房地产项目结算流程英文回答:Real Estate Project Settlement Process.The settlement process for a real estate project involves several steps and parties. It is essential to understand this process to ensure a smooth and successful transaction. In this article, we will discuss the key steps involved in the settlement process.1. Contract Preparation and Negotiation:The settlement process starts with the preparation and negotiation of the contract between the buyer and the seller. This contract includes the terms and conditions of the sale, such as the purchase price, payment terms, and settlement date. Both parties need to review and agree upon the contract before proceeding with the settlement.2. Property Inspection and Due Diligence:After the contract is signed, the buyer typically conducts a property inspection and due diligence to ensure that the property is in good condition and meets their requirements. This may involve hiring professionals such as building inspectors, surveyors, and lawyers to assess the property's legal and physical aspects.3. Finance and Mortgage Approval:If the buyer requires financing, they will need to apply for a mortgage and obtain approval from the lender. The lender will assess the buyer's financial situation, creditworthiness, and the property's value to determine the loan amount and terms. Once the mortgage is approved, the buyer can proceed with the settlement.4. Settlement Agent Engagement:Both the buyer and seller engage a settlement agent or conveyancer to handle the settlement process. Thesettlement agent acts as an intermediary between the parties, ensuring that all necessary documents are prepared, signed, and lodged with the relevant authorities.5. Title Search and Transfer:The settlement agent conducts a title search to verify the property's ownership and any encumbrances or restrictions. Once the title is clear, the settlement agent prepares the