10KV及以上变电所电气施工组织设计
- 格式:doc
- 大小:117.00 KB
- 文档页数:21
湖南科技大学毕业设计(论文)题目110/35/10kv变电所设计作者本人学院信息学院专业电气工程及其自动化学号********指导教师欧阳无敌二〇〇九年六月一日摘要变电所是电力系统的重要组成部分,它直接影响整个电力系统的安全与经济运行,是联系发电厂和用户的中间环节,起着变换和分配电能的作用。
这次设计以110KV降压变电所为主要设计对象,分析变电站的原始资料确定变电所的主接线;通过负荷计算确定主变压器台数、容量及型号。
根据短路计算的结果,对变电所的一次设备进行了选择和校验。
同时完成配电装置的布置、防雷保护及接地装置方案的设计。
关键词:变电所电气主接线;短路电流计算;一次设备;防雷保护AbstractA substation is an important component of electricity system and has the direct impact on the security and rational operation of the whole power systems, it is the intermediate which links power plants and users, and plays an important role in changing and distributing electrical energy.My design considers the terminal 110kV substations as the main design target, and makes analysis on the original data of substation and defines its main wiring; through the calculations of load to determine the main transformers' number, capacity and types. My design also focuses on selecting and proofreading for the one-time equipment of substation according to result of calculation for short-circuit; at the same time I complete the design about the distribution devices' layout, mine-protection and earthing devices.KeyWords:substation electrical main wiring ;short-circuit current calculation ;one-time equipment ;mine-protection目录第1章引言........................................................................ - 1 -1.1 概述 ................................................. - 1 -1.2 原始资料分析 ......................................... - 1 -1.2.1 本所设计电压等级................................ - 1 -1.2.2 电源负荷地理位置情况............................ - 1 -1.2.3 设计任务书...................................... - 3 -第2章电气主接线设计 ............................................................ - 4 -2.1 主接线接线方式........................................ - 4 -2.1.1 单母线接线...................................... - 4 -2.1.2 单母线分段接线.................................. - 4 -2.2.3 单母分段带旁路母线.............................. - 4 -2.2.4 桥型接线........................................ - 4 -2.2.5 双母线接线...................................... - 5 -2.2.6 双母线分段接线.................................. - 5 -2.3 电气主接线的选择...................................... - 6 -2.3.1 10kV电气主接线.................................. - 6 -2.3.2 35kV电气主接线.................................. - 7 -2.3.3 110kV电气主接线................................. - 8 -第3章主变压器的选择......................................................... - 10 -3.1负荷计算............................................. - 10 -3.2 主变压器型式的选择................................... - 10 -3.2.1主变台数的选择.................................. - 10 -3.2.2 主变压器容量的选择............................. - 