一:配管工程常用英语缩写1 管子及管件编号缩写中文名称英文名称P 管子PipeEL 弯头ElbowELL 长半径弯头Long radius elbowELS 短半径弯头Short radius elbowMEL 斜接弯头(虾米腰弯头)Mitre elbow REL 异径弯头Reducing elbowT 三通TeeLT 斜三通Lateral teeRT 异径三通Reducing teeR 异径管接头(大小头)ReducerCR 同心异径管接头(同心大小头)Concentric reducerER 偏心异径管接头(偏心大小头)Eccentric reducerCPL 管箍CouplingFCPL 双头管箍Full couplingHCPL 单头管箍Half couplingRCPL 异径管箍Reducing couplingBU 内外螺纹接头BushingUN 活接头UnionHC 软管接头Hose couplerSE 翻边短节Stub endNIP 短节Pipe nipple or straight nipple SNIP 异径短节Swaged nippleCP 管帽(封头)CapPL 管堵(丝堵)PlugBLK 盲板BlankSB 8字盲板Spectacle blind (blank)RP 补强板Reinforcing pad2 法兰编号缩写中文名称英文名称PLG 法兰FlangeWNF 对焊法兰Welding neck flangeSOF 平焊法兰Slip-on flangeSWF 承插焊法Socket-welding flangeT 螺纹法兰Threaded flangeLJ 松套法兰Lapped joint flangeREDF 异径法兰Reducing flangeBF 法兰盖(日法兰)Blind flangeFSF 法兰密封面Flange scaling faceFF 全平面Flat faceRF 凸台面Raised faceMFF 凹凸面Male and female faceLF 凹面Female faceLM 凸面Male faceRJ 环连接面Ring joint face TG 榫槽面Tongue and groove faceTF 榫面Tongue faceGF 槽面Groove face3 垫片编号缩写中文名称英文名称G 垫片GasketNMG 非金属垫片Non-metallic gasketAG 石棉垫片Asbestos gasketRG 橡胶垫片Rubber gasketTEG 聚四氟乙烯包复垫片PTFE envelope gasketSMG 半金属垫片Semimetallic gasketMJG 金属包垫片Meta-jacket gasketSWG 缠绕式垫片Spiral wound gasketMG 金属垫片Metallic gasketFMG 金属平垫片Flat metallic gasket SMSG 齿形金属垫片Solid metal serrated gasketLER 透镜式金属环垫Lens ring gasketOCR 八角形金属Octagonal ring gasket OVR 椭圆形金属环垫Oval ring gaksetIR/OR 内外定位环Inner ring and outer ring IR 内定位环Inner ringOR 外定位环Outer ring4 坚固件编号缩写中文名称英文名称螺栓BoltSB 螺柱Stud boltNU 螺母NutTB 花蓝螺母TurnbuckleWSR 垫圈WasherSWSR 弹簧垫圈Spring washer5 阀门编号缩写中文名称英文名称GV 闸阀Gate valveGLV 截止阀Globe valveCHV 止回阀Check valveBUV 蝶阀Butterfly valveBAV 球阀Ball valvePV 旋塞阀Plug valve (cock)CV 调节阀Control valveSV 安全阀Safety valveRV 减压阀Pressure reducing valveST 蒸汽疏水阀Steam trapPRV 泄压阀Pressur relief valveBV 呼吸阀Breather valveNV 针形阀Needle valveAV 角阀DV 隔膜阀TWV 三通阀SGV 插板阀6 管道上用的小型设备编号缩写中文名称英文名称SPR 气液分离器SeparatorFA 阻火器Flame arresterSR 过滤器StrainerSRY Y型过滤器Y-type strainerSRT T型过滤器T-type strainerSRB 桶式过滤器Bucket type strainerTSR 临时过滤器Temporary strainerSIL 消声器SilencerSG 视镜Slight glassSC 取样冷却器Sample coolerDF 排液漏斗Drain funnelLM 管道混合器Line mixerRO 限流孔板Restriction orificeMO 混合孔板Mixing orificeRD 爆破片(爆破膜)Rupture diskEJ 补偿器Expansion joint7 隔热、伴热编号缩写中文名称英文名称INS 隔热Thermal insulationH 保温Hot insulationC 保冷Cold insulationP 防烫伤隔热Personnel protection insulation T&I 伴热Tracing and insulationT 管道伴热(冷)TracingEST 蒸汽外伴热External steam tracingIST 蒸汽内伴热Internal steam tracingSJT 蒸汽夹套伴热Steam-jacket tracingET 电伴热Electric tracing8 配管材料和等级编号缩写中文名称英文名称M 金属材料Metallic materialCS 碳钢Carbon steelCAS 铸钢Cast steelFS 锻钢Forged steelAS 合金钢Alloy steelSS 不锈钢Stainless steelAUSTSS 奥氏体不锈钢Austenitic stainless-steelCI 铸铁Cast ironMI 可锻铸铁Malleable ironDI 球墨铸铁Ductile ironAL 铝Aluminum BRS 黄铜BrassBRZ 青铜BronzeCU 紫铜CopperLAS 低合金钢Low alloy steelFLAS 低合金锻钢Forged low alloy steel CLAS 低合金铸钢Cast low alloy steel壁厚ThicknessSCH 表号Schedule numberSTD 标准StandardXS 加强Extra strongXXS 特强Double extra strong9 装置布置编号缩写中文名称英文名称CN 建北Construction northE 东EastW 西WestS 南SouthN 北NorthH 水平HorizontalV 竖直、铅直、直立VerticalGRD 地坪GroundUG 地下UndergroundBL 装置边界线Battery limit lineESEW 事故沐浴洗眼器Emergency shower and eye washerHS 软管站Hose stationML 接续分界线Match linePS 管道支架(管架)Piping supportPR 管桥Pipe rackSTRU 