transfer of ownership documents, which are signed by the seller and buyer. The settlement agent then lodges these documents with the land registry to officially transfer the property's title.6. Payment of Settlement Funds:On the settlement date, the buyer transfers the purchase funds to the settlement agent, who distributes the funds to the seller and other relevant parties. The settlement agent also ensures that any outstanding debts, such as mortgages or liens, are paid off before completing the settlement.7. Registration and Stamp Duty:After the settlement, the settlement agent registers the transfer of ownership with the land registry and pays the applicable stamp duty on behalf of the buyer. This step ensures that the buyer's ownership is officially recorded, and any necessary taxes are paid.8. Handover and Possession:Once the settlement is complete, the buyer takes possession of the property. This may involve receiving the keys, access codes, or any other necessary items to fully access and use the property.中文回答:房地产项目结算流程。
第1篇项目名称:XX建筑工程项目地点:XX市XX区XX路XX号建设单位:XX房地产开发有限公司施工单位:XX建筑集团有限公司项目负责人:张三结算日期:2021年9月30日一、工程概况本项目为XX房地产开发有限公司开发的住宅小区,占地面积约为XX平方米,总建筑面积约为XX平方米,建筑层数为XX层,建筑高度为XX米。
本项目包括土建工程、安装工程、室外工程等。
二、结算依据1. 《建筑工程施工合同》;2. 国家及地方有关建筑工程计价依据;3. 工程量清单;4. 工程变更签证;5. 施工过程中发生的其他费用。
三、结算内容1. 土建工程结算(1)基础工程:基础混凝土浇筑、基础垫层、基础防水等,结算金额为XX万元。
(2)主体结构工程:主体混凝土浇筑、钢筋绑扎、模板拆除等,结算金额为XX万元。
(3)装饰装修工程:室内墙面、地面、天花板的涂料、瓷砖、木地板等,结算金额为XX万元。
2. 安装工程结算(1)给排水工程:给水管、排水管、阀门、水表等,结算金额为XX万元。
(2)电气工程:电缆、电线、配电箱、灯具等,结算金额为XX万元。
(3)通风空调工程:风机、风管、空调机组等,结算金额为XX万元。
3. 室外工程结算(1)道路工程:道路混凝土浇筑、路面铺装等,结算金额为XX万元。
(2)绿化工程:绿化苗木、草坪、景观设施等,结算金额为XX万元。
(3)照明工程:道路照明、景观照明等,结算金额为XX万元。
四、结算金额根据上述结算内容,本项目结算金额为XX万元。
五、付款方式1. 首付款:合同签订后,支付合同总价款的XX%;2. 进度款:按工程进度支付,每月支付上月已完成的工程款;3. 验收款:工程验收合格后,支付合同总价款的XX%;4. 保修金:保修期满后,无质量问题退还。
六、其他事项1. 本结算单仅供参考,具体结算金额以实际发生为准;2. 本结算单签订后,双方应严格履行合同约定;3. 如有争议,双方应友好协商解决,协商不成的,可依法向人民法院提起诉讼。
