SH3503-2017交工资料石化封皮目录-设备及材料合格证
- 格式:docx
- 大小:26.20 KB
- 文档页数:4
SH/T 3503—2017目次附录A(规范性附录)交工技术文件通用表 (7)附录B(规范性附录)交工技术文件土建工程用表 (54)附录C(规范性附录)交工技术文件设备安装工程用表 (68)附录D(规范性附录)交工技术文件管道安装工程用表 (140)附录E(规范性附录)交工技术文件电气安装工程用表 (164)附录F(规范性附录)交工技术文件仪表安装工程用表 (176)附录G(规范性附录)交工技术文件压力容器现场组焊安装工程用表 (188)附录H(规范性附录)交工技术文件起重机械安装工程用表 (202)Appendix A(Normative Appendix)Handover Technical Documentation—General (217)Appendix B(Normative Appendix)Handover Technical Documentation—Civil (264)Appendix C(Normative Appendix)Handover Technical Documentation—Equipment Installation (278)Appendix D(Normative Appendix)Handover Technical Documentation—Piping Installation (351)Appendix E(Normative Appendix)Handover Technical Documentation—Electrical Installation (376)Appendix F(Normative Appendix)Handover Technical Documentation—Instrumentation Installation (388)Appendix G(Normative Appendix)Handover Technical Documentation—Pressure Vessel SiteAssembly Welding and Installation (400)Appendix H(Normative Appendix)Handover Technical Documentation—Lifting Machinery Installation · 414IContentsAppendix A(Normative Appendix)Handover Technical Documentation-General (Chinese) (7)Appendix B(Normative Appendix)Handover Technical Documentation—Civil(Chinese) (54)Appendix C(Normative Appendix)Handover Technical Documentation-Equipment Installation(Chinese) (68)Appendix D(Normative Appendix)Handover Technical Documentation-Piping Installation(Chinese) (140)Appendix E(Normative Appendix)Handover Technical Documentation—Electrical Installation (Chinese) (164)Appendix F(Normative Appendix)Handover Technical Documentation—Instrumentation Installation (Chinese) (176)Appendix G(Normative Appendix)Handover Technical Documentation—Pressure Vessel Site Assembly Welding and Installation(Chinese) (188)Appendix H(Normative Appendix)Handover Technical Documentation—Lifting Machinery Installation (Chinese) (202)Appendix A(Normative Appendix)Handover Technical Documentation—General (English) (217)Appendix B(Normative Appendix)Handover Technical Documentation-Civil(English) (264)Appendix C(Normative Appendix)Handover Technical Documentation—Equipment Installation (English) (278)Appendix D(Normative Appendix)Handover Technical Documentation—Piping Installation(English) (351)Appendix E(Normative Appendix)Handover Technical Documentation—Electrical Installation (English) (376)Appendix F(Normative Appendix)Handover Technical Documentation—Instrumentation Installation (English) (388)Appendix G(Normative Appendix)Handover Technical Documentation—Pressure Vessel Site Assembly Welding and