Con tract of Con struct ion Project

合同编号:Co ntract Number:

工程名称:Project Name:

发包方(甲方):工程设计顾问(北京)

Employer (Party A): Intern ati onal Con suit ing Engin eers ( Beiji ng) Limited

承包方(乙方):中寰艺高建筑装饰工程有限公司

Con tractor (Party B): Zhong Huany igao Buildi ng Decorati on Engin eeri ng Co. , Ltd

根据《中华人民共和国合同法》和《建筑安装工程承包合同条例》及有关规定,为明确双方在施工过程中的权利、义务和经济责任,经双方协商同意签订本合同。

In order to make defi nite of the rights, obligati ons and econo mic resp on sibilities of both parties duri ng the con struct ion, the parties, in accorda nee with The PRC Con tract Law and Con structi on Engin eeri ng Con tract Regulati ons and releva nt provisi ons, agree to sig n this con tract.

第一条工程项目Article 1, Project item

1. 工程地点:Project site:

2. 工程范围:Scope of project

3. 工程造价:人民币元整(该造价为包工包料价)

Project cost: PMB Yua n only (Cost of this con tract is the con tract price for labor and materials)

第二条施工准备Article 2, Preparati on for con struct ion

1 .甲方协助乙方办理临时水电及垂直运输,提供建筑图纸及有关隐蔽障碍物的资料。

Party A shall assists party B to deal with the procedures of temporary hydropower and vertical tran sportati on and provide architectural draw ings and docume nts of releva nt con cealed obstacles .

2 .乙方:.Party B:

①负责施工区域的临时设施、水电管线的铺设、管理、使用和维修工作;

Be resp on sible for the works of lay ing, man ageme nt, use and maintenance of the temporary facilities, water and electricity pipeli ne in the con struct ion area.

②组织施工管理人员和材料、施工机械进场;

Orga nize con struct ion man ageme nt staff and con structi on materials, con struct ion mach inery en ter the Site.

③负责在装修期间保持公共地方清洁及每天负责将装物料弃置于由管理处指定的垃圾收集处。

Be resp on sible for keep ing public places clea n duri ng con struct ion and pack ing

con struct ion material and leavi ng in the garbage collecti on place desig nated by man ageme nt office each day.

第三条工程期限Article 3 Period of Con structio n

1.根据工期和使用需要,商定工程总施工期为天(日历天),自年月日开工

至年月日完工

Accord ing to the period of con structi on and the use n eed, the total con struct ion period

agreed shall be days (Cale ndar days), start from the date of and complete on the

date of .

2 ?如遇下列情况,经甲方现场代表签证后,工期相应顺延:

Con struct ion period shall be proIon ged upon Party A site represe ntative's con firmati on

whe n the matters occur as follows.

①按施工准备规定,甲方未协助乙方办理临时水电及垂直运输,影响进场施工;

Accord ing to the requireme nts of con structi on preparati on. Party A fail tot assist Party B to apply for temporary water and electricity and vertical tran sportati on and have an impact on Party B con struct ion;

②因甲方提出增减项目而造成重大设计变更,因而影响进度;

The material modificatio n or cha nge of desig n due to the party A ' s requireme nt of additi on

or deleti on of project have the effect of hindrance on the progress of works.

③未按合同规定拨付预付款、工程款而影响施工;

Party A fail to pay the adva nee payme nt and con struct ion cost to party B and impact the

con struct ion progress;

④人力不可抗拒的因素而延误工期。

The delay of schedule of con struct ion due to Force Majeure.

第四条工程质量Article 4 The quality of project

一.本工程质量经双方研究要求达到双方约定之验收标准。

The quality of project should achieve the requireme nts of accepta nee agreed by both parties.

二?乙方必须严格按照施工图纸、说明文件和国家颁发的建筑工程规范、规程和标准进行施

工,并接受甲方的监督。

Party B should carry on the con struct ion in strict accorda nee with draw ing, specificati on

file and regulati ons and specificati ons authorized by the compete nt authorities and be

un der the supervisi on of Party A.

