监理工作总结
- 格式:doc
- 大小:47.50 KB
- 文档页数:7
监理公司工作总结5篇(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。
文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如工作总结、工作计划、调研报告、演讲致辞、合同协议、条据文书、规章制度、教学资料、作文大全、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, our store provides various types of classic sample essays, such as work summaries, work plans, research reports, speeches, contract agreements, documents, rules and regulations, teaching materials, complete essays, and other sample essays. If you would like to learn about different sample formats and writing methods, please pay attention!监理公司工作总结5篇通过工作总结,我们可以更好地了解自己在工作中的目标和期望,工作总结是一个重要的工具,可以帮助我们梳理工作中的成功经验和教训,本店铺今天就为您带来了监理公司2024年工作总结5篇,相信一定会对你有所帮助。
监理工作总结4篇监理工作总结-1在这一时期的监理工作中,我负责监督和检查建筑工程的进展情况,并确保其符合相关的法规和标准。
我积极参与每一个工程阶段,与施工人员密切合作,以确保项目的顺利进行。
我主要的工作内容包括了解工程进展情况,检查施工现场并提出改进意见,以及解决可能出现的问题。
在工程开工前,我与施工人员一起制定施工计划,并确保施工按计划进行。
在整个施工过程中,我密切监督每个工作阶段的质量和进度,并及时报告给相关部门。
在监理工作中,我始终坚持严格遵守法规和标准,并尽最大努力确保工程的质量和安全。
我与施工人员进行了密切合作,及时解决了一些技术难题,并采取了相应的措施来改善工程质量。
在这一时期的监理工作中,我还与工程师和设计师进行了有效的沟通,并就工程设计和施工方案提出了宝贵的建议。
我努力保持良好的工作态度,并不断提升自己的专业知识和技能,以更好地完成监理工作。
总的来说,我在这一时期的监理工作中取得了一定的成绩。
通过与施工人员的密切合作和有效的沟通,我成功地监督了建筑工程的质量和进度,并提出了一些建设性的改进意见。
在未来的工作中,我将继续努力,提高自己的监理能力,为项目的成功完成做出更大的贡献。
监理工作总结-2在过去的一段时间里,我负责监督和协调一项重要的市政工程项目。
在这个项目中,我积极参与了工程的各个阶段,并与施工人员紧密合作,确保工程的顺利进行。
在工程的前期,我与工程师和设计师进行了深入的沟通,明确了工程的目标和要求。
我帮助制定了施工方案,并参与了施工计划的制定。
在工程开工之后,我对施工现场进行了频繁的检查,并及时发现和解决了一些问题。
在监理工作中,我坚持严格遵守法规和标准,并确保施工质量符合要求。
我对施工现场进行了全面的检查,督促施工人员按照施工方案进行施工,并做出了必要的修正。
同时,我还督促施工人员进行了安全防护,并确保工地的秩序良好。
在这一次监理工作中,我与施工人员保持了良好的合作关系,充分发挥了监理的作用。
监理年终工作总结参考范本时间过得太快了,不知不觉中,充满希望的____年过去了。
