测力环说明书
- 格式:doc
- 大小:12.50 KB
- 文档页数:3
测力环说明书,测力环测力计测力环测力环说明书测力环测力计测力环量程范围:1.2-300kN 功能:测力环结构公道、操纵方便,适用于各种型号路面材料强度试验仪、承载比试验仪、电动应变无侧限压力仪、土基试验仪等公路仪器标准力值的试验。
测力环(1级精度压式测力环2-100KN)测力环(0.3级精度测力环0.1-1.5KN)测力环(0.3级精度拉压式测力环3-10KN)测力环(0.3级精度拉压式测力环30-300KN)测力环(0.3级精度压式测力环600-5000KN)数字测力环(0.1级精度拉压式100N-5000KN)技术参数:示值重复性相对误差不大于0.3% 示值进回程相对误差不大于1.5% 示值长期稳定度(三个月)不大于0.3% 回零偏差不大于0.2个分度灵敏度所不大于0.2个分度对应的力值测力环说明书测力环技术参数:示值重复性相对误差不大于0.3%示值进回程相对误差不大于1.5%示值长期稳定度(三个月)不大于0.3%回零偏差不大于0.2个分度灵敏度所不大于0.2个分度对应的力值。
标准测力仪,测力环,测力计,标准测力环技术参数1、本测力仪精度为常用的0.3和0.1级标准测力仪。
2、本测力仪的有效丈量范围为最大量程的10%至最大量程。
技术特点1、本测力仪表与传感器可以组成0.1级、0.2级、0.3级、0.5级的标准测力仪。
2、3000型多通道专业仪表在使用时,可智能判定传感器量程,插上即用,不需要切换通道,操纵简单、使用方便。
3、采用∑-△24位A/D转,有可编程增益放大、输出滤波、偏移寄存器调零功能。
4、本测力仪具有稳定的16位分辨率,内部分度数为传感器满量程的1/65000。
5、本测力仪丈量正确度:0.005%FS6、本测力仪供电电源:220vAC±10%, 50HZ,7、本测力仪传感器激励电压:5vDC8、显示:六位数码管动态扫描显示9、测力仪标定方法:用键盘标定(有两种方法):测力环说明书①传感器线性段修正. 该仪表具有对传感器满量程的线性修正有以下四种:A.10%、20%、50%、100%四段线性修正.B.10%、20%、40%、60%、80%、100%六段线性修正;C.10%、20%、30%、40%、50%、60%、70%、80%、100%九段线性修正;D.5%、10%、20%、30%、40%、50%、60%、70%、80%、100%十段线性修正能力,进步了系统的丈量正确度。
KH2便携式测力仪表使用说明书目录1注意事项 (1)2功能与特点 (1)3型号与技术规格 (2)3.1型号规格 (2)3.2技术规格 (2)3.3产品外形及尺寸 (3)4使用 (3)4.1电源 (3)4.2传感器接口 (3)4.3按键 (4)4.4标定(校准) (4)4.5系统设置菜单 (6)4.5.1日期时间设置 (6)4.5.2显示亮度 (7)4.5.3 定时关机 (7)4.5.4 上下限设置 (7)4.6删除记录 (7)4.7设备信息 (7)4.8查看记录 (7)4.9工作界面 (8)5其它注意事项 (8)1注意事项感谢您购买KH2便携式测力计。
为了确保产品正确使用,请在使用之前仔细阅读本手册。
收到产品后请根据随机装箱清单检查包装内物品是否齐全或损坏。
请核对您收到的产品型号是否与订单一致。
产品型号在产品上方的铭牌标签上。
如发现新开箱产品有部件遗漏,损坏,或型号规格不一致情形,请准备好证据(如订单号,收货日期,产品序列号)并及时与我公司最近的办事处,授权机构,或售后服务部联系。
电源:本仪表内置3.6V/2300mAh耐低温锂电池。
请用标配的电源适配器进行充电。
请在常温环境充电。
报废的电池请妥善处理,不能随便丢弃。
2功能与特点KH2系列便携式测力计采用先进的Cortex-M3单片机平台,精密ADC转换器,通过外接的应变式传感器,测量实时力值。
仪表内置耐低温锂电池,自发光OLED显示器,可以实现上下限判断,20笔存储信息。
KH2主要功能特点:⏹便携式设计,传感器接口采用军标航空插头⏹具有实时时钟⏹内置耐低温锂电池⏹可保存20条记录⏹汉化界面,导航式菜单⏹上下限声光报警3型号与技术规格3.1 型号规格3.2 技术规格产品尺寸(WxHxD)103mm×220mm×40mm。
产品自重约0.4kg传感器接口驱动最多2只350Ω传感器,或等效阻抗大于175Ω的传感器负载。
输入信号范围:-6mV ~ +6mV。
9257b测力仪使用手册
9257B测力仪使用手册:
1.注意事项。
使用前应确认测力仪所需的电力供应是否正常,如需使用电源,请将测力仪正确连接至电源。
检查测力仪的显示屏和按钮是否正常,如有异常应立即停止使用,并联系维修人员进行检修。
检查测力仪的传感器和连接线是否完好,如有损坏应及时更换,并确保连接稳固。
2.操作步骤。
将待测物体放置在测力仪的测试平台上,确保物体处于水平状态。
打开测力仪的电源开关,按下清零按钮,将待测物放在测试台中间,轻按置零按钮,此时显示力值。
3.保养事项。
保持测力仪干燥、清洁,定期清理传感器上的铁屑等杂物。
动力学测试仪器操作指南说明书1. 简介动力学测试仪器是一种用于测量物体运动特性的设备。
本操作指南说明书旨在帮助使用者正确操作该仪器,以获得准确可靠的测试数据。
2. 仪器结构与功能动力学测试仪器由以下几个部分组成:- 主机:用于提供测试所需的力学驱动和控制系统。
- 传感器:用于测量物体的位移、速度和加速度等物理量。
- 数据采集系统:用于记录并分析传感器采集到的数据。
- 电源系统:提供仪器运行所需的电力。
- 控制面板:控制仪器的开关、参数设置等功能。
3. 使用前的准备- 仔细阅读本操作指南,熟悉仪器的结构和功能。
- 确保仪器与电源连接正常,并进行必要的校准。
- 检查传感器的安装是否正确,并确保传感器与仪器主机的连接牢固可靠。
4. 操作流程4.1 打开仪器电源- 将电源线插入电源插座,并接通电源开关。
- 确保电源指示灯亮起,表示仪器已成功开机。
4.2 设置测试参数- 根据具体需求,在控制面板上设置测试的时间间隔、采样率和测量单位等参数。
- 确认参数设置无误后,按下确认键。
4.3 安装待测物体- 使用适当的工具将待测物体固定到测试台上,确保其牢固稳定。
- 检查待测物体的位置与传感器位置的对应关系,确保能够准确测量。
4.4 开始测试- 在控制面板上选择开始测试的指令。
- 仪器将根据预设参数自动开始记录传感器采集到的数据。
- 测试期间,可以实时监测数据曲线,并根据需求暂停、继续或停止测试。
4.5 结束测试- 在测试时间结束或达到预设的测试点后,选择结束测试的指令。
- 仪器将停止记录数据,并自动保存测试结果。
5. 数据分析与报告- 通过数据采集系统,可以对测试结果进行分析和处理。
- 利用分析软件生成测试报告,包括数据曲线图、统计参数等信息。
- 根据测试需求,将测试报告导出或打印出来,以便进一步研究或归档保存。
6. 注意事项- 在操作仪器之前,务必熟悉操作指南,并按照说明正确操作。
- 避免超出仪器的额定工作范围,以免对仪器造成损坏。
RFP-03智能型测力仪说明书RFP-03型智能测力仪说明书一、主要规格及技术参数电源:~380 ±10% V / 50 Hz;仪器功耗:≦20W;温度:-10 ?C - 40 ?C;湿度30 % - 85 %;外形尺寸:360×215×145(开空尺寸345×260×130)(宽×深×高);打印纸尺寸:57㎜宽(热敏打印纸);仪表保险丝:15A、1A;测力:解析度:1/100000;非线性重复性误差:≦±1%;精度: 0.5%以上(一般可达到0.02%FS);测量范围:50kN ~3000 kN任意设定;分辨率:3位小数(量程≦100kN),2位小数(量程≦3000kN)采样。
频率:80次/秒二、二.功能1.时钟:年、月、日、时、分、秒。
2.组号设定:000001——9999993。
3.截面设定:抗折抗压试块。
