商场装修流程
- 格式:doc
- 大小:26.00 KB
- 文档页数:3
时代奥特莱斯租户入场装修流程为了使租户装修更方便、快捷、安全,本公司制定以下入场装修流程:1、图纸审核租户提交全套的装修图纸到我司工程部进行图纸审核,并根据工程部的意见,完善图纸的设计。
2、审核通过后办理进场装修手续审核通过,租户携带填写完成的《租户装修申请表》(附表一)和《租户及装修工程承办商资料表》(附表二),并盖章,然后到营运部、保安部、工程部签字,并与营运部确认缴纳费用明细(附表三),经各部门确认后,通知商户按照(附表三)到财务部缴纳相关费用及提供购买工程一切险凭证。
3、办理入场证件租户携《租户装修申请表》及缴费凭据、保险购买凭据到保安部办理入场相关证件,填写《施工人员登记表》(附表四),签订《施工单位消防治安及安全生产协议书》(附表五)。
4、租户装修前场地交接租户装修前由营运部、工程部、保安部、招商部与商家一起办理交接手续。
并做好《租户装修前场地交收记录》(附表六)。
5、装修过程中租户进场装修一切按照《装修手册》要求进行,整个过程由营运部、工程部、保安部全程监督,发现问题及时纠正、整改。
动焊、动火、用水需要到保安部办理相关手续。
6、租户验收申请租户装修完成后商家向营运部提出验收申请需填写《店铺验收申请表》(附表七)并提供相关资料,三天内由营运部安排工程部、保安部联合验收,并填写《店铺装修联合验收表》。
(附表八)7、退款手续装修验收合格后租户持《店铺装修联合验收表》(附表八)到财务部办理退款手续。
8、表格存档租户装修流程所填写的表格由行政部门存档。
9、附件(表一—表八)备注:以下是各部门联系电话。
租户装修申请表填表日期:__________备注:在提交本装修申请时,请承租户携带以下材料:1、施工图四套、施工说明一份、装修计划进度表一份2、设计单位、施工单位营业执照、资质证书复印件(需有承租户盖章)3、施工人员清单、身份证(原件复印后归还)4、特殊工种操作证书(原件复印后归还)表二:租户及装修工程承办商资料表店铺名称: _________________________ 店铺位置:___________________________租户公司名称:_______________________________________________________________________租户代表/联系人:_____________________________________________________________________电话号码:_____________________________ 传真号码:____________________________手机号码:_____________________________ 电邮地址:___________________________装修工程承办商:______________________________________________________________________装修负责人: _________________________________________________________________________ 电话号码:_____________________________ 传真号码:___________________________手机号码:_____________________________ 电邮地址:___________________________备注:此表由租户填写,并盖租户公司公章,由工程部暂存。
商场工程的建设的流程一、规划设计。
1.1 首先呢,这商场工程得有个好的规划设计。
就像盖房子得先画个蓝图一样,这可不是随随便便画画就行的。
要考虑商场的定位,是高端大气上档次的那种,还是走亲民路线的。
比如说,要是定位高端,那在设计上就得有宽敞的中庭、豪华的装修风格,就像那些国际大牌商场似的,让人一进去就感觉“高大上”。
1.2 还要考虑商场的布局。
不同的区域怎么划分,餐饮区、购物区、娱乐区都得安排得妥妥当当。
这就好比排兵布阵,每个区域都有自己的作用,不能乱了套。
像餐饮区得靠近人流多的地方,但又不能影响购物区的氛围,这其中的门道可多着呢。
二、施工准备。
2.2 材料的采购也很关键。
材料的质量直接关系到商场的质量。
咱得货比三家,挑那些质量好、价格合理的材料。
不能为了省钱就用那些“歪瓜裂枣”的材料,那可就是“偷鸡不成蚀把米”了。
2.3 办理各种施工许可证之类的手续也不能马虎。
这就像给工程上了一道保险,一切都得合法合规。
要是手续不全就开始施工,那就是在给自己找麻烦,到时候被查出来,那可就是“吃不了兜着走”。
三、施工阶段。
3.1 基础工程是重中之重。
就像盖房子打地基一样,基础打不好,整个商场就像建在沙滩上的城堡,不牢固。
施工的时候得严格按照标准来,一点都不能含糊。
3.2 主体结构施工的时候,那得保证质量和进度两手抓。