在这一年中监理工作有了很多的收获,下面先谈谈本人在本年度的工作情况吧:一、个人年度工作内容在这一年的时间里,我参与了同里云水谣工程、山湖弘雅苑桩基工程、平望运河花园工程、平望污水处理厂____万吨日/提标改造工程及平望中心幼儿园精装修工程的工作。
二、岗位职责履行情况在这一年的工作中,我仍然抱着边工作边学习的态度进行各项工作,总结每项工作的流程和要点,找出不明白的问题,及时查阅规范并向同事请教,一点一滴的积累工作经验。
1、工程质量方面根据监理规范、工程图纸和《监理细则》严格监督。
参与山湖弘雅苑桩基工程时,我大部分时间都在工地现场,工程看似简单,但是工地范围比较大,多点同时施工,我参与施工现场的监理人员分配工作、旁站工作及相关的记录工作。
我知道必须抓住监理工作重点才能在即减少工作量的同时又能提高工作效率和效果。
当我发现自己解决不了的问题会及时向总监汇报并查阅相关规范,在解决问题的同时,也填补了自己在该方面的知识空缺,下次再遇到类似情况就可以独立解决了。
在参与平望运河花园工程时对需要旁站的部位进行全程旁站并做好旁站记录,对要验收的隐蔽工程严格按照验收规范进行验收,如果验收不合格,则严禁进行下道工序的施工。
对进场材料、设备等的原始凭证检测报告质量证明文件进行检查和确认,对钢筋、砼试块等进行见证取样。
每个月末将现场的施工情况与施工计划进行核对,如果进度落后及时要求施工单位在保证质量的前提下采取相关措施加快施工。
2、工程资料方面每天根据工地现场情况写好监理日记,并将当天的旁站记录等资料整理归档,督促施工单位上报相应的工程资料。
定期将见证取样、平行检测等资料整理归档,并且将各项的台账做好,力求在工程结束时资料也备齐归档。
三、工作体会感受及不足通过今年的监理工作,我觉得作为一名监理人员只有做到品行端正、严于律己、融入团队、尊重他人、工作认真负责才会赢得别人的尊重。
监理个人年终工作总结7篇篇1时间飞逝,转眼间一年即将过去,在项目监理部领导的带领下,我时刻紧记监理工作职责,努力完成监理工作任务,服从领导安排,听从同事意见,团结同事,做好本职工作,现将一年来的工作进行以下总结。
一、忠诚于公司,爱岗敬业我坚持公司的利益高于一切,做到干一行、爱一行、专一行,时刻提醒自己要不断学习,不断提高自己的业务水平,用实际行动为公司的发展做出应有的贡献。
二、立足本职,干好工作我从事监理工作以来,一直以立足本职、干好工作为宗旨,以务实的工作态度,务实的工作作风,务实的工作精神,扎实的工作基础,务实的工作方法,圆满完成了本职工作。
1. 严格按监理程序办事。
监理工作看似轻松,实则不然。
在实际工作中,我时刻提醒自己要严格按照监理程序办事,不能有丝毫的马虎大意。
在实际工作中,我严格按照监理程序进行了监理工作,保证了工作的顺利进行。
2. 严格按监理规范进行监理。
在实际工作中,我严格按照监理规范进行监理工作,对每一道工序都进行了严格的检查和验收,保证了工程质量符合设计要求。
同时,我严格按照公司的要求进行资料的整理和归档工作,保证了资料的完整性和真实性。
3. 做好事前控制工作。
在实际工作中,我时刻提醒自己要做好事前控制工作,不能等到问题出现了才去解决。
因此,在实际工作中,我严格按照设计图纸和施工规范进行监督和检查工作,保证了工程质量符合设计要求。
4. 加强沟通和协调工作。
在实际工作中,我时刻提醒自己要加强沟通和协调工作,不能因为个人原因影响整个项目的工作进度。
因此,在实际工作中,我积极与相关单位进行沟通和协调工作,保证了项目的顺利进行。
三、遵守纪律,团结同事我时刻牢记自己是公司的一员,时刻维护公司的利益和形象。
在实际工作中,我严格遵守公司的各项规章制度,不迟到、不早退、不旷工、不私自外出、不参与赌博等违法违纪行为。