用于非标试件抗压(无需输面积)--(0)用于100×100㎜的立方体抗压试块--(1)用于150×150㎜的立方体抗压试块--(2)用于200×200㎜的立方体抗压试块--(3)适用于任意截面的抗压试块(需输面积)--(4)用于150×150×550㎜的抗折试块--(5)用于100×100×400㎜的抗折试块--(6)用于40×40×160㎜的抗压试块--(7)用于70.7×70.7㎜的立方体抗压试块--(8)用于砖块抗折(需输入长度、宽度、高度)--(9)三、功能和操作介绍1.按键功能说明本仪器共用24个按键,各按键的作用与功能如下:功能待机状态下按此键,进入各项功能的选择确定参数输入状态下为确认输入的内容复位返回待机界面删除用于清除输入的数字启动油泵电机,启动停止油泵电机,停止清零用于对力值清零1、2、3、4、5、6、7、8、9、0直接输入数字信息本仪表应安装在试验机某个固定位置,输入电源和输出电源、传感器接口等全部在仪器后部相对应的插座内,仅须将插头和相对应的插座对好,插好并拧紧就行。
数字式测力仪使用说明书使用前,请务必阅读使用前,在阅读使用说明书的同时,还要认真阅读“安全注意事项”,做到正确使用。
FGJ-1/2/5/10/20/5093562A安全注意事项●阅读完使用说明书后,请务必保管在使用者能随时看得见的地方。
安全注意事项使用时的注意事项1.本产品的特征 42.确认附属品 43.各部位的名称和作用 5 3.1.主体部分 53.2.显示部分 63.2.1.各部位的名称 63.2.2.数值显示部位 63.2.3.单位显示部位 63.2.4.峰值保持显示部位 64.使用前注意事项 7 4.1.充电 7 4.2.计测头的安装 7 4.3.吊架的安装 7 4.4.跟踪功能 84.5.功能设定 84.5.1.设定显示符号:f01 94.5.2.设定显示周期: f02 94.5.3.设定电源自动关闭: f03 94.5.4.结束功能模式 10 4.6.上下倒转显示 105.功能及操作 115.1.操作概要 115.2.计测模式 115.2.1通常计测模式 115.2.2峰值保持模式 11 5.3.单位切换功能 125.4.归零功能 126.常见问题 12 6.1.无动作、或疑为故障的问题 126.2.其它的一般问题 127.保证 138.规格和外形尺寸 13目录1.本产品的特征●额定容量10.00N(1000gf,2000lbf)~500.0N(50.00kgf,100.0lbf)之间的全系列机种 → 见8.规格和外形尺寸●采用简单操作可实现显示数值和显示单位倒转的倒转式显示 →见4.6.上下倒转显示●一键操作可实现N、kgf(gf)、lbf等各单位的切换 →见5.3.单位切换功能●可分别计测正值和负值的峰值(峰值保持) →见5.2.2.峰值保持模式●1000次/秒的高速峰值计测 → 见5.2.2.峰值保持模式●最高可从5次/秒选择计测次数(表示周期) → 见5.2.1.通常计测模式2.确认附属品3.各部分的名称和作用 3.1.主体部分① 計測軸施加推拉力的螺栓。
CL-03智能测力仪使用说明书本仪器能够把测得的力值数据由单片机根据使用要求进行数字化处理,可配套用于各种压力机、试验机的显示控制部分,用途广泛。
九、主要技术参数额定工作电压:~380V±10%V,50Hz工作环境温度:0~40℃功耗:≤30VA外形尺寸:360*140*210(开孔尺寸345*125)印纸尺寸:57mm仪表保险丝:8A十、功能简介1时间显示:年、月、日、时、分2试件截面代号设定:1----用于截面为100mm×100mm的立方体抗压试件2----用于截面为150mm×150mm的立方体抗压试件3----用于截面为200mm×200mm的立方体抗压试件4----适用于任意截面的抗压试件5----用于截面为150×150×550mm的抗折试6----用于截面为100×100×400mm的抗折7----用于截面为40×40×160mm的抗压试8----用于截面为70.7×70.7的立方体抗压试3 数据存储:本仪器具有数据记忆的能力。
本仪器编号为000~9998#,每组测试单元包括3或6个测试值及强度平均值。
十一、安装与操作1、打印纸的安装方法介绍如图所示第一步骤:打开打印机盖,并把打印纸放进卷纸仓中,同时将打印纸穿出打印机盖,打印纸正反位置不要放错。
第二步骤:把橡皮滚轴装入对应的卡口处。
第三步骤:调整橡皮滚轴位置,用力按住橡皮滚轴,同时拉动打印纸,检查其是否正常转动。
第四步骤:按装完成后,盖上打印机盖,并测试正常打印。
2.钟设定:次使用时或使用较长时间后,应对本机的时钟进行检查设置,正常使用时无须设定。
按“时钟”键,仪表显示如:窗1显示:“—2010”,表示年,窗2显示:“02-25”表示月、日。
如果不正确可输入数字键修改闪烁位,按“退出”键移动闪烁位,修改完年月日后按“确认”键,仪表:窗1显示:“---08”表示小时。
检力器使用方法
一、准备工作
在使用检力器之前,需要做好以下准备工作:
1. 检查检力器的外观和结构,确保没有损坏或异常。
2. 确认检力器的量程和精度符合使用要求。
3. 准备好需要测量的物品,并确保其尺寸和重量在检力器的测量范围内。
二、校准
为了确保检力器的测量准确性,需要在使用前进行校准:
1. 将检力器放置在平稳的地面上,调整检力器的位置和角度,使其稳定。
2. 使用标准砝码对检力器进行校准,确保测量结果的准确性。
3. 如果检力器长期未使用或经过修理,也需要进行校准。
三、放置物品
在放置物品时,需要注意以下几点:
1. 将物品轻轻放置在检力器的台面上,避免对检力器产生过大的冲击或振动。
2. 确保物品放置的位置与台面中心基本一致,以保证测量的准确性。
3. 如果物品的尺寸较大或形状不规则,需要适当调整检力器的位置或采用相应的附件来辅助测量。
四、读取数值
在读取数值时,需要注意以下几点:
1. 确保检力器的指针稳定后,再读取测量结果。
2. 读取数值时,应该避免视线与指针之间存在折射或反射,以免影响读数的准确性。
3. 如果需要多次测量,需要取平均值以减小误差。
五、清理
在清理时,需要注意以下几点:
1. 使用柔软的湿布擦拭检力器的台面和外壳,以保持清洁。
2. 避免使用含有化学物质的清洁剂,以免对检力器造成损害。
3. 在清理过程中,需要避免对检力器产生过大的力量或碰撞。
六、存储
在存储时,需要注意以下几点:
1. 将检力器放置在干燥、通风的地方,避免阳光直射和潮湿环境。
测力环安全操作及保养规程测力环是一种常见的力测量工具,广泛应用于制造业、航空航天、电力等领域,但是使用测力环也存在一定的危险性,因此需要了解安全操作和保养规程,以保证使用过程中的安全和使用寿命的延长。
安全操作规程1.选择合适的测力环:在使用测力环前,需要选择合适的类型和规格,以确保能够满足测量需求并安全承载所测量的力。
2.确定安装位置:需要在安装时选择好合适的位置,并确保安装牢固可靠,防止意外脱落。
3.注意测力环的安装方向:要确保测力环的顶点朝向上方,以避免使用中的误差。
4.避免使用超载:在测量前需要先了解测力环的额定负荷,避免超过该负荷,以免对测力环造成损坏。
5.防止碰撞:在使用中需要注意防止测力环受到碰撞,尤其是避免与硬、尖锐的物体接触。
如果发生碰撞需要及时进行检查并进行修复和更换。
保养规程1.定期检查:需要定期将测力环拆卸进行检查,检查包括各部件是否存在损坏、紧固件是否松动、传感器是否误差等,并根据检查结果进行相应修复或更换。
2.防潮防尘:在使用测力环过程中,需要注意防潮防尘,以免对传感器造成损伤。
建议在不使用测力环的情况下将其存放在干燥的地方,避免受潮。
3.避免过度使用:在使用测力环时,要避免过度使用,以免对测力环传感器造成负担。
并控制温度变化,避免大温度变化。
4.定期标定:测力环在使用一段时间后,需要进行标定,以保证读数的准确性。
标定周期不宜过长,建议每半年至一年进行一次异地标定。
总结测力环的正确使用和保养,是确保测量准确性和延长使用寿命的必要手段。
同时,需要在使用中遵循安全操作规程,保证人员安全。
用户还需认真研读测力环的使用手册,了解产品使用和规则,以充分发挥测力环的测量效果。