11 -3.2.3 主变相数的选择................................. - 11 -3.2.4绕组数的选择.................................... - 11 -3.2.5 主变调压方式的选择............................. - 12 -3.2.6 连接组别的选择................................. - 12 -3.2.7 容量比以及冷却方式的选择....................... - 12 -第4章所用电的设计.............................................................. - 14 -4.1 所用电接线一般原则.................................... - 14 -4.2 所用变容量型式的确定.................................. - 14 -4.3 所用电接线方式确定.................................... - 14 -4.4 备用电源自动投入装置.................................. - 15 -4.4.1备用电源自动投入装置作用........................ - 15 -4.4.2 适用情况以及优点............................... - 15 -4.4.3 BZT的工作过程及要求[2].......................... - 15 -第5章短路电流计算............................................................... - 17 -5.1短路计算的目的....................................... - 17 -5.2 短路计算过程 ........................................ - 17 -5.2.1 110KV短路电流计算.............................. - 17 -5.2.2 35KV侧短路计算................................. - 22 -5.2.3 10KV侧短路计算................................. - 24 -第6章设备选择..................................................................... - 26 -6.1 选择设备的一般原则和基本要求[3]....................... - 26 -6.2 高压断路器的选择...................................... - 27 -6.2.1 断路器选择的具体技术条件[1]...................... - 27 -6.2.2 断路器选择及校验.............................. - 28 -6.3 隔离开关的选择........................................ - 32 -6.3.1 隔离开关选择的具体技术条件..................... - 32 -6.3.2 隔离开关选择计算............................... - 33 -6.4 电流互感器选择........................................ - 37 -6.4.1 电流互感器的选择技术条件[2]...................... - 37 -6.4.2 电流互感器选择及校验........................... - 38 -6.5 电压互感器选择计算.................................... - 41 -6.5.1 电压互感器选择技术条件[1]........................ - 41 -6.5.2 电压互感器选择................................. - 42 -6.6 各级电压母线的选择.................................... - 43 -6.6.1裸导体选择的具体技术条件........................ - 43 -6.6.2 母线的选择计算................................. - 44 -6.6.3 引接线的选择计算.............................. - 47 -第7章继电保护配置...................................................................... - 51 -7.1 变电所母线保护配置.................................... - 51 -7.2.1 主变压器的主保护............................... - 51 -7.2.2 主变压器的后备保护............................. - 51 -第8章防雷接地..................................................................... - 53 -8.1 避雷器的选择.......................................... - 53 -8.1.1 避雷器的配置原则............................... - 53 -8.1.2 避雷器选择技术条件[5]............................ - 53 -8.1.3 避雷器的选择和校验............................. - 55 -8.2变电所的进线段保护[8].............................. - 57 -8.3 避雷针的配置.......................................... - 58 -8.3.1 避雷针位置的确定............................... - 58 -8.4接地装置的设计 ........................................ - 60 -8.4.1设计原则[1]...................................... - 60 -8.4.2 接地网型式选择及优劣分析............................ - 60 -8.4.3 降低接地网电阻的措施........................... - 61 -8.4.4 接地刀闸的选择与校验........................... - 61 -第9章无功补偿装置的选择 ................................................ - 64 -9.1概述 .................................................. - 64 -9.2 补偿装置的确定........................................ - 64 -9.3 补偿装置容量的选择.................................... - 65 -第10章电气总平面布置及配电装置的选择 ......................... - 66 -10.1 配电装置应满足以下基本要求[1]......................... - 66 -10.2 配电装置特点......................................... - 66 -10.3 屋外配电装置类型及应用............................... - 66 -10.4 配电装置的确定....................................... - 67 -10.5 10KV高压开关柜选择.................................. - 67 -10.6 电气总平面布置....................................... - 68 -第11章结束语...................................................................... - 69 -致谢........................................................................................ - 70 -参考文献.................................................................................. - 71 -附录....................................................................................... - 72 -第一章引言1.1 概述本次设计题目为110KV变电所一次系统设计。
10kV及以下变电所设计规范GB50053-94主编部门:中华人民共和国机械工业部批准部门:中华人民共和国建设部施行日期:1994年11月1日第一章总则第1.0.1条为使变电所设计做到保障人身安全、供电可靠、技术先进、经济合理和维护方便,确保设计质量,制订本规范。
第1.0.2条本规范适用于交流电压10kV及以下新建、扩建或改建工程的变电所设计。
第1.0.3条变电所设计应根据工程特点、规模和发展规划,正确处理近期建设和远期发展的关系,远近结合,以近期为主,适当考虑发展的可能。
第1.0.4条变电所设计应根据负荷性质、用电容量、工程特点、所址环境、地区供电条件和节约电能等因素,合理确定设计方案。
第1.0.5条变电所设计采用的设备和器材,应符合国家或行业的产品技术标准,并应优先选用技术先进、经济适用和节能的成套设备和定型产品,不得采用淘汰产品。
第1.0.6条10kV及以下变电所的设计,除应执行本规范的规定外,尚应符合国家现行的有关设计标准和规范的规定。
第二章所址选择第2.0.1条变电所位置的选择,应根据下列要求经技术、经济比较确定:第2.0.2条一、接近负荷中心;第2.0.3条二、进出线方便;第2.0.4条三、接近电源侧;第2.0.5条四、设备运输方便;第2.0.6条五、不应设在有剧烈振动或高温的场所;第2.0.7条六、不宜设在多尘或有腐蚀性气体的场所,当无法远离时,不应设在污染源盛行风向的下风侧;第2.0.8条七、不应设在厕所、浴室或其他经常积水场所的正下方,且不宜与上述场所相贴邻;第2.0.9条八、不应设在有爆炸危险环境的正上方或正下方,且不宜设在有火灾危险环境的正上方或正下方,当与有爆炸或火灾危险环境的建筑物毗连时,应符合现行国家标准《爆炸和火灾危险环境电力装置设计规范》的规定;第2.0.10条九、不应设在地势低洼和可能积水的场所。
第2.0.11条装有可燃性油浸电力变压器的车间内变电所,不应设在三、四级耐火等级的建筑物内;当设在二级耐火等级的建筑物内时,建筑物应采取局部防火措施。
110-35-10变电站设计摘要随着工业时代的不断发展,人们对电力供应的要求越来越高,特别是供电的稳固性、可靠性和持续性。
然而电网的稳固性、可靠性和持续性往往取决于变电站的合理设计和配置。
一个典型的变电站要求变电设备运行可靠、操作灵活、经济合理、扩建方便。
出于这几方面的考虑,本论文设计了一个降压变电站,此变电站有三个电压等级:高压侧电压为110kv,有二回线路;中压侧电压为35kv,有六回出线;其中有四回出线是双回路供电。
低压侧电压为10kv,有八回出线,其中有六回是双回路供电。
同时对于变电站内的主设备进行合理的选型。
