浅谈建设工程项目的投资与控制

作者:陈轶缤

来源:《城市建设理论研究》2012年第32期

摘要:根据建设工程项目投资控制的客观规律,结合工作中遇到的实际问题,阐述了建设项目各个阶段投资控制的重点、难点及注意事项,提出应采取责任层层分解、落实到人、动态控制等管理办法,以达到建设项目投资控制的目的。

关键词:建设项目,投资控制,目标分解,动态控制

Abstract: according to the construction project the objective law of the investment control, combined with the practical problems met in work, this paper expounds the construction project each stage of the investment control key points and difficulties and the matters needing attention and puts forward that we should take responsibility layers of decomposition, fulfil person, such as dynamic control measures for the administration, in order to achieve the aim of control of project investment.

Keywords: construction project, the investment control, target decomposition, dynamic control

中图分类号:O23文献标识码:A文章编号:

大型建设工程项目往往具有多项节能环保技术、质量要求高、设计内容复杂、安装设备先进、建设周期长、建造过程中不确定因素多等众多特点,因此给项目投资控制也带来了很大的难度。本文针对建设项目投资管理的重点和难点,应设置相应的投资控制预案,以确保建设项目投资严格控制在预期限额。

一、事前具体分解、责任落实到人

由于投资控制过程是一个由浅入深、不断深化的过程,依次分为若干工作阶段,如设计阶段,作为项目投资控制的重点,建设单位工程技术部门各个专业负责人员根据各个专业的概算提出限额设计要求,计划主管部门通过设计委托合同和聘请造价咨询公司及时对设计图纸及设计单位的施工预算进行比较准确的测算及复核,对超过限额的设计图纸返回设计院重新优化设计,保证设计施工图技术可行性与经济合理性的有机结合,确保施工图预算不超过批复概算。

在招标阶段,工程技术部门负责工程范围的界定和技术需求书的编写,计划主管部门负责招标文件的编制、合同条款的拟定以及工程量清单与施工图预算的编制。在保证工程范围清晰、技术需求书齐备、招标文件完善、合同条款全面、工程量清单与施工图预算合理的同时,通过招投标,将施工单位的承包合同价控制在设置的投标限价内,为将施工单位的结算价控制在施工图预算内打下坚实基础。

二、事中处处引领、进行及时纠偏

浅谈工程项目成本控制

浅谈工程项目成本控制 摘要:工程项目成本控制是指对生产经营所消耗的人力资源、物质资源和费用开支的控制,其目的是降低项目成本,提高经济效益。本文详尽阐述了工程项目成本控制的原则、内容及措施。 关键词:工程项目;成本控制;费用开支 abstract: the engineering project cost control refers to the consumption of the human resources, material resources and cost control in the production and management, its aim is to reduce the project cost, raise economic benefits. this paper expounds the engineering project cost control principles, content and measures. key words: engineering project; cost control; cost 施工项目成本控制,是指在项目成本的形成过程中,对生产经营所消耗的人力资源、物质资源和费用开支,进行指导、监督、调节和限制,及时纠正将要发生和已经发生的偏差,把各项生产费用控制在计划成本的范围之内,保证成本目标的实现。施工项目成本控制的目的,在于降低项目成本,提高经济效益。 在我国,工程项目成本管理一直是项目管理的弱项。在项目前期,由于没有深入地调研,不能准确估算完成项目活动所需的资源成本,造成开源不足的局面,甚至部分项目根本就没有经过科学的预测和分析,决策失误,不能获得赢利也就在所难免了。 1. 工程项目成本控制的一般原则

工程项目成本分析

工程项目成本分析 从近几年工程项目开展成本分析的情况看,不少单位的项目对成本进行分析,把成本分析作为项目管理的一项重要内容来抓,取得了一定成效。但还有些项目总是强调工期紧、任务重、精力和人员不足等,工程成本分析往往被搁置。工程项目有没有必要进行成本分析,如何做好工程成本分析呢?笔者就近几年项目成本管理的体会和思考,谈一点自己的认识以与同行共享。 一、成本分析在项目成本管理中的作用非常重要 第一,工程成本分析活动的开展为项目管理者提供了一个重要的经济信息交流平台。 项目管理不外乎两个方面,一是现场管理;二是成本管理。现场管理主要是工程进度、质量、安全,反映的是实物现状,看到的是一目了然的工程实体,比较直观;而成本管理主要是过程控制行为,形成的是内业资料,若不通过解剖分析就难以看清它的真实面貌,了解到成本管理的真实情况。分析交流可以使项目领导和各级管理人员较为详细地了解项目成本管理的基本状况和管理成效,明白项目的管理优势和存在的问题、原因,使领导心中有数,便于领导决策;同时通过分析交流相互启发,可以使企业领导和各管理部门能够在成本管理的思路上、经济运行的做法上和对某些具体问题的认识上达到高度统一,从而形成相互协调、相互促进、共同提高、良性互动的良好局面。 第二,开展经济运行分析是对企业项目管理制度措施的检验和对业务人员能力考验和素质提高。分析考核成效明显说明制度措施对路,相