INSTRUCTION MANUALELECTRICAL LOAD CELLModel ANCLORoctest Limited, 2017. All rights reserved.This product should be installed and operated only by qualified personnel. Its misuse is potentially dangerous. The Company makes no warranty as to the information furnished in this manual and assumes no liability for damages resulting from the installation or use of this product. The information herein is subject to change withoutnotification.Tel.: 1.450.465.1113 • 1.877.ROCTEST (Canada, USA) • 33 (1) 64.06.40.80 (Europe) • • www.telemac.frE1033-170413TABLE OF CONTENTS1PRODUCT (2)1.1D ESCRIPTION (2)1.2S PECIFICATIONS (2)2INSTALLATION (3)2.1C ABLE INSTALLATION (4)2.2E LECTRICAL SPLICES (5)2.3C ABLE WIRING (5)2.4L IGHTNING PROTECTION (5)3DATA READING AND ANALYSIS (7)3.1G ENERAL (7)3.2R EADING O UTPUT IN ENGINEERING UNITS (7)3.3R EADING O UTPUT IN M V/V (9)3.4D ATA REDUCTION (12)3.5V ERIFICATION OF CELL CIRCUIT (13)3.6P OTENTIAL EFFECTS OF INSTALLATION OVER READINGS (13)4MISCELLANEOUS (14)4.1C ONVERSION FACTORS (14)4.2C ALIBRATION DATA SHEET (15)4.3W IRING DIAGRAM (17)1PRODUCT1.1DESCRIPTIONANCLO load cells are used to measure tensile loads in tie-back anchors and rockbolts, or compressive loads in structures. Typical applications include:∙ Anchored retaining walls, tieback.∙ Anchoring systems for deep excavations∙ Tie-down anchors for buoyant structures∙ Rockbolts and soil nails monitoring in mines and slope stabilization∙ Load monitoring in structures∙ To check on the load as determined by hydraulic pressure applied to a jack during proof-testing on tiebacks. Note that in this case because of many parameters, the agreement cannot be guaranteed better than +/-20%.The load sensing element is a spool of high strength heat-treated steel that withstands rough handling and loading. The ANCLO load cell is built with a hollow cylindrical core onto which four to eight strain gages are bonded in pairs at 90o intervals around the periphery and connected in a Wheatstone bridge circuit. Load cells less than 152 mm in internal diameter use four bonded strain gages whereas 152 mm or larger internal diameter load cells use eight pairs of bonded strain gages. The gages are wired in a full bridge configuration for temperature compensation, optimum sensitivity and the accurate measurement of non-uniformly distributed loads. A steel housing with o-ring seals covers the spool and protects the strain gauges from mechanical damage and water infiltration. The plain PVC or armor-jacketed electrical cable connects to the cell by∙either a detachable multi-pin electrical connector mounted on the cell∙or permanent factory wiring of the lead cable to the cell. The cable enters the cell through a watertight electrical connectorThe load cells are protected against moisture intrusion and are splash proof.An identification plate on the outside of the cell holds the following information: ∙The serial number∙The capacity of the cell in kN1.2SPECIFICATIONS2INSTALLATIONThe load cell support surface should be smooth and perpendicular to the axis of the anchor or tieback. The use of a load bearing plate of suitable thickness between cell base and the bearing surface, and a load distribution plate between the anchor or tieback head and the load cell is required.Load distribution on bearing plates that are too thin or improperly dimensioned will result in uneven load distribution causing erroneous results. The inside diameter of the load bearing and distribution plates should be identical to the inside diameter of the load cell.The load distribution plate can be either a single plate or double spherically seated plates. Use of latter can compensate for misalignment of