建设监理日志范本
- 格式:doc
- 大小:22.50 KB
- 文档页数:3
监理实习日志【12篇】(实用版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。
文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的教育资料,如幼儿教案、音乐教案、语文教案、知识梳理、英语教案、物理教案、化学教案、政治教案、历史教案、其他范文等等,想了解不同资料格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor.I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, this store provides various types of educational materials for everyone, such as preschool lesson plans, music lesson plans, Chinese lesson plans, knowledge review, English lesson plans, physics lesson plans, chemistry lesson plans, political lesson plans, history lesson plans, and other sample texts. If you want to learn about different data formats and writing methods, please stay tuned!监理实习日志【12篇】本店铺为您整理的监理实习日志【12篇】,希望可以帮助到您,欢迎分享!1.监理实习日志实习的第xx周我是作为一名资料员负责工程项目的资料档案管理、计划、统计管理及内业管理工作。
工程施工安全监理日志范文日期:2022年2月1日地点:某某工地天气:晴施工单位:某某建设公司监理单位:某某监理公司施工安全监理日志1、上午8点,监理人员到达工地,首先进行了与施工单位负责人的交流,了解了目前工地的施工情况和存在的安全隐患。
2、随后,监理人员对工地进行了全面的安全检查。
发现部分施工人员未佩戴安全帽,立即要求施工单位进行整改,并对相关人员进行了安全教育。
3、在巡视施工现场时,发现有一处高处作业没有设置警示标识,存在安全隐患。
立即要求施工单位设置警示标识,并安排专人进行监护,确保高处作业的安全进行。
4、对施工现场的施工机械和设备进行了检查,发现有几台设备存在安全隐患,如缺乏必要的防护装置等。
要求施工单位对这些设备进行维修和更新,确保施工过程中的设备安全可靠。
5、下午2点,监理人员召集了施工单位的相关人员进行了安全会议。
会上对目前工地存在的安全问题进行了深入分析,并提出了相应的整改措施。
同时要求施工单位加强对施工人员的安全教育和培训,提高他们的安全意识和技能。
6、在会后,监理人员对施工单位的安全管理制度进行了审核,发现存在一些不完善之处。
要求施工单位立即对安全管理制度进行修订,确保其符合相关法律法规的要求,并有效地落实到施工过程中。
7、对施工现场的临时用电进行了检查,对电气线路的安全隐患进行了排查。
发现存在一些用电设备未按规定接地,存在触电风险。
要求施工单位立即对这些设备进行整改,并加强对用电安全的监管。
8、在下午4点,监理人员对施工现场进行了最后一次巡视。
发现现场整体安全状况有了明显改善,施工单位对监理人员提出的安全整改要求都进行了认真落实。
对此表示肯定,并要求施工单位在后续施工中要始终保持对安全的重视,并不断加强安全管理工作。
9、最后,监理人员向施工单位提出了下一步的安全监督要求,要求施工单位对施工过程中的安全隐患进行全面排查,并加强对施工人员的安全培训,确保施工过程中的安全风险得到有效控制。
安全监理日记监理日志制度一、监理日志为项目监理机构详细记录当天自然情况和主要工作;二、大中型项目可分专业填写;三、日志每天现场监理人员应签名,总监理工程师应每天签阅监理日记;四、主要内容包括:1、现场大事记(建设单位通知单/联系单、开工/暂停令、监理备忘录/通知单/联系单、工程例会/专题会/专家论证会、质量及安全事故处理);2、工程质量控制(施工组织设计/方案审核、抽查及见证试验/设备开箱检验、检验批/分项工程/分部工程平行检查和验收、旁站监理、质量事故处理过程);3、工程进度控制(施工进度评价及措施、施工人力/材料/设备投入、批准延长工程);4、工程投资控制(工程变更、工程索赔/计量/工程款支付等);5、安全管理(安全措施方案和技术措施审核、安全状况和);6、其它需记录问题。
