公路工程资料填写范例及表格
- 格式:docx
- 大小:12.37 KB
- 文档页数:1
工程分项开工申请批复单〔A-01〕承包单位:合同号;监理单位:编号:施工技术方案报审表〔A-03〕承包单位:合同号;监理单位:编号:建筑材料报验单〔A-02〕承包单位:合同号;监理单位:编号:施工放样报验单〔A-04〕承包单位:合同号;监理单位:编号:进场设备报验单〔A-08〕承包单位:合同号;监理单位:编号:中间检验申请单〔A-10〕承包单位:合同号;监理单位:编号:工程报验单〔A-11〕承包单位:合同号;监理单位:编号:中间交工证书〔B-03〕承包单位:合同号;监理单位:编号:工程检验认可书〔B-05〕承包单位:合同号;监理单位:编号:分项工程质量检验评定表〔J-1〕分项工程名称:所属分部工程:所属建设项目:工程地点:承包单位:监理单位:分部工程质量检验评定表〔J-2〕分部工程名称:所属单位工程:所属建设项目:工程地点:承包单位:监理单位:子分部工程质量检验评定表〔J-2-1〕子分部工程名称:所属单位工程:所属建设项目:工程地点:承包单位:监理单位:单位工程质量检验评定表〔J-3〕单位工程名称:所属建设项目:路线名称:工程地点:承包单位:监理单位:子单位工程质量检验评定表〔J-3-1〕子单位工程名称:所属建设项目:路线名称:工程地点:承包单位:监理单位:建设项目〔合同段〕质量检验评定表〔J-4〕建设项目名称:路线名称:起讫桩号:完工日期:承包单位:监理单位:土方路基现场质量检验报告单〔高速与一级公路〕〔C-001〕承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:土方路基现场质量检验报告单〔其他等级公路〕〔C-002〕承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:路基填前地表处理现场质量检验报告单〔高速与一级公路〕〔C-003〕承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:路基填前地表处理现场质量检验报告单〔其他等级公路〕〔C-004〕承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:软基基底现场质量检验报告单〔C-005〕承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:软土地基砂垫层现场质量检验报告单〔C-006〕承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:混凝土浇筑申请报告单〔C-010〕承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:管节预制现场质量检验报告单〔C-011〕承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:管道根底与管节安装现场质量检验报告单〔C-012〕承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:检查〔雨水〕井现场质量检验报告单〔C-013〕承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:土沟现场质量检验报告单〔C-014〕承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:浆砌排水沟现场质量检验报告单〔C-015〕承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:盲沟现场质量检验报告单〔C-016〕承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:排水泵站〔沉井〕现场质量检验报告单〔C-017〕承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:砌体挡土墙现场质量检验报告单〔C-020〕承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:锥、护坡现场质量检验报告单〔C-022〕承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:导流工程现场质量检验报告单〔C-023〕承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:导流工程填土现场质量检验报告单〔C-024〕承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:石笼防护现场质量检验报告单〔C-025〕承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:水泥混凝土面层现场质量检验报告单〔一〕〔高速与一级公路〕〔C-030〕承包单位:合同号;监理单位:编号:水泥混凝土面层现场质量检验报告单〔一〕〔其他等级公路〕〔C-031〕承包单位:合同号;水泥混凝土面层现场质量检验报告单〔二〕〔高速与一级公路〕〔C-032〕承包单位:合同号;水泥混凝土面层现场质量检验报告单〔二〕〔其他等级公路〕〔C-033〕承包单位:合同号;拉杆、胀缝板与其套帽、滑移端设置现场质量检验报告单〔C-034〕承包单位:合同号;监理单位:编号:水泥混凝土路面模板〔加工矫正〕现场质量检验报告单承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:水泥混凝土路面模板〔加工矫正〕现场质量检验报告单承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:水泥混凝土路面模板〔加工矫正〕现场质量检验报告单承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:水泥混凝土路面模板安装现场质量检验报告单承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:水泥混凝土路面模板安装现场质量检验报告单承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:水泥混凝土路面模板安装现场质量检验报告单承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:沥青混合料用材料现场质量检验报告单〔C-041〕承包单位:合同号;施工负责人:质量检查员:驻地监理工程师:“随时〞是指经常检查的项目,其检查频率可根据材料来源与质量波动情况由业主与监理确定。