the bearing surface, load cell and distribution plate. Upon installation, locate the electrical connector downward to minimize the risk of damage.TABLE 1: Wiring code for connecting load cell to a “P3” readout unit.Load cells are accurate instruments and should be treated with care. They should under no circumstances be picked up by the cable. Even if the cells have been designed to be watertight and robust, they can be damaged by misuse, particularly with respect to the cable. Load cells have to be installed with a special care to their installation. From the design arrangements comes the quality of the measurements. The installation design should minimize the eccentric loading and the misalignment of load, whatever the context of measurement (tie-backs, pile test …). Therefore, cells have to be set between two flat, smooth and stiff plates. The wall where the tie-back applies or the top of the pile during a load test should be plane as well. If necessary, make it so with cement or concrete. If the cells are installed on tie-backs, bushings are often useful to center the hollow cylinder.Figure 1: Anclo typical installation on a tie-back2.1CABLE INSTALLATIONCable identificationThe electrical signal coming from the sensor is transmitted through an electrical cable. This cable is generally supplied in rolls. Cables are identified with the serial number that is labelled on the sensor housing. The serial number is stamped on a tag that is fastened to the readout end of the cable. In the case where the sensor cable has to be cut or if the cable end is inaccessible, make sure to be able to identify it (by marking its serial number for instance with an indelible marker or using a color code). It is very important to clearly identify the instrument for reading or wiring purposes.Cable routingSome of the more important considerations that must be given to cable runs are: ∙Avoid traversing transition zones where large differential settlements could create excessive strain in the cable.∙Avoid cable splices. If necessary, refer to the special paragraph below.∙Do not lay cables one on top of the other.∙Use horizontal snaking or vertical snaking of the cable within the trenches. For most materials, a pitch of 2 m with amplitude of 0.4 m is suitable. In very wet clays increase the pitch to 1 m.∙Use a combination of horizontal and vertical snaking at transition zones.Once a cell is installed, route its cable towards the junction or switching box. Make sure that the cable is protected from cuts or abrasion, potential damage caused by angular material, compacting equipment or stretching due to subsequent deformations duringconstruction or fill placement. If necessary, run the cable through rigid or flexible conduit to the terminal location. To provide protection for cable running over concrete lifts, hand placed concrete is sometimes used, depending on site conditions. Check that the cable does not cross over itself or other cables in the same area. Surface installations require continuous surveillance and protection from the earth moving equipment circulating on the field. During the cable routing, read the instruments at regular intervals to ensure continued proper functioning. Record the cable routing with care and transfer this routing to the drawings.2.2ELECTRICAL SPLICESGenerally, cable splices are to be avoided. If necessary, use only the manufac turer’s approved standard or high-pressure splice kit. Splicing instructions are included with the splice