反说明制度措施有漏洞,需要尽快完善调整;分析资料如何,能否反映出企业项目实情,是业务人员工作质量和专业能力水平的体现,同时,也可使业务人员的业务素质得到促进和提高。 第三,开展经济运行分析是改善和促进企业管理的一种好形式。分析就是为企业“体检”,为企业“诊断把脉”,体检就是找“毛病”、查“病因”;查到“病症病因”,对“症”下“药”,企业就能健康成长。否则,企业的经济状况若明若暗,盲目乐观或者盲目悲观,都会影响企业健康发展。 二、当前情况下,项目应高度重视并认真做好工程成本分析工作 (一)提高认识,加强领导,扎实推进 1.首先是领导认识要到位,要认识到工程成本分析在项目管理中的地位作用,把成本分析工作当作项目管理的大事来抓;其次是管理人员认识要到位,不管工作多忙这项工作不能耽误,并主动研究分析思考成本分析工作中的问题和矛盾,成为自觉行动。 2.要加强对工程成本分析工作的领导。要健全组织体系,配齐配强管理核算人员,明确工作分工,一般由分管领导牵头抓总思路、抓协调、抓督促检查;每个部门、环节有明白人把关;部门按职责分工积极配合,主动合作,不推诿、不扯皮,真正把工作落在实处。 3.项目领导(特别是项目总会、总经)要带头学习成本管理和成本分析的基本常识和方法,了解和掌握项目成本管理控制的重点难点,做到指挥有方,并适时督促检查。

浅谈建筑工程造价管理与控制

浅谈建筑工程造价管理与控制 史满进、陈益清 【摘要】随着我国市场经济的迅速发展,人们的生活水平不断的提高,我国的建筑工程行业也在不断的发展。而对于建筑工程行业来说,它的工程造价是建筑行业的重点,只有有效的管理和控制好工程造价,才能更好的实施建筑的所有步骤。 【关键词】工程造价;建筑工程;管理;控制 一.建筑工程造价的管理和控制的意义 接触过建筑行业的人都非常清楚工程造价是建筑工程的核心,工程造价对于建筑工程具有重要的意义。那么,关于建筑工程造价的管理和控制的主要意义可以体现在以下几点: 1.建筑工程造价对于签证工作具有重要的意义 由于在建筑施工的过程中,施工的质量、施工的设计深度以及施工的复杂,从而导致经常会出现施工进度的变化和地质的变化,也会经常出现施工的工程量的变化。而对于建筑工程造价在签证工作的意义来说就是对于以上方面的不断变化,在双方都同意的同时,利用建筑工程造价来实施工程承发包双方针对施工现场的变化,采取用书面的形式进行修改。 2.建筑工程造价对于有效的抓好工程质量提供了合理的控制 在建筑工程行业中要不断的加强施工过程的有效控制,以及有效的抓好施工的工程质量,这两点是建筑工程的最基本的要求。而建筑工程造价在这里面就起到了有效的、合理的控制作用,建筑工程造价可以有效的、合理的控制建筑工程中的竣工后所建筑成功后的建筑物能够达到、符合国家的基本规范以及国家的标准要求。 3.建筑工程造价对于建筑工程中的各经济和责任具有重要的控制作用 建筑工程造价对于建筑工程项目经济起到了控制作用;建筑工程造价可以不断的、有效的对工程各个内部的岗位的责任进行有效的完善和明确;建筑工程造价对建筑工程的成本的控制,以及有效的降低造价都起到了非常重要的作用。 4.建筑工程造价对于建筑工程中的机械和材料起到了重要的管理作用 一般来说,建筑工程所有的材料费大约是占建筑工程造价的60%--70%,也就是说建筑工程中机械和材料的管理都能够影响建筑工程的造价,所以有效的控制好建筑工程的造价,就能够有效的管理好建筑工程的机械和材料。 5.控制好建筑工程造价可以有效的利用环境的资源 每一个需要进行实施建筑工程的周围环境对于实施建筑工程有着密切的、相关的影响,也就是说,在进行建筑工程施工之前要做好对周围环境的考察,要能够做到有效的利用好周围环境本身自带的资源(尤其是原材料的采购方面),然后根据不同的的周围环境的场地做好有效的、有意义的建筑工程施工前的准备。 二.目前建筑工程造价的管理和控制中存在的问题 目前我国建筑工程造价的管理和建筑工程造价的控制所存在的问题一般可以分为以下几点: 1.建筑工程招投标阶段所存在的问题 建筑工程在招投标阶段中有非常多的单位都会参加这个阶段的招投标,而且有些单位会特意在这个阶段中利用一种任意压价的手段来使建设工程的资金减少。因此,导致了有的单位会在低价的时候中标,然后在建筑工程施工的时候再弥补在招投标阶段中中标的差价,从而这些单位就会开始偷工减料等,进行降低工程质量的标准来进行施工。这样的一种做法不仅严重的影响了建筑工程造价的有利性,而且也严重影响了建筑工程造价的真实性。 2.建筑工程造价在投资、决策的阶段所存在的问题 建筑工程造价在投资、决策的阶段中所存在的问题一般可以从以下几点进行分析: 2.1 建筑工程造价在可行性的研究阶段中所存在的问题。所谓的可行性研究是指由两种建筑工程设计的单位进行对建筑工程实施的研究,并且要这两个单位一起根据研究的结果做一份研究报告出来,那么这两种单位就是:建筑工程设计的单位以及建筑工程勘察设计的单位。而建筑工程中的建设单位经常因为一些原因,从而有时就会影响到这些建筑工程的设计,例如:经常会要求建筑工程的建设单位降低投资的预