****************************项目监理规划编制:总代、专监审核:总监技术负责人:企业技术负责人兰州********************有限公司二O一六年十二月二十五日目录•工程概况及规模•监理工作范围•监理工作内容•监理工作目标•监理工作依据•项目监理机构及人员配备•监理人员岗位职责•工程质量控制•工程投资控制•工程进度控制•合同管理•安全文明施工•协调工作•监理工作制度•监理资料管理•监理工作程序框图•工程项目概况一.工程概况及规模•项目名称:•建设单位:********************公司•设计单位:甘肃省建筑设计研究院•施工单位:•建设地址:兰州市安宁区安宁东路200-212号、214号•工程规模:总建筑面积41380.67㎡。
•结构型式:框架及剪力墙结构二.工程特点本工程建筑结构的安全等级为二级。
抗震等级:主楼四层及以下框架及剪力墙均为一级,四层以上框架梁、剪力墙均为一级;夹层、负一层:框架及剪力墙均为一级;负二层框架及剪力墙均为一级。
车库:无上部结构的部分框架抗震等级为二级,主楼相关范围一级,裙楼框架抗震等级一级。
建设安全监理日志填写内容说明
一、施工情况施工单位当日安全施工情况,特种设备施工情况,特种作业人员持证上岗情况,安全管理人员到岗情况,现场文明施工情况,安全自检、验收情况。
二、安全监理工作情况
1、安全巡视、旁站、安全检查、安全验收等日常监理工作
2、发出的监理通知单(安全)、工作联系单、监理报告、暂停令、复工令等指令文件和通知
3、收到的监理通知回复单和复工报审,并对整改结果进行复查。
4、发送各种会议纪要、安全监理月报、安全监理实施细则等文件
5、审核施工单位上报的安全资料。
6、收到建设单位和其他有关单位的通知或函件
三、发现问题及处理情况
1、当天发现的问题(如:特种作业人员持证上岗、机械使用情况、安全防护措施检查、方案是否需要论证、是否按照方案执行、现场文明施工情况、现场危险源的针对性检查、临时用电、深基坑、支架脚手架、起重吊装、群塔施工等)
2、处理当天发生的问题及结果
3、处理当天以前发生的问题及结果(发现问题及处理结果的闭合性)
四、其他事项
1、公司、建设行政主管部门及其他有关单位到现场检查的情况。
2、项目大事记
3、提出的合理化建议
备注:审阅人每周至少签阅一次安全监理日志并签署相关意见
广东天衡工程建设咨询监理有限公司
安全日志
页码:
填表人:贺端祥
审阅人:雷锋。
监理日志范本篇一:监理日记样本监理日记样本日期:2008年12月31日气象:晴气温:-4℃~3℃湿度:风力:风向:一、当日工程施工情况1、施工进展情况;三分部本日完成27根钻孔桩,1个承台,1个墩身;2、四分部本日完成10根钻孔桩;3、五分部累计完成存梁台57个,便道1300m,全部完成,场地硬化83500m2;4、施工中采用的新工艺、新材料、新设备、新技术情况二、当日施工人员、材料、机械设备动态1、施工人员动态数量及现场技术人员和质量检验人员状况等施工人员钢筋**人/班、焊工**人/班、模板**人/班、混凝土**人/班、架子工**人/班,技术人员**人/班、质量检验人员**人/班、2、施工进场材料、构配件的数量及使用状况等砂进场200M3,石料(5~10)进场500 M3,钢筋进场规格、数量、批号等,支座型号、数量等。
3、施工机械进出场情况旋挖钻机8台(其中2台出现故障)、7辆25t吊车、5台装载机、6辆10m混凝土罐车、5台50kw发电机、2台空压机,3三、当日监理工程主要工作1、检查验收情况及结论**桥钻孔桩714-4、733-1孔深检查孔底标高***M,设计孔底标高***M,符合设计要求;沉渣厚度检查**CM,符合设计及规范要求,现场技术人员***,质量检验人员***。
2、旁站部位描述**桥钻孔桩714-4、733-1,**段路基碾压,**箱梁浇筑混凝土,**箱梁预应力初张拉。
3、巡视检查及过程中发现的问题及处理情况4、原材料检测及现场质量检测情况5、测量放样及验收情况四、存在问题及处理情况1、发生索赔、合同争议及纠纷时承包单位的实际情形和处理意见;2、向承包单位发出的通知或口头指示,承包单位提出的问题及答复意见;3、上级指示或指令,建设单位的有关要求,质量监督机构的检查意见:4、尚需解决的问题。
1、一分部监理巡视10次、旁站6次、见证6次、验收18次,进场材料碎石5-16mm 200t、16-25mm 380t、河砂592t、水泥200t、粉煤灰40t,黄茂生取砂、碎石一批做见证试验,取水泥、粉煤灰一批做平行试验。
监理日志填写范例
监理日志
日期:2021年10月15日
工地名称:某某项目
施工单位:某某建设公司
监理单位:某某监理公司
施工进展:
1. 今日施工进展顺利,按计划进行,完成了第一层楼的混凝土浇筑工作。
2. 施工队伍数量正常,工人操作规范,没有发现违章违规行为。
3. 施工中使用的设备和机械运行稳定,无需维修和更换。
4. 施工现场整洁,周边道路通畅,无任何影响交通的情况发生。
质量控制:
1. 对于混凝土浇筑,监理人员在施工进行中进行了实时监控,并进行了现场浇筑质量检查。
结果显示,浇筑质量符合相关规范要求。
2. 对所有施工材料进行了抽样检测,结果合格,符合质量要求。
3. 对施工过程中出现的质量问题及时提出整改意见并与施工单位沟通解决,问题得到及时解决。