本设计选择选择两台SFSZL-31500/110主变压器,其他设备如站用变,断路器,隔离开关,电流互感器,高压熔断器,电压互感器,无功补偿装置和继电保护装置等等也按照具体要求进行选型、设计和配置,力求做到运行可靠,操作简单、方便,经济合理,具有扩建的可能性和改变运行方式时的灵活性。
使其更加贴合实际,更具现实意义。
关键字:变电站设计目录第一章电气主接线的设计 (6)1.1原始资料分析 (6)1.2主结线的设计 (6)1.3主变压器的选择 (11)1.4变电站运行方式的确定 (12)第二章短路电流计算 (13)第三章电气设备的选择 (14)3.1断路器的选择 (14)3.2隔离开关的选择 (15)3.3电流互感器的选择 (16)3.4电压互感器的选择 (16)3.5熔断器的选择 (17)3.6无功补偿装置 (18)3.7避雷器的选择 (18)第四章导体绝缘子套管电缆 (20)4.1母线导体选择 (20)4.2电缆选择 (21)4.3绝缘子选择 (21)4.4出线导体选择 (22)第五章配电装置 (23)第六章继电保护装置 (25)6.1变压器保护 (25)6.2母线保护 (26)6.3线路保护 (27)6.4自动装置 (27)第七章站用电系统 (29)第八章结束语 (31)第一章电气主接线的设计一、原始资料分析本设计的变电站为降压变电站,有三个电压等级:高压侧电压为110kv,有二回线路;中压侧电压为35kv,有六回出线;其中有四回出线是双回路供电。
专科毕业设计(论文)资料题目名称:10Kv降压变电所及车间低压配电系统设计学院(部):电气与信息工程学院专业:电气自动化学生姓名:班级:指导教师姓名:最终评定成绩:湖南工业大学教务处(2011届) 专科毕业设计(论文)题 目 名 称:10kv降压变电所及车间低压配电系统设计学 院(部): 电气与信息工程学院 专 业: 电气自动化 学 生 姓 名: 周敏 班 级: 电气0631 学号 06053103 指导教师姓名:职称 副教授最终评定成绩:2011 年 月摘 要本设计含工厂供电设计,包括:负荷的计算及无功功率的补偿;变电所主变压器台数和容量、型式的确定;变电所主接线方案的选择;进出线的选择;短路计算和开关设备的选择;二次回路方案的确定及继电器保护的选择和整定;防雷保护与接地装置的设计;车间配电线路布线方案的确定;线路导线及其配电设备和保护设备的选择;以及电气照明的设计,还有电路图的绘制。
本设计根据设计任务书可分为三大部分,第一部分为各车间变电所的设计选择,包括方案比较、变压所变压器台数及容量选择、变电所I的供电负荷统计无功补偿,变压所I的变压器选择;第二部分为各车间计算负荷和无功率补偿、短路电流计算、工厂总降压变电所及接入系统设计、变电所高低压电气设备的选择、继电保护的配置;第三部分为电气设计图,包括车间变配电所电气主接线图、继电保护原理接线图。
关键词:变电所变压器断路器继电器隔离开关互感器熔断器ABSTRACTThis design including factory, including power supply system design : Calculation of load and compensation of the inactive power; Transformer substation main voltage transformer platform count and capacity , sureness of pattern; Mainly wire the choice of the scheme in the transformer substation; Pass in and out the choice of the thread; Choice of shorting out and calculating and switchgear ; Two return circuit sureness and choice that relay protect of scheme exactly make; Defend the thunder and protect the design with the earth device ; The workshop distribution line connects up the sureness of the scheme; Circuit wire and distribution equipment and protecting the choice of the equipment; And the electric design that lighted, there is drawing of circuit diagram.This design according to the design specification can be divided into three parts, the first part of the design of each workshop substation, including scheme comparison, choose variable pressure transformer sets and capacity of what I choose, substation reactive-power compensation power load statistics, which I transformer variable pressure choice;The second part is computational load each workshop and without power compensation, short-circuit current calculation, factory general voltage substation and access system design, substation high-low voltage electrical