注塑英语大全
- 格式:doc
- 大小:39.01 KB
- 文档页数:10
注塑方面英语术语压铸 die-cast压炼 injection铸件 casting/cast/founding起泡/气泡 bubble/blister/air bubble缺料 shor-shots/undershot浇不足/*铸 under-founding多料 superfluit ies/superfluous material(alloy)顶针痕 ejector (pins)mark花纹 flowmark/flow line冷纹 coldmark/cold streak油纹 oilstreak走水纹 splash mark银纹 silverstreaks霜纹 splaymark夹水纹 silverstreaks/flow line/weld line扣模/粘模 sprue sticking 砂眼/气眼 air hole(塑胶件)弯曲/变形 warping/warpage变形 deformation扭曲 twist翅曲 warp/warped材料错误 using wrongplastic material凸痕 convex mark凹位/凹陷 sink mark/dentmark披锋 flashing批损 pare-mark/cut mark批凹 pareoff锉纹 trim-mark/file-mark锉损 excessive trim mark黑点/黑纹 black spots/blackstreak发白 white mark烧焦 burnmarks刮花/刮痕 scratch mark擦痕/擦伤 rub-mark/brush-burn裂缝 cracking裂纹 craking line碰损 stress mark起皮 chip错位(合模线) part line misaling ment孔位尺寸改变 dimension various哑色 dull color表面变光滑(喷油面) glossy finishing表面sruface/outside镶件insert/insert word缩水/收缩 sinkmark/shrinkage/shrink mark偏差 color deviation色粉 colourment颜色 colour/color零件污糟 dirty mark onpart顶白 stress mark/ejector mark屈曲 bent夹模线移位 part linemisalignment胶件料厚不均 uneven wall thickness水口料 degradedmaterial凹印 sink mark擦花 abrasion mark混色 contamination mark热点不良 poor heatsticking定位圈 locatingring唧嘴 sprue bush (浇口套)A板 Aplate (定模板)B板 Bplate(动模板)方铁 spacer block (垫铁)底板 bottom clamp plate(动模底板)面板 topclamp plate(定模底板)顶针 ejector pin(顶杆)直边钉 guide pin(导柱)托司 shoulder guide bush(导套)直司 straightguide bush(导柱)回针 returnpin(回程杆)细水口边钉 support pin(副导柱)蓝弹簧 blue spring(回程弹簧)水口推板 runner stripperplate(卸流道板)中边钉 ejector guidepin (顶板导柱)顶针板 ejectorretainer plate(顶杆固定板)顶针底板 ejector plate(顶杆垫板)撑头 support pollar(支撑柱)垃圾钉 stop pin(限位钉)呵core (后模肉内镶件)后模肉 back moldbody(后模镶件)前模肉 cavity(前模镶件)扣鸡 P-lockblister 起泡blooming 起霜blow hole 破孔blushing 泛白body wrinkle 侧壁皱纹breaking-in 冒口带肉bubble 膜泡burn mark 糊斑burr 毛边camber 翘曲cell 气泡center buckle 表面中部波皱check 细裂痕checking 龟裂chipping 修整表面缺陷clamp-off 铸件凹痕collapse 塌陷color mottle 色斑corrosion 腐蚀crack 裂痕crazing 碎裂crazing 龟裂deformation 变形edge 切边碎片edge crack 裂边fading 退色filler speak 填充料斑fissure 裂纹flange wrinkle 凸缘起皱flaw 刮伤flow mark 流痕galling 毛边glazing 光滑gloss 光泽grease pits 污斑grinding defect 磨痕haircrack 发裂haze 雾度incrustation 水锈indentation 压痕internal porosity 内部气孔mismatch 偏模mottle 斑点necking 缩颈nick 割痕orange peel 橘皮状表面缺陷overflow 溢流peeling 剥离pit 坑pitting corrosion 点状腐蚀plate mark 模板印痕pock 麻点pock mark 痘斑resin streak 树脂流纹resin wear 树脂脱落riding 凹陷sagging 松垂saponification 皂化scar 疤痕scrap 废料scrap jam 废料阻塞scratch 刮伤/划痕scuffing 深冲表面划伤seam 裂痕shock line 模口挤痕short shot 充填不足shrinkage pool 凹孔sink mark 凹痕skin inclusion 表皮折迭straightening 矫直streak 条状痕surface check 表面裂痕surface roughening 橘皮状表皮皱折surging 波动sweat out 冒汗torsion 扭曲warpage 翘曲waviness 波痕webbing 熔塌weld mark 焊痕whitening 白化wrinkle 皱纹missing part漏件wrong part错件excessive defects过多的缺陷critical defect极严重缺陷major defect主要缺陷minor defect次要缺陷not up to standard不合规格dimension/size is a little bigger尺寸偏大(小) cosmetic defect外观不良slipped screwhead/slippery screw head螺丝滑头slipped screwhead/shippery screw thread滑手speckle斑点mildewed=moldy=mouldy发霉rust生锈deformation变形burr(金属)毛边flash(塑件)毛边poor staking铆合不良excesssive gap间隙过大grease/oil stains油污inclusion杂质painting peel off脏污shrinking/shrinkage缩水mixed color杂色scratch划伤(Flow Line)流痕(Weld Line) 熔接线Sink Mark凹陷Streak条纹Warpage翘曲希望以上资料对你有所帮助,附励志名言3条:1、有志者自有千计万计,无志者只感千难万难。
注塑词汇Injection machine 啤机Shot size(weight)实际射胶量 injection volume 理论射胶量 min mold height 最小容模厚度Max mold height 最大容模厚度 Tie bar clearance 拉杆间距 Die plate size 模板尺寸 Ejector stroke 顶出行程 barrel 炮筒,机筒 clamp force 锁模力 non-return valve 止回阀shear 剪切 opening 开模行程Injection pressure 射胶压力back pressure 背压 nozzle size 射咀尺寸Cycle time 循环周期down time 停机时间 hopper 料筒Mold release 脱模剂lubrication 润滑 work horse 主力,主要设备Reserve pressure / packing pressure保压mold trial 试模 shot (一)啤Decompress 减压oven 烤炉,烘灶 shrinkage rate 收缩率Residence time 滞留时间injection speed 注射速度 booster time 增压时间Compression ratio 压缩比 mold close time 合模时间Resin 胶料Plastification 塑化,增塑viscosity 粘性,粘度contamination 污染,杂物Thermoplastic 热塑性塑料thermosetting plastics 热固性塑料Booster time 增压时间 feed 喂料,填充purge 净化Flame retardant 阻燃 degradation 降解,软化 regrind 再粉碎Water absorption 吸水reinforce 增强,加固 specific gravity 比重Elongation 延伸率 density 密度 melting point 熔点Polystyrene 聚苯乙烯(PS) Styrene 苯乙烯Acrylonitrile 丙烯腈Polypropylene 聚丙烯(PP) Polyethylene 聚乙烯 glass fiber 玻纤Condensation 凝固,浓缩 crystalline resin 结晶形塑料compre sion molding 压缩成型flash mold 溢流式模具plsitive mold 挤压式模具split mold分割式模具cavity 型控母模core 模心公模taper 锥拔leather cloak 仿皮革shiver 饰纹flow mark 流痕welding mark 溶合痕post screw insert 螺纹套筒埋值self tapping screw 自攻螺丝striper plate 脱料板piston 活塞cylinder 汽缸套chip 细碎物handle mold 手持式模具(移转成型用模具)encapsulation molding 低压封装成型(射出成型用模具)two plate 两极式(模具)well type 蓄料井insulated runner 绝缘浇道方式hot runner 热浇道runner plat 浇道模块valve gate 阀门浇口band heater 环带状的电热器spindle 阀针spear head 刨尖头slag well 冷料井cold slag 冷料渣air vent 排气道welding line 熔合痕eject pin 顶出针knock pin 顶出销return pin 回位销反顶针sleave 套筒stripper plate 脱料板insert core 放置入子nner stripper plate 浇道脱料板guide pin 导销eject rod (bar)(成型机)顶业捧subzero 深冷处理three plate 三极式模具runner system 浇道系统stress crack 应力电裂orientation 定向sprue gate 射料浇口,直浇口nozzle 射嘴sprue lock pin 料头钩销(拉料杆) slag well 冷料井side gate 侧浇口edge gate 侧缘浇口tab gate 搭接浇口film gate 薄膜浇口flash gate 闸门浇口slit gate 缝隙浇口fan gate 扇形浇口dish gate 因盘形浇口diaphragm gate 隔膜浇口ring gate 环形浇口subarine gate 潜入式浇口tunnel gate 隧道式浇口pin gate 针点浇口Runner less 无浇道(sprue less) 无射料管方式long nozzle 延长喷嘴方式sprue 浇口;溶渣入水:gate 进入位:gate location 水口形式:gate type 大水口:edge gate 细水口: pin-point gate 水口大小:gate size 转水口:switching runner/gate 唧嘴口径:sprue diameter 流道: runner 热流道:hot runner,hot manifold 热嘴冷流道: hot sprue/cold runner 唧嘴直流: direct sprue gate 圆形流道:round(full/half runner 流道电脑分析:mold flow analysis 流道平衡:runner balance 热嘴:hot sprue 热流道板:hot manifold 发热管:cartridge heater 探针: thermocouples 插头:connector plug 插座: connector socket 密封/封料: seal 三、运水:water line 喉塞:line lpug 喉管:tube 塑胶管:plastic tube 快速接头:jiffy quick connector plug/socker 四、模具零件:mold components 三板模:3-plate mold 二板模:2-plate mold 边钉/导边:leader pin/guide pin 边司/导套:bushing/guide bushing 中托司:shoulder guide bushing 中托边L:guide pin 顶针板:ejector retainner plate 托板:support plate 螺丝: screw 管钉:dowel pin 开模槽:ply bar scot 内模管位:core/cavity inter-lock 顶针:ejector pin 司筒:ejector sleeve 司筒针:ejector pin 推板:stripper plate 缩呵:movable core,return core core puller 扣机(尼龙拉勾):nylon latch lock 斜顶:lifter 模胚(架): mold base 上内模:cavity insert 下内模:core insert 行位(滑块): slide 镶件:insert 压座/斜鸡:wedge 耐磨板/油板:wedge wear plate 压条:plate 撑头: support pillar 唧嘴: sprue bushing 挡板:stop plate 定位圈:locating ring 锁扣:latch 扣鸡:parting lock set 推杆:push bar 栓打螺丝:S.H.S.B 顶板:eracuretun 活动臂:lever arm 分流锥:spure sperader 水口司:bush 垃圾钉:stop pin 隔片:buffle 弹弓柱:spring rod 弹弓:die spring 中托司:ejector guide bush 中托边:ejector guide pin 镶针:pin 销子:dowel pin 波子弹弓:ball catch 喉塞: pipe plug 锁模块:lock plate 斜顶:angle from pin 斜顶杆:angle ejector rod 尼龙拉勾:parting locks 活动臂:lever arm 复位键、提前回杆:early return bar 气阀:valves 斜导边:angle pin 术语:terms 承压平面平衡:parting surface support balance 模排气:parting line venting 回针碰料位:return pin and cavity interference 模总高超出啤机规格:mold base shut hight 顶针碰运水:water line interferes withejector pin 料位出上/下模:part from cavith (core) side 模胚原身出料位:cavity direct cut on A-plate,core direct cut on B-plate. 不准用镶件: Do not use (core/cavity) insert 用铍铜做镶件: use beryllium copper insert 初步(正式)模图设计:preliinary (final) mold design 反呵:reverse core 弹弓压缩量:spring compressed length 稳定性好:good stability,stable 强度不够:insufficient rigidity 均匀冷却:even cooling 扣模:sticking 热膨胀:thero expansion 公差:tolorance 铜公(电极):copper electrode塑料成形模具 mould for plastics 热塑性塑料模 mould for thermoplastics 热固性塑料模 mould for thermosets 压缩模 compression mould 压注模、传递模 transfer mould 注射模 injection mould 热塑性塑料注射模 injection mould for thermoplastics 热固性塑料注射模 injection mould for thermoses 定模 stationary mould fixed half 动模 movable mould moving half 定模座板 fixed clamp plate, top clamping plate. top plate 动模座板 moving clamp plate. bottom clamping plate. bottom plate 上模座板 upper clamping plate 下模座板 lower clamping plate 凹模固定板 cavity-retainer plate 型芯固定板 core-retainer plate 凸模固定板 punch-retainer plate 模套 chase. bolster. frame 支承板 backing plate. supprr plate 垫块 spacer parallel 支架 ejector housing. mould base leg abrasive grinding 强力injection mould 注塑模injection 注射in-line-of-draw 直接脱模insert 嵌件inserted die 嵌入式凹模inspection检查,监督installation安装Surface Appearance 外观Glossiness/gloss finish 光洁度Matt finish/matt surface 毛面Glass fiber richsurface/glass emergence on the surface 玻纤外露Blooming/surface blooming 表面析出White patches on surface 表面白斑Silver marks/silver streak 银纹Splay mark 水纹Flow mark 流纹Weld line 溶结纹Brittle/brittleness 脆Bubbles/trapped gas 气泡V oid 孔Burn marks 烧伤FR failed 阻燃不合格Flame rating V-2 阻燃V-2 Poor dispersion 分散不好FR/PTFE …agglomerates etc 阻燃剂/PTFE…结块Pellet porous 粒子不密/蜜蜂窝Low impact/tensile etc 物理性能低High flow/filler content etc 流动性/填充…过高Longs/fines/doubles 长粒/碎屑/连粒Poor cut 粒形不好Bristle/voids 表面有小气泡/孔Glass bundles 玻纤结团Product was rejected due to 产品不能接受因为… High moisture level 高水分Warpage/warped 翘曲Shrinkage/shrink 收缩Sink marks 缩影Short shot/short molding 打不满Distortion 变形Over dimension 尺寸过大Under dimension 尺寸过小Flashing 飞边Discoloration 变色Off color 颜色差异Flow rate 流动率Viscous 粘High flow 高流动Low flow 低流动Sticky 粘Mold release 脱模Antioxidant 抗氧剂Flame retardant agent 阻燃剂Heat stabilizer 热稳定剂Chopped glass fiber 短切玻纤Roving glass fiber 粗纱/长玻纤Glass beads 玻璃微珠Milled fiber 碾磨纤Molybdenum disulfide/moly/MoS2 二硫化钼Colorant 着色剂Pigment 颜料Dye 染料Accepted product specification 接受产品规格Approved our product 认可我们的产品Re-set spec 重新定标准Add in extra … 添加多一点… Reduced … content 减少…含量Dropped/redu ced … by x%减少…含量…%Confirmed color standard 确认颜色标准Approved color standard 认可颜色标准Re-confirmed color standard 重新确认颜色标准Qualified our product 认可我们的产品Undergoing heat aging test 在做热老化实验Product is under testing 产品在测试当中Received first order 接了第一个定单Expected to finish by … 预计在…完成Expected order is xMT 预计定单量…吨Estimated annual/monthly consumption 预计年/月用量SPC statistic process control 品管保证Quality Assurance 品管控制Quality control 来料检验IQC Incoming quality control 巡检IPQC In-process quality control 校对calibration 动态试验dynamic test 环境试验Environmental test 非破坏性试验non-destructive test 光泽gloss 击穿电压(dielectric) breakdown voltage 拉伸强度tensile strength 冷热骤变试验thermal shock test 环境试验炉Environmental chamber 盐雾实验salt spray test 绝缘电阻测试验仪Insulating resistance meter 内应力internal stress 疲劳fatigue 蠕变creep 试样specimen 撕裂强度tear strength 缩痕shrink mark, sink mark 耐久性durability 抽样sampling 样品数量sample size AQL Acceptable Quality level 批量lot size 抽样计划sampling plan OC曲线operation curve 试验顺序sequence of tests 环境温度ambient temperature 可焊性solderability 阻燃性flame resistance XX电子有限公司XX Electronics CO., Ltd 总经理办公室General manager’s office 企管部Enterprise management department (EM) 行政部Administration department (AD) 销售部Sales department (SD) 财务部Financial department (FD) 技术部Technology department (TD) 物控部Production material control department (PMC) 生产部Production department(PD) 模具部Mold manufacturing department, Tooling manufacturing department (TM) 品管部Quality Assurance department (QA) 冲压车间Stamp workshop, press workshop 注塑车间injection workshop 装配车间Assembly workshop 模具装配车间Mold and die Assembly workshop 金属加工车间metal machine workshop 电脉冲车间Electric discharge process workshop 线切割车间wire cutting process workshop 工磨车间Grinding workshop 总经理General manager (GM) 副总经理Vice-general manager 经理manager 董事长president 副董事长Vice-president XX部门经理Manager of XX department 主任、主管supervisor 拉长Line leader 组长Foreman, forelady 秘书secretary 文员clerk 操作员operator 助理assistant。
注塑英语词汇Injection machine 啤机Shot size(weight)实际射胶量 injection volume 理论射胶量 min mold height 最小容模厚度Max mold height 最大容模厚度 Tie bar clearance 拉杆间距 Die plate size 模板尺寸 Ejector stroke 顶出行程 barrel 炮筒,机筒 clamp force 锁模力 non-return valve 止回阀shear 剪切 opening 开模行程Injection pressure 射胶压力back pressure 背压 nozzle size 射咀尺寸Cycle time 循环周期down time 停机时间 hopper 料筒Mold release 脱模剂lubrication 润滑 work horse 主力,主要设备Reserve pressure / packing pressure保压mold trial 试模 shot (一)啤Decompress 减压oven 烤炉,烘灶 shrinkage rate 收缩率Residence time 滞留时间injection speed 注射速度 booster time 增压时间Compression ratio 压缩比 mold close time 合模时间Resin 胶料Plastification 塑化,增塑viscosity 粘性,粘度contamination 污染,杂物Thermoplastic 热塑性塑料thermosetting plastics 热固性塑料Booster time 增压时间 feed 喂料,填充purge 净化Flame retardant 阻燃 degradation 降解,软化 regrind 再粉碎Water absorption 吸水reinforce 增强,加固 specific gravity 比重Elongation 延伸率 density 密度 melting point 熔点Polystyrene 聚苯乙烯(PS) Styrene 苯乙烯Acrylonitrile 丙烯腈Polypropylene 聚丙烯(PP) Polyethylene 聚乙烯 glass fiber 玻纤Condensation 凝固,浓缩 crystalline resin 结晶形塑料compre sion molding 压缩成型flash mold 溢流式模具plsitive mold 挤压式模具split mold分割式模具cavity 型控母模core 模心公模taper 锥拔leather cloak 仿皮革shiver 饰纹flow mark 流痕welding mark 溶合痕post screw insert 螺纹套筒埋值self tapping screw 自攻螺丝striper plate 脱料板piston 活塞cylinder 汽缸套chip 细碎物handle mold 手持式模具(移转成型用模具)encapsulation molding 低压封装成型(射出成型用模具)two plate 两极式(模具)well type 蓄料井insulated runner 绝缘浇道方式hot runner 热浇道runner plat 浇道模块valve gate 阀门浇口band heater 环带状的电热器spindle 阀针spear head 刨尖头slag well 冷料井cold slag 冷料渣air vent 排气道welding line 熔合痕eject pin 顶出针knock pin 顶出销return pin 回位销反顶针sleave 套筒stripper plate 脱料板insert core 放置入子nner stripper plate 浇道脱料板guide pin 导销eject rod (bar)(成型机)顶业捧subzero 深冷处理three plate 三极式模具runner system 浇道系统stress crack 应力电裂orientation 定向sprue gate 射料浇口,直浇口nozzle 射嘴sprue lock pin 料头钩销(拉料杆) slag well 冷料井side gate 侧浇口edge gate 侧缘浇口tab gate 搭接浇口film gate 薄膜浇口flash gate 闸门浇口slit gate 缝隙浇口fan gate 扇形浇口dish gate 因盘形浇口diaphragm gate 隔膜浇口ring gate 环形浇口subarine gate 潜入式浇口tunnel gate 隧道式浇口pin gate 针点浇口Runner less 无浇道(sprue less) 无射料管方式long nozzle 延长喷嘴方式sprue 浇口;溶渣入水:gate 进入位:gate location 水口形式:gate type 大水口:edge gate 细水口: pin-point gate 水口大小:gate size 转水口:switching runner/gate 唧嘴口径:sprue diameter 流道: runner 热流道:hot runner,hot manifold 热嘴冷流道: hot sprue/cold runner 唧嘴直流: direct sprue gate 圆形流道:round(full/half runner 流道电脑分析:mold flow analysis 流道平衡:runner balance 热嘴:hot sprue 热流道板:hot manifold 发热管:cartridge heater 探针: thermocouples 插头:connector plug 插座: connector socket 密封/封料: seal 三、运水:water line 喉塞:line lpug 喉管:tube 塑胶管:plastic tube 快速接头:jiffy quick connector plug/socker 四、模具零件:mold components 三板模:3-plate mold 二板模:2-plate mold 边钉/导边:leader pin/guide pin 边司/导套:bushing/guide bushing 中托司:shoulder guide bushing 中托边L:guide pin 顶针板:ejector retainner plate 托板:support plate 螺丝: screw 管钉:dowel pin 开模槽:ply bar scot 内模管位:core/cavity inter-lock 顶针:ejector pin 司筒:ejector sleeve 司筒针:ejector pin 推板:stripper plate 缩呵:movable core,return core core puller 扣机(尼龙拉勾):nylon latch lock 斜顶:lifter 模胚(架): mold base 上内模:cavity insert 下内模:core insert 行位(滑块): slide 镶件:insert 压座/斜鸡:wedge 耐磨板/油板:wedge wear plate 压条:plate 撑头: support pillar 唧嘴: sprue bushing 挡板:stop plate 定位圈:locating ring 锁扣:latch 扣鸡:parting lock set 推杆:push bar 栓打螺丝:S.H.S.B 顶板:eracuretun 活动臂:lever arm 分流锥:spure sperader 水口司:bush 垃圾钉:stop pin 隔片:buffle 弹弓柱:spring rod 弹弓:die spring 中托司:ejector guide bush 中托边:ejector guide pin 镶针:pin 销子:dowel pin 波子弹弓:ball catch 喉塞: pipe plug 锁模块:lock plate 斜顶:angle from pin 斜顶杆:angle ejector rod 尼龙拉勾:parting locks 活动臂:lever arm 复位键、提前回杆:early return bar 气阀:valves 斜导边:angle pin 术语:terms 承压平面平衡:parting surface support balance 模排气:parting line venting 回针碰料位:return pin and cavity interference 模总高超出啤机规格:mold base shut hight 顶针碰运水:water line interferes withejector pin 料位出上/下模:part from cavith (core) side 模胚原身出料位:cavity direct cut on A-plate,core direct cut on B-plate. 