三.乙方在施工过程中必须遵守下列规定:

Party B should, duri ng the con structi on.

comply with the provisi ons as follows:

1?由乙方提供给甲方的所有材料必须经甲方同意方可使用,未按要求购买严禁使用;

All materials provided by Party B should be subject to the approval of Party A prior to use,

And none of the same being bought without con formity with Party A requireme nts can be

used.

国际工程协议(中英文对照)

Memorandum of Understanding This Memorandum of Understanding(MOU)is made and entered into this 8th day of sep,2012 between: The Consortium whose principal place of business is in PRC and consisting,inter alia of i)China International Fund Limited; ii)China Railway Construction Corporation; (the Consortium)of the one part, and the Government of the Republic of Sierra Leone(GOSL) The Consortium and GOSL are sometimes referred to in this MOU individually as a “Party”and,collectively, as the “Parties” WHEREAS A. In furtherance of the mutual desires of the Parties to develop a strategic partnership and cooperation to ensure that the rich potential resources of Sierra Leone benefit the people of Sierra Leone through improved welfare of the People of Sierra Leone through the provision of services and infrastructure and the strengthening of Sierra Leone’s national development through experience sharing(South-South Cooperation) particularly in the sphere of construction of core infrastructure assets; B.To bring to the People of Sierra Leone, in the spirit of mutual respect and with a view of transferring relevant technical, organizational and management skills necessary to bring to the C.Republic of Sierra Leone to a higher level of development and prosperity; D.GOSL desires assistance in sourcing,implementing or prequalifying skilled and competent contractors and financiers for the purpose of its national development priorities award of contracts for projects specifically in the following priority areas; 1.MINISTRY OF WORKS,HOUSING AND INFRASTRUCTURE - Remedial Roads Rehabilitation - Development of new city - Construction and Operation of Ⅰ) Affordable Social Housing Infrastructure Ⅱ) National trunk and feeder roads Ⅲ) National railways Ⅳ) Bridges and drainage systems at national ,regional and local levels Ⅴ) Airports 2.MINISTRY OF ENERGY AND WATER RESOURCES: - Construction and operation of: Ⅰ) Thermal electric generation systems Ⅱ) Hydro power systems & infrastructure Ⅲ) Water supply systems & infrastructure Ⅳ) Other renewable power generation systems 3.PETROLEUM DIRECTORATE

建设工程委托设计合同(中英文对照)

建设工程设计合同 Construction Project Design Contract 项目名称: Project Name: 项目建设地点: Project Location: 合同编号: Contract No.: 设计证书等级: Grade of Design License: 委托方: Client: 承接方: Design Firm: 签订日期: Signed on: 委托方:(甲方) Client (Party A): 承接方:(乙方) Design Firm (Party B): 甲方委托乙方承担XX 项目(一期)工程设计,经双方协商一致, 签订本合同。 Party A entrusts Party B to undertake the design for This Contract is made by the two parties after their mutual agreement. 第一条本合同依据下列文件签订 Article 1. This Contract is made on the basis of the following documents:

1.1 《中华人民共和国合同法》、《中华人民共和国建筑法》和《建 设工程勘察设计市场管理规定》。 1.1 《The Contract Law of the People’s Republic of China》,《The building regulations of the People’s Republic of China》and 《The developmental Law of the People’s Republic of China. 1.2 国家及地方有关建设工程勘察设计管理法规和规章。 1.2 Relevant Building & Design Codes and Regulations of the State and of the Shanghai Municipality. 1.3 建设工程的相关批准文件。 1.3 The approval documents that are required for this construction project. 第二条本合同工程设计项目的名称、地点、规模、投资、内容及 标准 Article 2. The name, location, size, investment sum, function, design contents and standards : 2.1 工程项目的名称:XX 项目(一期) 2.1 Project name: 2.2 工程项目的地点: 2.2 Project location: 2.3 工程项目的规模:总建筑面积约平方米(其中地下面 积约平方米),高度米。 2.3 Project size:The total floor area is approximately m2(of which the floor area of the underground area is m2),the total height is m. 2.4 工程特征及附注说明:商业办公综合楼 2.4 Project features & remarks:A commercial cum office building complex 2.5 工程项目的投资总额:控制在亿元人民币以下 2.5 Project investment in total: Controlled Within RMB million yuan RMB