质量就不用说了,这是商场的“脊梁骨”。
进度也不能落下,不然拖拖拉拉的,成本就会增加。
就像跑步一样,得保持一个稳定的速度向前冲。
而且施工过程中要注意安全,安全可是“天字第一号”的大事,要是出了安全事故,那可就麻烦大了。
四、装修与设备安装。
4.1 装修可是给商场“穿衣服”的过程。
要根据之前的设计风格来装修,从地面到天花板,每一个细节都得注意。
像墙面的颜色、地板的材质,都得精心挑选,让商场看起来美观大方。
4.2 设备安装也不能忽视。
电梯、空调、消防设备等等,这些设备就像商场的器官一样重要。
电梯得保证运行平稳,空调得让商场里冬暖夏凉,消防设备更是要符合标准,这可是关系到大家生命财产安全的大事,绝不能“掉链子”。
商场装修进场实施方案一、前期准备工作。
商场装修是一个复杂的工程,需要在进场实施前做好充分的准备工作。
首先,需要明确装修的具体要求和目标,包括装修风格、装修材料、装修预算等,确保所有相关方对装修方案有一个清晰的认识。
其次,需要进行场地勘察和测量,了解商场的具体情况和要求,为后续的施工提供准确的数据支持。
同时,还需要与商场管理方和相关部门进行充分沟通,了解相关规定和要求,确保装修方案符合商场的管理标准。
二、施工准备阶段。
在进场实施前,需要进行施工准备工作。
首先,要确定施工队伍和相关人员的配置,包括施工队长、工人、监理人员等,确保施工队伍的配备和素质达到要求。
其次,需要准备施工所需的材料和设备,包括施工机械、施工材料、安全防护用品等,确保施工过程中的需要得到满足。
同时,还需要制定详细的施工计划和施工方案,包括施工的时间节点、工序安排、质量要求等,确保施工进程有条不紊地进行。
三、施工实施阶段。
在进行商场装修施工时,需要严格按照施工方案和相关规定进行实施。
首先,要确保施工现场的安全和秩序,包括设置安全警示标识、施工围挡、安全通道等,确保施工现场的安全。
其次,需要严格按照施工计划和工序安排进行施工,确保施工进度和质量达到要求。
同时,还需要加强施工现场的管理和监督,包括施工人员的行为规范、材料的使用管理、质量的监控等,确保施工质量和安全。
四、验收和收尾阶段。
在商场装修施工完成后,需要进行验收和收尾工作。
首先,要进行施工质量的验收,包括装修工程的质量、安全、环保等方面的验收,确保装修工程符合相关标准和规定。
其次,需要进行施工现场的清理和整理工作,包括清理施工垃圾、整理施工设备、清洁施工现场等,确保施工现场的整洁和安全。
同时,还需要与商场管理方进行最终的验收和交接工作,确保装修工程的最终验收和交接工作顺利进行。
五、总结和改进阶段。
商场装修施工完成后,需要进行总结和改进工作。
首先,要对整个装修施工过程进行总结和评估,包括施工质量、施工进度、施工管理等方面的总结和评估,为今后的装修工程提供经验和借鉴。
商场装修验收标准及验收流程商场装修是商家展示自身形象的重要方式,它呈现出来的装修风格、装修材料、建造标准等方面,直接影响到商家在公众心目中的形象。
因此,商场装修验收应该要具备一定的标准和流程,以确保商场的装修质量和标准符合消费者的需求和期望,同时也要保证商家的合法权益。
一、商场装修验收标准1.施工质量商场装修的施工过程中,应该严格按照国家建筑标准进行施工。
施工过程中应该注意建筑物的安全性,合理选用施工材料,上下文之间不能有缝隙,图案设计要美观、大方、实用,装修整体风格要符合国际潮流。
2.材料选择卫生间、走廊、地面等公共区域的材料要符合政府相关法律法规要求,特别是材料的绿色环保和低碳等指标应当符合国家标准。
商场的装修材料应选用可回收的、能再利用的天然材料,符合环保要求的绿色材料。
电子产品,家具等的选择也应符合相关标准,符合国家的能源节约、环保等相关要求。
3.电器安装商场的装修中,电器安装部分同样应符合相关标准规范。
应选用优质的电线、电器插头和电器配件,保证设备运转安全、稳定,符合国家强制性标准等法律法规和标准。
同时,灯具配件、开关面板、控制器等装饰效果也应让人满意。
4.卫生消毒商场装修验收标准中,卫生方面也是必须要有相关检验。
装修完成之后,应进行消毒处理,确保商场内的环境达到卫生标准。
同时,应定期进行美观清洁,并做好垃圾、建筑垃圾的分类处理,充分保护环境。
二、商场装修验收流程1.施工初期施工初期的验收,主要是对商场的基础工程建设情况进行检查,同时也需要进行电气系统、通风系统、水路系统等方面的初始验收。
检测的主要内容包括:(1)商场的基础设施条件是否符合国家的施工要求;(2)水路系统的水压测试和工作状态的检验;(3)电气调试和电器接线的检查;(4)通风系统的强度检测和正常工作状态的测试。
2.主体施工中期主体施工中期的验收,是在商场装修项目中最为关键的阶段,通过验收对商场的主体施工质量及材料的选择进行检查。
精装工程施工方案一、工程概况本工程位于某市某区,总建筑面积约10000平方米,包括商业楼宇和住宅楼宇。
本工程为精装工程,属于高档建筑装修工程范畴。