房地产项⽬清算条件在我国因为⼈⼝的⼤量涌⼊许多⼤中型经济发达地区导致根据不同地区经济发达程度和⼈⼝密集很多房产的价格也不⼀样,但⼀样的就是都⽐较昂贵,⽽房地产开发商在进⾏房地产项⽬开发完成的时候就需要对房地产项⽬进⾏清算,那么具体的条件有哪些呢?店铺⼩编整理了相关的内容,希望对您有帮助。
房地产项⽬清算条件因房地产项⽬时间⽐较长,⼤部分房地产企业是按预收款的⼀定的⽐例预交的⼟地增值税。
⼟地增值税项⽬清算,就是对符合清算条件的项⽬进⾏清算,按照《中华⼈民共和国⼟地增值税暂⾏条例》及有关规定,1、凡符合下列情况之⼀的,纳税⼈应到主管地⽅税务机关办理⼟地增值税清算⼿续:(1)全部竣⼯并销售完毕的房地产开发项⽬。
(2)整体转让未竣⼯的房地产开发项⽬。
(3)直接转让⼟地使⽤权的项⽬。
(4)纳税⼈申请注销税务登记的房地产开发项⽬。
2、符合下列情况之⼀的,主管地⽅税务机关可要求纳税⼈进⾏⼟地增值税清算:(1) 纳税⼈开发的房地产开发项⽬已通过竣⼯验收,在整个预(销)售的房地产开发建筑⾯积达到可销售总建筑⾯积的⽐例85%(含)以上的。
(2)取得销售(预售)许可证满三年仍未销售完毕的。
(3)经主管地⽅税务机关进⾏纳税评估发现问题后,认为需要办理⼟地增值税清算的房地产开发项⽬。
(五)对于房地产开发企业建造的商品房,在未出售前先⾃⽤或出租使⽤年限在⼀年以上的,不再列⼊⼟地增值税清算的范围,应按照转让旧房及建筑物的政策规定缴纳⼟地增值税。
实际上在很多时候,房地产开发过程当中企业对于清算都是规定了具体期限对于每期需要清算的直接进⾏计算,之后再将本项⽬与其他项⽬合并计算的所应该缴纳的所得税额,但是对于开发项⽬没有完成的情况同样是不能拖⽋的,如果遇到问题可以多多咨询律师帮忙,店铺也提供律师在线咨询服务,欢迎您进⾏法律咨询。
房地产公司工程项目成本结算总结报告编制指导书一、背景和目的随着经济发展和城市化进程加快,房地产行业成为国民经济中的支柱产业。
在房地产开发过程中,工程项目成本结算是一个十分关键的环节,因此编制一份结算总结报告非常必要。
本指导书旨在指导房地产公司编制工程项目成本结算总结报告,做到真实、准确、规范。
同时,也可以提高公司的管理水平,帮助公司更好地进行经济决策,并为房地产行业的发展做出贡献。
二、编制步骤1.汇总数据编制工程项目成本结算总结报告,首先要收集相关数据,包括工程项目的投资额、开发周期、工程量和工程质量等信息。
合理、准确的数据汇总是保证报告真实性的关键。
2.计算费用将收集的数据按照一定的计算方法进行处理,包括直接费用、间接费用以及效益分析等。
其中,直接费用包括各项实际支出的费用,如材料、劳动力、机械租赁费用等;间接费用则包括管理费、税金等,而效益分析则是对工程项目的投入、产出进行评估和比较。
3.制作报告将计算得出的数据按照一定的格式和结构进行组织,制作一份符合规范、完整、清晰的工程项目成本结算总结报告。
三、报告内容1.概述报告的概述部分应该对工程项目进行简要的介绍和概述,包括项目背景、目的、投资额、开发周期等。
2.费用明细该部分是对项目投入的直接费用、间接费用提供具体的细节和明细,包括各项支出的费用以及引入的税费等,同时需将各项费用分类,方便读者理解和比较。
3.效益分析本部分通过对工程项目的投入和产出进行比较,分析项目的经济效益和投资回报,具体内容包括预算效益、比较效益分析和灵敏度分析等。
4.结论和建议该部分总结前面的分析和评估,并根据分析结果提出相应的管理建议和改进措施,以促进房地产公司的可持续发展。
四、注意事项1.确保数据真实准确,合理汇总和处理数据,以保证结果的准确性和有效性;2.注意报告的可读性和可理解性,注重用语准确规范,以便于读者理解;3.尽可能地将报告结构化、分类、统一,以达到易于比较和查询的效果。
房地产项目工程预结算管理办法房地产项目工程预结算管理办法一、概述房地产项目工程预结算是指按照工程建设项目实际完成情况,对工程结算定额进行调整,提出工程预结算金额,以支持项目结算、竣工验收、决算等工作。
本管理办法旨在规范房地产项目工程预结算管理,保障预算编制质量和结算审查的准确性和有效性。
二、适用范围本管理办法适用于所有房地产项目工程预结算管理工作,包括开发商、设计单位、监理单位、施工单位等相关单位。
三、工程预结算基本原则1、质量第一:工程建设质量是生命线,在保证工程建设质量的基础上,才能保证做出的工程预算质量。
2、科学合理:工程预结算应根据实际完成情况以适当的方式对工程结算定额进行调整。
调整范围应符合工程建设技术、工程量实际完成情况、合同约定等相关规定,调整理由应具有合理性和可行性。