同时,我时刻提醒自己要加强团结同事的意识,不能因为个人原因影响整个团队的工作氛围。
监理工作总结报告范文12篇监理工作总结报告范文一20xx年8月份,我监理部受公司委派至建业壹号城邦三期项目开展工程监理工作。
一年多以来,我监理部严格遵守国家法律、法规和各项制度,爱岗敬业,坚持为业主服务的思想意识,对工作认真负责,严格按照设计要求和有关标准、规范进行监理,监理工作成果做到了让业主满意、让公司放心,圆满的完成了本项目本年度的监理任务。
1、工程名称:2、工程类别:3、工程地址:4、建设单位:5、设计单位:6、施工承包单位:在本项目的监理工作中,我监理部工作人员能够严格遵守国家法律、法规和各项制度,爱岗敬业,对工作认真负责,诚实守信。
坚持为业主服务的思想意识,对工作认真负责,严格按照设计图纸和相关专业技术标准、规范进行监理,围绕“三控制三管理一协调”的工作方针,在建设单位的领导、施工单位的配合以及我公司领导的长期关注下,将工程质量作为监理工作的重中之重,认真抓好安全生产和礼貌施工,做好工程施工过程中各方的协调工作,圆满完成了本项目本年度的监理工作任务,基本情景如下:1、质量控制方面:工在进行质量控制的过程中,遵循坚持质量第一的原则。
根据相关的国家及有关部门颁发的有关质量管理方面的法律、法规性文件,工程承包合同文件,施工规范,本工程有关的检验评定的标准和方法以及设计图纸,确定质量控制工作程序;采取事前、事中、事后控制相结合的质量控制方法,对投入的物质资源的质量控制、施工过程的质量控制和工程产品质量的控制,以工序质量控制为重点、以保证分项工程质量和单位工程质量,进而确保工程项目质量。
2.进度控制:影响项目进度的因素很多。
因此,本项目监理机构进度控制的重点是对本项目的进度进行检查和评估,对具备施工条件的局部项目的施工进度进行监督,以消除承包商自身管理水平的影响。
主要采取技术措施和合同措施,消除承包商自身管理水平的影响,及时处理工程中遇到的技术问题,尽可能为建设单位创造条件;监理指令下达后,督促施工单位加大资源投入,改进施工工艺,加快施工进度。
监理工作经验总结参考范文在繁忙的工作中送走了盛满收获的____,即将迎来充满希望的____。
在这年初收尾之时,回忆过去,展望未来,在过去一年的工作、学习中撑握了一些管理办法和经验,对过去一年来的工作做一小结:一、工程概况及我所承担的监理工作:工程总建筑面积为40000㎡,结构类型为框架,外墙装饰为:石材、玻璃幕墙,内墙普通抹灰,计划工期为____月____日至____月____日。
我前期主要承担土建监理工作,后期装修等监理工作。
二、质量方面的管理工作:为了能够达到此质量目标做了以下工作:1、对分包资质和施工方案的审查工作:分包单位进场之前,根据招标文件要审查其资质、业绩材料是否真实有效,是否具有承担分包工程的施工资质和施工能力,为总监理工程师审批提供基础资料,另外对分包单位的施工方案进行严格审查,审查其是否对工程具备指导意义,及是否具备针对性,审查合格后并以此检查施工工艺及质量。
我主要对承担断桥铝合金窗工程施工的分包单位资质及施工方案进行了认真的审查,在所上报的方案中发了一些不符合要求等问题,并且口头通知其及时修改重报,直至符合要求为止。
2、进场材料质量验收工作:首先了解招标文件和设计、规范对某种材料的要求,材料进场后由分包单位或材料供应商自检合格报总承包单位检查验收合格报监理验收,监理主要对材料规格、品种等外观进行检查,同时检查材料的检验报告、材质证明等资料,要求复试的材料还要检查其复试报告是否符合规范要求,另外加强了现场巡视,对关键结构所使用的材料质量有怀疑时应进行现场取样复试。
在复试期间停止此工序的施工,待检验报告出来并且合格时方可复工。
3、以监理规范及监理规划、细则等为指导。