不准用镶件: Do not use (core/cavity) insert 用铍铜做镶件: use beryllium copper insert 初步(正式)模图设计:preliinary (final) mold design 反呵:reverse core 弹弓压缩量:spring compressed length 稳定性好:good stability,stable 强度不够:insufficient rigidity 均匀冷却:even cooling 扣模:sticking 热膨胀:thero expansion 公差:tolorance 铜公(电极):copper electrode塑料成形模具 mould for plastics 热塑性塑料模 mould for thermoplastics 热固性塑料模 mould for thermosets 压缩模 compression mould 压注模、传递模 transfer mould 注射模 injection mould 热塑性塑料注射模 injection mould for thermoplastics 热固性塑料注射模 injection mould for thermoses 定模 stationary mould fixed half 动模 movable mould moving half 定模座板 fixed clamp plate, top clamping plate. top plate 动模座板 moving clamp plate. bottom clamping plate. bottom plate 上模座板 upper clamping plate 下模座板 lower clamping plate 凹模固定板 cavity-retainer plate 型芯固定板 core-retainer plate 凸模固定板 punch-retainer plate 模套 chase. bolster. frame 支承板 backing plate. supprr plate 垫块 spacer parallel 支架 ejector housing. mould base leg abrasive grinding 强力injection mould 注塑模injection 注射in-line-of-draw 直接脱模insert 嵌件inserted die 嵌入式凹模inspection检查,监督installation安装Surface Appearance 外观Glossiness/gloss finish 光洁度Matt finish/matt surface 毛面Glass fiber richsurface/glass emergence on the surface 玻纤外露Blooming/surface blooming 表面析出White patches on surface 表面白斑Silver marks/silver streak 银纹Splay mark 水纹Flow mark 流纹Weld line 溶结纹Brittle/brittleness 脆Bubbles/trapped gas 气泡V oid 孔Burn marks 烧伤FR failed 阻燃不合格Flame rating V-2 阻燃V-2 Poor dispersion 分散不好FR/PTFE …agglomerates etc 阻燃剂/PTFE…结块Pellet porous 粒子不密/蜜蜂窝Low impact/tensile etc 物理性能低High flow/filler content etc 流动性/填充…过高Longs/fines/doubles 长粒/碎屑/连粒Poor cut 粒形不好Bristle/voids 表面有小气泡/孔Glass bundles 玻纤结团Product was rejected due to 产品不能接受因为… High moisture level 高水分Warpage/warped 翘曲Shrinkage/shrink 收缩Sink marks 缩影Short shot/short molding 打不满Distortion 变形Over dimension 尺寸过大Under dimension 尺寸过小Flashing 飞边Discoloration 变色Off color 颜色差异Flow rate 流动率Viscous 粘High flow 高流动Low flow 低流动Sticky 粘Mold release 脱模Antioxidant 抗氧剂Flame retardant agent 阻燃剂Heat stabilizer 热稳定剂Chopped glass fiber 短切玻纤Roving glass fiber 粗纱/长玻纤Glass beads 玻璃微珠Milled fiber 碾磨纤Molybdenum disulfide/moly/MoS2 二硫化钼Colorant 着色剂Pigment 颜料Dye 染料Accepted product specification 接受产品规格Approved our product 认可我们的产品Re-set spec 重新定标准Add in extra … 添加多一点… Reduced … content 减少…含量Dropped/redu ced … by x%减少…含量…%Confirmed color standard 确认颜色标准Approved color standard 认可颜色标准Re-confirmed color standard 重新确认颜色标准Qualified our product 认可我们的产品Undergoing heat aging test 在做热老化实验Product is under testing 产品在测试当中Received first order 接了第一个定单Expected to finish by … 预计在…完成Expected order is xMT 预计定单量…吨Estimated annual/monthly consumption 预计年/月用量SPC statistic process control 品管保证Quality Assurance 品管控制Quality control 来料检验IQC Incoming quality control 巡检IPQC In-process quality control 校对calibration 动态试验dynamic test 环境试验Environmental test 非破坏性试验non-destructive test 光泽gloss 击穿电压(dielectric) breakdown voltage 拉伸强度tensile strength 冷热骤变试验thermal shock test 环境试验炉Environmental chamber 盐雾实验salt spray test 绝缘电阻测试验仪Insulating resistance meter 内应力internal stress 疲劳fatigue 蠕变creep 试样specimen 撕裂强度tear strength 缩痕shrink mark, sink mark 耐久性durability 抽样sampling 样品数量sample size AQL Acceptable Quality level 批量lot size 抽样计划sampling plan OC曲线operation curve 试验顺序sequence of tests 环境温度ambient temperature 可焊性solderability 阻燃性flame resistance XX电子有限公司XX Electronics CO., Ltd 总经理办公室General manager’s office 企管部Enterprise management department (EM) 行政部Administration department (AD) 销售部Sales department (SD) 财务部Financial department (FD) 技术部Technology department (TD) 物控部Production material control department (PMC) 生产部Production department(PD) 模具部Mold manufacturing department, Tooling manufacturing department (TM) 品管部Quality Assurance department (QA) 冲压车间Stamp workshop, press workshop 注塑车间injection workshop 装配车间Assembly workshop 模具装配车间Mold and die Assembly workshop 金属加工车间metal machine workshop 电脉冲车间Electric discharge process workshop 线切割车间wire cutting process workshop 工磨车间Grinding workshop 总经理General manager (GM) 副总经理Vice-general manager 经理manager 董事长president 副董事长Vice-president XX部门经理Manager of XX department 主任、主管supervisor 拉长Line leader 组长Foreman, forelady 秘书secretary 文员clerk 操作员operator 助理assistant。
注塑方面英语术语压铸die-cast压炼injection铸件casting/cast/founding起泡/气泡bubble/blister/air bubble缺料shor-shots/undershot浇不足/*铸under-founding多料superfluities/superfluous material(alloy) 顶针痕ejector (pins) mark花纹flow mark/flow line冷纹cold mark/cold streak油纹oil streak走水纹splash mark银纹silver streaks霜纹splay mark夹水纹silver streaks/flow line/weld line 扣模/粘模sprue sticking砂眼/气眼air hole(塑胶件)弯曲/变形warping/warpage变形deformation扭曲twist翅曲warp/warped材料错误using wrong plastic material凸痕convex mark凹位/凹陷sink mark/dent mark披锋flashing批损pare-mark/cut mark 批凹pare off锉纹trim-mark/file-mark 锉损excessive trim mark 黑点/黑纹black spots/black streak 发白white mark烧焦burn marks刮花/刮痕scratch mark擦痕/擦伤rub-mark/brush-burn裂缝cracking裂纹craking line碰损stress mark起皮chip错位(合模线)part line misaling ment孔位尺寸改变dimension various哑色dull color表面变光滑(喷油面)glossy finishing表面sruface/outside镶件insert/insert word缩水/收缩sink mark/shrinkage/shrink mark 偏差color deviation色粉colourment颜色colour/color零件污糟dirty mark on part顶白stress mark/ejector mark屈曲bent夹模线移位part line misalignment 胶件料厚不均uneven wall thickness 水口料degraded material凹印sink mark擦花abrasion mark混色contamination mark 热点不良poor heat sticking定位圈locating ring唧嘴sprue bush (浇口套) A板 A plate (定模板)B板 B plate(动模板)方铁spacer block (垫铁)底板bottom clamp plate(动模底板) 面板top clamp plate(定模底板)顶针ejector pin(顶杆)直边钉guide pin (导柱)托司shoulder guide bush(导套)直司straight guide bush(导柱)回针return pin(回程杆)细水口边钉support pin(副导柱)蓝弹簧blue spring(回程弹簧)水口推板runner stripper plate(卸流道板)中边钉ejector guide pin (顶板导柱)顶针板ejector retainer plate(顶杆固定板) 顶针底板ejector plate(顶杆垫板)撑头support pollar(支撑柱)垃圾钉stop pin (限位钉)呵core (后模肉内镶件)后模肉back mold body(后模镶件) 前模肉cavity(前模镶件)扣鸡P-lockblister 起泡blooming 起霜blow hole 破孔blushing 泛白body wrinkle 侧壁皱纹breaking-in 冒口带肉bubble 膜泡burn mark 糊斑burr 毛边camber 翘曲cell 气泡center buckle 表面中部波皱check 细裂痕checking 龟裂chipping 修整表面缺陷clamp-off 铸件凹痕collapse 塌陷color mottle 色斑corrosion 腐蚀crack 裂痕crazing 碎裂crazing 龟裂deformation 变形edge 切边碎片edge crack 裂边fading 退色filler speak 填充料斑fissure 裂纹flange wrinkle 凸缘起皱flaw 刮伤flow mark 流痕galling 毛边glazing 光滑gloss 光泽grease pits 污斑grinding defect 磨痕haircrack 发裂haze 雾度incrustation 水锈indentation 压痕internal porosity 内部气孔mismatch 偏模mottle 斑点necking 缩颈nick 割痕orange peel 橘皮状表面缺陷overflow 溢流peeling 剥离pit 坑pitting corrosion 点状腐蚀plate mark 模板印痕pock 麻点pock mark 痘斑resin streak 树脂流纹resin wear 树脂脱落riding 凹陷sagging 松垂saponification 皂化scar 疤痕scrap 废料scrap jam 废料阻塞scratch 刮伤/划痕scuffing 深冲表面划伤seam 裂痕shock line 模口挤痕short shot 充填不足shrinkage pool 凹孔sink mark 凹痕skin inclusion 表皮折迭straightening 矫直streak 条状痕surface check 表面裂痕surface roughening 橘皮状表皮皱折surging 波动sweat out 冒汗torsion 扭曲warpage 翘曲waviness 波痕webbing 熔塌weld mark 焊痕whitening 白化wrinkle 皱纹missing part漏件wrong part错件excessive defects过多的缺陷critical defect极严重缺陷major defect主要缺陷minor defect次要缺陷not up to standard不合规格dimension/size is a little bigger尺寸偏大(小) cosmetic defect外观不良slipped screwhead/slippery screw head螺丝滑头slipped screwhead/shippery screw thread滑手speckle斑点mildewed=moldy=mouldy发霉rust生锈deformation变形burr(金属)毛边flash(塑件)毛边poor staking铆合不良excesssive gap间隙过大grease/oil stains油污inclusion杂质painting peel off脏污shrinking/shrinkage缩水mixed color杂色scratch划伤(Flow Line)流痕(Weld Line) 熔接线Sink Mark凹陷Streak条纹Warpage翘曲。
Surface Appearance外观Glossiness/gloss finish光洁度Matt finish/matt surface毛面Glass fiber rich surface/glass emergence on the surface 玻纤外露Blooming/surface blooming表面析出White patches on surface表面白斑Silver marks/silver streak银纹Splay mark水纹Flow mark流纹Weld line溶结纹Brittle/brittleness脆Bubbles/trapped gas气泡V oid孔Burn marks烧伤FR failed阻燃不合格Flame rating V-2阻燃V-2Poor dispersion分散不好FR/PTFE …agglomerates etc阻燃剂/PTFE…结块Pellet porous粒子不密/蜜蜂窝Low impact/tensile etc物理性能低High flow/filler content etc流动性/填充…过高Longs/fines/doubles长粒/碎屑/连粒Poor cut粒形不好Bristle/voids表面有小气泡/孔Glass bundles玻纤结团Product was rejected due to产品不能接受因为…High moisture level高水分Warpage/warped翘曲Shrinkage/shrink收缩Sink marks缩影Short shot/short molding打不满Distortion变形Over dimension尺寸过大Under dimension尺寸过小Flashing飞边Discoloration变色Off color颜色差异Flow rate流动率Viscous粘High flow高流动Low flow低流动Sticky粘Mold release脱模Antioxidant抗氧剂Flame retardant agent阻燃剂Heat stabilizer热稳定剂Chopped glass fiber短切玻纤Roving glass fiber粗纱/长玻纤Glass beads玻璃微珠Milled fiber碾磨纤Molybdenum disulfide/moly/MoS2 二硫化钼Colorant着色剂Pigment颜料Dye染料Accepted product specification接受产品规格Approved our product认可我们的产品Re-set spec重新定标准Add in extra …添加多一点…Reduced … content减少…含量Dr opped/reduced … by x%减少…含量…%Confirmed color standard确认颜色标准Approved color standard认可颜色标准Re-confirmed color standard重新确认颜色标准Qualified our product认可我们的产品Undergoing heat aging test在做热老化实验Product is under testing产品在测试当中Received first order接了第一个定单Expected to finish by …预计在…完成Expected order is xMT预计定单量…吨Estimated annual/monthly consumption 预计年/月用量air vent vale 通气阀anchor pin 锚梢angular pin 角梢baffle 调节阻板angular pin 倾斜梢baffle plate 折流档板ball button 球塞套ball plunger 定位球塞ball slider 球塞滑块binder plate 压板blank holder 防皱压板blanking die 落料冲头bolster 上下模板bottom board 浇注底板bolster 垫板bottom plate 下固定板bracket 托架bumper block 缓冲块buster 堵口casting ladle 浇注包casting lug 铸耳cavity 模穴(模仁)cavity retainer plate 模穴托板center pin 中心梢clamping block 锁定块coil spring 螺旋弹簧cold punched nut 冷冲螺母cooling spiral 螺旋冷却栓core 心型core pin 心型梢cotter 开口梢cross 十字接头cushion pin 缓冲梢diaphragm gate 盘形浇口die approach 模头料道die bed 型底die block 块形模体die body 铸模座die bush 合模衬套die button 冲模母模?die clamper 夹模器die fastener 模具固定用零件die holder 母模固定板die lip 模唇die plate 冲模板die set 冲压模座direct gate 直接浇口dog chuck 爪牙夹头dowel 定位梢dowel hole 导套孔dowel pin 合模梢dozzle 辅助浇口dowel pin 定位梢draft 拔模锥度draw bead 张力调整杆drive bearing 传动轴承ejection pad 顶出衬垫ejector 脱模器ejector guide pin 顶出导梢ejector leader busher 顶出导梢衬套ejector pad 顶出垫ejector pin 顶出梢ejector plate 顶出板ejector rod 顶出杆ejector sleeve 顶出衬套ejector valve 顶出阀eye bolt 环首螺栓filling core 椿入蕊film gate 薄膜形浇口finger pin 指形梢finish machined plate 角形模板finish machined round plate 圆形模板fixed bolster plate 固定侧模板flanged pin 带凸缘flash gate 毛边形浇口flask 上箱floating punch 浮动冲头gate 浇口gate land 浇口面gib 凹形拉紧?goose neck 鹅颈管guide bushing 引导衬套guide pin 导梢guide post 引导柱guide plate 导板guide rail 导轨head punch 顶冲头headless punch 直柄冲头heavily tapered solid 整体模蕊盒hose nippler 管接头impact damper 缓冲器injection ram 压射柱塞inlay busher 嵌入衬套inner plunger 内柱塞inner punch 内冲头insert 嵌件insert pin 嵌件梢king pin 转向梢king pin bush 主梢衬套knockout bar 脱模杵land 合模平坦面land area 合模面leader busher 导梢衬套lifting pin 起模顶lining 内衬locating center punch 定位中心冲头locating pilot pin 定位导梢locating ring 定位环lock block 压块locking block 定位块locking plate 定位板loose bush 活动衬套making die 打印冲子manifold block 歧管档块master plate 靠模样板match plate 分型板mold base 塑胶模座mold clamp 铸模紧固夹mold platen 模用板moving bolster 换模保持装置moving bolster plate 可动侧模板one piece casting 整体铸件parallel block 平行垫块paring line 分模线parting lock set 合模定位器pass guide 穴型导板peened head punch 镶入式冲头pilot pin 导pin gate 针尖浇口plate 衬板pre extrusion punch 顶挤冲头punch 冲头puncher 推杆pusher pin 衬套梢rack 机架rapping rod 起模杆re-entrant mold 凹入模retainer pin 嵌件梢retainer plate 托料板return pin 回位梢riding stripper 浮动脱模器ring gate 环型浇口?roller 滚筒runner 流道runner ejector set 流道顶出器runner lock pin 流道拉梢screw plug 头塞set screw 固定螺丝shedder 脱模装置shim 分隔片shoe 模座之上下模板shoot 流道shoulder bolt 肩部螺丝skeleton 骨架slag riser 冒渣口slide(slide core) 滑块slip joint 滑配接头spacer block 间隔块spacer ring 间隔环spider 模蕊支架spindle 主轴sprue 注道sprue bushing 注道衬套sprue bushing guide 注道导套sprue lock bushing 注道定位衬套sprue puller 注道拉料spue line 合模线square key 方键square nut 方螺帽square thread 方螺纹stop collar 限位套stop pin 止动梢stop ring 止动环stopper 定位停止梢straight pin 圆柱stripper bolt 脱料螺栓stripper bushing 脱模衬套stripper plate 剥料板stroke end block 行程止梢submarine gate 潜入式浇口support pillar 支撑支柱/顶出支柱support pin 支撑梢supporting plate 托板sweep templete 造模刮板tab gate 辅助浇口taper key 推拔键taper pin 拔锥梢/锥形梢teeming 浇注three start screw 三条螺纹thrust pin 推力销tie bar 拉杵tunnel gate 隧道形浇口vent 通气孔wortle plate 拉丝模板plain die简易模pierce die冲孔模forming die成型模progressive die连续模gang dies复合模shearing die剪边模riveting die铆合模pierce冲孔forming成型(抽凸,冲凸) draw hole抽孔bending折弯trim切边emboss凸点dome凸圆semi-shearing半剪stamp mark冲记号deburr or coin压毛边punch riveting冲压铆合side stretch侧冲压平reel stretch卷圆压平groove压线blanking下料stamp letter冲字(料号) shearing剪断tick-mark nearside正面压印tick-mark farside反面压印extension dwg展开图procedure dwg工程图die structure dwg结构图material材质material thickness料片厚度factor系数upward向上downward向下press specification冲床规格die height range适用模高die height闭模高度burr毛边gap间隙weight重量total wt.总重量punch wt.