最新xxx工程合同中英文版模板

xxx engineering contract xxx工程合同 Contract No.: 合同编号: Party A: xxxCompany Limited 甲方:xxx有限公司 Party B:xxx Company Limited 乙方:xxx有限公司

(TSH)冊肖尊曲豐寺羽 '蚩制■£ ?SH)s引d^UHd JUBLUUOI!八归PUE 心BJES '屮|EBH '£ 。国沃旦甫 琴目举近澤 '魁号呦觀舛赃'您韦当直黑者鸳Y峯甘沿那迤Y峯曲四艮2律目回号李2 2 luaiuAed pejjuog pue pafojd o屮jo aouejdaooe ajisuo o屮」O#E pasop pue 'sailed。屮jo sieas o屮屮!M padiuejs pue sailed。屮jo saAijejuasajdaj pazuoq;ne 」o saAijejuasajdaj |e6a| aq; Aq pau6is A|np si S!屮」aye pa^uaiuaidiui eq ||eqs pejjuoo siqi 乙乙 °讷卷薪圣工逐%由劲觀首用兴觀鋼舛赃馬'「/呦觀工逐阴粗馬皐由帀菲'粗琴M 口助工&怦当丄!鸳回号:晡僧回府畐工邈李 uoipadsui ajisuo 」O#E jaaqs aouejdaoov $ uoipadsui 0屮onssi ||eqs、Aped Aq pein川suoo tueai aouejdaoov $ uoipadsui pafojd aq;疋屮si」aAopueq jo uoijipuoo aqi pejjuog 0屮6UIU6IS uodn qjuoiu 乙u!i|i!A/\ pa;a|diuoo eq ||eqs ”」o/v\ aq; :pafojd uoqonjjsuog peoy aq;」oj pouad ”」O/\A 「乙 刨ae回呂z pouad)OBJ)UOO■乙。畐工李马於來壷書當吐朝洱翦車阴混畐工XX帀型RN '澤卷阴四釧加回号李瞬羽 XX )0 uoiup oi|l jo 6uuaau!6u3 jo A JJSIUIIAI Aq pa;e|ndqs pjepuejs 心!|Enb pue pjepuejs pafojd o屮」od se pafojd o屮Qnpuoo neqs g 心阳'pejjuog S!屮ui pa;e|ndqs siuaji o屮qjiM aouepjoooe u| J 近壷 '躇印助工- siuaiuajinba^j pue)ua)uoo >IJO/V\ k ° “―”区癱歎寅'(M…区癱腸丄近回号李丑RN吐皐由 Aped V se paneo si qoiq/v\ jo qoea 'pejjuoo S!屮」opun sailed 屮。日jo aiueu juiof e Aq paneo aje g Aped pue v Aped xxx : Y峯 ' ( “RN,癱丄)'ax :者书聃卿眾灣一疯:RN 1pajiiun Auediuog xxx :g Aped xxx :Y峯聊四艮'(“2由”癱丄)'xxx °°<:R由 1pa;!iu!_l Auediuog xxx :v Aped 。署鸳丑2葷乐丄rn甲口M曲怦o乙丄回号伞 UI

工程设计合同(中英文)

