浅谈隧道工程施工中测量放样摘要:测量工作伴随隧道开挖的整个过程,因洞内条件的限制,洞内开挖断面的测量放样工作占用的时间不少,直接影响着隧道的施工安全、进度。
在隧道施工中如何对超欠挖进行有效控制,一直是值得探讨的问题。
本文通过施工坐标法将地面曲线的计算方法、隧道施工有机地结合在一起, 利用此方法施工, 可以减少技术人员的工作强度。
流程。
关键词:隧道开挖;施工坐标;施工测量;放样abstract: the measurement of working with tunnel excavation of the whole process, because of the limited conditions, tunnel excavation section surveying setting-out work take time, directly affects the construction safety of tunnel, progress. in construction of tunnel over break how to control effectively, has been a problem that is worth to discuss. the construction method of coordinate ground curve calculation method, tunnel construction are organically combined together, using the method of construction, can reduce the work intensity of staff of technology.key words: tunnel excavation; construction coordinate; construction measure; lofting中图分类号:u45文献标识码:a 文章编号:引言随着社会经济的发展以及工程设计水平的提高,隧道的建筑结构形式已经被越来越广泛的采用。
论隧道工程测量在施工中存在的问题及对策隧道工程是一项较为复杂的工程,它需要众多专业人员的合作才能顺利完成。
在隧道工程中,测量是一个非常重要的环节,它直接关系到隧道工程的质量和安全。
在实际施工中,隧道工程测量存在着诸多问题,如地质条件复杂、设备故障、人员技术素质等,因而需要采取一系列对策来解决这些问题,确保隧道工程的顺利进行。
一、隧道工程测量存在的问题1.地质条件复杂:隧道通常位于地下,地质条件复杂,地层不规则,存在岩层变化、土层淤积等问题,导致测量数据不准确。
2.设备故障:隧道工程的测量设备经常需要在恶劣的环境中工作,容易受到湿气、灰尘等影响,造成故障,影响测量质量。
3.人员技术素质不高:部分测量人员技术水平不高,操作不规范,容易产生测量误差。
4.施工环境复杂:隧道工程施工环境通常比较复杂,地面不平整,通风条件差,给测量工作带来很大困难。
以上问题都直接影响到隧道工程的质量和进度,因此需要采取一系列的对策来解决这些问题。
1.加强地质勘察:在进行隧道工程测量之前,需要对隧道所在地段的地质情况进行全面勘察,掌握地质条件的变化,及时调整测量方案,保证测量数据的准确性。
2.提高设备质量:选择高质量的测量设备,并对设备进行定期维护,确保设备的正常工作,降低设备故障的概率。
3.加强人员培训:提高测量人员的技术素质,加强他们对测量设备的操作管理能力,保证操作规范,提高测量的准确性。
4.改善施工环境:优化隧道工程施工环境,改善通风条件,确保测量工作可以在相对稳定的环境中进行,避免环境对测量质量的影响。
5.实施监测措施:在隧道工程施工过程中,采用实时监测技术,对隧道的变形和渗水情况进行监测,及时发现问题,采取应对措施,保证隧道工程的安全。
隧道工程测量在施工中存在着诸多问题,需要采取一系列的对策来解决。
通过加强地质勘察、提高设备质量、加强人员培训、改善施工环境以及实施监测措施,可以有效地保证隧道工程测量的准确性和可靠性,确保隧道工程的顺利进行。
隧道施工测量技术总结范文一、前言。