浅谈如何加强工程建设项目的投资控制

浅谈如何加强工程建设项目的投资控制 在实际的工程建设中,投资相关控制工作十分重要,由于其贯穿于整个项目的施工、设计以及决策和竣工过程中。投资控制的目标是在保证工程质量的前提下节省大量资金。 标签:投资控制;项目建设前期;工程实施阶段;竣工投产阶段 前言 对于工程投资控制,在实际的工程建设中关系到了整个工程的进程推进,会影响到整体工程的设计质量、施工质量。投资控制的目标是在保证工程质量的前提下节省大量资金。作为一名财政评审人员,通过多年的评审工作,作者认为应当对工程的投资进行全方位、全过程的动态控制监管,以此实现投资效益最大化。 1 前期控制 对投资的控制工作起始于项目决策阶段,这也是由于决策是决定整个项目发展方向的重要阶段,投资控制的前期主要是对项目决策进行控制,也是最为关键的环节。 对于我国来说,对于工程的前期造价控制不够重视,普遍会出现忽视现象,而将精力放到施工以及结算环节。虽然保证账目明细清晰、结算价款明确对于工程投资控制工作有一定的促进作用,但取得效果甚微。有效对工程造价进行控制,实际应当重视前期的投资控制,对于该阶段的控制主要起到未雨绸缪的作用,为确保设计质量且有利于投资控制,应大力推行设计招标,前期评审的介入,可通过合理的价值比较对方案进行选择以及经济分析、技术分析,对设计方案进行综合选择,保证方案的技术具有先进性,方案在经济上具有合理性,方案的功能和工艺具有全面性,同时又具有较高的性价比,满足工程造价控制需要。从中选出技术上先进、经济上合理,既能满足功能和工艺要求,又能降低工程造价的设计方案。 另外对通过招标选择的设计单位编制的概、预算实行先审核后实施的制度,对概、预算编制项目不完整,估算指标不合理,没有进行限额设计,概预算超计划投资的责成设计单位重新编制;但是在设计费的确定时,应按照国家规定的计费标准执行,不要人为压低设计费,打击设计单位的优化设计的积极性。 笔者认为要加强审查力度,尤其是对建设项目的投资估算、设计概预算的内容进行审查。通过此类审查将投资控制在源头。 2 工程实施阶段的投资控制 在工程实施阶段,造成工程投资难以控制的因素很多,主要体现在:设计变

工程项目管理的三大目标控制_兰丽萍

工程项目管理的三大目标控制 兰丽萍 摘 要:结合多年工程实践,就工程项目管理的核心内容,从工程项目的质量控制、进度控制和投资控制三方面,阐述了其三大目标控制的具体内容,并对其三者的关系作了分析。 关键词:质量控制,项目管理,进度控制,投资控制 中图分类号:TU721+.2文献标识码:A 1 概述 随着工程建设项目向大型化和复杂化的发展,工程项目管理在项目建设中起到越来越重要的作用,甚至关系到项目建设的成败。根据多年的工程实践,浅谈工程项目管理的核心内容———质量、进度和投资三大目标的控制。 2 工程项目目标的控制 2.1 工程项目质量控制 工程项目质量控制是指在力求实现建设项目总目标的过程中,为满足项目总体质量要求所开展的有关监督管理活动。工程项目的质量目标是指对工程项目实体、功能和使用价值以及参与工程建设的有关各方工作质量的要求或需求的标准和水平,也就是对项目符合有关法律、法规、规范、标准程度和满足业主要求程度做出的明确规定。 影响工程项目质量的因素很多,通常可以概括为人、机械、材料、方法和环境五个方面。工程项目的质量控制,应当是一个全面、全过程的控制过程,项目管理人员应当采取有效措施对这些因素进行控制,以保障工程质量。对人,要从思想素质、业务素质、身体素质等多方面综合考虑,全面控制;对机械,要根据工艺和技术要求,确认是否选用了合适的机械设备,是否建立了各种管理制度;对材料,要把好检查验收这一关,保证正确合理使用原材料、成品、半成品、构配件,并检查、确认、督促,做好收、发、储、运等技术管理工作;对方法,要通过分析、研究、对比,在确认可行的基础上确定应采用的优化方案、工艺、设计和措施;对环境,要通过指导、督促、检查,建立良好的技术环境、管理环境和劳动环境,以便为实现质量目标提供良好条件。 工程项目质量控制的工作重点应放在调查研究外部环境和系统内部各种干扰质量的因素上,要做好风险分析和管理工作,预测各种可能出现的质量偏差,并采取有效的预防措施。同时,要使这些主动控制措施与监督、检查、反馈,要发现问题并及时解决,发生偏差及时纠偏等控制措施有机结合起来,使工程项目质量始终处于项目管理人员的有效控制之下。 2.2 工程项目进度控制 工程项目进度控制是指在实现建设项目总目标的过程中,为使工程建设的实际进度符合项目进度计划的要求,使项目按计划要求的时间动用而开展的有关监督管理活动。工程项目进度控制的目标就是项目最终动用的计划时间,也就是工业项目负荷联动试车成功、民用项目交付使用的计划时间。由此可见,工程项目进度控制是对工程项目从策划与决策开始,经设计与施工,直至竣工验收交付使用为止的全过程控制。 工程项目进度目标不能按计划实现的原因有多种。例如,管理人员、劳务人员素质和能力低下,数量不足;材料和设备不能按时、按质、按量供应;建设资金缺乏,不能按时到位;施工技术水平低,不能熟练掌握和运用新技术、新材料、新工艺;组织协调困难,各承包商不能协作同步工作;未能提供合格的施工现场;异常的工程地质、水文、气候、社会、政治环境等。要实现有效的进度控制,必须对上述影响进度的因素实施控制,采取措施减少或避免其对工程进度的影响。 为了有效地控制工程项目进度控制,必须做好与有关单位的协调工作。组织协调是实现有效进度控制的关键,与工程项目进度有关的单位较多,包括项目业主、设计单位、施工单位、材料供应单位、设备供应厂家、资金供应单位、工程毗邻单位、监督管理工程建设的政府部门等等。如果不能做好与这些单位的协调工作,不建立协调工作网络,不投入一定力量去做联络、联合、调和工作,进度控制工作将是十分困难的。 2.3 工程项目投资控制 工程项目投资控制是指在整个项目的实施阶段开展管理活动,力求使项目在满足质量和进度要求的前提下,实现项目实际投资不超过计划投资。 工程项目投资控制不是单一目标的控制,而应当与工程项目质量控制的进度控制同时进行。项目管理人员在对工程投资目标进行确定或论证时,应当综合考虑整个目标系统的协调和统一,不仅要使投资目标满足业主的需求,还要使质量目标和进度目标也能满足业主的要求。这就需要在确定项目目标系统时认真分析业主对项目的整体需求,反复协调工程质量、进度和投资三大目标之间的关系,力求实现三大目标的最佳匹配。 在对工程投资控制的过程中,要协调好与质量和进度控制的关系,做到三大控制的有机结合。当采取某项投资控制措施时,要考虑这项措施是否对其他目标的控制产生不利影响。例如,当采用限额设计进行工程投资控制时,一方面要力争使实际的项目设计投资限定在投资额度内,同时又要保障项目的功能、使用要求和质量标准。这种协调工作在目标控制过程中是绝对不可缺少的。 此外,项目管理人员在控制工程项目投资时,应立足于工程项目的全寿命经济效益,不能只局限于项目的一次性费用。 3 工程项目管理三大目标的关系 工程项目的质量、进度和投资三大目标是一个相互关联的整体,三大目标之间既存在着矛盾,又存在着统一。进行工程项目管理,必须充分考虑工程项目三大目标之间的对立统一关系,注意统筹兼顾,合理确定三大目标,防止发生盲目追求单一目标而