4. 对施工单位进行技术指导,提供了必要的施工流程和操作规范。
安全管理:
1. 施工现场设置了必要的安全警示标志和防护措施,保障了施工人员的工作安全。
2. 对施工人员进行了安全培训,加强了施工人员的安全意识。
3. 对施工现场进行了巡查,及时发现并整改了存在的安全隐患。
4. 与施工单位沟通,告知安全事项,并要求施工人员遵守工地管理规定,确保安全施工。
其他事项:
1. 与业主进行了工程进展的沟通,及时反馈了施工情况。
2. 向业主汇报了目前施工遇到的难题,并商讨了解决方案。
3. 与监理单位保持了紧密的沟通和协作,共同推进工程进展。
以上为今日监理日志,供参考。
签字:监理员。
安全监理日志填写范文(建筑)英文版安全监理日志填写范文(建筑)1. IntroductionThe safety supervision log is a crucial document in the construction industry, serving as a record of daily activities, observations, and any potential hazards encountered during the construction process. It plays a vital role in ensuring the safety of workers, materials, and the overall project.2. Log FormatThe log should be divided into sections for easy reference and organization. These sections could include:Date and TimeWeather ConditionsWorkforce DeploymentSafety Measures ImplementedObservations and HazardsCorrective Actions TakenIncident Reports3. Filling Out the LogDate and Time: Begin by noting the exact date and time of the entry. This helps track changes and progress over time.Weather Conditions: Describe the weather conditions, such as temperature, humidity, wind speed, and precipitation. This information can affect work safety and efficiency.Workforce Deployment: List the number of workers on site, their positions, and any special skills or qualifications they possess. This ensures that the right personnel are in the right places.Safety Measures Implemented: Describe the safety measures taken, such as wearing protective gear, using safety equipment, and following safety procedures. This demonstrates compliance with safety standards.Observations and Hazards: Note any observations or hazards encountered during the day, such as unsafe workingconditions, equipment malfunctions, or worker fatigue. This raises awareness of potential issues and prompts corrective action.Corrective Actions Taken: Describe the steps taken to address the observed hazards, such as repairs, replacements, or changes in work procedures. This ensures that hazards are addressed promptly and effectively.Incident Reports: If any accidents or incidents occur, provide detailed reports, including the time, location, cause, and