上模重量三、模具塑料模具mould of plastics 注塑模具injection mould冲压模具die模架mould base定模座板Top clamping plate Top plateFixed clamp plate水口推板stripper plateA板A plateB板B plate支承板support plate方铁spacer plate 底针板ejector plate面针板ejector retainer plate回针Return pin导柱Guide pin有托导套Shoulder Guide bush直导套Straight Guide bush动模座板Bottom clamp plate Moving clamp plate基准线datum line基准面datum plan型芯固定板core-retainer plate凸模固定板punch-retainer plate顶针ejector pin单腔模具single cavity mould多腔模具multi-cavity mould多浇口multi-gating浇口gate缺料starving排气breathing光泽gloss合模力mould clamping force锁模力mould locking force挤出extrusion开裂crack循环时间cycle time老化aging螺杆screw麻点pit嵌件insert活动镶件movable insert起垩chalking浇注系统feed system主流道sprue分流道runner浇口gate直浇口direct gate , sprue gate轮辐浇口spoke gate , spider gate点浇口pin-point gate测浇口edge gate潜伏浇口submarine gate , tunnel gate 料穴cold-slug well浇口套sprue bush流道板runner plate排飞槽vent分型线(面)parting line定模stationary mould,Fixed mould 动模movable mould, movable half上模upper mould,upper half下模lower mould,lower half型腔cavity凹模cavity plate,cavity block拼块split定位销dowel定位销孔dowel hole型芯core斜销angle pin, finger cam滑块slide滑块导板slide guide strip楔紧块heel block, wedge lock拉料杆sprue puller定位环locating ring冷却通cooling channel脱模斜度draft滑动型芯slide core螺纹型芯threaded core热流道模具hot-runner mould绝热流道模insulated runner mould熔合纹weld line (flow line)三板式模具three plate mould脱模ejection换模腔模具interchangeable cavity mould脱模剂release agent注射能力shot capacity注射速率injection rate注射压力injection pressure差色剂colorant保压时间holdup time闭模时间closing time定型装置sizing system阴模female mould,cavity block阳模male mould电加工设备Electron Discharge Machining数控加工中心CNC machine center万能铁床Universal milling machine卧式刨床Horizontal planer车床Engine lathe平面磨床Surface grinding machine去磁机Demagnetization machine万能摇臂钻床Universal radial movable driller立式钻床Vertical driller超声波清洗机Ultrasonic clearing machine一、组织机构及职位二、X X电子有限公司XX Electronics CO., Ltd三、总经理办公室General manager’s office四、企管部Enterprise management department (EM)五、行政部Administration department (AD)六、销售部Sales department (SD)七、财务部Financial department (FD)八、技术部Technology department (TD)九、物控部Production material control department(PMC)十、生产部Production department(PD)十一、模具部Mold manufacturing department, Tooling manufacturing department (TM)十二、品管部Quality Assurance department (QA) 十三、冲压车间Stamp workshop, press workshop 十四、注塑车间injection workshop十五、装配车间Assembly workshop十六、模具装配车间Mold and die Assembly workshop 十七、金属加工车间metal machine workshop十八、电脉冲车间Electric discharge process workshop十九、线切割车间wire cutting process workshop 二十、工磨车间Grinding workshop二十一、总经理General manager (GM)二十二、副总经理Vice-general manager二十三、经理manager二十四、董事长president二十五、副董事长Vice-president二十六、XX部门经理Manager of XX department二十七、主任、主管supervisor二十八、拉长Line leader二十九、组长Foreman, forelady三十、秘书secretary三十一、文员clerk三十二、操作员operator三十三、助理assistant六.物控保质期shelf lifeABC分类法ABC Classification反常需求Abnormal Demand措施信息Action Message活动报告标志Action-report-flag基于活动的成本核算Activity-based Costing (ABC) 实际能力Actual Capacity实际成本Actual Costs调整现有库存量Adjust-on-hand已分配量Allocation替代工序Alternative Routine装配订单Assembly Order装配零件表Assembly Parts List装配Assembly计划自动重排Automatic Rescheduling可达到库存Available Inventory可用材料Available Material达到库存Available Stock可利用工时Available Work可签约量Available-to-promise平均库存Average Inventory欠交订单Back Order倒序计划Back Scheduling倒冲法Back flush未完成订单Backlog现有库存余额Balance-on-hand Inventory批号Batch Number批量生产Batch Production标杆瞄准Benchmarking工时清单Bill of Labor提货单Bill of Lading物料清单Bill of Material分库Branch Warehouse经营规划Business Plan采购员Buyer能力管理Capacity Management能力需求计划Capacity Requirements Planning (CRP) 保管费率Carrying Cost Rate保管费Carrying Cost单元式制造Cellular Manufacturing修改批量日期Change Lot Date修改工序Change Route修改产品结构Change Structure检查点Check Point闭环物料需求计划Closed Loop MRP通用工序标识Common Route ID计算机集成制造Computer-integrated Manufacturing (CIM)配置代码Configuration Code约束管理/约束理论Constraints Management/Theory of Constraints (TOC)依成本的材料清单Costed Bill of Material急需零件Critical Part累计提前期Cumulative Lead Time现有运转时间Current Run Hour现有运转数量Current Run Quantity周期盘点Cycle Counting调整日期Date Adjust有效日期Date Available修改日期Date Changed结束日期Date Closed截止日期Date Due生产日期Date in Produced库存调整日期Date Inventory Adjust作废日期D ate Obsolete收到日期Date Received交付日期Date Released需求日期Date Required发货日期Date to Pull空负荷Dead Load需求管理Demand Management需求Demand实际能力Demonstrated Capacity非独立需求Dependent Demand直接增减库存处理法Direct-deduct Inventory Transaction Processing发料单Disbursement List派工单Dispatch List分销资源计划Distribution Resource Planning (DRP) 鼓-缓冲-绳子Drum-buffer-rope经济订货批量Economic Order Quantity (EOQ)工程变更生效日期Engineering Change Effect Date工程变更生效单Engineering Change Effect Work Order工程停止日期Engineering Stop Date例外控制Exception Control呆滞材料分析Excess Material Analysis急送代码Expedite Code加工订单Fabrication Order补足欠交Fill Backorder总装提前期Final Assembly Lead Time 确认的计划订单Firm Planned Order固定订货批量F ixed Order Quantity集中预测Focus Forecasting完全跟踪Full Pegging通用生产管理原则Generally Accepted Manufacturing Practices毛需求Gross Requirements在制品库存In Process Inventory独立需求Independent Demand投入/产出控制Input/ Output Control检验标识Inspection ID厂际需求Interplant Demand库存周转率Inventory Carry Rate仓库库位类型Inventory Location Type库存周转次数Inventory Turnover发送订单Issue Order项目记录Item Record物料项目Item加工车间Job Shop准时制生产Just-in-time (JIT)看板Kanban人工工时Labor Hour最后运输日期Last Shipment Date提前期Lead Time层Level负荷量Load Leveling负荷报告Load Report负荷Load仓位代码Location Code仓位备注Location Remarks仓位状况Location Status按需订货Lot for Lot批量标识Lot ID批量编号Lot Number批量Lot Size低位码Low Level Code机器能力Machine Capacity机器加载Machine Loading外购或自制决策Make or Buy Decision面向订单生产的产品Make-to-order Product面向库存生产的产品Make-to-stock Product制造周期时间Manufacturing Cycle Time制造资源计划Manufacturing Resource Planning (MRP II)主生产计划Master Production Schedule (MPS)物料成本Material Cost物料发送和接收Material Issues and Receipts物料需求计划Material Requirements Planning (MRP) 登陆标志MPS Book Flag MPS多重仓位Multiple Location净改变式MRP N et Change MRP净需求Net Requirements新仓位New Location新组件New Parent新仓库New Warehouse不活动报告No Action Report现有库存量On-hand Balance未结订单Open Order订单输入Order Entry订货点Order Point订货方针Order Policy订货承诺Order Promising订货备注Order Remarks双亲Parent零件清单Part Bills零件批次Part Lot零件编号Part Number零件Part反查Pegging领料单Picking List领料/提货Picking计划订单Planned Order后减库存处理法Post-deduct Inventory Transaction Processing前减库存处理法Pre-deduct Inventory Transaction Processing发票价格Price Invoice采购订单价格Price Purchase Order优先计划Priority Planning产品控制Product Control产品线Production Line生产规划编制Production Planning产品率Production Rate产品结构树Production Tree预计可用库存Projected Available Balance采购订单跟踪Purchase Order Tracking已分配量Quantity Allocation仓位数量Quantity At Location欠交数量Quantity Backorder完成数量Quantity Completion需求量Quantity Demand毛需求量Quantity Gross进货数量Quantity In排队时间Queue Time队列Queue重生成式MRP Regenerated MRP重排假设Rescheduling Assumption资源需求计划Resource Requirements Planning粗能力计划Rough-cut Capacity Planning工艺路线Routing安全库存量Safety Stock保险期Safety Time预计入库量Scheduled Receipt残料率Scrap Factor发送零件Send Part维修件Service Parts发货地址Ship Address发货单联系人Ship Contact发货零件Ship Date发货单Ship Order 工厂日历Shop Calendar车间作业管理Shop Floor Control损耗系数Shrinkage Factor标准产品成本Standard Product Cost标准机器设置工时Standard Set Up Hour标准单位运转工时Standard Unit Run Hour标准工资率Standard Wage Rate状况代码Status Code库存控制Stores Control建议工作单Suggested Work Order约束理论Theory of Constraints (TOC)时间段Time Bucket时界Time Fence单位成本Unit Cost采购计划员Vendor Scheduler采购计划法Vendor Scheduling工作中心能力Work Center Capacity工作中心Work Center在制品Work in Process工作令跟踪Work Order Tracking工作令Work Order工作进度安排Work Scheduling零库存Zero Inventories经济订货批量=Squat(2*年订货量*平均一次订货准备所发生成本/每件存货的年储存成本)美国生产和库存控制协会APICS,American Production & Inventory Control Society三十四、产品三十五、连接器connector三十六、端子terminal三十七、条型连接器bar connector三十八、阴连接器Housing三十九、阳连接器wafer四十、线束wire harness四十一、间距space四十二、额定电压rated voltage四十三、额定电流rated current四十四、接触电阻contact resistance四十五、绝缘电阻insulation resistance四十六、超声波焊接ultrasonic welding四十七、耐压withstand voltage四十八、针pin四十九、物料编号part number五十、导线wire五十一、基体金属Base metal五十二、电缆夹cable clamp五十三、倒角chamfer五十四、接触面积contact area五十五、接触件安装孔contact cavity五十六、接触长度contact length五十七、接触件电镀层contact plating五十八、接触压力contact pressure五十九、接触件中心距contact space六十、接触簧片contact spring六十一、插孔socket contact六十二、法兰、凸缘Flange六十三、界面间隙interfacial gap六十四、键Key六十五、键槽keyway六十六、过渡段ramp六十七、屏蔽套shielding六十八、定位基准Datum reference六十九、扁平电缆flat cable ,Ribbon cable七十、柔性印刷电线Flexible printed wiring七十一、多层印制电路Multilayer printed circuit七十二、焊盘pad七十三、图形pattern七十四、间距pitch七十五、负极Negative pole七十六、正极positive pole七十七、回流Reflow七十八、原理图Schematic diagram七十九、单面板single sided board八十、双面板Two-sided board,Double-sided board 八十一、表面安装surface Mounting八十二、翘曲warp,bow八十三、波峰焊wave soldering八十四、编织层braid八十五、同轴电缆coaxial cable八十六、电介质dielectric八十七、电缆中导线的头数ends八十八、外部干扰external interference八十九、填充物filler九十、护套jacket九十一、比重specific gravity九十二、电阻的温度系数Temperature coefficient of resistance九十三、品管九十四、SPC statistic process control九十五、品管保证Quality Assurance九十六、品管控制Quality control九十七、来料检验IQC Incoming quality control九十八、巡检IPQC In-process quality control九十九、校对calibration百、动态试验dynamic test百一、环境试验Environmental test百二、非破坏性试验non-destructive test百三、光泽gloss百四、击穿电压(dielectric) breakdown voltage百五、拉伸强度tensile strength百六、冷热骤变试验thermal shock test百七、环境试验炉Environmental chamber百八、盐雾实验salt spray test百九、绝缘电阻测试验仪Insulating resistance meter百十、内应力internal stress百十一、疲劳fatigue百十二、蠕变creep百十三、试样specimen百十四、撕裂强度tear strength 百十五、缩痕shrink mark, sink mark百十六、耐久性durability百十七、抽样sampling百十八、样品数量sample size百十九、AQL Acceptable Quality level百二十、批量lot size百二十一、抽样计划sampling plan百二十二、OC曲线operation curve百二十三、试验顺序sequence of tests百二十四、环境温度ambient temperature百二十五、可焊性solderability百二十六、阻燃性flame resistance百二十七、生产百二十八、注塑机injection machine百二十九、冲床Punch machine百三十、混料机blender mixer百三十一、尼龙nylon百三十二、黄铜brass百三十三、青铜bronze百三十四、紫(纯)铜copper百三十五、料斗hopper百三十六、麻点pit百三十七、配料compounding百三十八、涂层coating百三十九、飞边flash百四十、预热preheating百四十一、料reworked material百四十二、塑料reworked plastics百四十三、工艺设计process design百四十四、紧急停止emergency stop百四十五、延时time delay七.QS-9000中的术语APQP Advanced Product Quality Planning and Control Plan,产品先期策划和控制计划PPAP Production Part Approval Process,生产件批准程序FMEA Potential Failure Mode and Effects Analysis,潜在失效模式及后果分析Injection machine 啤机Shot size(weight)实际射胶量injection volume 理论射胶量min mold height 最小容模厚度Max mold height 最大容模厚度Tie bar clearance 拉杆间距Die plate size 模板尺寸Ejector stroke 顶出行程barrel 炮筒,机筒clamp force 锁模力non-return valve 止回阀shear 剪切opening 开模行程Injection pressure 射胶压力back pressure 背压nozzle size 射咀尺寸Cycle time 循环周期down time 停机时间hopper 料筒Mold release 脱模剂lubrication 润滑work horse 主力,主要设备Reserve pressure/packing pressure保压mold trial 试模shot (一)啤Decompress 减压oven 烤炉,烘灶shrinkage rate 收缩率Residence time 滞留时间injection speed 注射速度booster time 增压时间Compression ratio 压缩比mold close time 合模时间Resin 胶料Plastification 塑化,增塑viscosity 粘性,粘度contamination 污染,杂物Thermoplastic 热塑性塑料thermosetting plastics 热固性塑料Booster time 增压时间feed 喂料,填充purge 净化Flame retardant 阻燃degradation 降解,软化regrind 再粉碎Water absorption 吸水reinforce 增强,加固specific gravity 比重Elongation 延伸率density 密度melting point 熔点Polystyrene 聚苯乙烯(PS)Styrene 苯乙烯Acrylonitrile 丙烯腈Polypropylene 聚丙烯(PP)Polyethylene 聚乙烯glass fiber 玻纤Condensation 凝固,浓缩crystalline resin 结晶形塑料Mold materials 模具General-purpose steel 多用途钢tool steel 模具钢Free-cutting steel 高速切削钢case hardening steel 表面硬化钢Pre-hardened steel 预硬钢ball and roller bearing steel 滚珠轴承钢Nonferrous steel 非铁合金high speed steel 高速钢cast iron 铸铁Steel specification 钢材规格steel certification 钢材合格证明书Stainless steel 不锈钢nickel 镍chrome 铬aluminum 铝Copper 铜brass 黄铜bronze 青铜titanium 钛Processing 钢材的加工方法Harding / quench 淬火nitride 氮化temper 回火anneal 退火Roll 轧制abrasive 研磨,磨损的finish 精加工,抛光(polish)Case-hardening 表面硬化milling machine 铣(锣)床Lathe车床drill 钻床wire cut 线割NC(numerical control ) 数控材料EDM (Electrical discharge machine) 电火花加工Cut steel 开料Precision ground 精密研磨heat treatment 热处理tap 丝锥,攻牙Texture 蚀纹weld 焊接forge 锻压deformation 变形Spraying 喷涂die-cast 压铸Properties 性能Resistance 电阻,抵抗能力abrasion / wear磨损erode / corrode 腐蚀Toughness 韧性yield strength 屈服强度tensile strength 拉伸强度Fatigue strength 疲劳强度break 断裂stress 应力hardness 硬度Humidity / moisture 潮湿,湿气roughness 粗糙度parameter 参数Thermal conductivity 导热系数manufacture 制造,加工drawback 缺点Ductility 延展性grain 晶粒property 性能,财产brittleness 脆性GD&T (Geometric Dimensions and Tolerance )形位尺寸公差Flexural strength 挠曲强度impact 冲击conductivity 传导性,导电性Optical 光学的transparent 透明的insulation 绝缘Mechanical 机械的processability 可加工性能timeyield 蠕变Physical 物理的flow rate 流动速率compressive strength 压缩强度Adhesive 粘附的,胶合durability 耐用性Mold design 模具设计Tooling specification 模具规格mould flow 流动模拟sprue nozzle 唧咀孔Clearance 避空,间隙undercut 倒扣flush 插入,埋入legend 图例Groove 凹槽latch 插销class 类型,种类plan 平面图Orifice 孔,口column 柱位boss 凸台standard 标准,规格Rib 骨位tapered interlock 锥形管位块Bubbler 炮隆Bolt 螺钉,销顶identification mark 铭牌P/L strip 锁模片Overflow well / cold-slug well 冷料井Vent 排气pocket 槽Gate location 入水点full line 实线broken line 虚线Retainer 固定,支撑operator 操作者(啤工)receptacle 插座Lifting hole 吊令孔insulation plate 隔热板cavity number 型腔号Bolster 支撑,垫子vent channel 排气槽leak / filter 渗漏Leak test 试运水stamp / engrave 雕刻,印记(打字唛)Clamp slot 码模槽support button / pin 垃圾钉cut steel 开料Lodge 安装,放置inlay 镶嵌,插入cam / lifter 斜顶Stripper推方lifting bar 吊模方sprue 唧咀tolerance 公差Counter bore 沉孔slant 倾斜,斜面conical 圆锥的,圆锥形的Bolt 螺栓manifold 热流道板prototype tooling 原型试验Gusset 角撑reverse mold 倒装模constrain / restrict约束,限制Counter lock 反锁thermocouple 热电偶moldmaker 模具制造商Asset / property number 资产编号tool product destination 模具生产地点Accelerating ejection 加速顶出hydraulic 液压的pneumatic 气动的Trapezoid 梯形的semi-round 半圆形format 格式baffle 隔水片Electrode 电极,铜公spare part 配件gall 磨伤,插伤Cable 电缆,电线plating / coating (电)镀bonding / joint 接头Wall transition 壁厚过渡Product problem 产品问题Troubleshoot 故障处理reduce(add) plastic 减(加)胶Burr/flash披峰Burn mark 烧焦ejector mark 顶针印,顶白black specs 黑点,黑斑Discoloration 混色,污点gloss 光泽jetting/worming 走水纹Sink mark 缩水void / bubble 气泡,夹气distortion 变形Warpage 翘曲short molding / non-fill缺胶,未走齐Weld line / knit line 夹水线discarded as useless 报废Split line 夹线stick in sprue bushing / cavity / core 粘唧咀/前模/后模Break / crack 顶裂brittleness 脆性,易脆Others 其他Invoice 发票,清单vendor(er) 卖方vendee 买方guideline 方针,指导Intricate 复杂的confidential 机密的,不可外泄的proprietary 私有的Authorize 批准,授权recipient 接收者issue ①发布,提供;②问题Approve 确认,赞成requirement 需要,必需物const 常数,常量Regarding 关于,涉及opposite 相反的,对面的latitude 纬度,纵向的Version 版本definition 注释,解说transversal 横向的,截线Profile 轮廓,剖面eliminate / cancel 取消allow / permit 允许,许可Respective 各自的,分别的individual 单独的decrease 减少increase 增加Preliminary 初步的approximately 大约,近似estimate / valuate估计,预算Adjust 调整,校准application 应用,申请maintain 维持Accurate / precise 精确的smooth 光滑,顺畅的device 装置,设备Convenient 方便的deadline 截至日期available 有用的,有空的Shift 轮班,换班critical 关键的,临界的exceptional 异常的,优异的Exceed 超过layout 布局,方案loss 损失,消耗install 安装,安置Rotation 旋转item 条款,项目quotation 报价stabilize 稳定Quality 质量quantity 数量couple 连接,接合configuration 构造,外形Illustrate 图解说明simulation 模拟,仿真recommend 推荐使用。