3、客观公正:工程预结算应建立公正、透明的评审机制,由专家委员会组成,通过审核、评估等多项环节进行。
4、安全可靠:工程预结算应充分考虑安全可靠性,确保建筑结构、环保等要求。
5、节约节能:工程预结算应有节约节能的原则,并对控制浪费、提高效益加强管理。
四、工程预结算审核内容1、施工计划审核:全面了解承包单位施工计划,并对施工计划进行审查,以确保施工计划与实际施工情况保持一致,变更合理化。
2、施工进度审核:全面了解施工进度,确保施工进度符合工期要求,如有超期,要具有充分的理由。
3、工程量审核:全面审查工程量完成情况,必要情况下要进行实测、实量验证,精准控制工程款项。
4、工程设备审核:全面审查设备采购、布局等情况,确保符合工程建设要求,减少资源浪费。
5、质量安全审核:全面了解工程建设过程中的安全、质量问题,对问题进行整改改进,确保建设项目够安全、够稳定。
6、成本核算审核:全面了解工程造价情况,对建设工程造价可能的波动进行风险评估、成本控制,确保预算特别是财务未来负担计算合理并控制在预算范围内。
五、工程预结算结果评审1、工程预结算组织:成立评审组织部门,由专家、技术人员、监督部门等组成。
房地产项目结算流程英文回答:The settlement process in real estate projects involves several steps and parties. Let's break down the processinto different stages:1. Pre-settlement stage:During this stage, the buyer and seller negotiate the terms of the sale and sign a contract. The buyer usually pays a deposit, which is held in a trust account until settlement.与中文回答:房地产项目的结算流程涉及多个阶段和参与方。
让我们将流程分解为不同的阶段:1. 结算前阶段:在此阶段,买方和卖方就销售条款进行谈判,并签订合同。
买方通常支付一笔定金,该定金将存放在托管账户中,直到结算时才释放。
英文回答:2. Settlement preparation stage:In this stage, both parties engage their solicitors or conveyancers to prepare the necessary documents for settlement. The buyer's solicitor conducts property searches, checks for any encumbrances or caveats, and prepares the transfer of land document. The seller's solicitor prepares the discharge of mortgage document and ensures any outstanding rates or taxes are paid.与中文回答:2. 结算准备阶段:在此阶段,双方聘请他们的律师或过户人为结算准备必要的文件。
本项目竣工后结算50%,
摘要:
1.项目竣工后结算50%
2.项目结算的具体流程
3.项目结算所需文件和资料
4.项目结算的时间安排
5.项目结算的方式和注意事项
正文:
本项目竣工后,将进行50%的结算。
这意味着在项目完成后,我们将支付合同总价款的50%。
项目结算的具体流程如下:
1.提交项目完成报告:项目完成后,需提交项目完成报告,该报告应包括项目的实际情况、完成情况、质量情况等。
2.审核项目完成报告:我们将对提交的完成报告进行审核,以确保项目已经按照合同要求完成。
3.确认付款金额:审核通过后,我们将确认付款金额,并根据合同约定的付款方式进行付款。
4.提交发票:在付款前,需提交符合要求的发票。
项目结算所需文件和资料包括:项目完成报告、合同、发票等。
项目结算的时间安排将在合同中约定。
通常情况下,项目完成后,将在10个工作日内完成结算。
项目结算的方式和注意事项如下:
1.付款方式:根据合同约定的付款方式进行付款,通常是银行转账或支票。
2.注意事项:在项目结算前,请确保提交的发票和资料符合要求,以避免付款延误。