二、工程内容1. 商业楼宇商业楼宇包括商场、餐饮等区域,主要进行大堂装修、商铺隔断、空调系统改造等工程。
2. 住宅楼宇住宅楼宇包括多个住宅单元,主要进行厨卫间装修、客厅装修、墙面装修等工程。
三、施工方案1. 施工组织本工程将按照“安全生产、高质量、精细管理、文明施工”的原则进行施工,建立合理的施工组织架构,确保工程按时按质完工。
2. 施工流程(1)商业楼宇装修流程① 商场大堂装修:首先进行大堂天花、地板、墙面等装修工程;然后进行大堂装饰物品、灯具、广告牌等安装工程。
② 商铺隔断:进行商铺隔断、门窗安装等工程。
③ 空调系统改造:对商业楼宇的空调系统进行升级改造,确保商业楼宇的通风、制冷系统正常运行。
(2)住宅楼宇装修流程① 厨卫间装修:首先进行厨房、卫生间的瓷砖、卫浴设施安装等工程;然后进行各种厨卫间的水、电、气改造工程。
② 客厅装修:进行客厅吊顶、墙面、地面等装修工程。
③ 墙面装修:对住宅楼宇的公共走道、楼梯间等墙面进行涂料、壁纸、装饰画等装修工程。
3. 施工质量本工程施工质量严格按照国家相关标准执行,施工过程中采用优质材料、先进工艺,确保工程的稳定性和耐久性。
4. 安全预防为了确保工程施工的安全性,采取以下措施:(1)建立健全的安全管理制度,明确责任人,加强安全检查和督促工人佩戴安全防护用具。
(2)加强施工现场管理,划定施工区域,进行警示标识,确保施工现场的通道畅通、安全防护设施的完善。
(3)定期进行安全教育培训,增强员工的安全意识和应急处理能力。
5. 环保措施本工程严格按照国家环保法规进行施工,确保施工过程中对环境的影响降到最低。
(1)严格控制噪音和粉尘污染,使用低污染材料和设备,减少施工噪音和粉尘排放。
(2)合理利用水、电、气资源,做好环保节能工作。
商场商户装修流程
1:招牌制作。
针对商铺门面进行美化处理,打造专属照片,做好铺面宣传。
2:墙面处理。
为了给人舒适体验感,针对铺面的墙体进行基层处理,包括刷漆、两百、刮胶、贴墙纸等。
3:天花吊顶。
为了让铺面空间效果更完美,对吊顶的形状要求、材质选择,要提前准备好。
一般吊顶材料,可选择:石膏板、矿棉板、金属、玻璃、铝扣板等。
4:水电改造。
水电改造,主要是做好卫生间防水工作,根据铺面使用情况来设计电路,可能会涉及到对墙壁以及地面的开槽。
5:各类营业家具的购置与安装。
安装好购置的家具就可以营业了。
施工方案-商场装修施工方案一、项目背景商场装修工程是为了提供一个舒适、美观的购物环境,吸引顾客并促进销售。
本文档旨在概述商场装修施工方案,确保工程顺利进行。
二、施工范围商场装修施工范围包括但不限于以下内容:1. 墙面和地板的修复和粉刷;2. 电气设备和照明系统的安装和调试;3. 室内装饰材料(如吊顶、墙饰、地板)的安装;4. 店铺门窗的维修和更换;5. 空调和通风系统的安装和维护。
三、施工计划1. 预备阶段:- 确定施工设计和材料清单;- 安排施工人员和设备;- 确定施工时间和工期。
2. 施工阶段:- 按照设计方案进行室内装修;- 安装照明、电气和通风设备;- 衡量和调试装饰材料。
3. 完工阶段:- 清理施工现场;- 检查和修复可能存在的瑕疵;- 完善室内空气质量。
四、安全措施1. 施工人员需佩戴个人防护用品,如头盔、手套和安全鞋;2. 施工现场需设置明显的安全警示标志;3. 定期检查施工设备和电线,确保安全运行。
五、质量与验收标准1. 预计施工后的墙面和地板无开裂、起泡和漏水现象;2. 电气设备和照明系统正常工作,无故障;3. 室内装饰材料安装平整牢固,无明显损坏;4. 店铺门窗通畅,无卡顿和漏风;5. 空调和通风系统达到舒适的温度和通风效果。
六、施工成本商场装修施工成本根据具体项目的规模和要求而有所不同。
包括劳动力费用、材料费用、设备租赁费用和管理费用等。
以上是商场装修施工方案的概述。
详细的施工流程和技术细节将在具体的施工合同中详细规定。
为确保施工顺利进行,建议在施工前与相关法律专家进行必要的法律咨询。
商场商户装修手册商场商户装修是一个非常重要的环节,直接关系到商场的整体形象和消费者对商场的认知度。
因此,本手册旨在为商户提供装修指南和注意事项,使得商户能够合理规划、有效施工。
1. 商场装修规范商场作为一个公共场所,装修要遵守一系列规范,包括但不限于以下几点:1.1. 合法合规商场商户装修必须合法合规,需要遵循相关的国家、地方政策和法律法规,包括规划许可证、建设工程规划许可证、装修招标文件等等。
同时,应尽量选择与商业区域和商场运营管理相符的装修形态、隔音材料等。
1.2. 安全环保商场作为一个公共场所,对安全和环保的要求更高,商户的装修也应遵守相关规范。
比如,电力、燃气和水路等管道隐蔽装修;使用环保材料和低VOC材料等等。
1.3. 设施便利商场营业时间长、观众较多,特别需要考虑消费者的便捷性。
拥有条线明晰、干净整洁的通道和交通良好的电梯、扶梯等设施是必要的。
同时,需要为残疾人提供无障碍设施。