kit. Should the cable be cut, we recommend the use of our cable splice kits, especially if the splice is located underwater. Furthermore, in special cases on site (large distance between sensors, readout position for example), splices are useful to limit the number of cables to lay. Individual sensor cables can be merged into a multi-conductor cable using a splice or a junction box.Figure 2: Example of junction box usePlease contact Roctest for additional information about junction boxes and splice kits.2.3CABLE WIRINGBefore cutting a cable, make sure of its identification. Strip back the conductor insulation by about 1cm. If possible, tin the exposed conductors with a solder.2.4LIGHTNING PROTECTIONAt all times during the installation, any cable that is exposed to potential damage by lightning must be protected. A large grounded metal cage placed over the cable bundle, combined with direct grounding of all leads and shields is an effective way to prevent lightning damage to the instruments and cables during the installation process. Please contact Roctest for additional information on protecting instruments, junction boxes and data logging systems against power surges, transients and electromagnetic pulses. Alljunction boxes and data logging systems furnished by Roctest are available with lightning protection.3DATA READING AND ANALYSIS3.1GENERALEach load cell comes with a calibration certificate. The certificate lists the sensitivity factor used with a P-3 VISHAY strain indicator or equivalent.Read each load cell immediately prior to installation. Record each reading under no-load conditions and compare it with the initial value on the calibration data sheet. Readings should agree within +/-0.025mV/V. ANCLO load cells are temperature compensated for a range of -40 °C to +75 °C for equilibrium temperature conditions. It is recommended to protect it from direct sunlight.If there is a wide discrepancy during storage temperature of the cell and the ambient temperature prior to installation, the cells should be conditioned to the ambient temperature until temperature equilibrium is reached. This ensures that initial reading, made under no-load conditions prior to installation, is a stable value to which subsequent measurements can be referenced. ANCLO load cells can be read with most strain gage indicators. The following procedure applies to the P-3 VISHAY Micro-Measurements indicators.3.2READING OUTPUT IN ENGINEERING UNITS(For more details on other P-3 features, please refer to “P-3 Strain Indicator and Recorder Instruction Manual”)LCD DisplayKeypadIf you want to see the reading of the load cell directly in engineering units as kN then refer to the following instruction for P-3 configuration. You can connect up to four load cells to a P-3 readout unit as it has four channels available.1.Press POWER key on the face plate2.Press CHAN key“Chan” Sub-menuUse left and right arrows to activate appropriate ChannelConfirm entry by pressing key MENU3.Press BRIDGE key“Bridge” Sub-menuSelect the appropriate ChannelUse left and right arrows to select appropriate bridge type.For ANCLO Load Cell, select “Undef FB” for each channel to be used.Confirm entry by pressing key MENU4.Press GF/SCALING key“Chan” Sub-menuUse left and right arrows to select appropriate Channel“Units” Sub-menuSet appropriate unit among available listNote that units are provided for convenience only, and have no effect on the calculated values. In order to properly scale the data, it is necessary to supply the full scale value and the mV/V output at the full scale value.