本项目竣工后,将进行50%的结算。
在项目完成后,需提交项目完成报告,并经过审核确认付款金额。
在付款前,需提交符合要求的发票。
项目结算的时间安排将在合同中约定,付款方式将根据合同约定的方式进行。
房地产开发公司工程结算管理为规范工程结算管理,确保结算的及时、公平、准确,及时反映项目实际成本变化,制定本管理制度。
第一条:总则1.所有工程类合同结算(包含建安工程、装饰工程、材料设备采购、环境配套工程、智能化工程及非政府性收费的区内管网设备工程),均需执行本管理制度。
XX公司合同值与结算值发生变化的的结算由集团计划成本部负责,合同值与结算值没有变化的结算由项目公司成本计划部负责;异地公司的结算由该公司成本计划部负责,集团计划成本部进行复审。
结算过程资料整理齐全存档,结算工作过程具备可追溯性。
2.所有工程类合同结算时必须遵循原合同约定的结算原则,严禁出现与结算原则违背的现象。
3.所有工程类结算必须经逐级审批后方能生效,在没有经过集团结算审批例会最终审批前,不论就整个结算还是单笔签证、变更,结算相关人员都不得与承包单位签订任何结论性文件或签字认可。
4.所有工程类结算完成后,XX公司的结算由集团计划成本部统一编号后返项目公司,项目公司成本计划部应及时将结算金额反映到合同台账和项目动态成本中。
异地公司由异地公司成本计划部统一编号,并将结算金额及时反映到合同台账和项目动态成本中。
5.工程类结算原则上不允许外部委托,结算复审需要外部委托的,XX项目由集团本部统一组织实施。
异地项目需要结算外审的委托,需报集团计划成本部、集团主管副总裁批准,由项目公司按招标流程组织实施。
第二条:职责1. 项目公司1.1合同主办部门(工程部、开发部等部门)负责汇总并确认合同结算资料,确保结算资料的真实准确;1.2XX公司成本计划部负责编制《结算月度计划》,报送集团计划成本部备案,同时上报审核合格的结算资料;集团计划成本部将安排结算审核。
1.3XX公司成本计划部负责审核结算资料是否齐全,并负责合同额与结算额发生变化的结算与集团计划成本部的结算对接工作(如做好结算过程中结算资料的解释工作和被结算单位的联络工作等)。
1.4XX公司合同主办部门负责对合同额与结算额没有变化的合同进行确认,公司成本计划部负责此类合同《结算分析报告》的填写,并于每月度末填报《月度结算汇总表》,一同上报集团计划成本部。
房地产公司项目结算资料确认函
尊敬的XXX公司:
您好!我司承接了您公司的房地产项目,并已于近日完成全部工程的施工与安装。
现已按照合同约定提交了结算单及相应的结算资料。
为了确保本项目结算的精准与合法性,即日起,我方正式向贵公司发出结算资料确认函,请您务必认真核对。
一、本次结算资料包括:
•我司与贵公司签订的合同;
•本次工程的完工验收证明文件;
•我司提交的结算单及相关单据;
•本次工程相关的质证书、保修书等资料。
二、要求贵公司核对的内容包括:
1.结算单中涉及到的工程量清单是否准确无误;
2.质量、工期等方面的验收是否操作规范,有无质量问题;
3.支付明细表是否与相应的单据一致;
4.结算所需其他资料是否齐全、真实、完整。
三、备注事项:
1.本次结算资料中列出的资料和单据为必要资料和单据,如有遗漏或者错误,请及时通知我司以便及时补充或更换;
2.如有其他需要补充的结算资料或要求,请及时提出;
3.若贵公司对本次结算有任何异议或疑问,请及时联系我方。
以上是本次结算资料确认函的内容,我们恳请贵公司务必认真核对,如有任何问题,请随时与我们联系。
我们将为您提供优质的服务。
此致
敬礼!
XXX房地产公司
XXXX年XX月XX日
在结算的过程中,双方需要保持沟通与协作,防止在结算过程中出现问题,以保证双方的合法权益。
最后提醒双方,在下一次的合作中,我们也期望能够再次合作愉快。
房地产企业工程竣工决算(结算)管理制度1、总则为规范工程项目竣工决算(结算)的编制和审批,明确工作流程,特制定本管理制度。
2、适用范围工程项目竣工决算(结算)主要针对各类施工总承包、独立承包、各专业分包施工工程的决算编制和审批工作。
3、决算前置条件3.1、工程项目已按照合同约定的工程范围施工,已竣工并已验收合格的工程。
3.2、施工单位提供了完整的工程竣工资料、工程竣工结算书,并经公司工程部、总师办、档案员签字确认。
4、决算工作流程4.1、决算申报:4.1.1、施工单位在办理好工程移交手续后10个工作日内提出竣工决算申请,经监理公司复核后,报送公司工程部。