加强了现场巡视,发现问题及时以口头或发联系单的形式告之施工单位进行整改,直到合格,这样大大提高了工序的一次验收合格率,钢筋、模板工程的验收是不定时的,时常是深更半夜,做到了____小时全天候随叫随到,并且对关键工序(砼浇筑、梁与柱节点钢筋绑扎、防水、回填土)进行了旁站。
监理工作总结范文6篇篇1一、引言作为本次监理工作的负责人,我在过去的一年中,全程参与了项目的规划、实施与监控,积累了丰富的实践经验。
在此,我将对过去一年的工作进行全面的总结,并提出未来工作的改进建议。
二、工作内容概述1. 项目规划与启动:参与项目前期调研,制定项目计划,明确项目目标,确保项目顺利启动。
2. 施工过程监理:对施工现场进行定期巡查,确保施工质量、进度和安全达到预定目标。
3. 质量控制:严格执行质量控制标准,确保工程质量和材料质量符合规定。
4. 沟通协调:与业主、承包商、设计单位和相关部门保持良好沟通,解决项目实施过程中的问题。
5. 合同管理:负责合同执行过程中的监控与管理,确保合同双方权益得到保障。
6. 风险管理:识别项目风险,制定应对措施,降低项目风险损失。
三、重点成果1. 顺利完成项目计划:确保项目按时启动,并顺利推进,实现预定目标。
2. 质量控制成效显著:全年未发生一起重大质量事故,工程质量得到业主认可。
3. 沟通协调机制完善:成功解决各类问题数十起,提高了项目实施的效率。
4. 合同履行率高:严格执行合同条款,合同双方均无异议。
5. 风险管理水平提升:成功应对多项风险事件,降低项目损失。
四、遇到的问题与解决方案1. 问题:施工现场管理存在漏洞。
解决方案:加强现场巡查频次,优化管理流程,提高现场管理水平。
2. 问题:部分承包商进度滞后。
解决方案:加强沟通协调,明确责任分工,确保施工进度。
3. 问题:材料价格波动较大。
解决方案:密切关注市场动态,与供应商协商调整价格,降低采购成本。
五、自我评估/反思过去一年,我在工作中取得了一定的成绩,但也存在一些不足。
在质量控制和风险管理方面还需进一步加强。
在未来的工作中,我将继续提升专业技能,加强学习和实践,努力为公司创造更多价值。
六、未来计划1. 加强项目管理力度,提高项目管理水平。
2. 加强与业主、承包商和相关部门的沟通协作,确保项目顺利进行。
监理工作总结报告5篇(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。
文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如工作报告、工作计划、心得体会、讲话致辞、条据文书、合同协议、策划方案、教学资料、作文大全、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, our store provides various types of classic sample essays, such as work reports, work plans, insights, speeches, written documents, contract agreements, planning plans, teaching materials, complete essays, and other sample essays. If you want to learn about different sample formats and writing methods, please pay attention!监理工作总结报告5篇工作中出现失误的概率是很大的,必须将问题汇总做好总结报告,做好总结报告,才能更好的推动工作前进,下面是本店铺为您分享的2024年度监理工作总结报告5篇,感谢您的参阅。