2. 商户装修流程商户要向商场申请装修,需要按照一定流程进行,包括以下几步:2.1. 选取装修设计公司商户可以自主寻找装修公司进行报价和设计,也可以选择商场指定的装修公司,一定要根据自己的实际情况选择专业的公司,避免后期造成困扰。
2.2. 签订合同在选择好装修设计公司之后,商户要与公司签订装修合同,清晰规定装修标准、施工进度、验收方法和应急措施等。
2.3. 申请装修许可证商户需根据商场要求申请装修许可证,并依据许可证规定完成装修。
2.4. 进行装修验收装修完成后,商场会组织验收,如不符合要求,需要及时整改。
3. 商户装修注意事项商场商户进行装修时,也需要特别注意以下几点:3.1. 学习相关规范商户在进行装修前需要了解商场或者当地有关规范,遵守并落实到实践中。
3.2. 做好防火工作商场的防火工作非常重要,商户要根据防火规定配置灭火器和火灾警报器,并根据要求进行安装和使用。
3.3. 做好施工场地管理商户应在经营场地周围设置可折叠式栅栏等安全设施,并施加管束力,确保行人安全。
商场装饰装修安全管理规定XX为进一步规范专柜进场装修的统一执行标准,保障施工期间安全及顺利完成施工任务,特制定本规定。
一、装饰、装修流程1、凡各租户需要进行装饰、装修的应提前三个工作日办理入场施工手续。
在管理处领取《商场货柜(架)装修申请表》的表格,填写清楚(一式二份),由管理处负责人在《申请表》“施工内容”栏签字确认。
2、管理处将《申请表》填写好后交送商场领导签字确认。
3、装饰、装修期间缴纳“装修杂费”300元/间(含:消防器材,清洁费,水电费)。
4、物管部负责审核用电量,确认电路施工图,审核设计单位和施工单位是否属二级或二级以上资质,审核施工平、立、剖面图。
5、保卫部负责施工现场监督。
6、装修单位必须严格按照“申请表”上的入场时间和竣工时间进场施工及准时完工。
7、保卫、物管部根据“申请表”上的竣工时间准时验收,合格则在“申请表”上签字认可,不合格则立即向管理处门或施工单位发“隐患整改通知书”。
8、施工中若需动火、动焊的必须另行申请,填写《动火(焊)申请表》。
二、装饰、装修时间及各项费用收取标准1、装修时间(入场和竣工)由管理处根据经营需要和具体施工内容确定,并由部门负责人在“申请表”上签字确认。
2、若未能准时完工的或因验收不合格需处长工期整改的,则每拖延一天扣除200元,以次类推,若不整改的取消施工单位在商场的施工资格。
三、装饰、装修现场要求1、需现场制作的专柜,装修时必须使用白色板进行全封装修,不得使用其他临时性遮围材料。
2、管理处必须留人现场值班,负责商品安全,监督施工和协调相关事宜。
3、施工人员必须一个一证凭证入场,服从值班人员指挥,不得随意到施工现场以外的地方逗留、挪动商品。
4、大件物品进出商场时只能走后楼梯安全通首,不得使用客梯,不得损坏公物,损坏公物则照价赔偿。
5、专职电工必须随身携带“电工操作证”,随时备查。
6、施工现场施工队人员严禁吸烟、随地大小便,违者按200元/次进行处罚。
商场店铺装修流程物业规范英文回答:Tenant Coordination: The first step is for the tenant to coordinate with the property owner or management company to ensure that the proposed renovation plans comply with the building codes and regulations. This includes submitting detailed drawings for approval and obtaining the necessary permits.Architectural Design: The tenant then works with an architect or designer to develop the detailed design for the store renovation. This includes selecting materials, finishes, and fixtures, as well as creating a layout that meets the functional and aesthetic requirements of the business.Construction Documents: Once the design is finalized, the architect or designer prepares detailed construction documents, including floor plans, elevations, sections, andspecifications. These documents provide the contractor with the necessary information to