浅谈工程项目成本管理与控制

龙源期刊网 https://www.doczj.com/doc/4b14905989.html, 浅谈工程项目成本管理与控制 作者:赵晓芳 来源:《科技创新与应用》2013年第36期 摘要:经济的发展带动了工程项目规模的不断增加,工程项目的实施过程中其管理是十 分重要的,当前一种全新的工程项目管理模式即工程总承包应运而生,并在建筑领域中予以广泛的应用,其不仅有效的缩短了工程建设的周期,同时对降低工程造价、减少纠纷,实现资源的优化配置起到了积极的作用。文章分析了工程总承包项目成本管理的内容,并进一步对工程项目成本控制的主要内容和要点进行了具体的阐述。 关键词:项目管理;成本管理;成本控制 前言 任何一项工程的建设,都是为了谋求其经济效益和社会效益的实现,而要保证其良好的经济效益,就要做好工程项目的成本管理和控制工作。这就需要在工程项目实施过程中,在保证工程质量的前提下采取各种组织、技术、经济、合同等措施,从而将成本有效的进行控制,使其不脱离成本的计划,并在控制成本的基础上,再进一步寻求节约成本的途径,从而保证项目的经济效益得以实现。 1 工程总承包项目成本管理的内容 工程实施过程中,其项目管理是十分必要的,其是保证工程能否顺利进行,及取得预期经济效益的关键。而在项目管理系统中最为重要的一个系统即为工程成本管理系统,其做为项目管理系统的子系统,包括了成本预测、计划、控制、核算、分析和考核的全过程,并在施工中以成本控制为核心,发挥着各自的作用,并在运转中有效的结合为一个统一的整体。 1.1 工程成本预测 通常在项目进行决策和计划时需要做好成本预测工作,这是项目决策和计划的科学依据,工程成本预测是通过对计划工期内的对成本的影响因素进行分析,并与近期已完工或即将完工的项目成本进行相互对比,从而预测出这些因素可能对工程成本所造成的影响程度,并对工程的总成本和单位成本进行预测,估算出工程项目所需要的总成本及单位成本。通过对工程成本预测,可以有效的满足施工企业和业主要求的前提下,尽可能的选择最佳的成本控制方案,并在施工中针对方案中较为薄弱的环节进行成本控制,使施工中成本控制具有科学的计划性和可预性,提高了控制的水平。 1.2 成本计划

浅谈建筑工程造价的控制与管理

郑州交通职业学院 毕业论文 论文(设计)题目:浅谈建筑工程造价的控制与管理 所属系别:建筑工程系 专业班级: 10级工程造价二班 姓名:赵宁 学号: 201008040460278 指导老师:夏春艳 撰写日期 2013 年 3 月

