吊篮拆除旁站记录范文英文回答:Title: Dismantling Scaffold Record.Introduction:Today, I would like to share with you my experience of dismantling a scaffold. It was a challenging task that required careful planning and coordination. In this record, I will describe the process, the challenges faced, and how we overcame them.Process:Firstly, we conducted a thorough inspection of the scaffold to ensure its stability and identify any potential hazards. We checked the connections, platforms, and safety measures such as guardrails and toe boards. Once we were confident that it was safe to proceed, we began thedismantling process.We started by removing the platforms one by one, starting from the top. This required us to carefully disconnect the platforms from the scaffold frame and lower them down using a hoist. It was crucial to ensure that the platforms were securely fastened to the hoist and that no loose materials were left behind.Next, we disassembled the scaffold frames, starting from the top and working our way down. We carefully removed the cross braces and vertical posts, ensuring that each component was properly labeled and stored for future use. It was important to maintain a clean and organized work area to prevent any accidents or injuries.Challenges and Solutions:During the dismantling process, we encountered several challenges. One of the challenges was the limited space around the scaffold, which made it difficult to maneuver the equipment and materials. To overcome this, we had tocarefully plan our movements and coordinate with other workers to ensure everyone's safety.Another challenge was the presence of overhead power lines near the scaffold. We had to be extremely cautious to avoid any contact with the power lines, as it could lead to serious accidents. We used insulated tools and followed strict safety protocols to minimize the risk.Furthermore, weather conditions posed a challenge. On one particular day, it started raining heavily, making the scaffold slippery and dangerous to work on. We immediately halted the dismantling process and waited for the rain to stop. Safety was our top priority, and we were not willing to compromise it for the sake of speed.Conclusion:In conclusion, dismantling a scaffold requires careful planning, coordination, and adherence to safety protocols. It is essential to conduct thorough inspections, ensure proper labeling and storage of components, and maintain aclean and organized work area. Challenges such as limited space, overhead power lines, and adverse weather conditions can be overcome with proper planning and a focus on safety. Dismantling a scaffold may be a challenging task, but with the right approach, it can be completed safely and efficiently.中文回答:标题,吊篮拆除记录。
旁站监理记录表
工程名称:秦灶人才市场幕墙工程编号:
日期及气候:年月日℃~℃工程地点:工农路永和路路口
旁站监理的部位或工序:裙□ 主□ 楼立面
旁站监理开始时间:旁站监理结束时间:
施工情况:
施工单位安全管理人员到场情况:,本次施工单位进行吊篮安装特种人员人,本次安装吊篮台,工人是□ 否□ 严格按照吊篮安装规范及专项施工方案中的施工方法及顺序进行施工。
监理情况:
吊篮安装特种施工人员证件是□ 否□ 齐全有效
吊篮安装方案是□ 否□ 报监理单位审核
是□ 否□ 由施工单位技术负责人进行技术交底
施工单位安全员是□ 否□ 到位
是□ 否□ 进行安全技术交底后开始施工
对本次吊篮安装是□ 否□ 进行了全过程旁站监理。
发现问题:
处理意见:
备注:3
施工企业:
监理企业:
项目经理部:
项目监理机构:
质检员(签字):
旁站监理人员(签字):
年月日