构架(构筑物)StructureBLDG 建筑物BuildingPD 清扫设施Purge devicePT 池PitSHLT 棚ShelterCOFF 围堰CofferdamFL 楼板FloorPF 平台Plateform10 尺寸标注编号缩写中文名称英文名称EL 标高ElevationBOP 管底Bottom of pipeCOP 管中心Center of pipeTOP 管顶Top of pipeFOB 底平Flat on bottomFOT 顶平Flat on topCL(屯) 中心线Center lineTL 切线T angent lineSYM 对称的SymmetricalBOS 支架底Bottom of supportTOS 支架顶Top of supportCL 净距(净空)ClearanceCTC 中心至中心Center to centerCTF 中心至面Center to faceCTE 中心至端部Center to endETE 端到端End to endFEF 法兰端面Flange and faceFTF 面到面Face to faceD 直径DiameterDN 公称直径Nominal diameterID 内径Inside diameterOD 外径Outside diameterDIM 尺寸DimensionMAX 最大MaximumMIN 最小MinimumAVG 平均AverageAPP 约、近似ApproximatePT.EL 点标高Point elevation11 图表编号缩写中文名称英文名称PFD 工艺流程图Process flow diagramPID 管道和仪表流程图Piping & instrument diagramCOD 接续图Continued on drawingDTL 详图DatailSPDWG(ISODWG) 管段图Spool drawing (each line isometric drawing)DWGNO 图号Drawing numberDWGI 所在图号Drawing identification LOW 材料表List of materialMTO 汇料Material take-offAPPX 附录AppendixJOB. No. 工号Job NumberBEDD 基础工程设计数据Basic engineering design dataDEDD 详细工程设计数据Detail engineering design dataREV. No. 修改号Recision numberREFDWG 参考图Reference drawingSC 采样接口Sample connection12 操作方式及工作参数编号缩写中文名称英文名称AUT 自动AutomaticML 手动Manual controlCHOP 链条操作Chain operatedCSC 铅封关Car seal closeCSO 铅封开Car seal openLC 锁闭Lock closed LO 锁开Lock openNC 正常关Normally closeNO 正常开Normally openATM 大气压AtmospherePN 公称压力Nominal pressureA 绝压G 表压(T) 温度Temperature(P) 压力Pressure13 施工编号缩写中文名称英文名称W 焊接WeldingAW 电弧焊Arc weldingGSAW 气体保护电弧焊Gas shielded-acr weldingEFW 电熔焊Elecric fusion weldingERW 电阻焊Electric Resistance weldingGW 气焊Gas weldingLW 搭接焊Lap weldingBW 对焊Butt weldingTW 定位焊Tack weldingSW 承插焊Socket weldingCW 连续焊Continuous weldingSEW 密封焊Seal weldingSFG 堆焊SurfacingFW 现场焊接Field weldingHT 热处理Heat treatmentPH 预热PreheatingSR 应力消除Stress reliefPWHT 焊后热处理Post weld heat treatment EIT 检查、探伤和实验Examination, inspection & testingVE 外观检查Visual examinationUI (UT) 超声探伤Ultrasonic inspection (test) RI (RT) 射线探伤Radiographic inspection (test)MPI (MT) 磁粉探伤Magnetic particle inspection (test)LPI (PT) 液体渗透检验Liquid penterant inspection (test)HADT 硬度实验Hardness testingHYDT 水压实验Hydraulic testingPNET 气压实验Pneumatic testingCE 焊条Covered electrodeWW 焊丝Welding wireASSY 装配、组合AssemblyF 现场FieldF/F 现场制造Field faricatedSF 现场决定Suit in fieldCSP 冷紧Cold springBCT 螺栓冷紧Bolt cold tighteningBHY 螺栓热紧Bolt hot tightening CO 清洗口Clean outANNY 退火AnnealedPE 平端面Plain endBE 坡口端Belelled endTHR 螺纹ThreadHB 布氏硬度Brinnel hardnessRC 洛氏硬度14 其他编号缩写中文名称英文名称14.1 FDN 基础FoundationINF 信息(资料)Information REF 参考ReferenceREV 修改Revision SEQ 序号(顺序)SequenceW/E 设备带来With equipmentW/I 仪表带来With instrument CM 色标Colour markCA 腐蚀裕度Corrosion allowance UTL 公用系统UtilityUC 公用工程接头Utility connection QTY 数量QuantityWT 重量WeightMHR 工时Man hourBC 螺栓分布圆Bolt circleHP 高点High pointLP 低点Low pointSUC 吸入(口)SuctionDIS 排出(口)DischargeSO 蒸气吹扫(口)Steam outNPT 美国标准锥管螺纹National standard taper pipe threadNPS 美国标准直管螺纹National standard straight pipe threadDR 排液DrainVT 放气VentRTG (压力)等级RatingCL 等级ClassSMLS 无缝Seamless14.28 螺旋缝石油化工工程英语常用缩写序号缩写英文中文1 AC Air Conditioning 空气调节装置2 AGO Atmospheric gas oil 常压瓦斯油3 AML Approved Manufacturers' List 批准的厂商名单4 APE Area Project Engineer 区域项目工程师5 AR Atmospheric residue 常压渣油6 ARDS Atmospheric residue desulfurization 常压渣油加氢脱硫7 