关于监理个人工作总结7篇篇1在过去的一年里,我作为监理团队的一员,积极参与了多个项目的监理工作。
通过不断的努力和学习,我在工作中取得了一定的成绩,也获得了一些宝贵的经验。
下面,我将对过去一年的工作进行全面的总结,以期为未来的工作提供参考和借鉴。
一、项目概况在过去的一年中,我参与了多个项目的监理工作。
这些项目涵盖了住宅、商业、工业等多个领域,规模和复杂度各异。
作为监理团队的一员,我主要负责项目现场的监督和管理,确保施工质量和进度符合要求。
二、工作重点与成果1. 现场监督与管理:我始终坚持以现场为中心,加强对施工过程的监督和管理。
通过定期巡查和检查,及时发现问题并督促施工单位进行整改。
同时,我还积极参与例会和协调会议,确保各方之间的沟通和协作顺畅。
2. 质量控制:在施工过程中,我严格把控质量关。
通过制定和执行严格的质量控制标准,确保每一道工序都符合要求。
此外,我还积极参与质量验收工作,对不合格的工程坚决不予验收,确保整体工程质量达标。
3. 进度控制:我密切关注施工进度,根据合同要求和实际情况制定合理的进度计划。
通过定期检查和调整,确保施工进度不受影响。
同时,我还积极参与进度协调会议,解决进度过程中出现的问题。
4. 安全管理:我始终将安全放在首位,严格执行安全管理制度。
通过加强安全教育和培训,提高施工人员的安全意识。
在施工现场设置必要的安全设施和警示标志,确保施工安全无事故。
三、经验与教训1. 加强学习:在过去的一年中,我深刻认识到学习的重要性。
通过不断学习新知识、新技能,提高自己的专业素养和综合能力。
在未来的工作中,我将继续加强学习,以适应不断变化的工作环境。
2. 注重沟通:有效的沟通是确保工作顺利进行的关键。
在未来的工作中,我将继续注重与各方的沟通与协作,共同解决问题,实现共赢。
3. 持续改进:虽然在过去的一年中取得了一定的成绩,但我还存在一些不足之处。
在未来的工作中,我将持续改进自己的工作方法和思路,以提高工作效率和质量。
监理工作总结范文(精选3篇)【第1篇】项目监理工作总结范文我项目监理部自20xx年4月承接xxxxx办公楼工程项目,监理部工作在建设单位的大力支持下、在施工单位的积极配合下顺利开展,就本年度的监理工作情况作出书面总结如下:一、监理合同履行情况本监理部现场工作认真负责,认真按照有关工程建设的法律法规、监理规范、监理委托合同及公司的要求开展监理业务工作,能够处理好与项目业主的关系以及承包商的关系,能够做好“三控、四管、一协调”工作。
为了更好地履行监理合同目标值,根据工程特点设置了项目监理组织机构:配置总监理工程师1人、土建工程师4人、机电专业高级工程师1人、给排水暖通专业高级工程师1人、安全工程师1人、资料员1人、工程造价工程师1人,于20xx年3月24日进场,对本工程开展监理工作。
项目监理部严格执行监理程序,坚持“诚信、守法、公正、科学”的宗旨,以“认真、严谨、一丝不苟”的工作作风实施监理并完成本年度监理任务。
编制了详细的工程监理规划及监理实施细则,建立了完善的监理规章制度,如岗位职责、内部监督管理制度、监理人员工作守则、监理程序等,使监理人员的岗位职责明确,工作积极,以高度的责任感和过硬的专业技能投入到监理工作中去,力争为建设单位提供高素质的服务。
二、本年度监理工作评价与分析:本年度监理工作顺利开展,没有产生重大安全事故及质量事故,投资控制符合合同要求,进度控制在合同及计划范围内并完成预定目标,资料齐全,与建设单位、设计单位、施工单位及建设行政主管部门等建立良好合作关系使工程得以顺利进展。
(一)工程质量状况评价与控制本年度没有出现工程质量事故,各分项工程质量能够达到合格标准,符合合同目标要求。