complete the renovation according to the approved design.Contractor Selection: The tenant selects a qualified contractor to perform the renovation work. The contractor should be experienced in retail construction and have a proven track record of completing projects on time and within budget.Construction Phase: The contractor begins the renovation work according to the approved plans and specifications. During this phase, the tenant is responsible for overseeing the progress of the work and ensuring that it meets the agreed-upon standards.Inspections: Regular inspections are conducted throughout the construction phase to ensure that the work is being performed in accordance with the approved plans and specifications. These inspections are typically conducted by the architect, the contractor, and the property owner or management company.Certificate of Occupancy: Once the renovation is complete, the contractor provides the tenant with a certificate of occupancy. This certificate indicates thatthe renovation has been completed in compliance with the building codes and regulations and that the space is safefor occupancy.Tenant Fit-Out: The tenant then completes the finalfit-out of the store, including installing fixtures, furniture, and merchandise. The tenant is responsible for ensuring that the fit-out complies with the lease agreement and the property owner's or management company's guidelines.中文回答:商场店铺装修流程物业规范。
商场装修范文规定商场装修的进度和验收标准1. 装修进度规定商场装修是一个复杂而耗时的过程,为保证工程按照计划进行,制定以下装修进度规定:1.1 设计阶段设计阶段是商场装修的起点,设计师和业主需就设计方案及施工图进行充分沟通和确认,确保设计满足业主需求并符合法律法规。
设计阶段的完成时间不得超过1个月。
1.2 施工准备阶段施工准备阶段包括施工图纸的归档、材料、设备和施工队伍的准备等。
施工准备阶段的完成时间不得超过1个月。
1.3 施工阶段施工阶段应按照设计方案和施工图纸进行施工,并严格按照施工进度完成各项工程。
施工阶段的时间根据实际工程规模而定,但通常不得超过6个月。
1.4 完工阶段施工完成后,商场装修需经过相关部门的验收。
对于符合验收标准的工程,方可正式交付使用。
完工阶段的验收时间不得超过15个工作日。
2. 装修验收标准商场装修验收标准应参照国家相关法律法规和行业标准,制定以下验收标准:2.1 结构验收标准结构验收主要检查施工工程的基础、梁柱、墙体、楼板等结构是否牢固可靠,是否符合相关设计和施工规范要求。
2.2 电气验收标准电气验收主要检查商场的供电系统、照明系统、安防系统等是否符合电气工程规范,是否达到安全使用要求。
2.3 空调与通风验收标准空调与通风验收主要检查商场的空调系统、通风系统是否安装齐全、工作正常,并满足室内环境舒适要求。
2.4 管道验收标准管道验收主要检查商场的给水管道、排水管道、燃气管道等是否合理布置,是否达到使用要求,并确保无渗漏现象。
2.5 室内装饰验收标准室内装饰验收主要检查商场的地面、墙面、天花、吊顶等装饰材料是否安装完好、无缺陷,并达到装修设计要求。