Installation(English) (400)Appendix H(Normative Appendix)Handover Technical Documentation—Lifting MachineryInstallation(English) (414)IISH/T 3503—2017 附录A(规范性附录)交工技术文件通用表交工技术文件通用表(续)78SH/T 3503—2017910SH/T 3503—20171112SH/T 3503—20171314SH/T 3503—2017SH/T 3503—2017SH/T 3503—2017SH/T 3503—2017SH/T 3503—2017SH/T 3503—2017SH/T 3503—2017SH/T 3503—2017SH/T 3503—2017SH/T 3503—2017SH/T 3503—2017SH/T 3503—2017SH/T 3503—2017SH/T 3503—2017SH/T 3503—2017SH/T 3503—2017SH/T 3503—2017SH/T 3503—2017SH/T 3503—2017SH/T 3503—2017附录B(规范性附录)交工技术文件土建工程用表。
Owner/Supervision ContractorGeneral Contractor Construction ContractorDiscipline Engineer: Date: Discipline Engineer:Date:Foreman:Quality Inspector:Discipline Engineer:Date:SH/T 3503—J326立式设备安装检验记录Vertical EquipmentInstallation InspectionRecord工程名称:Project Name:单位工程名称:Unit Name:Equipment Description Equipment Item No.SpecificationNote: h is the distance between two check points, taking mm.Unit: mmItemCheckPointLocationAllowable ValueActualValueItemCheckPointLocationAllowableValueActualValueDeviatio n in Elevation0ºDeviation inCentral Position ofSupport0º90º90º180º180º270º270ºVerticalDeviation0º/180ºDeviation inOrientation0º90º/270ºConclusion:Owner/Supervision Contractor General Contractor Construction Contractor Discipline Engineer:Date:Discipline Engineer:Date:Foreman:Quality Inspector:Discipline Engineer:Date:SH/T 3503—J327卧式设备安装检验记录Horizontal EquipmentInstallation InspectionRecord工程名称:Project Name:单位工程名称:Unit Name:EquipmentDescriptionEquipmentItem No.SpecificationNote 1:B、C、D、E shown in the sketch are bench marks for measuring the equipment shell levelness. Note 2: The elevation of equipment installed shall be measured from the baseline on the equipment foundation to the lower surface of the base plate of the equipment support.Note 3: The deviation in axial levelness shall be in line with the drain direction.Note 4: L is the distance between two end check points, taking mm.Unit: mm ItemCheckPointLocationAllowableValueActualValueItemCheck PointLocationAllowableValueActualValue。
附录 E(规性附录)交工技术文件电气安装工程用表MMM附录F(规性附录)交工技术文件仪表安装工程用表附录G(规性附录)交工技术文件压力容器现场组焊安装工程用表900/ 18090/ 270SH/T 3503—J703球形储罐预制件检查记录赤道带/温带板工程名称:单位工程名称:设备名称设备位号产品编号公称容积 m3直径mm 厚度mm 执行标准检查数量检查比例% 项目单位允许偏差值设计值球壳板编号及实侧值球壳板与样板间隙E mm ≤3坡口钝边A mm ±1.5坡口深度 t mm ±1.5坡口角度α(°)±2.5长度方向弦长L1 mm ±2.5L2 mm ±2.5宽度方向弦长B3 mm ±2B2 mm ±2对角线弦长C1 mm ±3C2mm ±3两条对角线间距h mm 5带支柱赤道板支柱直线度mm支柱轴线位移mm支柱断口周长mm检测部位示意图外观检查:结论:建设/监理单位总承包单位施工单位专业工程师:日期:年月日专业工程师:日期:年月日施工班组长:质量检查员:专业工程师:日期:年月日SH/T 3503—J704球形储罐预制件检查记录极板/极中板工程名称:单位工程名称:设备名称设备位号产品编号公称容积 m3直径 mm 厚度mm 执行标准检查数量检查比例% 