equipment choice, relay protection configuration;Keyword: Transformer substation Voltage transformer Circuit breaker Relay Isolate the switch Mutual inductor Fuse box目录第一章各车间计算负荷和无功功率补偿 (6)1.1 根据下列公式计算 (6)1.2 各车间计算负荷 (6)1.3 无功功率补偿 (9)第二章各车间变电所的设计选择 (12)2.1 方案比较 (12)2.2 变压所变压器台数及容量选择 (13)第三章短路电流计算 (16)3.1 短路电流计算的目的及方法 (16)3.2 短路电流计算 (16)第四章工厂总降压变电所及接入系统设计 (19)4.1 工厂总降压变电所主变压器台数及容量的选择 (19)4.2 35KV供电线路截面选择 (19)第五章变电所高低压电气设备的选择 (20)5.1 高压35KV侧设备 (20)5.2 中压10KV侧设备 (20)5.3 低压侧0.4KV侧设备 (21)第六章继电保护的配置 (22)6.1 主变压器的继电保护装置 (22)6.2 电流速断保护装置 (22)6.3 变压器的差动保护 (23)6.4 35KV进线线路保护 (23)6.5 10KV进线线路保护 (24)6.6 电流速断保护装置 (25)结论 (26)参考文献 (27)致谢 (28)附录 (29)第一章各车间计算负荷和无功功率补偿计算负荷计算负荷也称需要负荷或最大负荷。
电力工程施工组织设计一、工程概况:航站楼整体强电安装分为高压10KV配电安装、变电室低压配电安装、发电机安装、照明安装、动力电安装、接地系统安装。
其分项工程划分为:电缆线路工程、配管及管内穿线工程、硬母线安装工程、电力变压器安装工程、成套配电柜(盘)及动力开关柜安装工程、配电箱安装工程、发电机安装工程、避雷针(网)及接地装置安装工程、电气照明器具安装工程。
供电示意图如下:航站楼设有8个变电站,首层南北两端各两个,地下层中部四个,八个变电站划分为八个供电区域,如图示。
1.10KV高压配电在首层南指廊设有一个10KV开闭所,10KV市电由室外电缆引入开闭所,开闭所设正常电源和备用电源.开闭所到变电站采用高压专用电缆桥架,开闭所至每个变电站供两路10KV电源作为正常供电,每个变电站都设有高压柜,将本站两路10KV分配给本站变压器。
主要安装内容:高压开关柜、高压电缆、直流柜、电缆桥架。
2.变电室低压配电低压配电分为正常供电和应急供电,采用五线制放射式供电,正常供电电源为市电,应急供电电源为发电机电源,低压配电室馈出采用电缆桥架明敷供电,每个配电室低压母线设有正常电源母线段和事故电源母线段,两段正常母线之间和正常与事故母线之间设有联络开关,变压器到低压柜采用成套封闭母线供电,大型机房和配电小间用电也采用封闭母线供电。
主要内容:高压开关柜、干式变压器、低压开关柜、低压封闭母线、高压电缆、低压电缆、电缆桥架.3.发电机航站楼首层南北端各设一个发电机房,各装2×800kw柴油发电机组,每个发电机房设有低压配电柜,共有33台低压柜,馈出采用封闭母线和低压电缆,由发电机房配电柜送到每个变电站的低压配电柜事故母线段。
4.照明照明分为正常照明、事故照明、疏散照明和广告照明电源等类型。
航站楼按供电区域每层设有20个配电小间(地下24个),配电小间上下贯通为电气竖井,由相应变电站供电,小间电源分别从干线上取电源,小间内按用途分为各类电源总柜。
10kV及以下变电所设计规范GB50053-94主编部门:中华人民共和国机械工业部批准部门:中华人民共和国建设部施行日期:1994年11月1日第一章总则第1.0.1条为使变电所设计做到保障人身安全、供电可靠、技术先进、经济合理和维护方便,确保设计质量,制订本规范。
第1.0.2条本规范适用于交流电压10kV及以下新建、扩建或改建工程的变电所设计。
第1.0.3条变电所设计应根据工程特点、规模和发展规划,正确处理近期建设和远期发展的关系,远近结合,以近期为主,适当考虑发展的可能。
第1.0.4条变电所设计应根据负荷性质、用电容量、工程特点、所址环境、地区供电条件和节约电能等因素,合理确定设计方案。
第1.0.5条变电所设计采用的设备和器材,应符合国家或行业的产品技术标准,并应优先选用技术先进、经济适用和节能的成套设备和定型产品,不得采用淘汰产品。
第1.0.6条10kV及以下变电所的设计,除应执行本规范的规定外,尚应符合国家现行的有关设计标准和规范的规定。
第二章所址选择第2.0.1条变电所位置的选择,应根据下列要求经技术、经济比较确定:一、接近负荷中心;二、进出线方便;三、接近电源侧;四、设备运输方便;五、不应设在有剧烈振动或高温的场所;六、不宜设在多尘或有腐蚀性气体的场所,当无法远离时,不应设在污染源盛行风向的下风侧;七、不应设在厕所、浴室或其他经常积水场所的正下方,且不宜与上述场所相贴邻;八、不应设在有爆炸危险环境的正上方或正下方,且不宜设在有火灾危险环境的正上方或正下方,当与有爆炸或火灾危险环境的建筑物毗连时,应符合现行国家标准《爆炸和火灾危险环境电力装置设计规范》的规定;九、不应设在地势低洼和可能积水的场所。
第2.0.2条装有可燃性油浸电力变压器的车间内变电所,不应设在三、四级耐火等级的建筑物内;当设在二级耐火等级的建筑物内时,建筑物应采取局部防火措施。
第2.0.3条多层建筑中,装有可燃性油的电气设备的配电所、变电所应设置在底层靠外墙部位,且不应设在人员密集场所的正上方、正下方、贴邻和疏散出口的两旁。
井下中央变电所设备安装施工组织设计一、工程简况井下中央变电所采用单母线接线方式,两回路电源分别引自地面主井变电所不同母线段.中央变电所10KV高压采用BGP49-6型矿用隔爆型真空配置装置,以10KV向水泵房\回采工作面和踪掘工作面矿用隔爆型移动变电站供电;在中央变电所设两台KBSG-315/6/0.69矿用隔爆干式变压器.低压660V侧选用KBZ型矿用变压器技术参数如下:二、主要工作量三、施工准备组织一支具有丰富电气安装经验的施工队伍,施工前对全体施工人员进行一次技术和安全交底。