“Full Scale” Sub-menuSet appropriate Full Scale to the full scale value of the load in engineering units as shown on the calibration data sheet.“F.S. mV/V” Sub-menuSet sensitivity at full scale (in mV/V) according to load cell sensitivity value indicated on the calibration data sheet.“Dec.Places” Sub-menuSet the Dec. Places to the correct number in accordance with the units and the full scale reading previously chosen or select Auto for automatic adjustment.To return to reading display, confirm entry by pressing key MENUWe highly recommend to take note now of the no load zero reading.5.Press BAL keyBefore to use the BAL key you should check if the balance is not in the disable mode. Then go to the main menu and select balance. For each channel be sure to select the mode Auto and press key menu to confirm and come back to reading value.The balance will do a null reading to see a value near of zero when there is no load on the load cell.Then press the BAL key on the face plate. Depress the balance button a second time to select auto. This will trigger the auto balance procedure. When completed it will automatically bring up to the Saving Settings menu. Save the settings by depressing the record button on the face plate. The display should now read zero and you are ready to display the load directly in engineering units.Note that the auto balance only works when the load cell is under zero load. Do not switch from one load cell to another if the load cells are under load.For more details on readings relative to an absolute ZERO, refer to “Manual Balance” topic in “P-3 Strain Indicator and Recorder Instruction Manual”.3.3READING OUTPUT IN MV/VThe simplest way to read multiple load cells using the P-3 readout unit is to read the output in mV/V and then use the load cell sensitivity factor in mV/V at full scale to compute the load as shown on the section 3.4.Before to read in mV/V be sure to erase all previous parameters and settings in the readout unit. To erase the settings go to the Main Menu and select Options as shown on following pictures.In the menu OPTIONS select AdvancedAnd select Factory Defaults.Then press the record button on the front panel to restore factory defaults.After erasing the settings, set up the P-3 readout unit as follows:First connect the load cell according to wiring and color code as mentioned on table 1 on channel 1.Then press CHAN key or from the main menu press ‘’select channel’’ and activate all channels where you have connected a load cell. Confirm entry by pressing key MENUThen press “Bridge” Sub-menu, select the appropriate Channel and use left and right arrows to select appropriate bridge type. For ANCLO Load Cell, select “Undef FB” for each channel to be used. Confirm entry by pressing key MENUThen Press GF/SCALING key and in “Chan” Sub-menu use left and right arrows to select appropriate channel. In “Units” Sub-menu set appropriate unit to mV/V like following picture.Be sure in the BAL key menu to disable all channels.Then reading will be displayed in mV/V. See next section for conversion in engineering unit.3.4DATA REDUCTIONReading output in engineering unitIf you display the value in engineering unit on the P-3 readout (section 3.2) then actual load is obtained following this equation:Load = (L - L o)Where L = Current reading in P-3 unitsL o= Initial reading in P-3 unitsLoad = Load in engineering unitsReading output in mV/VIf you display the