2.6 消防验收标准消防验收主要检查商场的防火设施、消防通道、灭火器材等是否符合消防要求,以保障商场的火灾安全。
2.7 环保验收标准环保验收主要检查商场的材料选择、室内空气质量、噪音控制等方面,确保装修工程对环境无污染和危害。
商场装饰装修工程施工方案(技术标)
一、工程概况
1.1 项目名称
商场装饰装修工程
1.2 工程地点
待确定
1.3 工程规模
待确定
二、施工内容
2.1 主要施工项目
1.室内装修
2.灯光设计与安装
3.地面铺设
4.墙面装饰
5.橱窗设计与制作
6.其他
2.2 施工工艺
1.拆除、清理
2.基础处理
3.室内装修
4.灯光布置
5.地面铺设
6.墙面装饰
7.橱窗制作及设计
8.设备安装
9.其他
三、施工要求
3.1 施工质量要求
1.建筑结构牢固、安全可靠
2.装修材料符合国家标准
3.装修工艺精细,无划痕、漆面光滑
4.灯光照明布置合理,色彩搭配协调3.2 施工时间要求
1.按计划完成,不得拖延工期
3.3 施工进度要求
1.按项目进度安排合理完成各项工作
四、施工安全
4.1 安全管理
1.建立安全文明施工标准
2.确保现场安全,杜绝安全事故发生4.2 施工人员
1.配备合格、上岗证明的施工人员
2.定期进行安全培训
五、施工预算
5.1 预算编制
1.结合工程实际情况编制详细预算表
2.合理控制费用,确保施工质量
六、验收及维护
6.1 验收标准
1.完成工程必须符合国家相关标准
2.验收合格后方可交付使用
6.2 维护保养
1.提供装饰装修维护保养说明书
2.定期检查维护并保持设备设施良好状态以上为商场装饰装修工程施工方案的技术标。
商场装修管理规定商场装修管理规定是为了确保商场装修安全、环保,提高商场形象,在商场装修过程中规范各项管理工作的文件。
商场装修管理规定是商场将装修过程中的管理要点、标准、程序等进行明确、规范的一种制度。
一、责任部门商场装修管理责任部门包括商场经营部门、财务部门、工程部门等。
二、装修要求1.装修材料要求:商场装修材料必须符合国家安全、环保标准,严禁使用有毒有害物质;2.装修风格要求:商场装修风格要与商场定位相匹配,符合消费者的审美需求;3.装修施工要求:商场装修施工要按照国家相关施工标准进行,施工过程中需注意安全措施,保证工人的人身安全。
三、装修程序商场装修程序包括前期准备、设计方案确定、施工准备、施工过程、竣工验收等环节。
1.前期准备:商场装修前,需要进行详细的规划和设计,并制定详细的装修方案。
2.设计方案确定:商场装修设计方案需经商场经营部门审核通过后方可实施。
3.施工准备:选择合格的装修公司、制定详细的施工计划、购置好所需材料等。
4.施工过程:按照设计方案进行施工,施工过程中需注意安全、环保要求。
5.竣工验收:商场装修竣工后,由商场经营部门进行验收,确保装修质量符合要求。
四、装修费用商场装修费用应明确列入商场预算,包括设计费、施工费、材料费等各项费用,并进行合理支出。
五、装修监督商场装修过程中,需要由商场工程部门进行监督,确保装修符合相关规定。
六、环保要求商场装修要注重环保,尽量选择环保材料,并严格按照国家相关环保标准进行施工。
七、安全措施商场装修过程中,必须切实做好安全措施,保证施工现场的安全,防止事故发生。
八、装修期限商场装修期限一般需在商场闭店期间进行,确保不影响商场正常营业。
九、装修效果商场装修效果应与商场形象相匹配,能够吸引消费者,提升商场的竞争力。
商场装修管理规定是商场在装修过程中进行管理的指导文件,通过明确各项管理要点,规范商场装修的各个环节,确保商场装修质量和安全,提高商场形象。
商场装修的步骤及基本流程
商场装修的步骤和基本流程可以概括如下:
1. 策划阶段:确定装修目标、风格、设计理念和预算,进行市场调研和竞争分析,制定整体规划和时间表。
2. 设计阶段:雇佣专业设计师进行商场建筑和室内设计,包括平面布局、装修风格、灯光设计、色彩搭配等。
3. 材料选购:根据设计方案,选购适合商场的建材、家具、灯具、装饰品等,考虑品质、价格和供应商的可靠性。
4. 施工准备:与装修承包商签订合同,安排施工队伍和物料进场,申请相关施工许可证和审批文件。
5. 基础施工:进行基础设施建设,如水电安装、墙面处理、地面铺设等。
6. 室内装修:按照设计方案进行室内装修,包括墙面装饰、地板铺设、天花板安装、门窗安装等。
7. 系统设施安装:安装商场的空调、照明、消防、安防等系统设施,并进行调试和验收。
8. 室内装饰:进行商场的室内装饰工作,如摆放家具、装饰品、标识牌等。
9. 设备测试:对商场内的各种设备进行测试,确保其正常运作。
10. 清洁和整理:对商场进行清洁、整理和收尾工作,确保商场的整洁和美观。
11. 验收和交付:与设计师、承包商进行最终验收,确保装修工程按照预期完成,并交付使用。
需要注意的是,商场装修的具体流程会根据项目的规模、复杂性和特殊需求而有所不同。