摘要 工程造价是对整个工程的所有项目投资进行估算,而工程造价的控制与管理始终贯彻于项目建设的全过程,是工程项目管理的核心部分,它能够在工程建设项目的全过程(投资决策、设计、招投标、施工阶段)中采取有效措施,把工程建设发生的全部费用控制在批准的限额内。建筑工程造价控制是建筑工程管理工作的重要组成部分。建筑工程造价管理工作的科学性、合理性、有效性是企业取得经济效益最大化的重要环节,工程造价在选择工程项目、签订工程合同、加强工程管理、提高企业利润方面发挥至关重要的作用。 本文针对建筑工程造价的重要性,造价管理贯穿于工程项目建设的全过程,并分阶段的对工程造价控制进行了探讨。分析阐述建设单位在工程项目的实施阶段造价管理的方法和措施。为加强工程造价的管理和控制,防止施工阶段决算超预算,避免建设项目投资失控,我们需强调合同管理、优化施工组织设计、加强工程直接费和工程变更的控制、增强索赔意识,在工程建设实施中,把工程造价实际额控制在限额以内。 关键词:工程造价,造价控制,造价管理,全过程,合同管理

Abstract Project cost is all the project investment estimate for the whole project, and always carry out project cost control and management in the whole process of project construction, is the core part of project management, it can be in the whole process of engineering construction projects, investment decision-making, design, bidding, construction stage) take effective measures, in the engineering construction of all cost control within the approved limit. Construction project cost control is an important part of construction project management work. Construction project cost management work of scientific nature, rationality, effectiveness is an important part of the enterprise economic benefit maximization, the project cost in engineering project, the project of engineering contract, strengthen management, improve corporate profits plays a vital role. In this paper the importance of the construction project cost, cost management throughout the whole process of project construction, and phases of the project cost control are discussed in this paper. Analysis in this paper, the construction unit in the implementation stage of the project cost management methods and measures. In order to strengthen the project cost management and control, to prevent the construction budget and final accounts to avoid construction project investment out of control, we need to emphasis on contract management, optimizing the construction organization design, strengthening project direct cost and engineering change control, strengthen the consciousness of the claim, in the implementation of the project construction, control the project cost the actual amount within the quota. Key words: The project cost, cost control, cost management, whole process, the contract management

工程项目投资控制的分析

题目:工程项目投资控制的分析专业:土木工程(工程管理)学号: 姓名: 指导教师: 学习中心: 2014 年 5 月25日

院系网络教育学院专业土木工程(工程管理)本科 年级学号姓名 学习中心指导教师 题目 指导教师 评语 是否同意答辩过程分(满分20) 指导教师(签章) 评阅人 评语 评阅人(签章) 成绩 答辩组组长(签章) 年月日

毕业论文任务书 班级学生姓名学号 发题日期:2014 年 2 月26 日完成日期:2014 年5 月 6 日 题目工程项目投资控制的分析 1、本论文的目的、意义长期以来,我们普遍把工程项目投资控制的重心放在建设的实施阶段——施工 图预算、决算的审核上。要完整有效的控制工程造价,取得投资效益的最优化,还必须在项目决策阶段、 设计阶段、实施阶段对工程造价实施全过程控制。 2、学生应完成的任务 第一步:在全面掌握有关理论的基础上积极着手收集资料,拟定该论文大纲; 第二步:依据指导老师修改后的论文提纲撰写论文; 第三步:向指导老师提交论文初稿; 第四步:依据老师的指导对论文进行反复修改; 3、论文各部分内容及时间分配:(共 10 周) 第一部分收集相关资料,阅读理解( 2 周) 第二部分确定题目,拟定设计大纲( 3 周) 第三部分撰写论文,修改( 3 周) 第四部分定稿, ( 2 周) 第五部分( 周) 评阅或答辩( 周) 4、参考文献 [1] 左小德项目投资管理学[M].广州:暨南大学出版社,1997. [2] 彭烨.关于建设项目工程造价的有效控制[J].建筑管理现代化,2008 [3] 林国胜.关于工程造价目标过程控制的思考.基建优化,2010,26(2). [4] 周桂荣.惠恩才编著.成功项目管理模式.北京:中国经济出版社,2006 [5]刘伊生编著.建设项目管理(第二版).清华大学出版社、北京交通大学出版社,2004. [6]王伟. 基于全过程造价管理理念下的施工阶段工程造价动态控制研究[D]. 昆明理工大学, 2008,(9).

浅谈建设项目各阶段的投资控制

浅谈建设项目各阶段的投资控制 摘要: 建设项目投资控制是从投资决策阶段、设计阶段、建设实施阶段到决算阶段。建设项目的投资控制与管理是一个动态的过程,只有做到各方综合平衡,投资控制工作才能直接、有效。 关键词:投资控制招标合同签证工程造价 建设项目投资控制是从投资决策阶段、设计阶段、建设实施阶段到决算阶段。把建设项目的投资控制在批准的投资限额以内,随时纠正发生的偏差,以保证项目投资管理目标的实现,以求在建设项目中能合理使用人力、物力、财力,取得较好的投资效益和社会效益。建设项目的投资控制与管理是一个动态的过程。它的目标应是随着建设项目实践的不断深入而分阶段设置,应是严肃的、有科学的依据。根据多年的学习和在工作中的实践经验,浅谈一下个人在投资控制工作中的体会。 一、施工以前的投资控制 1、可行性研究阶段 一个建设项目首先要进行可行性研究,即先对与该项目有关的技术、经济、环境等方面进行调查研究。对项目各种可能的拟建方案认真地进行技术、经济分析、论证,研究项目在技术上的先进适用性,在经济上的合理性和建设上的可能性。 2、设计阶段 优化设计工作的推行,可以有效防止由于设计阶段投资控制失去目标,而给施工阶段乃至整个建设项目的投资控制带来不利影响。 二、建设项目招标阶段的投资控制 1、在进行项目招标时应注意与加强以下几项工作 (1)招标工作应遵循公平,公开,公正,诚信的原则。避免造成一级企业转包,二级企业进场等不正常现象,这对项目投资控制非常不利。 (2)做好招标文件的编制工作。造价管理人员应收集、积累、筛选、分析和总结各类有价值的数据、资料,对影响项目投资的风险因素进行预测、鉴别、分析、评价,然后编制招标文件。 (3)合理低价者中标。目前推行的工程量清单计价报价与合理低价中标。应杜绝一味寻求绝对低价中标,以免造成低于成本价恶意竞争。