ASME American Society of Mechanical Engineers 美国机械工程师协会8 BD Business Director 商务主任9 BD Business Development 市场部10 BEDP Basic Design Engineering Package 基础设计包11 BFW Boiler feed water 锅炉给水12 BL Battery limits 界区13 BEDD Basic Engineering Design Data 基础工程设计数据14 BM Bill of Material 材料表15 BOD Basis of Design 设计基础16 BOD Biological Oxygen Demand 化学需氧量17 BP Boiling point 沸点18 BS Bright stock 光亮油19 BSI British Standards Institute 英国标准协会20 BTEX Benzene, toluene, ethyl benzene, xylene 苯,甲苯,乙苯,二甲苯21 BTU British thermal unit 英热单位22 BTX Benzene, toluene, xylene 苯,甲苯,二甲苯23 C Construction 施工24 CAD Computer Aided Design 计算机辅助设计25 CADD Computer Aided Design and Drafting 计算机辅助设计和绘图26 CCR Conradson carbon residue 康氏残炭27 CCR Continuous Catalyst Regeneration 催化剂连续再生28 CDU Crude distillation unit 原油蒸馏装置29 CGO Coker gas oil 焦化瓦斯油30 CI Cetane index 十六烷指数31 CL Center line 中心线32 CM Construction Manager 施工经理33 CN Conference Note 会议纪要(老外更喜欢用 MOM:Minitues of Meeting)34 COD Chemical oxygen demand 化学需氧量35 CPDP Chinese Preliminary Design Package 中国初步设计包(直接称为PDP就OK了)36 CPM Critical Path Method 关键路径法37 CR Catalytic Reforming 催化重整38 CS Carbon Steel 碳钢39 CW Cooling Water 冷却水40 FEED Front End Engineering Design 前期工程设计41 GB GUO BIAO 国标42 GCD Guaranteed Completion Date 保证完成日期43 GG Gauge glass 玻璃液面计44 GHSV Gaseous hourly space velocity 气体体积空速45 GPH Gas phase hydrogenation 气相加氢46 GSN Global Supply Network 全球供应网络47 GTG Gas Turbine Generator 燃气涡轮发电机48 GW Gross weight 毛重49 HAZID Hazard Identification Review 危险识别审查50 HAZOP Hazard and Operability Study 危险与可操作性研究51 HBP Highly branched paraffins 高支链烷烃52 HC Hydrocracking 加氢裂化53 HCCO Heavy catalytic cycles oil 重催化循环油54 HCGO Heavy coker gas oil 重焦化瓦斯油55 HDA hydrodearomatization 加氢脱芳烃56 HDF hydrofinishing 加氢后精制57 HDM hydrodemetallization 加氢脱金属58 HDN hydrodenitrogenation 加氢脱氮59 HDPE High Density Polyethylene 高密度聚乙烯60 HO Home Office 总部61 HDS hydrodesulfurization 加氢脱硫62 HDT hydrotreating 加氢精制,加氢处理63 HGO Heavy gas oil 重瓦斯油64 HR Human Resource 人力资源65 HP High pressure 高压66 HSFO High sulfur fuel oil 高硫燃料油67 HSR Heavy straight run 重直馏油68 HVAC Heating, Ventilation and Air Conditioning 采暖通风69 HVGO Heavy vacuum gas oil 减压重瓦斯油70 HVI High viscosity index 高粘度指数71 IBL Inside Battery Limits (Same as ISBL) 界区内72 IBP Initial Boiling Point 初馏点,初沸点73 IEC International Electro-technical Commission 国际电工委员会74 IFA Issued for Approval 用于正式批准75 IFB Issued for Bid 用于招标(ITB:用的更多)76 IFC Issued for Construction 用于施工77 IFD Issued for Design 用于设计78 IFH Issued for HAZOP 用于危险与可操作性研究79 ISBL Inside Battery Limits (same as IBL) 界区内80 ISO International Standardization Organization 国际标准化组织81 IS&T/IT Information System and Technology (same as IT) 信息系统和技术82 ITB Invitation to Bid 邀标书83 JV Joint Venture 合营者84 KW Kilo-Watt 千瓦85 LAN Local Area Network 局域网86 LC Letter of Credit 信用证87 LCC Life Cycle Cost 寿命周期成本88 LCCO Light catalytic cycle oil 催化裂化轻循环油89 LCGO Light coker gas oil 焦化轻瓦斯油90 LCN Light coker naphtha 焦化轻汽油91 LCO Light cycle oil 轻循环油92 LDE Lead Discipline Engineer 专业负责人93 LDPE Low Density Polyethylene 低密度聚乙烯94 Level 1 High Level Schedules, control documentsused for control of total scope 项目计划1 (项目进度)95 Level 2 Intermediate Level Schedules, control documents designed to control scope at unit, area, department, contract or discipline level 项目计划296 Level 3 Detailed Schedules, control documents designed to control and report the status of individual deliverables, e.g. documents, requisitions etc. 