建设工程设计合同 Engin eeri ng Service Con tract (专业建设工程设计合同) (Professio nal Engin eeri ng Service Con tract For Con structio n Project) 工程名称:___________ Name of the project: 工程地点:____________________________ Locati on of the project: 合同编号:__________________________________________ (由设计人编填) Con tract No.: (Filled in by the Desig ner) 设计证书等级:_____________________________ Level of the desig n certificate: 发包人:_________________________ Employer: 设计人:______________________________ Desig ner: ____________________ 签定日期:____________________________________________ Date of con tract: 江苏省建设厅监制 江苏省工商行政管理局 Supervised by: Jia ngsu Provin cial Departme nt of Con structi on Jiangsu Provincial Administration for Industry and Commerce

x工程合同中英文版.docx

编号:_______________本资料为word版本,可以直接编辑和打印,感谢您的下载 x工程合同中英文版.docx 甲方:___________________ 乙方:___________________ 日期:___________________

xxx工程合同 Contract No.: 合同编号: Party A: xxxCompany Limited 甲方:xxx有限公司 Party B:xxx Company Limited 乙方:xxx有限公司 This contract is made and entered into on the day of , 20xx by the following Parties in . 本合同丁20xx年月日由以下当事方在签署。 Party A: xxx Company Limited, 甲方:xxx有限公司,xxx经营的公司,住所地为xxx,(下称“甲方”),法定代表人:xxx Party B: xxx Company Limited, 乙方:xxx有限公司,一家xxx经营的公司,注册地址是:xxx,(下称“乙方”),法定代表人:xxx Party A and Party B are called by a joint name of Both Parties under this contract, each of which is called as A Party. 甲方和乙方在本合同项下统称为“双方”,单独称为“一方”。 1. Work Content and Requirements 1.1 In accordance with the items stipulated in this Contract, Party B shall conduct the project as per the Project standard and quality standard stipulated by Ministry of Engineering of the Union of xx. 1.1依据本合同所限定的条款,乙方应以xx工程部规定的建筑标准和质量要求执行本工程。 2. Contract Period— 2.1 Work period for the RoadConstruction Project: the work shall be completed within 2 month upon signing the Contract. The condition of handover is that the Project Inspection & Acceptance Teamconstituted by Party A, shall issue the Inspection & Acceptance Sheet

中英文工程合同

Contract of Construction Project 合同编号:Contract Number: 工程名称:Project Name: 发包方(甲方): Employer (Party A): 承包方(乙方): Contractor (Party B): 根据《中华人民共和国合同法》和《建筑安装工程承包合同条例》及有关规定,为明确双方在施工过程中的权利、义务和经济责任,经双方协商同意签订本合同。 In order to make definite of the rights, obligations and economic responsibilities of both parties during the construction, the parties, in accordance with The PRC Contract Law and Construction Engineering Contract Regulations and relevant provisions, agree to sign this contract. 第一条工程项目Article 1, Project item 1.工程地点:Project site: 2. 工程范围:Scope of project 3. 工程造价:人民币元整(该造价为包工包料价) Project cost: PMB Yuan only(Cost of this contract is the contract price for labor and materials) 第二条施工准备Article 2, Preparation for construction 1.甲方协助乙方办理临时水电及垂直运输,提供建筑图纸及有关隐蔽障碍物的资料。 Party A shall assists party B to deal with the procedures of temporary hydropower and vertical transportation and provide architectural drawings and documents of relevant concealed obstacles . 2.乙方:. Party B: ①负责施工区域的临时设施、水电管线的铺设、管理、使用和维修工作; Be responsible for the works of laying, management, use and maintenance of the temporary facilities, water and electricity pipeline in the construction area. ②组织施工管理人员和材料、施工机械进场; Organize construction management staff and construction materials, construction machinery enter the Site. ③负责在装修期间保持公共地方清洁及每天负责将装物料弃置于由管理处指定的垃圾收集处。 Be responsible for keeping public places clean during construction and packing

