[最新]部编人教版五年级上册教学进度表.doc

  • 格式:doc
  • 大小:108.50 KB
  • 文档页数:2

2019-2020学年度第一学期五年级语文(上册)教学进度表
十八2019.12.30—
期末考试
—2020.01.3
1、Thank you very much for taking me with you on that splendid outing to London. It was the first time that I had seen
the Tower or any of the other famous sights. If I'd gone alone, I couldn't have seen nearly as much, because I wouldn't
have known my way about.The weather was splendid on that day, which I thought was rare. I still remember some people
told me that in Britain there was weather and no climate. During the same day, it might snow in the morning, rain
at noon, shine in the afternoon and be windy before the night falls. So I think I was lucky。

20.8.168.16.202011:1511:15:01Aug-2011:15
2、最困难的事情就是认识自己。

二〇二〇年八月十六日2020年8月16日星期日
3、有勇气承担命运这才是英雄好汉。

11:158.16.202011:158.16.202011:1511:15:018.16.202011:158.16.2020
4、与肝胆人共事,无字句处读书。

8.16.20208.16.202011:1511:1511:15:0111:15:01
5、阅读使人充实,会谈使人敏捷,写作使人精确。

Sunday, August 16, 2020August 20Sunday, August 16, 20208/16/2020
6、最大的骄傲于最大的自卑都表示心灵的最软弱无力。

11时15分11时15分16-Aug-208.16.2020
7、志气这东西是能传染的,你能感染着笼罩在你的环境中的精神。

那些在你周围不断向上奋发的人的胜利,会鼓励激发你作更艰苦
的奋斗,以求达到如象他们所做的样子。

20.8.1620.8.1620.8.16。

2020年8月16日星期日二〇二〇年八月十六日
8、时间是一位可爱的恋人,对你是多么的爱慕倾心,每分每秒都在叮嘱:劳动,创造!别虚度了一生!
11:1511:15:018.16.2020Sunday, August 16, 2020。