将施工所用的电气试验装置,槽钢支架、接地板、接地扁钢、电焊机、倒链等,材料工具准备检查完毕,运至现场。
在现场安装15盏防爆荧光灯,供井下变电所安装时照明。
四、施工工艺及方法:(一)设备清点检查高爆开关、变压器、低爆真空开关到货后,由矿方组织施工单位、监理等与生产厂家一道按设备清单进行逐一清点检查。
核定到货产品与设计是否相符,设备在运输中有无损坏,总体数量是否与设计一致,附件是否齐全,产品是否有说明及出厂合格证。
无问题后,签字入库,有问题的由厂家负责处理,并做好记录。
(二)基础验收安装前由矿方组织矿建施工单位、监理等对高压设备基础进行一次检查验收,电缆沟宽1.4m,高0.3m,长20米,上面放置20台高压防爆开关、6台低压开关及2台变压器。
主要检查基础施工质量、外形尺寸、位置、表面平整度等。
表面应平整,无空洞、凹坑、掉角等现象,基础距硐室边应均匀,砼基础应无麻面、鼓器等现象,砼强度检查砼配合记录。
对于偏差大的进行处理,处理后验收,合格后交于安装单位进行设备就位。
(三)设备运输尺寸和重量最大件变压器重约1500kg,利用副提绞车进行下放,可满足要求。
加工一平板车,上面放置2根道木,变压器开关柜等要绑扎牢固,保护好,不得损坏散热器等部件,绑牢后,用塑料布搭好,防止井下水淋,绞车开车速度要慢控制在0.5m/s 左右,沿途有人跟随,有情况时,打信号至车房,人力运至变电所内,用倒链三角架卸车。
目錄前言 (1)1變電所原始資料 (2)2變壓器的設計 (3)2.1主變壓器的選擇 (3)2.2所用變壓器的選擇 (4)3電氣主接線的設計 (5)3.1電氣主接線方案的確定 (5)3.2110KV側電氣主接線的選擇 (6)3.3變電所的無功補償 (7)4短路電流計算 (7)4.1短路計算的原則 (7)4.2短路電流的計算方法和步驟 (8)4.3短路電流計算結果表 (9)4.4短路電流的計算 (9)4.5短路電流計算列表 (9)5電氣設備的選擇 (10)5.1電氣設備的選擇原則 (11)5.2 電氣設備選擇的技術條件 (11)5.3 主要電氣設備的選擇 (12)5.4 10KV高壓開關櫃選擇 (14)6配電裝置的選擇 (14)6.1高壓配電裝置的選擇 (14)1.附錄1短路電流的計算及程式說明 (17)2.附錄2 電氣設備的選擇 (20)3.附錄3主接線圖 (29)4.參考文獻 (29)前言電力工業是能源工業、基礎工業,在國家建設和國民經濟發展中佔據十分重要的位置,是時間國家現代化的戰略重點。
電能是一種無形的、不能大量儲存的二次能源。
電能的發、變、送、配和用電,幾乎是在同一瞬間完成的,須隨時保持功率平衡。
要滿足國民經濟發展的要求就必須加強電網建設,而變電站建設就是電網建設中的重要一環。
在變電站的設計中,既要求所變電能能很好地服務於工業生產,又要切實保證工廠生產和生活的用電的需要,並做好節能工作,就必須達到以下基本要求:安全在變電過程中,不發生人身事故和設備事故。
可靠所變電能應滿足電能用戶對用電的可靠性的要求。
優質所變電能應滿足電能用戶對電壓和頻率等品質的要求。
經濟變電站的投資要少,輸送費用要低,並盡可能地節約電能、減少有色金屬的消耗量和盡可能地節約用地面積。
110KV變電站屬於高壓網路,該地區變電所所涉及方面多,考慮問題多,分析變電所擔負的任務及用戶負荷等情況,選擇所址,利用用戶數據進行負荷計算,確定用戶無功功率補償裝置。
第1篇一、工程概况1. 工程名称:XX地区供电工程项目2. 工程地点:XX地区XX县XX镇3. 工程规模:本工程主要包括110kV变电站一座,10kV线路若干条,以及配套的电力设施。
4. 工程建设内容:(1)110kV变电站:包括主变压器、高压配电装置、低压配电装置、继电保护装置、通信设备等。
(2)10kV线路:包括架空线路、电缆线路、配电设备等。
(3)电力设施:包括配电室、变压器、电杆、接地装置等。
5. 工程建设周期:预计总工期为12个月。
二、施工组织设计原则1. 安全第一原则:确保施工过程中人员安全和设备安全,严格执行安全生产法规和操作规程。
2. 质量第一原则:确保工程质量达到国家标准和设计要求,严格控制施工过程中的质量。
3. 进度控制原则:合理编制施工进度计划,确保工程按期完成。
4. 节约成本原则:合理组织施工,降低施工成本,提高经济效益。
5. 环保原则:遵守国家环保法规,减少施工对环境的影响。
三、施工组织机构1. 施工项目经理部:由项目经理、技术负责人、质量负责人、安全负责人等组成,负责整个工程的施工组织和管理。
2. 施工项目部各职能部门:(1)工程技术部:负责施工图纸的审核、技术交底、施工方案的编制等。
(2)质量保证部:负责施工过程中的质量控制,确保工程质量。
(3)安全保卫部:负责施工过程中的安全管理工作,确保施工安全。
(4)物资设备部:负责施工所需物资和设备的采购、供应和管理。
(5)工程合同部:负责工程合同的签订、变更、结算等工作。
(6)综合办公室:负责工程项目的日常行政管理。
四、施工方案1. 施工工艺:(1)110kV变电站施工:- 基础施工:采用混凝土基础,按设计图纸进行施工。
- 变电站设备安装:按照设备技术说明书进行安装,确保设备安装质量。
- 电气一次、二次回路施工:按照设计图纸进行施工,确保电气回路正确、可靠。
(2)10kV线路施工:- 架空线路施工:按照设计图纸进行施工,确保线路架设牢固、安全。
IOKV变电所设计全套1、IOkV及以下变电所的设计中常见问题11主接线不符合要求因为有关电力的部门对有关产权的分界点的划分要求不了解,同时还不知道功率的因数低还会被处罚的相关规定,很多IOkV及以下变电所的主接线的设计在不能满足计量和功率因数的补偿的相关要求的时候,却不恰当地选用了对负荷等级进行改变的做法。
1.2电源进线开关的配置的不合理由于规范GB50053-2013≪20kV及以下变电所设计规范》中没有明确电源的进线开关在什么情况下可以使用断路器或使用带熔断器的负荷开关,因此在一些变电所的工程设计中会出现全部采用真空断路器或都用负荷开关的不正常现象。