资料目录(样表)1、开工资料及附属资料页2、施工资料及现场质量检验评定表页3、桥梁资料页4、验收资料(单位、分部、分项工程评定)页二OO七年三月工程交工验收证书工程名称:工程地址:年月日工程交工验收证书交工验收时间:合同段交工验收证书第号注:表中容较多时,可用附件工程交工验收报告工程名称:工程地址:年月日工程交工验收报告奉节县公桃路A2 合同段(K11+676.29小桥)开工报告书国平建筑工程二OO六年八月二十八日桥梁工程开工报告国平建筑工程公桃路A2合同段项目部文件渝国平(2005)06号关于公桃路A2合同段工程项目部主要成员的报告项目负责人吴高国项目经理林国青技术负责人万维富施工员邓明源资料员马泮华质安员宋明文材料员周自任驾驶员宋平国平建筑工程公跳路A2段项目部二OO五年六月二十日奉节县公桃路改建工程人员进场报验单承包单位:国平建筑工程合同号:A2奉节县公桃路改建工程机械进场报验单承包单位:国平建筑工程合同号:A2监理单位:路达公路设计咨询事务所·监理部编号:奉节县公桃路改建工程建筑材料进场报验单承包单位:国平建筑工程合同号:A2材料送样人:日期:施工放样报验单承包单位:国平建筑工程合同号:A2承包人:日期:年月日工程分项开工申请批复单承包单位:国平建筑工程合同号:A2监理单位:路达公路设计咨询事务所·监理部编号:检验申请批复单承包单位:国平建筑工程合同号:A2监理单位:路达公路设计咨询事务所·监理部编号:中间计量表承包单位:国平建筑工程合同号:A2日期:日期:地基验槽(坑)记录承包单位:国平建筑工程合同号:A2监理单位:路达公路设计咨询事务所·监理部编号:工程隐蔽检查记录承包单位:国平建筑工程合同号:A2监理单位:路达公路设计咨询事务所·监理部编号:土方路基现场质量检验报告单承包单位:国平建筑工程合同号:A2监理单位:路达公路设计咨询事务所·监理部编号:承包人:日期:年月日石方路基现场质量检验报告单承包单位:国平建筑工程合同号:A2监理单位:路达公路设计咨询事务所·监理部编号:承包人:日期:年月日地基基(槽)坑现场质量检验报告单承包单位:国平建筑工程合同号:A2监理工程师:日期:年月日承包人:日期:年月日基础砌体现场质量检验报告单承包单位:国平建筑工程合同号:A2监理单位:路达公路设计咨询事务所·监理部编号:承包人:日期:年月日砌体挡土墙现场质量检验报告单承包单位:国平建筑工程合同号:监理单位:路达公路设计咨询事务所·监理部编号:承包人:日期:年月日浆砌砌体现场质量检验报告单承包单位:国平建筑工程合同号:A2监理单位:路达公路设计咨询事务所·监理部编号:承包人: 日期:年 月 日盖板制作现场质量检验报告单承包单位:国平建筑工程 合同号:A2监理单位:路达公路设计咨询事务所·监理部 编 号:承包人: 日期: 年 月 日盖板安装现场质量检验报告单承包单位:国平建筑工程合同号:A2承包人:日期:年月日盖板涵现场质量检验报告单承包单位:国平建筑工程合同号:A2承包人:日期:年月日涵台现场质量检验报告单承包单位:国平建筑工程合同号:A2监理单位:路达公路设计咨询事务所·监理部编号:拱涵浇(砌)筑现场质量检验报告单承包单位:国平建筑工程合同号:A2监理单位:路达公路设计咨询事务所·监理部编号:承包人:日期:年月日一字墙和八字墙现场质量检验报告单承包单位:国平建筑工程合同号:A2承包人:日期:年月日涵洞总体现场质量检验报告单承包单位:国平建筑工程合同号:A2监理单位:路达公路设计咨询事务所·监理部编号:路肩现场质量检验报告单承包单位:国平建筑工程合同号A2:承包人:日期:年月日浆砌排水沟现场质量检验报告单承包单位:国平建筑工程合同号:A2监理单位:路达公路设计咨询事务所·监理部编号:承包人:日期:年月日手摆片石现场质量检验报告单承包单位:国平建筑工程合同号:A2监理单位:路达公路设计咨询事务所·监理部编号:承包人:日期:年月日级配碎(砾)石基层和底基层现场质量检验报告单承包单位:国平建筑工程合同号:A2监理单位:路达公路设计咨询事务所·监理部编号:承包人:日期:年月日护栏制作现场质量检验报告单承包单位:国平建筑工程合同号:A2承包人:日期:年月日护栏安装现场质量检验报告单承包单位:国平建筑工程合同号:A2监理单位:路达公路设计咨询事务所·监理部编号:承包人:日期:年月日墩、台身砌体现场质量检验报告单承包单位:国平建筑工程合同号:监理单位:路达公路设计咨询事务所·监理部编号:承包人: 日期: 年 月 日墩、台身安装现场质量检验报告单承包单位:国平建筑工程 合同号:A2监理单位:路达公路设计咨询事务所·监理部编 号:墩、台身现场质量检验报告单承包单位:国平建筑工程合同号:A2监理单位:路达公路设计咨询事务所·监理部编号:承包人:日期:年月日承台现场质量检验报告单承包单位:国平建筑工程合同号:A2监理单位:路达公路设计咨询事务所·监理部编号:承包人:日期:年月日侧墙砌体现场质量检验报告单承包单位:国平建筑工程合同号:监理单位:路达公路设计咨询事务所·监理部编号:承包人:日期:年月日拱圈砌体现场质量检验报告单承包单位:国平建筑工程合同号:监理单位:路达公路设计咨询事务所·监理部编号:承包人:日期:年月日主拱圈安装现场质量检验报告单承包单位:国平建筑工程合同号:A2监理单位:路达公路设计咨询事务所·监理部编号:承包人:日期:年月日台背填土现场质量检验报告单承包单位:国平建筑工程合同号:A2监理单位:路达公路设计咨询事务所·监理部编号:承包人:日期:年月日桥梁总体现场质量检验报告单承包单位:国平建筑工程合同号A2:监理单位:路达公路设计咨询事务所·监理部编号:工程竣工报告承包单位:广夏第筑(集团)合同号:A1。
工程分项开工申请批复单(A-01)承包单位:合同号;监理单位:编号:施工技术方案报审表(A-03)承包单位:合同号;监理单位:编号:建筑材料报验单(A-02)承包单位:合同号;监理单位:编号:施工放样报验单(A-04)承包单位:合同号;监理单位:编号:进场设备报验单(A-08)承包单位:合同号;监理单位:编号:中间检验申请单(A-10)承包单位:合同号;监理单位:编号:工程报验单(A-11)承包单位:合同号;监理单位:编号:中间交工证书(B-03)承包单位:合同号;监理单位:编号:工程检验认可书(B-05)承包单位:合同号;监理单位:编号:分项工程质量检验评定表(J-1)分项工程名称:所属分部工程: 所属建设项目: 工程地点: 承包单位: 