注塑方面英语术语压铸die-cast压炼injection铸件casting/cast/founding起泡/气泡bubble/blister/air bubble缺料shor-shots/undershot浇不足/*铸under-founding多料superfluities/superfluous material(alloy)顶针痕ejector (pins) mark花纹flow mark/flow line冷纹cold mark/cold streak油纹oil streak走水纹splash mark银纹silver streaks霜纹splay mark夹水纹silver streaks/flow line/weld line 扣模/粘模sprue sticking砂眼/气眼air hole(塑胶件)弯曲/变形warping/warpage变形deformation扭曲twist翅曲warp/warped材料错误using wrong plastic material 凸痕convex mark凹位/凹陷sink mark/dent mark披锋flashing批损pare-mark/cut mark批凹pare off锉纹trim-mark/file-mark锉损excessive trim mark黑点/黑纹black spots/black streak发白white mark烧焦burn marks刮花/刮痕scratch mark擦痕/擦伤rub-mark/brush-burn裂缝cracking裂纹craking line碰损stress mark起皮chip错位(合模线)part line misaling ment孔位尺寸改变dimension various哑色dull color表面变光滑(喷油面)glossy finishing表面sruface/outside镶件insert/insert word缩水/收缩sink mark/shrinkage/shrink mark 偏差color deviation色粉colourment颜色colour/color零件污糟dirty mark on part顶白stress mark/ejector mark屈曲bent夹模线移位part line misalignment胶件料厚不均uneven wall thickness水口料degraded material凹印sink mark擦花abrasion mark混色contamination mark热点不良poor heat sticking定位圈locating ring唧嘴sprue bush (浇口套)A板 A plate (定模板)B板 B plate(动模板)方铁spacer block (垫铁)底板bottom clamp plate(动模底板)面板top clamp plate(定模底板)顶针ejector pin(顶杆)直边钉guide pin (导柱)托司shoulder guide bush(导套)直司straight guide bush(导柱)回针return pin(回程杆)细水口边钉support pin(副导柱)蓝弹簧blue spring(回程弹簧)水口推板runner stripper plate(卸流道板)中边钉ejector guide pin (顶板导柱)顶针板ejector retainer plate(顶杆固定板)顶针底板ejector plate(顶杆垫板)撑头support pollar(支撑柱)垃圾钉stop pin (限位钉)呵core (后模肉内镶件)后模肉back mold body(后模镶件)前模肉cavity(前模镶件)扣鸡P-lockblister 起泡blooming 起霜blow hole 破孔blushing 泛白body wrinkle 侧壁皱纹breaking-in 冒口带肉bubble 膜泡burn mark 糊斑burr 毛边camber 翘曲cell 气泡center buckle 表面中部波皱check 细裂痕checking 龟裂chipping 修整表面缺陷clamp-off 铸件凹痕collapse 塌陷color mottle 色斑corrosion 腐蚀crack 裂痕crazing 碎裂crazing 龟裂deformation 变形edge 切边碎片edge crack 裂边fading 退色filler speak 填充料斑fissure 裂纹flange wrinkle 凸缘起皱flaw 刮伤flow mark 流痕galling 毛边glazing 光滑gloss 光泽grease pits 污斑grinding defect 磨痕haircrack 发裂haze 雾度incrustation 水锈indentation 压痕internal porosity 内部气孔mismatch 偏模mottle 斑点necking 缩颈nick 割痕orange peel 橘皮状表面缺陷overflow 溢流peeling 剥离pit 坑pitting corrosion 点状腐蚀plate mark 模板印痕pock 麻点pock mark 痘斑resin streak 树脂流纹resin wear 树脂脱落riding 凹陷sagging 松垂saponification 皂化scar 疤痕scrap 废料scrap jam 废料阻塞scratch 刮伤/划痕scuffing 深冲表面划伤seam 裂痕shock line 模口挤痕short shot 充填不足shrinkage pool 凹孔sink mark 凹痕skin inclusion 表皮折迭straightening 矫直streak 条状痕surface check 表面裂痕surface roughening 橘皮状表皮皱折surging 波动sweat out 冒汗torsion 扭曲warpage 翘曲waviness 波痕webbing 熔塌weld mark 焊痕whitening 白化wrinkle 皱纹missing part漏件wrong part错件excessive defects过多的缺陷critical defect极严重缺陷major defect主要缺陷minor defect次要缺陷not up to standard不合规格dimension/size is a little bigger尺寸偏大(小) cosmetic defect外观不良slipped screwhead/slippery screw head螺丝滑头slipped screwhead/shippery screw thread滑手speckle斑点mildewed=moldy=mouldy发霉rust生锈deformation变形burr(金属)毛边flash(塑件)毛边poor staking铆合不良excesssive gap间隙过大grease/oil stains油污inclusion杂质painting peel off脏污shrinking/shrinkage缩水mixed color杂色scratch划伤... (Flow Line)流痕(Weld Line) 熔接线Sink Mark凹陷Streak条纹Warpage翘曲。
注塑方面英语术语压铸die-cast压炼injection铸件casting/cast/founding起泡/气泡bubble/blister/air bubble缺料shor-shots/undershot浇不足/*铸under-founding多料superfluities/superfluous material(alloy)顶针痕ejector (pins) mark花纹flow mark/flow line冷纹cold mark/cold streak油纹oil streak走水纹splash mark银纹silver streaks霜纹splay mark夹水纹silver streaks/flow line/weld line 扣模/粘模sprue sticking砂眼/气眼air hole(塑胶件)弯曲/变形warping/warpage变形deformation扭曲twist翅曲warp/warped材料错误using wrong plastic material 凸痕convex mark凹位/凹陷sink mark/dent mark披锋flashing批损pare-mark/cut mark批凹pare off锉纹trim-mark/file-mark锉损excessive trim mark黑点/黑纹black spots/black streak发白white mark烧焦burn marks刮花/刮痕scratch mark擦痕/擦伤rub-mark/brush-burn裂缝cracking裂纹craking line碰损stress mark起皮chip错位(合模线)part line misaling ment孔位尺寸改变dimension various哑色dull color表面变光滑(喷油面)glossy finishing表面sruface/outside镶件insert/insert word缩水/收缩sink mark/shrinkage/shrink mark 偏差color deviation色粉colourment颜色colour/color零件污糟dirty mark on part顶白stress mark/ejector mark屈曲bent夹模线移位part line misalignment胶件料厚不均uneven wall thickness水口料degraded material凹印sink mark擦花abrasion mark混色contamination mark热点不良poor heat sticking定位圈locating ring唧嘴sprue bush (浇口套)A板 A plate (定模板)B板 B plate(动模板)方铁spacer block (垫铁)底板bottom clamp plate(动模底板)面板top clamp plate(定模底板)顶针ejector pin(顶杆)直边钉guide pin (导柱)托司shoulder guide bush(导套)直司straight guide bush(导柱)回针return pin(回程杆)细水口边钉support pin(副导柱)蓝弹簧blue spring(回程弹簧)水口推板runner stripper plate(卸流道板)中边钉ejector guide pin (顶板导柱)顶针板ejector retainer plate(顶杆固定板)顶针底板ejector plate(顶杆垫板)撑头support pollar(支撑柱)垃圾钉stop pin (限位钉)呵core (后模肉内镶件)后模肉back mold body(后模镶件)前模肉cavity(前模镶件)扣鸡P-lockblister 起泡blooming 起霜blow hole 破孔blushing 泛白body wrinkle 侧壁皱纹breaking-in 冒口带肉bubble 膜泡burn mark 糊斑burr 毛边camber 翘曲cell 气泡center buckle 表面中部波皱check 细裂痕checking 龟裂chipping 修整表面缺陷clamp-off 铸件凹痕collapse 塌陷color mottle 色斑corrosion 腐蚀crack 裂痕crazing 碎裂crazing 龟裂deformation 变形edge 切边碎片edge crack 裂边fading 退色filler speak 填充料斑fissure 裂纹flange wrinkle 凸缘起皱flaw 刮伤flow mark 流痕galling 毛边glazing 光滑gloss 光泽grease pits 污斑grinding defect 磨痕haircrack 发裂haze 雾度incrustation 水锈indentation 压痕internal porosity 内部气孔mismatch 偏模mottle 斑点necking 缩颈nick 割痕orange peel 橘皮状表面缺陷overflow 溢流peeling 剥离pit 坑pitting corrosion 点状腐蚀plate mark 模板印痕pock 麻点pock mark 痘斑resin streak 树脂流纹resin wear 树脂脱落riding 凹陷sagging 松垂saponification 皂化scar 疤痕scrap 废料scrap jam 废料阻塞scratch 刮伤/划痕scuffing 深冲表面划伤seam 裂痕shock line 模口挤痕short shot 充填不足shrinkage pool 凹孔sink mark 凹痕skin inclusion 表皮折迭straightening 矫直streak 条状痕surface check 表面裂痕surface roughening 橘皮状表皮皱折surging 波动sweat out 冒汗torsion 扭曲warpage 翘曲waviness 波痕webbing 熔塌weld mark 焊痕whitening 白化wrinkle 皱纹missing part漏件wrong part错件excessive defects过多的缺陷critical defect极严重缺陷major defect主要缺陷minor defect次要缺陷not up to standard不合规格dimension/size is a little bigger尺寸偏大(小) cosmetic defect外观不良slipped screwhead/slippery screw head螺丝滑头slipped screwhead/shippery screw thread滑手speckle斑点mildewed=moldy=mouldy发霉rust生锈deformation变形burr(金属)毛边flash(塑件)毛边poor staking铆合不良excesssive gap间隙过大grease/oil stains油污inclusion杂质painting peel off脏污shrinking/shrinkage缩水mixed color杂色scratch划伤实用标准文档(Flow Line)流痕(Weld Line) 熔接线Sink Mark凹陷Streak条纹Warpage翘曲文案大全。
专业英语注塑成型专业词汇专业英语---注塑成型专业词汇Injection machine 啤机Shot size(weight)实际射胶量injection volume 理论射胶量min moldheight 最小容模厚度Max mold height 最大容模厚度Tie bar clearance 拉杆间距Die platesize 模板尺寸Ejector stroke 顶出行程barrel 炮筒,机筒clamp force 锁模力non-return valve 止回阀shear 剪切opening 开模行程Injection pressure 射胶压力back pressure 背压nozzle size 射咀尺寸Cycle time 循环周期down time 停机时间hopper 料筒Mold release 脱模剂lubrication 润滑work horse 主力,主要设备Reserve pressure/packing pressure保压mold trial 试模shot (一)啤Decompress 减压oven 烤炉,烘灶shrinkage rate 收缩率Residence time滞留时间injection speed 注射速度booster time 增压时间Compression ratio 压缩比mold close time 合模时间Resin 胶料Plastification 塑化,增塑viscosity 粘性,粘度contamination 污染,杂物Thermoplastic 热塑性塑料thermosetting plastics 热固性塑料Booster time增压时间feed 喂料,填充purge 净化Flame retardant 阻燃degradation 降解,软化regrind 再粉碎Water absorption 吸水reinforce 增强,加固specific gravity比重Elongation 延伸率density 密度melting point 熔点Polystyrene 聚苯乙烯(PS)Styrene 苯乙烯Acrylonitrile 丙烯腈Polypropylene 聚丙烯(PP)Polyethylene 聚乙烯glass fiber 玻纤Condensation 凝固,浓缩crystalline resin 结晶形塑料Mold materials 模具General-purpose steel 多用途钢tool steel 模具钢Free-cutting steel 高速切削钢case hardening steel 表面硬化钢Pre-hardened steel 预硬钢ball androller bearing steel 滚珠轴承钢Nonferrous steel 非铁合金high speed steel 高速钢cast iron 铸铁Steel specification 钢材规格steel certification 钢材合格证明书Stainless steel 不锈钢nickel 镍chrome 铬aluminum 铝Copper 铜brass 黄铜bronze 青铜titanium 钛Processing 钢材的加工方法Harding / quench 淬火nitride 氮化temper 回火anneal 退火Roll轧制abrasive 研磨,磨损的finish 精加工,抛光(polish)Case-hardening 表面硬化milling machine 铣(锣)床Lathe车床drill 钻床wire cut 线割NC(numerical control ) 数控材料EDM (Electrical discharge machine) 电火花加工Cut steel 开料Precisionground 精密研磨heat treatment 热处理tap 丝锥,攻牙Texture 蚀纹weld 焊接forge 锻压deformation 变形Spraying 喷涂die-cast 压铸Properties 性能Resistance 电阻,抵抗能力abrasion / wear磨损erode / corrode 腐蚀Toughness 韧性yield strength 屈服强度tensile strength 拉伸强度Fatigue strength 疲劳强度break 断裂stress 应力hardness 硬度Humidity / moisture 潮湿,湿气roughness粗糙度parameter 参数Thermal conductivity 导热系数manufacture 制造,加工drawback 缺点Ductility 延展性grain 晶粒property 性能,财产brittleness 脆性GD&T (Geometric Dimensions and Tolerance )形位尺寸公差Flexural strength 挠曲强度impact 冲击conductivity 传导性,导电性Optical 光学的transparent透明的insulation 绝缘Mechanical 机械的processability 可加工性能timeyield 蠕变Physical物理的flow rate 流动速率compressive strength 压缩强度Adhesive 粘附的,胶合durability 耐用性Mold design 模具设计Tooling specification 模具规格mould flow 流动模拟sprue nozzle 唧咀孔Clearance 避空,间隙undercut 倒扣flush 插入,埋入legend 图例Groove 凹槽latch 插销class 类型,种类plan 平面图Orifice 孔,口column 柱位boss 凸台standard 标准,规格Rib 骨位tapered interlock 锥形管位块Bubbler 炮隆Bolt 螺钉,销顶identification mark 铭牌P/L strip 锁模片Overflow well / cold-slug well 冷料井Vent 排气pocket 槽Gatelocation 入水点full line 实线broken line 虚线Retainer 固定,支撑operator 操作者(啤工)receptacle插座Lifting hole 吊令孔insulation plate 隔热板cavity number 型腔号Bolster 支撑,垫子vent channel 排气槽leak / filter 渗漏Leak test 试运水stamp / engrave 雕刻,印记(打字唛)Clamp slot 码模槽support button / pin 垃圾钉cut steel 开料Lodge 安装,放置inlay 镶嵌,插入cam / lifter 斜顶Stripper推方lifting bar 吊模方sprue 唧咀tolerance 公差Counter bore 沉孔slant 倾斜,斜面conical 圆锥的,圆锥形的Bolt 螺栓manifold 热流道板prototype tooling 原型试验Gusset 角撑reverse mold 倒装模constrain / restrict约束,限制Counter lock 反锁thermocouple 热电偶moldmaker 模具制造商Asset / property number 资产编号tool product destination 模具生产地点Accelerating ejection 加速顶出hydraulic 液压的pneumatic 气动的Trapezoid 梯形的semi-round 半圆形format 格式baffle 隔水片Electrode 电极,铜公spare part 配件gall 磨伤,插伤Cable 电缆,电线plating / coating (电)镀bonding / joint 接头Wall transition 壁厚过渡Product problem 产品问题Troubleshoot 故障处理reduce(add) plastic 减(加)胶Burr/flash披峰Burn mark 烧焦ejector mark 顶针印,顶白black specs 黑点,黑斑Discoloration 混色,污点gloss 光泽jetting/worming 走水纹Sink mark 缩水void / bubble 气泡,夹气distortion 变形Warpage 翘曲short molding / non-fill缺胶,未走齐Weld line / knit line夹水线discarded as useless 报废Split line 夹线stick in sprue bushing / cavity /core 粘唧咀/前模/后模Break / crack 顶裂brittleness 脆性,易脆Others 其他Invoice 发票,清单vendor(er) 卖方vendee 买方guideline 方针,指导Intricate 复杂的confidential 机密的,不可外泄的proprietary 私有的Authorize 批准,授权recipient 接收者issue ①发布,提供;②问题Approve 确认,赞成requirement 需要,必需物const 常数,常量Regarding 关于,涉及opposite 相反的,对面的latitude 纬度,纵向的Version 版本definition 注释,解说transversal 横向的,截线Profile 轮廓,剖面eliminate / cancel 取消allow / permit 允许,许可Respective 各自的,分别的individual 单独的decrease 减少increase 增加Preliminary 初步的approximately 大约,近似estimate / valuate估计,预算Adjust 调整,校准application 应用,申请maintain 维持Accurate / precise 精确的smooth 光滑,顺畅的device 装置,设备Convenient 方便的deadline 截至日期available 有用的,有空的Shift 轮班,换班critical 关键的,临界的exceptional 异常的,优异的Exceed 超过layout 布局,方案loss 损失,消耗install 安装,安置R otation 旋转item 条款,项目quotation 报价stabilize 稳定Quality 质量quantity 数量couple 连接,接合configuration 构造,外形Illustrate 图解说明simulation 模拟,仿真recommend 推荐使用。
塑料加工专业英语
Plastic Processing专业英语是指与塑料制品的加工工艺、产品设计、设备和工艺参数等相关的英语词汇和表达方式。
下面是一些相关的塑料加工专业英语词汇和表达方式:
1. Injection molding 注塑成型
2. Extrusion 挤出
3. Blow molding 吹塑
4. Rotational molding 旋转成型
5. Thermoforming 热成型
6. Compression molding 压缩成型
7. Calendering 挤压
8. Plasticizing 熔化
9. Melt temperature 熔融温度
10. Injection pressure 注塑压力
11. Cooling time 冷却时间
12. Mold cavity 模腔
13. Ejector pin 弹簧顶杆
14. Gate sprue 浇口
15. Runner system 平衡道
16. Mold release agent 脱模剂
17. Plasticizer 增塑剂
18. Reinforcement 增强剂
19. Melt flow index 熔体流动指数
20. Mold shrinkage 模具收缩率
这些词汇和表达方式可以帮助从事塑料加工专业的人更好地理解和沟通相关的技术和工艺要求。
注塑英语大全成型工艺流程及条件介绍Molding technique procedure and parameter introduction 第一节成型工艺Section 1 molding technique.1.成型工艺参数类型Sorts of molding parameter.(1).注塑参数ction parameter.a.注射量ction rate.b.计量行程Screw back positionc.余料量Cushiond.防诞量Sucking back ratee.螺杆转速Screw speedf.塑化量Plastic0 rateg.预塑背压Screw back pressureh.注射压力和保压压力ction pressure and holding pressurei.注射速度ction speed(2)合模参数Clamping parametera.合模力 Clamping forceb.合模速度Clamping speedc.合模行程.Clamping stroked.开模力Opening forcee.开模速度Opening speedf.开模行程Opening positiong.顶出压力Ejector advance pressureh.顶出速度Ejector advance speedi.顶出行程Ejector advance position2.温控参数Temperature parametera.烘料温度Dry resin material temperatureb.料向与喷嘴温度Cylinder temperature and nozzle temperaturec.模具温度Mold temperatured.油温Oil temperature3.成型周期Molding cyclea.循环周期Cycle timeb.冷却时间Cool timec.注射时间ction timed.保压时间Holding pressure timee.塑化时间Plant timef.顶出及停留时间Knocking out and delay timeg.低压保护时间Mold protect time成型工艺参数的设定须根据产品的不同设置.Molding technique parameter setting differs depending on type of product第二节成型条件设定Section 2 Molding parameter Setting按成型步骤:可分为开锁模,加热,射出,顶出四个过程.Molding steps: mold opening/closing, heating ction and knocking out.开锁模条件:Mold opening parameter:快速段中速度低压高压速度High-speedmid-speedLow pressure high pressure speed锁模条件设定:Mold closing parameter setting1锁模一般分:快速→中速→低压→高压Mold closing: high-speed →low-speed →low pressure→high pressure2.快锁模一般按模具情况分,如果是平面二板模具,快速锁模段可用较快速度,甚至于用到特快,当用到一般快速时,速度设到55-75%,完全平面模可设定到80-90%,如果用到特快就只能设定在45-55%,压力则可设定于50-75%,位置段视产品的深浅(或长短)不同,一般是开模宽度的1/3.In high-speed section, Mold closing speed depends on type of mold. For two –plate mold it can set quick and even especially quick usually, it set speed within 55-75%. For full-plate mold it set speed within80-90% while using especially high speed it set speed within 45-55% and pressure within 50-75% position distance setting differs depending on the volume of product and usually it can be set 1/3 of mold opening position.3.中速段,在快速段结束后即转换成中速,中速的位置一般是到模板(包括三板模,二板模)合在一块为止,具体长度应视模板板间隔,速度一般设置在30%-50%间,压力则是20%-45%间.In mid-speed section: Mold closing speed changes into mid-speed after high-speed section finish.Mid-speed start position is where two plates meet (include three-plate mold and two-plate mold ) Distance of mid-speed is up to distance of two plates plate it speed within 30-50% and pressure 20-45%.4.低压设定,低速设定一般是在模板接触的一瞬间,具体位置就设在机台显示屏显示的一瞬间的数字为准,这个数字一般是以这点为标准,,即于此点则起不了高压,高于此点则大,轻易起高压.设定的速度一般是15%-25%,视乎不同机种而定,压力一般设定于1-2%,有些机则可设于5-15%,也是视乎不同机种不同.Low-pressure section: Mold closing sets low-pressure when plates meeting. This position is set to the data of machine screen on this time. This point is the gage of the data. Data lower the point there is no high-pressure. Data higher the point there is high-pressure easily. It set speed within 15-25% and pressure within 1-2% depending on type within 1-2% depending on type of ction molding machine.5.高压设定,按一般机台而言,高压位置机台在出厂时都已作了设定,相对来讲,是不可以随便更改的,比如震雄机在50P.速度相对低压略高,大约在30-35%左右,而压力则视乎模具而定,可在55-85%中取,比如完全平面之新模,模具排气良好,甚至于设在55%即可,如果是滑块较多,原来生产时毛边也较多,甚至于可设在90%还略显不足.High-pressure section: To normal ction molding machine, high-pressure position had been set before they were sent to customer. It can not be modified. For example high-pressure position of CHENHSONG machine is 50P.The speed of high-pressure section is about 30-35% and higher than that of low-pressure. The pressure is up to mold, it can set within 55-85% For full-plate mold, it’s eject air well, it can set pressure 55% .If mold has a lot of slides and flash rate high in production, pressure can set 90%.加热工艺条件设定Heating technique parameter setting1.加热段温度设定必须按照产品所使用的原料的不同而不同,但却必须遵循一个这样的规则,即由射口筒到进科段温度是逐步递减的.且递减温度是以10.