7 WASTES
- 格式:ppt
- 大小:1.23 MB
- 文档页数:41
Walk By – 7 wastesSELV July 2 – July 5, 2012Walk-by / Lean Manufacturing / SPSA principle concept of Lean Manufacturing (and SPS) is that most problems are visible and the best improvement ideas will come from people going to the factory floor and observing the problems. A “Walk-by” is a special way to test our own assumptions about what is going on in the process by “seeing” the actual process running. In the SPS, this is the first part of the concept “I SEE, I DO”. More often than not, when we actually “see”, we see that something else is going on than what we expected. The regular Walk-by is, finally, to check whether progress is happening at the desired pace. Walk-by is an essential responsibility of all MBC and DVC employees.Schneider Electric - GST \ SPS – G. PARRINI – 2010 2Walk-by is an essential part of the SPS assessmentWalk-by, during an SPS assessment, is a good opportunity to have the vision of the factory floor from the eyes of a person unfamiliar to the plant. Assessors are not safety experts but each time they “walk-by” they look for safety issues. Most of the issues seen are not expert related issues but simple observations of behavior that could be seen at one moment and may not be observed later. The Schneider plant of Pisek gives the name “Ghost” to those issues highlighted during a Walk-bySchneider Electric - GST \ SPS – G. PARRINI – 20103Walk by is also an extremely effective tool for the identification of waste●During the walk-by…● We see ● We ask why? ●And most of the time the reply is: “That’s an exceptional situation, you will not see it again tomorrow” This is not an acceptable response to a “why” question!Schneider Electric - GST \ SPS – G. PARRINI – 201047 Main wastes (MUDA)WaitingTTransport & HandlingWOverproductionO O D5IInventoryOver processingMMotion Defects & ReworkSchneider Electric - GST \ SPS – G. PARRINI – 2010Waste: Transportation● Two seconds of value added timeWeld Parts, place in bin Move & place bin on trolley Transport trolley to Warehouse Move bins to pallet Wrap pallet● Opportunity to reduce waste, reduce NPV costsTransport pallet to Rack Transport pallet from rack Put in shipping lane Transport pallet to truckSchneider Electric - GST \ SPS – G. PARRINI – 20106Waste: Transportation● Waste of labor ● What if ???????● Subcon shipped 12 trays already on a trolley? ● How much NPV labor can be saved? ● NPV at subcon and in warehouse.“White poles” from subcon received in trays on pallets 120,000 poles per day Trays on the pallet Trays are transferred from pallet to trolley Total number of trolleys Motions per trolley: 1 pull of 7 trays, manual move of 572 poles per tray1,667 trays 7 trays per stack 12 trays per trolley 139 2-3 “pulls” per trolleySchneider Electric - GST \ SPS – G. PARRINI – 20107Waste: Transportation● Is this optimized? Is this productive?Schneider Electric - GST \ SPS – G. PARRINI – 20108Waste: Inventory● Waste of inventory always leads to wasted floor space (square meters)Schneider Electric - GST \ SPS – G. PARRINI – 20109Waste: Inventory● Waste of inventory always leads● Waste of space ● Waste of Moving / TransportationSchneider Electric - GST \ SPS – G. PARRINI – 201010Waste: Motion●Operator must manually remove the welded part before putting in the new parts to be welded●67 Welders do not have auto eject●Time lost = .5 –1.0 secondsExample of Potential Savings Calculation Average welds per machine:5,800X 3 Shifts 17,400X 60 machines 1,044,000Manual eject time .5 seconds Totalopportunity 8,700 minutes 145 hoursCurrent Time spent (60 people X 3 shifts X 8 hours 1,440 hoursProductivity10%Waste: Waiting●Every day that I went to the floor there was a different cell stopped and people waiting.Waitin gWaitin gWaitin gWaitin gIf you have a flexibleworkforce, can’t we findWaitin g Waitin gsomething else for the people to do?Waste: Overproduction●Finished goods inventory–in the factory!!!