监理单位:检验负责人:计算:复核:年月日分部工程质量检验评定表(J-2)分部工程名称:所属单位工程:所属建设项目:工程地点:承包单位:监理单位:检验负责人:计算:复核:年月日子分部工程质量检验评定表(J-2-1)子分部工程名称:所属单位工程:所属建设项目:工程地点:承包单位:监理单位:检验负责人:计算:复核:年月日单位工程质量检验评定表(J-3)单位工程名称:所属建设项目:路线名称:工程地点:承包单位:监理单位:检验负责人:计算:复核:年月日子单位工程质量检验评定表(J-3-1)子单位工程名称:所属建设项目:路线名称:工程地点:承包单位:监理单位:检验负责人:计算:复核:年月日建设项目(合同段)质量检验评定表(J-4)建设项目名称:路线名称:起讫桩号:完工日期:承包单位:监理单位:检验负责人:计算:复核:年月日土方路基现场质量检验报告单(高速及一级公路)(C-001)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:土方路基现场质量检验报告单(其他等级公路)(C-002)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:路基填前地表处理现场质量检验报告单(高速及一级公路)(C-003)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:路基填前地表处理现场质量检验报告单(其他等级公路)(C-004)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:软基基底现场质量检验报告单(C-005)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:软土地基砂垫层现场质量检验报告单(C-006)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:混凝土浇筑申请报告单(C-010)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:管节预制现场质量检验报告单(C-011)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:管道基础及管节安装现场质量检验报告单(C-012)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:检查(雨水)井现场质量检验报告单(C-013)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:土沟现场质量检验报告单(C-014)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:浆砌排水沟现场质量检验报告单(C-015)承包单位:合同号;编号:监理单位:施工负责人:质量检查员:驻地监理工程师:盲沟现场质量检验报告单(C-016)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:排水泵站(沉井)现场质量检验报告单(C-017)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:砌体挡土墙现场质量检验报告单(C-020)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:锥、护坡现场质量检验报告单(C-022)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:导流工程现场质量检验报告单(C-023)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:导流工程填土现场质量检验报告单(C-024)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:石笼防护现场质量检验报告单(C-025)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:水泥混凝土面层现场质量检验报告单(一)(高速及一级公路)(C-030)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:水泥混凝土面层现场质量检验报告单(一)(其他等级公路)(C-031)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:水泥混凝土面层现场质量检验报告单(二)(高速及一级公路)(C-032)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:水泥混凝土面层现场质量检验报告单(二)(其他等级公路)(C-033)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:拉杆、胀缝板及其套帽、滑移端设置现场质量检验报告单(C-034)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:水泥混凝土路面模板(加工矫正)现场质量检验报告单(三辊轴机组)(C-035)承包单位:合同号;监理单位:编号:。
工程分项开工申请批复单(A-01)承包单位:合同号;监理单位:编号:施工技术方案报审表(A-03)承包单位:合同号;监理单位:编号:建筑材料报验单(A-02)承包单位:合同号;监理单位:编号:施工放样报验单(A-04)承包单位:合同号;监理单位:编号:进场设备报验单(A-08)承包单位:合同号;监理单位:编号:中间检验申请单(A-10)承包单位:合同号;监理单位:编号:工程报验单(A-11)承包单位:合同号;监理单位:编号:中间交工证书(B-03)承包单位:合同号;工程检验认可书(B-05)监理单位:编号:分项工程质量检验评定表(J-1)分项工程名称:所属分部工程:所属建设项目:工程地点:承包单位:监理单位:检验负责人:计算:复核:年月日分部工程质量检验评定表(J-2)分部工程名称:所属单位工程:所属建设项目:工程地点:承包单位:监理单位:检验负责人:计算:复核:年月日子分部工程质量检验评定表(J-2-1)子分部工程名称:所属单位工程:所属建设项目:工程地点:承包单位:监理单位:检验负责人:计算:复核:年月日单位工程质量检验评定表(J-3)单位工程名称:所属建设项目:路线名称:工程地点:承包单位:监理单位:检验负责人:计算:复核:年月日子单位工程质量检验评定表(J-3-1)子单位工程名称:所属建设项目:路线名称:工程地点:承包单位:监理单位:检验负责人:计算:复核:年月日建设项目(合同段)质量检验评定表(J-4)建设项目名称:路线名称:起讫桩号:完工日期:承包单位:监理单位:检验负责人:计算:复核:年月日土方路基现场质量检验报告单(高速及