value in mV/V on the P-3 readout (section 3.3) then actual load is obtained following this equation:Load = Full scale x (L1 - L0)Load cell sensitivity (S)WhereLoad= Applied load in engineering unit (kN)L1= Current reading in mV/VL0= The regression zero no-load reading in mV/V (see calibration data sheet for the value of L0.S= is the load cell sensitivity at full scale in mV/V (see the calibration data sheet for the value)Full Scale= is the full scale capacity of the load cell (see the calibration data sheet for the value)Here is an example based on the calibration data sheet as defined on section 4.2.For example if the current load cell reading is 1.508mV.Load = [2000kN x (1.508mV/V – 0.218mV/V)] / 2.1515 mV/V = 1199.16kN3.5VERIFICATION OF CELL CIRCUITThe cell circuit may be checked by reading resistance and comparing it with values below: ∙Between P+ and P- wires: 700 ohms (1400 ohms when 8 pairs)∙Between S+ and S- wires: idem∙Other combination between wires: 500 ohms∙Between any wire and ANCLO/structure/shield: >1000 Mega ohms3.6POTENTIAL EFFECTS OF INSTALLATION OVER READINGSHollow-center load cells are susceptible to varying conditions of end loading. Eccentric loading, warping of the distribution plate and friction between the distribution plate and the load cell can significantly affect readings. Special precautions must be taken to minimize these effects.Furthermore, cells have to be set between two flat and stiff plates. Thickness of the distribution plate should be at least 25 mm. This thickness should be more important when load range increases and when surfaces of the load cell and the loading element (hydraulic ram) differ. Also, the user may consider asking for doing a calibration using the same distribution and bearing plates he intends to use in the field. Please contact Roctest for more information about distribution plates and calibration.Finally, different friction conditions between the distribution plate and the cell will also affect readings. We suggest using flat, smooth, non-lubricated, plates in the field as we do during calibration. Friction losses within the hydraulic jack can also affect readings.4MISCELLANEOUS4.1CONVERSION FACTORSTABLE 2: Conversion Factors.4.2CALIBRATION DATA SHEETA calibration data sheet is supplied with each load cell. It enables conversion of raw readings into load values. All the sensors are individually calibrated over their working capacity before shipment. The calibration factor coefficient, which is the load cell sensitivity, is obtained using regression techniques through a linear regression formula which may introduce a substantial non-linearity error around the zero reading. See the following page for an example of calibration data sheet.CALIBRATION DATA SHEETLOAD CELLModel: ANCLO-2000Serial number: 33012030Capacity: 2000 kNMax. excitation: 10.00 VDCTemperature: 21 °CCable model: IRC-41ACable length: 12 mColor code: Red: Power P +Black: Power P -Green: Signal S +White: Signal S -Calibration data:Load cell sensitivity: 2.1515 mV/V at full scaleRegression zero (L o): 0.2180 mV/VTraceability no: TR-12-07Certificate no: 033012028-030.xlsxCalibrated by: Eric Tremblay Date: 2017/04/124.3WIRING DIAGRAMFIGURE 3: ANCLO Load cell wiring diagram (Full Bridge Configuration).。
力准lz-801f压力传感器说明书为了进行精确的测试,应校准压力测试传感器。
静态测试只需要静态校准。
要求动态响应的压力传感器需要动态标定。
(1)静态标定。
静标定是指标定系统在静态压力作用下确定压力传感器输出和输入之间的对应关系,确定反映传感器精度的相关指标。
为取得较好的标定精度,作为标定基准的仪器,其精度至少比标定传感器高一个数量级。
常用的静态标定方法有:砝码、杠杆秤、标准测力环、标准测力环、标准测力仪等。
(2)动态标定。