项目计划3(还有LEVEL 4)97 LLDPE Linear Low Density Polyethylene 线性低密度聚乙烯98 LOI Letter of Intent 意向书99 LP Low Pressure 低气压100 LPG Liquefied Petroleum Gas 液化石油气101 LS Lump Sum 固定总价102 LS Low sulfur 低硫103 LSD Low sulfur diesel 低硫柴油104 LSFO Low sulfur fuel oil 低硫燃料油105 LSR Light straight run 轻直馏油106 LSTK Lump Sum Turn Key (一揽子价格)总承包107 LSWR Low sulfur waxy residue 低硫含蜡渣油108 LTFT Low-temperature flow test 低温流动性试验109 LTRS Low-temperature recovery system 低温回收系统110 LV Low Voltage 低(电)压111 LVGO Light vacuum gas oil 轻减压瓦斯油112 LVI Low viscosity index 低粘度指数113 LVN Light virgin naphtha 直馏轻石脑油馏分114 MC Mechanical Completion 机械竣工115 MCR Micro carbon residue 微残炭116 MEG Mono Ethylene Glycol same as EG) 乙二醇117 MHC Mild hydrocracking 缓和加氢裂化118 MPA Multi Project (Purchasing) Agreement 大宗采购协议119 MFA Multi-Facility (Purchase) Agreement 大宗采购协议120 MON Motor octane number 马达法辛烷值121 MP Medium pressure 中压122 MPHC Moderate pressure hydrocracking 中压加氢裂化123 MR Material Requisition 请购单124 MRP Material Requisition (issued for Purchase) 请购单(用于购买)125 MRQ Material Requisition (issued for Quotation) 请购单(用于报价)126 MRR Material Receiving Report 材料验收单127 MTO Material Take-Off 材料表128 MV Medium Voltage 中(电)压129 MW Mega-Watt 兆瓦130 MW Molecular weight 分子量131 N/A Not applicable or Not Appropriate 不适用的132 N/A Not Available 无133 NEC National Electrical Code 国家电气规范134 NEMA National Electrical Manufacturers Association 国家电气制造商协会135 NFPA National Fire Protection Association 全国防火协会136 NGL Natural Gas Liquids 天然气液体137 NP Normal paraffin 正构烷烃138 NPSH Net positive suction head 净吸入头139 NR Non Reimbursable (costs) 非实报实销140 NTP Notice To Proceed 开工通知书141 NTS Not to Scale 不按比例142 OBL Outside Battery Limits £®same as OSBL 界区外143 OBS Organization Breakdown Structure 组织分解结构144 OSBL Outside Battery Limits (same as OBL) 界区外145 P3 Primavera Project Planner 项目计划管理(一个盛名之下,其实难负的进度编制软件,用来忽悠忽悠老外还行)146 PAC Polycyclic aromatic compound 稠环芳烃,多环芳烃147 PAG Project Automation Group 项目自动化团队148 PAF Personnel Authorization Form 职员批准表149 P&ID Process and instrumentation Diagram 工艺仪表流程图150 PID Proportional, Integral and Differential 比例、积分加微分(控制)151 PC Personal Computer 个人电脑152 PDA Propane deasphalting 丙烷脱沥青153 PDAO Propane deasphalted oil 丙烷脱沥青油154 PDU Propane deasphalting unit 丙烷脱沥青装置155 PE Project Engineer 项目工程师156 PE Polyethylene 聚乙烯157 PEM Project Engineering Manager 项目设计经理158 PET Project Execution Team 项目执行组159 PFD Process Flow Diagram 工艺流程图160 PFE Project Field Engineer 项目现场工程师161 PFPM Project Field Procurement Manager 项目现场采购经理162 PEFS Process Engineering Flow Scheme (same as P&ID) 工艺设计流程图163 PFS Process Flow Scheme (same as PFD-Process Flow Diagram) 工艺流程图164 P/L Packing List 装箱单165 PM Project Manager 项目经理166 PMC Project Management Contractor 项目管理承包商167 PMM Project Material Manager 项目材料经理168 PNA Polynuclear aromatics 稠环芳烃,多环芳烃169 PNA Paraffin, Naphthene, Aromatic 烷烃、环烷烃、芳烃170 PO Procurement Order 采购订单171 POX Partial Oxidation 部分氧化造气172 PP Polypropylene 聚丙烯173 PPM Project Procurement Manager 项目采购经理174 PQP Project