嗨,大家好!今天来和大家唠唠我在隧道施工测量这事儿上的一些经验和心得。
隧道施工测量就像是给隧道这个“大怪兽”做精确的体检,每一个数据都得准确无误,不然这“怪兽”可就要不听话,出乱子啦。
二、工程概况。
咱这隧道工程啊,那可是相当有挑战性。
这隧道就像一条长长的神秘通道,贯穿了[具体山脉/地段]。
它的全长[X]米,分为[不同段落或者不同类型的施工区间]。
周围的地质条件就像个调皮的孩子,一会儿是硬邦邦的岩石,像是在和我们的钻头较劲儿;一会儿又是软乎乎的泥土,让我们时刻担心会不会出现塌方啥的。
而且,这个工程的工期还特别紧,就像被上了发条一样,每一步都得紧锣密鼓地进行。
三、测量仪器与设备。
在这个隧道测量的战场上,我的武器可不少呢。
首先就是全站仪,这家伙就像个全能战士,测量距离、角度那都是小菜一碟。
还有水准仪,别看它不起眼,它可是确定高度的小能手。
每次使用这些仪器前,我都得像照顾小宝贝一样,小心翼翼地检查它们有没有“生病”,校准工作可不能马虎。
要是它们出了问题,那测量出来的数据就像撒谎的孩子,完全不能信。
四、测量工作流程。
# (一)洞外控制测量。
洞外控制测量就像是给隧道施工定个大方向。
我们先在隧道周围找那些稳定的、不容易被破坏的地方建立控制点。
这就好比在一片大森林里找到一些大树作为标记一样。
然后用全站仪精确地测量这些控制点之间的距离、角度,算出它们的坐标。
这个过程就像是玩一场超级精确的寻宝游戏,每一个坐标都是宝藏的位置。
而且啊,为了保证数据的准确性,我们还得反复测量,就像你检查作业一样,多检查几遍心里才踏实。
# (二)洞内控制测量。
等洞外的工作做好了,就要进军洞内啦。
洞内的测量就更复杂了,环境又暗又潮湿,就像走进了一个阴森的洞穴。
我们在洞内也是先建立控制点,但是这些控制点要根据施工进度不断地往前延伸。
每向前推进一段距离,就得重新测量、计算,就像给隧道的建设铺轨道一样,轨道铺歪了,火车可就跑不了啦。
隧道施工测量方法探讨摘要:隧道施工测量工作是隧道工程建设的重要环节,是技术管理工作的重要组成部分。
它既是工程建设施工阶段的重要技术基础工作,又为施工和运营阶段提供必要的资料和技术依据。
本文以成昆线广通至昆明段扩能改造工程第二标段的隧道工程为例,探讨了隧道工程施工测量的主要内容、隧道施工方法及应注意的问题。
关键词:隧道隧道施工测量管理贯通误差Study of Tunnel Construction SurveyWang Yan-dongKunming Yunjindi Geo-Information Co.Ltd.,Kunming 650106,ChinaAbstract:Tunnel construction survey work is an important part of the tunnel construction, the technical management of the important part. It is the construction of important technical basis for the construction phase of the work, but also for the construction and operation phases to provide the necessary information and technical basis. In this paper, Guang-Kun line wide segment expansion through to the second section of the tunnel renovation project engineering, for example, measurement of the tunnel construction management of the main contents of tunnel construction methods and should pay attention to the problem.Key words:tunnel Tunnel Construction;Survey Management Penetration error1、工程概况改建铁路成昆线广通至昆明段扩能改造工程第二标段(DK971+150~DK993+170),总长22.05公里。