13平面布置不合理在有些变电所的设计中变电所的出入口没有满足要求或者设备的通道没有满足要求。
变配电的设备当采用干式的时候,就可以和主体的建筑安放在一起,而且门还要采用防火门。
在建筑的长度超过了7m时,还要设置两个出入口,而且其中一个的出入口还要满足设备搬运的要求,当长度超过60m时,中间还要增加出口。
1.4低压配电屏前后通道宽度和出口数量不满足要求这个问题主要针对GB50053-2013的规定来说,例如以固定屏而言,单排屏的屏后通道最少应该为IOOOmm,屏前的通道最少为1500mm;在双排面对面进行布置时屏后的通道最少为IOOOm,屏前的通道最少2000mm o在出口的数量方面,在配电装置的长度超过6m时,屏后的通道应该有2个出口;在低压配电装置的2个出口之间间距大于15m时,还应该增加通道出口。
但是在这方面的执行不力,一是因为通道宽度不够,二是出口数量也不符合规范要求。
2、变电所内高压电缆截面的选择变电所内高压电缆的截面,主要需按满足短路电流热稳定的要求确定:式中:S—保护导体的截面积,mm2。
厂一通过导体(电缆)的预期故障电流(短路电流周期分量有效值),A;当持续时间小于0.1s时,应计入非周期分量的影响;1值可由《35~6/0.4kV配变电系统短路电流计算实用手册》查到近似值,或经计算得出。
.. .w 10KV及以上变电所电气施工方案
第 二 分 公 司 ..
.w 第 二 分 公 司 .............................................................................................1 1主题容 ....................................................................................................................4 2引用标准 ................................................................................................................4 3施工准备 ................................................................................................................4 4施工程序 ................................................................................................................5 5质量要求及技术措施 ...........................................................................................6 6 质量记录 ........................................................................................................ 20 7 施工机具配置 ................................................................................................ 20 8 施工进度计划及劳动力计划安排 ............................................................... 20 9 施工安全措施 ................................................................................................ 20 ..
.w 目 录 1 主题容 2 引用标准 3 施工准备 4 施工程序 5 质量要求及技术措施 5.1 基础槽钢安装 5.2 盘柜安装 5.3 高压电器安装 5.4 变压器安装 5.5 母线安装 5.6 电缆桥架及支架安装 5.7 接地系统安装 5.8 部电缆敷设及接线 6 质量记录 7 施工机具配置 8 施工进度计划及劳动力计划安排 9 施工安全措施 ..
.w 1 主题容
10KV及以上变配电所电气安装工程包括下列主要容: 高压开关柜;直流盘及控制、保护盘;低压开关柜;高压电器;电力变压器;电缆桥架及电缆支架;电力电缆及控制电缆;接地极及接地线。 在施工时,应根据施工设计文件据实统计工程量。 2 引用标准
GBJ148-90 电气装置安装工程电力变压器、油浸电抗器、互感器施工及验收规 GBJ149-90 电气装置安装工程母线工程施工及验收规 GB50168-92 电气装置安装工程电缆线路施工及验收规 GB50169-92 电气装置安装工程接地装置施工及验收规 GB50171-92 电气装置安装工程盘、柜及二次回路接线施工及验收规 GBI147-90电气装置安装工程高压电器施工及验收规 HG20237-94 化学工业工程建设交工技术文件规定 SHJ3505-99 石油、化工施工安全技术规程 3 施工准备
3.1 认真熟悉图纸,了解工程中电气设备的几何尺寸。 3.2 配合土建做好各项预埋及预留孔工作,保证其位置及尺寸正确无误。 3.3 备齐施工用料及施工机具。 3.4 做好施工用电准备工作。 3.5 与质检部门一起进行工程设备及材料的检验工作。要求设备材料的规格、型号、数量应与图纸一致,并有合格证,同时应符合规要求,做好检验记录。 ..
.w 4 施工程序
施工程序见图4.1
变压器室母线安装 电缆桥架及支架安装 电缆桥架及 支架安装 高压电器母
线安装
基 础 槽 钢 安 装 高压柜及控制盘安装 变压器抽芯
检查
主母线及小母线安装 变压器及附
件安装
低压柜安装 主母线安装 高压电器安
装前检查
高压电器安装调整
接地系统安装 调 试 电缆敷设及接地 ..