any injuries sustained. This information is crucial for accident investigation and prevention.4. ConclusionThe safety supervision log is a vital tool for ensuring the safety and efficiency of construction projects. By filling out the log regularly and accurately, supervisors can identify and address hazards promptly, protect workers, and maintain project momentum.中文版安全监理日志填写范文(建筑)1. 引言安全监理日志是建筑行业中非常重要的文件,记录了施工过程中的日常活动、观察以及遇到的潜在危险。
监理施工日志范文精选八篇下载温馨提示:该文档是我店铺精心编制而成,希望大家下载以后,能够帮助大家解决实际的问题。
文档下载后可定制随意修改,请根据实际需要进行相应的调整和使用,谢谢!并且,本店铺为大家提供各种各样类型的实用资料,如教育随笔、日记赏析、句子摘抄、古诗大全、经典美文、话题作文、工作总结、词语解析、文案摘录、其他资料等等,如想了解不同资料格式和写法,敬请关注!Download tips: This document is carefully compiled by the editor. I hope that after you download them, they can help yousolve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!In addition, our shop provides you with various types of practical materials, such as educational essays, diary appreciation, sentence excerpts, ancient poems, classic articles, topic composition, work summary, word parsing, copy excerpts,other materials and so on, want to know different data formats and writing methods, please pay attention!监理施工日志是监理人员在工程施工过程中记录和反映施工情况、质量验收、安全管理等方面的一种工作制度。
在建工程施工监理日志日期:2022年1月1日施工单位:XXX建筑公司监理单位:XXX监理公司本日天气:晴施工进度:1. 今天施工现场进展顺利,工人们准时到岗,按照施工计划有序进行工作。
主要完成了地基基础的挖掘和浇筑工作,预计明天可以进行主体结构的施工。
2. 在施工过程中,发现部分地基土质偏软,存在一定的承载力问题,需要进行加固处理。
已联系设计单位进行设计方案调整,并准备在明天进行加固工作。
3. 检查了施工现场的安全措施,发现有几名工人未佩戴安全帽和安全带,立即进行了教育和整改,要求所有工人严格遵守安全规定,确保施工过程的安全。
4. 与施工单位协调了材料供应问题,确保了施工进度的顺利进行。
同时对施工质量进行了抽检,发现部分细节存在不合格情况,立即要求施工单位进行整改。
5. 与业主单位进行了沟通,汇报了施工进度和质量情况,得到了业主单位的认可和支持,保证了施工工作的顺利进行。
施工质量:1. 地基基础浇筑完毕后进行了质量检查,符合设计要求,已经达到了要求的强度标准。
2. 在施工过程中,对施工现场的环境卫生进行了整理,保证了施工环境的整洁,也有利于工人的工作效率。
3. 对施工单位的工人进行了技术培训和安全教育,提高了他们的专业水平和安全意识,确保了施工质量和安全。
4. 对施工过程中的质量隐患进行了及时的整改和处理,确保了施工质量的达到和保障。
5. 在施工现场设置了必要的安全警示标识和警戒线,保证了施工过程中的安全。
今日总结:今天的施工工作进展顺利,但也暴露出一些问题和不足。
需要在明天继续加强监管和管理,确保施工质量和安全,推动工程顺利进行。
同时,要与相关单位密切合作,做好沟通和协调工作,共同推动工程进展。
监理工程师签字:XXX施工单位负责人签字:XXX监理单位负责人签字:XXX日期:2022年1月1日以上内容为施工监理日志,仅供参考。
工程施工企业监理日志模板
日期:____年____月____日
项目名称:_________
监理单位:_________
施工单位:_________
监理工程师:_________
天气情况:______(晴/阴/雨/雪等)
施工进度:
1. 今日施工进度:今天施工单位完成了哪些工程内容?