Quality Plan 项目质量计划175 PQAM Project Quality Assurance Manager 项目质量保证经理176 PQCM Project Quality Control Manager 项目质量控制经理177 PR Procedure 程序178 PRC People Republic of China 中华人民共和国179 PRS Power recovery system 能量回收系统180 PSA Pressure swing adsorption 变压吸附181 PSM Project Site Manager 项目现场经理182 PVC Poly Vinyl Chloride 聚氯乙烯183 PW Paraffin wax 石蜡184 QA Quality Assurance 质量保证185 QC Quality Control 质量控制186 QM Quality Management 质量管理187 RDS Resid desulfurization 渣油(加氢)脱硫188 RFCC Resid FCC 渣油催化裂化189 RFG Reformulated gasoline 新配方汽油190 RHC Resid hydroconversion 渣油加氢转化191 RHDS Residue hydrodesulfurization 渣油加氢脱硫192 RIS Refinery information system 炼油厂信息系统193 RMP Risk management plan 风险管理计划194 RON Research octane number 研究法辛烷值195 RONC Research octane number clear 不加铅研究法辛烷值196 ROSE Resid oil supercritical extraction 渣油超临界抽提197 SCO Synthetic crude oil 合成原油198 SDW Solvent dewaxing 溶剂脱蜡199 SIGF Site Integration & General Facility 全场一体化和一般设施200 RFSU Ready for Start Up 待开车201 S/C Subcontractor 分包商202 SM Styrene Monomer 苯乙烯单体203 SOR Start of run 运转初期204 SR Semi-regenerative 半再生的205 SR Straight run 直馏206 SRU Sulfur recovery unit 硫磺回收装置207 SS Stainless Steel 不锈钢208 SSOT Single stage once through 一段一次通过加氢裂化209 STG Steam Turbine Generator 蒸汽发电机210 TAN Total acid number 总酸值211 TBD To be Determined 待定212 TBN Total base number 总碱值213 TBS Technical Bid Summary 技术标概要214 T&C'S Terms and Conditions (e.g. of purchase) 术语和条件(用于采购) 215 TCD Target Completion Date 目标完成日期216 TGCU Tail gas cleanup unit 尾气净化装置217 TGTU Tail gas treating unit 尾气处理装置218 TIC Total Installed Cost 总体安装费用219 T&L Traffic and Logistics 交通与后勤管理220 TS Technical Specialist 技术专家221 TSA Technical Services Agreement 技术服务协议222 TF Tank Farm 罐区223 UFD Utility Flow Diagram 公用工程流程图(UP&ID 或UID更常用)224 ULSD Ultra low sulfur diesel 超低硫柴油225 UK United Kingdom 英国226 UR Unit Rate 单价227 USA United States of America 美利坚合众国228 VDU Vacuum distillation unit 减压蒸馏装置229 VE Value Engineering 价值工程230 VGO Vacuum gas oil 减压瓦斯油231 VI Viscosity index 粘度指数232 VL Vendor List 制造厂表233 VP Vendor Print 厂商资料234 VPMS Vendor Print Management System 厂商资料管理系统235 VPTL Vendor Print Transmittal Letter 厂商资料传送236 VR Vacuum residue 减压渣油237 VRDS Vacuum residue desulfurization 减压渣油加氢脱硫238 VTB Vacuum tower bottoms 减压渣油239 WAN Wide Area Network 广域网240 WHSV Weight hourly space velocity 重时空速241 WPC World Petroleum Congress 世界石油大会242 WT Weight 重量243 WWTS Wastewater treatment system 污水处理系统244 VCM/PVC Vinyl Chloride 氯乙烯/聚氯乙烯245 VIP Value Improvement Practices 价值工程实践246 WBS Work Breakdown Structure 工作分解结构(这个是很重要的衡量进度的手段。
铁道信号工程施工作业指导书-电缆工程1.适用范围本作业指导书适用于信号电缆工程。
2.作业准备2.1 内业技术准备作业指导书编制后,应在开工前组织技术人员认真学习实施性施工组织设计,阅读、审核施工图纸,澄清有关技术问题,熟悉规范和技术标准。
制定安全确保措施,提出应急预案。
对施工人员进行技术交底,对参加施工人员进行上岗前技术培训,考核合格后持证上岗。
2.2 外业技术准备施工作业层中所设计的各种外部技术数据收集。
租赁生活房屋以及料库,配齐生活、办公设施,满足主要管理、技术人员进场生活、办公需要。
3.技术要求信号电缆线路的规格型号应符合设计要求,并对电缆径路进行定测,定测结果作为施工依据,电缆工程施工坚持“三检制度”,并做好检测记录;电缆回填前应通知监理工程师进行检查验收。
4.施工程序与工艺流程为了确保工期,信号工程各工序采取平行与流水相结合的办法进行施工,工序间采取合理的搭接,施工程序如下:电缆线路径路复测→电缆采购→到货检验→电缆单盘测试→开挖电缆沟→敷设电缆→电缆防护→电缆接续→电气特性测试→回填夯实→埋设电缆标→箱盒安装。
为确保施工质量和施工进度的顺利进行,常规部分的施工方法,选择已成熟的施工工法、施工工艺进行组织施工;采用新技术、新工艺、新设备部分的施工,参照新设备提供商提供的安装规范,制定相应的施工方法和施工工艺,满足工程的施工需要。
5.施工要求电缆工程5.1 一般规定5.1.1 工程所采用电缆的型号、规格应符合设计文件规定。
5.1.2 电缆敷设前应检查:电缆盘是否完整、无破损、无机械损伤、钢带外护层无破损开裂、硬化变质现象。