中英文对照工程施工合同2范本

工程施工合同 Contract 合同编号( Contract NO. ): 签订日期( Date ): 发包方(简称甲方) Party A: 承包方(简称乙方): Party B: 根据《中华人民共和国合同法》以及其他有关法律法规规定的原则,结合本工程的具体情况,甲、乙双方在平等、自愿、协商一致的基础上达成如下协议,共同遵守。 According to “P.R.C Contract Law”,and other relevant laws and regulations to the specific circumstances of this project, parties A and B have hereby equally and voluntarily entered into the following agreement executed on the basis of mutual respect. 1.工程概况 Project overview 1.1工程名称: Project name: 1.2工程地点: Project location: 1.3工程范围: A. 新研发中心和新厂房的网络综合布线系统的施工; B. 数据中心的建设,主要包含:数据中心的装饰工程、电气系统、空调系统、机房闭路监控系统、机房门禁系统、消防系统改造、机柜系统等。 Project contents: A. The new R & D and new plant construction of network cabling systems; B. Data Center, mainly includes: data center decoration and electrical systems, air-conditioning systems, CCTV systems, access control systems, firefighting system reform, server rack systems. 1.4开工条件:合同生效后,甲方预付款到位和现场具备开工条件。 Start conditions: After the commencement of the contract, Party A has started advance and on-site conditions in place.

xxx工程合同中英文版(标准版)

xxx engineering contract xxx工程合同 Contract No.: 合同编号: Party A: xxxCompany Limited 甲方:xxx有限公司 Party B:xxx Company Limited 乙方:xxx有限公司

This contract is made and entered into on the day of , 2014 by the following Parties in . 本合同于2014年月日由以下当事方在签署。 Party A: xxx Company Limited, 甲方:xxx有限公司,xxx经营的公司,住所地为xxx,(下称“甲方”),法定代表人:xxx Party B:xxx Company Limited, 乙方:xxx有限公司,一家xxx经营的公司,注册地址是:xxx,(下称“乙方”),法定代表人:xxx Party A and Party B are called by a joint name of Both Parties under this contract, each of which is called as A Party. 甲方和乙方在本合同项下统称为“双方”,单独称为“一方”。 1. Work Content and Requirements 1. 工作内容、要求 1.1 In accordance with the items stipulated in this Contract, Party B shall conduct the project as per the Project standard and quality standard stipulated by Ministry of Engineering of the Union of xx. 1.1 依据本合同所限定的条款,乙方应以xx工程部规定的建筑标准和质量要求执行本工程。 2. Contract Period 2. 合同期限 2.1 Work period for the Road Construction Project: the work shall be completed within 2 month upon signing the Contract. The condition of handover is that the Project Inspection & Acceptance Team constituted by Party A, shall issue the Inspection & Acceptance Sheet after onsite inspection. 2.1 本次工程时间周期:合同签订后14个工作日内完成,并以甲方组成的竣工验收小组现场检验并出具 验收单为竣工交接条件。 2.2 This contract shall be implementedafter this is duly signed by the legal representatives or authorized representatives of the Parties and stamped with the seals of the Parties, and closed after the onsite acceptance of the Project and Contract payment. 2.2 本合同自双方法定代表人或授权代表人签字盖章后生效,现场验收合格、款项支付完毕后关闭。 3. Health, Safety and Environment Principles (HSE) 3. 健康、安全和环境原则(HSE) 3.1 The staff from Party B shall follow the arrangement of Local government and Party A (or its representatives), and comply with the laws and regulations of Myanmar as well as rules and regulations on Health, Safety and Environment (HSE) of Party A. 3.1 乙方工作人员必须听从地方政府、甲方人员(或代表)的安排,遵守缅甸法律、法规和甲方的安全 环境健康规章制度等。 3.2 Before or during the implementation of this Project, Party B shall acknowledge, avoid and prevent the possible damage of the Project to the surrounding environment and other affiliatedfacilities, and the resulting losses shall be borne by Party B.

2019年建筑施工合同中英文对照版本.