一级公路)(C-001)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:土方路基现场质量检验报告单(其他等级公路)(C-002)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:路基填前地表处理现场质量检验报告单(高速及一级公路)(C-003)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:路基填前地表处理现场质量检验报告单(其他等级公路)(C-004)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:软基基底现场质量检验报告单(C-005)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:软土地基砂垫层现场质量检验报告单(C-006)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:混凝土浇筑申请报告单(C-010)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:管节预制现场质量检验报告单(C-011)承包单位:合同号;编号:监理单位:施工负责人: 质量检查员: 驻地监理工程师:管道基础及管节安装现场质量检验报告单(C-012)承包单位:合同号; 监理单位: 编 号:施工负责人:质量检查员:驻地监理工程师:检查(雨水)井现场质量检验报告单(C-013)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:土沟现场质量检验报告单(C-014)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:浆砌排水沟现场质量检验报告单(C-015)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:盲沟现场质量检验报告单(C-016)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:排水泵站(沉井)现场质量检验报告单(C-017)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:砌体挡土墙现场质量检验报告单(C-020)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:锥、护坡现场质量检验报告单(C-022)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:导流工程现场质量检验报告单(C-023)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:导流工程填土现场质量检验报告单(C-024)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:石笼防护现场质量检验报告单(C-025)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:水泥混凝土面层现场质量检验报告单(一)(高速及一级公路)(C-030)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:水泥混凝土面层现场质量检验报告单(一)(其他等级公路)(C-031)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:水泥混凝土面层现场质量检验报告单(二)(高速及一级公路)(C-032)承包单位:合同号;监理单位:编号:施工负责人: 质量检查员:驻地监理工程师:水泥混凝土面层现场质量检验报告单(二)(其他等级公路)(C-033)承包单位: 合同号; 监理单位: 编 号:施工负责人:质量检查员:驻地监理工程师:拉杆、胀缝板及其套帽、滑移端设置现场质量检验报告单(C-034)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:水泥混凝土路面模板(加工矫正)现场质量检验报告单(三辊轴机组)(C-035)承包单位:合同号;监理单位:编号:施工负责人:质量检查员:驻地监理工程师:水泥混凝土路面模板(加工矫正)现场质量检验报告单(轨道摊铺机)(C-036)承包单位:合同号;监理单位:编号:。
X X X工程资料整理范本目录第一章交桩和复测报告第一节交桩 (1)第二节复测报告 (4)第二章开工报告 (12)第三章原材料出厂质量证明和工地试验报告第一节原材料出场质量证明 (24)第二节工地原材料抽检试验报告 (24)第四章路基工程施工资料第一节路基检验记录整理顺序 (26)第二节路基排水资料整理顺序 (44)第三节挡土墙、防护工程资料整理顺序 (52)第四节小桥和涵洞资料整理顺序 (60)第五章路面工程施工资料第一节水泥稳定粒料基层(底基层)资料整理顺序 (80)第二节沥青混凝土面层资料整理顺序 (88)第三节水泥混凝土面层资料整理顺序 (93)第四节路缘石资料整理顺序 (97)第五节路肩资料整理顺序 (100)第六章桥涵工程施工资料第一节施工试验报告 (102)第二节施工检验资料整理顺序 (107)一、基础及下部构造资料整理顺序 (107)二、上部构造预制和安装资料整理顺序 (145)三、总体、桥面系和附属工程资料整理顺序 (157)第三节悬索桥资料整理顺序 (181)第七章施工检验结果汇总表第一节施工抽检试验结果汇总表 (213)第二节施工检验结果汇总表 (217)第八章监理资料第一节监理行政管理文件 (223)第二节合同管理文件 (237)第三节进度管理文件 (252)第四节质量管理文件 (259)第五节计量支付文件 (286)第六节监理原始资料 (302)第九章内业资料整理规定 (303)第一节科技档案归档须知 (303)第二节科技档案分类 (305)第三节 XXX工程竣工文件材料立卷归档管理办法 (308)第四节河北省XXX工程竣(交)工验收办法实施细则 (320)第五节内业资料归档程序表格 (353)编制说明为规范XXXXXXXXXXXXXX工程施工资料的编制和归档工作,准确、全面记录施工中各种信息,XXXXXXXXXXXXXX工程建设管理办公室特制定《XXXXXXXXXXXXXX工程资料整理范本》。