申请须有施工单位法定代表人或法定委托代理人的签章。
4.1.2、公司工程部对施工单位申报的竣工资料(竣工图纸、工程量清单、工程变更联系单、现场签证材料等)的真实性、完整性、准确性进行认真核实,在《工程结算工作交接单》签复意见,并移交公司总师办。
4.2、决算审核:4.2.1、总师办应对决算资料的完整性、准确性进行复核,对工程的招投标文件、合同文件、其它相关材料,以及施工单位申报的工程量、价格等进行审核,并在《工程结算工作交接单》签复意见,并移交预决算。
4.2.2、公司预决算人员展开决算内审工作,并与总师办、工程部、设计院、监理单位等部门沟通,对与施工单位有争议的资料进行逐项核实。
4.2.3、预决算在收到竣工决算资料后,根据工作进程及时通知施工单位进行核对。
决算审查过程中,施工单位的补充资料仍需经履行上述的审核流程。
4.2.4、在核对过程中若出现较大的争议问题可先与施工单位协商,协商不成的暂不计入总造价,报公司项目开发建设领导小组研究决定。
4.2.5、工程竣工决算内审一般应在60天内完成。
4.3、决算审计。
经内审的决算报告经公司领导批准后,上报区审计局审计。
5、工程结算5.1、区审计局批复工程决算审计报告后,审计报告由预决算分送办公室、财务部和总师办等相关部门。
房地产公司项目结算通知书(供货类)致:供应商尊敬的供应商:感谢贵公司对我公司项目的支持与配合。
根据双方签订的合同及约定,现通知如下:一、结算情况截至本次结算日期,贵公司共向我公司提供了以下货物及服务:货物名称规格型号单价(元)数量(件)金额(元)XXX X XX X XXXXX X XX X XX服务名称单价(元)数量(次)金额(元)XXX XX X XXXXX XX X XX以上货物及服务,经我公司验收合格,符合合同约定及技术规格,现按照双方约定并结合实际情况,进行结算处理。
二、结算金额明细1.货物结算:货物总金额 = 货物单价×货物数量× 1.00货物总金额 = XX元2.服务结算:服务总金额 = 服务单价×服务次数× 1.00服务总金额 = XX元3.税金计算:根据国家有关税收政策,本次结算需缴纳增值税和各种税费,计算如下:增值税费用 = 货物总金额×增值税率增值税费用 = XX元其它税费如下:XXX税金 = XX元总税金 = 增值税费用 + 其它税费总税金 = XX元4.结算金额:结算金额 = 货物总金额 + 服务总金额 + 总税金结算金额 = XX元三、结算方式1.付款时间:本次结算应在XX年XX月XX日前完成支付。
2.付款方式:依据合同约定,本次结算应采用XX方式进行付款,具体付款详情详见以下表格:支付方式付款比例付款时间XX方式 XX XX年XX月XX日四、其他事项1.最终解释权:本结算通知书解释权归我公司所有。
2.催款方式:如有延迟支付或未支付,我公司有权采取各种合法方式进行催款,因此产生的费用由供应商负责。
以上即为本次结算通知书相关核算金额的详细情况。
若贵公司对以上信息有任何疑问或纠正,请及时与我司联系沟通并协商解决。
谢谢!此致敬礼!XXX房地产有限公司日期:XXXX年XX月XX日。
房地产工程决算方案一、项目概况本项目是位于xxxx地区的一处房地产开发项目,项目总建筑面积为xxxx平方米,包括住宅、商业等多个功能区域。
项目从规划设计到施工,历经数年,现已进入尾声阶段。
在此,我们对本项目的决算方案进行详细介绍,以确保经济合理和资金使用透明。
二、决算依据1. 项目概况和结算依据:本次决算依据为项目的建设合同、设计文件以及实际完成的工程量清单等相关文件。
2. 成本构成:决算将按照主要工程量和费用构成,包括各项施工投入费用、材料价格、设计变更的费用、设备购置费用等。
三、决算程序1. 决算组成:决算小组由项目领导、财务主管、施工负责人、工程设计负责人等组成,具体责任分工如下:(1)项目领导:负责组织和协调决算工作,对决算结果负最终责任。
(2)财务主管:核对资金使用,做好财务记录,对决算进行审核。
(3)施工负责人:核对和修订工程量清单,负责审定施工方的报价单。
(4)工程设计负责人:核对设计文件、工程变更清单,并对设计变更费用进行审核。
2. 决算程序:(1)核实工程量和费用:决算小组通过对实际的工程量和费用进行核对,确认各项工程量以及资金支出。
(2)确定设计变更费用:对于因规划设计变更所导致的费用,决算小组将对设计变更费用进行确认,并填写设计变更确认表。
(3)出具决算文件:对于决算结果形成决算报告,并依据有关法律法规制度,出具决算文件和决算表。