度为单位.The proper temperature setting differs depending on type of resin material, but it must be abide by a rule that temperature setting should diminish in step 10.C from nozzle to feeding resin material position.2特殊情况下.如料头抽丝,则射口筒温度应降低,如果是比较特殊的原料冷凝比较快的.则射口筒温度则不止比第二节法兰温度高10度.比如PPS.尼龙等.Nozzle temperature setting should low if product line. If resin material such asPPS, PA, cool very soon , Nozzle temperature should higher more 10.C than the second cylinder temperature.3.机台马达启动温度视乎机台不同而不同,一般出于对机台油路中的油封保护需要,油温最好能控制在40度-60度,以免油封长期高压而变化,缩短使用寿命,造成成型不稳定.Pump turning on temperature is different depending on type of ction molding machine. To protect oil seal of machine it set oil temperature within 40.C-60.C, If oil seal work on condition that high pressure and damaged It’s work time will be shorter, it can cause molding stable.第三节注射及熔胶(加料)工艺条件设定ction and plastic Technique parameter setting一.注射ction第四节常见塑料原料的有关温度值.原料Resin名称Name熔点℃Melt’s成型温度℃Molding Temperature(’c)分解温度℃Decomposing Temperature(‘C)模具温度℃Mold Temperature(‘c)干燥温度℃Resin d ry temperature(‘c)注射是把塑料原料经加热后射进模腔的过程,它一般可分为第一级,第二级,第三级,第四级及保压几段:ction is a step which ct melt resin material into mold. It consists of stepl,step2 ,step3,step4 and holding pressure step:1.第一级注射一般是注射料头段.具注射量一般可根据料头的轻重来估计其行程,当然也可以依据公式来计算,如公式:Step l cts usually tunnel material, ction V olume can be estimated according to the weight of course it can be calculated by formula:L=Si=Vi/0.785Ds2L:注射行程; Si:注射行程;L: ction stroke Si: ction strokeVi:理论注射容积; Ds:螺杆直径;Vi: ction volume of theoretical Ds: diameter of screw0.785:是Ω/4的值.0. 785: value ofΩ/4.当然,如果我们在成型时每设定一个参数都要计算一次,要成型出一个产品就要几个小时才能完成了.But it cost a lot of time to produce one product if every time molding parameter is setting by calculation.2.第二级是注塑产品约2/3的阶段,当然,根据产品特殊需要,也允许成型不到2/3阶段,比如避免结合线问题,这一阶段的成型速度及压力一般是整个成型段的最大值段,如果排的产品与机台基本是相吻合的.模具结构合理,排气良好,这一段的压力一般也不会超过80%.速度侧视产品需变,可能大到95%也可,自然一般都是在55%-80%间.Step 2 ct 2/3 of product. It can lower 2/3 of product according to requirement of product. For example to prevent weld line. Molding speed and pressure on this step is the maximum of whole molding section. If Mold suit the ction molding machine and mold structure reasonable and eject air well, pressure of this step should lower 80%. Molding speed setting within 55-80% but it may setting 95% for especial product.3.第三段是注射余下的1/3段,其速度和压力根据产品的需要,一般是小于第二段,速度和压力存在于一个往下降的过程.主要是为了防止产品毛边的产生,但同时又必须把产品充填饱满.Step3 ct remain 1/3 of product. According to product molding speed and pressure lower than that of step2 To prevent flash speed and pressure should decrease but it can’t shot short.4.第四段:一般有机台还有第五,第六段,这段的成型速度和压力相同前,都存在两段一个递减过程.其作用都是起到一个再次充满的作用.Step4 section: Some ction machines have step5,step6 which are same as former molding speed and pressure this step should diminish and ct once more.5.保压段:不论成型什么产品,都存在一个保压过程.任何产品都不同程度的存在一个厚薄不一的问题,正常情况下,较厚的部分都可能存在一个收缩凹陷的现象,为了解决这种现象,就应应用到保压,保压一般来讲都应用较慢的射速,而压力的设置则应看缩水的情况如何,小到25%,大到80%都有可能.Holding pressure step: No matter what product there is a holding pressure step. Any product can’t molding a same thickness. Usually the deeper section may sink mark . To prevent this defect it should set holding pressure, The ction speed of holding pressure step is slow but holding pressure setting within 25-80% depending on sink mark.二.熔胶段工艺Plastic Technique1.再复杂的熔胶旋转过程最多不会超过三段,因为熔胶本身就是存在于把胶熔进料筒的过程,如果原料粘度大,熔胶压力则大,但速度则应取决于原料的分解温度,熔胶速度越快,原料中的剪切力则会越大,料管温度则越高,局部原料产生分解的可能性则会越大,故一般熔胶会采用中速为宜,如45%-75%,熔胶同时会碰到一个比较重要的环节,那就是背压的使用,产品精度要求越大,背压的使用则更大,背压可使原料分子间结构更紧密,成型出的产品则尺寸更稳定,外观越好.当然,背压太大,则会产生流涎,所以背压的使用又应考虙到其它原因.Plastic should lower 3 steps, because plastic is a step to add melt resin material to cyclinder , Higher stick of resin material ,higher screw back pressure. Screw speed differs depending on decomposing temperature of resin material ,Higher screw speed ,Higher trim force of resin, higher cyclinder temperature. Some resin material may decomposes so it set screw speed in mid-speed such as 45-75%, In plastic step setting screw back pressure is very important, Higher screw back pressure ,higher quality of product screw back pressure make resin structure order, Molding product is beautiful and volume stable. But ,it maybe flow if screw back pressure too high . So all factors should be considered when using screw back pressure.2.熔胶过程还有一个比较重要的环节,那就是松退,松退分前松退和后松退,其作用一般是为了防止流涎和抽丝,设定值速度和压力都在20%-50%间,设定的行程一般在2-5cm间,太长的行程可能会使料筒里面贮存空气,导致下一模出现不期望的气泡.In plastic step sucking back is very important too. Sucking back include front sucking back and back sucking back It setting sucking back to prevent flow and line. It sets sucking back speed and pressure within 20-50% and distance within 2-5cm. TOO long distance make cyclinder reserve air and cause bubble at next molding.顶出的工艺设定knocking out technique setting产品经冷却定型后则有一个开模的过程,开模基本上是合模的反过程.开模的未段则有一个慢速设置,开模完成后,产品必须顶出的过程.There is a mold opening step after product cooling taking shape. Mold opening is a reverse step of mold closing. The last step of mold opening speed set slow. Product should be knocked out after mold opened.一.顶前:Knocking out顶前最好分两个阶级,第一阶可分为中压慢速,即是把产品轻轻顶出一部分,然后是中压中速顶,中压中速一般指的是35%-55%,而低速则有可能低到5%,这需视产品不同而言,顶出行程设定是顶出长度稍比产品垂直深度大1-2cm即可.Knocking out includes two steps, Step1 section setting mid-speed, knocks product out partly step2 section setting mid-pressure and mid-speed . Depending on different product, mid-pressure and mid-speed sets within 35-55% but low-speed can set 5%. Distance of knocking out longer 1-2cm than the vertical thickness of product.二.退针Back顶退包括两个过程与顶落的过程基本一致,顶退的终点应预留1-3cm的空间,以保护顶针油管不被顶坏.The same as knocking out, ejector back includes 2 steps. To protect the ejector oil jar, it should make a 1-3mm distance in the ending point of ejector back.三.顶针方式还包括一个多次顶,单次顶及顶针停留的选择,机械手取产品,脱模顺利的情况都采取多项,为了顶针油缸寿命的延长,多次顶就以不超过三次为宜,顶针停留一般用在顶针带着产品退回有可能对增品产生损伤的模具,同时为配合机械手使用,有时也需要较短的顶针停留.The way of knocking out includes knocking out once, Knocking out repeat and ejector delay. Take product by manipulator or take product easy, it should select knocking out once. To longer the work time of ejector oiljar, times of knocking out lower 3 times. Ejector delay used when product will be damaged if ejector back or suit manipulator.成型时间的设定Molding time setting在保证产品质量的前提下,周期时间是越短越好,周期时间又包括如下几项:射胶时间,保压时间,熔胶时间,冷却时间,顶出时间,锁模低压时间,甚至乎关系到时间因素的还有还开模与锁模,及顶出的快慢.Cycle time should shorter on condition that product quality well. Cycle time includes: ction time , holding pressure time, plastic time, cure time, knocking out time and mold protect time. Even mold opening closing sopeed and knocking out speed affect cycle.1.射胶时间包含保压时间,一般看起来,射胶时间越长,产品越饱和,但我们在讲求质量时,同时也须考虑产能,更何况,射胶时间过长,有可能会造成产品过于饱满而寻致粘模顶的变形呎寸偏大等一系列问题,故我们在设置射胶时间时应综合考虑,尽量在合乎质量要求时缩短射胶时间.ction time consists holding pressure time. Longer ction time, fuller product, we should consider production quantity when we suit for quality. If ction time too long, it may cause a series of defects suck as flash strain. So all sorts of factors should be considered, ction time should be shout if quality suit for requirement.2.熔胶时间的长短取决于熔胶速度设定的快慢,背压设定的大小,但有一点,熔胶时间控制的长短一定要比冷却时间短.Plastic time depends on plastic speed and screw back pressure, but plastic time must shorter than cure time.3.冷却时间:冷却时间的长短直接影响到成型的周期,冷却时间越长,成型时间就越长,造成产能就越低,故我们在设定高压冷却时间时,只要能保证到产品成型顺利,不会直接影响到变形等问题,设定的时间也是越短越好.Cure time: Cure time affects molding cycle. Longer cure time, longer molding cycle, lower production quantity. So it sets cure time short on condition that product molding succed and can’t deformation..4.在大量使用机械手的塑胶公司,我们的顶出时间一般是与机械手配合为宜,全自动使用机械手时顶出停留时间一般保持1.5-2秒,半自动生产,如因顶针退回会导致产品掉落或卡紧,而取不下产品,停留时间则应保持5秒左右.In PCE company, for using manipulator in abundence , knocking out time suits manipulator, Knocking out delay keeps 1.5-2 second when using manipulator full-manipulator, knocking out delay keeps about 5 second when using manipulator semi-manipulator and product will fall or can’t be taken off if ejector back.5.低压保护时间对保护我们人身安全,模具安全起很大作用,配合好模具低压位置和低压压力的调整,低压保护的时间应取1-3秒,保护时间越短,可能造成的危害则越小.Low-pressure protect is very important for safety and protect mold, Mold protect time should adjust within 1-3 second suit low pressure and position of mold protect, shorter protect time, make damaged。
精心整理一、浇口(入水):gate??????浇口进入位置:gatelocation??????浇口形式:gatetype??????大水口(2板模):edgegate,sidegate??????细水口(3板模):pin-pointgate????????????????????????????????????????????????????????????流道平衡:runnerbalance??????热嘴:hotsprue??????热流道板:hotmanifold??????发热管:cartridgeheater??????探温针:thermocouples??????插座:connectorsocket ??????密封/封料:seal三、运水:waterline??????喉塞:lineplug??????????????????????????????????????????????????????????????????管销(管钉):dowelpin ??????开模槽:plybarslot??????内模管位锁:core/cavityinter-lock ??????顶针:ejectorpin??????司筒针:ejectorsleevepin??????推板:stripperplate??????缩呵:movablecore,returncore,corepuller ??????扣机(尼龙拉勾):nylonlatchlock????????????????????????????????????????????????????????????????????????挡板:stopplate??????定位圈:locatingring??????锁扣:latch??????扣鸡:partinglockset??????推杆:pushbar??????栓打螺丝:??????杯头螺丝:S??????活动臂:leverarm??????分流锥:sprueseparator????????????????????????????????????????????????????????????????????????斜顶杆:angleejectorrod?? ??????复位键/提前回杆:earlyreturnbar ??????气阀:valves五、术语:terms??????承压平面平衡:partingsurfacesupportbalance ??????模排气:partinglineventing??????回针碰料位:returnpinandcavityinterference ??????模闭合总厚度:moldbaseshutheight ??????顶针碰运水:waterlineinterfereswithejectorpin????????????????????????????????????????????????????????????????????????公差:tolerance??????铜电极(铜公):copperelectrode ??????石墨电极:graphiteelectrode??????夹线:weldline??????翘曲:warpage??????缺胶:shortshot??????困气:airtrap??????毛刺:flash,burr~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~模具述语进入位:大水口:细水口:转水口:二、流道热流道:唧嘴直流流道平衡热嘴:发热管:探针插头:插座:connectorsocket密封/封料:seal三、运水:waterline喉塞:linelpug喉管:tube塑胶管:plastictube快速接头:jiffyquickconnectorplug/socker四、模具零件:moldcomponents三板模:3-platemold二板模:2-platemold边钉/导边:leaderpin/guidepin边司/导套:bushing/guidebushing 中托司:shoulderguidebushing中托边L:guidepin顶针板:ejectorretainnerplate托板:supportplate螺丝:screw管钉:dowelpin开模槽:顶针:司筒:司筒针:推板:缩呵:斜顶:上内模:下内模:镶件:压座/耐磨板/压条:撑头唧嘴:挡板:定位圈:锁扣:latch扣鸡:partinglockset推杆:pushbar栓打螺丝:顶板:eracuretun活动臂:leverarm分流锥:spuresperader水口司:bush垃圾钉:stoppin隔片:buffle弹弓柱:springrod弹弓:diespring中托司:ejectorguidebush中托边:ejectorguidepin镶针:pin销子:dowelpin波子弹弓:ballcatch喉塞:pipeplug锁模块:斜顶:斜顶杆:活动臂:气阀:斜导边:术语:模排气:料位出上反呵:稳定性好:goodstability,stable强度不够:insufficientrigidity均匀冷却:evencooling扣模:sticking热膨胀:theroexpansion公差:tolorance铜公(电极):copperelectrode~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ SurfaceAppearance外观Glossiness/glossfinish光洁度Mattfinish/mattsurface毛面Glassfiberrichsurface/glassemergenceonthesurface玻纤外露Blooming/surfaceblooming表面析出Whitepatchesonsurface表面白斑Silvermarks/silverstreak银纹Splaymark水纹Flowmark流纹Weldline溶结纹Void孔FRfailedPoorcutDistortion变形Overdimension尺寸过大Underdimension尺寸过小Flashing飞边Discoloration变色Offcolor颜色差异Flowrate流动率Viscous粘Highflow高流动Lowflow低流动Sticky粘Moldrelease脱模Antioxidant抗氧剂Flameretardantagent阻燃剂Heatstabilizer热稳定剂Choppedglassfiber短切玻纤Rovingglassfiber粗纱/长玻纤Glassbeads玻璃微珠ColorantPigmentDye。
注塑模具英文专业词汇大全组合铣顶块Assemble mill紫(纯)铜copper注塑模具injection mold注塑机injection machine注射压力injection pressure注射速率injection rate注射能力shot capacity主流道sprue直浇口direct gate支承板support plate再生料recycle material预热preheating银条Silver streak移印pad printing循环时间cycle time型腔cavity斜销angle pin镶件Insert万能摇臂钻床Universal radial movable driller 万能铁床Universal milling machine脱模斜度draft脱模剂release agent脱模ejection涂层coating凸模core plate锁模力clamp force缩水Sink mark丝印Silk screen printing水路钻孔加工drill water holes双色注塑Double injection molding 双色注塑2K injection数控加工中心CNC machine center 试生产Trial run; Pilot run (PR)烧焦Burn mark三板式模具three plate mold熔合线Welding line热熔Heat staking热流道模具hot-runner mold缺料Short mold青铜bronze切料头Degate翘曲变形Deformation嵌件注塑Insert molding潜伏浇口submarine gate气印gas mark气泡Bubbles破裂Crack平面磨床Surface grinding machine配料compounding排气槽vent尼龙nylon能力Capability膜内注塑IMD molding ( In-mold decoration)模流分析mold flow analysis模架mold base麻点pit螺纹型芯threaded core螺杆screw流痕Flow mark流道板runner plate料斗hopper量产mass production立式钻床Vertical driller老化aging拉料杆sprue puller困气air trap快速成型模Rapid prototype tool (RPT)开裂crack 精加工CNC machining浇口套sprue bush浇口残留gate vestige浇口gate键槽keyway键Key间距pitch机械手Robot回位销Return pin黄铜brass滑块slide滑动型芯slide core黑条Black streak合模力clamping force合模mold spotting合模Bed out高光注塑Mold in color(MIC)分型线(面)parting line分流道runner飞边flash方铁spacer plate多腔模具multi-cavity mold短射short injection动模座板Moving clamp plate动模装配/定模抛光Assembly core side/Polishing 动模movable mold定位环locating ring定模座板Fixed clamp plate定模Fixed mold顶针ejector pin电脉冲加工EDM电脉冲加工EDM电加工设备Electron Discharge Machining点浇口pin-point gate倒角chamfer导柱Guide pin单腔模具single cavity mold粗加工CNC rough machining冲床Punch machine超声熔接Ultrasonic welding (USW)产能Capacity测浇口edge gate参数Parameter采购备料Order steel表面光泽不良Lusterless 表面剥离Pelling变形warpage闭模时间closing time保压时间holding time薄壁注塑Thin wall molding 凹模cavity plate,T0试模T o Tool TrialB板B plateA板A plate3D数据设计3D design。