隧道施工测量技术总结范文在隧道施工这个神秘而又充满挑战的领域里,测量技术就像是一个隐藏在幕后的超级英雄,默默发挥着巨大的、不可替代的作用。
今天,我就来给大家唠唠我在隧道施工测量中的那些事儿。
一、工程概况。
咱们这个隧道啊,就像一条巨大的地下长龙,它可不是那种普普通通的小工程。
这隧道的长度,那数字一说出来都能让人咋舌,而且地质条件复杂得就像一个脾气古怪的小怪兽,一会儿是坚硬的岩石,像顽固的老头,怎么都不肯轻易让步;一会儿又可能是软乎乎的土层,像个娇弱的小姑娘,需要我们格外小心对待。
二、测量仪器及工具。
在这场与隧道施工的战斗中,我的武器可不少。
全站仪就像是我的千里眼,它能够精确地看到远处的目标,把角度和距离这些信息快速地告诉我。
水准仪呢,则是我的水平仪小助手,有了它,我就能清楚地知道哪里高哪里低,就像给地面做了一个超级精确的体检。
还有棱镜,这小家伙虽然看起来不起眼,但却是全站仪的好伙伴,没有它,全站仪可就像没了眼睛的巨人,有劲使不出。
这些仪器和工具啊,每一个都是我的宝贝,我得像照顾自己的孩子一样细心地呵护它们,定期给它们做检查、校准,确保它们随时都能在战场上发挥出最佳状态。
三、测量控制网的建立。
要想让隧道乖乖听话,按照我们的计划进行施工,建立一个强大的测量控制网是关键。
这个控制网就像是给隧道施工画的一幅超级精确的地图,每个控制点都是地图上的一个重要标记。
我们先在隧道周围的合适位置,挑选那些稳固可靠的地方,像是大自然专门为我们准备的“小基地”一样,设立控制点。
然后,就开始了一场精确的测量大战。
我们用全站仪反复测量各个控制点之间的角度和距离,就像在解一道超级复杂的数学谜题,每一个数据都要精确到毫米级别,差一点儿都不行。
通过这些数据,我们就能计算出控制点的准确坐标,把这个测量控制网建立得稳稳当当的。
这个过程可不容易啊,有时候为了一个数据,得在太阳底下晒上半天,汗水不停地流,眼睛都快被阳光刺瞎了,但只要一想到这个控制网是整个隧道施工的基础,就又充满了动力。
目录摘要 (I)第一章绪论 (1)1.1引言 (1)1.2工程概况 (1)第二章隧洞施工测量的相关理论基础 (2)2.1隧洞施工测量的目的及任务 (2)2.2施工控制测量的概况 (2)2.2.1 施工控制测量基本概念 (2)2.2.2 施工控制测量分类 (2)2.2.3 控制测量应遵循的原则 (2)2.2.4 控制测量实施步骤 (3)2.3隧洞施工控制测量 (3)2.3.1 洞外控制测量 (3)2.3.2 洞内控制测量 (6)2.4洞外、内的三角高程测量 (8)2.5水准测量的技术要求及注意事项 (10)2.6进洞关系计算和进洞测量的主要任务 (13)第三章所在工程引水隧洞控制测量的大体设计 (14)3.1控制点布设 (14)3.2选点 (14)3.3控制点标石 (14)3.4边、角及水准观测 (14)3.4.1 边、角观测 (14)3.4.2 水准观测 (15)第四章如何进行断面测量 (16)4.1工程作业情况 (16)4.2断面测量 (16)第五章贯通测量及精度分析 (18)5.1贯通测量的介绍 (18)5.2影响贯通误差的主要因素及其分解 (18)5.3贯通误差对隧道贯通的影响 (18)5.4主要的贯通横向中误差分析 (19)5.5贯通横向中误差的计算公式 (19)5.6洞内导线贯通误差估算示例 (20)第六章隧道测量工作中需要注意的几个问题 (24)6.1洞内导线应注意的问题 (24)6.2在洞内进行平面控制时的注意事项 (24)总结 (24)参考文献 (26)致谢 (27)摘要隧道工程测量是在隧道工程的规划、勘测设计、施工建造和运营管理的各个阶段进行的测量。
锦屏引水隧洞埋深大,洞群并行、洞径大、洞线长,地质条件复杂,岩爆、突发性涌水多,通风排烟难度大,施工交叉干扰大,各种工序衔接紧凑,平行作业,洞内排风不畅,空气质量差,导致红外线测量仪器反射信号弱,往往无法进行测量工作。
测量工作在隧道开挖施工中非常重要,它控制着隧道开挖的平面、高程和断面几何尺寸,关系到隧道的贯通。