5.1.3 电缆敷设前应进行电气特性测试:5.2 电缆沟要求5.2.1 普通土敷设单层电缆时,沟深不得少于750mm。
5.2.2 普通土敷多层电缆时,沟深不得少于850mm。
5.2.3 穿越道口或公路等处的沟深应大于本电缆沟深200mm,且有钢管防护。
5.2.4 使用电缆槽时,正常情况下槽盖上面距地面不得少于500mm。
应答器数据传输电缆技术条件(暂行)2005年9月30日目次前言 (Ⅱ)1. 范围 (1)2. 规范性引用文件 (1)3. 使用特性 (1)4. 型号、名称、规格及产品表示方法 (2)5. 技术要求与试验方法 (3)6. 检验规则 (5)7. 标志、包装、运输、贮存及施工 (6)附录A (规范性附录)应答器数据传输电缆A端结构图 (7)附录B (资料性附录)应答器数据传输电缆成品参考外径 (10)附录C (资料性附录)应答器数据传输电缆施工方法 (11)Ⅰ前言本技术条件是参照国外应答器设备电缆参数传输技术要求编制。
是中国铁路列车运行控制系统中高速率、大容量信息配套使用的应答器数据传输电缆。
本技术条件由北京全路通信信号研究设计院提出并归口。
本技术条件主要起草单位:北京全路通信信号研究设计院、焦作铁路电缆工厂、西安西电光电缆有限责任公司、天水铁路电缆工厂、中国铁路通信信号集团公司信号施工工艺研究所。
本技术条件主要起草人: 罗松、陈耀春、张颜珠、梁斌、张新军、袁栩、付军Ⅱ应答器数据传输电缆技术条件(暂行)1范围本技术条件规定了应答器数据传输电缆(以下简称电缆)的使用特性、型号、名称、规格、技术要求、试验方法、检验规则、标志、包装、运输、贮存及施工。
本技术条件适用于应答器与LEU地面电子单元的连接,传输报文数据信息及电能的电缆。
电缆可在铁路电气化和非电气化的不同区段使用。
2规范性引用文件下列文件中的条款通过本技术条件的引用而成为本技术条件的条款。
凡是注日期的引用文件,其随后所有的修改单(不包括勘误内容)或修订版均不适用本技术条件,然而,鼓励根据本技术条件达成协议的各方研究是否可使用这些文件的最新版本。
凡是不注日期的引用文件,其最新版本适用于本技术条件。
GB/T 3953 电工圆铜线GB/T 4909.2 裸电线试验方法尺寸测量GB/T 3048.4 电线电缆电性能试验方法导体直流电阻试验GB/T 3048.6 电线电缆电性能试验方法绝缘电阻试验GB/T 3048.8 电线电缆电性能试验方法交流电压试验GB/T 3048.14 电线电缆电性能试验方法直流电压试验GB/T 5441.1 通信电缆试验方法总则GB/T 5441.2 通信电缆试验方法工作电容试验GB/T 5441.7 通信电缆试验方法衰减常数试验GB/T 5441.9 通信电缆试验方法工频条件下理想屏蔽系数试验GB/T 2952 电缆外护层GB/T 2951.1 电线电缆机械物理性能试验方法第1部分:通用试验方法GB/T 2951.8 电线电缆机械物理性能试验方法第4部分:聚乙烯和聚丙烯混合料专用试验方法第1节:耐环境应力开裂试验—空气热老化后卷绕试验—熔体指数测量方法—聚乙烯中碳黑和/或矿物质填料含量测量方法GB/T 2951.23 电线电缆机械物理性能试验方法弯曲试验GB/T 2951.38 电线电缆机械物理性能试验方法白蚁试验方法GB/T19666 阻燃和耐火电缆通则YD/T 760 市内通信电缆用聚烯烃绝缘料TB/T3100.3 铁路数字信号电缆第3部分:综合护套铁路数字信号电缆3使用特性3.1电缆的使用环境温度为-40℃~+60℃,电缆敷设环境温度应不低于-10℃。
------改造--至--段信号工程施工技术标准(交底)--------------项目部----年-月目录总则 (4)一、有关规定 (4)二、施工工艺标准 (6)1、电缆工程 (6)1.1一般规定 (6)1.2电缆沟要求 (7)1.3电缆径路及敷设技术要求 (7)1.4敷设电缆的施工程序 (8)1.5电缆防护 (8)1.6电缆接续 (9)1.7电缆标设置 (9)2、室外箱盒安装 (10)2.1站内、区间(非桥梁)箱盒安装 (10)2.2桥梁上箱盒安装 (12)2.3室外设备及配线 (12)3、信号机的安装 (13)3.1一般规定 (13)3.2桥梁上信号机安装 (15)4、轨道电路 (15)4.1钢轨绝缘安装 (15)4.2站内轨道电路 (15)4.3ZPW-2000A无绝缘轨道电路 (16)4.4桥梁上电气绝缘节处设备布置 (20)4.5调谐区禁停标志牌安装 (21)4.6机械绝缘节处设备的安装 (21)4.7补偿电容的安装 (22)4.8室外设备防雷及地线 (23)4.9轨道横向连接及设置标准 (24)5、安装装置 (24)5.1ZD型电动转辙装置安装 (25)5.2电液转辙装置安装 (25)6、防雷、接地、油漆、硬面化 (25)6.1设备防雷、接地 (25)6.2综合地网设置 (26)6.3信号楼接地母线设置方案 (27)6.4防雷其他要求 (27)6.5信号机设备油漆 (28)6.6设备硬面化 (28)6.7信号设备名称书写 (28)7、室内工程工艺要求 (29)7.1一般规定 (29)7.2机柜安装 (29)7.3电源屏安装 (30)7.4室内布线 (30)7.5电缆引入 (31)------改造--至--(不含)段信号工程由----------------------------项目部施工。
为保证工程质量,施工中严格按《施工规范》、《技规》、《维规》、《验标》的要求进行施工总则:1、根据铁道部《信号维护规则》业务管理第5.4.3条规定:所有器材必须经过维修单位测试合格方可上道安装使用。
------改造--至--段信号工程施工技术标准(交底)--------------项目部----年-月目录总则 (4)一、有关规定 (4)二、施工工艺标准 (6)1、电缆工程 (6)1.1一般规定 (6)1.2电缆沟要求 (7)1.3电缆径路及敷设技术要求 (7)1.4敷设电缆的施工程序 (8)1.5电缆防护 (8)1.6电缆接续 (9)1.7电缆标设置 (9)2、室外箱盒安装 (10)2.1站内、区间(非桥梁)箱盒安装 (10)2.2桥梁上箱盒安装 (12)2.3室外设备及配线 (12)3、信号机的安装 (13)3.1一般规定 (13)3.2桥梁上信号机安装 (15)4、轨道电路 (15)4.1钢轨绝缘安装 (15)4.2站内轨道电路 (15)4.3ZPW-2000A无绝缘轨道电路 (16)4.4桥梁上电气绝缘节处设备布置 (20)4.5调谐区禁停标志牌安装 (21)4.6机械绝缘节处设备的安装 (21)4.7补偿电容的安装 (22)4.8室外设备防雷及地线 (23)4.9轨道横向连接及设置标准 (24)5、安装装置 (24)5.1ZD型电动转辙装置安装 (25)5.2电液转辙装置安装 (25)6、防雷、接地、油漆、硬面化 (25)6.1设备防雷、接地 (25)6.2综合地网设置 (26)6.3信号楼接地母线设置方案 (27)6.4防雷其他要求 (27)6.5信号机设备油漆 (28)6.6设备硬面化 (28)6.7信号设备名称书写 (28)7、室内工程工艺要求 (29)7.1一般规定 (29)7.2机柜安装 (29)7.3电源屏安装 (30)7.4室内布线 (30)7.5电缆引入 (31)------改造--至--(不含)段信号工程由----------------------------项目部施工。