XXXX施工合同 Con struct ion Con tract of xxxx 发包方(甲方)xxxx Party A: xxxx 承包方(乙方)xxxx Party B: xxxx 本合同由如上列明的甲、乙双方按照《中华人民共和国合同法》、《建筑安装工程承包合同条例》 以及国家相关法律法规的规定,结合本合同具体情况,于xx年x月x日在XX签订。 This con tract is sig ned by the two Parties in xxxx on xxxx accord ing to the “ Con tract Law of the People' s Republic of China " , the " Regulation on Building and Installation Con tract ing Con tract " , and other releva nt n ati on al laws and regulati ons , as well as the specific n ature of this project 第一条总则 Article 1 General Prin ciples 1.1合同文件 Con tract Docume nts 本合同包含合同、展示、施工图纸、作法说明、招投标文件以及合同所指的其他文件,它们均被视为合同的一部分。合同文件应该能够相互解释,互为说明。组成本合同的文件及优先解释的顺序如下:本合同、中标通知书、投标书及其附件、标准、规范及有关技术文件、图纸、工程量清单及工程报价单或预算书。合同履行中,发包人承包人有关工程的洽商、变更等书面下一或文件视为本合同的组成部分。 This con tract in eludes the con tract itself, exhibits, con struct ion draw in gs, explanations of work procedures, tender documents, as well as other documents specified by the con tract. The con tract docume nts should be mutually expla in able and mutually descriptive. The docume nts that con stituted the con tract and the priority hierarchy of expla nati ons of the docume nts are as follows: this con tract; the official letter of winning the ten der; Letter of biddi ng and its ann ex, sta ndards, guideli nes, and releva nt tech nical docume nts, draw in gs, Bill of Quan tity (BOQ) , quotati on of prices, and project budget. During the impleme ntati on of the con tract, any writte n agreeme nts or documents between two parties such as change-orders are also regarded will be deemed as part of this con tract. 1.1.1项目概况 Project In troduct ion 1.1.21 程名称:xxxx Name of Project: xxxx

中英文建筑工程合同(ContractofConstructionProject)

编号:_______________ 本资料为word版本,可以直接编辑和打印,感谢您的下载 中英文建筑工程合同 (ContractofConstructionProject) 甲方:___________________ 乙方:___________________ 日期:___________________

Contract of Construction Project 合同编号:Contract Number: 工程名称:Project Name: 发包方(甲方): ______________________________ Employer (Party A): ________________________ 承包方(乙方): ______________________________ Contractor (Party B): ________________________ 根据《中华人民共和国合同法》和《建筑安装工程承包合同条例》及有关规定,为明确双方在施工过程中的权利、义务和经济责任,经双方协商同意签订本合同。 In order to make definite of the rights, obligations and economic responsibilities of both parties during the construction, the parties, in accordance with The PRC Contract Law and Construction Engineering Contract Regulations and relevant provisions, agree to sign this contract. 第一条工程项目Article 1, Project item 1 .工程地点:Project site: 2. 工程范围:Scope of project 3. 工程造价:人民币元整(该造价为包工包料价) Project cost: PMB Yuan only(Cost of this contract is the contract price for labor and materials) 第二条施工准备Article 2, Preparation for construction 1 .甲方协助乙方办理临时水电及垂直运输,提供建筑图纸及有关隐蔽障碍物的资料。 Party A shall assists party B to deal with the procedures of temporary hydropower and vertical transportation and provide architectural drawings and documents of relevant concealed obstacles . 2 .乙方:.Party B: ①负责施工区域的临时设施、水电管线的铺设、管理、使用和维修工作; Be responsible for the works of laying, management, use and maintenance of the temporary facilities, water and electricity pipeline in the construction area. ②组织施工管理人员和材料、施工机械进场;

