缩写说明

Metrics:

HR Dept.:

Lost Work Day Case Rate

Quality Dept.:

COQ: Cost of Quality (质量成本)

WIR: Wiring Incident Report (配线报告)

FTQ: First Time Quality (

WFCC: Worldwide Formal Customer Complaint (所有客户正式的反馈)PPM: Pieces per Million (一百万产品)

RRPPM: Return & Reject Piece Per Million (不合格部品多少钱)IPTV: Incident Per Thousand Vehicles (运输中发生的事故部品)

Engineering Dept.:

C/O: Changeover time (对策转变时间)

C/T: Cycle Time (周期时间)

PDT: Planned Downtime (计划停产期)

LT: Lost Time (损失时间)

DT: Downtime (停产期)

OA: Operational Availability (操作可行性)

OE: Operational Effectiveness(效力的可行性)

PC&L Dept.:

OEM:On time Shipments (及时出货)

IPM: Incident Per Million (事故损失的钱数)

E&O: Excess & Obsolete (超额完成&荒废的)

PRR: Problem Resolving Request (问题分析请求)

MU: Material Utilization (材料的利用)

Others:

Tpct: Total Production Cycle Time (整体生产周期)

MCR: Material Cost Reduction (材料成本的精简)

6SIGMA

DMAIC: Define, Measure, Analysis, Improve, Control

VOC: Voice of Customer

CTQ: Critical to Quality

SIPOC: Supplier, Input, Process, Output, Customer

I&CIM: Innovation, & Continuos Improvement

TMAP: Though Map

PMAP: Process Map

MSE: Measure System Evaluation

FMEA: Failure Modes and Effects Analysis

NEM: Numerical Evaluation of Metrics

ANOVA: Analysis of Variance

DOE : Design of Experiments

LEAN

1.DMS -- Delphi Manufacturing system

EEI : Employee Environment & Involvement

WPO: Workplace Organization

QS: Quality System

OA: Operational Availability

MM: material movement

MSD: Manufacturing System Design

2.KMS -- Kaizen Manufacturing system

3.OSKKK -- Observation, Standardization, Kaizen, Kaizen, Kaizen ……

4.PFP -- People Focus practice

5.VSM— Value Stream Mapping

6.TPM: Total Production Maintenance

7.PMP: Production Maintenance Partnership

8.PM: Planned Maintenance

9.TPS: Toyota Production System

10. SMED: Single Minutes of Exchange Die

12. FIFO: First In First Out

13.5S: Clear (Sort), Organize ( Straighten), Clean(Sweep), Maintain

(Standardize), Continuous Improvement ( Sustain)

14.NWG: Natural Work Group

15.WIP: Work In Process

16.PFEP: Plant For Every Part

17.JIT: Just in Time

18.PDCA: Plan – Do – Check – Action

19.SQIP: Supplier Quality Improvement Process

20.VOC: Voice of Customer

21.MSDS: Material Safety Date Sheets

22.PDP: Product Development Process

23.PTC: Protect The Customer

24.APQP: Advanced Product Quality Planning

25.SPDP: Supplier Performance Development Process

26.QSA: Quality System Assessment

27.SPC: Statistic Process Control

28.PDAP: Production Part Approval

29.DBS: Delphi Business System

30.MSA: Measurement System Analysis

31.FMEA: Failure Mode and Effects Analysis

32.TLCC: Total Life Cycle Cost

Each Function

HR Dept:

HR: Human Resource

PBP: People Business Plan

NWG: Natural Work Group

PPI: People Performance Index

MSDS: Material Safety Data Sheets

OSHA : Occupational Safety and Health Administration

IS&S Dept.

IS&S: Information System and Service

IT: Information Technology

FS: Fourth Shift

MRP: Material Requirement Plan

ERP: Enterprise Resource Plan

SAP: System, Application & Products

JIT: Just – In – Time

SILS: Supply in Line Sequence

OA: Office Automation

ISP: Information Security Policy

FIS: An information System Supporting Audi A4 Production in FAW-VW BF: Back Flush

OS: Operation System