.w 图4.1 施工程序图 5 质量要求及技术措施
5.1 基础槽钢安装 5.1.1 基础槽钢安装后,其顶部宜高出抹平地面10mm,高压柜(手车)应按产品技术要求执行,或与建设单位协商,按建设单位 要求施工。 5.1.2 基础槽钢安装后,其偏差应在以下围: 不直度<1mm/m 全长<5mm 水平度<1mm/m 全长<5mm 位置误差及不平行度 全长<5mm 5.1.3 基础槽钢安装后,应采用水准仪进行检验,符合要求后方可进行固定。 5.2 盘柜安装 5.2.1 盘柜安装前,建筑工程应具备下列条件: a) 屋顶、楼板施工完毕、不得渗漏; b) 结束室地面工作; c) 门窗安装完毕; d) 室装饰工作全部结束。 5.2.2 盘柜安装时,应先将盘柜按排列位置进行编号、排列,以防盘柜位置调换。 5.2.3 盘柜固定时,主控制盘、继电保护盘和自动装置盘不宜与基础焊死。 5.2.4 盘柜安装后应符合下列要求: 垂 直 度: <1.5mm/m 水平偏差: 相邻盘顶部<2mm 成列盘顶部<5mm .. .w 盘 面: 相邻盘边 <1mm
成列盘面 <5mm 盘间接缝: <2mm 5.3 高压电器安装 5.3.1 设备安装前,建筑工程应具备下列条件: 5.3.1.1 屋顶、楼板施工完毕,不得渗漏。 5.3.1.2 室地面的基层施工完毕,并在墙上标出地面标高;在配电室,设备底座及母线的构架安装后,作好抹平地面的工作;配电室的门窗安装完毕。 5.3.1.3 预埋件及预留孔符合设计要求,预埋件牢固。 5.3.1.4 混泥土基础及构架达到允许安装的强度和刚度,设备支架焊接质量符合要求。 5.3.1.5 模板、施工设施及杂物清除干净,并有足够的安装用地,施工道路畅通。 5.3.2 断路器的安装 5.3.2.1 断路器安装前要进行检查,到达现场后的保管要符合规要求。 5.3.2.2 空气断路器的安装 a)空气断路器的安装应在无雨雪及无风沙天气下进行;部件的解体检查宜在室或棚进行。 b)空气断路器部件的解体检查应包括:启动阀、主伐、中间伐、控制伐、排气伐等阀门系统及灭弧动触头的传动活塞,灭弧室的主、辅灭弧触头、并联电阻、均压电容,传动部件的检查。 c)空气断路器的组装,要符合国家标准规要求。 d)控制柜、分相控制箱应封闭良好;加热装置应完好。 e)空气断路器的调整,应包括:分、合闸及自动重合闸的最低动作气压及零气压闭锁,分、合闸及自动重合闸时的气压降和动作时间。调整结果应符合产品的技术规定。 .. .w f)分、合闸位置指示器应动作灵活可靠,指示正确。
5.3.2.3 油断路器的安装 a)油断路器的组装,要符合国家标准规要求。 b)油断路器的灭弧室应作解体检查和清理,复原时应安装正确。制造厂规定不作解体检查且有具体保证的10KV油断路器,可进行抽查。 c)油标的油位指示应正确、清晰。 d)油断路器和操动机构连接时,其支撑应牢固,且受力均匀;机构应动作灵活,无卡阻现象。 e)油断路器安装调整,检查结果应符合产品的技术规定。 f)油断路器调整结束后注油前,应进行检查。 5.3.2.4 六氟化硫断路器的安装 a)六氟化硫断路器到达现场后要进行检查、保管,检查结果要符合标准要求。 b)六氟化硫断路器的安装,应在无风沙、无雨雪的天气下进行;灭弧室检查组装时,空气湿度应小于80%,并采取防尘、防潮措施。 c)六氟化硫断路器的组装应符合有关要求。 d)断路器调整后的各项参数,应符合产品技术规定。 5.3.2.5 真空断路器的安装 a)真空断路器到达现场后要进行检查、保管,检查结果要符合标准要求。 b)真空断路器的安装与调整,应符合国家规标准。 5.3.3 断路器的操动机构的安装 5.3.3.1 断路器的操动机运到现场后的检查、保管要符合要求。 5.3.3.2 操动机构的安装应符合下列要求: a)操动机构固定应牢靠,并应与断路器底座的标高相配合,各片间应焊牢。