目录一、报表··········································合同执行概况表····································施工人员状况表····································主要进场机械设备表·································承包商试验仪器设备表·······························监理机构框图·····································为工程师提供的测量仪器表····························气象及施工活动报告·································施工测量形象进度图·······························工程进度概况表··································工程进度概况表··································工程进度概况表··································工程进度概况表··································承包商施工测量概况表·····························施工试验检测概况表·······························监理独立测量概况表·······························监理工程师独立试验概况表··························承包人混凝土、砂浆试件概况表······················工程事故一览表··································工程延期/索赔一览表······························工程变更汇总表··································二、汇总表·········································石灰土剂量试验汇总表·····························石灰改善土重型击实标准试验汇总表···················石灰改善土无侧限抗压强度抽检试验汇总表··············砂、碎石抽检试验汇总表···························混凝土配合比试验汇总表···························砂浆配合比试验汇总表·····························钢筋抽检试验汇总表·······························水泥抽检试验汇总表·······························重型击实标准试验汇总表···························工程变更汇总表··································三、施工监理表·······································施工图审查申报表·································进场材料申报表··································施工放样报验单··································工程变更令······································工程变更申报审批表·······························工程变更审查(批)意见书··························工程变更清单表··································工程变更数量计算书·······························分部(项)工程开工申报表··························分部(项)工程开工通知···························承包人每周工作计划·······························检验申请批复单··································工作指令·······································会议纪要·······································中间交工证书····································分包申请报告单··································工程暂时停工指令·································复工指令·······································工程质量事故处理报告单···························工程缺陷责任期终止证书···························四、计量表·········································中期支付月报································中期支付证书····································中期支付申请表··································清单支付报表····································中间计量支付汇总表·······························工程变更中间计量支付汇总表························工程变更支付一览表·······························工程变更支付明细表·······························计日工支付一览表·································计日工支付明细表·································暂定金额支付一览表·······························费用索赔支付一览表·······························价格调整支付一览表·······························扣回动员预付款一览表·····························前期支付月报································动员预付款支付申请表·····························中间计量表······································工程变更中间计量表·······························中间计量表目录··································