浅谈工程项目成本控制论文

浅谈工程项目成本控制 【内容摘要】工程项目是施工企业效益的源泉。随着市场竞争越来越激烈,项目的利润空间也越来越小。如何加强项目的成本控制,有效降低工程成本,提高企业的经济效益,已成为企业目前非常紧迫的任务。成本管理的水平,已成为施工企业的核心竞争力。本文以企业的角度,阐述了如何在项目建设过程中控制好成本,指出了当前施工企业项目成本控制中存在的主要问题,并对解决这些问题进行了粗浅的探讨。 【关键词】工程项目成本控制原则措施

随着施工企业市场的竞争加剧,如何搞好成本控制,使经济效益最大化已经成为施工企业提高自身竞争力的重要途径。但很多施工企业还没有意识到成本控制的重要性,没有将成本控制工作落到实处,或者是成本控制的体系不够完善,致使工程项目施工过程中出现了很多浪费,增加了工程项目的成本。这必将导致施工企业利润的减少,减少企业的内部积累,也会降低施工企业的竞争力,从而阻碍企业的长远发展。当前,我国经济迅速发展,每年的项目投资多达万亿元,含盖了经济、文化、科教、国防、民生等所有重要领域。工程项目成本控制,是指在项目成本的形成过程中,对生产经营所消耗的人力资源、物质资源和费用开支,进行指导、监督、调节和限制,及时纠正将要发生和已经发生的偏差,把各项生产费用控制在计划成本的范围之内,保证成本目标的实现。施工项目成本控制的目的,在于降低项目成本,提高经济效益。 一、工程项目成本控制的特点 (一)工程项目成本概述 工程成本是指施工企业以工程项目作为成本核算的对象,在施工过程中,所耗费的生产资料,转移价值和劳动者的必要劳动,所创造的价值的货币形式,或者说是工程项目在施工过程中,所发生的全部生产费用的总和。 按成本的经济性质,工程成本可以分为直接成本和间接成本。直接成本指施工过程中,耗费构成的工程实体,包括人工费用、材料费用、机械使用费用、其它直接费用;间接成本指企业内部为组织和管理工程施工所发生的全部支出,包

浅谈建设监理在工程投资控制中的作用(doc 8页)

浅谈建设监理在工程投资控制中的作用(doc 8页)

建设监理在工程投资控制中的作用 moussin 发表于 2006-6-26 23:31:00 [出自:] 【摘要】通过分析工程建设各阶段对建设投资的影响,提出了建设监理在投资控制中应全过程地发挥作用。 我国固定资产投资领域内概算超估算、预算超概算及决算超预算是一种普遍的现象。造成这种问题的原因有很多,归纳起来主要有两个方面:一是投资目标确定不合理;二是在实施过程中未能进行有效的全过程控制。笔者认为全过程开展监理是投资控制的一种有效方法。建设监理制在全国范围内推广以来,对扭转建设项目投资失控现象起到了一定的作用,但普遍存在的“重阶段监理,轻其它阶段监理;重施工监理,轻投资、监理;重技术方面,轻经济方面和方面”等现象,

使建设监理制在投资控制方面还未充分发挥它的作用。本文就建设监理如何在投资控制中充分发挥应有的作用谈谈自己的观点。 一般来讲,建设各阶段对建设投资的影响,如图1所示: 从图1可以看出,施工阶段费用高出设计阶段很多,设计阶段费用也高于决策阶段,但各阶段对投资额的影响大小却恰恰相反。项目决策阶段决定修建或不建、建什么样的规模和标准等对投资的影响是最大的,设计阶段路线选线、结构类型等对投资影响也较大,到施工阶段投资大小已基本确定,但由于施工阶段是大部分资金的使用阶段,也应加强管理,进行投资控制。 1项目决策阶段 项目决策阶段是决定项目有无的阶段,其决策的正确与否直接关系到投资的成败,因此该阶段应成为我们控制投资的重点阶段。投资决策应以项目可行性研究为依据,在尊重客观现实的基础上,对项目的技术、经济、财务等方面进行综合分析,正确确定项目在这个阶段的投资目标即投资估算,打足投资,对设计概算起到控制和指导作用,