为确保工程质量,总监理工程师确立了以预控为主、跟踪监控、监帮结合、强化验收的方法对工程质量进行控制,主要体现为:1.严把预控关熟悉图纸、承包合同、技术规范、验收标准等,严格审核施工组织设计与方案,特别是质量保证体系、安全保障措施及人、材、机的配置是否满足工程施工的需求,并在施工过程中督促实施,如深基坑、模板支架体系高度超过8米属于危险性较大的分项,施工前就组织了专家论证,认真按照论证后的施工方案施工,并实施全过程监督,在符合要求后才允许进入下一工序的施工,确保了施工安全及工程质量。
监理工作总结
1、工程概况
大连海事大学东山航海类专业教学、实验楼群工程位于大连海事大学东山校区内,总建筑面积为27062平方米,建筑层数为三至五层,结构形式为钢筋砼框架结构,建筑工程等级为一级。
其中,教学楼为13070平方米,三至五层,建筑高度为19.35米;模拟器培训中心建筑面积为9245平方米,地上五层,半地下室为设备层,建筑高度为23.90米;基础培训中心建筑面积为4747平方米,五层,建筑高度为22.95米。
本工程由大连海事大学投资兴建,辽宁有色勘察研究院大连分院进行岩土工程勘察设计,大连建发建筑设计院进行建筑设计,大连筑成建设集团有限公司施工,大连正信土木工程建设监理有限公司监理。
工程计划总投资为4000万元,计划开工日期2004年2月16日,计划竣工日期为2004年8月31日,实际开工日期为2004年2月16日,实际竣工日期为2005年1月7日。
工程质量目标为辽宁省“世纪杯”优质工程,申报国家“鲁班奖”。
2、监理组织机构、监理人员和投入的监理设施
2.1项目监理组织机构组织形式:
2.2项目监理机构的人员配备:
2.3投入的监理设施:
2.3.1检测仪器
红外线测距仪仗队一台经纬仪J2 一台DS3自动安平水准仪一台
回弹仪一台
万能表一台
兆欧表一台
接地电阻测试仪一台
建筑工程检验组合工具一套
2.3.2办公设备
计算机、打印机一套
数码相机一部
办公桌椅七套
文件柜三组
3、监理合同履行情况
依据大连海事大学与大连正信土木工程建设监理有限公司签订的《建设工程委托监理合同》进行土建、室内外装饰、给排水系统、暖通系统、消防系统、强弱电系统施工阶段全过程质量、进度、投资控制,合同管理、信息管理、安全文明施工管理,参建各方的组织协调等。
另外,多媒体、空调、室外管网均未在监理合同范围内,监理部仍然进行监理。
本工程质量目标是满足现行规范及设计要求,无质量事故,确保辽宁省“世纪杯”,争创国家“鲁班奖”。
施工过程中,自始自终坚持质量目标,无质量事故,辽宁省“世纪杯”优质工程可望达到。
质量情况:正常施工条件下,所用原材料钢筋、水泥、砖、砂、石、大孔板、镀锌管、PPR、UPVC管等土水电及各种半成品进行见证取样、见证送样、试验结果均满足规范要求。
施工现场进行巡视检查、旁站管理、实测实量,钢筋安装规格及数量、模板安装与拆除、土方回填、砼浇筑、电渣压力焊、砌筑、
抹灰、大白、面砖、理石、地板、乳胶漆、楼梯扶手、水暖、电气等分项工程均满足现场规范及设计要求。
管理中,监理部注重样板引路及实测实量,如砼、钢筋、砌筑、抹灰、大白等分项工程施工前均进行样板施工,施工单位项目部和监理部共同进行实测实量及观感效果检验,满足要求。
双方意见统一后,同意大面积展开作业面。
现场实测实量合格率达到91%以上。
技术档案资料方面,无论是施工单位还是监理单位均按规范及档案编制办法进行记录、整理。
工程进度监理委托合同为2004年2月16日至2004年11月30日。
工程进度较滞后,有大连筑成建设集团项目部的原因,也有大连海事大学的原因,也有参建各方的原因,也有市场的原因。