项目单位允许偏差值设计值球壳板编号及实侧值球壳板与样板间隙E mm ≤3开孔处球壳曲率mm ≤3坡口钝边A mm ±1.5坡口深度 t mm ±1.5坡口角度α(°)±2.5直径D mm ±2检测部位示意图管口编号管口位置偏差mm管口高度偏差Lmm法兰水平度mm/m允许值实测值允许值实测值允许值实测值径向周向径向周向外观检查:结论:建设/监理单位总承包单位施工单位专业工程师:日期:年月日专业工程师:日期:年月日施工班组长:质量检查员:专业工程师:日期:年月日SH/T 3503—J705球形储罐预制件检查记录支柱工程名称:单位工程名称:设备名称设备位号产品编号公称容积 m3直径mm 厚度mm 执行标准检查数量检查比例%支柱编号支柱全长直线度emm支柱长度Hmm支柱与底板垂直度mm分段支柱断口周长mm备注允许偏差实测值允许偏差实测值允许偏差实测值上段下段径向周向检测部位示意图外观检查:结论:建设/监理单位总承包单位施工单位专业工程师:日期:年月日专业工程师:日期:年月日施工班组长:质量检查员:专业工程师:日期:年月日SH/T 3503—J706 球形储罐组装尺寸检查记录工程名称:单位工程名称:设备名称设备位号产品编号公称容积 m3直径mm 厚度mm 检查样板半径R样 mm 检查样板弦长L mm检查项目允许值mm焊缝编号及实测值mm组对间隙M a b c组对错边n a b c组对棱角E abc检测部位示意图结论:建设/监理单位总承包单位施工单位专业工程师:日期:年月日专业工程师:日期:年月日施工班组长:质量检查员:专业工程师:日期:年月日SH/T 3503—J707球形储罐组装尺寸检查记录(续)工程名称:单位工程名称:设备名称设备位号产品编号公称容积m3直径mm 厚度mm检测部位示意图检查项目允许值mm实测值mm 赤道截面最大直径与设计直径之差赤道截面最小直径与设计直径之差两极间直径与设计直径之差赤道截面最大直径与最小直径之差赤道截面最大直径与两极间直径之差赤道截面最小直径与两极间直径之差赤道线水平度支柱焊缝与对接焊缝最小距离相邻对接焊缝最小距离项目管口编号管口水平度ΔH,mm 允许值实测值管口位置mm 允许值实测值结论:建设/监理单位总承包单位施工单位专业工程师:日期:年月日专业工程师:日期:年月日施工班组长:质量检查员:专业工程师:日期:年月日SH/T 3503—J708 球形储罐支柱检查记录工程名称:单位工程名称:设备名称设备位号产品编号公称容积 m3直径mm 厚度mm 检查时机支柱编号支柱全长直线度mm支柱垂直度mm允许偏差值实测值允许偏差值径向实测值周向实侧值径向周向a1 a2a1-a2a1a2a1-a212345678910结论:检测部位示意图建设/监理单位总承包单位施工单位建设/监理单位总承包单位施工单位专业工程师:日期:年月日专业工程师:日期:年月日施工班组长:质量检查员:专业工程师:日期:年月日SH/T 3503—J710 封头/过渡段组装尺寸检查记录工程名称:单位工程名称:设备名称设备位号产品编号封头/过渡段规格材质执行标准检查项目允许值mm焊缝编号及实测值 mm组对间隙M a b c组对错边n a b c组对棱角E 检查样板长度L=mm abc封头/过渡段规格整体检查样板检查形状偏差大值椭圆度上端小值下端检测部位示意图结论:建设/监理单位总承包单位施工单位。
竣工资料档号编号规则一、静设备F.04.0403-001(开工报告、施工设计)、002(方案)、003(合格证)、004(715工号、716工号、223工号)、005(705)、007(706)二、动设备F.04.0404-001(方案)、002(方案)、003(合格证)、004(672B、223工号安装记录)、005(705/713)、006(706)、016(02477动设备)三、管道F.04.0405-001、002、003、004、005、006、007、008(综合册),009(压力管道监检报告)010(安全阀校验报告)、011(安全阀校验报告)、012(705/713质量证明册)、013(705/713质量证明册)、014(705/713质量证明册)、015(716质量证明册)、016(716质量证明册)、017(716质量证明册)、018(716质量证明册)、019(223质量证明册)、020(715质量证明册)、021(716质量证明册)、022(716质量证明册)、023(672b质量证明册)、024(717管廊质量证明册)、705/713(025-042)、706(043-085)、223(086-090)、715(091-098)、716(99-108)672B(109-111)、717(112-117)(02477、02084地管)118F.04.0405-119(713、717探伤报告);F.04.0405-120(706)探伤报告);F.04.0405-121、122(223)探伤报告);F.04.0405-123、124(715)探伤报告);F.04.0405-125、126(716)探伤报告);F.04.0405-127(672B)探伤报告);四、F.04.0402-001(综合册、单位工程验收)、 F.04.0402-002(705/713合格证) F.04.0402-003(717、223、715合格证)、F.04.0402-004(716合格证)、F.04.0402-005(706、672b合格证)、F.04.0402-006(715、716、672b、223安装记录)、F.04.0402-007、008(705检验批分部分项、安装记录)、F.04.0402-009(706检验批分部分项、安装记录)五、电气F.04.0406-001(综合册及合格证)、F.04.0406-002(705、706合格证)F.04.0406-003(02306合格证)六、仪表F.04.0407-001(综合册)、F.04.0402-002-005(合格证)、705/713(006、007)、706(008、009)、223(010)、715(011)716(012)。