注塑专业名词中英文对照表英语名称中文名称Hopper Dryer 料斗干燥器Injection Molding Cycle 注塑周期Crushing Mill 粉碎机Precision Injection 精密成形Gas Injection/AGI 吹气成形、气辅成形Set the condition 设定注塑前提Machine 机械Mold Set-Up 上模Screw 螺杆、螺钉、螺旋Mold Down 下模Screw Head 螺杆头Pressure 压力Joint 接头,接缝Low Pressure 低压Injection 注塑Low Pressure Clamping 低压锁模Feeder 送料(加料)器Holding Time 保压时间Compound 混炼料Back Pressure 背压Blend 搅浑,调和Clamping Force 合模力Mixer 混淆器Hold Clamping Pressure 锁模型压成力Mixing 混淆Clamping Stroke 合摸行程Cooling 冷却Clamping Unit 锁模装配Cooling Tower 冷却塔Mold Opening 开模Chiller 冷水机Mold Closing 合摸Temperature Controller 温调机Speed 速率Cylinder 料筒Injection Speed 射出速率Heater 加热器Injection Capacity 注塑量Band Heater 加热圈Charging 计量Thermocouple 热电偶Charging Stroke 计量行程Nozzle 射嘴Rib 骨位,筋位,增强筋Nozzle Head 射嘴头子Insert 嵌件,镶嵌"Tie Bar,Tie Rod" 拉杆,拉杠Wall Thickness 胶厚,壁厚Distance Between Tie Rods 拉杆距离Plasticizing 塑化Limit Switch 限位(限定)开关Thermal Decomposition 热分化Operation Switch 操作开关Shrinkage 收缩Operation Guide 操作指南Resin 树胶Control Panel 节制器Material 原料,质料Automatic 全自己主动Plastics 份子化合物塑料,塑胶成品Semi Auto 半自己主动Rubber 橡胶Hand 手动Master Batch 色母Handle 手柄Powder 色粉,粉,粉末Extruder 押出机,挤塑机Dry Color 色粉,干色料Extrusion Molding 挤塑Pellet 粒,塑胶粒Blow Molding Machine 吹塑机"Glass Fiber,Fibrous Glass" 玻璃纤维Blow Molding 吹塑Hose 软管,管Program Control 步伐节制Over Packing 过充填Process 工艺,工序,历程Mold Mark 马克模伤,模痕Inject visor 注塑工艺步伐节制装配Shock 冲击Damage 损坏,毁伤Cold Slug 冷料Sink 马克抽水,紧缩Cold Slug Well 冷料井Short Shot 充填不足,欠料Freeze 冷凝Flash 毛刺,披峰Hydraulic 液压,油压String Flash 胶丝Ghydraulic Ejector 液压顶出,液压脱模White 马克白化,顶白Hydraulic Pump 液压泵Silver 雪白,银痕Hydrautic 摩托液压电动机Flow mark 流纹air compressor 空气压缩机,空压机burn 烧黑,烧焦oil leakage 漏油异物black spot 异物,黑点oil tank 油箱,油槽sticking 粘模piston 活塞weld 溶接线,联合线air cylinder 气缸flash 料花alarm 报警oil 马克油污,油渍safety gate 太平门damage 打痕,击伤emergency stop 紧迫遏制cracking 裂,开裂color change 换色jetting 气纹purge material 清机份子化合物塑料deform 变型resin thermal 胶料温度warping 屈曲,翘曲,外倾mold thermal 模温bend 屈曲,翘曲,外倾heat up 升温,升热torsion 扭曲air shot 空射蛟,空打uneven color 色彩不均匀try 试模Eccentric Wall thickness 壁厚不匀称mold release 脱模"bladder,cell" 气泡儿,浮泛,空地mold release agent 脱模剂stripes 条纹rust preventatives 防锈剂dirty 污痕,污点,渗溢can't release (产物)没有办法脱模flaking 脱落,剥落shot 注,射tear off 上下翻动gate 进点,浇口float 浮起center gate 中间浇口screw damage 螺钉滑牙sprue runner 水口,注口,流道料shortage 员数不足,欠品clearance 距离,余隔run out 跃动度,偏疼sprue 主流道注(塑)口contraction 紧缩runner 流道,流道料assembly NG 嵌合不良,装配不良air vent 散气眼,透风口stress 应力breathing 排气,散气internal stress 内部策应力anneal 热措置惩罚,退火preparation 摆设,筹办mold 生产模型stopper 挡块machining center 加工中间stripper 推板,脱模型板universal milling machine 刨床,锣床spacer plate 垫板latter 车床mould base 模胚surface grinder 最简单的面磨制机床support plate 托板grinding drilling 钻床support pillar 撑头electric discharge machine 火花机加工puller lock 拉塞wire EDM 线割切puller bolt 拉杆nitride steel 氮化钢取付板top clamp plate 工字板,水口板nitrogen 氮气bottom plate 底板nitride 氮化措置惩罚return 回针titanium 钛guider pin 导柱heat treatment 热措置惩罚guider bush 导套hardening 淬火die 生产模型,动模,移动模型板Temper 回火die plate 模型板,载模型板annealing 退火module 板块,模件,模数pre harden 预加硬钢parts 零件,生产模型零件hardness 硬度eye bolt 吊环螺栓soft 软,软的crane 吊车,行车electrodes 铜公hook 勾,吊勾insert 镶件wire 钢丝,钢丝绳slide 行位,滑块file 锉子taper 斜度oil stone 油石taper 斜度,锥度,锥形的sand paper 砂纸draft 脱模斜度mesh 节号,目guide pin 导向柱刻印engrave 刻印sleeve pin 司筒针texture 蚀纹square pin 扁顶针放电目EDM texture 火斑纹angular ejector 斜顶针rough 粗的cavity 模腔,前模,母模trifling 细的,幼的core 模心,后模,公模diamond cut 钻石纹number of cavities 取数,模腔数roulette 滚花刀,刻痕rocket ring 定位环blast 喷沙o ring O环,胶圈hot runner 暖流道wall trickness 肉厚,胶厚repair 补缀add material 加胶接welding 溶接,焊接building 加胶溶接机welder 焊机,电焊机cut material 减胶溶接棒welding rod 焊条,电焊条modify the tooling 改模(因设变补缀)argon arc welder 氩弧焊repairing the tooling 生产模型补缀torch bumper 喷燃烧现象器,火苗燃烧现象器design 预设ejector pin 顶出design drawing 预设图ejector pin 顶针design change 预设变动,设变gate type 水口体式格局designer 预设者,预设职员tunnel gate 隧道式浇口,潜入水下口designer 预设者pin point gate 针孔形浇口,细水口mold design 生产模型预设side gate 侧水口,洪流口mold specification 生产模型建造仕样书direct gate 直接浇口specification 规格multi gate 复式浇口mold construction 生产模型机关,生产模型布局fan gate 扇形浇口input 输入film gate 扇形浇口programming 编程jump gate 搭接浇口3D drawing 3D图,3维图gate balance 浇口均衡2D drawing 2D图,最简单的面图undercut 凹槽,倒扣front elevation 正面图cooling line 水管,运水plan 平面图cross-sectional drawing 剖面图cooling 冷却回路,运水CAD date CAD数值modeling 模mock-up 模子,原尺寸模子software 软体hand made sample 手板,手工样品mold drawing 生产模型图module 模数,模量,模件part drawing 零件图gear 齿轮,传动装配diagrammatic sketch 草图helical gear 螺旋齿轮drawing 绘图solid 群体的,固体revised drawing 图订变换transformation 变换,转换dimensioning 记入尺寸floppy disk 磁盘,软盘out mold direction 出模标的目的computer 台式机,计较机draft 出模斜度personal computer 私家用电器脑,手提台式机pitch 间距,齿距version 情势,品类(译文,翻译,译本)angle 角度reading 读取projected area 投影平面或者物体表面的大readout 读出taper 锥度,斜度reading 度数under cut 倒扣压缩compression 压缩2 plate 两板模开open 打开,读出文件(软体)3 plate 三板模not open 打(解)不开,读不出offset 偏置,偏移miss 纰缪,掉误mold layout 分模condition of the progress 进程项度状态split mold 对于开式生产模型finishing 打光,磨光slide core 滑动模芯polish 研磨,打磨loose core 勾当模芯target 方针,目的,对于准loose mold 勾当生产模型schedule 每一日安排表press 冲压,压床,压maintenance 维护,调养press machine 冲床did casting 压铸progressive 级进sintering 加热使黏结single 单冲monkey 勾当板子packing plate 垫板clamp 夹具(固定生产模型用)punch 冲头,凸模,冲床scrap 废铁,废物,废渣punch press 冲孔机rust 生锈die 下模rust inhibitor 防锈剂die set 模座,模架washing agent 洗濯剂press mold 冲压模,五金模ultrasonic cleaning 超音波洗濯leveler 整平滚,矫平机feeder 送料机,加料机burr 反边,毛刺drawing 拉伸thinner 天纳水,淡薄剂burring 去毛刺triclinic 三氯乙烯脱脂剂blank 复合trivalent chromium 六价铬cutting 落料,冲孔bending 折弯degreasing 脱脂,去油bend 折弯,屈曲harmful metal 有害物box-bending 箱cut 割切L-bending L折弯"press, sheet metal" 板金V-beding V折弯cut 堵截,割断punching 冲孔,钻孔iron plate 铁板SECC 镀锌板cutting 冲压,抽去silver top 镀锌板shirk 避空stainless 不锈钢calking 铆接copper 铜tap 螺丝攻brass 黄铜dies 板牙steel 钢reamer 铰孔aluminum 铝reamer 铰刀,扩孔器width 宽度end mill 刨刀thickness 板厚grinder 砂轮机,磨制机床density 疏密程度barrel 滚筒coil 卷材barrel tumbling 滚(捅抛)光width cut 片材plating 电镀nut 螺丝帽,螺帽electro plating vacuum 真空电镀bolt 螺栓,螺杆spot welding 点溶接,点焊chrome plating 镀铬jip 夹具,治具galvanization 镀锌clearance 间隙shave 切,削matching 接口assembly 装配,组装counter 统计器assembly unit 装配组件count method 统计法assembly time 装配工数timer 按时器line 生产线,拉线digital 数码(的),数码self 单人装配digital camera 数码拍照机conveyer 传送带connect 插座,插嘴U line U形出产线plug 插头,瓶塞capacitor 电器皿lamp 灯resistor 电阻器lighting 点灯,灯亮diode 二极管fuse 断电丝LED (light-emitting diode) 闪光二极管power code 电源线transistor 形成品体体管wire hamess 电线导线IC 集成电路bar code 条纹码lcd(liquid crystal display) 液态品体预示器vinyl tape 绝缘带sensor 传感器noise 异音,杂音,噪音relay 替续器decibel 分贝(声强单位)connector 保持器instruction sheet 功课引导书transformer 变压器access platform 功课台breaker 断路器series 串联buzzer 蜂鸣器parallel 并联printed circuit board/PCB 印刷电路板clutch 联轴器,聚散器driver 螺钉刀,起子solenoid coil 电磁线圈driver 十字批(起)coil 线圈driver 一字批(起)static electricity 静电electric drive 电动螺钉刀,电批prevent electricity 防静电torque 扭矩,转矩fan motor 电扇电动机screw 螺钉刀,起子grease 润滑washer 垫圈(片)apply 涂油e-ring 卡环block copy 底板,草图solder 焊锡film 胶卷,软片soldering iron 烙铁silk print 丝印tin 锡pat print 移印earth 接地,地线hot sample 烫印alcohol 火酒,乙醇ink 印字油墨foot switch 脚踏开关color sample 色板terminal 端子print NG 印刷不良terminal block 端子板bleeding 渗溢,飞油label 标贴,标签stamp 捺印bar code 条纹码,条形码spray 涂装,喷涂mile 软片,聚酯树胶wood graining 木纹加工quality control 品位办理sample 样品,样本,样板inspection 查抄boundary sample 限度样板IQC 验收,受入查抄approval sample 认可样板OQC 出货查抄tolerance 公役PQC 工程查抄plus 正,加号sampling 抽查minus 负,减号total inspection 全检disperse 不变,颠簸visual inspection 目视查抄unstable 不稳固appearance check 外不雅查抄balance 均衡patrol 巡检process capability /CP 工程能力measurement 丈量仪三角螺丝刀detection 检验测定measurement 张良,标定check point 查验(重)点measuring method 丈量要领no check 漏检clogging 刻度,分度special adoption application 特采审请memory 储存,影像provisional countermeasure 暂定对策three-dimensional measuring machine 3D丈量仪permanent countermeasure 长久对策microscope 东西目镜claim 投诉,抱怨,索赔profile projectior 投影机appraisal 评价slide calipers 卡尺decide 鉴定micrometer 量具,检查基准check standard 查抄基准lever type dial test 百分表检查基准表inspection sheet 查抄基准表torque gauge 扭转力计QC 工程表QC flow chart QC工程表scale 刻度尺specula face 镜面square 90度角尺mirror face 光面,光泽面steel tate 皮尺texture face 蚀纹面height gauge 高度尺first the face 一级面pin gauge 柱规appearance 外不雅面thickness gauge 片appearance part 外不雅产物protractor 角度仪function part 性能部品tension gauge 拉力机slide 滑动面indicator 百分表检查基准表flatness 最简单的面度hardness tester 硬度计reform 矫正multitester 万用表check jig 查抄用治具surface plate 平台,平板feed back 反馈V block V形块communication 信息,抱怨gauge block 方块规manual 指南,手册dial gauge 百分表flow chart 流程图data 数值process inspection 工程监查data sheet 数值单qualification 确定地认为parameter 参量graph 图表,曲线图warehouse 堆customhouse 海关pallet 卡板customs clearance 报关,通关corrugated fiberboard 纸箱customs clearance 报关手续partition 刀卡electronic data interchange 电子报关recycle box 周转箱container 货柜车plastics box 折叠式周转箱foot 英尺container 份子化合物塑料周转箱packing list 装箱单poly-bag 胶袋list 详细登记单tape 封箱品牌一字螺丝刀胶纸declaration 申请报告rope 绳索,线import 入口first in first out 先入先出export 出口fork lift 铲车fumigation certificate 熏蒸证实书hand lift 手推铲车no wood packing certificate 无木质包装证实书bogie 台车wooden box 木箱truck 卡车shelf 货架license 批文,容许stock 在库数license document 转厂shelf 盘货limits 指标,配额指标dead stock 死仓储,积压品import limits 入口指标purchasing 采集购买unbalance 数目不服衡supply parts 支给品contract 合约purchase parts 采集购买品contract 手册lead time 交货期,定货期order placement 发定单"transfer,carry over" 转余料,拨余料pay 有偿erase 核销free of charge 没有报酬的provision of information 加签vender 供应商submit document 递单quotation 报价单brand name 商物品名称invoice 发票,请款单goods No 商品编码deposit 预付款,包管金foreign enterprise 外资企业payment 付款owned enterprise 独资企业payment condition 付款partnership enterprise 合资工厂month payment 月结processing 来料加工over time 加班(没事了事情日加班)bailment processing 委托加工over time fee 加班费labor cost 人件费holiday work 加班(节假日上班)amortization 折旧费two shift 两班制hour charge 加工费,工时费day shift 白班exchange rate 汇价night shift 晚班material certificate 质料证实书。
注塑专业英语Company number:【WTUT-WT88Y-W8BBGB-BWYTT-19998】Surface Appearance外观Glossiness/gloss finish光洁度Matt finish/matt surface毛面Glass fiber rich surface/glass emergence on the surface 玻纤外露Blooming/surface blooming表面析出White patches on surface表面白斑Silver marks/silver streak银纹Splay mark水纹Flow mark流纹Weld line溶结纹Brittle/brittleness脆Bubbles/trapped gas气泡Void孔Burn marks烧伤FR failed阻燃不合格Flame rating V-2阻燃V-2Poor dispersion分散不好FR/PTFE …agglom erates etc阻燃剂/PTFE…结块Pellet porous粒子不密/蜜蜂窝Low impact/tensile etc物理性能低High flow/filler content etc流动性/填充…过高Longs/fines/doubles长粒/碎屑/连粒Poor cut粒形不好Bristle/voids表面有小气泡/孔Glass bundles玻纤结团Product was rejected due to 产品不能接受因为…High moisture level高水分Warpage/warped翘曲Shrinkage/shrink 收缩Sink marks缩影Short shot/short molding打不满Distortion变形Over dimension尺寸过大Under dimension尺寸过小Flashing飞边Discoloration变色Off color颜色差异Flow rate流动率Viscous粘High flow高流动Low flow低流动Sticky粘Mold release 脱模Antioxidant抗氧剂Flame retardant agent阻燃剂Heat stabilizer热稳定剂Chopped glass fiber短切玻纤Roving glass fiber粗纱/长玻纤Glass beads玻璃微珠Milled fiber碾磨纤Molybdenum disulfide/moly/MoS2二硫化钼Colorant着色剂Pigment颜料Dye染料Accepted product specification接受产品规格Approved our product认可我们的产品Re-set spec重新定标准Add in e xtra …添加多一点…Reduced … content减少…含量Dropped/reduced … by x%减少…含量…%Confirmed color standard确认颜色标准Approved color standard认可颜色标准Re-confirmed color standard重新确认颜色标准Qualified our product认可我们的产品Undergoing heat aging test在做热老化实验Product is under testing产品在测试当中Received first order接了第一个定单Expected to finish by …预计在…完成Expected order is xMT预计定单量…吨Estimated annual/monthly consumption预计年/月用量air vent vale 通气阀anchor pin 锚梢 angular pin 角梢baffle 调节阻板 angular pin 倾斜梢baffle plate 折流档板 ball button 球塞套ball plunger 定位球塞 ball slider 球塞滑块binder plate 压板 blank holder 防皱压板blanking die 落料冲头 bolster 上下模板bottom board 浇注底板 bolster 垫板bottom plate 下固定板 bracket 托架bumper block 缓冲块 buster 堵口casting ladle 浇注包 casting lug 铸耳cavity 模穴(模仁) cavity retainer plate 模穴托板center pin 中心梢 clamping block 锁定块coil spring 螺旋弹簧cold punched nut 冷冲螺母cooling spiral 螺旋冷却栓 core 心型core pin 心型梢 cotter 开口梢cross 十字接头 cushion pin 缓冲梢diaphragm gate 盘形浇口 die approach 模头料道die bed 型底 die block 块形模体die body 铸模座 die bush 合模衬套die button 冲模母模die clamper 夹模器die fastener 模具固定用零件 die holder 母模固定板die lip 模唇 die plate 冲模板die set 冲压模座 direct gate 直接浇口dog chuck 爪牙夹头 dowel 定位梢dowel hole 导套孔 dowel pin 合模梢dozzle 辅助浇口 dowel pin 定位梢draft 拔模锥度 draw bead 张力调整杆drive bearing 传动轴承 ejection pad 顶出衬垫ejector 脱模器 ejector guide pin 顶出导梢ejector leader busher 顶出导梢衬套 ejector pad 顶出垫ejector pin 顶出梢 ejector plate 顶出板ejector rod 顶出杆 ejector sleeve 顶出衬套ejector valve 顶出阀 eye bolt 环首螺栓filling core 椿入蕊 film gate 薄膜形浇口finger pin 指形梢 finish machined plate 角形模板finish machined round plate 圆形模板 fixed bolster plate 固定侧模板flanged pin 带凸缘 flash gate 毛边形浇口flask 上箱 floating punch 浮动冲头gate 浇口 gate land 浇口面gib 凹形拉紧goose neck 鹅颈管guide bushing 引导衬套 guide pin 导梢guide post 引导柱 guide plate 导板guide rail 导轨head punch 顶冲头headless punch 直柄冲头 heavily tapered solid 整体模蕊盒hose nippler 管接头 impact damper 缓冲器injection ram 压射柱塞 inlay busher 嵌入衬套inner plunger 内柱塞 inner punch 内冲头insert 嵌件 insert pin 嵌件梢king pin 转向梢 king pin bush 主梢衬套knockout bar 脱模杵 land 合模平坦面land area 合模面 leader busher 导梢衬套lifting pin 起模顶 lining 内衬locating center punch 定位中心冲头 locating pilot pin 定位导梢locating ring 定位环 lock block 压块locking block 定位块 locking plate 定位板loose bush 活动衬套 making die 打印冲子manifold block 歧管档块 master plate 靠模样板match plate 分型板 mold base 塑胶模座mold clamp 铸模紧固夹 mold platen 模用板moving bolster 换模保持装置 moving bolster plate 可动侧模板one piece casting 整体铸件 parallel block 平行垫块paring line 分模线 parting lock set 合模定位器pass guide 穴型导板 peened head punch 镶入式冲头pilot pin 导 pin gate 针尖浇口plate 衬板 pre extrusion punch 顶挤冲头punch 冲头 puncher 推杆pusher pin 衬套梢 rack 机架rapping rod 起模杆 re-entrant mold 凹入模retainer pin 嵌件梢 retainer plate 托料板return pin 回位梢 riding stripper 浮动脱模器ring gate 环型浇口roller 滚筒runner 流道 runner ejector set 流道顶出器runner lock pin 流道拉梢 screw plug 头塞set screw 固定螺丝 shedder 脱模装置shim 分隔片 shoe 模座之上下模板shoot 流道 shoulder bolt 肩部螺丝skeleton 骨架 slag riser 冒渣口slide(slide core) 滑块 slip joint 滑配接头spacer block 间隔块 spacer ring 间隔环spider 模蕊支架 spindle 主轴sprue 注道 sprue bushing 注道衬套sprue bushing guide 注道导套 sprue lock bushing 注道定位衬套sprue puller 注道拉料 spue line 合模线square key 方键 square nut 方螺帽square thread 方螺纹 stop collar 限位套stop pin 止动梢 stop ring 止动环stopper 定位停止梢straight pin 圆柱stripper bolt 脱料螺栓 stripper bushing 脱模衬套stripper plate 剥料板 stroke end block 行程止梢submarine gate 潜入式浇口 support pillar 支撑支柱/顶出支柱support pin 支撑梢 supporting plate 托板sweep templete 造模刮板 tab gate 辅助浇口taper key 推拔键 taper pin 拔锥梢/锥形梢teeming 浇注 three start screw 三条螺纹thrust pin 推力销 tie bar 拉杵tunnel gate 隧道形浇口 vent 通气孔wortle plate 拉丝模板plain die简易模pierce die冲孔模forming die成型模progressive die连续模gang dies复合模shearing die剪边模riveting die铆合模pierce冲孔forming成型(抽凸,冲凸)draw hole抽孔bending折弯trim切边emboss凸点dome凸圆semi-shearing半剪stamp mark冲记号deburr or coin压毛边punch riveting冲压铆合side stretch侧冲压平reel stretch卷圆压平groove压线blanking下料stamp letter冲字(料号)shearing剪断tick-mark nearside正面压印tick-mark farside反面压印extension dwg展开图procedure dwg工程图die structure dwg结构图 material材质 material thickness料片厚度 factor系数 upward向上downward向下 press specification冲床规格 die height range适用模高 die height闭模高度 burr毛边gap间隙 weight重量 total wt.总重量 punch wt.