大工16秋《水利水能规划》大作业及要求答案Big work 16 autumn "water conservancy and hydropower planning" major operations and requirements answerJob contentTitle: time series method for calculating favorable reservoir capacityLearning center:Major:Year: Spring / autumnStudent number:Student:Tutor:1 basic knowledge1.1 regulation of reservoir profitExcept for non regulated water conservancy and hydropower projects that can only supply natural runoff water, all of them can adjust the storage capacity to a certain extent.The relation between regulation performance and reservoir capacity: the longer the cycle, the better the regulationperformance and the larger the storage capacity.1, according to the adjustment cycle points:(1) daily regulation: the regulation period of daily regulation is one day and four days. That is to say, the daily water demand of reservoir will be adjusted by the daily water demand of the water sector. Daily variation of power load.(2) weekly adjustment: the regulation cycle of the week adjustment is one week, and the inflow runoff which is not changed within a week is adjusted according to the water demand process of the water sector. The weekly variation of power consumption in a period of time.(3) annual adjustment: the annual runoff of inland rivers has changed greatly, and the water supply during the rainy season and the dry season is very different. The task of regulating the annual runoff is to store and increase the surplus water during the flood season in accordance with the annual domestic water demand process in the water sector, so as to increase the water supply during the water shortage period, and the regulation cycle is less than one year. According to the variation of the abundance and drought in the runoff, the regulation of the abundance and deficiency of the seedlings was carried out.(4) adjustment over many years: the task of regulating runoff for many years is to utilize the storage capacity of the reservoir to save the surplus water in the year of the flood so as to increase the water supply in the dry season. For manyyears, the drought and flood change year by year.2, according to reservoir task points(1) single task streamflow regulation;(2) comprehensive utilization of runoff regulation;3, according to the reservoir water supply mode(1) fixed water supply;(2) variable water supply;4. Other classifications(1) reverse regulation reservoir: the downstream reservoir is adjusted again according to the demand of water.(2) compensation adjustment of a single reservoir: mutual compensation between reservoir and downstream water supply.(3) adjustment of reservoir group compensation: hydrology, storage capacity and power compensation.1.2, the concept of regulatory cycleConstruction of the so-called regulatory cycle, refers to the reservoir capacity of the reservoir, from storage to full storage and then emptying of the complete storage process. The longer regulation period, the better regulation performance ofreservoir and the corresponding storage capacity.1.3 hour calendar method1, according to the water use process to determine reservoir benefit storage capacityKnown: natural runoff, dead storage capacity, according to the requirements of water to facilitate the storage capacity and facilitate the settlement of water storage.(1) annual adjustment calculation process without water loss:Determine the regulatory cycle: usually in October of that year, second years, June;The difference between water demand and natural runoff was calculated monthly from 10 to June;The accumulated difference is the favorable reservoir capacity and the advantageous reservoir position;Returning to the beginning of the flood season, the reservoir will be stored, discharged and abandoned.Determine the water level of the downstream section according to the discharge.(2) annual adjustment calculation process of water loss (considering water evaporation loss):Use of water loss calculation results;Determine the water area of each period;Calculate the evaporation loss at each period;The difference between the amount of water supply + evaporation loss and natural runoff is calculated monthly;The difference between the accumulated traffic;Determine the reservoir capacity and profit and fill water level, and determine the reservoir operation process.Summary and induction:The greater the difference between runoff and water use, the greater the storage capacity;Under the condition of one charge and storage, the sum of the water shortage and the loss amount accumulated during the whole water supply period, that is, the favorable storage capacity is independent of the amount of water allocated within each month;The total adjustment water quantity in water supply period is converted into flow, and then is adjusted by the average runoff for many years, and the adjustment coefficient is obtained to reflect the regulating performance.2, according to the favorable reservoir capacity to determinethe flow adjustmentAccording to the two calculation methods: the annual adjustment process of water loss and the annual adjustment process of water loss loss can be seen:(1) if the water loss is not considered, adjust the flow rate = (W for +V Xing), /T supply(2) if water loss is consideredAdjust flow = = W (W, +V, /T)(3) the storage capacity factor B=V is /W and the average annual rate is 830%;Over more than 30% years to adjust.3, according to the reservoir capacity and reservoir operation plan, the reservoir operation process is deduced:Constant flow operation: irrigation, water supply, shipping, etc., actual demand.Constant power operation: in order to meet the requirement of power consumption, the water quantity of hydropower station should be adjusted to the change of load.Because the output is related to the flow rate and the head, and the flow is related to the head, the calculation of the output is calculated by trial calculation.2 calculate content2.1 calculation dataAccording to the basic data given, the calculation process is described in detail.The average annual discharge of the dam site of a proposed reservoir is annual average water inflow. According to the design guarantee rate = 90%, the selected design low flow year hydrograph is shown in table 1. The initial storage capacity. Try to calculate the regulated flow rate (excluding water loss) and the adjustment factor.Table 1 monthly flow data sheet for designing low flow yearAverage of 789101112123456 years in MarchMonthly average flow ()294824167644875413.52.2 determine reservoir regulation performanceAccording to the basic data, the reservoir regulation performance is determined, and the calculation process and final results are described in detail.2.3 determine the regulated flowAccording to the basic data for flow adjustment calculation, detailed description of the calculation process and final results.2.4 adjustment factorAccording to the basic data given adjustment coefficient calculation, detailed description of the calculation process and final results."Water conservancy and hydropower planning offline operation" course learning requirementsI. the form of curriculum assessmentThe assessment of this course is offline, with online homework. The final course results include 80% offline homework scores and +20% online assignments. Offline jobs and requirements are downloaded from the offline homework module of the course.Two, offline job requirementsStudents need to download the "big 16" autumn "planning of water conservancy and hydropower operations and requirements in platform offline operation, watch the course video courseware, courseware based on knowledge and theory, fill in the" big 16 "autumn" planning of water conservancy and hydropower operations and requirements, and submit to the course platform, off-line homework as one of the main basis for the submission of course assessment.Three, offline job submission form and deadlineStudents need to submit an offline job in the form of an attachment (the size of the attachment is limited to 10M), select the completed job, and click "turn in". As shown in the following figure.Deadline: March 7, 2017. Prior to this, students can submit offline work at any time. If you need to modify, you can upload new files directly. The platform will automatically overwrite the original file.Four, offline operation markingThe teacher will be in operation after the closure of centralized marking offline operation, the offline operation is not carried out before the deadline to submit any form of marking.Matters needing attention:Complete the offline operation independently, allowed plagiarism or ask someone to do, any similarity scores to 0!School of network education, Dalian University of TechnologyNovember 2016。