●It cannot be MTO if you have stock!●MTO MOQ Must = 1Waste: Over-processing●Inspection: human visual inspectionis only good to about 5000 PPM●If we have advancedAutomated equipment, whydo we need a finished goodsampling plan ?●It is hard to be so good●You have an excellent plant●So what does SELV do to improve?See the waste●Even the smallest waste, multiplied many times, can equal huge savings.Challenge everything●Tribal Knowledge & Assumptions●When you are good….●And you have been doing many things the same for along time●It is sometimes hard to question what you are doing.●Challenge everything, challenge the processes,challenge the rules●Think creatively●There is no such thing as a dumb idea.Be creative●“We can’t because…”●The biggest waste in every company is the waste of our employee’s creativity●Involve all of your employees in the change process●Leverage their collective intelligence and their experience●Never talk about why you can not do something●Always talk about how you can do it.Benchmark●Against the best, not the others ●Against internal, but also external。
Push system 推式生产 Pull system 拉式生产 Muda 浪费 Kaizen 改善 Kanban 看板Visual control system 目视控制系统 Mass production大规模生产 mised-model production混和型生产one piece flow 单件流程 water spider水蜘蛛 mistake-proofing错误校正 Red tag 红牌TT(Takt time)生产节奏 WIP(work in process) 库存 VSM(value steam map)价值溪流图表格明细:標准作業票Standard Work Sheet多能工表Multi Skilled Sheet改善事例记录本Kaizen Event Record价值流程图Value Stream/Process Flow Chart快速换模/线查核表Quick change over checklist每小時生產管理表EVN Hourly Production Management Sheet生產狀況趨勢圖Production Trend Chart上游单位评估记录表The Status of up stream sub cell/supplier measured材料需求表Material requirement listseven muda七大浪费the seven wastes are overproduction in excess of demand, waiting for the next processing step, unnecessarytransprot of materials, overprocessing of parts due to poor tool and product design, inventories greater than the absolute minimum needed, unnecessary movement by employees during the course of their word,and theproduction of defective partsCEDAC 鱼骨图cause-and -effect diagram with the addition of cards): a significant enhancement to the widely usedIsakawa"fishbone"diagramming technique for problem solvingQCO (Quick Changeover) 快速转换:the installation of a new tool in a metalworking machine.A changeover begins after the last good piece off onerun has been produced(and inspected, if necessary, to confirm that it is good) and ends when the first goodpiece off the new run is producedNon-value-adding非增值Any activity in a production process that is considered wasteful; which is th say, any activity that does notchange material of does not add information to a product or service in a way that the end-user values enoughto pay for.BCS(Build Customer Schedule)计划执行率D2D(Dock to Dock)生産前導時間:a tactical measurement used to indicate the veocity of material in the production process starting with the receipet of raw materials to the shipment of that meterial to a customer orderRFT(right the first