为保证工程质量,施工中严格按《施工规范》、《技规》、《维规》、《验标》的要求进行施工总则:1、根据铁道部《信号维护规则》业务管理第5.4.3条规定:所有器材必须经过维修单位测试合格方可上道安装使用。
HDM-T-P型电缆接续盒的应用技术研究蔡学利;杨兴【摘要】现阶段,随着科技的不断进步,铁路运输在我国运输行业中的作用越来越重要,铁路信号设备的正常运行离不开铁路信号电缆,信号电缆担负着传输设备电源和信息的重要任务,是电源、信息传输的主要路径,尤其是干线电缆传递着众多的信号(信号机、轨道电路、转辙机的电源等),一旦受外界干扰,可能会影响到整个咽喉的信号,进而导致全站停运,而HDM-T-P型地下电缆接续盒的应用,从根本上解决了电缆受外界干扰这一难题。
本文中笔者将结合自己的专业知识和工作经验,对铁路信号HDM-T-P型地下电缆接续盒的应用做进一步介绍。
【期刊名称】《煤矿现代化》【年(卷),期】2016(000)003【总页数】2页(P74-75)【关键词】铁路信号电缆;电缆接续盒;工艺原理;接续;电缆芯线【作者】蔡学利;杨兴【作者单位】兖州煤业股份有限公司铁路运输处,山东邹城 273500;兖州煤业股份有限公司铁路运输处,山东邹城 273500【正文语种】中文【中图分类】U284.77+2铁路信号电缆的接续按工艺的不同,主要有两种接续方法:一种是普遍采用的地面铸铁电缆盒接续;另一种是地下接续,是一种新工艺。
矿区铁路现有的13个信号车站的信号电缆的接续均采用铸铁的HF4、HF7型电缆盒进行地面方式接续,但是这种方式存在着不少的问题和隐患,危及行车安全。
主要表现在以下几个方面。
(1)电缆盒使用时间过长,会出现密封不严,易进潮,进而导致端子座、芯线锈蚀氧化,造成信号电缆的电气性能下降。
(2)采用地面接续方式的电缆,其备用量有时过少或备用电缆已被全部使用。
四月份,电务部门信号设备的春测检修,检查出济二站、南屯站、电厂站的部分信号电缆的绝缘阻值为零,但由于电缆备用量已被全部使用,而不得不重新敷设新电缆,这不仅会影响设备的正常使用,更会造成极大的人力、物力、财力的浪费。
(3)存在电缆盒易遭破坏,安全得不到保证且日常维修工作量大,维修费用高等缺陷。
优化关键参数指标释义目录1 功率过载参数 (5)1.1 参数释义 (5)2 切换参数 (7)2.1 软切换过程 (7)2.2 切换参数释义 (8)3 控制信道参数 (9)3.1 参数释义 (9)4 接入参数 (10)4.1 参数释义 (10)5 PN复用、PN混淆 (11)5.1 概念释义 (11)6 搜索窗 (12)6.1 参数释义 (12)7 小区半径 (14)7.1 概念释义 (14)8 覆盖指标 (15)8.1 覆盖关键指标 (15)8.2 覆盖率 (16)8.3 影响覆盖的因素 (16)8.4 覆盖几个指标的分析 (16)8.5 改善覆盖质量的常用优化措施 (17)9 关键性能指标 (18)9.1 呼叫建立成功率 (18)9.2 业务信道掉话率 (18)9.3 软切换成功率 (18)9.4 软切换比例 (18)9.5 话务掉话比 (19)9.6 坏小区 (19)9.7 系统接通率 (19)9.8 寻呼成功率 (19)10 邻区优化 (20)10.1 邻区列表 (20)10.2 邻接小区 (20)10.3 邻区列表配置原则 (20)11 双载频换频切换 (22)11.1 数据库方式实现换频切换 (22)11.2 伪导频方式实现换频切换 (23)11.3 两种换频切换方式比较 (26)12 常见网优问题分析 (27)12.1 业务信道负载率 (27)12.2 越区覆盖问题 (27)12.3 搜索窗设置问题 (27)12.4 ECAM发送消息参数 (28)12.5 影响话务掉话比指标的问题 (30)12.6 掉话相关定时器 (30)12.7 基站资源拥塞问题 (31)12.8 BSC资源拥塞问题 (31)13 常见问题原因分析 (32)13.1 语音呼叫失败原因 (32)13.2 语音异常释放原因 (32)13.3 语音切换失败原因 (33)参考文章 (34)1序言本文针对自己初步的网优工作积累和网优知识学习汇总介绍了网络优化过程中经常涉及到的关键参数和指标,以及常见网优问题分析和问题产生原因分析,希望对网优还不太精通的同事有所帮助,可能难免有些疏漏之处,请批评指正!2功率过载参数前向功率过载控制采用了3级控制,即T_SETUP(限制呼叫建立门限,缺省设为90%)、T_HO(限制软切换加门限,缺省设为95%)、T_PWRUP(限制现有呼叫功率增长门限,缺省设为100%)。
编码:修订码:HDM-T免维护地中电缆盒接续工艺作业指导书(用于铁路信号内屏蔽数字电缆)编制:日期:审核:日期:会签:日期:批准:日期:实施日期:二OO三年十二月一日中国铁路通信信号集团公司天津工程分公司二OO三年十一月1 概述HDM-T免维护地中电缆盒采用多级密封措施,使用性能好、寿命长(可与电缆同寿命)、免维护、操作简单;电缆芯线接续及内屏蔽的连接采用压接工艺,全部接续工艺无需喷灯及焊具,避免了对电缆的热损伤,保证了接续质量及施工速度。
1.0.1 适用于国内各种地质条件下的电缆接续;1.0.2 采用多级密封防护,可做到免维护;1.0.3 采用压接工艺,接续省时、省力,质量可靠;1.0.4 接续部位与电缆同结构,确保电缆通道的各项电气性能;1.0.5 抗拉机械应力部分采用金属件固定,机械强度大;1.0.6 铝护套及内屏蔽层采用金属屏蔽网,以实现磁屏蔽和电屏蔽;1.0.7 采用可变径密封胶片和变径环,可用于不同外径电缆。
2 基本规定2.0.1 接续人员须经过严格培训,考试合格后持证上岗;2.0.2 电缆在距铁路、公路、道口、河流、桥梁、涵洞2m范围内不得进行电缆接续;2.0.3 电缆地下接续地点距热力、煤气、燃料管道不应小于2m;当小于2m时,应有防护措施;2.0.4 雨、雪天气以及环境温度不符合电缆施工要求时,不能进行电缆的地下接续;2.0.5 同径路的两个接头盒间的距离不得小于1m;2.0.6 电缆应A、B端对接,同芯组、同颜色芯线对接;2.0.7 电缆的地下接头应水平放置,接头两端300mm内不得弯曲;2.0.8 电缆的备用量应盘成“S”形或“Ω”形(即不得呈闭合圈),并集中放在接头的一端,长度不小于2m。
2.0.9 接头盒上方应设电缆槽防护,防护长度不得小于1m;2.0.10 接续后,接头盒应密封良好。
2.0.11 电缆接续后在接头盒正上方埋设电缆接续标,接续标应符合规定;2.0.12 接续工作全部完成后,准确测量电缆接续位置坐标(包括线路里程X及距最近钢轨距离Y),填写电缆接续卡,一式三份,施工单位保留一份,移交电务段及信号工区各一份;卡式见表2.1.1所示;3 电缆接续的工艺流程图电 缆 接 续 记 录 卡表2.1.14 电缆接续工艺4.1 电缆测试及复核4.1.1 为确认电缆敷设后的符合性,在电缆接续前,应严格按照施工设计图、电缆相应技术指标及测试程序进行电缆型号、来去向、外端别的复核及电气性能测试;复核合格方可进行电缆接续工作。
4.1.2 复核程序:根据电缆名牌(标识)及施工设计图确认电缆来、去向→开剥电缆确认电缆型号及外端别→依据电缆电气性能测试程序进行测试→比照规定的电缆电气性能指标复核其符合性→锯掉开剥的电缆头,准备接续。
4.1.3 电缆接续必须符合A、B端对接的原则。
4.1.4 以上经测试、复核后,全部合格方可进行接续工作。
4.2 开挖接头坑4.2.1 深度:同电缆沟深;4.2.2 宽度:≥1200mm,依据内屏蔽数字电缆最大电缆外径45mm,电缆弯曲半径≥其外径15倍计算而得。