上模重量三、模具塑料模具mould of plastics 注塑模具injection mould 冲压模具die 模架mould base 定模座板Top clamping plate Top plate Fixed clamp plate 水口推板stripper plate A板A plate B板B plate 支承板support plate 方铁 spacer plate 底针板 ejector plate 面针板 ejector retainer plate 回针 Return pin 导柱 Guide pin 有托导套 Shoulder Guide bush 直导套 Straight Guide bush 动模座板Bottom clamp plate Moving clamp plate 基准线datum line 基准面datum plan 型芯固定板core-retainer plate 凸模固定板punch-retainer plate 顶针ejector pin 单腔模具single cavity mould 多腔模具multi-cavity mould 多浇口multi-gating 浇口gate 缺料starving 排气breathing 光泽gloss 合模力mould clamping force 锁模力mould locking force 挤出extrusion 开裂crack 循环时间cycle time 老化aging 螺杆screw 麻点pit 嵌件insert 活动镶件movable insert 起垩chalking 浇注系统feed system 主流道 sprue 分流道runner 浇口gate 直浇口direct gate , sprue gate 轮辐浇口spoke gate , spider gate 点浇口pin-point gate 测浇口edge gate 潜伏浇口submarine gate , tunnel gate 料穴cold-slug well 浇口套sprue bush 流道板runner plate 排飞槽vent 分型线(面)parting line 定模stationary mould,Fixed mould 动模movable mould, movable half 上模upper mould, upper half 下模lower mould, lower half 型腔cavity 凹模cavity plate,cavity block 拼块split 定位销dowel 定位销孔dowel hole 型芯core 斜销angle pin, finger cam 滑块slide 滑块导板slide guide strip楔紧块heel block, wedge lock 拉料杆sprue puller 定位环locating ring 冷却通cooling channel 脱模斜度draft 滑动型芯slide core 螺纹型芯threaded core 热流道模具hot-runner mould 绝热流道模insulated runner mould 熔合纹weld line (flow line)三板式模具three plate mould 脱模ejection 换模腔模具interchangeable cavity mould 脱模剂release agent 注射能力shot capacity 注射速率injection rate 注射压力injection pressure 差色剂colorant 保压时间holdup time 闭模时间closing time 定型装置sizing system 阴模female mould,cavity block 阳模male mould 电加工设备Electron Discharge Machining 数控加工中心CNC machine center 万能铁床Universal milling machine 卧式刨床Horizontal planer 车床Engine lathe 平面磨床Surface grinding machine 去磁机Demagnetization machine 万能摇臂钻床Universal radial movable driller 立式钻床Vertical driller 超声波清洗机Ultrasonic clearing machine一、组织机构及职位二、XX电子有限公司XX Electronics CO., Ltd三、总经理办公室General manager’s office四、企管部Enterprise management department(EM)五、行政部Administration department (AD)六、销售部Sales department (SD)七、财务部Financial department (FD)八、技术部Technology department (TD)九、物控部Production material controldepartment (PMC)十、生产部Production department(PD)十一、模具部Mold manufacturing department, Tooling manufacturing department (TM) 十二、品管部Quality Assurance department (QA) 十三、冲压车间Stamp workshop, press workshop 十四、注塑车间injection workshop十五、装配车间Assembly workshop十六、模具装配车间Mold and die Assembly workshop十七、金属加工车间metal machine workshop 电脉冲车间Electric discharge process workshop 线切割车间wire cutting process workshop 工磨车间Grinding workshop 总经理General manager (GM) 副总经理Vice-general manager 经理manager 董事长president 副董事长Vice-president XX部门经理Manager of XX department 主任、主管supervisor 拉长Line leader 组长Foreman,forelady 秘书secretary 文员clerk 操作员operator 助理assistant六.物控保质期shelf life ABC分类法ABC Classification 反常需求Abnormal Demand 措施信息Action Message 活动报告标志Action-report-flag 基于活动的成本核算Activity-based Costing (ABC) 实际能力Actual Capacity 实际成本Actual Costs 调整现有库存量Adjust-on-hand 已分配量Allocation 替代工序Alternative Routine 装配订单Assembly Order 装配零件表Assembly Parts List 装配Assembly 计划自动重排Automatic Rescheduling 可达到库存Available Inventory 可用材料Available Material 达到库存Available Stock 可利用工时Available Work 可签约量Available-to-promise 平均库存Average Inventory 欠交订单Back Order 倒序计划Back Scheduling 倒冲法Back flush 未完成订单Backlog 现有库存余额Balance-on-hand Inventory 批号Batch Number 批量生产Batch Production 标杆瞄准Benchmarking 工时清单Bill of Labor 提货单Bill of Lading 物料清单Bill of Material 分库Branch Warehouse 经营规划Business Plan 采购员Buyer 能力管理Capacity Management 能力需求计划Capacity Requirements Planning (CRP) 保管费率Carrying Cost Rate 保管费Carrying Cost 单元式制造Cellular Manufacturing 修改批量日期Change Lot Date 修改工序Change Route 修改产品结构Change Structure 检查点Check Point 闭环物料需求计划Closed Loop MRP 通用工序标识Common Route ID 计算机集成制造Computer-integrated Manufacturing (CIM) 配置代码Configuration Code 约束管理/约束理论Constraints Management/Theory of Constraints (TOC) 依成本的材料清单Costed Bill of Material 急需零件Critical Part 累计提前期Cumulative Lead Time 现有运转时间Current Run Hour 现有运转数量Current Run Quantity 周期盘点Cycle Counting 调整日期Date Adjust 有效日期Date Available 修改日期Date Changed 结束日期Date Closed 截止日期Date Due生产日期Date in Produced 库存调整日期Date Inventory Adjust 作废日期D ate Obsolete 收到日期Date Received 交付日期Date Released 需求日期Date Required 发货日期Date to Pull 空负荷Dead Load 需求管理Demand Management 需求Demand 实际能力Demonstrated Capacity 非独立需求Dependent Demand 直接增减库存处理法Direct-deduct Inventory Transaction Processing 发料单Disbursement List 派工单Dispatch List 分销资源计划Distribution Resource Planning (DRP) 鼓-缓冲-绳子Drum-buffer-rope 经济订货批量Economic Order Quantity (EOQ) 工程变更生效日期Engineering Change Effect Date 工程变更生效单Engineering Change Effect Work Order 工程停止日期Engineering Stop Date 例外控制Exception Control 呆滞材料分析Excess Material Analysis 急送代码Expedite Code 加工订单Fabrication Order 补足欠交Fill Backorder 总装提前期Final Assembly Lead Time 确认的计划订单Firm Planned Order 固定订货批量F ixed Order Quantity 集中预测Focus Forecasting 完全跟踪Full Pegging 通用生产管理原则Generally Accepted Manufacturing Practices 毛需求Gross Requirements 在制品库存In Process Inventory 独立需求Independent Demand 投入/产出控制Input/ Output Control 检验标识Inspection ID 厂际需求Interplant Demand 库存周转率Inventory Carry Rate 仓库库位类型Inventory Location Type 库存周转次数Inventory Turnover 发送订单Issue Order 项目记录Item Record 物料项目Item 加工车间Job Shop 准时制生产Just-in-time (JIT) 看板Kanban 人工工时Labor Hour 最后运输日期Last Shipment Date 提前期Lead Time 层Level 负荷量Load Leveling 负荷报告Load Report 负荷Load 仓位代码Location Code 仓位备注Location Remarks 仓位状况Location Status 按需订货Lot for Lot 批量标识Lot ID 批量编号Lot Number 批量Lot Size 低位码Low Level Code 机器能力Machine Capacity 机器加载Machine Loading 外购或自制决策Make or Buy Decision 面向订单生产的产品Make-to-order Product 面向库存生产的产品Make-to-stock Product 制造周期时间Manufacturing Cycle Time 制造资源计划Manufacturing Resource Planning (MRP II) 主生产计划Master Production Schedule (MPS) 物料成本Material Cost 物料发送和接收Material Issues and Receipts 物料需求计划Material Requirements Planning (MRP) 登陆标志MPS Book Flag MPS 多重仓位Multiple Location 净改变式MRP N et Change MRP 净需求Net Requirements 新仓位New Location 新组件New Parent 新仓库New Warehouse 不活动报告No Action Report 现有库存量On-hand Balance 未结订单Open Order 订单输入Order Entry 订货点Order Point 订货方针Order Policy 订货承诺Order Promising 订货备注Order Remarks 双亲Parent 零件清单Part Bills 零件批次Part Lot 零件编号Part Number 零件Part 反查Pegging 领料单Picking List领料/提货Picking 计划订单Planned Order 后减库存处理法Post-deduct Inventory Transaction Processing前减库存处理法Pre-deduct Inventory Transaction Processing 发票价格Price Invoice 采购订单价格Price Purchase Order 优先计划Priority Planning 产品控制Product Control 产品线Production Line 生产规划编制Production Planning 产品率Production Rate 产品结构树Production Tree 预计可用库存Projected Available Balance 采购订单跟踪Purchase Order Tracking 已分配量Quantity Allocation 仓位数量Quantity At Location 欠交数量Quantity Backorder 完成数量Quantity Completion 需求量Quantity Demand 毛需求量Quantity Gross 进货数量Quantity In 排队时间Queue Time 队列Queue 重生成式MRP Regenerated MRP 重排假设Rescheduling Assumption 资源需求计划Resource Requirements Planning 粗能力计划Rough-cut Capacity Planning 工艺路线Routing 安全库存量Safety Stock 保险期Safety Time 预计入库量Scheduled Receipt 残料率Scrap Factor 发送零件Send Part 维修件Service Parts 发货地址Ship Address 发货单联系人Ship Contact 发货零件Ship Date 发货单Ship Order 工厂日历Shop Calendar 车间作业管理Shop Floor Control 损耗系数Shrinkage Factor 标准产品成本Standard Product Cost 标准机器设置工时Standard Set Up Hour 标准单位运转工时Standard Unit Run Hour 标准工资率Standard Wage Rate 状况代码Status Code 库存控制Stores Control 建议工作单Suggested Work Order 约束理论Theory of Constraints (TOC) 时间段Time Bucket 时界Time Fence 单位成本Unit Cost 采购计划员Vendor Scheduler 采购计划法Vendor Scheduling 工作中心能力Work Center Capacity 工作中心Work Center 在制品Work in Process 工作令跟踪Work Order Tracking 工作令Work Order 工作进度安排Work Scheduling 零库存Zero Inventories 经济订货批量=Squat(2*年订货量*平均一次订货准备所发生成本/每件存货的年储存成本) 美国生产和库存控制协会APICS,American Production & Inventory Control Society十八、产品十九、连接器connector二十、端子terminal二十一、条型连接器bar connector二十二、阴连接器Housing二十三、阳连接器wafer二十四、线束wire harness二十五、间距space二十六、额定电压 rated voltage二十七、额定电流 rated current二十八、接触电阻contact resistance二十九、绝缘电阻insulation resistance三十、超声波焊接ultrasonic welding三十一、耐压withstand voltage三十二、针pin三十三、物料编号part number三十四、导线wire三十五、基体金属Base metal 电缆夹cable clamp 倒角chamfer 接触面积contact area 接触件安装孔contact cavity 接触长度contact length接触件电镀层contact plating 接触压力contactpressure 接触件中心距contact space 接触簧片contact spring 插孔socket contact 法兰、凸缘Flange 界面间隙interfacial gap 键Key 键槽keyway 过渡段ramp 屏蔽套shielding 定位基准Datum reference 扁平电缆flat cable ,Ribboncable 柔性印刷电线Flexible printed wiring 多层印制电路Multilayer printed circuit 焊盘pad 图形pattern 间距pitch 负极Negative pole 正极positive pole 回流Reflow 原理图Schematicdiagram 单面板single sided board 双面板Two-sided board,Double-sided board 表面安装surface Mounting 翘曲warp, bow 波峰焊wave soldering 编织层braid 同轴电缆coaxial cable 电介质dielectric 电缆中导线的头数ends 外部干扰external interference 填充物filler 护套jacket 比重specific gravity 电阻的温度系数Temperature coefficient of resistance三十六、品管 SPC statistic process control 品管保证Quality Assurance 品管控制Qualitycontrol 来料检验IQC Incoming quality control 巡检IPQC In-process quality control 校对calibration 动态试验dynamic test 环境试验Environmental test 非破坏性试验non-destructive test 光泽gloss 击穿电压(dielectric) breakdownvoltage 拉伸强度tensile strength 冷热骤变试验thermal shock test 环境试验炉Environmentalchamber 盐雾实验salt spray test 绝缘电阻测试验仪Insulating resistance meter 内应力internalstress 疲劳fatigue 蠕变creep 试样specimen 撕裂强度tear strength 缩痕shrink mark, sink mark 耐久性durability 抽样sampling 样品数量samplesize AQL Acceptable Quality level 批量lot size 抽样计划sampling plan OC曲线operation curve 试验顺序sequence of tests 环境温度ambienttemperature 可焊性solderability 阻燃性flameresistance三十七、生产三十八、注塑机injection machine三十九、冲床Punch machine四十、混料机blender mixer四十一、尼龙nylon四十二、黄铜 brass四十三、青铜 bronze四十四、紫(纯)铜 copper四十五、料斗hopper四十六、麻点pit四十七、配料compounding四十八、涂层coating四十九、飞边flash五十、预热preheating五十一、料reworked material五十二、塑料reworked plastics 工艺设计process design 紧急停止emergency stop 延时time delay七.QS-9000中的术语APQP Advanced Product Quality Planning and Control Plan,产品先期策划和控制计划 PPAP Production Part Approval Process,生产件批准程序 FMEA Potential Failure Mode and Effects Analysis,潜在失效模式及后果分析Injection machine 啤机Shot size(weight)实际射胶量 injection volume 理论射胶量 min mold height 最小容模厚度Max mold height 最大容模厚度Tie bar clearance 拉杆间距 Die plate size 模板尺寸Ejector stroke 顶出行程barrel 炮筒,机筒clamp force 锁模力 non-return valve 止回阀shear 剪切 opening 开模行程 Injection pressure 射胶压力 back pressure 背压nozzle size 射咀尺寸Cycle time 循环周期down time 停机时间hopper 料筒Mold release 脱模剂lubrication 润滑work horse 主力,主要设备Reserve pressure/packing pressure保压 mold trial 试模shot (一)啤Decompress 减压 oven 烤炉,烘灶 shrinkage rate 收缩率 Residence time 滞留时间injection speed 注射速度booster time 增压时间Compression ratio 压缩比mold close time 合模时间Resin 胶料Plastification 塑化,增塑viscosity 粘性,粘度contamination 污染,杂物Thermoplastic 热塑性塑料thermosetting plastics 热固性塑料 Booster time 增压时间feed 喂料,填充purge 净化Flame retardant 阻燃degradation 降解,软化regrind 再粉碎Water absorption 吸水reinforce 增强,加固 specific gravity 比重Elongation 延伸率density 密度melting point 熔点Polystyrene 聚苯乙烯(PS)Styrene 苯乙烯Acrylonitrile 丙烯腈Polypropylene 聚丙烯(PP) Polyethylene 聚乙烯glass fiber 玻纤 Condensation 凝固,浓缩 crystalline resin 结晶形塑料Mold materials 模具General-purpose steel 多用途钢 tool steel 模具钢 Free-cutting steel 高速切削钢case hardening steel 表面硬化钢 Pre-hardened steel 预硬钢 ball and roller bearing steel 滚珠轴承钢Nonferrous steel 非铁合金 high speed steel 高速钢cast iron 铸铁 Steel specification 钢材规格steel certification 钢材合格证明书 Stainless steel 不锈钢 nickel 镍 chrome 铬 aluminum 铝 Copper 铜brass 黄铜 bronze 青铜 titanium 钛Processing 钢材的加工方法Harding / quench 淬火nitride 氮化temper 回火anneal 退火 Roll 轧制 abrasive 研磨,磨损的finish 精加工,抛光(polish)Case-hardening 表面硬化 milling machine 铣(锣)床Lathe车床 drill 钻床 wire cut 线割 NC(numerical control ) 数控材料EDM (Electrical discharge machine) 电火花加工 Cut steel 开料 Precision ground 精密研磨heat treatment 热处理 tap 丝锥,攻牙 Texture 蚀纹weld 焊接 forge 锻压 deformation 变形Spraying 喷涂 die-cast 压铸Properties 性能Resistance 电阻,抵抗能力abrasion / wear磨损erode / corrode 腐蚀 Toughness 韧性yield strength 屈服强度tensile strength 拉伸强度Fatigue strength 疲劳强度 break 断裂stress 应力 hardness 硬度 Humidity / moisture 潮湿,湿气 roughness 粗糙度 parameter 参数Thermal conductivity 导热系数manufacture 制造,加工 drawback 缺点 Ductility 延展性grain 晶粒 property 性能,财产 brittleness 脆性GD&T (Geometric Dimensions and Tolerance )形位尺寸公差 Flexural strength 挠曲强度impact 冲击 conductivity 传导性,导电性 Optical 光学的 transparent 透明的 insulation 绝缘Mechanical 机械的processability 可加工性能timeyield 蠕变 Physical 物理的 flow rate 流动速率compressive strength 压缩强度Adhesive 粘附的,胶合 durability 耐用性Mold design 模具设计Tooling specification 模具规格 mould flow 流动模拟 sprue nozzle 唧咀孔 Clearance 避空,间隙undercut 倒扣 flush 插入,埋入 legend 图例 Groove 凹槽 latch 插销 class 类型,种类 plan 平面图Orifice 孔,口 column 柱位 boss 凸台 standard 标准,规格 Rib 骨位 tapered interlock 锥形管位块Bubbler 炮隆 Bolt 螺钉,销顶 identification mark 铭牌 P/L strip 锁模片Overflow well / cold-slug well 冷料井Vent 排气pocket 槽 Gate location 入水点 full line 实线broken line 虚线 Retainer 固定,支撑 operator 操作者(啤工) receptacle 插座Lifting hole 吊令孔insulation plate 隔热板cavity number 型腔号 Bolster 支撑,垫子vent channel 排气槽 leak / filter 渗漏 Leak test 试运水 stamp / engrave 雕刻,印记(打字唛)Clamp slot 码模槽 support button / pin 垃圾钉 cut steel 开料 Lodge 安装,放置inlay 镶嵌,插入cam / lifter 斜顶Stripper推方lifting bar 吊模方 sprue 唧咀tolerance 公差Counter bore 沉孔slant 倾斜,斜面conical 圆锥的,圆锥形的Bolt 螺栓 manifold 热流道板 prototype tooling 原型试验 Gusset 角撑reverse mold 倒装模constrain / restrict约束,限制Counter lock 反锁thermocouple 热电偶 moldmaker 模具制造商 Asset / property number 资产编号tool product destination 模具生产地点Accelerating ejection 加速顶出hydraulic 液压的 pneumatic 气动的 Trapezoid 梯形的 semi-round 半圆形 format 格式baffle 隔水片 Electrode 电极,铜公 spare part 配件gall 磨伤,插伤 Cable 电缆,电线plating / coating (电)镀 bonding / joint 接头 Wall transition 壁厚过渡Product problem 产品问题Troubleshoot 故障处理reduce(add) plastic 减(加)胶 Burr/flash披峰 Burn mark 烧焦ejector mark 顶针印,顶白black specs 黑点,黑斑Discoloration 混色,污点 gloss 光泽jetting/worming 走水纹Sink mark 缩水void / bubble 气泡,夹气 distortion 变形Warpage 翘曲 short molding / non-fill缺胶,未走齐Weld line / knit line 夹水线discarded as useless 报废Split line 夹线stick in sprue bushing / cavity / core 粘唧咀/前模/后模Break / crack 顶裂 brittleness 脆性,易脆Others 其他Invoice 发票,清单 vendor(er) 卖方 vendee 买方guideline 方针,指导 Intricate 复杂的confidential 机密的,不可外泄的 proprietary 私有的Authorize 批准,授权 recipient 接收者issue ①发布,提供;②问题Approve 确认,赞成requirement 需要,必需物 const 常数,常量Regarding 关于,涉及opposite 相反的,对面的latitude 纬度,纵向的 Version 版本definition 注释,解说transversal 横向的,截线Profile 轮廓,剖面 eliminate / cancel 取消allow / permit 允许,许可Respective 各自的,分别的 individual 单独的 decrease 减少increase 增加Preliminary 初步的approximately 大约,近似 estimate / valuate估计,预算Adjust 调整,校准application 应用,申请maintain 维持 Accurate / precise 精确的smooth 光滑,顺畅的device 装置,设备Convenient 方便的 deadline 截至日期available 有用的,有空的 Shift 轮班,换班 critical 关键的,临界的 exceptional 异常的,优异的Exceed 超过 layout 布局,方案 loss 损失,消耗install 安装,安置 Rotation 旋转item 条款,项目quotation 报价stabilize 稳定Quality 质量 quantity 数量 couple 连接,接合configuration 构造,外形Illustrate 图解说明simulation 模拟,仿真 recommend 推荐使用。
注塑模具英语词汇(总3页)--本页仅作为文档封面,使用时请直接删除即可----内页可以根据需求调整合适字体及大小--注塑模具英语词汇一、工程部 / Design department:1) Designer - 设计师。
2) Assembly drawing - 模具组装图。
3) Mold layout - 模具结构图。
4) 2D product drawing - 2D产品图。
5) 3D product data - 3D产品数据。
6) Part drawing - 散件图。
7) Insert molding - 镶件模。
8) 2 color mold / Double injection tool - 双色模。
9) Hydraulic system - 油/水压系统。
10) Parting line - 分模线。
11) Air venting - 排气槽。
12) Cooling system - 冷却系统。
13) Screw - 镙丝。
14) Hot runner system - 热流道。
15) Valve gate - 伐针入水口。
16) Fan gate - 扇型入水口。
17) Pin point gate - 针点进胶。
18) Moon gate / Banana gate - 香蕉,象牙入水口。
19) Submarine gate - 潜水口。
20) Injection machine tonnage - 注塑机吨数。
21) Number of cavity - 穴数。
22) Steel - 钢材。
23) Copper - 铜。
24) Tungsten copper - 钨铜。
25) Beryllium copper - 铍铜。
26) Hardening - 加硬/淬火。
27) Tempering - 回火。
28) Chroming - 电镀。
29) Painting - 喷漆。
30) Resin - 胶材。