筑成项目部的原因是主体工程施工后主体结构验收时间滞后,个别装修材料进场滞后;海事大学方面的原因是空调、多媒体、幕墙专业队伍进场滞后也是一个原因;市场的原因是三级钢市场供应量较少,即使市场有三级钢供应而在大连却未注册备案,致使工程无法正常进行。
工程投资方面预计会超计划投资,其原因是模拟器培训中心土方施工时遇到一锅炉房基础,基础培训中心独立基础改为灌注桩基础,增加外网施工。
合同管理方面,严格履行大连海事大学与参建单位签订的承包合同,实现合同承诺。
信息管理方面,项目监理部及时将工程管理方面的信息传递给大连海事大学基建处、各参建单位,尤其是上级文件精神、鲁班奖需注意的问题、鲁班奖的经验总结等资料,收到很好的效果。
组织协调方面,参建各方进入施工现场后,监理部将各队伍的组织彼此介绍,要求各方在施工中要相互坚持,相互沟通,监理做为第三者进行协助,这
不仅仅局限于例会,很多情况下是亲临现场。
若监理定不了的情况下,由甲方最后定。
4、监理工作成效
进入现场每周三定期召开监理内部会议,布置本周工作重点及注意的事项,以便于及时发现问题,及时总结。
每周四下午1:45分准时组织召开工程例会,对现场施工中出现的问题及时进行解决,对进度、质量、投资等方面进行综合评价,以促进工程质量的提高,保证工程进度。
随着工程进度的增进,各参建方的增加,为了加强进度、质量、投资控制、强化合同、信息、安全管理及组织协调,每周一监理组织各参见单位、各工种参加协调会,就现场存在的问题及时进行沟通和处理,会议上不能解决的问题现场实地解决,收到了显著的成效。
针对工程进度滞后存在的问题,监理部于2004年9月10日召集施工单位召开进度会议,要求编制详尽的进度计划,同时及时调整进度。
加强现场技术管理,砌筑工程、抹灰、面砖镶贴等工程施工均采用样板引路。
砌筑工程两次样板墙砌筑存在水平灰缝过大、组砌方式不合理,存在通缝,观感效果不好,第三次砌筑问题得到改进,我方同意砌筑。
面砖镶贴弥缝存缝不均匀、裂缝等问题,后改进效果显著。
我监理部对施工单位档案检查中,发现砼试块试验不及时、砂浆试验不及时、部位标注不清、档案资料编制不及时等问题,我部及时通知筑成公司进行整改,整改效果较好。
砼在正常施工条件下,发现砼拆模后观感质量与高标准要求有差距,监理部与施工项目部及时召开现场会议,提出施工中的问题和解决处理的办法,要
求施工单位设专人在浇筑砼时调整钢筋间距,模板安装时考虑木方挠度加密支撑点;对砼浇筑工、振捣工要进行培训,振捣要快插慢拔,浇筑砼柱周边时采取柱边对称浇筑振捣,严禁逆时针或顺时针浇筑,经过细心的工作,一点小问题都不放过,收到很好的效果。
现场实测实量,收到效果。
5、施工过程中出现的问题及其处理情况和建议
进行砼施工时,在拆模管理中,我们发现跨度为9米的地梁拆底模前,同条件养护试块试压9天达到设计强度的77%,不符合拆模条件,而施工单位未经监理同意擅自拆模,发现后,我们及时下发监理通知书,要求停止拆模,然后将此情况通知甲方代表,得到甲方代表支持。
与此同时,我们告诉施工队项目经理、具体负责人今后坚决杜绝此类现象的发生。
经过这一事,施工单位感到监理要求的严格,从而为后续施工做到了严格按规范要求打开了局面。
而对于此次拆除的梁,我们经常观察,未发现异常现象。
灌注桩施工中,我部在2004年3月25日监理例会中要求施工单位留置一桩一组试块,施工单位档案员留置,做试验时擅自少送试件,监理发现后及时纠正,责其将补做试验。
屋面炉渣施工时,发现含水率过高,通知施工单位必须将炉渣凉晒控制含水率低于规范要求后方可允许进行找平层施工,教学楼、模拟器教学楼中收到较好的效果。
墙体砌筑施工中,发现局部有空裂现象,为了将工程做细,施工单位微小裂缝都不放过,认真整改。
雨水管堵
水、电矛盾
建议:施工图形成后,招标进行各专业队伍进场、协调。
装饰方案应在土建施工单位,外网应是施工。
6工程照片(有必要时)。