在整个装修过程中,与设计师、承包商和相关部门的沟通协调非常重要,以确保工程的顺利进行和最终的成功交付。
商场装修施工办理流程June 8th, 2022, what a day of hard work.装修施工办理流程材料进场时间:19:30—20:00装修施工时间:20:00—22:00延时装修时间:22:00—次日5:00 需缴纳50元/日延时费一.业户自行装修办理:第一步、业户到管理部现场组申请装修施工,现场人员审核相关材料;1. 管理员首先要求业户去经营部核实有无欠缴费情况,需要经营部发内部联络单确认,并通知业务部审核效果图,无误后收集施工材料信息;2. 管理员询问业户是否装备灭火器,如果没有灭火器,须要求业户购买,为保证消防器材质量,灭火器由逸彩城统一代购;灭火器75元/个、灭火毯120/张,由管理部现场组人员开具缴款单缴款单写完需部长签字,业户凭缴款单到财务交款;业户交款后凭收据到现场组,现场人员从业户手中收回缴款单白色一联存档即第一联带领业户到消控中心领取消防器械;3. 现场人员询问业户装修的具体内容;由管理员协助业户填写店铺施工申请单详见附件4;填写店铺号、申请人、日期、申请内容,并且明确施工人数身份证复印件留存,约定施工起止日期;第二步、明确了解装修是否改变店铺整体格局,是否影响商场的整体格局;如果需改变格局,并影响商场整体格局,应提交施工效果图施工平面图先发内部联络单征求业务部、经营部、工程部意见会签后需交总经理审批,总经理同意后办理相关手续;第三步、判断此项施工是否需要继续进行审批1. 需要继续审批的情况①业户装修会改变店铺格局的需提交施工效果图施工平面图;②装修涉及电路改动的需提交电路布局图,进行风、电、气焊接等工作以及动用明火的,必须办理动火许可证详见附件3注意:动火许可证只能由管理部部长签发并通知消控中心,装修动火时必须配备足够的消防器材,并派专职消防人员消控员进行看护;另需出示特种作业证明,办理施工申请时必须提供相应证件复印件备档留存,并由专业人员持证操作;③涉及改造给排水的需提交给排水布局图;④明确装修材料进场前防火检查,木质材料进场必须提供阻燃证明,并对相关木质材料阻燃证明材料进行留存;如安装电路,必须外套金属管,不准电线裸露,接头必须焊接并固定在金属线盒内;⑤管理员填写内部联络单附相应图纸注明情况与店铺施工申请单详见附件4,先报本部门审批,然后依次到业务部、经营部、工程部、审批意见,汇总审批无误后继续为业户办理装修手续2. 不需要审批的情况①如果业户只是安装货架,贴壁纸等不涉及改变整体效果的工程施工则不需要会签审批,可直接报部长后办理手续;第四步、所有审批手续完毕,并且业户提供材料齐全,将施工申请单报部长审批然后为其办理装修手续1、与业户约定装修的起止时间,材料进场的路线及时间,并告知装修规定,配备相应器材;关于时间要求如下:材料进场时间:19:30—20:00装修施工时间:20:00—22:00延时装修时间:22:00—次日5:00 需缴纳50元/日延时费2、与业户签订场内施工安全责任书详见附件13、给施工人员办理临时工卡,特殊操作工种需在工卡上注明;临时工卡收取5元/人/张工本费4、为业户办理进场装修许可证详见附件2明确施工负责人,消防负责人;第一联业户留存,第二联本部存档;第五步、发内部联络单与工程部,要求其为装修业户留灯、留电;与经营部告知其店铺装修;联络单复印件本部备档;第六步、在记事本上记录,并通知本班次和其他班次人员一楼告示板及日常白班组主管装修安排,如需动火,通知消控主管安排人员现场看护;第七步、施工完毕验收转装修施工验铺流程.第八步、施工验收完毕,所有单据及复印件交管理部内勤留存;二.业户委托商场工程部装修流程第一步、业户到管理部申请有商场工程部为其装修,现场组人员询问装修内容,业户填写申请书,把装修要求与装修内容着明;第二步、明确了解装修是否改变店铺整体格局,是否影响商场的整体格局;如果需改变格局,应先发内部联络单报管理部部长审批征求业务部、经营部、工程部意见会签后需交总经理审批,总经理同意后办理相关手续;第三步、发内部联络单于工程部,着明装修内容,相关事项,并附业户申请书交管理部部长审核,签字通过后发与工程部,说明情况,请其作出报价;第四步、将报价交予业户,业户同意后,由管理部现场人员开具缴款单,经办人签字,找工程部部长签字后监督业户交款;第五步、缴款完毕管理部现场组人员开具店铺施工确认单详见附件5与缴款单一并教育工程部,由工程部进行装修第六步、施工完毕验收转装修施工验铺流程.第七步、施工验收完毕,所有单据及复印件交管理部内勤留存;。
装修管理办法一)审批流程1、商户进场或移位必须填报区域《装修审批及验收表》,备有平面图(标出商场原有设施位置)、效果图、电路图(标出灯具、电气线路、开关箱等),并提供灯具、电线及线管的合格证。
由商管经理签字,物业工程主管、消防中控审批,公司主管经理审核、签字,报消防部门备案。
2、办理动火、动电手续,交物业保安安排并签署《装修工程明火作业许可证》。
3、物业安排现场监护指导人员。