监理服务费中期支付申请···························监理服务费清单支付报表···························监理服务数量汇总表·······························监理人员考勤表··································五、路线表·········································路线导线网、点测量(复测)报表·····················附合导线计算表··································路线导线网、点测量(复测)报表·····················路线水准点测量(复测)报表························测量放样(复核)记录表···························六、检查、记录表······································土方路基现场质量检验表···························石方路基现场质量检验表···························砂垫层现场质量检验表·····························袋装砂井、塑料排水板现场质量检验表·················粉喷桩现场质量检验表·····························加筋工程土工合成材料现场质量检验表·················隔离工程土工合成材料现场质量检验表·················过滤排水工程土工合成材料现场质量检验表··············管节预制施工现场质量检验表························管道基础及管节安装施工现场质量检验表···············检查(雨水)井砌筑现场质量检验表···················浆砌排水沟现场质量检验表··························盲沟现场质量检验表·······························砌体挡土墙现场质量检验表··························干砌挡土墙现场质量检验表··························锥、护坡现场质量检验表···························浆砌砌体现场质量检验表···························干砌片石现场质量检验表···························混凝土排水管施工现场质量检验表·····················预应力锚索现场质量检查表··························水泥混凝土面层现场质量检验表······················沥青混凝土面层和沥青碎(砾)石现场质量检验表·········沥青贯入式面层现场质量检验表······················沥青表面处治面层现场质量检验表·····················水泥土基层和底基层现场质量检验表···················水泥稳定粒料基层及底基层现场质量检验表··············石灰土基层和底基层现场质量检验表···················石灰稳定粒料基层和底基层现场质量检验表··············灰、粉煤灰土基层和底基层现场质量检验表··············石灰、粉煤灰稳定粒料基层和底基层现场质量检验表·······级配碎(砾)石基层和底基层现场质量检验表··············路缘石铺设现场质量检验表··························路肩现场质量检验表·······························桥梁总体实测项目现场质量检验表·····················钢筋安装实测项目现场质量检验表·····················钢筋网实测项目现场质量检验表······················预制桩钢筋实测项目现场质量检验表···················钢筋、钢绞线先张法现场质量检验表···················后张法现场质量检验表·····························基础砌体现场质量检验表···························墩、台身砌体现场质量检验表························拱圈砌体现场质量检验表···························侧墙砌体现场质量检验表···························扩大基础现场质量检验表···························钻孔灌注桩现场质量检验表··························挖孔桩现场质量检验表·····························预制桩现场质量检验表·····························沉桩现场质量检验表·······························双壁钢围堰现场质量检验表··························沉井或钢围堰封底砼项目现场质量检验表···············承台实测项目现场质量检验表························大体积混凝土结构实测项目现场质量检验表··············墩、台身实测项目现场质量检验表·····················柱或双壁墩身实测项目现场质量检验表·················墩、台身安装实测项目现场质量检验表·················墩、台帽或盖梁实测项目现场质量检验表···············梁(板)预制实测项目现场质量检验表·················梁(板)安装实测项目现场质量检验表·················就地浇筑梁(板)安装实测项目现场质量检验表··········悬臂浇筑梁实测项目现场质量检验表···················悬臂拼装梁实测项目现场质量检验表···················防水层实测项目现场质量检验表······················桥面铺装实测项目现场质量检验表·····················复合桥面水泥混凝土铺装现场质量检验表···············支座垫石实测项目现场质量检验表·····················挡块实测项目现场质量检验表························支座安装实测项目现场质量检验表·····················伸缩缝安装实测项目现场质量检验表···