2. 明日施工计划:明天施工单位将安排进行哪些工作?
质量管理:
1. 施工质量情况:今天施工单位施工质量是否符合规范要求?有无质量问题?
2. 质量整改措施:如有质量问题,监理单位采取了哪些整改措施?
安全管理:
1. 安全生产情况:今天是否发生了安全事故?有无安全隐患?
2. 安全整改措施:如有安全隐患,监理单位采取了哪些整改措施?
现场管理:
1. 现场秩序:施工现场是否保持了良好的秩序?
2. 现场卫生:施工现场的卫生情况如何?
材料管理:
1. 材料验收情况:今天是否有材料到货?是否进行了验收?
2. 材料使用情况:今天施工单位如何使用了材料?
设备管理:
1. 设备情况:今天使用的施工设备运行情况如何?
2. 设备维护:是否对设备进行了维护保养?
沟通协调情况:
1. 与施工单位的沟通情况:今天是否与施工单位进行了沟通?沟通内容是什么?
2. 与业主的沟通情况:今天是否与业主进行了沟通?沟通内容是什么?
监理工程师总结:
1. 今天的监理工作总结:今天的监理工作有哪些收获与不足?
2. 明天的监理工作计划:明天的监理工作将重点关注哪些方面?
备注:
1. 其他需要特别记录的情况,如突发事件、监理工程师个人的感悟等。
签字:_________
(监理单位签字)。
监理日志范文监理日志范文一日期:XXXX年XX月XX日工程名称:XXX地铁站施工施工单位:XXX建设工程有限公司监理单位:XXX监理工程有限公司天气:晴施工内容:今天主要进行了XXX地铁站的混凝土浇筑工作,施工单位派出了XX名工人,使用了X台泵车进行浇筑,施工过程中,按照设计要求,控制了浇筑厚度和坡度,质量较好。
存在问题:部分工人在施工过程中存在安全意识不强的情况,需加强安全教育。
其他情况:施工现场秩序井然,施工单位对工程质量有较高要求,施工质量得到监理工程的认可。
监理工程师:XXX监理日志范文二日期:XXXX年XX月XX日工程名称:XXX地铁隧道施工施工单位:XXX建筑工程有限公司监理单位:XXX监理有限公司天气:多云施工内容:今天进行了XXX地铁隧道的支护结构施工,施工单位使用了X台液压支架和X吨的钢材,按照设计要求进行了支护施工,现场操作规范。
存在问题:施工现场部分区域存在杂物堆放,需及时清理。
其他情况:施工进度符合计划,工程质量受到了施工单位和监理单位的一致好评。
监理工程师:XXX监理日志范文三日期:XXXX年XX月XX日工程名称:XXX地铁站站台施工施工单位:XXX建筑施工有限公司监理单位:XXX监理工程有限公司天气:阴施工内容:今天进行了XXX地铁站站台的混凝土浇筑工作,施工单位派出了XX名工人,使用了X台泵车进行浇筑,施工过程中,按照设计要求,控制了浇筑厚度和坡度,质量较好。
存在问题:部分工人在施工过程中存在沟通不畅的情况,需加强团队协作。
其他情况:施工现场整洁有序,施工单位对工程质量管理严格,受到监理单位的肯定。
监理工程师:XXX监理日志范文四日期:XXXX年XX月XX日工程名称:XXX地铁隧道施工施工单位:XXX建筑工程有限公司监理单位:XXX监理有限公司天气:晴施工内容:今天进行了XXX地铁隧道的混凝土浇筑工作,施工单位派出了XX名工人,使用了X台泵车进行浇筑,施工过程中,按照设计要求,控制了浇筑厚度和坡度,质量较好。
监理日志篇一1、监理日志记录内容1、1、每日必须记录内容;日期、气象、施工部位及作业内容、施工人数、使用的主要设备材料等、对主要分部分项开工完工做出标记。