time)一次达标率MLT( Manufacturing lead time)制造期:the amount of time nominally taken from the issuance of raw material through the prodution process to thecompletion of the saleable productTPM(Total Productive Maintenance)全员生产保全A Japanese Kaizen Strategy focus on improving the efficiency of machine to gain the overall profit of thecompanyfocused equipment improvement聚焦设备改进:an approach, applied in the later stages of total productive maintenance, that focuses on specific equipment proameters of capabilities so as to improve the overall equipment effectiveness.OEE(overall equipment effectiveness)设备总体有效性the primary metric of total productive maintenance that indicates a single piece of equipment's actualcontribution as a percentage of its potential to add value to the value streamMatrix diagram矩阵图:a graph used to show the relationship between two or more diffrerent factors。
waste是什么意思waste表达的意思有很多种,那么你知道waste做动词,名词和形容词分别都有哪些意思吗?下面店铺为大家带来waste的英语意思解释和英语例句,欢迎大家一起学习!waste作名词的意思:浪费,白费,挥霍钱财;废料,废品waste作动词的意思:浪费;徒劳;(使)损耗;(使)消瘦waste作形容词的意思:废弃的,无用的,荒芜的waste的英语音标:英 [weist] 美 [west]waste的时态:现在分词: wasting过去式: wasted过去分词: wastedwaste的英语例句:1. Solid low-level waste will be disposed of deep underground.放射性水平低的固体废料将做地下深埋处理。
2. They make compost out of all kinds of waste.他们用各种废料制造堆肥。
3. Overcrowding has taxed the city's ability to deal with waste.人口过多使得城市的垃圾处理能力达到了极限。
4. The ability to separate out reusable elements from other waste is crucial.能从其他废料中分离出可重复利用成分是很关键的。
5. I think that is a total waste of money.我认为那完全是浪费金钱。
6. The aphid is now laying waste to the wheat and barley fields.蚜虫正在毁掉一片片的小麦和大麦田地。
7. I'm not one to waste time on just anyone.我可不是个随便浪费时间在任何人身上的人。
8. You could waste your whole life on a pipe-dream.白日梦会荒废你一生。
7SEA管理目录什么是7SEA7SEA管理的要素什么是7SEA7SEA是由素养(Sentiment)、整理(Sort)、整顿(Straighten)、清扫(Sweep)、清洁(Sanitary)、安全(Safety)、节约(Save)、环保(Environmental protection)和活动(Activity)的英文开头字母构成的,其也是7SEA管理法的要素。
7SEA现场管理法是"5S管理"的基础上进一步完善发展起来的。
7SEA管理的要素(一) 管理要素7SEA现场管理法中的字母分别是"素养(Sentiment)"、"整理(Sort)"、"整顿(Straighten)"、"清扫(Sweep)"、"清洁(Sanitary)"、"安全(Safety)"、"节约(Save)"、"环保(Environmental protection)"和"活动(Activity)"、的英文开头字母,也是构成7SEA管理法的要素。
现场是由各生产要素构成的,现场管理是对人、机、料、法、环、信息、制度等生产要素的综合管理,而人不仅是诸多生产和管理要素的核心,更是实施各项管理的主体。
因此,只有把员工作为系统最重要的要素,去主动推动和保证系统的运行,才能在系统中的其他要素发生变化时,由人这个第一要素及时准确地进行相应的变化,推动系统的处理和反馈,使生产现场的各要素重新达到和谐统一。
没有了人,再完善的系统也将失去生命力。
而和人员的数量相比,高素质的员工是系统的决定性的要素。
因此,应把高素质的员工作为现场管理的根本,首先对"5S"的顺序进行调整,把"素养"作为7SEA的第一条,纲举目张,总领其它要素,并且对各要素的内容进行了充实和新的诠释,进一步发展和完善了"5S"管理。
waste的第三人称单数和短语例句waste的第三人称单数: wastes waste的词组短语: waste water 污水,废水 solid waste 固体废物,固态废物;固体废料,固体垃圾 waste gas 废气 a waste of 浪费… waste water treatment 废水处理,污水处理 waste第三人称单数例句: 1. nuclear weapons plants across the country are heavily contaminated with toxic wastes. 全国的核武器工厂均受到了有毒废弃物的严重污染。
2. he decided to do something about reforesting man-made wastes of western australia. 他决定为在澳大利亚西部人为导致荒芜的土地上重新造林做点事情。
3. the system wastes a large amount of water. 这套系统浪费了大量的水。
4. he wastes time fiddling about with minor matters. 他把时间都浪费在鸡毛蒜皮的小事上。
5. the functionof the kidneys is to excrete wastes from the body. 肾的功能是排泄人体里的废物. 6. these wastes are finally eliminated from the body in the urine. 这些废物最后从尿中排出. 7. all wastes are usually eliminated from the body before death. 通常在(人)死亡之前一切废物都从体内排出. 8. we traveledthrough treeless wastes. 我们穿过了没有树木的荒地.9. the explorers spent months in the arctic wastes. 探险家们在北极荒原上工作了几个月. 10. his failureto turn his attention to flagrant wastes of public moneyis inexcusable. 他未能注意到公共资金的公然浪费,这是不可原谅的。