路循环导通,指示灯循环亮;当两个空气开关同时闭合时,两个指示灯回路都导通,两个指示灯同时亮。
(4)站内工作实际应用改造。
通过此方法对加热器控制回路的改进,延长了加热器使用寿命,进而减少了加热器的更换次数,节省了更换费用。
同时也节约了人力资源,减少了设备损耗。
此外,在提高加热器使用效率后还很好地保证了柜内的温度保持恒定,减少了设备因为温度过高而误动或者拒动。
图4 模拟回路4 结语该方法提高了加热器的使用效率,对电网的健康、安全稳定运行意义重大。
以确保不发生继电保护原因引起的稳定事故和电网扩大事故,不发生因运行、维护、管理不到位造成的继电保护责任事故和“三误”事故,确保继电保护装置安全可靠运行,夯实电网安全工作基础。
抽水蓄能机组背靠背启动过程中机组励磁配合王干军;赵兵【摘要】在背靠背启动过程中,机组的励磁配合是需要解决的一个关键问题.该文根据同步电机的状态方程,建立了抽水蓄能机组背靠背启动的数学模型.基于上述模型,对包括正常启动和启动过程中电动机突然灭磁和制动等工况下抽水蓄能机组的背靠背启动过程进行仿真研究.基于分析背靠背启动的仿真结果,发现背靠背启动中两机励磁系统配合存在的问题,并提出相应的解决方案.通过在LCU与保护回路之间增加逻辑控制的硬接线回路保证两机同时灭磁,解决了两机灭磁次序问题.%In the process of back-to-back starts, the excitation systems coordination between two units is a key issue. Using the state equations of synchronous motor, a mathematical model of back-to-back starting was established in this paper. Based on above research, back-to-back starting process for pumped storage units under different conditions were simulated, which includes the normal starting and starting processes with motor de-excitation and braking and so on. With the research of simulations, the problems of excitation systems coordination between two units were recognized, and an appropriate solution for this problem is proposed. By adding a hard-wire circuit between LCU and the tripping circuit and each of these circuits is added with an additional relay, two excitation systems can be removed simultaneously.【期刊名称】《电力系统及其自动化学报》【年(卷),期】2013(025)002【总页数】5页(P143-147)【关键词】抽水蓄能电站;数学模型;背靠背启动;励磁配合【作者】王干军;赵兵【作者单位】广东电网公司电力科学研究院,广州510080【正文语种】中文【中图分类】TM732随着我国电网容量的不断增大,调峰填谷、提高水火电站利用率等问题越来越重要。
第39卷增刊2水电姑机电技术Vol.39No.S2182016 年 12 月Mechanical & Electrical Technique of Hydropower StationDec.2016黑麋峰抽水蓄能电厂背靠背启动过程分析任鑫,刘平,吴志峰,何忠华(湖南黑麋峰抽水蓄能有限公司,湖南长沙410213)摘要:目前大型可逆式抽水蓄能机组在水泵工况启动时,可以采用静止变频器(SFC )启动和背靠背(BTB )启动2种方式。
正常情况下机组采用SFC 启动方式,在SFC 故障或者检修维护时采用BTB 启动方式,本文着重介绍了黑麋峰 抽水蓄能电厂机组背靠背启动过程中监控、调速器、励磁控制流程,并对调试中出现的问题进行了综合分析。
关键词:黑麋峰抽水蓄能电厂;背靠背启动;控制流程;励磁;调速器中图分类号:TV 743文献标识码:BD 0I : 10.13599/j .cnki .11-5130.2016.S 2.0061引言黑麋峰抽水蓄能有限公司位于湖南省长沙市望 城县桥驿镇杨桥村,紧邻湖南电网负荷中心长、株、 潭地区。
电站距长沙市区公路里程25 km ,距离湘 潭、株洲不足60 km ,地理位置优越,是湖南省建设 贿麵水勸嫩占。
电站安装4台量300 M W可逆式机组,总装机容量1 200 MW ,以1回500 kV 出线黑沙线接人湖南电网500 kV 沙坪变电站,线路 输电距离约16.4 km 。
设计年发电量16.06亿kW .h , 年抽水耗用低谷电量21.41亿kW *h ,年发电利用小 时数1 338 h ,年抽水利用小时数1 732 h 。
黑麋峰公司 为日调节纯抽水蓄能电站,主要担负湖南及华中电网调峰播、调频、调相及事故备用割壬务。
可逆式抽水蓄能机组水泵启动主要有两种方 式,一种是SFC 启动,一种是背靠背启动,其中背靠 背启动涉及拖动机和被拖机的监控流程配合、励磁 配合、调速器配合、一次及辅助系统配合。
18第42卷 第1期2019年1月Vol.42 No.1Jan.2019水 电 站 机 电 技 术Mechanical & Electrical Technique of Hydropower Station0 引言泰山抽水蓄能电站(简称“泰蓄”)位于山东省的泰山西南麓,电站在电网中主要担负调峰、填谷作用,兼有调相和紧急事故备用等功能。
泰安抽水蓄能电站装机为容量4×250MW的可逆式水泵水轮机组和发电电动机组,其主要运行工况有发电、发电调相、抽水、抽水调相等[1]。
泰蓄机组抽水调相工况启动采用SFC启动为主,背靠背启动为辅的方式。
泰蓄机组SFC启动成功率很高,背靠背启动在日常运行中较少用到。
泰蓄机组背靠背启动时,有时会出现启动失败的情况。
本文分析了泰蓄机组背靠背启动的失败原因,提出了改善背靠背启动成功率的方法。
1 背靠背启动方式背靠背启动方式是1台机组由另1台机组拖动并网实现抽水调相启动的方式。
2台机组中被拖动机组以水泵电动机方式运行,拖动机组以水轮发电机方式运行,拖动机组与被拖动机组通过建立电气连接轴实现拖动[2]。
背靠背启动成功率受2台机组外加励磁电流、拖动机组导叶开启规律、2台机组制动转矩和保护等多方面因素的影响,各环节要相互协调好才能保证启动成功率。
泰蓄机组背靠背启动流程如图1所示。
主要步骤具体说明如下:图1 背靠背启动流程示意图收稿日期:2018-10-29作者简介:肖仁军(1984-),男,高级工程师,从事抽水蓄能电站设备运行管理工作。
泰山抽水蓄能机组背靠背启动流程优化方法肖仁军1,夏 鑫1,刘晓波2,白剑飞2,谷东永2(1.山东泰山抽水蓄能电站有限责任公司,山东 泰安271000;2.北京中水科水电科技开发有限公司,北京100038)摘 要:针对泰蓄机组抽水调相工况背靠背启动失败的情况,分析了启动失败的原因并阐述了改进方法。
关键词:背靠背启动;原因;改进中图分类号:TV743 文献标识码:B 文章编号:1672-5387(2019)01-0018-03DOI:10.13599/ki.11-5130.2019.01.00519第1期(1)被拖动机组(3号机)收到上位机下发的“3号机由2号机背靠背拖动启动令”后,开机至辅助设备运行。