1、2、每日主要事项记录内容;1、2、1、施工过程巡视检查和旁站监理,见证取样1、2、2、材料、设备、构配件和主要施工机械设备进场情况及进场验收记录。
1、2、3、施工测量放线,工程报验情况及验收结果。
1、2、4、施工单位资料报审及审查结果。
1、2、5、施工图交接、工程变更的有关事项。
1、2、6、发出的监理通知(文字、口头)的主要内容及签发、接收人。
1、2、7、建设单位提出的有关事项及处理意见。
1、2、8、施工单位提出的有关事宜及处理意见。
1、2、9、工地会议议定的有关事项及协调确定的有关问题。
1、2、10、工程质量事故(缺陷)及处理方案。
1、2、11、异常事件(可能引发索赔的事件)及对施工的影响情况1、2、12、设计人员到工地及处理、支持的有关事项。
1、2、13、质量监督人员、有关领导来工地检查、指导工作情况及有关指示。
1、2、14、其他重要事项记载。
附:监理日记填写的内容及方法监理日记的内容分五个方面逐一填写。
填写的方法如下:1、天气情况的填写天气情况是监理日记的第一项内容,也是非常重要的内容,因为天气情况对工程施工质量、施工进度和工期索赔等都至关重要。
天气情况的信息可根据当日的报纸、广播、电视及自己的观察填写。
2、施工情况的填写①施工内容应写明当日做的是什么工序或分项工程,房屋建筑则应写明是支模板、绑钢筋、浇筑混凝土还是砌筑抹灰等;市政工程也按照有关分类填写。
②施工部位房屋建筑应写明是第几层;是内部还是外部等;如道路应写明是什么里程什么位置的那一结构层。
③进度和质量及安全情况应写明当日进度是否正常施工;质量是否符合验收标准;有无安全隐患。
④投入的劳动和设备情况应写明投入什么样的劳务、人数及投入什么机械设备,是否有检验合格证书。
上述四项内当日如果发生均应如实填写。
第1篇日期:2023年4月20日天气:晴朗温度:20-30℃一、工程概况工程名称:XX住宅小区建设单位:XX房地产开发有限公司施工单位:XX建筑工程有限公司工程地点:XX市XX区XX街道二、监理工作内容1. 施工现场巡查今日监理人员对施工现场进行了全面巡查,重点检查了以下几个方面:(1)施工人员到位情况:今日施工人员全部到位,现场施工有序进行。
(2)施工材料准备情况:施工材料准备齐全,各类材料质量符合要求。
(3)施工设备运行情况:各类施工设备运行正常,无故障现象。
2. 施工过程监理(1)地基基础工程:今日地基基础工程已完成基础垫层施工,监理人员对垫层厚度、平整度进行了检查,符合设计要求。
(2)主体结构工程:今日主体结构工程进行到二层施工阶段,监理人员对二层结构钢筋绑扎、混凝土浇筑进行了现场监督,确保施工质量。
(3)装饰装修工程:今日装饰装修工程进行到外墙抹灰阶段,监理人员对抹灰厚度、平整度进行了检查,符合设计要求。
3. 监理日志填写今日监理人员按照监理日志填写要求,对施工现场巡查、施工过程监理进行了详细记录,确保监理日志的完整性和准确性。
三、存在问题及处理措施1. 问题:部分施工人员对施工规范理解不够深入,导致施工过程中出现不规范现象。
处理措施:加强对施工人员的培训,提高施工人员的业务素质,确保施工过程符合规范要求。
2. 问题:部分施工材料存在质量问题,监理人员发现后及时与施工单位沟通,要求其更换不合格材料。
处理措施:加强材料检验,确保施工材料质量符合要求。
四、明日工作计划1. 继续对施工现场进行巡查,确保施工过程符合规范要求。
2. 加强对施工人员的培训,提高施工人员的业务素质。