对建筑工程施工成本控制的浅析

对建筑工程施工成本控制的浅析 前言 在市场经济条件下,面对当前竞争日趋激烈的建筑市场,如何强化和完善成本控制,不断提高施工企业管理水平,从而节约成本,实现企业经济效益最大化,是所有建筑工程施工企业的共同目标。然而,目前部分施工企业仍然没有充分意识到成本控制的重要性,未将成本控制工作落到实处,致使工程项目成本居高不下,企业利润低下,削弱了施工企业的竞争力,无法实现企业利润最大化。为此,施工企业不断强化和完善成本控制势在必行。 建筑工程施工成本控制,是指在项目成本的形成过程中,对工程施工过程中所消耗的人力资源、物质资源和费用开支,进行指导、监督、调节和限制,及时纠正将要发生和已经发生的偏差,把各项施工费用控制在成本控制方案的范围内。工程项目成本控制是施工企业管理的重要内容,那么,如何保证成本控制实现施工企业的最低成本,确保经济效益最大化,从而提高企业市场竞争力,是众多施工企业共同关注和急待解决的关键问题。基于此,笔者结合多年建筑工程施工成本的控制经验,在正确认识成本控制重要性的基础上,结合工程项目成本控制过程中的各重要影响因素以及环节,浅谈如何提高工程项目成本控制水平。 1 工程成本控制是项目管理的要求 工程项目的成本控制与管理,是指施工企业在工程项目施工过程中,将成本控制的观念充分渗透到施工技术和施工管理的措施中,通过实施有效的管理活动,对工程施工过程中所发生的一切经济资源和费用开支等成本信息系统地进行预测、计划、组织、控制、核算和分析等一系列管理工作,使工程项目施工的实际费用控制在预定的计划成本范围内。由此可见,工程施工成本控制贯穿于工程项目管理活动的全过程和各个方面,包括项目投标、施工准备、施工过程中、竣工验收阶段,其中的每个环节都离不开成本管理和控制。 由此可见,工程项目成本控制是项目管理的要求,也是施工企业管理的重要内容。它是技术、经济与管理的有机结合,是工程项目中参与人员、材料、方法、技术等的互动,是全员参与的系统工程。要想科学、合理、有效地进行工程项目成本控制,企业必须强化和完善成本控制核算制度,进一步加强项目管理部的管

浅谈建筑工程造价管理的问题及对策分析

浅谈建筑工程造价管理的问题及对策分析 发表时间:2012-12-18T10:56:57.717Z 来源:《建筑学研究前沿》2012年8月under供稿作者:王艳双 [导读] 不同阶段对建筑工程造价的影响不同。本文主要谈的是建设期造价管理工作中的问题及对策分析。 王艳双辽宁中成建正工程管理咨询有限公司 110013 摘要:建筑工程造价管理是贯穿于工程建设项目生命周期的全过程造价管理,工程建设项目生命周期按国际工程管理界习惯的定义分为三阶段:项目前期管理阶段:项目的决策期;建造期或建设期管理阶段:项目的工程设计期与施工期;项目后期管理阶段:项目竣工后的保修期。不同阶段对建筑工程造价的影响不同。本文主要谈的是建设期造价管理工作中的问题及对策分析。 关键词:建筑工程;造价管理;问题;对策 Discussion on the construction project cost management problems and Countermeasures Analysis Wang Yanshuang Liaoning into the Jianzheng project management consulting company limited 110013 Abstract: the construction project cost management is perforative at project project life cycle cost management in the whole process of construction project life cycle, according to the international project management community definition of habit is divided into three stages: early stage of project management: project decision making stage; the construction period and construction period management stage: Project Design stage and construction stage late stage; project management: project after the completion of the warranty period. Different stages of construction project cost and the effects of different. This paper is mainly about the construction cost management problem and countermeasure analysis. Key words: Construction Engineering; cost management; problem; countermeasure 一、引言 环保,节能,可持续发展是近年来出现在我国各类政府工作报告中的流行语,住房建设作为我国第三产业的主要支柱在目前市场经济中占据重要位置,建筑工程造价管理在市场经济中日趋重要,政府对工程造价的管理也日趋重视,特别是项目周期的全过程控制。 二、我国建筑工程造价管理中存在的问题 1、无法在设计阶段进行有效的工程造价的事前管理 在设计阶段,施工单位和监理单位往往都还没有明确,所以在设计阶段无法发挥各相关单位之间的优势互补进行有效的工程造价管理事前控制,一般都是由设计单位单独完成的,而很多设计人员是没有现场施工经验的,在工作中也很少下工地,设计都是根据”天书”来设计的,设计出来的施工大样往往不能顺利完成施工,现在标准化设计图册虽然可以解决一些常用的施工大样,但是随着生活水平的提高,个性的设计越来越多,很多设计大样到了真正要放线施工时才发现问题,变更索赔就自然无法避免。也有的是设计人员挂靠一些设计单位进行跨专业设计,本人曾在工作中碰到园林专业的人员设计一些园建工程,地梁基础就直接设计在土层表面,在实际施工中就必须进行设计变更,工程造价变化自然就很大;再就是设计深度不够的问题,现在的建筑结构往往不是单一的,常见的如体育馆主体结构往往是采用框架结构,屋面通常会采用钢结构,由于专业细分,很多建筑设计院往往没有钢结构设计资质,设计图纸中最常见的一句话是,由专业施工单位细化等字样,自然只有中标的施工单位才会对专业工程进行施工细化,在施工时就会产生很多变更,事前工程造价控制就成为纸上谈兵。在设计阶段,施工单位和监理单位往往都还没有明确,所以在计阶段无法发挥各相关单位之间的优势互补进行有效的工程造价管理事前控制。 2、招标控制价不能如实反映项目所在地的实际工程造价 在招投标管理中招标控制价及合理低价中标是比较普遍的做法,招标控制价应是项目工程造价的实际反映,我国很多采用招标控制价进行招投标的工程在竣工结算时往往偏离都很大,除去因设计问题引起造价变更之外,在编制招标控制价编制本身也存在许多问题。人、章分离是这个行业的普遍现象,这使的许多刚参加工作的人员在未取得造价员执业资格的情况下也能进行独立的招标控制价编制。对于刚参加工作的造价专业的员工来说,很多人连图纸都不能完全读懂,很容易出现缺项、漏项的情况;闭门造车也这个行业的特点之一,很多造价人员在读完书后就直接进入造价行业,他们的造价知识都是只是来自书本,根本不懂施工工序,所以在招标控制价里我们还可以经常见到清单的设置很不合理的情况,很多清单的单价与市场也严重不符,造价人员基本上都是通过一系列的书本去完成定价工作,主材价格基本上来自由政府编制的材料指导价,很多主材的价格与市场价相差甚远,对于指导价里没有的品牌材料通常也会通过中介询价机构获得;造价公司管理水平的高低也是影响招标控制价质量的因素之一,造价咨询行业的成本主要是人力成本,在经营成本里占60%左右,为降低经营成本,一专多能是必须的,在职造价工程师数量比例往往偏低,有些造价公司的三级审核形同虚设。 3、施工实施阶段的工程造价管理现状 在施工阶段参与建设的相关单位都已明确,施工过程中的造价控制主要是由甲方聘请的监理公司及造价咨询公司来完成,在政府投资的项目中,监理公司及造价咨询公司的服务并不是完全的市场行为,工程结算造价是监理公司及造价咨询公司收费的计算基础,工程变更多工程造价自然就会增加,而服务费自然也是水涨船高,所以监理公司及造价咨询公司对此类工程造价控制的积极性不高,并且此类工程项目的的变更也是非监理和造价咨询单位可以控制的,甲方变更是领导的意志,乙方变更也要看甲方的态度。施工阶段的工程造价事前控制一般是在工程中标后的施工准备阶段进行,认真做好施工组织设计方案的优化可以节约工程造价,目前施工单位挂靠现象仍然很多,施工单位一般不会主动优化或者是根本没有能力去优化。即使参与建设的相关单位能提供优化方案,但是他们也很难分享优化后取得的增值价值,反而只是增加了自身的工作量。目前开工前报批的施工组织设计方案大部分都是走过场,并没有很大的实际作用。开发商对工程造价成本是很重视,但是由于自身管理模式的限制,很改变现状。这两年有些开发商也开始外聘造价咨询公司为其提供造价服务,但是价格被压的很低,也很难调动造价人员提供更多的增值服务。 三、关于规范建筑工程造价管理的几点建议 1、加强招投标的监管力度,进一步完善市场经济 建设行政主管部门要加强对执法队伍的管理,不断提高执法人员的业务素质,完善监督机制。很多政府投资为主体的业主单位都有自己的服务单位库,没有进入该单位的企业库就无法承接该单位的项目,形成小圈子,小气候,甚至可以规避招投标,采取企业库内部邀请招标