Surface Appearance 外观Glossiness/gloss finish 光洁度、粗糙度Matt finish/matt surface 毛面Glass fiber rich surface/glass emergence on thesurface 玻纤外露、浮纤Blooming/surface blooming 表面析出White patches on surface 表面白斑Silver marks/silver streak 银纹Splay mark 水纹、料花Flow mark 流纹,流痕Brittle/brittleness 脆、脆性Bubbles/trapped gas 气泡/困气V oid 孔、气泡Burn marks 烧伤FR failed 阻燃不合格Flame rating V-2 阻燃等级V-2Poor dispersion 分散不好FR/PTFE …agglomerates etc 阻燃剂/PTFE…结块Pellet porous 颗粒料孔隙、Low impact/tensile strength etc 低冲击强度/拉伸强度等High flow/filler content etc 高流动性/过度填充Longs/fines/doubles 长粒/碎屑/连粒Poor cut 粒形不好Bristle/voids 表面有小气泡/孔Glass bundles 纤维结团Product was rejected due to 产品不能接受因为…High moisture level 高水分、高湿度Warpage/warped 翘曲/变形Shrinkage/shrink 收缩/收缩率Sink marks 凹陷、缩水Short shot/short molding 打不满、欠注、缺料,短射Distortion 变形Over dimension 尺寸过大Under dimension 尺寸过小Flashing 飞边、披锋、溢边Discoloration 变色Off color 颜色差异Flow rate 流动速率Viscous/viscosity 粘性的、粘的/黏度High flow 高流动Low flow 低流动Sticky 粘的,粘性的Sticking core 粘后模,粘模芯Sticking sprue 粘水口Sticking cavity 粘前模Mold release(agent)脱模(剂)Antioxidant 抗氧剂Flame retardant agent 阻燃剂Heat stabilizer 热稳定剂Chopped glass fiber 短切玻纤Roving glass fiber 粗纱/长玻纤Glass beads 玻璃微珠Milled fiber 碾磨纤Molybdenum disulfide/moly/MoS2 二硫化钼Colorant 着色剂Pigment 颜料Dye 染料Accepted product specification 接受产品规格Approved our product 认可我们的产品Re-set spec 重新定标准Add in extra …添加多一点…Reduced …content 减少…含量Dropped/reduced …by x%减少…含量…%Confirmed color standard 确认颜色标准Approved color standard 认可颜色标准Re-confirmed color standard 重新确认颜色标准Qualified our product 认可我们的产品Undergoing heat aging test 在做热老化实验Product is under testing 产品在测试当中Received first order 接了第一个定单Expected to finish by …预计在…完成Expected order is xMT 预计定单量…吨Estimated annual/monthly consumption 预计年/月用量模具方面:Ejection system 顶出系统、脱模系统pin 顶针、推杆spring 弹簧Gate type 浇口类型sprue 主流道runner 分流道cavity 模腔Sprue gate 直浇口Pin point gate 点浇口Tab gate 护耳浇口Fan gate 扇形浇口Tunnel or submarine gate 潜伏式浇口Jump gate 跳跃式浇口Diaphragm gate 片状浇口Ring gate 环形浇口The cavity of the mould 模腔Heated cylinder 加热料筒Surface finish 表面光洁度Sink mark 缩水Air trap 困气Gas trapped 气体困着,困气void 空隙,孔galling 烧焦Weld line 熔接痕,熔合线Drag mark 划伤、脱模痕Scratch mark 模具刮花Deformed/ warp 变形Ejector not returned 顶针不回位slide 滑块、行位streak 波纹、条纹、色痕delamination 分层Jetting mark 喷射痕Gate mark 浇口痕rib 筋、加强筋、骨位boss 凸台、凸起、凸痕Melt flow length 熔体流线长度Ejector plate 顶针板Stop pin 限位销Push rod 推杆、顶针Push back pin 复位杆Ejector guide pin 顶针导柱Cold-slug-well 冷料井、冷料穴plate 模板Ejected mark 顶痕,顶白nozzle 喷嘴Surface defect 表面缺陷Air vent 排气口Filling uneven 走胶不平衡、进胶不平衡。
注塑英语大全成型工艺流程及前提介绍Molding technique procedure and parameter introduction第一节成型工艺Section 1 molding technique.1.成型工艺参数类型Sorts of molding parameter.(1).注塑参数ction parameter. a.打针量ction rate.b.计量行程Screw back positionc.余料量Cushiond.防诞量Sucking back ratee.螺杆转速Screw speedf.塑化量Plastic0 rateg.预塑背压Screw back pressureh.打针压力和保压压力ction pressure and holding pressurei.打针速度ction speed (2)合模参数Clamping parametera.合模力Clamping forceb.合模速度Clamping speedc.合模行程.Clamping stroked.开模力Opening forcee.开模速度Opening speedf.开模行程Opening positiong.顶出压力Ejector advance pressureh.顶出速度Ejector advance speedi.顶出行程Ejector advance position2.温控参数Temperature parametera.烘料温度Dry resin material temperatureb.料向与喷嘴温度Cylinder temperature and nozzle temperaturec.模具温度Mold temperatured.油温Oil temperature3.成型周期Molding cyclea.轮回周期Cycle timeb.冷却时光Cool timec.打针时光ction timed.保压时光Holding pressure timee.塑化时光Plant timef.顶出及逗留时光Knocking out and delay timeg.低压呵护时光Mold protect time成型工艺参数的设定须根据产品的不合设置.Molding technique parameter setting differs depending on type of product第二节成型前提设定Section 2 Molding parameterSetting 按成型步调:可分为开锁模,加热,射出,顶出四个进程. Molding steps: mold opening/closing, heating ction and knocking out. 开锁模前提: Mold openingparameter: 快速段中速度低压高压速度High-speedmid-speed Low pressure high pressure speed 锁模前提设定: Mold closing parameter setting 1锁模一般分:快速→中速→低压→高压Mold closing: high-speed →low-speed →low pressure→high pressure 2.快锁模一般按模具情形分,假如是平面二板模具,快速锁模段可用较快速度,甚至于用到特快,当用到一般快速时,速度设到55-75%,完整平面模可设定到80-90%,假如用到特快就只能设定在45-55%,压力则可设定于50-75%,地位段视产品的深浅(或长短)不合,一般是开模宽度的1/3. In high-speed section, Mold closing speed depends on type of mold. For two –plate mold it can set quick and even especially quick usually, it set speed within 55-75%. For full-plate mold it set speed within80-90% while using especially high speed it set speed within 45-55% and pressure within 50-75% position distance setting differs depending on the volume of product and usually it can be set 1/3 of mold opening position. 3.中速段,在快速段停止后即转换成中速,中速的地位一般是到模板(包含三板模,二板模)合在一块为止,具体长度应视模板板距离,速度一般设置在30%-50%间,压力则是20%-45%间. In mid-speed section: Mold closing speed changes into mid-speed after high-speed section finish. Mid-speed start position is where two plates meet (include three-plate mold and two-plate mold ) Distance of mid-speed is up to distance of two plates plate it speed within 30-50% and pressure 20-45%. 4.低压设定,低速设定一般是在模板接触的一刹时,具体地位就设在机台显示屏显示的一刹时的数字为准,这个数字一般是以这点为尺度,,即于此点则起不了高压,高于此点则大,随意马虎起高压.设定的速度一般是15%-25%,视乎不合机种而定,压力一般设定于1-2%,有些机则可设于5-15%,也是视乎不合机种不合. Low-pressure section: Mold closing sets low-pressure when plates meeting. This position is set to the data of machine screen on this time. This point is the gage of the data. Data lower the point there is no high-pressure. Data higher the point there is high-pressure easily. It set speed within 15-25% and pressurewithin 1-2% depending on type within 1-2% depending on type of ction molding machine. 5.高压设定,按一般机台而言,高压地位机台在出厂时都已作了设定,相对来讲,是不成以随意更改的,比方震雄机在50P.速度相对低压略高,大约在30-35%阁下,而压力则视乎模具而定,可在55-85%中取,比方完整平面之新模,模具排气优越,甚至于设在55%即可,假如是滑块较多,本来临盆时毛边也较多,甚至于可设在90%还略显缺少. High-pressure section: To normal ction molding machine, high-pressure position had been set before they were sent to customer. It can not be modified. For example high-pressure position of CHENHSONG machine is 50P.The speed of high-pressure section is about 30-35% and higher than that of low-pressure. The pressure is up to mold, it can set within 55-85% Forfull-plate mold, it’s eject air well, it can set pressure 55% .If mold has a lot of slides and flash rate high in production, pressure can set 90%. 加热工艺前提设定Heating techniqueparameter setting 1.加热段温度设定必须按照产品所运用的原料的不合而不合,但却必须遵守一个如许的规矩,即由射口筒到进科段温度是慢慢递减的.且递减温度是以10.度为单位. The proper temperature setting differs depending on type of resin material, but it must be abide by a rule that temperature setting should diminish in step 10.C from nozzle to feeding resin material position. 2特别情形下.如料头抽丝,则射口筒温度应降低,假如是比较特别的原料冷凝比较快的.则射口筒温度则不止比第二节法兰温度高10度.比方PPS.尼龙等. Nozzle temperaturesetting should low if product line. If resin material suchas PPS, PA, cool very soon , Nozzle temperature should higher more 10.C than the second cylinder temperature. 3.机台马达启动温度视乎机台不合而不合,一般出于对机台油路中的油封呵护须要,油温最好能掌握在40度-60度,以免油封长期高压而变更,缩短运用寿命,造成成型不稳固. Pump turning on temperature is different depending on type of ction molding machine. To protect oil seal of machine it setoil temperature within 40.C-60.C, If oil seal work on condition that high pressure and damaged It’s work time will be shorter, it can cause molding stable.第三节打针及熔胶(加料)工艺前提设定 ction and plastic Technique parameter setting 一.打针 ction第四节罕有塑料原料的有关温度值.原料Resin名称Name熔点℃Melt’s成型温度℃Molding Temperature(’c)分化温度℃Decomposing Temperature(‘C)模具温度℃Mold Temp erature(‘c)湿润温度℃Resin dry temperature(‘c)打针是把塑料原料经加热后射进模腔的进程,它一般可分为第一级,第二级,第三级,第四级及保压几段: ction is a step which ct melt resin material into mold. It consists of stepl,step2 ,step3,step4 and holding pressure step: 1.第一级打针一般是打针料头段.具打针量一般可根据料头的轻重来估量其行程,当然也可以根据公式来盘算,如公式: Step l cts usually tunnel material, ction Volume can be estimated according to the weight of course it can be calculated by formula: L=Si=Vi/0.785Ds2 L:打针行程; Si:打针行程; L: ction stroke Si: ction stroke Vi:理论打针容积; Ds:螺杆直径; Vi: ction volume of theoretical Ds: diameter of screw 0.785:是Ω/4的值. 0. 785: value ofΩ/4.当然,假如我们在成型时每设定一个参数都要盘算一次,要成型出一个产品就要几个小时才干完成了. But it cost a lot of time to produce one product if every time molding parameter is setting by calculation. 2.第二级是注塑产品约2/3的阶段,当然,根据产品特别须要,也许可成型不到2/3阶段,比方防止联合线问题,这一阶段的成型速度及压力一般是全部成型段的最大值段,假如排的产品与机台根本是相吻合的.模具构造合理,排气优越,这一段的压力一般也不会超出80%.速度侧视产品需变,可能大到95%也可,天然一般都是在55%-80%间. Step 2 ct 2/3 of product. It can lower 2/3 of product according to requirement of product. For example to prevent weld line. Molding speed and pressure on this step is the maximum of whole molding section. If Mold suit the ction molding machine and mold structure reasonable and eject air well,pressure of this step should lower 80%. Molding speed setting within 55-80% but it may setting 95% for especial product. 3.第三段是打针余下的1/3段,其速度和压力根据产品的须要,一般是小于第二段,速度和压力消失于一个往降低的进程.主如果为了防止产品毛边的产生,但同时又必须把产品充填饱满. Step3 ct remain 1/3 of product. According to product molding speed and pressure lower than that of step2 To prevent flash speed and pressure should decrease but it can’t shot short. 4.第四段:一般有机台还有第五,第六段,这段的成型速度和压力雷同前,都消失两段一个递减进程.其感化都是起到一个再次充满的感化. Step4 section: Some ction machines have step5,step6 which are same as former molding speed and pressure this step should diminish and ct once more. 5.保压段:不管成型什么产品,都消失一个保压进程.任何产品都不合程度的消失一个厚薄不一的问题,正常情形下,较厚的部分都可能消失一个压缩凹陷的现象,为懂得决这种现象,就应运用到保压,保压一般来讲都运用较慢的射速,而压力的设置则应看缩水的情形若何,小到25%,大到80%都有可能. Holding pressure step: No matter what product there is a holding pressure step. Any product can’t molding a same thickness. Usually the deeper section may sink mark . To prevent this defect it should set holding pressure, The ction speed of holding pressure step is slow but holding pressure setting within 25-80% depending on sink mark. 二.熔胶段工艺Plastic Technique 1.再庞杂的熔胶扭转进程最多不会超出三段,因为熔胶本身就是消失于把胶熔进料筒的进程,假如原料粘度大,熔胶压力则大,但速度则应取决于原料的分化温度,熔胶速度越快,原估中的剪切力则会越大,料管温度则越高,局部原料产生分化的可能性则会越大,故一般熔胶会采取中速为宜,如45%-75%,熔胶同时会碰着一个比较重要的环节,那就是背压的运用,产品精度请求越大,背压的运用则更大,背压可使原料分子间构造更慎密,成型出的产品则尺寸更稳固,外不雅越好.当然,背压太大,则会产生流涎,所以背压的运用又应考虙到其它原因. Plastic should lower 3 steps, because plastic is a step to add melt resin material to cyclinder , Higher stick of resin material ,higher screw back pressure. Screw speed differs depending on decomposing temperature of resin material ,Higher screw speed ,Higher trim force of resin, higher cyclinder temperature. Some resin material may decomposes so it set screw speed in mid-speed such as 45-75%, In plastic step setting screw back pressure is very important, Higher screw back pressure ,higher quality of product screw back pressure make resin structure order, Molding product is beautiful and volume stable. But ,it maybe flow if screw back pressure too high . So all factors should be considered when using screw back pressure. 2.熔胶进程还有一个比较重要的环节,那就是松退,松退分前松退和后松退,其感化一般是为了防止流涎和抽丝,设定值速度和压力都在20%-50%间,设定的行程一般在2-5cm间,太长的行程可能会使料筒里面贮存空气,导致下一模消失不期望的气泡. In plastic step sucking back is very important too. Sucking back include front sucking back and back sucking back It setting sucking back to prevent flow and line. It sets sucking back speed and pressure within 20-50% and distance within 2-5cm. TOO long distance make cyclinder reserve air and cause bubble at next molding. 顶出的工艺设定knocking out technique setting 产品经冷却定型后则有一个开模的进程,开模根本上是合模的反进程.开模的未段则有一个慢速设置,开模完成后,产品必须顶出的进程. There is a mold opening step after product cooling taking shape. Mold opening is a reverse step of mold closing. The last step of mold opening speed set slow. Product should be knocked out after mold opened. 一.顶前: Knocking out 顶前最好分两个阶层,第一阶可分为中压慢速,等于把产品轻轻顶出一部分,然后是中压中速顶,中压中速一般指的是35%-55%,而低速则有可能低到5%,这需视产品不合而言,顶出行程设定是顶出长度稍比产品垂直深度大1-2cm即可. Knocking out includes two steps, Step1 section setting mid-speed, knocks product out partly step2 section setting mid-pressure and mid-speed . Depending on different product, mid-pressure and mid-speed sets within 35-55% but low-speed can set 5%. Distance of knocking out longer 1-2cm than the vertical thickness of product.二.退针Back 顶退包含两个进程与顶落的进程根本一致,顶退的终点应预留1-3cm的空间,以呵护顶针油管不被顶坏. The same as knocking out, ejector back includes 2 steps. To protect the ejector oil jar, it should make a 1-3mm distance in the ending point of ejector back. 三.顶针方法还包含一个多次顶,单次顶及顶针逗留的选择,机械手取产品,脱模顺遂的情形都采纳多项,为了顶针油缸寿命的延伸,多次顶就以不超出三次为宜,顶针逗留一般用在顶针带着产品退回有可能对增品产生毁伤的模具,同时为合营机械手运用,有时也须要较短的顶针逗留. The way of knocking out includes knocking out once, Knocking out repeat and ejector delay. Take product by manipulator or take product easy, itshould select knocking out once. To longer the work time of ejector oiljar, times of knocking out lower 3 times. Ejector delay used when product will be damaged if ejector back or suit manipulator. 成型时光的设定Molding time setting 在包管产品德量的前提下,周期时光是越短越好,周期时光又包含如下几项:射胶时光,保压时光,熔胶时光,冷却时光,顶出时光,锁模低压时光,甚至乎关系到时光身分的还有还开模与锁模,及顶出的快慢. Cycle time should shorter on condition that product quality well. Cycle time includes: ction time , holding pressure time, plastic time, cure time, knocking out time and mold protect time. Even mold opening closing sopeed and knocking out speed affect cycle. 1.射胶时光包含保压时光,一般看起来,射胶时光越长,产品越饱和,但我们在讲究质量时,同时也须斟酌产能,更况且,射胶时光过长,有可能会造成产品过于饱满而寻致粘模顶的变形呎寸偏大等一系列问题,故我们在设置射胶时光时应分解斟酌,尽量在合乎质量请求时缩短射胶时光. ction time consists holding pressure time. Longer ction time, fuller product, we should consider production quantity when we suit for quality. If ction time too long, it may cause a series of defects suck as flash strain. So all sorts of factors should be considered, ction time should be shout if quality suit for requirement. 2.熔胶时光的长短取决于熔胶速度设定的快慢,背压设定的大小,但有一点,熔胶时光掌握的长短必定要比冷却时光短. Plastic time depends on plastic speed and screw back pressure, but plastic time must shorter than cure time. 3.冷却时光:冷却时光的长短直接影响到成型的周期,冷却时光越长,成型时光就越长,造成产能就越低,故我们在设定高压冷却时光时,只要能包管到产品成型顺遂,不会直接影响到变形等问题,设定的时光也是越短越好. Cure time: Cure time affects molding cycle. Longer cure time, longer molding cycle, lower production quantity. So it sets cure time short on condition that product molding succed and can’t deformation.. 4.在大量运用机械手的塑胶公司,我们的顶出时光一般是与机械手合营为宜,全主动运用机械手时顶出逗留时光一般保持秒,半主动临盆,如因顶针退回会导致产品失落落或卡紧,而取不下产品,逗留时光则应保持5秒阁下. In PCE company, for using manipulator in abundence , knocking out time suits manipulator, Knocking out delay keeps 1.5-2 second when using manipulator full-manipulator, knocking out delay keeps about 5 second when using manipulator semi-manipulator and product will fall or can’t be taken off if ejector back. 5.低压呵护时光对呵护我们人身安然,模具安然起很大感化,合营好模具低压地位和低压压力的调剂,低压呵护的时光应取1-3秒,呵护时光越短,可能造成的伤害则越小. Low-pressure protect is very important for safety and protect mold, Mold protect time should adjust within 1-3 second suit low pressure and position of mold protect, shorter protect time, make damaged。