4.2.3 电缆备用量盘成“S”形或“Ω”形(即不得呈闭合圈),集中放在接头的一端,长度不得小于2m。
4.3 接续配件加工与组装4.3.1 加工辅助套管4.3.1.1 首先用钢尺测出所接续电缆外径尺寸,然后比照辅助套管上的标线(标线为辅助套管内径尺寸)将辅助套管尾部小于电缆外径的部分切除。
4.3.1.2 各型铁路内屏蔽数字信号电缆外径参考值见表4.3-1。
表4.3-1 铁路内屏蔽数字信号电缆成品参考外径4.3.2 选择变径环组:根据电缆外径尺寸,去掉内径小于电缆外径的变环。
4.3.3 加工密封胶圈:将选择好的变径环组平放在密封胶圈上,二者外圆对齐;然后沿变径环组内孔壁用专用切割刀将密封胶圈中心部分切除成圆孔,加工后的密封胶圈中心孔的直径应与电缆外径同。
4.3.4 组装密封挡环:将变径环组、密封胶圈、外挡片、内挡片用5根M6×35螺栓和一根地线螺栓连接为一体(暂不拧紧),如图4.3-2所示。
图4.3-2 密封挡环组装示意图4.3.5 电缆盒组装:按顺序依次将辅助套管→密封挡环组(紧固螺母面向辅助套管侧)→钢带固定环套在电缆上(两侧电缆相同),然后将主套管套在一侧电缆上;如图4.3-3、4.3-4所示。
图4.3-3 密封挡环组、钢带固定环套安装示意图图4.3-4 免维护地中电缆盒组装示意图4.3.6 注意事项4.3.6.1 选择变径环组必须根据接续电缆的直径,严禁随意组合。
4.3.6.2 密封挡环和钢带固定环在电缆中的位置,要严格按图4.3-3及4.3-4所示组装顺序和零件位置的方向安装。
4.4 电缆成端制作4.4.1 剥除外护套:在距电缆端头190mm处用电工刀环切电缆外护套一周,并向端头方向纵向切割将其剥除。
4.4.2 折弯钢带:距外护套切口15mm处用克丝钳将钢带(双层)折弯、展平,与缆身呈90度。
4.4.3 铝护套表面附层绝缘:剥除钢带折弯处向电缆端头方向50mm范围内的铝护套表面绝缘层,并将铝护套擦净。
4.4.4 切除铝护套:距电缆外护套50mm处,用钢锯环锯铝护套一周,当锯深为铝护套厚度的1/2~2/3时,轻轻折断铝护套并将其抽出。
4.4.5 打毛:将双层钢带的正、反面及铝护套表面打毛,去掉钢带防锈漆及铝护套氧化层。
钢带、铝护套打毛要彻底,一方面保证屏蔽连接可靠,另一方面使灌注的胶液充分浸润良好粘合。
4.4.6 内屏蔽层:距铝护套切口50mm 处将屏蔽线组的屏蔽层剪断,除去屏蔽层端口10mm 范围的绝缘层,保留芯线;如图4.4-1所示。
图4.4-1 电缆成端示意图4.5 电缆屏蔽连接单端制作 4.5.1 将电缆固定在电缆支架上。
4.5.2 钢带的屏蔽连接:松开钢带固定环上的螺栓,将钢带放入固定环间,用M6×16将钢带紧固;保留钢带固定环外5mm 的钢带,将多余部分剪掉;钢带固定环固定后,其内孔应与电缆在同一轴线上,以方便其后的组装,如图4.4-1所示。
4.5.3 铝护套的屏蔽连接:将铝护套屏蔽网(大)一端套在保留的50mm 铝护套上,用喉箍将屏蔽网(大)与铝护套紧固牢靠,然后将屏蔽网(大)全部推向固定侧,露出电缆芯线。
4.5.4 内屏蔽线组屏蔽层的屏蔽连接:4.5.4.1 电缆内屏蔽组的屏蔽层连接使用金属网压接工艺;4.5.4.2 放置压接管:剥开四芯组内屏蔽层纵缝15mm ,将内屏蔽连接内衬管放置在芯线与屏蔽层间,将屏蔽连接压接管放置在内屏蔽层外端,内屏蔽层露出内衬管及压接管1mm ,以保证连接牢固、可靠;4.5.4.3 放置小屏蔽网:将小屏蔽网的一端穿入芯线屏蔽层与屏蔽连接压接之间,如图4.5-1所示:图4.5-1 内屏蔽四线组屏蔽层制作示意图4.7.3 压接:用专用压接钳(图4.5-2所示)将小屏蔽网压接固定在压接管与芯线屏蔽层间;4.7.3 将小屏蔽网沿电缆芯线推至电缆根部,露出电缆芯线。
4.6 芯线接续4.6.1 将两侧电缆芯线分组、编号; 4.6.2 将全部芯线开剥6-8mm ,露出裸铜线;4.6.3 先将一端电缆的全部芯线用接线端子压接,方法是:将裸铜线穿入压接端子筒,通过检查孔观察裸铜线端头穿至压接端子筒的根部,然后用压线钳压接; 4.6.4 一端压接完成后,进行芯线接续工作:将对应的另一端电缆的芯线穿入与其相同组号及芯线序号的压接端子管内,用压线钳压接;4.6.5 全部芯线压接完成后,检查核对压接的线组、线对,确保芯线接续正确,如图4.6-1所示。
图4.6-1 芯线压接示意图4.6.6 用白布带或脱脂棉将电缆芯线与内屏蔽层之间的缝隙填塞堵牢,防止灌胶时胶液沿电缆芯线与内屏蔽层渗漏。
4.6.7 注意事项:4.6.7.1 在芯线压接过程中始终保证电缆芯线在压接端子筒内的位置正确,因此必须两人密切配合。
4.6.7.2 压线钳与压接端子筒及芯线呈垂直状,压接时压接钳不得晃动。
4.6.7.3 压线应一次压紧,压线钳压紧后,能自动松开,表明压接成功,严禁对压图4.5-2 专用压接钳压接口接后的端子进行再次压接。
4.6.7.4 压线钳与压线筒及芯线的位置必须如图4.6-2所示,不得颠倒。
4.7 内屏蔽线组的屏蔽层连接4.7.1 将小屏蔽套沿电缆芯线拉至另一侧电缆的内屏蔽线组侧,同样4.5.4方法将小屏蔽网的另一端与电缆的芯线屏蔽层连接固定;如图4.7-3所示:图4.7-3 内屏蔽层连接示意图4.7.4 屏蔽线组的屏蔽层连接时应仔细操作,确保屏蔽线组内以及与其他芯线间的电气特性良好。
4.7.5 非内屏蔽线组芯线接续除不进行屏蔽连接外其他部分与内屏蔽线组芯线接续相同。
4.8 钢带、铝护套屏蔽连接及接地4.8.1 将两侧电缆外护套与铝护套之间的缝隙用密封带填塞,防止灌胶时胶液渗漏。
4.8.2 将铝护套屏蔽网沿电缆芯线拉至另一侧电缆的铝护套处,用喉箍将屏蔽网(大)与铝护套固定连接。
4.8.3 安装固定拉杆:4.8.3.1 将接续后的电缆芯线恢复直线状态;屏蔽层接地线图4.6-2 芯线压接示意图4.8.3.2 将固定拉杆固定在钢带固定环凹槽内(固定拉杆探出两侧钢带固定环凹槽的长度应相等),如图4.8-1所示。
图4.8-1 电缆屏蔽连接及接地示意图4.8.4 接地:电缆接续处需要接地时,应将内屏蔽线组的屏蔽层接地线复联后与铝护套屏蔽网(大)连接在一起,再与密封挡环上的接地端子连接,最后接到地线体。
如图4.8-1所示。
4.9 盒体组装4.9.1 将两侧外护套切口150mm 范围的电缆外护套用砂布打毛; 4.9.2 将主套管移至电缆接续的中间部位;4.9.3 将两端的密封挡环推入主套管,外挡环与主套管端面在同一平面上,调整主套管注胶孔的位置,使接头盒落地后注胶孔垂直向上;4.9.4 用扳手按对角、轮换的顺序紧固密封挡环的螺丝,使密封胶片受挤压后径向膨胀;当变径环均匀露出外挡环约1mm 时,停止紧固;一端完成后再用同样方法安装另一端密封挡环;4.9.5 将辅助套管与主套管对接,用专用扳手拧紧,辅助套管注胶孔应与主套管上的注胶孔在同一条直线上其角度差不大于±15°;4.9.6 在辅助套管小口径端与电缆之间用密封胶带缠包,防止灌胶时胶液渗漏; 4.9.7 紧固密封挡环的螺丝时,必须按对角轮换的要求均匀拧紧,不可盲目用力,避免用力过大损坏密封部件。
屏蔽网密封挡环接地连接线钢带钢带固定杆电缆铝护套钢带固定环电缆接地4.10 灌注密封胶和膨胀胶4.10.1 将接头盒水平放入电缆接头坑底部,保持主套管注胶孔与地面垂直;两端电缆储备量呈“Ω”状(或“S”状),盘放整齐。
4.10.2 灌注密封胶:4.10.2.1 调胶:密封胶为双组份,密封胶A组份(大桶)开盖后,先将盒底沉淀物与胶液充分搅拌均匀,再将B组份(小桶)全部倒入A组份中充分搅拌混合均匀。