浅谈建设工程投资控制方法

浅谈建设工程投资控制方法 [摘要] 建设工程投资控制贯穿于项目建设的全过程。本文从投资决策、设计、实施三个方面简要介绍了投资控制的方法。通过各阶段投资控制,把建设工程投资控制在批准的投资限额以内,随时纠正发生的偏差,以保证项目投资管理目标的实现,以求在建设工程中能合理使用人力、物力、财力,取得较好的投资效益和社会效益。 [ 关键词] 建设; 工程投资; 控制方法 引言 建设项目投资控制,就是在投资决策阶段、设计阶段、施工准备阶段和施工阶段等项目实施全过程,合理使用人力、物力、财力.把建设项目投资的发生控制在批准的投资限额以内,并随时纠正发生的偏差,保证项目投资目标的实现。建设项目的投资控制贯穿于项目的全过程,一般情况下大致可分为立项决策、设计及准备、实施及完工、投产交付四个阶段。做好各阶段投资控制,把工程建设项目的投资控制在批准的投资限额以内,随时纠正建设项目投资过程中发生的偏差,确保工程建设项目投资目标的实现,做到在各个项目中能合理地使用人力、物力、财力,以其得到投资的最佳经济效益和社会效益。 一、项目投资决策阶段 工程建设项目的各项技术经济决策,对项目的工程造价有重大影响,特别是建设标准水平的确定、工艺的选择、设备选用等,都直接关系到工程造价的高低。据有关资料统计,在项目建设各阶段中,投资决策阶段对工程造价的影响程度最高,可达到70%-80%。因此,项目投资决策阶段的造价控制是决定工程造价的基础,它直接影响着各个建设阶段工程造价的控制是否科学合理。只有加强项目决策的深度,采用科学的估算方法和可靠的数据资料,合理地计算投资估算,细致做好投资估算,才能保证其它阶段的造价被控制在合理范围,使投资控制目标能够实现。所以要切实做到以下几点: 1、认真搜集有关资料,积极做好项目决策前的准备工作。 2、切实做好项目可行性研究报告,合理确定工程的规模及标准。 3、科学进行工程项目的效益分析,编制工程投资估算。 二、工程设计阶段 工程项目设计质量的好坏直接影响着工程的建设质量、投资的回报和工程的效益。 1、积极推行设计招标