压力传感器动态标定的目的是确定其动态特性,即频率或脉冲响应,从而确定其工作频率范围和动态误差。
动态校准可用正弦响应法和瞬态响应法。
前一种方法是用正弦激振器输入激振信号,得到正弦响应。
正激振器有活塞筒正弦压力发生器、凸轮喷嘴正弦压力发生器等多种装置。
该方法利用专用装置对瞬变力进行振动激励,得到瞬态响应曲线,根据测试记录的数据,用相似方法得到频率特性。
柱塞缸正弦压力源结构图。
柱塞的行程是固定的,通过调节缸体体积可以改变输出压力的幅值,从而实现了输出压力的幅度和频率范围。
该凸轮表面轮廓为正弦波形,其气阻随凸轮面形状的变化而变化,产生压力信号。
当压力传感器的振幅较大、频率范围较大时,其动态响应也是确定的,应答器可以应用于压力传感器的高速响应。
由于激波管加工精度高、设备复杂,在工程实践中,有时采用冲击测试方法对其进行动态测试。
冲击法是一种机械装置撞击被标物传感器,产生瞬时冲击力,记录数据,获取压力传感器动态特性。
撞击法结构简单,使用方便,但误差大。
D810通用测力仪表使用手册前言非常感谢您选用本公司产品!本手册包含产品的警告、注意事项、技术特性、功能特点、包装与外形、安装与接线、菜单结构、工作方式、通讯说明、参数表、保修说明、产品选型等内容。
为了使本产品长期保持最佳工作状态,在使用前,请您认真阅读操作手册,并妥善保管,以备随时查阅。
未经本公司许可,不得转载与复制本手册内容。
修订日期:20210122警告●超过使用环境条件要求,会影响仪表的测量指标和性能,严重时会造成仪表永久损坏!●本产品的安装、调试、维护应由具备资质的工程技术人员操作。
●本公司不承担除产品本身以处的任何直接或间接损失。
●本公司保留未经通知即更改产品说明书的权利。
●请不要使用在原子能以及与生命相关的医疗器械设备上。
●为了防止浪涌发生,请在产品的输入输出信号线上,添加适当的浪涌抑制电路。
●为了防止仪表损坏和防止机器故障,请在与本仪表连接的电源线或大电流容量的输入输出线上,安装适当容量的保险丝类安全断路器件,保护仪表。
●请不要将金属片或导线碎屑混入本产品中,以免导致触电、火灾、故障。
●请确实地拧紧端子螺丝,如果不完全拧紧,可能导致触电、火灾。
●请务必在切断电源后再进行清洁。
●清洁时,请用干的软布擦去本产品的污垢。
请不要使用吸湿剂,否则可能导致变形、变色。
●请不要使用硬物擦蹭或敲打显示部分。
●本产品的安装、调试、维护应由具备资质的工程技术人员操作。
目录1.技术指标 (7)2.功能特点 (8)3.包装与外形 (9)3.1装箱内容 (9)3.2开孔尺寸图 (9)4.安装与接线 (10)4.1安装示意图 (11)4.2接线定义图 (12)5.菜单结构 (13)5.1主要画面说明 (13)5.2按键说明 (13)5.3主界面介绍 (14)5.4标定方式 (14)5.5功能操作 (15)6.工作方式 (17)6.1810-1常规工作模式:E026输入11 (17)6.2810-2峰谷值工作模式:E026输入12 (17)7.通讯说明 (18)7.1串口的设置 (18)7.2Modbus-RTU协议 (18)7.3主动发送协议 (21)7.4通讯可靠性问题 (21)7.5通讯常见问题 (23)8.参数表 (24)8.1功能参数表 (24)8.1.1方式1常规工作模式参数表 (24)8.1.2方式2峰谷值捕获参数表 (28)8.2通讯地址表 (32)9.保修说明 (36)10.产品选型 (36)1.技术指标●测量通道:5V供电,测量精度优于0.05%,测量速度10、20、80、320Hz,温漂小于10ppm。
SYE微电脑力值测量系统使用说明一、概述SYE微电脑力值测量系统,主要适用于各类试验机的力值测量和显示。
SYE微电脑力值测量系统能够将测得的力值数据经由单片机程序,根据实际使用要求进行处理的智能型仪器设备,处理结果既可以通过打印输出,也可以通过通讯端口上传至计算机进行联网分析,使用简便,功能强大,用途广泛。
二、技术参数额定电压: 220V±10%额定功耗:≤50VA非线性重复性误差:≤1%分辨能力:0-199.99kN 为0.01kN200.00-2000.00kN 为0.1kN工作温度: 0-40℃外形尺寸: 370mm×260mm×150mm打印纸尺寸: 4.4cm/16列仪器保险丝: 0.5A三、操作面板图 1.显示部份图 2.操作键盘部分(一)显示部分,见上述图一:第一排数码管:主要用于显示测量力值,输入数据时显示提示或做编辑区用;●第二排数码管:主要用于显示加荷速度,输入数据时作编辑区用;●第三排数码管:专用于显示仪器当前时间,包括年、月日、时分。
(二)操作键盘部分,见上述图二●“0-9”数字键:数字值的编辑输入。
●“模式”键:仪器进入计量标定状态。
测试时按此健可进行“峰值”和“实时”显示切换。
●“置0”键:清除当前仪器当前偏移力值。
●“时钟”键:切换显示仪器当前年、月日、时分等信息和设置时钟。
●“清除”键:编辑输入状态下,将数码管显示值全部置为“0”以便重新输入。
长按此健并输入“1234”可清除以前测试记录。
●“打印”键:打印试验数据或仪器内部系统报告。
●“取消”键:一般用于结束某组试验或退出仪器设置状态等。
●“测量”键:进入试验测量状态。
●“确认”键:确认编辑输入的内容或结束某组试验。
长按此健可以进入仪器设定状态。
●“截面”键:选择或输入试样的受压面积。
●“组号”键:选择或输入试样的组号(试样编号)。
四、仪器设置●仪器时间设置:仪器当前时间信息一般无须使用单位再调整。
测力环说明书,测力环测力计测力环
测力环说明书
测力环
测力计
测力环
量程范围:1.2-300kN 功能:测力环结构公道、操纵方便,适用于各种型号路面材料强度试验仪、承载比试验仪、电动应变无侧限压力仪、土基试验仪等公路仪器标准力值的试验。
测力环(1级精度压式测力环2-100KN)
测力环(0.3级精度测力环0.1-1.5KN)
测力环(0.3级精度拉压式测力环3-10KN)
测力环(0.3级精度拉压式测力环30-300KN)
测力环(0.3级精度压式测力环600-5000KN)
数字测力环(0.1级精度拉压式100N-5000KN)
技术参数:
示值重复性相对误差不大于0.3% 示值进回程相对误差不大于1.5% 示值长期稳定度(三个月)不大于0.3% 回零偏差不大于0.2个分度灵敏度所不大于0.2个分度对应的力值
测力环说明书
测力环技术参数:
示值重复性相对误差不大于0.3%示值进回程相对误差不大于1.5%示值长期稳定度(三个月)不大于0.3%回零偏差不大于0.2个分度灵敏度所不大于0.2个分度对应的力值。
标准测力仪,测力环,测力计,
标准测力环
技术参数1、本测力仪精度为常用的0.3和0.1级标准测力仪。
2、本测力仪的有效丈量范围为最大量程的10%至最大量程。
技术特点1、本测力仪表与传感器可以组成0.1级、0.2级、0.3级、0.5级的标准测力仪。
2、3000型多通道专业仪表在使用时,可智能判定传感器量程,插上即用,不需要切换通道,操纵简单、使用方便。
3、采用∑-△24位A/D转,有可编程增益放大、输出滤波、偏移寄存器调零功能。
4、本测力仪具有稳定的16位分辨率,内部分度数为传感器满量程的1/65000。
5、本测力仪丈量正确度:0.005%FS
6、本测力仪供电电源:220vAC±10%, 50HZ,
7、本测力仪传感器激励电压:5vDC
8、显示:六位数码管动态扫描显示
9、测力仪标定方法:用键盘标定(有两种方法):
测力环说明书
①传感器线性段修正. 该仪表具有对传感器满量程的线性修正有以下四种:
A.10%、20%、50%、100%四段线性修正.
B.10%、20%、40%、60%、80%、100%六段线性修正;
C.10%、20%、30%、40%、50%、60%、70%、80%、100%九段线性修正;
D.5%、10%、20%、30%、40%、50%、60%、70%、80%、100%十段线性修正能力,进步了系统的丈量正确度。
②并且具有满量程双键标定功能(当负荷加至额定量程时,同时按[选择]+向左键,即可完程标定),操纵简单、使用方便、校 准精确。
9、传感器灵敏范围:1-9mv/v
测力仪根据中华人民共和国国家计量检定规程JJG144-2007《标准测力仪》制造和检验的。
。