4、商管、物业工程和保安监护人员共同验收。
(二)商场品牌装潢十五大禁令1、严禁不经审批私自装灯、接电。
一经发现立即断电处理,责令整改,并处以罚款1000兀。
2、严禁遮挡和私移消防设施。
一经发现要求立即整改,并处以罚款30007L o3、严禁在防火卷闸下安放货架和物品(严禁私自移动封堵防火卷闸手盒)。
一经发现,立即整改,罚款500-1000元。
4、严禁堵塞原有消防疏散通道。
一经发现,立即整改,并罚款500-10007L o5、严禁在配电箱开关箱处摆放柜台、堆放物品。
一经发现立即整改,并罚款500-1000 元。
6、严禁在地板上、墙柱上乱打孔、乱钉钉子。
一经发现,立即整改,根据损坏情况进行处罚,最低200元。
7、严禁私自钻顶棚,在主副龙骨上悬挂重物。
一经发现立即整改,处以罚款500-1000 元。
8、严禁私自移动监视器。
一经发现,立即整改,处以罚款1000元。
9、严禁私自移动任何公用设施。
一经发现,立即整改,处以罚款500-10007L o10、严禁玻璃货柜、货架未打磨圆角而交付使用,遗留安全隐患。
一经发现,立即整改,罚款200-500元。
11、严禁施工前不使用工程布进行遮挡。
一经发现立即整改,罚款5007L o12、严禁施工区域在营业时间发出噪音。
一经发现,立即整改,罚款5007L o13、严禁在营业时间进行产生有毒、有害、刺鼻气体的操作。
一经发现,立即整改,罚款500元。
14、严禁私自张贴广告和POP-经发现,立即整改,罚款500元。
01、电话咨询(与客户进行简单的沟通)。
02、上门测量(勘测实地并了解客户需求)。
03、提供平面设计图并与客户讨论设计方案。
04、结合设计方案进行工程预算、洽谈报价。
05、准备合同、签订合同以及相关事宜。
06、设计师为客户提供并制作施工图纸。
07、工程部进行施工图纸审核。
08、项目交底,落实项目负责人和施工队长。
09、办理物业的相关手续,开始进场。
10、客户、设计师、项目负责人现场交底放样。
11、材料进场,客户、施工负责人到场验收。
12、相关工种按照施工流程进行施工作业。
13、配合客户对工程项目施工阶段逐一验收。
14、工程结束,组织客户对整体工程验收。
15、与客户进行项目收尾交接手续。
16、发放保修卡,建立饰后服务档案。
商场装修流程
一、现场管理规定:
1.施工前必须按照装修方案中的《装修现场围板效果图》将装修现场隔离。
2.所有施工人员需凭《装修工作牌》入场,并要求衣冠整洁,否则商场管理人员将拒绝其入场或清理出场。
3.商场内严禁吸烟、打闹、大声喧哗、睡觉、煮食。
施工人员只能在其施工场地工作,不得随意走动。
否则将受到罚款元。
4.对于施工现场原有废弃部件拆除以及装修材料的大件进出,只能在非营业时间进行,同时注意保护相
邻部位设施及相关商户的所有物品。
如有损坏需照价赔偿。
进出材料必须登记。
5.若需进行锯木板、打冲击钻、刷油漆等易产生大噪音、大灰尘、以及有激性气味的工作,请提前做好安排,在非营业时间或到商场后门外进行。
否则罚款元。
6.装修垃圾必须及时清理,并采用袋装堆放在安全位置。
装修结束后有施工队自行清理干净。
垃圾乱堆乱放甚至不清理干净者将处以罚款元。
7.装修过程中不得损坏商场任何设施和物品。
退场时必须接受防损部门的检查,不得带走商场任何物件。
二.消防管理:
1.施工负责人必须承担施工现场的一切消防责任。
现场必须配备灭火器,所有材料需进行适当防火处理。
2.。
对于木材、油漆等易燃易爆物品,在使用过程中主意安全,用后妥善处理。
3. 商场内禁止一切产生火花、烟雾以及明火的作业。
若确实需要,必须事先相工程及防损部申请,在研究可行的情况下由工程及防损部人员在现场监督时进行。
违者重罚元。
三、工程要求:
1.专柜的装修均不得影响或损坏商场的空调风管、配电主干、消防设施等原有设施与设备。
天花、地板若需要更换的必须事先审批并在施工工程中不得影响邻近部分。
2.顶部需要吊装物件的(包括吊天花),必须采用吊杆将承重部件固定在楼板上,不得直接安装在天花板上。
天花上不得留有任何杂物。
3.用的电线、开关、插座、灯具等必须有标明生产厂家、注册商标及认证。
4.一专柜必须在何时位置(不准在仓库)安装一配电箱,用于控制专柜射灯等效果照明。
基本照明和插座电源有空调房电箱控制。
5.有电线必须采用以上有出场标志的国标电线。
电线必须穿管布置,任何部分均不的外露。
天花上管线布置必须横平竖直,主管使用硬管,进入灯具部分可用软管,在交叉部位使用三通,对接部位使用直通。
电线颜色按相线(黄、绿、红)零线(黑色)、地线(黄绿相间)的标准色区分开。
6.灯具安装必须牢固,并与衣物之间有一定安全距离。
天花上的灯具需要用铁线吊装。
灯箱内部需使用防火材料,并预留散热孔。
7.灯必须安装配套支架,电子整流器密封于该铁壳支架内部。
石英灯使用铁壳整流器接卤素灯,不得使用灯杯。
8.必须严格按审批过的图纸施工,不得随意改动,若却有所需必须先报业务部审批。