················混凝土小型构件实测项目现场质量检验表···············人行道铺设实测项目现场质量检验表···················栏杆安装实测项目现场质量检验表·····················混凝土防撞护栏浇筑实测项目现场质量检验表············桥头搭板实测项目现场质量检验表·····················涵洞整体实测项目现场质量检验表·····················涵台实测项目现场质量检验表························管座及涵管安装实测项目现场质量检验表···············盖板制作实测项目现场质量检验表·····················盖板安装实测项目现场质量检验表·····················箱涵浇筑实测项目现场质量检验表·····················拱涵浇(砌)实测项目现场质量检验表·················倒虹吸竖井实测项目现场质量检验表···················一字墙和八字墙实测项目现场质量检验表···············交通标志现场质量检验表···························路面标线现场质量检验表···························突起路标现场质量检验表···························轮廓标现场质量检验表·····························波形梁钢护栏现场质量检验表························混凝土护栏现场质量检验表··························缆索护栏现场质量检验表···························防眩设施现场质量检验表···························隔离栅和防落网现场质量检验表······················砌体声屏障现场质量检验表··························金属结构声屏障现场质量检验表······················中央分隔带绿化现场质量检验表······················中央分隔带绿化现场质量检验表······················路侧绿化现场质量检验表···························取、弃土场绿化现场质量检验表······················钻孔灌注桩钢筋笼现场质量检查表·····················无破损检测桩基报告表·····························支座安装检查表··································。
项目开工申请报告单承包单位:监理单位:编号:A-1 □□□-□□□□注:合同段工程只有当本表内容审核符合合同或有关要求时,才可进行“分项工程”的开工审批。
工程分项开工申请批复单承包单位:监理单位:编号:A-1-1 □□□-□□□□施工放样报验单承包单位:监理单位:编号:A-1-2-□□□-□□□□承包人每周工作计划承包单位:监理单位:编号:A-2 □□□-□□□□监理周报承包单位:监理单位:编号:A-3 □□□-□□□□监理员:监理工程师:日期:日期:检验申请批复单承包单位:监理单位:编号:A-4 □□□-□□□□工作指令承包单位:监理单位:编号:A-5 □□□-□□□□承包人签字: 监理工程师签字:日期: 日期:工程变更申请单承包单位:监理单位:编号:A-6 □□□-□□□□工程变更令承包单位:监理单位:编号:A-7 □□□-□□□□索赔申请单承包单位:监理单位:编号:A-8 □□□-□□□□索赔时间/金额审批表承包单位:监理单位:编号:A-9 □□□-□□□□工地会议纪要承包单位:监理单位:编号:A-10 □□□-□□□□中间交工证书承包单位:监理单位:编号:A-11 □□□-□□□□分包申请报告单承包单位:监理单位:编号:A-12 □□□-□□□□工程暂时停工指令承包单位:监理单位:编号:A-13 □□□-□□□□复工指令承包单位:监理单位:编号:A-14 □□□-□□□□工程质量事故处理报告单承包单位:监理单位:编号:A-15 □□□-□□□□工程交工证书承包单位:监理单位:编号:A-16 □□□-□□□□工程缺陷责任期终止证书承包单位:监理单位:编号:A-17 □□□-□□□□承包商通用函件发函单位:发函时间: 年月日编号:A-18 □□□-□□□□注:用于没有固定格式的通知、报告、批复、指令及其它意向的表示。
建筑材料报验单承包单位:监理单位:编号:A-19 □□□-□□□□进场设备报验单承包单位:监理单位:编号:A-20 □□□-□□□□主要人员及人工报验单承包单位:监理单位:编号:A-21 □□□-□□□□。
公路工程施工资料表格及填写第一篇路线施工检测记录:1.施检—01导线点测量汇总表(1).该表为高速、一级公路、大桥、隧道等用坐标放样或用导线点网控制的工程使用。
不采用坐标放样的工程,不填此表。
(2).本表由施检01-1表导线测量记录表及施检01-2表附合导线测量计算表汇总而来。
2.施检一02路线平曲线检查表路线平曲线检查表是检查路面工程完工后的平曲线与设计平曲线的偏差情况。
为便于检测又能反映出曲线的主体,主要检测内容为:交点桩号、曲线偏角、曲线外距。
表中切线长、半径、缓和曲线长一般不检测。
3.施检-03路线纵坡检查表本表用于检查成型后的公路纵面是否满足设计要求。
4.施检-04超高、加宽、视距检测表该表适用于路线平面指标比较小且需要采取工程措施路段。
第二篇路基试表的填表说明(1)表头部分的填写:工程名称:指工程项目名称含合同段号。
试样编号:指对试样进行分类编号。
试样地点:指取样具体位置。
拟定用途:指用于何工程地段、结构层次和工程部位。
试验单位:指试验检测机构或工地试验室名称。
试样说明:指试样的类型及特征。
试验规程:指本试验所采用现行的部颁或行业试验规程的代号。
试验环境:指试验时试验场所的温度或湿度。
主要仪器:指使用计量器具或专用试验仪器的名称及型号精度等。
技术负责人:指试验检测机构或工地试验室的技术负责人试验日期:试验当天日期。
(2).表中主体部分的填写:①.应将试验数据如实填在规定的格内或栏内,其中各项测试结果的计算及数据应符合有效数字的规定,测定结果应符合试验规程规定的精度或允许偏差的要求。
采用的计量单位要与规范、规程规定的保持一致,不得随意采用。
②.如填写有误,不得涂改,应在原数据上划一杠,在其旁边将正确数据填上。
③.试验结果栏是综合上述检测数据,用简炼的语言将试验结果与施工技术规范或试验规程相比较后得出合格或能否使用的结论。