四、决算内容1. 工程量清单:核对实际工程量和费用,确定各项工程量和费用的具体数值。
2. 设计变更费用:对因设计变更而造成的额外费用进行确认和核对。
3. 施工投入费用:对施工过程中的各项费用进行核对和归档。
4. 材料价格:核对工程所使用的各项材料价格,并核算其实际成本。
5. 设备购置费用:对工程所需要的各类设备购置费用进行核算和确认。
五、决算审核决算小组完成决算工作后,将对决算结果进行内部审核,以确保决算结果的真实、准确、合法和合规。
审核流程包括:1. 决算报告的编制:决算小组根据具体条件和规定,编制项目决算报告,并将决算报告、决算文件和决算表一起提交内部审核。
地产结算案例
以下是一个关于地产结算的案例:
地产开发商甲公司在某地开发了一处楼盘,与乙建筑公司签订了建筑工程施工合同,约定由乙公司承建该楼盘的土建、安装等工程。
工程竣工后,甲公司与乙公司进行了结算,但双方对结算金额产生了争议。
甲公司认为,乙公司在施工过程中存在多报、虚报工程量、提高材料价格等问题,导致结算金额过高。
而乙公司则认为,他们在施工过程中严格遵守了合同约定,结算金额是合理的。
双方经过多次协商和谈判,最终达成了一致意见,结算金额被降低了一部分。
甲公司向乙公司支付了结算款项,并支付了相应的利息。
在这个案例中,甲公司和乙公司在工程结算时产生了争议。
双方通过协商和谈判,最终达成了一致意见,避免了法律纠纷的发生。
因此,在地产开发过程中,开发商和承包商应该充分了解合同条款和相关法律法规,严格遵守合同约定。
在结算过程中,双方应该充分沟通、协商,避
免产生不必要的争议和纠纷。
如果无法达成一致意见,可以寻求法律途径解决。
房地产项目结算流程下载温馨提示:该文档是我店铺精心编制而成,希望大家下载以后,能够帮助大家解决实际的问题。
文档下载后可定制随意修改,请根据实际需要进行相应的调整和使用,谢谢!并且,本店铺为大家提供各种各样类型的实用资料,如教育随笔、日记赏析、句子摘抄、古诗大全、经典美文、话题作文、工作总结、词语解析、文案摘录、其他资料等等,如想了解不同资料格式和写法,敬请关注!Download tips: This document is carefully compiled by the editor. I hope that after you download them, they can help yousolve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!In addition, our shop provides you with various types of practical materials, such as educational essays, diary appreciation, sentence excerpts, ancient poems, classic articles, topic composition, work summary, word parsing, copy excerpts,other materials and so on, want to know different data formats and writing methods, please pay attention!随着房地产行业的蓬勃发展,房地产项目结算流程成为了其中至关重要的一环。
房地产开发项目施工决算方式
根据目前建筑市场情况,按照正常的模式,如不考虑施工单位垫资,一般的付款方式是:在建筑基础完成后(达到正负零),按照施工进度,逐批支付工程进度款。
如施工单位垫资,要确定垫资额(或垫资至某工程形象进度)、垫资时间,双方确定垫资回报率。
一般采取的计价方式是:
第一种:按照国家08标准下浮一定比例,作为决算价格,形成工程承包价格。
在施工过程中,如有变更部分,按照变更量调整工程总价。
第二种:主要建筑材料采取甲方指定、乙方采购,材料进场甲方对价格、质量、数量鉴证的方式,按照鉴证额作为工程决算依据。
其它的人工费、材料费、管理费等按照国家标准下浮一定比例。
根据上述情况,建议公司成立专门班子对两种方式进行测算,以便确定决算方式,并负责与苏中建设进行谈判。
如按第一种方式,现场管理难度较小,但可能工程造价偏高。
按第二种方式,现场管理难度较大,同时要有专门人员对主要建材进行询价、确定,现场进行鉴证。
如把控好可能对降低工程造价有一定的好处。
上述建议供领导参考。