3. 对施工材料进行检验,确保施工材料质量符合要求。
4. 按时填写监理日志,确保监理日志的完整性和准确性。
监理人员:张三联系电话:138xxxx5678第2篇日期:2023年4月10日天气:晴温度:20-30℃一、监理人员动态今日,项目监理部全体成员到岗,现场监理人员按照预定计划开展各项工作。
监理日记【1】项目名称:监理单位:建设单位:施工单位:年月日至年月日监理日志概念和作用(1)监理日志是监理公司、监理工程师工作内容、效果的重要外在表现;管理部门也可以通过监理日志的记录内容了解监理公司的日常管理活动。
(2)通过监理日志,监理工程师可以对一些质量问题和一些重要事件进行准确追溯和定位,为监理工程师或总监的重要决定提供依据。
(3)对监理日志进行统计和总结,可以为监理月报、质量评估报告、监理工作总结、监理会议等提供重要内容。
(4)监理日志需要正确反映工程建设过程中监理人员参与工程投资、进度、质量、合同管理及现场协调的实际情况,尤其是施工中存在的安全、质量隐患和对承包商的重要建议、要求等,因此,监理日志也是监理项目部和监理企业用于检查、评价监理工程师日常工作的重要依据之一。
(5)监理日志是记录项目管理过程中施工质量、安全、费用、工期等各方面最原始最可靠的资料,因此,监理部门需要妥善保管监理日志,特别是在发生有工程延期、索赔、结算的纠纷或法律诉讼的时候将成为最主要的举证资料。
因此,除总监授权和主管部门调阅以外,即使是建设单位也通常只能查阅,但不能复印和拍照,监理部门也不允许将监理日志提供给任何的第三方(包括但不限于承包商)使用,以免影响监理工作的公平、公正及其独立性。
监理日志的内容监理日志应该真实、准确、全面地记录与工程进度、质量、安全相关的问题,用词要准确、专业、严谨、规范。
把所发生的问题以及解决途径、方法记录下来,这样不仅便于查找,也有利于业主和主管部门更全面地了解监理工作内容与监理工作业绩。
主要事件、重大的施工活动均应记录在监理日志上,尤其是施工中存在的安全、质量隐患和对承包商的重要建议、要求等。
通过多年的探索、改革、引进先进制度,我国监理市场正逐步走向成熟,监理人员也应不断提高素质,使自己适应不断变化的环境,监理日志的填写就是这种素质的一个侧面反映。
全面、详细的监理日志不仅能为监理工作提供方便,同时还是工程延期、索赔的依据。
建设监理日志
工程名称
合同号
项目法人
承包单位
年月日至年月日*****************工程建设监理有限公司
监理日志填写说明
一、监理日志由总监根据驻地监理机构的组成形式,实行分级填写办法;指定专人负责填写。
要求做到逐日记录监理活动。
追记时间不得超过24小时。
记述要求扼要、清晰;事实准确。
二、日期、日气象(含晴、阴、雨、雪、冰冻及温度、温度、风向、风级)须天天填写。
三、内容应按以下四个方面分别进行填写:
1、简述施工情况。
当日施工部位;人员、机械、材料、构配件的进(出)场动态。
2、重点记述监理实施情况。
包括监理人员到位;抽检与复核;质量验收、签证等。
3、重要事件,如项目法人指令;设计变更;会议;质量及安全事故;停水停电等,必须记录。
4、存在问题和处理情况。
凡当日发生并已及时处理的问题;当日处理的此前遗留问题;当日发生而未及时处理、计划日后处理的问题,均应于当日作出记录,以保持监理日志的连续性,做到前后呼应,促使所有发生的问题必定都有处理结论。
四、总监要定期检查监理日志,并在查阅过的监理日志上签字。
监理日志
填表人:。