工程施工合同中英文版

工程施工合同中英文版 Construction Contract PO No.: XXXXXXX Buyer:. Date of signature: 甲方: 签约日期: Seller: 乙方: This Purchase Order is made by and between the Buyer and the Seller: Whereby the Buyer agrees to buy and the Seller agrees to sell the under mentioned commodity according to the terms and conditions stipulated below: 甲乙双方经友好协商,一致就供应下列产品,达成如下条款: 1. Scope of Supply and Price 工作范围及价格明细 2. Technical Requirement, Quality Requirement, Standard & Warranty Period: Seller shall carried out the construction in strict accordance with the National Standard and the requirements stipulated in the Technical Agreement No. ________which both party signed (see attached documents). The warranty period shall be 1 year after placement of Goods in service. 技术要求、质量要求、技术标准和质保期限: 按国家标准和双方签定的技术协议(编号:______见附件)施工,质保期为投产后1年。 3. Job Sites: 施工地点: 4. Construction Equipment, Tools & Field Personnel Management: 施工设备工具及现场人员管理: (1) All the construction equipment and tools shall be provided by Seller. 所有施工用设备及工具由乙方自带。 (2) Buyer will coordinate and arrange the electricity and water supply on the site. 现场施工用水电由甲方协调安排。 (3) Buyer will be responsible for all the lifting work during the construction on site. 现场施工过程中的吊装工作由甲方负责。

施工合同中英文模板.

Con structi on Con tract 工程合同 PO No. : XXXXXXX Buyer:. Date of sig nature: 甲方: 签约日期: Seller: 乙方: This Purchase Order is made by and betwee n the Buyer and the Seller: Whereby the Buyer agrees to buy and the Seller agrees to sell the under mentioned commodity according to the terms and conditions stipulated below: 甲乙双方经友好协商.一致就供应下列产品,达成如下条款: 1.Scope of Supply and Price 工作范围及价格明细

2.Tech ni cal Requireme nt. Quality Requireme nt, Sta ndard &Warra nty Period: Seller shall carried out the construction in strict accordance with the National Standard and the requirements stipulated in the Tech ni cal Agreeme nt No. which both party sig ned (see attached docume nts). The warranty period shall be 1 year after placement of Goods in service. 技术要求、质员要求、技术标准和质保期限:按国家标准和双方签定的技术协议(编号: 见附件)施工. 质保期为投产后1年. 3.Job Sites: 施工地点: 4.Con structi on Equipme nt, Tools &Field Pers onnel Man ageme nt: 施工设备工具及现场人员管理: (1)Al 1 the con structi on equipme nt and tools shall be provided by Seller. 所有施工用设备及工具由乙方自带。 (2)Buyer will coord in ate and arra nge the electricity and water supply on the site. 现场施工用水电由甲方协调安排 (3)Buyer will be responsible for al 1 the lifting work during the construction on site.现场施工过程中的吊装工作由 甲方负责。 (4)Seller shall be responsible for the manageraent of its field personnel safety: Seller should provide reasonable protection and insurance for its personnel * s safety. All the personnel injury and property damage caused by Seller * s failure of management shall be borne by Seller. 现场施工人员管理由乙方负责.乙方应对人员的安全等方面提供合理的保障.由于乙方管理原因造成的人身伤亡及财产损失由乙方承担.

建设工程施工合同中英文翻译件

工程编号: ___________________ Project No.: ___________________ 合同编号: ___________________ Contract No.: __________________ 建设工程施工合同 Con structi on Con tract for Con structi on Projects (GF-2013-0201 ) 工程名称: Name of project: 工程地点: Locati on of project: 发包人: Clie nt: 承包人:

工 商 行 政 管 理 总 局 Made by Min istry of Hous ing Urba n-Rural Developme nt State Admi nistrati on for In dustry & Commerce of the P 目录 Table of Contents 第一部分合同协议书 .......................................... ................ 错误! 未 定 义 书 签。 Part I Con tract Agreeme nt ........................................................... .............................. 错误! 未 定 义 书 签。 ...17 I. Project Overview ................. ?... .......... ?... ........... ?... ......... ?... ......... ?... ......... ???17 、合同工期 ... ....... ... ....... ... ....... .............. .......... ........ ... ........... . (30) II. Project Duratio n un der Con tract ?… ......... … ..... ?….....?… ....... … ......... ?::... Con tractor: 住房和城乡建设部 制定 .R.C 、工程概况

相关主题
文本预览
相关文档 最新文档