④.附注或备注栏在必要时填写与试验有关或须进一步说明情况的事由。
⑤.监理工程师意见栏要求对检验结果准确地说明结论性意见。
第一篇路线施工检测记录:.施检— 导线点测量汇总表.该表为高速、一级公路、大桥、隧道等用坐标放样或用导线点网控制的工程使用。
不采用坐标放样的工程,不填此表。
.本表由施检 - 表导线测量记录表及施检 - 表附合导线测量计算表汇总而来。
.施检一 路线平曲线检查表路线平曲线检查表是检查路面工程完工后的平曲线与设计平曲线的偏差情况。
为便于检测又能反映出曲线的主体,主要检测内容为:交点桩号、曲线偏角、曲线外距。
表中切线长、半径、缓和曲线长一般不检测。
.施检- 路线纵坡检查表本表用于检查成型后的公路纵面是否满足设计要求。
.施检- 超高、加宽、视距检测表该表适用于路线平面指标比较小且需要采取工程措施路段。
第二篇 路 基试表的填表说明( )表头部分的填写:工程名称:指工程项目名称含合同段号。
试样编号:指对试样进行分类编号。
试样地点:指取样具体位置。
拟定用途:指用于何工程地段、结构层次和工程部位。
试验单位:指试验检测机构或工地试验室名称。
试样说明:指试样的类型及特征。
试验规程:指本试验所采用现行的部颁或行业试验规程的代号。
试验环境:指试验时试验场所的温度或湿度。
主要仪器:指使用计量器具或专用试验仪器的名称及型号精度等。
技术负责人:指试验检测机构或工地试验室的技术负责人 试验日期:试验当天日期。
( ).表中主体部分的填写:①.应将试验数据如实填在规定的格内或栏内,其中各项测试结果的计算及数据应符合有效数字的规定,测定结果应符合试验规程规定的精度或允许偏差的要求。
采用的计量单位要与规范、规程规定的保持一致,不得随意采用。
②.如填写有误,不得涂改,应在原数据上划一杠,在其旁边将正确数据填上。
③.试验结果栏是综合上述检测数据,用简炼的语言将试验结果与施工技术规范或试验规程相比较后得出合格或能否使用的结论。
④.附注或备注栏在必要时填写与试验有关或须进一步说明情况的事由。
⑤.监理工程师意见栏要求对检验结果准确地说明结论性意见。
土方路基填筑卷内目录承包单位:天津五市政清理与掘除检验表承包单位:天津五市政合同段:第六合同段监理单位:武汉大通公路监理公司编号:B-7C06—01—006-0]0]1]记录人:陈维韬复核人:李兴祖监理工程师:任小波检验申请批复单承包单位:天津五市政监理单位:武汉大通公路监理公司编号:A-5—C0]6—01-00|町一001施工单位:天津五市政监理单位:武汉大通公路监理公司6合同段:第六合回段6-01「一 编号:B —8—C06T)土方路基现场质量检验报告单施工时间 所属分部工程K81+593-K83+000 外观描述及结论:碾压平整、密实,无轮迹,符合要求土方路基分项工程名称检测:陈唯韬复核:李兴祖监理工程师:任小波日期:2006.3。
28 日期:2006.3。
28 日期:2006。
3.27施工放样报验单承包单位:天津五市政00001施工放线测量记录表承包单位:天津五市政合同段:第六监理单位:武汉大通公路监理公司编号:B-8-C09记录人:刘遵国日期:2006.3.28复核人:孙福凯日期:2006。
3。
28监理工程师:翟国清日期10水准测记录承包单位:天津五市政合同段:第六合同段复核人:孙福凯日期:2006.3。
28监理工程师:翟国清日期:2006.3。
28备注:施工中如涉及计量,则该期计量截止的最后一层不论是否为转区层均需提供水准测量记录表压实度检验报告编号:c—2—C06—口0994:压实度检测记录表(灌砂法)施工单位天津五市政天气晴距路基顶面设计标咼2。
633锥体砂重(g)799检测范围K82+940—K83+000左幅合同段第六合同段土场位置K82+940-K83+000左幅最大干容重(g/cm3)1。
82最佳含水量(%)13.4砂单位重(g/cm3)1。
42编号:C-4—C0肝口^0994检查日期2006.3。
28 试验规程JTJ059—95试验人:孙长安承包单位:天津五市政监理单位:武汉大通公路监理公司编号:A -5—C0]6—01—006—00115检验申请批复单0 16合同段:第六合同段编号:B —8—C 0|1 土方路基现场质量检验报告单施工单位:天津五市政监理单位:武汉大通公路监理公司土方路基 所属分部工程 K81+593—K83+000 外观描述及结论:碾压平整、密实,无轮迹,符合要求分项工程名称 施工时间检测:陈唯韬复核:李兴祖监理工程师:任小波17石方路基填筑压实质量施工记录承包单位:天津五市政合同段:第六合同段::2007 1.20复核人:李兴祖日期:2007.1。
公路工程资料整理范本目录第一章交桩和复测报告第一节交桩 (1)第二节复测报告 (4)第二章开工报告 (12)第三章原材料出厂质量证明和工地试验报告第一节原材料出场质量证明 (24)第二节工地原材料抽检试验报告 (24)第四章路基工程施工资料第一节路基检验记录整理顺序 (26)第二节路基排水资料整理顺序 (44)第三节挡土墙、防护工程资料整理顺序 (52)第四节小桥和涵洞资料整理顺序 (60)第五章路面工程施工资料第一节水泥稳定粒料基层(底基层)资料整理顺序 (80)第二节沥青混凝土面层资料整理顺序 (88)第三节水泥混凝土面层资料整理顺序 (93)第四节路缘石资料整理顺序 (97)第五节路肩资料整理顺序 (100)第六章桥涵工程施工资料第一节施工试验报告 (102)第二节施工检验资料整理顺序 (107)一、基础及下部构造资料整理顺序 (107)二、上部构造预制和安装资料整理顺序 (145)三、总体、桥面系和附属工程资料整理顺序 (157)第三节悬索桥资料整理顺序 (181)第七章施工检验结果汇总表第一节施工抽检试验结果汇总表 (213)第二节施工检验结果汇总表 (217)第八章监理资料第一节监理行政管理文件 (223)第二节合同管理文件 (237)第三节进度管理文件 (252)第四节质量管理文件 (259)第五节计量支付文件 (286)第六节监理原始资料 (302)第九章内业资料整理规定 (303)第一节科技档案归档须知 (303)第二节科技档案分类 (305)第三节公路工程竣工文件材料立卷归档管理办法 (308)第四节河北省公路工程竣(交)工验收办法实施细则 (320)第五节内业资料归档程序表格 (353)编制说明为规范某公路迁安支线工程施工资料的编制和归档工作,准确、全面记录施工中各种信息,某公路迁安支线工程建设管理办公室特制定《某公路迁安支线工程资料整理范本》。
针对本《范本》内容,特做以下几点说明:1、本《范本》中表格适用于施工单位和监理单位整理工程资料,工序自抽检表格相同,自检资料填写“自检说明”,抽检资料填写“监理评语”,可填写“符合规范及设计要求”。